HomeMy WebLinkAbout4.481 Original Contract . ! . -<I.</~J O"R I GIN A L ~ .1 PROJECT MANUAL Upgrade of Leachate Pump Station #1 Project 04-10 SCOPE OF WORK The City of Port Angeles Public Works and Utilities Department plans to refurbish and upgrade Leachate Pump Station Number 1, at the City landfill. The upgrade will consist of the following major components: 1. I nstallation of 2 non-clog submersible sewage pumps with 18.5 hp explosion proof motors that match the existing Pumpex model K 89 F-VE1170. 2. Filleting the sump bottom and adding Pumpex style discharge connections 3. Four-inch stainless steel wet well piping with pump retrieval system, using a new concrete wet well lid, aluminum hatch cover with safety grate and embedded sockets for supplied hoist. 4. Rehabilitation of existing valve vaults (2) to include four new 4 inch Mueller resilient gate wedge valves (MU-CO 040A236008LH 41N RWGV), two new 4 inch Mueller Swing Check valves (MU-CO 040A212206 0239), and two new six inch Mueller Resilient seat Wedge valves (MU-CO 060A236019LN 61N RWGV). This work should include the installation one air release valve (Val-matic model # 25.5 or equal), that can be isolated through a two inch stainless steel ball valve on the inlet side, to release air pockets in the force main. Contractor will also install a City-supplied 6-inch flowmeter. See attachment for detailed specifications. ADDITIONAL ~EQUIREMENTS 1. The bid shall be submitted on the attached Bid Form and mailed or delivered to the Director of Public Works & Utilities, City of Port Angeles, 321 East Fifth Street, P. O. Box 1150, Port Angeles, Washington 98362. Questions may be directed to Jeff Young, WWTP Superintendent, at 360-417-4845. 2. The most recently issued Washington State Prevailing Wage Rates for Clallam County, a copy of which is attached to this Project Manual, shall apply to this Contract. 3. The bid will be awarded to the lowest responsible bidder from the group of Small Works Roster contractors asked to bid on this work. The attached Contract will then be signed, requiring the Contractor to meet the requirements in the Contract as well as the entire Project Manual. No bidder will be permitted to withdraw its bid between the closing time for receipt of bids and the execution of a Contract, unless the award is delayed for a period exceeding sixty (60) calendar days. PW-407_10 [rev. 9/28/04] Small Works Roster Project Manual Page 1 of 9 4. Bids shall be submitted no later than 1 :30 pm Tuesday, November 9, 2004. 5. A bid bond, a performance and payment bond, and retainage will be required for this work. All bids shall be accompanied by a bid deposit in the form of a cashier's check, postal money order, or surety bond to the City of Port Angeles in the amount of five percent (5%) of the total amount of the bid. If a surety bond is used, said bond shall be issued by a surety authorized and registered to issue said bonds in the State of Washington. The bond shall specify the surety's name, address, contact and phone number, and shall include a power of attorney appointing the signatory of the bond as the person authorized to execute it. Should the successful bidder fail to enter into the Contract and furnish satisfactory performance bond within the time stated in the Information for Bidders, the bid deposit shall be forfeited to the City of Port Angeles. Faxed bids and/or surety bonds will not be accepted. 6. When awarded the Contract, the successful bidder shall promptly execute the Contract and shall furnish a bond of faithful performance of the Contract in the full amount of the Contract price. 7. The performance period for this work is 45 working days. Contractor is to mobilize and start work within 30 working days of Notice To Proceed. PW-407 _10 [rev. 10/29/03] Small Works Roster Project Manual Page 2 of 9 '- BID FORM Upgrade of Leachate Pump Station #1 Project 04-10 The bidder hereby bids the following amount for all work (including labor, equipment, time and materials) required to upgrade the Leachate Pump Station #1 as required in the Scope of Work. Lump Sum $ 3 7/ re 75 ~ bO ~ 3J 12.7_ ot'J- $ 40~ 802, O/:'J-. '6f) Sales Tax (8.3%) $ Total Bid The bidder hereby acknowledges that it has received Addenda No(s). (Enter uN/A" if none were issued) to this Project Manual. tV/A- I The name of the bidder submitting this bid and its business phone number and address, to which address all communications concerned with this bid and with the contract shall be sent, are listed below. UBI Number ... Bidder's firm name Gl<eLoll {ON't;)fl.-t,9C-TI'tJN Complete address If 3Cj .])U+.,e.fC1Z0W f2D~5e: #q of '1 (Street address) OI'1MP; A (City) Registration Number GR.e(o,-~qb 50"- CC:Do 3GO ~ I tJ 3:1: :3);/: 1:0 ~ t2 rLvf l-kAt 6e:nm w-~. (State) '1fJS I -3 (Zip) Telephone No. Signed by Title Printed Name: PW-407 _10 [rev. 9/28/04] Small Works Roster Project Manual Page 3 of:Jt , PUBLIC WORKS CONTRACT This Contract is made and entered into in duplicate this {j;i:A.- day of~O fI fJ..~(JA- 20~, by and between the City of Port Angeles, a non-charter code city ofthe State of Washington, hereinafter referred to as "the City", and Grecor Construction , a Washington Corporation , hereinafter referred to as "the Contractor". WITNESSETH: Whereas, the City desires to have certain public work performed as hereinafter set forth, requiring specialized skills and other supportive capabilities; and Whereas, the Contractor represents that it is qualified and possesses sufficient skills and the necessary capabilities to perform the services set forth in this Contract. NOW, THEREFORE, in consideration of the terms, conditions, and agreements contained herein, the parties hereto agree as follows: 1. Scope of Work. The Contractor shall do all work and furnish all tools, materials, and equipment in order to accomplish the following project: Upgrade of Leachate Pump Station #1 Project 04-10 in accordance with and as described in this Contract and the Project Manual, which include the attached plans and scope of work, and shall perform any alterations in or additions to the work provided under this Contract and every part thereof. The Contractor shall provide and bear the expense of all equipment, work, and labor of any sort whatsoever that may be required for the transfer of materials and for constructing and completing the work provided for in this Contract, except as may otherwise be provided in the Project Manual. 2. Time for Performance and Liquidated Damages. a. Time is of the essence in the performance of this Contract and in adhering to the time frames specified herein. The Contractor shall commence work within 45 working days of Notice to Proceed, and said work shall be physically completed within 30 working days after commencing work, unless a different time frame is expressly provided in writing by the City. b. If said work is not completed within the time for physical completion, the PW-407_10 [rev. 10/29/03] Small Works Roster Project Manual Page 4 of 9 Contractor may be required at the City's sole discretion to pay to the City liquidated damages of $100.00 for each and every day said work remains uncompleted after the expiration of the specified time. 3. Compensation and Method ofPavrnent. a. The City shall pay the Contractor for work performed under this Contract as detailed in the bid, at the completion of work and submission of a detailed InVOIce. b. Payments for any alterations in or additions to the work provided under this Contract shall be on a negotiated time and materials basis. 4. Independent Contractor Relationship. The relationship created by this Contract is that of independent contracting entities. No agent, employee, servant, or representative of the Contractor shall be deemed to be an employee, agent, servant, or representative of the City, and the employees of the Contractor are not entitled to any of the benefits the City provides for its employees. The Contractor shall be solely and entirely responsible for its acts and the acts of its agents, employees, servants, subcontractors, or representatives during the performance of this Contract. The Contractor shall assume full responsibility for payment of all wages and salaries and all federal, state, and local taxes or contributions imposed or required, including, but not limited to, unemployment insurance, workers compensation insurance, social security, and income tax withholding. 5. Prevailing Wage Requirements. The Contractor shall comply with applicable prevailing wage requirements of the Washington State Department of Labor & Industries, as set forth in Chapter 39.12 RCW and Chapter 296-127 WAC. The Contractor shall document compliance with said requirements and shall file with the City appropriate affidavits, certificates, and/or statements of compliance with the State prevailing wage requirements. The Washington State Prevailing Wage Rates For Public Works Contracts, Clallam County, incorporated in this Contract have been established by the Department of Labor & Industries and are included as an Attachment to this Contract. The Contractor shall also ensure that any subcontractors or agents of the Contractor shall comply with the prevailing wage and documentation requirements as set forth herein. 6. Indemnification and Hold Harmless. a. The Contractor shall defend, indemnify, and hold harmless the City, its officers, officials, employees, and volunteers against and from any and all claims, injuries, damages, losses, or lawsuits, including attorney fees, arising out of or in connection with the performance of this Contract, except for injuries and damages caused by the sole negligence of the City. It is further provided that no liability shall attach to the City by reason of entering into this Contract, except as PW-407_10 [rev. 9/28/04] Small Works Roster Project Manual Page 5 of 9 expressly provided herein. b. Should a court of competent jurisdiction determine that this Contract is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, and volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. It is further specifically and expressly understood that the indemnification provided herein constitutes the Contractor's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Contract. 