HomeMy WebLinkAbout3630 ORDINANCE NO. (o?J 0
AN ORDINANCE of the City of Port Angeles, Washington
amending sections of Chapter 13.12 of the Port Angeles Municipal
Code relating to electric utility rates.
THE CITY COUNCIL OF THE CITY OF PORT ANGELES DO HEREBY ORDAIN
AS FOLLOWS:
Section 1. Ordinance 2054 as amended, and Chapter 13.12 of the Port Angeles Municipal
Code relating to electric utility rates are hereby amended by amending sections of Chapter 13.12
as follows:
CHAPTER 13.12–ELECTRICITY–SERVICES AND RATES
13.12.030 - Schedule R-03—Residential service.
A. Applicability. This schedule applies throughout the City for domestic uses in single family
residences, individual apartments or farms. Separately metered services incidental to single
family residential and farm service may be served under this schedule.
B. Character of service. Sixty cycle, alternating current, 120/240 volts nominal, single phase
service will be furnished under this schedule, supplied through a single meter and one point
of delivery.
C. Uniform rate effective January 1, 24M2020:
1. The non discounted Rbase charge is $20.10$22.62 per month.
2. The non discounted Eenergy charge is $0.0809$9.07102 per kWh.
3. The 25% discount base charge is$16.97 per month.
4. The 25%discount engM charge$0.05326 per kWh.
5. The 35% discount base charge is $14.70 per month.
6. The 35%discount energy charge is $0.04616 per kWh.
D. Uniform rate effective January 1, 2021:
1. The non discounted base charge is $25.24 per month.
2. The non discounted energy charge is $0.06945 per kWh.
1
3. The 25% discount base chargee is $18.93 per month.
4. The 25% discount energy charge $0.05209 per kWh.
5. The 35% discount base charge is $16.40 per month.
6. The 35% discount energy charge is $0.04515 per kWh.
13.12.040 - Schedule GS-03—General service.
A. Applicability. This schedule applies to all accounts not covered by other rate schedules with
the following types of service:
1. 120/208 or 120/240 volts, single or three phase, service panel of 400 amps or smaller.
2. 240/480 or 277/480 volts, three phase, service panel of 200 amps or smaller.
3. Municipal traffic signal and street lights. The base charges for municipal traffic signals
and street lights includes maintenance of existing luminaries and controls by the Public
Works and Utilities Department.
4. Municipal emergency management systems. The municipal emergency management
system and City's security cameras base charge shall apply to systems with a normal
operating load of 150 watts or less, which shall not be required to be metered.
5. Cable television system and other communications systems, single phase power supplies
in accordance with Section 10.2 of Ordinance No. 3116.
6. Pole attachment fees. City-owned unmetered security camera system and wireless access
points shall be exempt from PAMC 13.14.040.
B. Character of service. Sixty-cycle, alternating current at such phase and voltage as the City
may have available will be furnished under this schedule, applied through a single meter and
one point of delivery.
C. Uniform rate effective January 1, 2-W8 2020:
1. Base charge:
a. Single phase $2.84 28.87 per month.
b. Three phase $64€x169.83 per month.
c. Municipal traffic signal $231.28 258.31 per month.
d. Municipal street light $!66.49 186.01 per month.
e. Municipal emergency management system $36-3 39.25 per month.
f. City's unmetered security camera system $3-.64 4.07 per month.
g. Municipal single phase $28.67 per month.
2
h. Municipal three phase $69.44 per month.
i. Federal single phase $28.57 per month.
j. Federal three phase $69.10 per month.
2. Energy usage charge: $9764 per kWh, except, >1^.,,0.,0., mun pal *r-^ffi^ signa4s an
stfeet li.9 s ener-gy ehar-ge shat be $0.0821 per i. V perthe list below
a. Single phase $0.06487 per kWh
b. Three phase $0.06855 per kWh
c. Municipal single phase $0.07150 per kWh
d. Municipal three phase $0.08615 per kWh
e. Municipal street light and traffic signals $0.07150 per kWh
f Federal single phase $0.06419 per kWh
g. Federal three phase $0.06720 per kWh
D. Uniform rate effective January 1, 2021.-
1.
