Loading...
HomeMy WebLinkAboutPC Agenda Packet 2022-08-10 AGENDA PLANNING COMMISSION Virtual Meeting Attend Live Meeting Here: https://www.cityofpa.us/984/Live-Virtual-Meetings August 10, 2022 6:00 p.m. I. CALL TO ORDER II. ROLL CALL III. PUBLIC COMMENT IV. APPROVAL OF MINUTES Minutes of the July 27, 2022 Regular Meeting V. ACTION ITEM and DISCUSSION 1. Action: Façade Grant No. 22-02 Skincare Suites and Wellness Spa, 106-108 East 1st Street 2. Discussion: Review of Process to Amend Port Angeles Municipal Code Title 17 Continued discussion of the Commission’s options for how to proceed with pursuing implementation of proposed changes to Title 17 of the Port Angeles Municipal Code. VI. STAFF UPDATES 1. Temporary Building Permit Fee Waiver (TBPFW) Program VII. REPORTS OF COMMISSION MEMBERS VIII. ADJOURNMENT August 10, 2022 Planning Commission Agenda Packet Page 1 of 25 MINUTES PLANNING COMMISSION Virtual Meeting Port Angeles, Washington 98362 July 27, 2022 6:00 p.m. REGULAR MEETING CALL TO ORDER Chair Stanley opened the regular meeting at 6:01 p.m. ROLL CALL Commissioners Present: Tammy Dziadek, Andrew Schwab (Vice-Chair), Marolee Smith, Benjamin Stanley (Chair) Commissioners Absent: Richie Ahuja, Steve Luxton, Colin Young (excused) City Staff Present: Ben Braudrick (Senior Planner) Chris Cowgill (Assistant City Attorney) Holden Fleming (Housing Coordinator) Zach Trevino (Assistant Planner) Public Present: None PUBLIC COMMENT Chair Stanley opened the meeting to public comment. No member of the public provided comment. Chair Stanley closed the meeting to public comment. APPROVAL OF MINUTES Vice Chair Schwab moved to approve the minutes from the July 13, 2022 regular meeting of the Planning Commission. Commissioner Smith seconded. The motion passed with unanimous consent (4-0). DISCUSSION AND POTENTIAL ACTION 1. Proposed Port Angeles Municipal Code Title 17 Amendments related to increased housing density and mixed uses. Staff presentation of the Commission’s options for how to proceed with review of the proposed changes to Title 17 of the Port Angeles Municipal Code (PAMC) approved for further consideration by the Planning Commission on July 13, 2022. Chair Stanley introduced the item, explaining that staff will begin by presenting some preliminary findings from their research regarding the PAMC changes proposed by Commissioner Luxton. Planner Braudrick displayed a presentation and introduced the process, emphasizing that the August 10, 2022 Planning Commission Agenda Packet Page 2 of 25 Planning Commission Minutes July 27, 2022 Page 2 purpose is to review some of the Commission’s options for moving forward. He noted that the City of Spokane can be used as an example or case study, as that jurisdiction is the first community in the State of Washington to allow multi-family development in traditional single-family residential zones, albeit on an interim basis. The memo provided to the Commission with the agenda packet notes that Spokane’s process could be used as a model, with additional documentation related to Spokane’s effort included in the agenda packet. He began the presentation by providing some background on what has already occurred in the City of Port Angeles since the 2016 Comprehensive Plan update to address housing affordability, attainability, and to enable the construction of more housing units in the City. Among the items he noted that have contributed to the facilitation of additional density, Planner Braudrick mentioned that the temporary waiver of building permit fees for construction serving households that have an income of 80% or less of area median income takes effect Monday, August 1st. This includes the waiver of some utility fees and the requirement for a right-of-way permit by enabling connection of ADUs to the water and sewer lines of primary residences. Another effort underway is the distribution of an RFP for the preparation of model home designs for ADUs, duplexes, and infill single-household units that developers could use to bypass the building permit review process, which would save time and money for applicants. Planner Braudrick concluded the overview of the recent process timeline by noting that a local planning training led by the Department of Commerce for the benefit of all Commissioners may be ideal, with the next available date being September 29th. That training would be a useful tool to enable the Commissioners to understand their roles and responsibilities. He provided an overview of the roles and responsibilities for both the Planning Commission and Planning Division staff, with the intent of clarifying how all involved can work together to realize some of the changes that are being proposed. After the synopsis of roles and responsibilities, Planner Braudrick provided a brief overview of the enabling legislation that could allow for certain changes to City regulations in accordance with the Commission’s goals. He noted that the issue of housing availability is a major problem statewide. Spokane is the first community to enact an interim ordinance allowing for multi-family development in single-family residential zones in the specific manner they did, which may serve as an example for Port Angeles. Regardless of the process decided upon by Port Angeles, staff wants to ensure that it is equitable and provides members of the community with opportunity to provide input on any recommended changes to zoning regulations. Planner Braudrick explained that Revised Code of Washington (RCW) 36.70A.600 contains provisions that prevent the actions proposed through the Building Residential Capacity (BRC) legislation from being judicially appealed until April 1, 2023, which can serve as a target date for the City to use when moving forward with changes. He noted that the BRC enabling legislation, specifically RCW 36.70A.600(1)(c), includes one of the proposals being considered by the Commission, which is to authorize at least one duplex triplex, quadplex, sixplex, and other types of housing on each parcel in one or more zoning districts that permits single-family residences, unless a city documents a specific infrastructure of physical constraint that would make this requirement unfeasible for a particular parcel. This means that the proposed effort of the City to allow multi-family units of up to four units in single-family residential zones is possible to accomplish through this enabling legislation, and an opponent of the effort could not try to stop that effort by suing the City. After reviewing the enabling legislation from the Revised Code of Washington (RCW), Planner Braudrick transitioned into an overview of staff-recommended procedures. He began by emphasizing the importance of