Loading...
HomeMy WebLinkAbout210 S Race St - Engineering e ~ ~-- ~;dIiI" CITY OF PORT ANGELES DEPARTMENT OF COMMUNITY DEVELOPMENT - BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 0-3 -)J l L ~F~~caL~on ~umDer Property Address ASSESSOR PARCEL NUMBER Application description Subdivision Name Property Zoning Application valuation 03-00000812 Date 8/19/03 210 S RACE ST BLDG 06-30-00-7-7-0100-0000- RIGHT OF WAY o Owner Contractor rz.C'-~ D ) CHURCH OF THE NAZARENE PO BOX 2086 PORT ANGELES WA 983620378 STRAIT ARROW CONSTRUCTION 4317 EUCLID ST PORT ANGELES WA 98362 (360) 452-7505 1l Permit Additional desc Permit Fee Issue Date Expiration Date RIGHT OF WAY 45 00 8/19/03 2/16/04 Plan Check Fee Valuation 00 o Qty Unit Charge Per 1 00 45 0000 ECH RIGHT OF WAY PERMIT Extension 45 00 Fee summary Charged Paid Credited Due ----------------- ---------- ---------- ---------- ---------- Permit Fee Total 45 00 45 00 00 00 Plan Check Total 00 00 00 00 Grand Total 45 00 45 00 00 00 Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned for a period of 180 days after the work as commenced, or if required inspections have not been requested within 180 days from the last inspection I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. 7< Signature of Owner (if owner is builder) Date T:\PLANNING\FORMS\1102.15 [4/2002] BUILDING PERMIT INSPECTION RECORD CALL 417-4815 FOR BUILDING INSPECTIONS. PLEASE PROVIDE A MINIMUM 24 HOUR NOTICE. IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT IN A CONSPICUOUS LOCATION. KEEP PERMIT CARD AND APPROVED PLANS AT JOB SITE INSPECTION TYPE DATE ACCEPTED COMMENTS YES NO FOUNDATION: FOOTINGS WALLS FOUNDATION DRAINAGE ELECTRICAL (LIGHT DEPT) SEPARATE PERMIT /I ROUGH-IN I PLUMBING UNDER FLOOR / SLAB ROUGH-IN WATER LINE GAS LINE BACK FLOW / WATER AIR SEAL WALLS CEILING FRAMING JOISTS / GIRDERS SHEAR WALL WALLS / ROOF / CEILING DRYWALL T-BAR INSULATION SLAB WALL / FLOOR / CEILING I I I MECHANICAL HEAT PUMP WOOD STOVE / PELLET / CHIMNEY HOOD / DUCTS PW UTILITIES / SITE WORK (Engineering Division) SEPARATE PERMIT /I's: WATERLINE / METER SEWER CONNECTION SANITARY STORM PLANNING DEPT SEPARATE PERMIT I/'s SEPA. PARKING/LIGHTING ESA. LANDSCAPING SHORELINE: FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE RESIDENTIAL DATE YES NO COMMERCIAL DATE ACCEPTED YES NO ELECTRJCAL LIGHT DEPT 417-'1735 ELECTRICAL LIGHT DEPT CONSTRUCTION R.W / PW/ CONSTRUCTION R.W ENGINEERING 417-4807 PW / ENGINEERING FIRE 417-4653 FIRE DEPT PLANNING DEPT 4 J 7-4750 PLANNING DEPT BUILDING 417-4815 BUILDING CITY OF PORT ANGELES DEPARTMENT OF COMMUNITY DEVELOPMENT - BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 Property Address ...... 210 S RACE ST BLDG Application description . . . RIGHT OF WAY Subdivision Name ...... Property Zoning ....... Application valuation .... 0 (360) 452-7505 Permit ...... RIGHT OF WAY Additional desc . . Permit Fee .... 45.00 Plan Check Fee . . .00 Issue Date .... 8/19/03 Valuation .... 0 Expiration Date . . 2/16/04 Qty Unit Charge Per Extension Fee summary Charged Paid Credited Due ......................................................... Permit Fee Total 45.00 45.00 .00 .00 Plan Check Total .00 .00 .00 .00 Grand Total 45.00 45.00 .00 .00 Separate Permlts are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days, if construction or work Is suspended or abandoned for a period of 180 days afler the work as commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the pedormance of construction. Signature of Contractor or Authorized Agent Date Signature of Owner (if owner is builder) Date T:\PLANN[NG\FOKMS\1102.15 [4~002]