7. Insurance. The Contractor shall procure and maintain for the duration ofthe Contract, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees or subcontractors. Failure by the Contractor to maintain the insurance as required shall constitute a material breach of contract upon which the City may, after giving five working days notice to the Contractor to correct the breach, immediately terminate the Contract or at its discretion, procure or renew such insurance and pay any and all premiums in connection therewith, with any sums so expended to be repaid to the City on demand, or at the sole discretion of the City, off set against funds due the Contractor from the City. a. Minimum Scope of Insurance The Contractor shall obtain insurance of the types described below: 1. Automobile Liability insurance covering all owned, non-owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. 11. Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, stop gap liability, independent contractors, products-completed operations, personal injury and advertising injury, and liability assumed under an insured Contract. The Commercial General Liability insurance shall be endorsed to provide the Aggregate Per Project Endorsement ISO form CG 25 03 11 85. There shall be no endorsement or modification of the Commercial General Liability insurance for liability arising from explosion, collapse or underground property damage. The City shall be named as an insured under the Contractor's Commercial General Liability insurance policy with respect to the work performed for the City using ISO Additional Insured endorsement CG 20 10 10 01 and Additional Insured-Completed Operations endorsement CG 20 37 10 01 or substitute endorsements providing equivalent coverage. PW-407_10 [rev. 10/29/03] Small Works Roster Project Manual Page 6 of 9 Ill. Workers' Compensation coverage as required by the Industrial Insurance laws ofthe State of Washington. b. Minimum Amounts of Insurance The Contractor shall maintain the following insurance limits: 1. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of$I,OOO,OOO per accident. 11. Commercial General Liability insurance shall be written with limits no less than $1,000,000 each occurrence, $2,000,000 general aggregate and a $2,000,000 products-completed operations aggregate limit. c. Other Insurance Provisions The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile Liability and Commercial General Liability insurance. 1. The Contractor's insurance coverage shall be primary insurance as respect to the City. Any Insurance, self-insurance, or insurance pool coverage maintained by the City shall be in excess of the Contractor's insurance and shall not contribute with it. 11. The Contractor's insurance shall not be cancelled or reduced as to coverage by either party, except after forty-five (45) days prior written notice by certified mail, return receipt requested, has been given to the City. d. Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best rating of not less than A:VII. e. Verification of Coverage The Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the insurance requirements ofthe Contractor before commencement of the work. 8. Compliance with Laws. a. The Contractor shall comply with all applicable federal, state, and local laws, including regulations for licensing, certification, and operation of facilities and programs, and accreditation and licensing of individuals, and any other standards or criteria as set forth in the Proj ect Manual. b. The Contractor shall pay any applicable business and permit fees and taxes which may be required for the performance of the work. PW-407 _10 [rev. 10/29/03] Small Works Roster Project Manual Page 7 of 9 c. The Contractor shall comply with all legal and permitting requirements as set forth in the Project Manual. 9. Non-discrimination. The parties shall conduct their business in a manner which assures fair, equal and nondiscriminatory treatment of all persons, without respect to race, creed, color, sex, Vietnam era veteran status, disabled veteran condition, physical or mental handicap, or national origin, and, in particular: a. The parties will maintain open hiring and employment practices and will welcome applications for employment in all positions from qualified individuals who are members of the above-stated minorities. b. The parties will comply strictly with all requirements of applicable federal, state or local laws or regulations issued pursuant thereto, relating to the establishment of nondiscriminatory requirements in hiring and employment practices and assuring the service of all patrons and customers without discrimination with respect to the above-stated minority status. 10. Assignment. a. The Contractor shall not assign this Contract or any interest herein, nor any money due to or to become due hereunder, without first obtaining the written consent of the City, nor shall the Contractor subcontract any part of the services to be performed hereunder without first obtaining the consent of the City. b. The Contractor hereby assigns to the City any and all claims for overcharges resulting from antitrust violations as to goods and materials purchased in connection with this Contract, except as to overcharges resulting from antitrust violations commencing after the date of the bid or other event establishing the price of this Contract. In addition, the Contractor warrants and represents that each of its suppliers and subcontractors shall assign any and all such claims for overcharges to the City in accordance with the terms of this provision. The Contractor further agrees to give the City immediate notice of the existence of any such claim. 11. Contract Administration. This Contract shall be administered by Grev Langemo on behalf of the Contractor and by Jeff Young on behalf of the City. Any written notices required by the terms of this Contract shall be served or mailed to the following addresses: PW-407 _10 [rev. 10/29/03] Small Works Roster Project Manual Page 8 of 9 Contractor: Grecor Construction 439 Duterrow Rd. SE, #9 Olympia, W A 98513 City: City of Port Angeles P.O. Box 1150 321 East Fifth Street Port Angeles, W A 98362-0217 12. Interpretation and Venue. This Contract shall be interpreted and construed in accordance with the laws ofthe State of Washington. The venue of any litigation between the parties regarding this Contract shall be Clallam County, Washington. IN WITNESS WHEREOF, the parties hereto have caused this Contract to be executed the day and year first set forth above. CONTRACTOR: ~f(~Wl<. (1 III $ TlWytO'<- BY:~7 Title: Ow Al$1. \ CITY OF PORT ANGELES: APP~ed as to ~ 11;~ ! ~-- City Attorney Attest: .Ao~~,. City C PW-407 _10 [rev. 10/29/03] Small Works Roster Project Manual Page 9 of 9 04-~lo ,(.... e..o ..H3'0'" :3:t: .4\"\ A C~ m~...u\. lc~ L ~ PUMPEX - Wastewater pumps K 89 F-VE1170 Mm hatch SIZe simplex - Hs Man hatch SIZe duplex -Hd T estnorm HI H [ft t 280 ~.......... .....! '\ 240 200 160 120 80 60 Hz I 1 ! I L2 ! 0 I I' L3 'I ~i I A-J-U ' ) : Iii I "~I/!\ I J I . i!~,," II, i /~d, I 2"guoderads I i I I . suool,ed localtv I I I I "" I I I -s'ne!I'jl L 1 "I'~ 'I I\' I ~ Ff'" 'J 'I 1 ,11~I~f$~ ](1 ~ I Ll I I I I I I I I I I I Wet sump Installation with base elbow 4" i 40 P2 [hPI- 40 I I ._ .'. ..' J:._. I ...... -.' . .-':...-- -..... I L -" :::::..:::: ;~::::::. :.::::::':f--r-"-"I'--'T 185 20 .- I [ I 170 I I 106 . . 206 . . 306 . . 400 560"" Q [US g:p.m:] ~/~~ i "'.--. m ' !) ~ , \ I ~'I ~~:~~~0'\\\ ~i \lU)) ~~\\!l; . \),~-rr-t l ~7!I[,'( ~rl~~~',,~~ ~) ~I ,~Ol..:l&':t'.::=;;::* 1 y '--.:: / ~ o :1 30 lJ J"O 1~ EE :>;; 10 o I Dimensions [inch] [ I I W2 7'3/'6 H5 1515/'6 Y 913/'6 Hd 36X44 W3 7'/2 A 39/,6 Z 1't, cc 20" L2 197/8 H2 413/,. C 3'5/'6 SL 43/. L3 7'5/'6 H3 77/6 D 8'/,6 F 3" W1 105/8 H4 107/,6 X 6"/,6 Hs 36X24 L1 373/8 H1 3513/,6 B 57/8 SM 't, " Operating data specification at duty point Flow 269 US g p.m. - ~,-Head ___~~~.__>~_~~. Static head 70ft I Nature of system Single head pump No of pumps 1 I FlUid Water Temperature 68 OF I Density 62 4 Iblft' VISCOSity o 0000108 ft2/s I Pump data Type K89F-VE1170 Make PUMPEX Impeller type Vortex Impeller Senes K Impeller size 170mm Free passage 2 3/8 Inch Flow 276 US g p m. Head 100 ft Shaft power 17.2 hp Operating speed 3480 rpm ~ Motor data I Rot'" "'.go M2016-2 [ Rated power P2 - 18~~ 460 V I Rated current 24A Nominal speed 3480 rpm Frequency 60Hz Degree of protection IP68 I Insulation class F I EffiCiency 80% I Power factor 0.93 i I I I i I I PUMPEX its. PUMPEX - Wastewater pumps K 89 F-VE1170 I I I I PUMPEX 1 i Density 162.4 Ib/ft3 'I Impeller Vortex 60 Hz ! VISCOSity I 0.0000108 ft2/S I Sel speed 3480 rpm 1 1 Date I June 27, 2003 I' T estnorm H.1. Impeller size 170mm I Nominal speed ! 3480 rpm I I 4 ft] I i I i I I ! I I I 0 ! I I 1 I 1 I I I ! ^ I I v I I I 1 I I I ! 1 1 0 1 I 0 ! ! I I I I I I I 1 I 1 I I I I 0_ 1 I "" 1 1 I i I 1 0 I I !'-" I : I 1 1 I ! I I 0 I I I - , I I I I i I I I 0 , I 1 30 1 ,jp3Wor ej I I -I 1 I I I ^ , I - - -, I I I I I 1 I I T I 0 -- I I I I I i-' ! I I i I I I I I 0 ""- '-- ~., T"-- I -'-,J I I 1 I I I I I I 0 , - , , , - ---,.L. I 0 '-.. , , ,- I I -+- "" I --',_1 395~ 1 I i 1 I I I I 0 -,- I "',-l. ---,J I I I I I 0 I -, I 1 - '1-'-- I - --,L -, 1 I~ I r-..... , - 0 """1--. '1----_ "-L ':005 I I ~ I i v " , -, - ......1... i/ I ! i 0 - - , I ......... 1"-, , - , , , ./ I 1 1 I """- " , 0 I ~ I , , '-" 4.: ~" "Ill I I 0 - , :.. - """'- - , , .......tr6~' , 0 -,....... I ./1".... I , , I 0 1 , , I I ~~' ". y"" ',-, , 'J, I I 0 1 I ~ ....