ensuring that the recommended changes are directly related to neighborhood scale, reasonable density, and encouraging health and quality of life. All of the changes that are proposed have a goal of reducing barriers to attainable housing, and the key to success will be ongoing monitoring over time to ensure that this is actually occurring. The process August 10, 2022 Planning Commission Agenda Packet Page 3 of 25 Planning Commission Minutes July 27, 2022 Page 3 that Spokane went through, as detailed in the materials included in the Planning Commission agenda packet for this meeting, can serve as a potential model for Port Angeles. Spokane instituted design standards to accompany the infill housing that they are allowing, in lieu of requiring a conditional use permit. The locations where Spokane will allow this infill housing were carefully evaluated for consistency with public health, safety, and general welfare. Additionally, the public process will continue following adoption of the ordinance on July 18th, with a public hearing scheduled in front of the Spokane City Council in September. As part of this process, Spokane declared a state of housing emergency, which included a resolution by the City Council to look into densification to build residential capacity. The process has so far resulted in an interim ordinance for one year while the City amends its Comprehensive Plan, followed by a reevaluation of the ordinance’s success over the year. Public comments from Spokane’s process were included in the Commission’s agenda packet, some of which expressed support and others opposition to the initiative. One concern expressed by a developer was that the one-year period would not be long enough to enable a complete evaluation of the program’s success. Therefore, Port Angeles staff is recommending that any potential interim ordinance adopted by the City of Port Angeles be in place until July of 2025, which corresponds with the date that the Comprehensive Plan update is due, currently established as June 30th. If, at that time, the ordinance is clearly fulfilling its purpose of enabling the provision of attainable housing in Port Angeles in a way that is not detrimental to surrounding properties, the Comprehensive Plan can be amended to ensure that this type of development remains part of the urban fabric going forward. Another option for the Commission to consider is to reevaluate the categorization of two duplexes on a single lot as infill development, although this may conflict with the State of Washington’s definition of multi-family development. In order to provide additional context for the staff recommended procedure, Planner Braudrick reviewed the City’s current density provisions in Title 17 of the PAMC. Duplexes are already allowed in every residential zone, and the infill development standards adopted in 2021 allow duplexes on infill lots with at least 25 feet of frontage, subject to applicable design standards. Moreover, cottages and townhouses have associated design standards that facilitate their use in infill development. He reminded the Commission that the recently-adopted temporary building permit fee waiver for residences intended exclusively for occupants making 80% of area median income (AMI) or less is scheduled to take effect on Monday, August 1st and last for one year. Furthermore, utility base rates will be waived for ADU housing, with the potential of having no need for right-of-way access for ADU water metering. In addition to these ongoing efforts, Planner Braudrick assured the Commission that there are many things the City can do to make the development of attainable housing more affordable. The Spokane model, if applied to Port Angeles, would necessitate a 4-5 month process, which could be completed by the April 1, 2023 deadline established in RCW 36.70A.600. While this deadline does protect against immediate legal action, it does not reduce the importance of going through a planning process correctly, albeit doing so as quickly as possible. Staff proposed the inclusion of one Public Works session that would include reaching out to the development community, property owners, other stakeholders, and the general public. At least one public hearing with the Planning Commission is necessary to enable passage of an ordinance. Staff also proposed the inclusion of design standards with the code update, which Planner Braudrick noted would take a minimum of eight weeks to prepare. Any interim ordinance should also include provisions that would ensure the ability of the City to assess the development community’s response, the public’s response, and the ordinance’s success by July 2025. Ultimately, this ordinance and associated effort would lead to a major change to the Comprehensive Plan’s Land Use Element and Future Land Use Map. As currently written, the Comprehensive Plan conflicts with the proposed Zoning Code update, so would need to be changed in order to avoid conflict in City regulations. Chair Stanley expressed appreciation for staff’s effort to investigate ways forward rather than focusing on finding legal reasons for why the Commission should not proceed. He stated that he is personally in favor of much of what Commissioner Luxton has said before in previous meetings August 10, 2022 Planning Commission Agenda Packet Page 4 of 25 Planning Commission Minutes July 27, 2022 Page 4 and would like to move forward with the effort. Commissioner Smith explained that the Commission may receive pushback on one aspect of this effort to increase housing availability. She raised the example of Alameda, California, which experienced a big push for more housing in the 1970s due to a number of factors, including high gas prices. She explained that nice houses were demolished and replaced with low-quality multi- family residential buildings, which ruined neighborhoods. When she lived in Oakland, nearby construction of a sixplex towered over her home and enabled others to look into her yard. This issue could arise in Port Angeles if the City does not address it preemptively. She concluded that the question is how to ensure that infill development does not consist of the demolition of an existing home and the construction of a building that is not consistent with neighborhood character. Chair Stanley expressed agreement with Commissioner Smith. He noted that, 10-15 years ago, the effort to promote infill development in single-family residential neighborhoods would have been considered an extremely radical thing to do in most cities. Proposing to allow four or even six units on a single lot is significant, and could cause concern among some people. Commissioner Smith noted that in the 1970s in California, it