Loading...
HomeMy WebLinkAbout1307 Marie View Dr - Building CITY OF PORT ANGELES  P~LIC WOKS BUILDING DWISION 321 EAST 5TH ST~ET, PORT ANGELES, WA 98362 DUII_I. JII~ I-'t'l~l~lJr ISSUED: 3/06/2002 PERMIT NO: 13266 OWNER/APPLICANT PROPERTY LOCATION KEN SINGHOSE 1307 MARIE VIEW DR 1307 MARIE VIEW DR Lot: SEABREEZE DIV 1 LT 25 Port Angeles, WA 98362 Block: [] Long Legal 360/457-4406 Subdivision: HIGHLAND HILLS T: S: Parcel No: 063001540230000 CONTRACTOR ARCHITECT GREAT NORTHWEST ENTERPRISES N/A PO BOX 2963 Port Angeles, WA 98362 , 98360-0000 206/452-9518 360/000-0000 PROJECT INFO Project Value: $2,870.00 SFD Units: 0 Commercial: 0 Project Type: RE-ROOF SFD SQ FT: 0 Industrial: 0 Occupancy Type: Garage: 0 Occupancy Group: MFD Units: 0 Construction Type: MFD SQ FT: 0 Zoning Use: PROJECT NOTES TEAR OFF, SHEET, FELT, COMP. RECEIPT~801 FEES ASSESSMENT Building Permit: $83.25 Misc Fee 1: $0.00 Plan Check: $0.00 Misc Fee 2: $0.00 State Surcharge: $4.50 Misc Fee 3: $0.00 House Moving: $0.00 Manufactured Home: $0.00 Sign: $0.00 TOTAL FEE: $87.75 Plumbing: $0.00 AMOUNT PAID: $87.75 Mechanical: $0.00 BALANCE DUE: $0.00 Radon: $0.00 Separate Permits are required for electrical work, S EPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes! null and void if work or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned for a pedod of 180 days after the work as commenced, or if required inspections have not been requested within 180 days from the last inspection, I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. Signature of Contractor or Authorized Agent Date Signature of Owner (if owner is builder) Date BUILDING PERMIT INSPECTION RECORD CALL 417-4815 FOR BUILDING INSPECTIONS. PLEASE PROVIDE A MINIMUM 24 HOUR NOTICE. ITIS UNLAWFUL TO COVER, INSUL4 TE OR CONCEAL ANY 14/ORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT IN A CONSPICUOUS LOCAT1ON~ KEEP PERMIT CARD AND APPROVED PLANS AT JOB SITE INSPECTION TYPE I DATE [YEsACCEPTEDI NO COMMENTS FOUNDATION: FOOTINGS WALLS FOUNDATION DRAINAGE ELECTRICAL (LIGHT DEPT) SEPARATE PERMIT: # PLUMBING UNDER FLOOR / SLAB ROUGH-IN WATER LINE GAS LINE BACK FLOW / WATER AIR SEAL FRAMING JOISTS / GIRDERS SHEAR WALL WALLS / ROOF / CEILING DRYWALL T-BAR INSULATION MECHANICAL HEAT PUMP WOODSTOVE / PELLET/CHIMNEY / INSERT HOOD/DUCTS PW UTILITIES / SITE WORK ( Engineerlng Division) SEPARATE PERMIT #'s: WATERUNE / METER SEWER CONNECTION SANITARY STORM PLANNING DEPT. SEPARATE PER. MIT#'s SEPA: PARKING/LIGHTING ESA: LANHSCAPING SHORELINE: FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE RESIDENTIAL DATE YES NO COMMERCIAL DATE ACCEPTED YES NO ELECTRICAL - LIGHT DEPT. 417-4735 ELECTRICAL LIGHT DEPT CONSTRUCTION R.W. / PW/ CONSTRUCTION - R.W. ENGINEERING 417-4807 PW / ENGINEEP-]NG FIRE 417-4653 FIRE DEPT. BUILDING 417-4g15 // ~/ BUILDING C:~APPL.WPD a"~' CITY OF PORT ANGELES °~ PUBLIC WORKS - BUILDING DIVISION 321EAST 5TH STREET, PORT ANGELES, WA 98362 BUILDING PERMIT ISSUED: 9/18/2001 PERMIT NO: 12975 OWNER/APPLICANT PROPERTY LOCATION 1307 MARIE VIEW DR KEN SINGHOSE 1307 MARIE VIEW DR Lot: SEABREEZE DIV 1 LT 25 Port Angeles, WA 98362 Block: [] Long Legal 360/457-4406 Subdivision: HIGHLAND HILLS T: S: Parcel No: 