Loading...
HomeMy WebLinkAbout1013 E 3rd St - Building~¢° ~.. CITY OF PORT ANGELES DEPARTMENT OF COMMUNITY DEVELOPMENT - BUILDiNG DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 Application Number ..... 03-00000285 Date 3/21/03 Property Address ...... 1013 E 3P~D ST ASSESSOR PARCEL NUMBER: 0630005403150000 Application description . . . RE-ROOF Property Zoning ....... Application valuation .... 2000 Owner Contractor Expiration Date . . 9/17/03 Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned for a period of 180 days after the work as commenced, or if required inspections have not been requested within 180 days from the last inspection. I here,b.v.v_xcedify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances g'Rverning this type of work will be complied with whether specified herein or not. The granting of a permit does not presum(~'~to give aptho~ity to violate or cancel the provisions of any state or local law regulating construction or the performance of construcl~pn., Signature of Contractor or Authorized Agent Date Signature of Owner (if owner is builder) Date T:\PLANNING\FORMS\1102.15 [4/2002] BUILDING PERMIT INSPECTION RECORD CALL 417-4815 FOR BUILDING INSPECTIONS. PLEASE PROVIDE A MINIMUM 24 HOUR NOTICE. ITIS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT IN A CONSPICUOUS LOCATION. INSPECTION TYPE DATE ACCEPTED COMMENTS YES I NO FOUNDATION: FOOTINGS WALLS FOUNDATION DRAINAGE ELECTRICAL (LIGHT DEPT) SEPARATE PERMIT: # PLUMBING UNDER FLOOR / SLAB ROUGH-IN WATER LINE GAS LINE BACK FLOW / WATER AIR SEAL I WALLS CEILING FRAMING JOISTS / GIRDERS SHEAR WALL WALLS / ROOF / CEILING DRYWALL T BAR INSULATION SLAB WALL / FLOOR / CEILING MECHANICAL HEAT PUMP WOOD STOVE / PELLET / C IBMNEY HOOD / DUCTS PWUTILTI'IES/ SITEWORK (Engineering Division) SEPARATE PEEJvlIT#'s: WATERLINE / METER SEWER CONNECTION SANITARY STORM PLANNING DEPT. SEPARATE PERMIT #'s SEPA: PARKING/LIGHTING ESA: LANDSCAPING SHORELINE: FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE RESIDENTIAL DATE YES NO COMMERCIAL DATE ACCEPTED YES NO ELECTRICAL - LIGHT DEPT. 417-4735 ELECTRICAL LIGHT DEPT CONSTRUCTION R.W. / PW/ CONSTRUCTION - R.W. ENGINEERING 417-4807 PW / ENGINEERING FIRE 417-4653 FIRE DEPT. PLANRqlNG DEPT. 417-4750 PLANNING DEPT. BUILDING 417 4815 L~ BUILDING T:\PLANNING\FORMS\1102.15 I4/2002] CITY OF PORT ANGELES DEPARTMENT OF PUBLIC WORKS ........... INSPECTION REPORT ........... REQUEST:, Date ~--~'~f ~ (~--'~' Time Received by /~// (phone, person) Location of Work to be inspected /~/~ ~ Name of person requesting inspection Address of person requesting inspection Phone No. Type of Inspection (circle appropriate one): Permit No. Sewer Foundation Framing Chimney Plumbing (~Sewer Excav. Other Inspected: Date -~'- ~'/- ~ ''~--~ Time By t Remarks: RESTORATION REQUIRED ...... YES NO SURFACE RESTORATION: SURFACE TYPE: [] Unimproved []Gravel I~Asphalt []PCC [~Other [] Repaired by City Work Order # ~] Repaired by Permittee [] COMPLETE [] No Damage Found [] INCOMPLETE (Continue on reverse side if necessary) STREET SUPERINTENDENT (DATE)