was inexpensive for developers to create investment properties by constructing unsightly buildings that changed the character of neighborhoods and caused parking problems. She explained that the City does not want to allow this to happen again here, so there needs to be design standards that prevent it and some staff discretion during the review process to avoid permitting structures that do not fit in the neighborhood. Chair Stanley noted that there are already some design standards that address this to a degree, such as those establishing a maximum building height in the R7 zone. He expressed that views are important to consider, since one of the biggest issues people may have with higher density is the ability of neighboring occupants to look into their private yard. One way to avoid this would be to mandate that windows be placed in such a way that avoid facilitating views of others’ yards. Building design could incorporate elements that naturally mitigate this concern. He also suggested allowing people to put up higher fences than are currently allowed in residential zones. Commissioner Smith raised the example of California’s “Sunshine Laws,” which prohibited people from blocking others’ sunshine. Although this effort failed, according to her, it was an interesting concept, though it resulted in many lawsuits. Chair Stanley stated his opinion that the City is in a serious housing emergency, requiring a different approach that that currently being taken by City Council. Design standards are needed, but the discussion about design standards should not delay the process. He suggested that the City Council approve the proposed Title 17 amendments as is and then monitor the results to incorporate them into an ongoing public process after adoption of the ordinance. That would allow the City to have a months-long discussion revisiting the issue in Spring 2023. Commissioner Smith noted that the City does not know how many rental units currently exist in the City, since nothing is in place requiring a landlord to register their units. Getting information on existing stock will allow the City to understand what needs to be built. She referenced a motion made by Councilmember Lindsey Schromen-Wawrin a few years ago to enable recreational vehicles (RVs) to be permitted as temporary housing, which she believes is necessary at this time, since many people are already living in RVs without any record of how water and sewage disposal services are being provided. Something similar was done in Port Angeles during the 1970s and 1980s. Legalizing what is currently illegal occupancy could enable regular inspections and ensure safety of occupants. Chair Stanley expressed his agreement, noting that there was much public input during the discussion of the aforementioned RV ordinance. He suggested that the RV ordinance be incorporated into the discussion of proposed Title 17 amendments, perhaps with the same proposed density allowance of four units on one 7,000 square foot lot that is being discussed for permanent housing. He also noted that he would like to see the ability of people to divide 7,000 square foot August 10, 2022 Planning Commission Agenda Packet Page 5 of 25 Planning Commission Minutes July 27, 2022 Page 5 lots into four lots, allowing people to put either a tiny home or an RV on each lot. Chair Stanley concluded by reiterating his preference for adopting an ordinance as quickly as possible and then conducting a public process before inserting design standards into the PAMC. Commissioner Smith asked whether Chair Stanley would consider going on the Todd Orloff radio show to talk about the issue being discussed, in order to reach as many members of the public about the matter as possible. Planner Braudrick responded, stating that it would be apt for the Mayor and City Manager to appear on the Todd Orloff Show at least once per month to discuss the ongoing housing effort, which would be a fantastic way to connect with the community. Chair Stanley asked whether staff would take the Commission’s feedback and lead this effort going forward. Planner Braudrick advised that one option is for the Commission to make a motion directing staff to continue the research process and produce draft code language, which would take at least eight weeks. Chair Stanley asked whether it is possible to move forward with drafting an ordinance that did not include design standards. Planner Braudrick responded that staff could proceed with an evaluation of the proposed changes Commissioner Luxton has proposed, which Chair Stanley agreed would be helpful to accompany with a list of proposed design standards that might be considered. As an example, Chair Stanley suggested that any new multi-family construction in the R7 zone include frosted windows facing to the side, with transparent windows limited to facing certain directions to minimize privacy intrusions. Planner Braudrick explained that it would be helpful if the Commission could specify what they would want to see in an ordinance. Some discussion of recently adopted design standards and options provided to developers, such as those related to fencing and landscaping, ensued. Commissioner Smith motioned for the Planning Commission to direct staff to continue to explore ways to create standards and ideas that can be used to approach an ordinance change that follows the recommended code text amendment language as drafted by Commissioner Luxton, suggesting changes to Title 17 of the Port Angeles Municipal Code. Chair Stanley proposed an amendment to the motion clarifying that the Commission will continue the discussion of this matter at the next meeting. Commissioner Dziadek seconded the motion. No further discussion occurred. The motion passed unanimously (4-0). After the vote, Chair Stanley clarified that the Commission is simply asking staff to do what they proposed to do, which is to continue the research process and provide tangible options for the Commission to debate. Planner Trevino asked whether the Commission had any additional thoughts about the interim ordinance that Planner Braudrick had suggested in his presentation, as it relates to the motion that had passed. Chair Stanley responded that the Commission is open to an interim ordinance, but needs to continue the discussion process to determine whether an interim ordinance makes sense. In his understanding of the motion, staff must provide the Commission with additional background on why an interim ordinance is important. STAFF UPDATES Planner Braudrick provided updates to the Commission, as follows: 1. Staff has completed the stakeholder implementation meetings for all five sectors of the Climate Resiliency Plan (CRP), and is