063001540230000 CONTRACTOR ARCHITECT PELLET HEAT CO. N/A 230 "C" E. 1ST STREET Pod Angeles, WA 98362 , 98360-0000 360/457-1649 360/000-0000 PROJECT INFO Project Value: $2,205.00 SFD Units: 0 Commercial: 0 Project Type: LP GAS / APPL SFD SQ FT: 0 Industrial: 0 Occupancy Type: RESIDENTIAL Garage: 0 Occupancy Group: MFD Units: 0 Construction Type: MFD SQ FT: 0 Zoning Use: PROJECT .OTES INSTALLATION OF A FREESTANDING STOVE, GAS PIPING, AND TANK SET, TANK SET BY PETTIT OIL RECEIPT # 8086 FEES ASSESSMENT Building Permit: $0.00 Misc Fee 1: $0.00 Plan Check: $0.00 Misc Fee 2: $0.00 State Surcharge: $0.00 Misc Fee 3: $0.00 House Moving: $0.00 Manufactured Home: $0.00 Sign: $0.00 TOTAL FEE: $35.00 Plumbing: $0.00 AMOUNT PAID: $35.00 Mechanical: $35.00 BALANCE DUE: $0.00 Radon: $0.00 Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, pdvate and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned for a peded of 180 days after the work as commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All previsions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. Signature of Contractor or Authorized Agent Date Signature of Owner (if owner is builder) Date BUILDING PERMIT INSPECTION RECORD CALL 417-4815 FOR BUILDING INSPECTIONS. PLEASE PROVIDE A MINIMUM 24 HOUR NOTICE. ITI$ UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT IN A CONSPICUOUS LOCATION. KEEP PERMIT CARD AND APPROVED PLANS AT JOB SITE INSPECTION TYPE I DATE I ACCEPTED COMMENTS YES I NO FOUNDATION: FOOTINGS WALLS FOUNDATION DRAINAGE ELECTRICAL (LIGHT DEPT) SEPARATE PERMIT: # PLUMBING UNDER FLOOR / SLAB ROUGH-IN WATER LINE GAS LINE [o -2T-o~ '- ~ ¼ BACK FLOW / WATER AIR SEAL CEILING FRAMING JOISTS / GIRDERS SHEAR WALL WALLS / ROOF / CEILING DRYWALL T-BAR INSULATION WALL / FLOOR / CEILING MECHANICAL HEAT PUMP WOODSTOVE / PELLET/CHIMNEY / INSERT HOOD/DUCTS PW UTILITIES / SITE WORK (Engin~ring Division) SEPARATE PERMIT #'s: WATEKLINE / METER SEWER CONNECTION SANITARY STORM PLANNING DEPT SEPARATE PERMIT #'s SEPA: PARKING/LIGHTING ESA: LANDSCAPING SHORELINE: FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE RESIDENTIAL DATE YES NO COMMERCIAL DATE ACCEPTED YES NO ELECTRICAL - LIGHT DEPT. 417-4735 ELECTRICAL LIGHT DEPT CONSTRUCTION R.W. / PW/ CONSTRUCTION - R.W. ENGINEERING 417-4807 PW / ENGINEERING BUILDING 417-4815 I ~'~'~- (~ ~ ~IC~- BUILDING FROM : SPA SHOP-PELLET HEAT CO FAX NO. : 3604520503 Sep. iS 2001 02:09PM P1 BUILDING PE~IT - APPLICATION CITY OF PORT ANGELES DEPARTMENT OF PUBLIC WORKS ........... INSPECTION REPORT ........... REQUEST:, Date /0/~/0/-- I Time Receivedby ~- 2 Location of Work to be inspected f ~_~--~ Name of person requesting inspection (~(~¢ [_ ~'[ ~(~'~'~l~- Address of person requesting inspection Phone Type of Inspection (circle appropriate one): Plumbir~ ~nal ewer Excav. Sewer Foundation Framing Chimney INSPECTION NOTES: ~,/ ~.~ ,. Inspected: Date ~)' ~ ~ Time By Remarks: RESTORATION REQUIRED ...... YES. NO SURFACE RESTORATION: SURFACE TYPE: [] Unimproved []Gravel I~Asphalt I-~PCC ~[Other [] Repaired by City Work Order # ~] Repaired by Permittee [] COMPLETE []No Damage Found [] INCOMPLETE (Continue on reverse side if necessary) STREET SUPERINTENDENT {DATE)