Loading...
HomeMy WebLinkAbout100 N Laurel St - Building CITY OF PORT ANGELES DEPARTMENT OF COMMUNITY DEVELOPMENT - BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 Application N~mber ..... 03-00000677 Date 7/15/03 Property Address ...... 100 N LAUREL ST MISC A~EEESOR PARCEL NUM~ER~ 06-30-00-5-1-3155-0000- Tenant nbr, name ...... FARMERS MARKET ON LAUREL Application description . . . SIGNS subdivision Name ...... Property Zoning ....... Appllcation valuation ..... 800 Owner Contractor CITY~0F PORT ANGELES OWNER PO DOX 1150 PORT ~ANGELES WA 983620217 Per,it ...... SIGN Additional desc . . Permit Fee .... 60.00 Plan Check Fee . . .00 Issue Date .... 7/15/03 Valuation .... 800 Expiration Date .., 1/12/04 Qty Unit Charge Per Extension 2.00 30.0000 PER S- SIGN LES THAN 25 SP 60.00 Fee summary Cha~ged Paid Credited Due ~ Per~it Fee Total 60.00 60.00 .00 .00 Plan Check Total .00 .00 ,00 ,00 Grand Total 60.00 60.00 .00 .00 ISeparate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned for a period of f 80 days after the work as commenced, or if required inspections have not been requested within 180 days from the last inspection, I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of dp~nstruction.~ % ~.~d,'~/~._ ~. y./~L/L.,..~ .~' J -- Signature of Owner (if owner is builder) Date