now seeking any further comments from all stakeholders, including the Climate Action Subcommittee members. The intent is to use the Commission as a public forum to engage the community in the CRP implementation process. August 10, 2022 Planning Commission Agenda Packet Page 6 of 25 Planning Commission Minutes July 27, 2022 Page 6 2. The temporary building permit fee waiver will become available as an option on August 1st. An application has been prepared and outreach will be conducted to inform developers of the fee waiver option. Planner Fleming provided an update to the Commission, as follows: 1. There may be misinformation about what the requirements of the temporary building permit fee waiver program are, so staff is preparing a one-page FAQs sheet on how the program will be administered. In addition to this fee waiver program, there were also changes made to utility connection requirements for ADUs. These two initiatives will work together to create multiple incentives that certain types of development, such as ADUs, could take advantage of. An additional incentive could be the multi-family tax exemption program, PAMC Chapter 17.46, which could be paired with the fee waiver program for multi-family developments. He mentioned that the final version of the application form will be included in the next Planning Commission agenda packet. He noted that the value of the Planning Commission is exemplified through this fee waiver program, which stemmed from a recommendation of the Commission. One challenge that staff will focus on is getting the word out to the public, especially the development community, about this program. Attorney Cowgill asked whether the motion made by the Commission at the July 13th meeting, which posed a very specific question to staff, was answered by staff’s presentation earlier in the meeting, or if the Commission still wants to receive a written response to that question. Discussion ensued, with the Commission concluding that no written response from the Legal Department would be necessary, as the information provided in the meeting presentation suffices. Moreover, staff will continue to address the Commission’s question and related subjects as the process continues. Commissioner Smith asked staff whether there are efforts underway to promote the temporary building permit fee waiver program. Planner Fleming confirmed that promotional materials are being prepared, and a meeting between the City Manager and relevant stakeholders could be considered. He explained that the City has a communications specialist dedicated to utilizing mass communication to effectively disseminate information to the public. Commissioner Smith responded by claiming that Facebook and radio station KONP are the only effective ways of providing information to a wide audience, as the City website and other sources are underutilized. Planner Fleming explained that, to address this, staff is planning presentations in front of local groups, and will keep the Commission up to date on the process. REPORTS OF COMMISSION MEMBERS Chair Stanley stated that he plans on returning comments on the Climate Resiliency Plan implementation planning process. While he was not able to attend weekday meetings, he does want to provide feedback. Chair Stanley asked staff to provide a status update on the Race Street improvement project. Planner Braudrick responded that finalized plans are expected in September and breaking ground is anticipated to occur in October. Currently, the City is completing the environmental review, and documentation has been submitted to the Federal Highway Administration. In response to Commissioner Smith’s question about how the project would impact private property, Planner Braudrick clarified that all of the proposed work will occur within the right-of-way. Commissioner Smith noted that the PAMC does not address poultry, specifically roosters. Considering this, she asked whether the Commission would be able to recommend language to City August 10, 2022 Planning Commission Agenda Packet Page 7 of 25 Planning Commission Minutes July 27, 2022 Page 7 Council addressing urban poultry. She noted that, if residential density increases, roosters may become an issue of contention among residents. Planner Braudrick acknowledged that the PAMC does not address chickens, stating that the existing animal husbandry regulations mostly pertain to undulates and other hooved animals, so there may be a benefit to expanding how this is addressed in order to avoid code enforcement issues. Commissioner Smith explained that jurisdictions throughout the country have a range of approaches to roosters, including keeping plans for rooster enclosures ready to distribute to the public from the planning department. She stated that she would prepare some recommendations for how to address roosters so they do not become a bigger problem. Vice Chair Schwab explained that, to his understanding, the issue of poultry noise is already addressed by PAMC 9.24.030. Commissioner Dziadek pointed out that barking dogs could be a related issue. Planner Braudrick noted that the PAMC contains an entire chapter, Chapter 7.09, addressing the treatment of animals, so does provide options for animals in need. ADJOURNMENT Commissioner Smith made a motion to adjourn the meeting. Commissioner Dziadek seconded the motion. The motion passed unanimously (4-0). The meeting adjourned at 7:26 p.m. Zach Trevino, Secretary Ben Stanley, Chair MINUTES PREPARED BY: Zach Trevino, Secretary August 10, 2022 Planning Commission Agenda Packet Page 8 of 25 TO: Planning Commission FROM: Ben Braudrick, Assistant Planner MEETING DATE: August 10, 2022 RE: Façade Grant Application for Business (Grant No. 22-02) APPLICANT: Jodie Fairchild OWNER: Same as Applicant LOCATION: 106-108 E Front Street, Port Angeles, WA 98362 RECOMMENDATION: Staff recommends the facade grant award amount of $20,000 toward the removal of the west entry of the building and replacement with windows and façade with similar design as the existing façade and the restoration of existing transom windows and brick at 106- 108 East 1st Street (Grant No. 22-02). PROJECT SUMMARY Jodie Fairchild is requesting funding for the replacement of windows and façade with similar design as the existing façade, and the restoration of existing transom windows and brick at 106- 108 East 1st Street (Grant No. 22-02). The applicant is requesting these funds as part of a larger effort of an interior remodel of the building to accommodate a skincare and spa business. A more in-depth description of the proposed work and its intended outcome can be found in “Attachment A” to this document. The desired end result of this proposal is to