021:1. Base charge:
a. Single phase $31.90 per month.
b. Three phase $75.22 per month.
c. Municipal traffic signal $285.41 per month.
d. Municipal street light $205.53 per month.
e. Municipal emergency management system $43.37 per month.
f. City's unmetered security camera system $4.50 per month.
g. Municipal single phase $31.20 per month.
h. Municipal three phase $73.74 per month.
i. Federal single phase $31.57 per month.
i. Federal three phase $74.43 per month
2. EneM usage charge: per kWh, per the list below
a. Single phase 50.06330 per kWh
b. Three phase $0.06650 per kWh
c. Municipal single phase $0.06945 per kWh
d. Municipal three phase $0.08268 per kWh
e. Municipal street light and traffic signals $0.06945 per kWh
3
1"'V
f. Federal single phase $0.06264 per kWh
g. Federal three phase $0.06519 per kWh
13.12.041 - Schedule GD-03—General service demand.
A. Applicability. This schedule applies to all not covered by other rate schedules with the
following types of service:
1. 120/208 or 120/240 volts, single or three phase, service panel larger than 400 amps.
2. 240/280 or 277/480 volts, three phase service panel larger than 200 amps.
B. Character of service. Sixty cycle, alternating current at such phase and voltage as the City
may have available will be furnished under this schedule, applied through a single meter and
one point of delivery.
C. Uniform rate effective January 1, 24M 2020:
1. Base charge:
a. Single phase $54.34 60.08 per month.
b. Three phase $13 5.91 140.08 per month.
c. Municipal Single phase $62.52 per month.
d. Municipal Three phase $139.84 per month.
e. Federal Single phase $59.45 per month.
f._ Federal Three phase $138.61 per month.
2. Energy usage charge: S$541 per kWh per the list below.
a. Single phase $ 0.5313 per kWh.
b. Three phase $0.05245 per kWh.
c. Municipal single phase $0.05664 per kWh.
d. Municipal three phase $0.05211 per kWh.
e. Federal single phase $0.05257 per kWh.
f. Federal three phase $0.05142 per kWh.
3. Billing demand:
a. Billing demand for each month shall be based on kVA (apparent power).
b. Demand usage charge: $4.62 4.174 per kVA of billing demand.
4
/^"V
4. Uniform rate effective January 1 2021:
1. Base charge:
a. Single phase $66.27 per month.
b. Three phase$144.82 per month.
c. Municipal Single phase $69.76 per month.
d. Municipal Three phase $144.33 per month.
e. Federal Single phase$65.58 per month.
f. Federal Three phase$143.30 per month.
2. EneM usage charger kWh per the list below.
a. Single phase $ 0.5301 per kWh.
b. Three phase$0.05245 per kWh.
c. Municipal single phase$0.05588 per kWh
d. Municipal three phase$0.05212 per kWh
e. Federal single phase $0.05245 per kWh.
f Federal three phase $0.05142 per kWh.
3. Billing demand:
a. Billing demand for each month shall be based on kVA (apparent power).
b. Demand usage charge: $4.462 per kVA.
13.12.042 - Schedule NP-03—Nonprofit.
A. Applicability. This schedule applies to all nonprofit tax-deductible organizations.
B. Character of service. Sixty cycle, alternating current at such phase and voltage as the City
may have available will be furnished under this schedule, applied through a single meter and
one point of delivery.
C. Uniform rate effective January 1, 20-18 2020:
1. Base charge:
a. Single phase $24.90 27.48 per month.
b. Three phase$62.23 66.01 per month.
5
,00"N
2. Energy usage charge: single phase$0.0798 0.05586 per kWh, three phase$0.05813 per
kWh.
D. Uniform rate effective January 1 2021:
1. Base charge:
a. Single phase$30.17 per month.
b. Three phase$70.00 per month.
2. Energy usa a charms single phase$ 0.5574 per kWh three phase $0.05718 per kWh
13.12.043 - Schedule GD-04—General service demand—Primary metered.
A. Applicability. This schedule applies to all accounts not covered by other rate schedules with
the following types of service:
1. 120/208 or 120/240 volts, single or three phase, service panel larger than 400 amps.
2. 240/480 or 277/480 volts, three phase service panel larger than 200 amps.
3. When electric current is measured at primary voltage and delivery to the customer is at
secondary voltage.
B. Character of service. Sixty cycle, alternating current at such phase and voltage as the City
may have available will be furnished under this schedule, applied through a single meter and
one point of delivery.
C. Uniform rate effective January 1, 20-1-8 2020:
1. Base charge:
a. Single phase$445-59.42 per month.
b. Three phase $132.30 158.98 per month.
2. Energy usage charge: $9:0482 .05204 per kWh.
i
3. Billing demand:
a. Billing demand for each month shall be based on kVA(apparent power).
b. Demand usage charge: $444 4.174 per kVA of billing demand.
D. Uniform rate effective January 1 2021:
1. Base charge:
a. Single phase $72.06 per month.
b. Three phase $192.79 per month.