- ! , , , , 1 0 " , , 1 I ~ I 41~ ",L I ", I I 0 1 i I I I -~ I "" I , 0 I', I I I I I " I , "J I '... , , 0 I 1 ~, I 'I" , , 0 ~~ I I , I i I I , I' "OA 0 ' 185 I I I i ! I 0 I I ! I 0 0 I I I I I I i 1 I I I I I I I ] I 1 I I I I I 1 1 I , 5 I I I I I I I I I I I 0 I I I I , 5 I I i I _J?-.n 1 i I ~ ___I J______l_____T_____~------ --194 I I I _----j215 -1..----205 _-- -- 200 0 .... ..._- I I -r- I -- I '--- I --- J -1-----, ------1.., I _----- _----- _-----_1-----1:---- ,----- 5 _... I ...- I _...- i _-- I ...,-- I I ____________..______ - ,----- I ----J-----:I----- 1 -L-----r----I I I I i 0 -----j _---__--{----::~----- _-----j----- I I I ~~ --- I I -1----- -----1-170 I 5 I , I I ..- ! I 1 I I I I I 0 I I 1 I I I I I I I I I I , I i I , , , , , , , , H[ 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 P2 [hp 4 3 3 2 2 o , 50 , 150 , 300 400 , ' 450 I' 500 550' 600 I 200 , , ' 250 , , 350 650 " Q [US g.'p:m.] , 100 K 89-VE1-AB 60Hz "2..j /."3- PUMPEX Wastewater pumps - K 89 F-VE1170 60 Hz Min. hatch size simplex - Hs Min. hatch size duplex -Hd t L2 I 0 I r------I hil Am I II I , I L \ I \1 i \ \ It) J: c, L3 " , I I ' I I-J 1\ 'd ! \'~/tt \ I ~' 1 I I I , I " ~ J: J L1 ~ I ~! I & ;t%~~~ ! .ty' ~@;:;- \'Q:;, ""I ' ) /; \<\ cri1 ~o~91 w"ry\\ \ ~~ (I"~'~'--{J/H -) co . ~\\ \~~' Yli 1 I '-lG 1'1 ;' . \,o,,~,"/1 / N ll, I (,)1 \y"Oj.... ::c:/"/,plJ ~ ..'(H~~~, r o y '1 o --r xl o ...5L Wet sump installation with base elbow 3" ---,,- (,) (,) x ' ale a..2 I ::l Ul l ~ ~ ------"- :2 i5 i Dimensions [inch] I I I I L1 L2 I L3 W1 W2 W3 37% 197/a I 715/16 105/a i 713/16 71/2 I H1 I H2 H3 I H4 H5 I A 3513/16 413/16 77/a 107/16 1515/16 39/16 B C I 0 I X y I Z 57/a 315/16 I 81/16 I 611/16 913/16 1112 8M 8L ! F I Hs 1 Hd CC 112 43/4 4" 36X24 I 36X44 20" I I I I PUMPEX 3/,. PUMPEX Wastewater pumps - K 89 F-VE1170 PUMPEX WASTEWATER PUMP K 89 60Hz Motor Pump Power rating Poles K 89 VC1160 12Hp 2 K 89 VC1174 12Hp 2 K 89 VC1191 18,5Hp 2 K 89 VC1200 32Hp 2 K 89 VC1216 32Hp 2 K 89 VC1220 32Hp 2 ~W.1.ZO-.. ~ B fiHp ? K 89 VE1185 32Hp 2 K 89 VE1194 32Hp 2 K 89 VE1200 32Hp 2 K 89 VE1205 32Hp 2 K 89 VE1215 32Hp 2 K 89 VE1230 32Hp 2 Suction-side: AnsI 4" Discharge- Connection AnsI 3" I Ansi 4" AnsI 3" I AnsI 4" AnsI 3" I AnsI 4" Ansi 3" I Ansi 4" AnsI 3" I AnsI 4" AnsI 3" I AnsI 4" /______ An~i :l" I An~i 4" ~ AnsI 3" I Ansi 4" AnsI 3" I AnsI 4" AnsI 3" I AnsI 4" Ansi 3" I AnsI 4" AnsI 3" I Ansi 4" Ansi 3" I Ansi 4" Motordata . Insulation Class F (3100 F) . Built-In thermal contacts. Built-In moisture sensor. Power Motor- Power- rating efficiency factor Speed (rpm) 12Hp 0.75 091 3480 ~~ 076 0.91 3480 ~ -o:mr ~ Impellers' VC .Vortex Impeller VE :Vortex impeller Cables: Motor D.O.L -start 230V Nom.current Nom.current Start current 230V (Amps) 460V (Amps) IsUln 33 16,5 6.1 ....4a- 24 ~ 84 -42 6,1 D.O.L.-start 460V 12Hp W AWG 8-4 (2x4x10 mm2) W AWG 10-4 (4x10 mm2) 1..8'~AHJL____.._~~yy'Q..9..~..1W.9..!!1!!i1.,._""".._. _,~ ~~A~~ mw:l 32 p vv AWG 2-4 (2x4x10 mm2) W AWG 8-4 (4x10 mm2) Control cable AWG 16-4 (4x1,5 mm2) Shaft seal : Double mechanical seal in oil bath. Primary seal: sIlicon carbide on silicon carbide. Secondary seal : SIlicon carbide on carbon. Bearings: Upper. single-row deep groove ball bearing. Lower: double angular contact ball bearing. 011 : White oil, e.g. BP Enerpar M002 011 quantity. 0,3 pints AWG 6-4 (4x1,5 mm2) PUMPEX L/I: PUMPEX - Wastewater pumps K 89 F-VE1170 Coolant: Dry pit (cooled) 23 pmts Wet pit (submersed) 8,5 pints Matenals . Motor-, oil-hoUSing, volute: Grey cast Iron ASTM A48 Class 35 B. Impeller, adapter: S.G. iron ASTM A395 Grade 60-45-15 Rotor shaft: Stamless steel AISI 420. Nuts and bolts Stainless steel AISI 304. O-rings: Nitnle rubber. Weights: Pump K89 F80 K89 F100 K89T K89 P 12HO 18,5Hp 32Hp Discharge bracket 3" 4" 4321bs 4561bs -;;u 16s 4371bs 5221bs 4521bs 4591bs 544lbs 4761bs ~53TlfJr=~1"j'1DS--54116S 771bs 791bS PUMPEX 5h PUMPEX - "Wastewater pumps K 89 F-VE1170 PUMPEX Engineenng Specifications SUBMERSIBLE SEWAGE PUMP Model K 89 (Same motor frame as for model K103 and K153) Furnished and Install submersible sewage pumps as Indicated on the drawings and specified herein. Pumps shall be manufactured by Pumpex or approved equal. A. Pump DeSign: The pumps shall be submersible, centnfugal, non-clogging sewage pumps, capable of handling raw, unscreened sewage. The pumps shall be capable of operating continuously In submersed or dry installed condition without adverse effects due to heat generation. Pumping units which utilize recirculation of the pumped media for cooling purposes or provide connections for external cooling water shall not be conSidered equal or acceptable. Removal of the motor Unit and Impeller from the volute shall be eaSily accomplished by turning TWO latch bolts on the pump hOUSing. O-nng sealing shall be provided between the motor and the volute to prevent external leakage. B. Installation: (1) Wet pit installatIon: When lowered on ItS gUide rail system consisting of two guide rails, each pumping Unit shall be automatically and firmly connected to a discharge connection bracket permanently mounted on the wet-well bottom Sealing of the discharge connection by means other than metal to metal contact of the pump discharge flange and the discharge connection bracket will not be acceptable. There shall be no need for personnel to enter the wet-well for any reason. No portion of the pump shall rest on the sump floor. (2) Dry pit installation: The pump should have a reliable, maintenance free cooling system that circulates a cooling liquid in a closed loop through a cooling Jacket, and transfer the heat to the pumped liqUid by heat exchange. A system that circulates the pumped liquid In a cooling system should not be accepted The pump should be equipped with adjustable telescopic support legs to secure the pump and faclllltate the Installation. C. Pump Construction (1) The motor housing and volute shall be made of grey cast Iron, ASTM A48, Class 30B, with appropriate coatings to protect the pump from corrosive properties of the materials being pumped. All bolts and nuts shall be AISI 304 stainless steel. (2) Impellers shall be vortex type of ductile Iron material, ASTM A-395, and shall be dynamically balanced, slip fit and keyed to the shaft. The Impeller shall be capable of handling solids, fibrous matenals, (3) The shaft and shaft sleeve shall be of 400 senes stainless steel and shall have a minimum overhang length from lower beanng to Impeller cap nut. Radial deflection and shaft distortion shall not exceed 2/1000" at the lower shaft seal. (4) The pump shaft shall rotate on two permanently lubncated ball beanngs. The lower beanngs for aXial and radial forces shall consist of double row angular contact ball beanngs With a minimum B10 life of 60,000 hrs. at the best efficiency point; while the upper beanng for radial forces shall consist of a single row deep groove ball bearing. (5) The shaft sealing system shall consist of tandem mounted mechanical seals built into a replaceable cartndge to facilitate on site replacement. A replacement shaft sealing system shall be tested and certified as a separate Unit by the manufacturer. The shaft sealing system shall run In an 011 bath. The lower, pnmary seal shall consist of one stationary silicone carbide nng and one positively dnven (rotating) silicon carbide nng; while the upper seal between the motor and the 011 hOUSing shall consist of PUMPEX b /':l PUMPEX - Wastewater pumps K 89 F-VE1170 one stationary stainless steel ring and one positively dnven rotating carbon ring. Each interface shall be held In place by its own independent spnng system. (6) The pump motor shall be housed in an air-filled, water-tight casing with Class F insulation (rated for 3100 F) and a 1.15 service factor. The stator shall be heat shrunk fit Into the stator housing, precluding the need for pins or other fastening methods. Built In motor protection shall consist of bl-metalllc micro sWitches in the windings. Motors shall be Hp, RPM, Volt, Phase, 60 HZ. Motors shall be non-overloading throughout the entire pump operatmg range. 011 filled motors shall not be considered equal or acceptable. (7) The cable entry water seal shall not require epoxies, silicones or other secondary sealing systems (8) The pump motor cable shall be heavy duty type suitable for submersible pump applications. (9) All mated surfaces shall be machined and fitted with O-rings for water-tight sealing. D. System Requirements: Each pump shall have the following characteristics: CAPACITY TDH (GPM) SHUTOFF HYDRAULIC (FT) HEAD (FT) EFFICIENCY PUMPEX 7 ~ I I r . , ..' r State of WashingtOn ~ DEPARTMENT OF LABOR AND INDUSTRIES Prevailing Wage Section. Telephone (360) 902-5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage Rates For Public Works Contracts The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe' benefits. On public works projects, workers' wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements is provided on the Benefit Code Key. CLALLAM COUNTY Effective 09-01.()4 .*********************************************************************************************AAAAAAAAAA********* (See Benefit Code Key) Over PREVAILING TIme Holiday NoIe . ' Classification WAGE Code ~ ~ ASBESTOS ABATEMENT WORKERS JOURNEY LEVEL $32.61 1N 50 BOILERMAKERS JOURNEY LEVEL $43.47 1B 5N BRICK AND MARBLE MASONS JOURNEY LEVEL $39.87 1M SA CABINET MAKERS (IN SHOP) JOURNEY LEVEL $14.67 1 CARPENTERS ACOUSTICAL WORKER I $39.11 1M 50 BRIDGE, DOCK AND WARF CARPENTERS $38.95 1M 50 CARPENTER $38.95 1M 50 CREOSOTED MATERIAL $39.05 1M 50 DRYWALL APPLICATOR $39.63 1M 50 FlOOR FINISHER $39.08 1M 50 FlOOR LAYER $39.08 1M 50 FlOOR SANDER $39.08 1M 50 MillWRIGHT AND MACHINE ERECTORS $39.95 1M 51!