create a single entrance for the building and remove interior walls to create a single occupiable unit where there were once two. STAFF ANALYSIS The Community Façade and Sign Improvement Program was authorized by the City Council through the passing of ordinance #3476. This authorization is represented in Chapter 2.80 of the Port Angeles Municipal Code. The Program will provide a grant for funding of façade improvements that will enhance the physical appearance, accessibility, and overall value of individual buildings as well as the surrounding downtown area. In evaluating proposals for funding, Staff reviewed the “Evaluation criteria and prioritization” of Section 2.80.110: 1. Private contribution over and above the required match; Staff Analysis: Per the submitted budget, the applicant is providing the required 50 percent match. The project is located in the designated redevelopment area along 1st Street between Laurel and Race Streets. The redevelopment area allows the applicant to request above the August 10, 2022 Planning Commission Agenda Packet Page 9 of 25 Skincare Suites and Wellness Spa at 106 and 108 East 1st Street, No. 22-02 August 10, 2022 Page 2 $10,000 maximum grant amount. The applicant has already begun interior work and is ready to move forward with exterior improvements as soon as the grant approval process is complete. 2. Present condition of existing façade: Staff Analysis: As seen in Figure 1, the existing façade is in a state of various changes and is aging. Overall, the façade is dirty and the brick needs restoration. Historic transom windows have been painted over in places and need to be restored in order to provide more natural light into the interior. The proposed changes will assist in brightening up the public space along the 1st Street corridor between Laurel and Lincoln Streets. 3. The buildings overall public visibility; Staff Analysis: The building is highly visible along the 1st street corridor. 4. Expected increase in assessed value of improvement; Staff Analysis: The improvements to the structure are extensive in order to accommodate for the change in use and will undoubtedly increase the assessed value of the structure. 5. Historic Preservation; Staff Analysis: The structure was inventoried as a part of the Downtown Historic Inventory Survey Report (See Attachment B). Although the applicant is making changes to the exterior and interior of the building, they are intending to restore historic windows and provide new façade elements that mirror the existing design elements of the building. It is unclear whether or not these changes will be averse to future historic designation. It is clear that this building is in need of Figure 1: Current Structure–North Elevation August 10, 2022 Planning Commission Agenda Packet Page 10 of 25 Skincare Suites and Wellness Spa at 106 and 108 East 1st Street, No. 22-02 August 10, 2022 Page 3 restoration and the changes are being done with the historic character of the building in mind (See Figure 2 below). 6. Context in the block or neighborhood; Staff Analysis: The building is one of several historic structures on the block, including the Lincoln Theater. Benefit partner projects on same block; Staff Analysis: The following nearby businesses have received Façade and Sign Improvement grants in the past: • 108 E 1st Street (Poppy and Marigolds sign and facade) • 105 E 1st Street (Rotary Norwest’r Murals) FINDINGS, CONDITIONS & CONCLUSIONS Staff determines the following findings based on Staff’s review of the Program’s criteria: Findings 1. The Façade Grant (Application No. 22-02) was submitted by Jodie Fairchild to the Department of Community and Economic Development on May 2, 2022. 2. The location of the work proposed is 106-108 East 1st Street. Figure 2: Proposed Changes– North Elevation August 10, 2022 Planning Commission Agenda Packet Page 11 of 25 Skincare Suites and Wellness Spa at 106 and 108 East 1st Street, No. 22-02 August 10, 2022 Page 4 3. The project site is located within the CBD, Central Business District zone. 4. The grant request includes the restoration of the entire building, including: a. Removal of the west entrance and replacement with similar display windows and bulkhead b. Reconfiguring of the east entrance to reduce the deep display area. c. Restoration of the storefront cornice, upper façade masonry wall, and decorative cornice. 5. The application was reviewed by Planning Division Staff under the Façade and Sign Grant Program criteria, as included in Chapter 2.80 of the Port Angeles Municipal Code. 6. The applicant is requesting $20,000.00 toward façade improvements valued no more than $74,200.00. 7. The request will be heard by the Planning Commission at the regularly scheduled meeting August 10, 2022. Conclusions Based on the findings above, Staff makes the following conclusions: 1. Grant Application No. 22-02 is found to provide for façade improvements that will enhance the physical appearance and overall value of the 1st Street corridor. 2. Grant Application No. 22-02 is found to meet the grant program’s criteria as included in Section 2.80.110 of the Port Angeles Municipal Code. 3. Therefore, Staff is recommending support of approval of the grant proposal with conditions of approval that outlines the requirements of the final award of funding. Conditions Based on Staff’s finding and conclusions, the following conditions are placed on this grant application approval: 1. Upon the date the Planning Commission’s approval, the applicant may proceed with the expenditures detailed in the application. 2. The applicant shall sign a grant contract with the City of Port Angeles for the reimbursement of a maximum amount of $20,000.00 for façade improvements. The applicant will be given 180 days to submit reimbursement of expenditures associated with the approved grant proposal as of the Planning Commission action. If progress on the project can be demonstrated, the applicant may request one 180-day extension of the contract. 3. Prior to contract signature, signed letters from the proposal’s property owners granting consent to the mural work on their property shall be provided to the Planning Division. The letters should indicate the acceptance of the 5-year requirement to preserve the grant work (Per standard contract language). August 10, 2022 Planning Commission Agenda Packet Page 12 of 25 Skincare Suites and Wellness Spa at 106 and 108 East 1st Street, No. 22-02 August 10, 2022 Page 5 4. The applicant shall submit invoices for total reimbursement with a coversheet detailing each invoice number, amount, and type of payment and not exceeding the awarded grant amount. Reimbursement by the City will occur within 30 days of submission. 