2. Energy usa eg charge: $0.05100 per kWh.
3. Billing demand:
6
""'-1;.
a. Billing demand for each month shall be based on kVA (apparent power).
b. Demand usage charge: $4.462 per kVA of billing demand.
13.12.060 - Schedule PS-03—Primary service—Customer owned.
A. Applicability. This schedule applies to all accounts which own and operate a primary voltage
distribution system.
B. Character of service. Service to be furnished under this schedule is unregulated three phase,
60 cycle,alternating current at primary voltage, 12.5 KV nominal. Service under this schedule
shall be provided and metered at the point(s) of interconnection of the distribution facilities
of the customer and the City.
C. Rates under this schedule do not recover the City's cost of maintenance and repair work on
the load side of the meter. Customer payment to the City in addition to the rates under this
schedule is required for any and all maintenance and repair work performed on City equipment
on the load side of the meter, including but not limited to, repair and/or replacement of all
City owned facilities. These include but are not limited to cables, terminations and
transformers.
D. Uniform rate effective January 1, 20M 2020:
1. Base charge: $331.49 381.85 per month.
2. Energy usage charge:
a. All billings between June 1 and August 31: $0.9383 $0.03520 per kWh.
b. All billings between September 1 and May 31: $0.0496 0.0577 per kWh.
3. Billing demand:
a. Billing demand for each month shall be based on kVA (apparent power).
b. Demand usage charge: $349 4.174 per kVA of billing demand.
4. Federal rates
a. Base charge: $377.84 per month.
b. Energy usage charge: $0.05146 per kWh.
c. Billing demand: Shall be per 13.12.060 D.3.
E. Uniform rate effective January 1, 2021:
1. Base charge: $ 432.20 per month.
�-� 2. Ene=usage charge:
7
a. All billings between June 1 and August 31• $0.0346 per kWh
b. All billings between September 1 and May 31: $0.0566 per kWh.
3. Billing demand:
a. Billing demand for each month shall be based on kVA (apparent power).
b. Demand usa a charge: $4.462 per kVA of billing demand.
4. Federal rates
a.Base charge: $427.66 per month.
b.Energy usage charge: $0.05051 per kWh.
c. Billing demand: Shall be per 13.12.060 E.3.
13.12.065 - Schedule PS-04—Primary service—City owned.
A. Applicability. This schedule applies to all accounts where the City owns and operates a
primary voltage distribution system when electric current is measured at primary voltage and
delivery to the customer is at secondary voltage.
B. Character of service. Service to be furnished under this schedule is unregulated three phase,
60 cycle, alternating current at primary voltage, 12.5 KV nominal.
C. Uniform rate effective January 1, 204.8 2020:
1. Base charge: $331.3 381.85 per month.
2. Energy usage charge:
a. All billings between June 1 and August 31: $0.0303$0.0352 per kWh.
b. All billings between September 1 and May 31: $0.0496 0.0577 per kWh.
3. Billing demand:
a. Billing demand for each month shall be based on kVA (apparent power).
b. Demand usage charge: $5-.N 4.174 per kVA of billing demand.
4. Federal rates
a. Base char-ae: $377.84 per month.
b. EneM usage charge: $0.05146 per kWh.
c. Billing demand: Shall be per 13.12.065 C.3.
8
D. Uniform rate effective January 1, 2-OM 2021.-
1.
021:1. Base charge: $ 432.20 per month.
2. Energy usage char
a All billings between June 1 and August 31: $0.0346 per kWh.
b. All billings between September 1 and May 31: $0.0566 per kWh.
3. Billing demand:
a Billing demand for each month shall be based on kVA (apparent power).
b. Demand usage charge: $4.462 per kVA of billing demand.
I
4. Federal rates
a. Base charge: $427.66 per month.
b. Energy usage charge: $0.05051 per kWh.
c. Billink demand: Shall be per 13.12.065 E.3.
i
13.12.073 - Schedule MW-03—Municipal water pumping.
A. Applicability. This schedule applies to municipal water pumping facilities where the connected
load is greater than 500 kVA.
B. Restrictions. Timers approved by the Public Works and Utilities Department shall be installed
to prevent pumping during restricted hours as determined by the Public Works and Utilities
Department.
C. Character of service. Service to be furnished under this schedule is three phase, 60 cycle,
alternating current at such phase and voltage as the City may have available will be furnished
under this schedule, applied through a single meter and one point of delivery.