>> PILEDRIVERS, DRNlNG. PUliING; PLACING COLlARS AND WELDING I . $39.15 1M 'SIb ' SAWFILER $39.08 1M sib SHINGLER $39.08 1M 50 STATIONARY POWER SAW OPERATOR $39.08 1M 50 STATIONARY WOODWORKING TOOLS $39.08 1M 50 CEMENT MASONS JOURNEY LEVEL $32.61 1N 50 DIVERS & TENDERS DIVER $80.62 1M 50 SA DIVER TENDER $41.72 1M 50 DREDGE WORKERS ASSISTANT ENGINEER $39.52 1B 50 8L ASSISTANT MATE (DECKHAND) $38.76 1B 50 8L BOATMEN $39.52 1B 50 8L ENGINEER WELDER $39.57 1B 50 8L LEVERMAN, HYDRAULIC $41.04 1B 50 8L MAINTENANCE $38.76 1B 50 8L MATES $39.52 1B 50 8L OILER $39.16 1B 50 8L DRYWAll TAPERS JOURNEY LEVEL $39.44 1J 5B ELECTRICAL FIXTURE MAINTENANCE WORKERS JOURNEY LEVEL $9.37 1 Page 1 fi CLALLAM COUNTY . . I Effective 09-01-04 ******************************.**************************..******************************....******************** (See Benefit Code Key) OYer PREVAILING Tane Holiday Note Classification WAGE ~ ~ Code ELECTRICIANS - INSIDE CABLE SPLICER $49.51 10 6H CABLE SPLICER (TUNNel) $53.31 10 6H CERTIFIED WELDER $47.79 1D 6H CERTIFIED WELDER (TUNNel) $51.41 1D 6H . CONSTRUCTION STOCK PERSON $24.33 10 6H JOURNEY LEVEL $46.06 1D 6H JOURNEY LEVEL (TUNNel) $49.51 1D 6H ELECTRICIANS - MOTOR SHOP . . CRAFTSMAN $15.37 2A 6C JOURNEY LEVEL $14.69 2A 6C ELECTRICIANS - POWERLlNE CONSTRUCTION CABLE SPLICER $49.54 4A SA CERTIFIED LINE WELDER $45.15 4A SA GROUNDPERSON $32.63 4A SA HEAD GROUNDPERSON $34.43 4A SA HEAVY LINE EQUIPMENT OPERATOR $45.15 4A SA JACKHAMMER OPERATOR $34.43 4A SA JOURNEY LEVEL LINE PERSON $45.15 4A SA LINE EQUIPMENT OPERATOR $38.37 4A SA POLE SPRAYER $45.15 4A SA POWDERPERSON $34.43 4A SA ELECTRONIC & TELECOMMUNICATION TECHNICIANS JOURNEY LEVEL $12.07 1 ELEVATOR CONSTRUCTORS MECHANIC $49.28 4A 6Q MECHANIC IN CHARGE $54.18 4A 6Q FABRICATED PRECAST CONCRETE PRODUCTS ALL CLASSIFICATIONS $13.50 1 FENCE ERECTORS ' . FENCE ERECTOR $13.80 1 FENCE lABORER $11.60 1 FLAGGERS JOURNEY LEVEL $27.93 1N 5D GLAZIERS JOURNEY LEVEL $39.96 2E 5G HEAT & FROST INSULATORS AND AS8ESTOS WORKERS MECHANIC $41.93 1F 5E HEATING EQUIPMENT MEC~ICS MECHANIC $16.00 1 HOD CARRIERS & MASON TENDERS JOURNEY LEVEL $33.09 1N 5D INDUSTRIAL ENGINE AND MACHINE MECHANICS MECHANIC $15.65 1 INDUSTRIAL POWER VACUUM CLEANER JOURNEY LEVEL $9.07 1 INLAND 80AT.MEN CAPTAIN $35.14 1K 58 COOK $30.11 1K 58 DECKHAND $29.09 1K 58 ENGINEER/DECKHAND $31.66 1K 58 MATE, LAUNCH OPERATOR $33.24 1K 58 Page 2 , . . . CLALLAM COUNTY Effective 09-01-04 I ********************.*.**************************.**************-************************************************ Classification INSPECTION/CLEANINGlSEAUNG OF SEWER & WATER SYSTEMS BY REMOTE CONTROL CLEANER OPERATOR, FOAMER OPERATOR GROUT TR~K OPERATOR HEAD OPERATOR TECHNICIAN TV TRUCK OPERATOR INSULATION APPLICATORS JOURNEY LEVEL IRONWORKERS JOURNEY LEVEL lABORERS ASPHALT RAKER BALlAST REGULATOR MACHINE BATCH'WEIGHMAN BRUSH CUTTER BRUSH HOG FEEDER BURNERS CARPENTER TENDER CASSION WORKER CEMENT OUMPERlPAVlNG CEMENT FINISHER TENDER CHANGE-HOUSE MAN OR DRY SHACKMAN CHIPPING GUN (OVER 30 LBS) CHIPPING GUN (UNDER 30 LBS) CHOKER SETTER CHUCK TENDER CLEAN-UP lABORER CONCRETE OUMPERlCHUTE OPERATOR CONCRETE FORM STRIPPER CONCRETE SAW OPERATOR CRUSHER FEEDER CURING LABORER DEMOLITION, WRECKING & MOVING (INCLUDING CHARRED DITCH DIGGER DIVER DRILL OPERATOR (HYDRAULIC, DIAMOND) DRILL OPERATOR, AlRTRAC OUMPMAN EPOXY TECHNICIAN EROSION CONTROL WORKER FAlLER/BUCKER, CHAIN SAW FINAL DETAIL CLEANUP (i.e., dusting, vacuuming, window cleaning; NOT CXlnstruction debris cleanup) FINE GRADERS ' FIRE WATCH FORM SETTER GAB ION BASKET BUILDER GENERAl LABORER GRADE CHECKER & TRANSIT PERSON GRINDERS GROUT MACHINE TENDER Page 3 (See Benefit Code Key) Over PREVAILING Tme Holiday Note WAGE ~ ~ ~ $9.73 1 $11.48 1 $12.78 1 $7.16 1 $10.53 1 $20.50 1 $43.12 1B 5A $33.09 1N 50 $32.61 1N 50 $27.93 1N . 50 $32.61 1N 50 $32.61 1N 50 $32.61 1N 50 $32.61 1N 50 $33.45 1N 50 $33.09 1N 50 $32.61 1N 50 $32.61 1N 50 $33.09 1N 50 $32.61 1N 50 $32.61 1N 50 $32.61 1N 50 $32.61 1N 50 $33.09 1N 50 $32.61 1N 50 $33.09 1N 50 $27.93 1N 50 $32.61 1N 50 $32.61 1N 50 $32.61 1N 50 $33.45 1N 50 $33.09 1N 50 $33.45 1N 50 $32.61 1N 50 $32.61 1N 50 $32.61 1N 50 $33.09 1N 50 $25.61 1N 50 $32.61 1N 50 $27.93 1N 50 $32.61 1N 50 $32.61 1N 50 $32.61 1N 50 $33.09 1N 50 $32.61 1N 50 $32.61 1N 50 1 I . CLALLAM COUNTY Effective 09-01-04 **..*******************************************************************-***************************************** Classification GUARDRAIL ERECTOR HAZARDOUS WASTE WORKER'LEVEL A HAZARDOUS WASTE WORKER LEVEL B HAZARDOUS WASTE WORKER LEVEL C HIGH SCALER HOD CARRIERlMORTARMAN JACKHAMMER' LASER BEAM OPERATOR MANHOLE BUILOER-MUOMAN MATERIAL YARDMAN MINER NOZZLEMAN. CONCRETE PUMP, GREEN CUTTER WHEN USING HIGH PRESSURE AIR & WATER ON CONCRETE & ROCK. SANDBLAST, GUNITE,SHOTCRETE,WATERBLASTER PAVEMENT BREAKER PILOT CAR PIPE POT TENDER PIPE RELlNER (NOT INSERT TYPE) PIPELAYER & CAUlKER PIPELAYER & CAUlKER (lEAD) PIPEWRAPPER POT TENDER POWDERMAN POWDERMAN HELPER POWERJACKS RAILROAD SPIKE PULlER (POWER) RE-T1MBERMAN , RIPRAP MAN RODDER SCAFFOLD ERECTOR SCAlE PERSON SIGNALMAN SLOPER (OVER 20j SLOPER SPRAYMAN SPREADER (ClARY POWER OR SIMILAR TYPES) SPREADER (CONCRETE) STAKE HOPPER STOCKPILER TAMPER & SIMIlAR ELECTRIC, AIR & GAS TAMPER (MULTIPLE & SELF PROPELLED) TOOLROOM MAN (AT JOB SITE) TOPPER-TAILER TRACK LABORER TRACK LINER (POWER) TRUCK SPOTTER TUGGER OPERATOR VIBRATING SCREED (AIR, GAS, OR ELECTRIC) VIBRATOR VINYL SEAMER WELDER WELL-POINT LABORER Page 4 (See Benefit Code Key) Over PREVAILING Tme Hardey Note WAGE ~ ~ ~ I $32.61 1N 50 $33.45 1N 50 $33.09 1M 50 $32.61 1M 50 $33.45 1N 50 . $33.09 1M 50 $33.09 1M 50 $33.09 1N 50 $33.09 1M 50 $32.61 1N 50 $33.45 1N 50 $33.09 1N 5D $33.09 1N 50 $27.93 1N 50 $33.09 1N 50 $33.09 1N 50 $33.09 1M 5D $33.45 1N 50 $33.09 1N 50 $32.61 1N 50 $33.45 1M 50 $32.61 1N 50 $33.09 1N 50 $33.09 1N 50 $33.45 1N 50 I $32.61 1N 51) , . $33.09 1N .51]1 $32.61 1N 5~ $32.61 1N 50 $32.61 1N 5D $33.09 1N 5D $32.61 1N 50 $33.09 1N 50 $33.09 1N 50 $32.61 1N 50 $32.61 1N 50 $33.09 1N 5D $33.09 1N 50 $32.61 1N 50 $32.61 1N 50 $32.61 1N 50 $33.09 1N 50 $32.61 1N 50 $33.09 1M 50 $32.61 1N 50 $33.09 1N 50 $32.61 1N 50 $32.61 1N 5D $33.09 1N 50 , . . '. CLALLAM COUNTY Effective 09-01-04 I . *******.************.****************...***..*****.......********************..********************************** (See Benefit Code Key) Over PREVAILING Tune Ho6day Noll! Classification WAGE ~ ~ ~ LABORERS - UNDERGROUND SEWER & WATER GENERAL. LABORER $32.61 1N 50 . PIPE LAYER $33.09 1N 50 LANDSCAPE CONSTRUCTION IRRIGATION OR LAWN SPRINKlER INSTALLERS $11.42 1 lANDSCAPE EQUIPMENT OPERATORS OR TRUCK DRIVERS $7.81 1 lANDSCAPING OR PLANTING LABORERS $7.93 1 LATHERS JOURNEY LEVEL $39.63 1M 50 MACHINISTS (HYDROEl:-ECTRIC SITE WORK) MACHINIST $16.84 1 METAL FABRICATION (IN SHOP) FITTERIWElDER $15.16 1 lABORER $11.13 1 MACHINE OPERATOR $10.66 1 PAINTER $11.41 1 PAINTERS , JOURNEY LEVEl $SO.76 2B SA PlASTERERS JOURNEY LEVEL $25.83 1 PLAYGROUND & PARK EQUIPMENT INSTAllERS JOURNEY LEVEL $7.93 1 PLUMBERS & PIPEFITTERS JOURNEY LEVEL $48.86 1G SA POWER EQUIPMENT OPERATORS ASSISTANT ENGINEERS $37.26 1T 50 8L BACKHOE. EXCAVATOR, SHOVEL (3 YO & UNDER) $39.88 1T 50 8L BACKHOE, EXCAVATOR. SHOVEL (OVER 3 YO & UNDER 6 YO) .'$40.34 1T 50 8L BACKHOE. EXCAVATOR, SHOvel (6 YO AND OVER WITH $40.86 1T 50 8L BACKHOES, (75 HP & UNDER) $39.49 1T 50 8L BACKHOES. (OVER 75 HP) $39.68 1T 50 8L BARRIER MACHINE (ZIPPER) $39.68 1T 50 8L BATCH PLANT OPERATOR, CONCRETE $39.68 1T 50 8L BELT LOADERS (ElEVATING TYPE) $39.49 1T 50 8L BOBCAT $37.26 1T 50 8L BROOMS $37.26 1T 50 8L BUMP ClITTER $39.68 1T 50 8L CABLEWAYS $40.34- 1T 50 8L CHIPPER $39.88 1T 50 8L COMPRESSORS $37.26 1T "50 8L CONCRETE FINISH MACHINE - LASER SCREED $37.26 1T 50 8L CONCRETE PUMPS - -- $39.49 1T 50 8L CONCRETE PUMP-TRUCK MOUNT WITH BOOM ATTACHMENT $39.68 1T 50 8L CONVEYORS $39.49 1T 50 8L CRANES, THRU 19 'TONS, WITH ATTACHMENTS $39.49 1T 50 8L CRANES, 20 - 44 TONS. WITH ATTACHMENTS $39.88 1T 50 8L CRANES, 45 TONS - 99 TONS, UNDER 150 FT OF BOOM (INCLUDING $40.34- 1T 50 8L JIB WITH ATACHMENTS) CRANES, 100 TONS - 199 TONS. OR 150 FT OF BOOM (INCLUDING JIB $40.86 1T 50 8L WITH ATTACHMENTS) CRANES, 200 TONS TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB $41.40 1T 50 8L WITH ATTACHMENTS) CRANES, A-FRAME, 10 TON AND UNDER $37.26 1T 50 8L Page 5 CLALLAM COUNTY " Effective 09-01-04 _************************************************************************************************_.AA.*********** (See Benefit Code Key) Over PREVAILING Tone Holiday Note Classification WAGE Code ~ ~ CRANES, A-FRAME, OVER 10 TON $39.49 1T 50 ,8L CRANES, OVER 300 TONS, OR 300' OF BOOM INCLUDING JIB WITH $41.92 1T 50 8L ATTACHMENTS CRANES, OVERHEAD, BRIDGE lYPE ( 20 - 44 TONS) $39.88 1T 50 8L CRANES, OVERHEAD, BRIDGE lYPE ( 45 - 99 TONS) $40.34 1T 50 8L CRANES, OVERHEAD, BRIDGE lYPE (100 TONS & OVER) $40.86 1T 50 8L CRANES, TOWER CRANE UP. TO 175' IN HEIGHT. BASE TO BOOM $40.86 1T 50 8L CRANES, TOWER CRANE OVER 175' IN HEIGHT, BASE TO BOOM $41.40 1T 50 8L CRUSHERS $39.88 1T 50 8L , ' DECK ENGINEERlDECK WINCHES (POWER) $39.88 1T 50 8L DERRICK, BUILDING $40.34 1T SO 8L DOZERS, 0-9 & UNDER $39.49 1T '50 8L DRILL OILERS - AUGER TYPE. TRUCK OR CRANE MOUNT $39.49 1T 50 .. DRILLING MACHINE $39.88 1T SO 8L ELEVATOR AND MANLIFT, PERMANENT AND SHAFT-TYPE $37.26 1T SO 8L EQUIPMENT SERVICE ENGINEER (OILER) $39.49 1T 50 8L FINISHING MACHINElBIDWELL GAMACO AND SIMILAR EQUIP $39.88 1T SO 8L FORK LIFTS. (3000 LeS AND OVER) $39.49 1T SO , .8L . FORK LIFTS, (UNDER 3000 LBS) $37.26 1T 50 8L GRADE ENGINEER I $39.49 1T 50 8L GRADECHECKER AND STAKEMAN $37.26 1T 50 8L GUARDRAIL PUNCH $39.88 1T SO 8L HOISTS. OUTSIDE (ELEVATORS AND MANLlFTS), AIR TUGGERS $39.49 1T 50 8L HORIZONTAlJDIRECTlONAL DRILL LOCATOR $39.49 1T SO 8L HORIZONTAlJDIRECTIONAL DRILL OPERATOR $39.88 1T 50 8L HYDRALIFTSIBOOM TRUCKS (10 TON & UNDER) $37.26 1T 50 8L HYDRALIFTSlBOOM TRUCKS (OVER 10 TON) $39.49 1T Sf? 8L LOADERS, OVERHEAD (6 YO UP TO 8 YO) $40.34 1T 5D BL LOADERS, OVERHEAD (8 YD& OVER) $40.86 1T '51b " '8L I LOADERS, OVERHEAD (UNDER 6 YO), PLANT FEED $39.88 1T 5ll) 8L LOCOMOTIVES, ALL $39.88 1T 50 8L MECHANICS, ALL $40.34 1T SO ,8L MIXERS, ASPHALT PLANT $39.88 1T SO 8L MOTOR PATROL GRADER (FINISHING) $39.88 1T 50 8L MOTOR PATROL GRADER (NON-FINISHING) $39.49 1T 50 '8L MUCKING MACHINE, MOLE, TUNNEL DRILL AND/OR SHIELD $40.34 1T 50 8L OIL DISTRIBUTORS, BLOWER DISTRIBUTION AND MULCH SEEDING $37.26 1T SO 8L OPERATOR PAVEMENT BREAKER $37.26 1T 50 8L PILEDRIVER (OTHER THAN CRANE MOUNT) $39.88 1T 50 8L PtANT-oIl:ERiASPHALT. eRt:JSHER} - -$39.49 - - - ---n- ---- -- -SO- - - n----8L- POSTHOLE DIGGER, MECHANICAl. $37.26 1T 50 8L POWER PLANT $37.26 1T 50 8L PUMPS, WATER $37.26 1T 50 8L QUAD 9, 0-10, AND HD-41 $40.34 1T 50 8L REMOTE CONTROL OPERATOR ON RUBBER TIRED EARTH MOVING $40.34 1T 50 8L EQUIP RIGGER AND BELLMAN $37.26 1T 50 8L ROLlAGON $40.34 1T 50 8L ROLLER, OTHER THAN PLANT ROAD MIX $37.26 1T SO 8L ROLLERS, PLANTMIX OR MUL TIUFT MATERIALS $39.49 1T 50 8L ROTD-MILL, ROTo-GRINDER $39.88 1T 50 8L SAWS, CONCRETE $39.49 1T 50 8L Page 6 . . . . CLALLAM COUNTY Effective 09-01-04 I. ***********_******...