5. Prior to reimbursement, the property must be available to Staff for a site visit on the property confirming the work was done according to the approved grant application. 6. A building permit shall be required and submitted to the Department of Community & Economic Development for any and all construction work beyond repair. 7. Any labor performed in association with the grant proposal over $2,000.00 must meet federal prevailing wage standards. ATTACHMENTS A. Application Materials B. Historic Property Inventory Form August 10, 2022 Planning Commission Agenda Packet Page 13 of 25 Attachment A August 10, 2022 Planning Commission Agenda Packet Page 14 of 25 Attachment A August 10, 2022 Planning Commission Agenda Packet Page 15 of 25 Attachment A August 10, 2022 Planning Commission Agenda Packet Page 16 of 25 QTE-2022-0002  Page 1 / 1stellar carpentry inc. — 2332 W 12TH STREET, PORT ANGELES, WA 98363, United States Telephone: 2062354405 — email: stellarcarpentryinc@gmail.com Number Designation Qty Unit price Tax Total excl. tax Total excl. tax $68,175.92 Tax at 8.7 %$5,931.31 Total incl. tax $74,107.23 Payment cash or check. CustomerSigned and dated: Jason Trople 1 demo existing entries and above mezzanines 2person 20 hr $100.00 8.7 % $2,000.00 2 Waste disposal 2 u $537.96 8.7 % $1,075.92 3 Framing, siding and window trim 30 hr $120.00 8.7 % $3,600.00 4 framing, siding and window trim material 1 u $2,650.00 8.7 % $2,650.00 5 Masonry, match existing column base material 60'. repair/point existing brick. materials and labor 1 u $20,000.00 8.7 % $20,000.00 6 Windows and doors. material and install 19 u $1,650.00 8.7 % $31,350.00 7 Paint. pressure wash existing brick, paint windows and trim 1   $7,500.00 8.7 % $7,500.00 Skin Care Suites 133 E 1st St PortAngeles, WA. 98362 United States As of 4/15/22Quote No. QTE-2022-0002 Valid 15 days Facade Stellar Carpentry Inc 2332 W 12TH STREET PORT ANGELES, WA 98363 United States Tel: 2062354405 stellarcarpentryinc@gmail.com Attachment A August 10, 2022 Planning Commission Agenda Packet Page 17 of 25 Attachment AAugust 10, 2022 Planning Commission Agenda Packet Page 18 of 25 . L,.__ ....._ --HISTORIC PROPERTY INVENTORY FORM IDENTIFICATION SECTION Field Site No. FIE106 OAHP No Date Recorded 20 April 2000 Site Name Historic 106 / 108 East First Street Common Ambrosia Adult Videos and Gifts/Gamers Northwest Field Recorder Gerald K. B. Eysaman Owner's Name John/Evelyn Westrem, Trustees Address Westrem, Revocable Living Trust 10006 E Balboa Boulevard City/St~te/Zip Code Newport Beach, California 92661 Status PHOTOGRAPHY ~ Surveynnventory Photography Neg. No. R~ O National Register (Roll No. & Frame No.) O State Register O Determined Eligible O Determined Not Eligible View of North Facade O Otner (HABS, HAER, NHL) O Local Designation Date 24 Nov 99 Classification O District O Site m Building O Structure O Object . District Status O NR O SR O LR O INV Contributing O Non-Contributing O District/ Thematic Nomination Name ________________________ _ DESCRIPTION SECTION Materials & Features I Structural Types Building Type Commerceffrade Plan Rectangular Structural System Reinforced Concrete & Masonry No. of Stories 1 1 /2 Cladding (Exterior Wall Surfaces) OLog O Horizontal Wood Siding O Rustic I D10p O Clapboard O Wood Shingle O Board and Batten O Vertical Board O Asbestos I Asphalt m Brick m Stone O Stucco m Terra Cotta O Concrete I Concrete Block O Vinyl I Aluminum Siding O Metal (Specifyj O Other (Specifyi Roof Type O Gable m Flat O Monitor O Gambrel osned Roof Material O Wood Shingle O Wood Shake O Composition 0Slate . m Tar I Built-Up OTile OHip O Pyramidal Other (Specify) O Metal (Specify) __ O Other (Specify) O Not Visible --- Foundation O Log O Post& Pier O Stone O Brick O Not Visible Concrete O Block ml Poured O Other (Specify) Integrity (Include detailed description in Description of Physical Appearance) Changes to plan ........•............................................. : ....... . Changes to windows ....................................................... . Changes to original cladding ........................................... . Changes to interior .......................................................... . other (Specify) Storefront Intact 0 0 ml 0 0 Slight m m 0 0 m Moderate 0 0 0 m 0 Extensive 0 0 0 0 0 ' · ' l ~ 1 _J _J ; ~. Wasmng'u:m, b .. ., .. ,'.,nent"'ui"ct,,nmCliiiiy." ,·radmonom1i; uevelopment ·· Office of Archaeology & Historic Preservation 420 Golf Club Road SE, Lacey Post Office Box 48343 Olympia, Washington 98504-8343 (360) 407-0752 LOCATION SECTION Address 106/108 East First Street City!Town/County/Zip Code Port Angeles, Clallam, Washington 98362 Twp 30 N Range 6 W Section 00 Y. Section Y. Y. Section. ___ _ Tax No./Parcel No. 063000-513155-0000 Acreage Less than one Quadrangle or Map Name Port Angeles Quadrangle UTM References Zone 10 Easting E 467842 Northing N5329352 Plat/Block/Lot Norman R Smith I Block 31 I Lot 8 Supplemental Map(s) ____________________________ _ Hagn ~ty1es t .-orms ti..;neCK one or more of the following) O Greek Revival O Spanish Colonial RevivaVMediterranean O Gothic Revival O Tudor Revival O Italianate O Craftsman I Arts & Crafts O Second Empire O Bungalow O Romanesque Revival O Prairie Style O Stick Style O Art Deco I Art Modeme O Queen Anne O Rustic Style O Shingle Style O International Style O Colonial Revival O Northwest Style O Beaux Arts I Neoclassical m Commerclal Vernacular O Chicago I Commercial Style O Residential Vernacular O American Foursquare m Other (Specify) O Mission Revival Renaissance Revival Vernacular House Types O Gable front O Gable front and wing O Side Gable O Cross gable O Pyramidal I Hipped O Other (Specify) Field Site No.: FIEt06 Attachment B August 10, 2022 Planning Commission Agenda Packet Page 19 of 25 Study Unit Themes (Check one or more of the following) OAaricullure O Conservation O Polllics/GovemmenVLaw ~ Architecture I Landscape Architecture O Education O Rellaion 0Arts O Entertainment I Recreation O Sclerice & Em:1ineeriOQ ffl Commerce O Ethnic Heritage (Specify) O Social Movements I Organizations O Communicalloris O Health I Medicine O Transportation O Community Planning I Development O Manufacturing / Industry O other (Specify) O Military O Studv Unit Sub-Theme(sl (Soecifyj Statement of Significance Date of Corislructiori 1926 _ Architect I Engineer I Builder __ ~U~n~k~n_,,o,_w~"-------------------m In the opinion of the surveyor, this properly appears to meet the criteria of the National Register of Historic Places. m In the opinion of the surveyor, thl~ property Is located In a potential historic district (National and/or local). ( This building was originally constructed in 1926 by Thomas T Aldwell. The original commerciaJ tenants were F. G. Lewis (Photographer) and Ernest Eldridge (Barber). Over the years, the building was t· occupied by the Barros Mercantile Co. and a market. The building is currently occupied by Ambrosia Adult Videos and Gifts and Gamers Northwest. This building was constructed during the downtown's forth phase of development which is most visible today. It was a period of rapid commercial expansion framed by the Great War and the Great Depression. Older wood frame buildings were being replaced by larger more substantial structures. The railroad was now a permanent feature across the waterfront where Lincoln. Laurel, and Oak Streets reached out to expand the downtown north with an orthogonal web of docks. They seamlessly merged dry land with the numerous wharfs reaching out into the harbor. The once formidable and restrictive bluff across Lincoln Street bad been sluiced away. First Street quickly filled up with new retail and commercial structures. lt.