Loading...
HomeMy WebLinkAbout1729 E 4th St - EngineeringBackflow Assembly Test Repo~ Received ~ ~ City of Pon Angeles ~r~s ~* Public Works and Utilities Depa~ment Water~astewater Collection Division SERVICE ADDRESS: ' Ma~ufac~rer Model Size Serial 1S THIS AN ~PROVED ASSEMBLY? ~S ~0 B IS ASSEMBLY ~STALEED CORRECTLY'? YES ~'~O B DATE OF INSTALLATION REDUCED PRESSURE PRINCIPLE ASSEMBLY RP ~ RPDA DOUBLE CHECKVALVE ASSEMBLY sv~ B av~ CHECK VALVE ~1 CHECK VALVE ~2 RELIEF VALVE PVB/SVB Repairs Cleaned ~ Cleaned ~ Cleaned ~ CHECK VALVE REPAIRS Cleaned Details Final Closed Tight ~ AIR INLET Opened al psi ~, r} CHECK VALVE Held at ps~ AIR GAP INSPECTION: REQUIRED MINIMUM SEPARATION: YES ~ NO ~ TYPE OF HAZARD ~" f; Line Pressure ' psi COMMENTS g2 Shutoff Held YES ~ NO Relief Valve Exercised YES ~ NO Date Time T~te~ Si~ature Cch. ~ Test Kit Passed Failed