****************.***********************************.******************&AA&*...*.~********* Classification SCRAPERS - SELF PROPELLED, HARD TAIL END DUMP. ARTICULATING OFF-ROAD EQUIPMENT ( UNDER 45 YO) SCRAPERS - SELF PROPELLED. HARD TAIL END DUMP. ARTICULATING OFF-ROAD EQUIPMENT (45 YO AND OVER) SCRAPERS. CONcRETE AND CARRY ALL SCREED MAN SHO'rCRETE GUNITE SLlPFORM PAVERS SPREADER, TOPSIDE OPERATOR - BLAW KNOX SUBGRADE TRIMMER TOWER BUCKET ELEVATORS TRACTORS. (75 HP & UNDER) TRACTORS. (OVER 75 HP) TRANSFER MATERIAL SERVICE MACHINE TRANSPORTERS. All TRACK OR TRUCK TYPE TRENCHING MACHINES TRUCK CRANE OILERlDRIVER ( UNDER 100 TON) TRUCK CRANE OILERlDRIVER (100 TON & OVER) TRUCK MOUNT PORTABLE CONVEYER WHEEL TRACTORS. FARMAU. TYPE YO YO PAY DOZER POWER EQUIPMENT OPERATORS- UNDERGROUND SEWER & (SEE POWER EQUIPMENT OPERATORS) POWER UNE CLEARANCE TREE TRIMMERS JOURNEY LEVEL IN CHARGE SPRAY PERSON TREE EQUIPMENT OPERATOR TREE TRIMMER TREE TRIMMER GROUNDPERSON REFRIGERATION & AIR CONDITIONING MECHANICS MECHANIC RESIDENJIAL BRICK & MARBLE MASONS JOURNEY LEVEL RESIDENTIAL CARPENTERS JOURNEY LEVEL RESIDENTIAL CEMENT MASONS JOURNEY LEVEL RESIDENTIAL DRYWAll TAPERS JOURNEY LEVEL RESIDENTIAL ELECTRICIANS JOURNEY LEVEL RESIDENTIAL GLAZIERS JOURNEY LEVEL RESIDENTIAL INSULATION APPLICATORS JOURNEY LEVEL . RESIDENTIAL LABORERS JOURNEY lEVEL RESIDENTIAL PAINTERS JOURNEY LEVEL RESIDENTIAL PLUMBERS & PIPEFITTERS JOURNEY LEVEL Page 7 PREVAILING WAGE $39.88 $40.34 $39.49 $39.88 $37.26 $40.34 $39.88 $39.88 $39.49 $39.49 $39.88 $39.88 $40.34 $39.49 ~.49 $39.88 $39.88 $37.26 $39.88 $33.06 $31.34 $31.76 $29.48 $21.94 $27.68 $39.87 $17.85 $25.63 $18.00 $27.78 $16.84 $9.86 $18.08 $15.97 $14.60 (See Benefit Code Key) Over Tme Holiday N~ Code ~ Code 1T 50 8L 1T 50 8L 1T 50 BL 1T 50 8L 1T 50 8L 1T 50 8L 1T 50 8L 1T 50 8L 1T 50 8L 1T 50 8L 1T 50 8L 1T 50 8L 1T 50 8L 1T 50 8L 1T 50 8L 1T 50 8L 1T 50 8L 1T 50 8L 1T 50 8L 4A SA 4A SA 4A SA 4A SA 4A SA. 1 1M SA 1 1 1 1 1 1 1 1 . . CLALLAM COUNTY Effective 09-01..()4 I. *****************************************...************************.****.*******.**.......***********AA&A&AAAAA& Class ification RESIDENTIAL REFRIGERATION & AIR CONDITIONING JOURNEY LEVEL RESIDENTIAl SHEET METAL WORKERS JOURNEY LEVEL (FIELD OR SHOP) RESIDENTIAL SOFT FLOOR LAYERS JOURNEY LEVEL RESIDENTIAL SPRINKLER FITTERS (FIRE PROTECTION) JOURNEY LEVEl ROOFERS JOURNEY LEVEL USING IRRITABLE BITUMINOUS MATERIALS SHEET METAL WORKERS JOURNEY LEVEL (FIELD OR SHOP) SIGN MAKERS & INSTAlLERS (ELECTRICAL) JOURN~ LEVEL SIGN MAKERS & INSTALLERS (NON-ELECTRICAL) JOURNEY LEVEL SOFT FLOOR LAYERS JOURNEY LEVEl SOLAR CONTROLS FOR WINDOWS JOURNEY LEVEl SPRINKlER FmERS (FIRE PROTECTION) JOURNEY LEVEL STAGE RIGGING MECHANICS (NON STRUCTURAL) JOU~EY LEVEL SURVEYORS CHAIN PERSON INSTRI:IMENT PERSON PARlY CHIEF TELEPHONE LINE CONSTRUCTION - OUTSIDE CABLE SPLICER HOLE.DIGGER/GROUND PERSON INSTALLER (REPAIRER) JOURNEY LEVEL TELEPHONE L1NEPERSON SPECIAL APPARAlUS INSTALLER I SPECIAL APPARAlUS INSTAl.LER II TELEPHONE EQUIPMENT OPERATOR (HEAVY) TELEPHONE EQUIPMENT OPERATOR (LIGHT) TELEVISION GROUND PERSON TELEVISION L1NEPERSONlINSTAl.LER TELEVISION SYSTEM TECHNICIAN TELEVISION TECHNICIAN TREE TRIMMER TERRAZZO WORKERS & TILE SETTERS JOURNEY LEVEL TILE. MARBLE & TERRAZZO FINISHERS FINISHER TRAFFIC CONTROL STRIPERS JOURNEY LEVEL TRUCK DRIVERS ASPHAl.T MIX (TO 16 YARDS) ASPHAl.T MIX (OVER 16 YARDS) PREVAILING WAGE $46.41 $30.22 $~O.88 $19.67 $34.53 $37.53 $46.74 $19.29 $12.15 $32.24 $10.31 $19.67 $13.23 $9.35 $11.40 $13.40 $28.29 $15.91 $27.13 $26.32 $28.29 $27.72 $28.29 $26.32 $15.10 $20.11 $23.80 $21.43 $26.32 $37.03 $30.86 $31.90 $36.89 $37.47 Page 8 (See Benefit Code Key) Over Tme Holiday HolE! Code ~ ~ 1G SA 1J 6L 1 1 1R 5A 1R SA 1J 6L 1 1 18 SA 18 50 1 t 1 1 1 28 28 28 28 28 2B 28 28 28 28 28 28 28 1H SA SA SA 5A SA SA SA SA SA SA SA SA SA SA SA SA 50 8L 50 8L 1H 1K 1T 1T . . CLALLAM COUNTY Effective {)9..()1.04 ***********......*********..A.A....*********..**.*****************************.**.*********aAAAAa...************* Classification DUMP TRUCK DUMP TRUCK & TRAILER OTHER TRUCKS TRANSIT MIXER WELL DRILLERS & IRRIGATION PUMP INSTAUERS IRRIGATION PUMP INSTALLER OILER WELL DRILLER PREVAILING WAGE $20.23 $20.23 $37.47 $23.73 $11.60 $9.45 $11.60 Page 9 (See Benefit Code Key) Over Tme Holiday Note ~ 9l9! Code 1 1 1T 50 8L 1 1 1 1 . . CLALLAM County - Apprentices - Effective 9/1/2004 - Benefit Code Kev . - - Prevailing Overtime Holiday Note Stage of ProgressIon & Hour Range Wage Code Code Code ASBESTOS ABATEMENT WORKERS ENVIRONMENTAL CONTROL PAINTERS $17.53 iN 5D $20.03 iN 5D $25.72 IN 5D 529.85 IN 5D LABORERS $22.63 iN 525.12 iN 527.62 iN 530.11 iN BOILERMAKERS 535.04 1B .5N 536.45 1B 5N $37.85 1B 5N $39.26 1B 5N $40.66 1B SN $42.07 1B SN BRICK AND MARBLE MASONS $23.96 1M SA $25.38 1M SA $26.84 1M SA $29.76 1M SA $32.68 1M SA $35.60 1M SA $37.06 1M SA CARPENTERS ACOUSTICAL WORKER 1: 0 -1000 Hours - 50.000At $20.96 1M 5D 2: 1001"-2000 Hours - 60.00% $27.69 1M 5D 3: 2001 - 3000 Hours - 68.00% $29.97 1M 5D 4: 3001 - 4000 Hours - 76.00% 532.26 1M 5D 5: 4001 - 5000 Hours - 84.00% 534.54 1M 5D 6: 5001 - 6000 Hours - 92.00% $36.83 1M 5D BRIDGE, DOCK AND W ARF CARPENTERS $23.72 1M 5D 529.01 1M SD 530.43 1M 5D $31.85 1M 5D 533.27 1M 5D 534.69 1M SD 536.11 1M 5D 537.53 1M 5D CARPENTER 523.72 1M 529.01 1M 530.43 1M 531.85 1M $33.27 1M $34.69 1M , 1: 0 - 1000 Hours - 50.00% .2: 1001- 2000 Hours - 60.00% 3: 2001 - 3000 Hours - 75.00% 4: 3001 - 4000 Hours - 90.00% 1: 0 - 1000 Hours - 60.00% 2: 1001 - 2000 Hours - 70.00% 3: 2001 - 3000 Hours - 80.00% 4:, 3001 - 4000 Hours - 90.00% 1: 0 -1000 Hours - 70.00% 2: 1001 - 2000 Hours - 75.00% 3: 2001 - 3000 Hours - 80.00% 4: 3001 - 4000 Hours - 85.00% 5: 4001 - 5000 Hours - 90.00% 6: 5001 - 6000 Hours - 95.00% 1: 0 - 750 Hours - 50.00% 2: 751 - 2250 Hours - 55.00010 3: 2251 - 3000 Hours - 60.00% 4: 3001 - 3750 Hours - 70.00% 5: 3751- 4500 Hours - 80.00% 6: 4501 - 5250 Hours - 90.00% 7: 5251 - 6000 Hours - 95.00% 1: 1- Period J 60.00% 2: 2M Period - 65.00% 3: 3n1 Period - 70.00% 4: 41b Period - 75.00% 5: Sib Period - 80.00% 6: 61b Period - 85.00% 7: 71b Period - 90.000At 8: 81b Period - 95.00% 1: 1- Period - 60.000At 2: 2JIIJ Period - 65.00% 3: 3n1 Period - 70.000At 4: 41b Period - 75.00% 5: Sib Period - 80.00% 6: 61b Period - 85.00% 5D 50 50 50 5D SD SD SD SD SD . . . 7: 7th Period - 90.00% 8: 8th Period - 95.000.4 5D 5D $36.11 1M $37.53 1M DRYWALL APPUCATOR DRYWAll. METAL STUD. AND CEIliNG APPliCATORS 1:0-7ooHoms-50'<)0% $21.22 1M . SD' 2: 701 - 1400 Homs - 60.00% $28.00 1M 5D 3: 1401- 2100 Homs - 68.00010 $30.32 1M 5D 4: 2101 - 2800 Homs - 76.00010 $32.65 1M 5D 5: 2801 - 3500 Hours - 84.000.4 $34.98 1M 5D 6: 3501 - 4200 Ho~; 92.00010 $37.30 1M SD. MILLWRIGHT AND MACHINE ERECTORS 1:1I1Period-60.00% $24.32 1M SD 2: 2M Period - 65.00% $29.66 1M SD 3: 3n1 Period - 70.00% $31.13 1M SD 4: 4lh Period - 75.00% $32.60 . 1M SD 5: Slh Period _ 80.00% $34.07 1M SD 6: 6lh Period - 85.00% $3S.54 1M 5D 7: 7th Period - 90.00% $37.01 1M 5D 8: 8lh Period - 95.00% $38.48 1M 5D Pn..EDRlVERS, DRIVING, PULLING, PLACING COLLARS AND WELDING 1: 111 Period - 60.00% $23.84 1M 5D 2: 2M Period - 65.00% $29.14 1M 5D 3: 3n1 Period - 70.00% $30.57 1M 5D 4: 4th Period - 75.00% $32.00 1M SD 5: Slh Period _ 80.00% $33.43 1M SD 6: (j'h Period - 85.00% $34.86 1M . SD 7: 7lh Period - 90.00% $36.29 1M 5D 8: 8th Period'- 95.00% $37.72 1M 5D CEMENT MASONS . . $12.48 IN $14.98 IN $17.47 IN $19.97 IN $22.46 IN $23.71 IN DRYWALL TAPERS $2S.78 1] $27.14 lJ $29.87 11 $32.61 1] $3S.34 11 $36.71 1] ELECTRICIANS - INSIDE 1: 0 -1000 Hours - 40.00% $19.55 1D 6H 2: 1001 - 2000 Hours - SO.OO% $23.00 1D 6H 3: 2001 - 3500 Hours - 5S.()00/o $27.92 ID 6H 4: 3501 - 5000 Hours - 65.00% $31.95 ID 6H 5: 5001 - 6500 Hours - 75.00% $3S.98 1D 6H 6: 6501 - 8000 Hours - 85.00% $40.01 1D 6H ELECTRICIANS - POWERLINE CONSTRUCTION JOURNEY LEVEL LINEPERSON $29.04 4A 5A $30.11 4A 5A . $31.55 4A SA $33.35 4A 5A 1: 0 -1000 Homs - SO.oo% 2: 1001 - 2000 Hours - 60.000/0 3: 2001 - 3000 Hours - 70.00% 4: 3001 - 4000 HourS - 80.00% 5: 4001 - 5000 Hours - 90.00% 6: 5001 - 6000 Hours - 95.00% 1: 0 - 1000 Homs - 50.00% 2: 1001 - 2000 Hours - 55.00% 3: 2001 - 3000 Hours - 65.00% 4: 3001 - 4000 Hours - 75.00% 5: 4001 - 5000 Hours - 85.00% 6: 5001 - 6000 Hours - 90.00% 1: 0 - 1000 Homs - 60.00% 2: 1001 - 2000 Hours - 65.00% 3: 2001 - 3000 Hours - 71.00% 4: 3001 - 4000 Hours - 81.00% SD 5D 5D 5D 5D 5D 5B 5B 5B 5B 5B 5B . . 5: 4001 - 5000 Hours. 85.00010 .6: 5001 - 6000 Hours. 