~as built in what is best described as a commercial vernacular style. Through its size, form, scaJe and materials as well as its relationship to its neighbors and the street, this structure helped to further define the downtown's historical patlem of development. The infill nature of this building's commercial storefronts facilitated modernizations with litlle or no damage to the surrounding fa<;ade. Similarly, over time, the signage on this building has undergone numerous transfonnations with dramatic impact but few lasting scars. The substantiaJ integrity of this building demonstrates its continuing ability to provide valuable retail and commercial space. It is an invaluable resource, documenting the history of downtown Port Angeles' development and the vernacular urban architecture of the Northwest. Description of Physical Appearance This is a one-story, Renaissance-revival and late-Victorian inspired commercial row structure. It has two separate, unequal, storefronts with centered entries lhal are recessed between large storefront , display windows. The western storefront has five continuous transom windows. The eastern storefront is smaller with three similar transom windows. All of the transom windows are multi-pane and ~ leaded. Three brick piers with stone dene capitals and flush stone bases frame th'e masonry storefront openings. A single, continuous, soldier course of brick extends across the fa<;ade atop the capitols , and storefront openings. It has a continuous glazed terracotta string course. The fa<;ade is capped with an ornate corbelled Lerra corta cornice. lt has a series of decorative bands that terminate in end ' consoles supporting short finials. A row of square terracotta 'studs' line up with corbel point and between them are diagonal brick lozenges. There is a mezzanine level. Major Bibliographic References Histories Clallam County lmmigralion Associalion. Port Angeles The Gateway City of the Pacific Coast 1897. Seattle: The Shorey Bookstore, Facsimile Reproduction 1965. Hunt, Herbert. WashingtoJL West of the Cascades. Chicago: Clarke Publishing Co., 1917. Lauridsen, G.M. The Story of Port Angeles and Clallam County Washington. Seattle: Lowman & Hanford Company, 1937. Martin, Paul. Port Angeles Washington: A History. Volwnc 1. Port Angeles: Peninsula Publishing, Inc., 1983. Mccallum, John and Lorraine Wilcox Ross. Port Angeles U.S A. Wood and Reber, Inc., 1961. Peppard, Kurt. "Port Angeles Guide". Seattle: Cascadia Publishing Company, 1995. Welsh, William. A Brief History of Port Angeles. Port Angeles: Crown Zellerbach Corp., Seventh Printing 1955. Maps Levy, Lewis, Compiled by. Town of Pmt Angeles Washington with Additions. Port Angeles: Lewis Levy Real Estate Broker, 1890. Map of Port Angeles, Washing1on. Tae<;1rna: N.R. Bank Nole Company, 1912. SanbomFirelnsuranccMaps: 1891, 1897, 1911, 1917, 1924, 1947. 1949, 1952, 1955, and 1964. Smillt C.E., Norman R., Compiled by. Map of Port Angeles, Washington. San Francisco: Schmidt Label & Lithograph Co., 189 t. Smith, Norman R., Compiled by. Map of Port Angeles Washington Territory., 1884. Ware, Edwin, Draughtsman. Port Angeles and Suburbs (sjcj. Port Angeles W.T., 1889 Ware, W J . Compiled by. Townsile of Port Angeles and Vicinity. Port Angeles: W.J. Ware, 1891. Other Sources Polk's Clallam County Classified Business Directory. Kansas City, Mo.: R.L.Polk Co., various editions. Port Angeles Public Library: Patricia Campbell Room Vertical Files Port Angeles Public Library: Photograph Albums (including the Bert Kellogg Photographs Collection). Field Site No.: FIE 106 Attachment B August 10, 2022 Planning Commission Agenda Packet Page 20 of 25 r I I l • ~ I I Historic Inventory Report 2000 Project North Port Angeles, Washington 1 06 I 1 08 East First Street Field Site No.: FIE 106. Commerce/Trade Site Map: 2 Attachment B August 10, 2022 Planning Commission Agenda Packet Page 21 of 25 Department of Community & Economic Development 321 E. 5th Street, Port Angeles, WA 98362 360.417.4750 | www.cityofpa.us | ced@cityofpa.us TBPFW TEMPORARY BUILDING PERMIT FEE WAIVER The purpose of a Temporary Building Permit Fee Waiver (TBPFW) is to encourage the development of a variety of housing types reserved for families at or below 80% area median income (AMI) until September 1, 2028. By completing this application, the applicant is agreeing to ensure through their own due diligence that any structure utilizing this fee waiver will meet the requirements of Port Angeles Municipal Code (PAMC) 3.70.080. CONTACT INFORMATION Full Street Address: Full Legal Description: Parcel Number: Current Zoning: Comprehensive Plan Designation:__________________________ □TBPFW Application: A completed application signed by the property owner □Associated Building Permit: Permit # ___________________ □Project Narrative: Explaining how the property will satisfy the affordable housing commitment proposed □Acknowledgment of fee and penalty liability: An affidavit signed by the property owner and notarized I have read and completed the application and attached all application materials and know it to be true and correct. I am authorized to apply for this exemption and understand that additional information may be required. I understand that I will forfeit fees if I withdraw the application prior to exemption issuance. I certify under penalty of perjury of the laws of the State of Washington that the information on this application and all information submitted herewith is true, complete and correct. Date Print Name Signature ( Owner Representative) APPLICATION MATERIALS CHECKLIST DATE STAMP Notes: Total Fees Waived: Form Revised 8/1/2022 Property Owner Name: Mailing Address: Phone: Email: Applicant (if other than Owner): ______________________________________________ Phone: Email: (If the applicant, or applicant’s representative, is not the property owner, written authorization from the owner for this proposed action must be provided) PROPERTY INFORMATION FILE NO. August 10, 2022 Planning Commission Agenda Packet Page 22 of 25 Department of Community & Economic Development 321 E. 5th Street, Port Angeles, WA 98362 360.417.4750 | www.cityofpa.us | ced@cityofpa.us FILE NO. TBPFW TEMPORARY BUILDING PERMIT FEE WAIVER Total:__________ Is the project site currently vacant? □Yes □ No Number of existing residential units: Occupied:__________ Vacant:_________ Total number of dwelling units proposed by type: ADU ___ DUPLEX ___ TRIPLEX ___ COTTAGE DEVELOPMENT ___ MULTI-FAMILY ___ Net Gain of Units ___ Number of units for which a fee waiver is requested:____________________ Will the owner/developer occupy one of the property units? Yes__ No__ Rehabilitation/Demolition of vacant units:_______/_______ Conversion from non-residential use:_______ Rental Units:________ Owner Occupied________ Affordable:________ Anticipated Construction Start Date:______________Anticipated Construction Completion Date:___________ Residential: □ New Construction □ Rehabilitation Unit Mix # of Units Avg. Unit Size Total SF Total Cost Cost Per Unit Studio/1 Bdrm 2 Bedrooms 3+ Bedrooms Common Areas* Totals Cost per SF Non-Residential: Use Mix Total SF Total Cost Cost per SF Commercial, Offi ce, Retail, etc. Commercial Common Areas* Totals Projected cost and fl oor area (SF) of new construction/rehabilitation: Projected total cost and cost/SF of residential construction/rehabilitation: $_____________ $/SF Projected total cost and cost/SF of non-residential construction/rehabilitation: $_____________ $/SF Total projected cost of all new construction/rehabilitation:$___________________________ Source of Cost Estimates:___________________________________________________________________ ________________________________________________________________________________________ ________________________________________________________________________________________ ________________________________________________________________________________________ PROJECT INFORMATION * Includes residential lobbies, recreation areas, parking, storage areas, etc. * Includes commercial lobbies, restrooms, parking, storage areas, etc. A A B B C C D D E E (A+C) Form Revised 8/1/2022August 10, 2022 Planning Commission Agenda Packet Page 23 of 25 STATEMENT ON REMOVAL FROM TEMPORARY BUILDING PERMIT FEE WAIVER PROGRAM & OWNER RESPONSIBILITY The purpose of the Port Angeles Temporary Building Fee Waiver program is to encourage the development of a variety of housing types reserved for families at or below 80% AMI until September 1, 2028. A unit having been been approved for this temporary fee waiver may be removed from said program for the following reasons: •A unit is bought by or rented to a family above 80% AMI before September 1, 2028 •A unit is utilized as a short term rental before September 1, 2028 •A unit is converted to a housing type not eligible for this fee waiver before September 1, 2028 If a unit utilizing the temporary building permit fee waiver program is removed from said program the original building permit fee waived through this program will be remitted to the City of Port Angeles. The original building permit fee is due within 30 days of the property's removal from this program, and  the total bears interest thereafter at the rate provided for delinquent property taxes.  AFFIRMATION  As owner(s) of the land described in this application, I hereby indicate by my signature that I am aware of  the fees to which the property will be subject if the waiver authorized by Port Angeles Municipal Code  3.70.080 is violated or canceled. I declare under penalty of perjury under the laws of the State of  Washington that this application and any accompanying documents have been examined by me and that  they are true, correct and complete to the best of my knowledge.  Signature(s) of all Owner(s) and Contract Purchaser(s) (Required):  ____________________________________   ____________________________________   Name Printed Name Printed  ____________________________________   ____________________________________  Signature                                                     Date    Signature                                                     Date  ____________________________________   ____________________________________  Name Printed Name Printed  ____________________________________   ____________________________________  Signature                                                      Date         Signature                                                     Date  (Fill out an additional page if there are more parties of record)  Form Revised 8/1/2022August 10, 2022 Planning Commission Agenda Packet Page 24 of 25 RESERVATION FOR FAMILIES AT OR BELOW 80% AMI  I/We, owner(s) of the building described herein, hereby swear under penalty of perjury that the dwelling  units located at (address)__________________________________________________ for which a  temporary building permit fee waiver has been requested, is legally described as  _____________________________________________________________________________________ _____________________________________________________________________________________  with Assessor’s Parcel Number(s) of________________________________________________________  The unit numbers are:___________________ and will be reserved for families at or below 80% AMI until September 1, 2028.  EXECUTED this __________ day of ___________________________ 20______. ____________________________________    Signature  ____________________________________    Name Printed STATE OF WASHINGTON        )  COUNTY OF CLALLAM         )SS  I CERTIFY that I know or have satisfactory evidence that _________________________, is the person who appeared before me, and said person acknowledged that he/she signed this instrument, on oath  stated that he/she was authorized to execute the instrument and acknowledged it as the  _____________________________________ of ______________________________ to be the free and  voluntary act of such party for the uses and purposes mentioned in the instrument.  ____________________________________    DATE  ____________________________________    SIGNATURE OF NOTARY PUBLIC   (Seal or Stamp)    ____________________________________    PRINTED  ____________________________________    TITLE  ____________________________________    DATE APPOINTMENT EXPIRES  Form Revised 8/1/2022August 10, 2022 Planning Commission Agenda Packet Page 25 of 25