D. Time of use rate for bills effective after January 1, 24M 2020:
1. Basic charge: $380.44 71.31per month.
2. Energy usage charge between June 1 and August 31, shall be $0.0552 0.0343 per kWh
during heavy-high load hours, $0.0552per-kNVh during medium load hours, and $0.0292
0.0181 per kWh during blow load hours.
3. Energy usage charge between September 1 and May 31, shall be$0.0932 0.0579 per kWh
during heavy high load hours, $0.0932 932per kNVh .7,,.ing.,-.ediu,, lead hours, and $0.0447
0.0278 per kWh during 4&low load hours.
4. Billing demand:
a. Billing demand for each month shall be based on the maximum hour of kVA
(apparent power) during heavy load hours.
9
/'1
b. All other months and hours: $5-.0-5 3.42 per kVA.
E. Time of use rate for bills effective after January 1, 2021:
1. Basic charge: $75.28 per month.
2 Energy usage charge between June 1 and August 31 shall be $0.0343 per kWh during
high load hours and $0.0181 per kWh during low load hours.
3 Energy usage charge between September 1 and May 31, shall be$0.0578 per kWh during
high load hours and $0.0277 per kWh during low load hours.
4. Billing demand:
a. Billing demand for each month shall be based on the maximum hour of kVA
apparent power) during heavy load hours.
b. All other months and hours: $3.66 per kVA.
Section 2. - Corrections. The City Clerk and the codifiers of this ordinance are authorized to
make necessary corrections to this ordinance including, but not limited to, the correction of the
scrivener's/clerical errors, references to other local, state, or federal laws, codes, rules or
regulations, or ordinance numbering, section/subsection numbers and any references thereto.
Section 3. - Severability. If any provisions of this Ordinance, or its application to any person
or circumstances, are held invalid, the remainder of the Ordinance, or application of the provisions
of the Ordinance to other persons or circumstances, is not affected.
Section 4.- Effective Date. This Ordinance,being an exercise of a power specifically delegated
to the City legislative body, is not subject to referendum. This ordinance shall take effect five (5)
days after passage and publication of an approved summary thereof consisting of the title.
PASSED by the City Council ofthe City of Port Angeles at a regular meeting of said Council
held on the 15th day of October,2019.
kl�2— I pfl?!4v
Sissi Bruch, Mayor
10
A""11,
APPVEDAS TO FORM:
e7,f __
William E. Bloor, City Attorney
ATTEST:
IL
Kari Martinez-Bailey, Ci Cle
11
Summary of Ordinances Adopted by the Port Angeles City Council on October 15, 2019
ORDINANCE NO. 3630
AN ORDINANCE of the City of Port Angeles,Washington amending sections of Chapter 13.12 of the
Port Angeles Municipal Code relating to electric utility rates.
ORDINANCE NO. 3631
AN ORDINANCE of the City of Port Angeles, Washington amending sections of Chapter 13.20 of the
Port Angeles Municipal Code relating to utility discounts.
ORDINANCE NO. 3632
AN ORDINANCE of the City of Port Angeles, Washington amending sections of Chapter 13.44 of the
Port Angeles Municipal Code relating to water rates.
ORDINANCE NO. 3633
AN ORDINANCE of the City of Port Angeles, Washington amending sections of Chapter 13.54 of the
Port Angeles Municipal Code relating to garbage collection.
ORDINANCE NO. 3634
AN ORDINANCE of the City of Port Angeles, Washington amending sections of Chapter 13.57 of the
Port Angeles Municipal Code relating to solid waste processing facility rates.
ORDINANCE NO. 3635
AN ORDINANCE of the City of Port Angeles,Washington amending sections of Chapter 13.63 of the
Port Angeles Municipal Code relating to stormwater-utility and regulations.
ORDINANCE NO. 3636
AN ORDINANCE of the City of Port Angeles,Washington amending sections of Chapter 13.65 relating
to wastewater service rates.
ORDINANCE NO. 3637
AN ORDINANCE of the City of Port Angeles,Washington amending sections of Chapter 13.73 of the
Port Angeles Municipal Code relating to ambulance service and medic I rates.
ORDINANCE NO. 3638
AN ORDINANCE of the City of Port Angeles,Washington amending portions of Chapter 2.70 of the
Port Angeles Municipal Code relating to the Lodging Tax Advisory Committee terms and term limits.
These ordinances are not subject to referendum and shall take effect 5 days after passage and publication
of summary.
The full texts of Ordinances are available at City Hall in the Clerk's office, on the City's website at
www.cityoofpa.us or will be mailed upon request. Office hours are Monday through Friday 8:00 a.m.to
5:00 p.m.
Kari Martinez-Bailey
City Clerk
Published by summary: Sunday, October 20, 2019