89.00% 7: 6001 - 7000 Hours - 93.00% '. SA 5A SA $35.51 4A $3837 4A $39.80 4A POLE SPRAYER 1: 0 - 1000 Hours - 85.70% $38.27 4A SA 2: 1001 - 2000 Hours - 89.80% $39.73 4A SA 3: 2001 - 3000 Hours - 92.80010 $40.81 4A SA ELECTRONIC & TELECOMMUNICATION TECHNICIANS ,1: 0 - 1000 Hams - 55.00010 2: 1001 - 2000 Hours - 60.00010 3: 2001 - 3000 Hours - 65.000A, 4: 3001 - 4000 Hours - 70.00% 5: 4001 - 5000 Hours - 75.000A, 6: 5001 - 6000 Hours - 80.00010 7: 6001 - 7000 Hours - 85.000A, 8:7001 - 8000 Hours - 95.00% 1: lit Period - 50.000A, 2: 2ad Period - S5.000A, 3: 3n1 Period - 65.000A, 4: 4th Period - 70.00010 S: 5th Period - 80.00010 $7.16 1 $7.24 1 $7.85 1 $8.45 1 $9.05 1 $9.66 1 $10.26 1 $11.47 1 ELEVATOR CONSTRUCTORS MECHANIC $17.67 4A ~ $32.66 4A ~ $36.20 4A ~ $37.96 4A ~ $41.50 4A ~ GLAZIERS 1~0-loo0Hours-4S.00% $21.76 2E 5G 2: 1001 - 2000 Hours - 50.00% $23.41 2E 5G 3: 2001 - 3000 Hours - 55.00010 $25.07 2E 5G 4: 3001 - 4000 Hours - 60.00010 $26.72 2E 5G 5: 4001 - 5000 Hours - 65.00010 $28.38 2E 5G 6: 5001 - 6000 Hours - 70.00010 $30.03 2E 5G 7: 6001 - 7000 Hours - 80.00010 $33.34 2E 5G 8: 7001 - 8000 Hours - 90.000A, $36.65 2E 5G HEAT & FROST INSULATORS AND ASBESTOS WORKERS MECHANIC 1: 0 -1000 Hours - 50.00% $25.97 IF 5E 2: 1001 - 2000 Hours - 55.00% $27.57 IF 5E 3: 2001 - 4000 Hours - 65.00% $30.76 IF 5E 4: 4001 - 6000 Hours - 75.00% $33.95 IF 5E 5: 6001 - 8000 Hours - 85.00% $37.14 IF 5E i HOD CARRIERS & MASON TENDERS 1: 0 - 1000 Hours - 60.00% 2: 1001 - 2000 Hours - 70.00% 3: 2001 - 3000 Hours - 80.00% 4: 3001 - 4000 Hours - 90.00% 1: 0 -1000 Hours - 50.00% 2: 1001 - 2000 Hours - 60.00% 3: 2001 - 3000 Hours - 75.00% 4: 3001 - 4000 Hours - 90.00% 1: lst Period - 65.00% 2: 2nd Period - 70.00% 3: 3n1 Period - 75.00% $22.63 . IN 5D $25.12 IN 5D $27.62 IN 5D $30.11 IN 5D INSULATION APPUCATORS $10.25 1 $12.30 1 $15.38 1 $18.45 1 mONWORKERS $25.68 IB SA $27.17 lB SA $35.67 IB SA << . ' . . . . 4: 41b Period - 80.00010 $37.16 1B 5A 5: Sib Period - 90.00010 $40.14 IB SA 6: ~ Period - 90.00010 $40.14 1B 5A 7:7lbPeriod-95.00% $41.63 IB 2A 8: 81b Period - 95.00% $41.63 1B 2A' LABORERS I:0-1000Hours-60.oo% $22.63.lli 50 2: 1001 - 2000 Homs - 70.00010 $25.12 IN SD 3: 2001 - 3000 HolDS - 80.00010 $27.62 IN ~ 4: 3001 - 4000 HolDS - 90.00% . $30.11 IN 5D I LABORERS _ UNDERGROUND SEWER & WATER 1: 0 - 1000 Hours - 60.00010 522.63 IN SD 2: 1001 - 2000 Homs - 70.00% $25.12 IN 50 3: 2001 - 3000 Homs - 80.00% 527.62 IN SD 4: 3001 - 4000 HolDS - 90.00% 530.11 IN ~ LATHERS 1: 0 - 700 Hams - 50.00% 521.22 1M 5D 2: 701 - 1400 HolDS - 60.00% 528.00 1M 50 3: 1401 - 2100 HolDS - 68.00% 530.32 1M 5D 4: 2101 - 2800 HolDS - 76.00010 532.65 1M 5D 5: 2801 - 3500 HolDS - 84.00% $34.98 1M 5D 6: 3501 - 4200 HolDS - 92.00% $3730 1M ~ PAINTERS 1: 0 - 750 Hams - 55.00% $16.18 2B 5A 2:7S1-1SooHolDS-6S.oo% $17.23 2B SA 3: 1501 - 2250 HoUrs - 75.00% $19.11 2B M 4: 2251 - 3000 HolDS - 80.00% $20.82 2B SA 5: 3001 - 3750 HolDS - 85.00% $21.81 2B SA 6:3751-4500HolDS-95.oo% $23.78 2B' I. ~ PLASTERERS 1: 0 - 500 Hams - 40.00% $10.33 1 2: 501 - 1000 HolDS - 45.00% $11.62 1 3: l001-15ooHoms-45.0001o $11.62 1 4: 1501 - 2000 HourS - 50.00% $12.92 1 5: 2001 - 2500 HolDS - 55.00% $14.21 1 6: 2501 - 3000 Homs - 60.00% $15.50 1 7: 3001 - 3500 Homs - 65.00% $16.79 1 8: 3501 - 4000 Homs - 70.00% $18.08 1 9: 4001 - 4500 Hours - 75.00% $19.37 1 ]0: 4501 - 5000 HolDS - 80.00% 520.66 1 ] 1: 5001 - 5500 HolDS - 85.00% 521.96 1 12: 5501 - 6000 HolDS - 90.00% $23.25 1 13: 6001 - 6500 HolDS - 95.00% $24.54 1 ]4: 6501 - 7000 Hours - 95.00% $24.54 1 PLUMBERS & PIPEFI1TERS 1:0-2000HolDS-50.00% $27.00 10 5A 2: 2001 - 4000 Hours - 62.50% 536.95 10 SA 3: 4001 - 6000 Hours -70.00% 539.54 IG SA 4: 6001 - 8000 Homs - 75.00% $41.25 1 G SA 5: 8001-10oo0Homs - 85.00% 544.70 10 5A POWER EQUIPMENT OPERATORS AU EOUIPMENT 1: 0-10ooHours - 65.00% 529.26 IT 5D 8L 2: 1001- 2000 Hours - 70.00% 530.72 IT 5D 8L 3: 2001 - 3000 Hours - 75.00% 532.18 IT 5D 8L 4: 3001 - 4000 Hours - 80.00% 533.64 IT SD 8L " . . . . .' . " . . '. 1: 0 - 2000 Hours - 50.00010 2: 2001 - 4000 Hours - 55.00% 3: 4001 - 6000 Hours - 60.00010 4: 6001 - 8000 Hours - 70.00% 5: 8001 - 10000 Hours - 85.00% 5: 4001 - 5000 Hours - 90.00% $36.57 IT 5D 8L 6: 5001 - 6000 Hours - 95.00% 538.03 IT 5D 8L POWER EQUIPMENT OPERATORS- UNDERGROUND SEWER & WATER (SEE POWER EQUIPMENT OPERATORS) 1: 0 - 1000 Hours - 65.00010 $29.26 . I 2: 1001 - 2000 Hours - 70.00% $30.27 3: 2001 - 3000 Hours -75.00% $32.18 4: 3001 - 4000 Hours - 80.00% $33.64 5: 4001 - 5000 Hours - 90.00% $36.57 6: 5001 - 6000 Hours - 95.00% $38.03 I POWER LINE CLEARANCE TREE TRIMMERS TREE TRIMMER 1: 0 - 1000 Hours - 65.00010 520.68 4A 5A 2: 1001 - 2000 Hours - 75.00% 523.04 4A 5A 3: 2001 - 3000 Hours - 80.00% 524.15 4A 5A 4: 3001 - 4000 Hours - 90.00% $26.41 4A SA REFRIGERATION & AIR CONDmONING MECHANICS MECHANIC 513.84 1 $15.22 1 516.61 1 519.38 1 523.53 1 RESIDENTIAL CARPENTERS , . . , 510.71 1. 511.60 1 $12.50 1 $13.39 '1' I. 514.28 1 $15.17 1 $16.07 1 $16.96 1 RESIDENTIAL ELECTRICIANS 1: 0 - 900 Homs - 50.00% $13.89 1 2: 901 - 1800 Hours - 55.00010 515.28 1 3: 1801 - 2700 Hours - 75J)0% $20.84 1 4: 2701 - 4000 Hours - 85.00% $23.61 1 RESIDENTIAL PLUMBERS & PIPEFfITERS 1: 0 - 1000 Hours - 55.00010 $8.03 1 2: 1001 - 2000 Hours - 65.00% $9.49 1 3: 2001 - 4000 Hours -75.00% 510.95 1 4: 4001 - 6000 Hours - 85.00% $12.41 1 RESIDENTIAL SHEET METAL WORKERS JOURNEY LEVEL (FIELD OR SHOP) $14.95 11 6L 515.81 11 6L $17.09 1J 6L $17.95 11 6L $19.06 1] 6L $19.93 II 6L ROOFERS 1: lit Period - 60.00% 2: 2- Period - 65.00% 3: 3n1 Period - 70.00010 4: 41b Period - 75.00%. 5: Sib Period - 80.00010 6: (j'h Period - 85.00010 7: 71b Period - 90.00% 8: 81b Period - 95.00010 .\ . I I 1: 1 - 1000 Hours - 50.00% 2: 1001 - 2000 Hours - 60.00% 3: 2001 - 3000 Hours - 65.00% 4: 3001 - 4000 Hours - 70.00% 5: 4001 - 5000 Hours - 80.00% 6: 5001 - 6000 Hours - 85.00% 1: 0 - 820 Hours - 60.000/0 2: 821 - 1630 Hours - 67.00% 3: 1631 - 2450 Hours - 74.00% $21.93 $23.78 525.58 lR lR lR 5A SA SA I. . ' .. . 4: 2451- 3270 Hours - 81.00% .5: 3271 - 4080 Hours - 88.000.4 6: 4081 - 4899 Hours - 95.00% 1: 0 - 2000 Hours - 45.00% 2: 2001 - 3000 Hours - 50.000.4 3: 3001 - 4000 Hours - 55.000.4 4: 4001 - 5000 Hours - 60.00% '5: 5001 - 6000 Hours - 65.000.4 6: 6001 - 7000 Hours - 70.00% 7: 7001 - 8000 Hours - 75.000.4 8: 8001 - 9000 Hours - 80.00% 9: 9001 - 10000 Hours - 85.00% 5A . SA 5A $29.66 1R $31.46 1R $33.25 1R SHEET METAL WORKERS JOURNEY LEVEL (FIELD OR SHOp) $20.23 1] 6L $27.96 11 6L $29.72 11 6L $31.50 11 6L $33.28 11 6L $35.05 11 6L $36.83 11 6L $38.61 11 6L $40.39 11 6L son FLOOR LAYERS APPRENTICES INDENTURED ON OR AFTER JUNE 1. 2003 1: 0 -750 Hours - 45.000.4 $16.52 lB SA 2: 751 - 1500 Hours - 50.000.4 $17.74 lB SA 3: 1501 - 2250 Hours - 60.000.4 $21.48 IB 'SA 4:2251-3000Hours-70.oo% $24.17 lB 5A 5: 3001 - 3750 Hours - 80.00% $26.86 lB 5A 6: 3751 - 4500 Hours - 90.00% $29.55 IB SA APPRENTICES INDENTURED PRIOR TO JUNE J. 2003 1:0-7S0Hours-45.oo% $17.45 1B SA 2: 751 - 1500 Hours - 50.00% $18.79 1B SA 3: 1501 - 2250 Hours - 60.00% $21.48 1B SA 4: 2251 - 3000 Hours - 70.00% $24.17 1B 5A 5: 3001 - 3750 Hours - 80.00% $26.86 1B SA 6: 3751 - 4500 Hours - 90.00% $29.55 1B 5A SPRINKLER FITTERS (FIRE PROTECl10N) GRADE J.ONDENTURED AFTER APRIL J. 2000) 1: 0 - 1000 Hours - 45.00% $8.85 1 2: 1001 - 2000 Hours - 50.00% $9.84 1 3: 2001 - 3000 Hours - 55.00% $10.82 1 4: 3001 - 4000 Hours - 60.00% $11.80 1 GRADE J (lNDENTURED BEFORE APRIL 1. 2000) 1: 0 - 1000 Hours - 40.00% $7.87 1 2: 1001 - 2000 Hours - 45.000,4 $8.85 1 3: 2001 - 3000 Hours - 50.000.4 $9.84 1 4: 3001 - 4000 Hours - 55.00% $10.82 1 GRADE 2 ONDENTURED AFTER APRIL J. 2000) 1: 0 - 1000 Hours - 65.00% $12.79 1 2: 1001 - 2000 Hours - 70.00% $13.77 1 3: 2001 - 3000 Hours - 75.000,4 $14.75 1 4: 3001 - 4000 Hours - 80.000.4 $15.74 1 5: 4001- 5000 Hours - 85.00% $16.72 1 6: 5001 - 6000 Hours - 90.00010 $17.70 1 GRADE 2 ONDENTURED BEFORE APRIL 1. 2000) 1: 0 - 1000 Hours - 60.00% $11.80 1 2:1oo1-2000Hours-65.00% $12.79 1 3: 2001 - 3000 Hours - 70.00% $13.77 1 4: 3001 - 4000 Hours - 75.00% $14.75 1 5: 4001 - 5000 Hours - 80.00% $15.74 1 6: 5001- 6000 Hours - 85.00% $16.72 1 TERRAZZO WORKERS & TILE SETfERS . . J 1: 0 -1000 Homs - 50.00% $22.07 lH SA 2: 1001 - 2500 Homs - 55.00010 $23.40 IH SA 3: 2501 - 3500 Homs - 60.00010 $24.73 lH SA 4: 3501 - 4500 Homs - 70.00010 $27.39 IH SA 5: 4501 - 5500 Homs - 80.00% $30.06 IH . SA I 6: 5501 - 6250 Homs - 90.00010 $32.72 IH SA 7: 6251 - 7000 Homs - 95.00% $34.05 IH SA TILE, MARBLE & TERRAZZO FINISHERS FINISHER $21.46 IH SA. $22.74 .IH SA $24.00 IH SA $26.56 IH SA TRAmC CONTROL STRIPERS 1: 0 - 1000 Hours - 50.00% . I 2: 1001 - 2500 Homs - S5.000A, 3: 2501 - 3500 Homs - 60.00010 4: 3501 - 4500 Homs - 70.00% 1: 0 - 500 HOUlS - 60.00010 2: 501 - 1000 HOUlS - 60.00% 3: 1001 - 2333 Homs - 60.00% 4: 2334 - 4666 Homs - 73.00% 5: 4667 - 7000 HOUlS - 88.00010 . 1: 0 - 700 HOUlS - 70.00010 2: 701 - 1400 Homs - 80.00% .3: 1401 - 2100 HOUlS - 90.00% $13.50 lK $18.60 lK $21.22 lK $24.69 lK $28.70 lK TRUCK DRIVERS ALL TRUCKS $14.16 1 $16.18 1 $18.21 1 . . SA SA SA SA SA , . ~ . . '. . v BENEFIT CODE KEY - EFFECTIVE 09-01-04 ........................................................................................................................ . OVERTIME CODES OVERTIME CALCULATIONS ARE :BASED ON TIlE HOURLY RATE ACTUALLY PAID TO THE WORKER. ON PUBLlC WORKS PROJECTS, THE HOURLY RATE MUST:BE NOT LESS THAN THE PREVAILING RATE OF WAGE MINUS THE HOURLY RATE OF THE COST OF FRINGE :BENEFITS ACTUALLY PROVIDED FOR THE WORKER. 