Loading...
HomeMy WebLinkAbout315 E 1st St - Engineering PUB/LIe WORKS & R/W PERM/T o Attached Notes OWNER/APPLICANT KELLY GABRIEL 173 GANDALF RD. Port Angeles, W A 98362 000/604-2623 PROJECT INFO Work is: Plans Required: Start Date: Contractor: QWEST COMMUNICATIONS Performance Bond Required: Amount: Proof of Insurance: Work to Perform: Issued: 2/05/2002 Permit No: Work Order: 1244 o PROPERTY LOCATION 315 1ST ST E Lot: 13&14 Subdivision: N R SMITH Parcel No: 063000511850000 Block: 18 D Long Legal Value Work: $0.00 II Finish Date: 360/000-0000 1 1 $0.00 D Install D Repair D Watermain D Sanitary Sewer D Storm Drain c><J Underground Tele/Elec D Mise push PROJECT NOTES push under alley between Front & E. 1st Street approx 3D' FEES ASSESSMENT 1.) RlW Excav: $0.00 15.) Other San Sewer: $0.00 2.) Sidewalk: $0.00 16.) Sew Tap Wye/Man Tap: $0.00 3.) Curb/Gutter: $0.00 17.) Sew Capl W/M Removal: $0.00 4.) Driveway: $0.00 18.) Alter Repair Sewer: $0.00 5.) Dwy Culvert: $0.00 19.) Storm Drain: $0.00 6.) Street Cut: $0.00 20.) Catch Basin per ea: $0.00 7.) Other RlW: $0.00 21.) Sewer System Dev: $0.00 8.) Fire Hydrant: $0.00 22.) Milwaukee Dr. Sew Ass: $0.00 9.) Res Water Serv: $0.00 23.) RlW Use Perm: $0.00 10.) Comm Water Serv: $0.00 24.) Admin Cost (D.R.A) $0.00 11.) Other Water Service: $0.00 25.) ORA $0.00 12.)Water System Dev: $0.00 26.) Mise: $0.00 13.) San Sewer SFR: $0.00 TOTAL FEE: $0.00 14.) San Sewer MFR: $0.00 add unit 0 Amount Paid: $0.00 Receipt No: Inspection Fee: $0.00 Balance Due: $0.00