1. All. HOURS WORKED IN EXCESS OF E]GHT (8) HOURS PER DAY ORFORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES 1liE HOURLY RATE OF WAGE. A. ALL HOURS WORKED ON SATIJRDAYS, SUNDAYS AND HOLIDAYS SHALL ALSO BE PAID AT ONE AND ONE-HALF 'TIMES nm HOURLY RATE OF WAGE. B. All. HOURS WORKED ON SATIJRDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES 1HE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. C. All. HOURS WORKED ON SUNDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. D. THE FIRST E]GHT (8) HOURS ON SA TIJRDA YS OF A FIVE - ElGlIT HOUR WORK WEEK. AND THE FIRST EIGHT (8) HOURS WORKED ON A FIFTH CALENDAR DAY, EXCLUDING SUNDAY, IN A FOUR - TEN HOUR SCHEDULE, SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. All. HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY ON SA TIJRDA Y; ALL HOURS WORKED IN EXCESS OF E]GlIT (8) HOURS IN A FIFIH CALENDAR WEEKDAY OF A FOUR - TEN HOUR SCHEDULE; ALL HOURS WORKED IN EXCESS OF TEN (10) HOURS PER. DAY MONDAY THROUGH FRIDAY, AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. E. All. HOURS WORKED IN EXCESS OF ]0 PER DAY SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. 1HE FIRST EIGHT (8) HOURS ON SA TURDA Y SHALL BE PAID ATONE AND ONE-HALF TIMES TIlE HOURLY RATE OF WAGE. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON SA TURDA Y, AND All HOURS WORKED ON . SUNDAYS .AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. F. THE FIRST EIGHT (8) HOURS ON SA TURDA Y SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOUJU. Y RATE OF WAGE. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON SATURDAY. AND All HOURS WORXED ON SUNDAYS AND HOLIDAYS (EXCEPT LABOR DAY) SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON LABOR DAY SHALL BE PAID AT THREE TIMES THE HOURLY RATE OF WAGE. 0. 1liE FmsT TEN (] 0) HOURS WORKED ON SATURDAYS AND THE FIRST TEN (10) HOURS WORKED ON A FIFTH CALENDAR WEEKDAY IN A FOUR - TEN HOUR SCHEDULE, SHAll BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. All HOURS WORKED IN EXCESS OF TEN (10) HOURS PER DAY MONDAY lHROUGH SATURDAY. AND All. HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. H. ALL HOURS WORKED ON SATURDAYS (EXCEPT MAKEUP DAYS ]F WORK]S LOST DUE TO INCLEMENT WEATHER CONDITIONS OR EQUIPMENT BREAKDOWN) SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. . L ALL HOuRS WORKED ON SATURDAY SHALL BE PAID ATONE AND ONE-HALF THE HOURLY RATE OF WAGE. WORK PERFORMED ON SUNDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. WORK PERFORMED ON A HOLIDAY SHAll. BE PAID ONE AND ONE-HALF TIMES THE]R HOURLY RATE FOR ACTUAL HOURS WORXED PLUS EIGHT (8) HOURS OF STRAlGlIT TIME FOR THE HOLlDA Y. J. THE F]RST EIGHT (8) HOURS ON SA TURDA Y SHALL BE P AID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF . -- 1. '. BENEFIT CODE KEY - EFFECTIVE O~ -2- . " '. P. ALL HOURS WORKED ON SATURDAYS (EXCEPT MAKEUP DAYS) AND SUNDAYS SHALL BE PAID AT ONE AND ONE- HALF TIMES THE HOURLY RATE OF WAGE. All HOURS WORKED ON HOLIDAYS SHAll BE PAID AT OOUBLE 1lIE HOURLY RATE OF WAGE. Q. All HOURS WORKED ON SA TURDA YS SHAll BE PAID AT ONE AND ONE-HALF TIMES 11iE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS (EXCEPT CHRISTMAS DAY) SHALL BE PAID AT DOUBLE lEE HOURLY RATE OF WAGE. All HOURS WORKED ON CHRISTMAS DAY SHAU. BE PAID AT TWO AND ONE-HALF TIMES 1lIE HOURLY RATE OF WAGE. R. All HOURS WORlCED ON SUNDAYS AND HOLIDAYS SHAll BE PAID AT TWO TIMES 11iE HOURLY RATE OF WAGE. T. All HOURS WORKED ON SA TURDA YS. EXCEPT MAKE-UP DAYS, sHALi. BE PAID ATONE AND ONE-HALF TIMES 1HE HOURLY RATE OF WAGE. All HOURS WORKED AFTER 6:00PM SA11JRDA Y TO 6:00AM MONDAY AND ON' HOLIDAYS SHAll BE PAID A T DOUBLE 1HE HOURLY RATE OF WAGE. U. All HOURS WORKED ON SA TURDA YS SHAll BE PAID AT ONE AND ONE-HALF TIMES 11iE HOURLY RATE OF WAGE. All HOURS WORKED ON SUNDAYS AND HOLmA YS (EXCEPT LABOR DAY) SHAll BE PAID AT TWO TIMES . 1HE HOURLY RATE OF WAGE. All HOURS WORKED ON LABOR DAY SHAll BE PAID AT THREE TIMES 1HE HOURLY RATE OF WAGE. ' W. All HOURS WORKED ON SATURDAYS AND SUNDAYS (EXCEPT MAKE-UP DAYS) SHAll BE PAID AT ONE AND ONE- HALF TIMES THE HOURLY RATE OF WAGE. All HOURS WORKED ON HOLmA YS SHAll BE PAID AT TWO TIMES 1HE HOURLY RATE OF WAGE. 2. All HOURS WORKED IN EXCESS OF El9HT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. A. 1HE FIRST SIX (6) HOURS ON SA ruRDA Y SHALL BE PAID AT ONE AND ONE-HALF TIMES 11iE HOURLY RATE OF WAGE. ALL HOURS WORKED IN EXCESS OF SIX (6) HOURS ON SAruRDA Y AND ALL HOURS WORKED ON SUN,DAYS AND HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RAn; OF WAGE. All HOURS WORKED ON HOLIDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES nm HOURLY RATE OF WAGE. , , All HOURS WORKED ON SUNDAYS SHAll BE PAID AT ONE AND ONE-HALF TIMES 1HE HOURLY RATE OF WAGE. All HOURS WORKED ON HOLIDAYS SHALL BE PAID AT TWO'TIMES THE HOURLY RATE'OF WAGE. I All HOURS WORKED ON SA TURDA YS AND SUNDAYS SHAll BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. THE FIRST EIGHT (8) HOURS WORKED ON HOLIDAYS SHAll BE P AID AT STRAIGHT TIME rn ADDmON TO THE HOLIDAY PAY. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON HOLmA YS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. B. c. D. E. All HOURS WORKED ON SA ruRDA YS OR HOLIDAYS (EXCEPT LABOR DAY) SHAll BE PAID AT ONE AND ONE- HALF TIMES THE HOURLY RATE OF WAGE. All HOURS WORKED ON SUNDAYS OR ON LABOR DAY SHALL BE PAID AT TWO TIMES 1HE HOURLY RATE OF WAGE. THE FIRST EIGHT (8) HOURS WORKED ON HOLIDAYS SHAll BE PAID AT THE STRAIGHT HOURLY RATE OF WAGE IN ADDmON TO THE HOLIDA Y PAY. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON HOLmA YS SJ:lAll. BE PAID AT DOUBLE 1HE HOURLY RATE OF WAGE. F. G. All HOURS WORKED ON SUNDAY SHAll BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON PAID HOLmA YS SHALL BE PAID AT TWO AND ONE-HALF TIMES THE HOURLY RATE OF WAGE INCLUDING HOLmA Y PAY. H. All HOURS WORKED ON SA ruRDA YS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS SHALL BE PAID AT TWO TIMES THE HOURI. Y RATE OF WAGE. All HOURS WORKED ON HOLIDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE rn ADDmON TO THE HOLIDAY PAY. L ALL HOURS WORKED ON SA ruRDA YS AND HOLIDAYS (EXCEPT LABOR DAY) SHAll BE PAID AT ONE AND ONE- HALF TIMES THE HOURLY RATE OF WAGE. All HOURS WORKED ON SUNDAYS AND ON LABOR DAY SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. J. All HOURS WORKED ON SUNDAYS SHALL BE PAID AT TWO TIMES THE HOURL Y RATE OF WAGE. All HOURS WORKED ON PAID HOLIDAYS SHALL BE PAID AT TWO AND ONE-HALF TIMES THE HOURLY RATE OF WAGE, INCLUDING THE HOLIDA Y PAY. All HOURS WORKED ON UNPAID HOLIDAYS SHAll BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. K. All HOURS WORKED ON HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE IN ADDmON TO THE HOLmAYPAY. I. . . ... ,> 4. 5. BENEnT CODE KEY - EFFECTIVE 03-03-04 -3- , , . ALL HOURS WORKED ON SATURDAYS, SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. . M. O. A. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK. SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SATURDA YS, "SUNDAYS AND HOLIDAYS SHAll BE PAID AT DOUBLE 1HE HOURLY RATE OF WAGE. HOLmA Y CODES HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DA Y, FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (7). B. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY, 1HE DAY BEFORE CHRISTMAS, AND CHRISTMAS DAY (8). A. C. HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY. THANKSGIVING DAY. THE FRIDAY AFTER THANKSGIVING DAY. AND CHRISTMAS DAY (8). D. HOLIDAYS: NEWYEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY. THE FRIDAY AND SATURDAY AFTER TIIANKSGIVING DAY, AND CHRISTMAS DAY (8). . E. HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY. PRESIDENTIAL ELECTION DAY, lHANKSGJVlNG DAY, mE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS . DAY (9). G. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY. THE LAST WORK DAY BEFORE CHRISTMAS DAY. AND CHRISTMAS DAY (7). H. HOLIDAYS: NEWYEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, THANKSGIVING DAY, THE DAY AFTER rnANKSGIVING DAY, AND CHRISTMAS (6). ' ' L 'HOLIDAYS: NEW YEAR'S DAY. MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY (6). N. HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (9). O. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, INDEPENDENCE DAY, LABOR DAY, rnANKSGIVING DAY, AND CHRISTMAS DAY (6). P. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY AND SA TURDA Y AFTER rnANKSGJVING DAY, THE DA Y BEFORE CHRISTMAS, AND CHRISTMAS DAY (9). Q. PAID HOLIDA YS: NEW YEAR'S DAY, MEMORIAL DAY ,INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND crmSTMAS DAY (6). R PAID HOLIDA YS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER TIiANKSGIVING DAY, ONE-HALF DAY BEFORE CHRISTMAS DAY, AND CHRISTMAS DAY. (7 112). S. PAID HOUDA YS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY (7). T. PAID HOLIDAYS: SEVEN (7) P AID HOLIDAYS. V. PAID HOLIDAYS: SIX (6) PAID HOLIDAYS. W. PAID HOLIDAYS: NINE (9) PAID HOLIDAYS. X. HOLIDAYS: AFTER 520 HOURS - NEW YEAR'S DAY, TIIANKSGIVING DAY AND CHRISTMAS DAY. AFTER 2080 HOURS _ NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCEDA Y, LABOR DAY. THANKSGIVING DAY, CHRISTMAS DAY AND A FLOATING HOLIDAY (8). Y. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, THANKSGIVING DAY, THE FRIDAY FOLLOWING THANKSGIVING DAY, AND CHRISTMAS DAY (8). .. .' BENEFIT CODE KEY - EFFECIlVE 03-03-04 -4- , '. I Z. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGlVING DAY, AND CHRISTMAS DAY (8). 6. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORlAL DAY, INDEPENDENCE DAY, LABOR DAY', THANKSGIVING DAY, THE FRIDAY AFTER THANKSGlVING DAY, AND CHRlSTMAS DAY (8). B. PAID HOLIDAYS: NEW YEAR'S EVE DAY, NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING DAY, CHRISTMAS EVE DAY, CHRlSTMAS DAY. (51) A. C. HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING DAY, THE LAST WORK DAY BEFORE OIRISTMAS DAY, AND OIRISTMAS DAY (9). . D. FAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, OIRISTMAS DAY, THE DAY BEFORE OR TIlE DAY AFTER CHRISTMAS DAY (9). 6. HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING JR. DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND OIRISTMAS DAY (8). L PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (7). H. L. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, THE LAST WORKING DAY BEFORE OIRISTMAS DAY, AND OIRISTMAS DAY. (8) Q. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY THANKSGIVING DAY, THE DAY AFTER THANKSGIVING DAY ANDCHRlSTMASDAY. UNPAID HOLIDA Yl PRESIDENTS' DAY. S. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS EVE DAY, AND CHRISTMAS DAY (8). T. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, THE LAST WORKING DAY BEFORE CHRISTMAS DAY, AND CHRISTMAS DAY (9). U. HOLIDAYS: NEW YEAR'S DAY, DAY BEFORE NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, THE DAY BEFORE CHRISTMAS DAY, CHRISTMAS DAY (9). V. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING DAY, CHRISTMAS EVE DAY, CHRISTMAS DAY, EMPLOYEE'S BIRnIDAY, AND ONE DAY OF THE EMPLOYEE'S CHOICE (10). W. FAID HOLIDAYS: NEW YEAR'S DAY, DAY BEFORE NEW YEAR'S DAY, PRESIDENTS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING DAY, OIRISTMAS DAY, DAY BEFORE CHRISTMAS DAY (10). X. PAID HOLIDAYS: NEW YEAR'S DAY, DAY BEFORE OR AFTER NEW YEAR'S DAY, PRESIDENTS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING DAY, CHRISTMAS DAY, DAY BEFORE OR AFTER CHRISTMAS DAY, EMPLOYEE'S BIRTHDAY (11). NOTE CODES 8. A. THE STANDBY RATE OF PAY FOR DIVERS SHAll BE ONE-HALF TIMES THE DIVERS RATE OF PAY. IN ADDmON TO THE HOURLY WAGE AND FRINGE BENEFITS, THE FOLLOWING DEPTH PREMIUMS APPLY TO DEPTHS OF FlFTY FEET OR MORE: OVER 50' TO 100' - $1.00 PER FOOT FOR EACH FOOT OVER SO FEET OVER 100' TO 175' - $2.25 PER FOOT FOR EACH FOOT OVER 100 FEET OVER 175' TO 250' - $5.50 PER FOOT FOR EACH FOOT OVER 175 FEET OVER 250' - DIVERS MAY NAME THEIR OWN PRICE, PROVIDED IT IS NO LESS THAN THE SCALE USTED FOR 250 FEET C. THE STANDBY RATE OF PA Y FOR DIVERS SHALL BE ONE-HALF TIMES THE DIVERS RATE OF PAY. IN ADDmoN TO THE HOURL Y WAGE AND FRINGE BENEFITS, THE FOLLOWING DEPTH PREMIUMS APPLY TO DEPTHS OF FIFTY FEET OR MORE: OVER 50' TO 100' - $ 1.00 PER FOOT FOR EACH FOOT OVER SO FEET OVER 100' TO ISO' - $1.50 PER FOOT FOR EACH FOOT OVER 100 FEET OVER ISO' TO 200' - $2.00 PER FOOT FOR EACH FOOT OVER 150 FEET ~ # ..... .. l' .' .. . BENEflT CODE KEY - EFFECJ1VE 03-03-04 -5- OVER 200' - DIVERS MAY NAME THEIR OWN PRICE D. WORKERS WORKING WITH SUPPLIED AIR ON HAZMAT PROJECTS RECEIVE AN ADDmONAL SI.00 PER ~OUll. L WORKERS ON HAZMA T PROJECTS RECEIVE ADDmONAL HOURLY PREMIUMS AS FOLLOWS - LEVEL A: SO.7S, LEVEL B: S0.50, AND LEVEL C: SO.25. M. WORKERS ON HAZMA T PROJECTS RECEIVE ADDmONAL HOURLY PREMIUMS AS FOLLOWS: LEVELS A&. B: S1.00. LEVELS C &. D: SO-SO. N. WORKERS ON HAZMAT PROJECTS RECEIVE ADDmONAL HOURLY PREMIUMS AS FOLLOWS - LEVEL A: SI.00, LEVEL B: SO.75, LEVEL C: S0.50, AND LEVEL D: SO.25. .._---P~C-2.g-2g94 MON 11; 36 AM CNA SURETY "- FAX NO. 605 335 0357 P. 02 ~~ Western Surety Company PERFORMANCE BOND Bond Numb@r, G9g29~BB KNOW ALL PERSONS BY THESE PRE~]ENTS, Thstwe Glreco;, Conse2;'tlc.r.i~l) __ of 439 quterro~ Rd. 5.~~te. 9,_Olympi~, WA 985~3 -- I hereinafter weate~n Sure~y Company ~~Y- of Port Angeles referred to as the Principal. and - --- as Surety, are held and firmly bound unto of __ __ ----12~~ift]~ St.~rt ~qel~A"~ " _ _. hereinafter referred to as the Obligee, in the sum of Fort;Y._Thou!l!.~.s"bt HUndred T:t:J.ree and.....a.o.D...Q 0 Dollars ($_4~3., 00 --l. for the p.ayment of which we bind ourselves, our legal representatives, successors and assigns. jointly and severally I firmly t.y these presents. WHEREAS, Principal has entered into a ::ontract with Obligee, dated me - -- day of - -, __.__, Tor -Re.~~ac..l:...-.E "un~:i.pin~ci...YaJ..Y@>s:l ..----- - NOW. THEREFORE, if the Principal sh;all faithfully perform such contract or shall indemnify and save harmless the Obligee from all cost and damage b~ reason of Principal's failure so to do. then this obligation shall be null and VOid; otherwise it :shall remain in full forcE I and effect. ANY PROCEEDING, legal or equitable, !Jndcr this Bond may be Instituted in any court of competent jurisdiction in the location in which the \Nork or part of I he work is located and shall be instituted within two years after Contractor Default or within two years after the Con tractor c;eased working or within two years after tM Surety refuses or fails to perform its obligations under thIs SOlid. whichever occurs first If the provisions of this Paragraph are void or prohibited by law, the minimum period c f limitation available to sureties as a defense in the jurisdiction of the suit shall be appli~ble. NO RIGHT OF ACTION shall accrue 0"'1 this Bond to or for the use of any person or corporation other than the Obligee named herein or the heirs. execJtors, administrators or successors of the Obligee. SIGNED, SEALED AND DATED this __ J.QS:.h__ day of _ Dq,c.ember" -, _2.0..04__ ~stern Sure_t;~IJl~ - --- - -- (~urety) 'I - By ~_ (/11/)~~ _ ~ _ __(Seal) I J - M.l.chael pet:!ra AnomeY-in-Fact ~~-~ Form F4597 Ra~alvad 1~-~0-~004 10;41am From-605 335 0357 To-PETRA INSURANCE AGEN Paia OO~ DE~-20~~094 MON 11;36 AM CNA SURETY " FAX NO. 605 335 0357 P. 03 '&Y Western Surety Company PAYMENT BOND Bond Number: 69623J.8a KNOW ALL PERSONS BYTHJ;;SE PRE,3ENTS, That we ~;r: const.l,"J.1.<:,Hon ---- --- ---- _of , hereinafter 439 Du1:er;-9W Rd. ~'~..L..Ste. 9, .~lympia, WA 995J.3 referred to as the Principal, and _. _ ___ .__ Wes1;ern sur~~v compap,v as Surety, are held and firmly bound unte. ___ .' City" ot pore.. ;mgelea . of __ _ 321 E. .Fift.~t_-.. port _Anq<el.~I!. WA. ~B362 __, hereinafter referred to 3S the Obligee, in me sum Of ~y. Thousand Eight. Hundr~d., Three S"-nd 00/1.0..0 Dollars ($ ~.E . B 0 3 ' 00 . __), for the F,ayment of which we bind ourselves, our legal representatives, successors and assigns. jointly and severally. firmly I)y these presents. WHEREAS, Principal has entered into a contract with Obligee, dated __ _ I for _Remove ~ ~eplace ...2YmI?~." Piping and Va.lveo;: _day of , copy of whioh contract is by reference m3de a part hereof. NOW, THEREFORE. if Principal shall, in accordance with applicable Statutes, promptly make payment to all persons supPlying labor and material in the prosecution of the work provided for in said contract, and any and all duly authorized modifications Of said contract that may hereafter be made, notice of which modifications to Surety being waived, then this obligation to be \ Oid; otherwise to remain in full force and effect No suit or action shall be commenced he lreunder (a) After the expiration of one (1) ) ear following the date on Wlllch principal ceased work: on 5aid contract it being understood, however, tha' if any limitation embodied in this bond is prOhibited by any law controlling the construction nereof such lirr itation shall be deemed to be amended so as to be equal to the minimum period of limitation permitted by 'such law. (b) other than in a state court of c )mpetent jurisdiction in and for the county or other political subdivision of the state in Which the project, 0; any part thereof, is situated. or in the United States District Court for the district in which the project, or a ,y part thereof, is situated, and not elsewhere. The amount of this bond shall be redul;ad by and to the extent of any payment or payments made in good faith hereunder. SIGNED, SEALED AND DATED this _ :2 01:11 _ day of _' Ileccm.1:;>!itl'-'_ ., _200A..-. Frem-605 335 0357 By _ (Seal) R~~~lv~d lZ-Z0-Z004 10:41am Te-PETRA INSURANCE AGEN Pal~ 003 DEC-20-2004 MON 11:37 AM CNA SURETY '. fAX NO. 605 335 0357 P. 05 Western Surety CDmpany POWER ~F ATTORNEY - CERTIFIED COPY Bond No. 69a2.9J.Sa Know All Men ay These Presents, that W:jlSTERN SURETY COMPANY. a corporatiol1 duly orGanized and exUltmg under the lawe of the State of South Dakota. and havb1g it I princ:;ipal office m Sioux FaU&, South Dakota (the "Company"). does by these pr9/lentS wake, constitute and appoint.7 Mic:h.a.aL ~t-""::Il ... -- ...- .'- ,." . .--- . its true and lawful attorney{s}-in-fact, Wlth full lower and authority hereby conferred, to ~",QQ'I1te, aeknowlodge and deliver foX' and on lta behalf as Surety, banda for: Princiv~: Greeor Construction Obli~ee: City of Pert Angeles Amount; 5500,000.00 and to bind the Company thereby as Nlly and 1<0 the 9A1l:loQ extent uS :If such bonds were .!Iigned by the Senior VicEl Prc3idcnt, aealed with the eorpot'at.Q seal of thD. Company nnd duly attested by lts Secretary, hereby rati(ying and confirming all that the said RUorney(a).in-fact may do Within the allove st;,ted limitA~UJna. Said appomtmlllnt is mad", under and by authority at the fbllowing bylaw of Western Surety Company which remai 18 in full force and effect. "Section 7. All bonds, policies, undertakill ;5, powem of Attorney or Ilther obligl'tiona of the> corporation shall be executed In the corporate nIlme of the Compllny by the 17Q..idmt, S...~tary. any Assistant Secretary, TreasureT, or any Vice President Or by such othQl' officeJ''' lUl the Board o!Directors may aUHhorize. The Preoidcnt, any Vice :President, SQoretawy, lU1Y Asai..tant Secretary. or the Treaaurer may appoint Attorneys in Fact or aG~nta who shall have authority to iClsue bonds. pOlicies, or undert;:akin~ in the nAme of the CompQny. The corporate gelll is not Decal! lary fur the validitY of any bonda, poli..iell, Undel"~llku1.ge. POWD.rSl of Attorney or other obligatlons of the corporation. The oi<:natlU'C of on,. sueh officor and thr:l corporate seal IDay be printed by facsimUe." Alllluthority hArcby con!e".".ed shall expire and terminate, without nQt.i.co, unl,,"ll used b.,forQ midni5ht of__ 20 0 5 _ . but until such time $hllll be irre ,ocable and in full fores and effect. June 20 In Witness Whereof, Western Surety coup any h.!Is caused these p:r~llenta to be aigned by its Senior V1<:e President. Paul T. Bruflat, na~~~rate seal to be af!Ixed thi!l -2J)th.- del)' of _ ne>C'~mb~:r.--. ~4_. ~~"\""~~ET)/"ql".. ~ I!.+~ ~""""""'-".~O"~ WE S SUR E l~..~~~OI'i*1;'''~\ - /-r-. ~U)l<:'>> ~:~= ~/. l . :~\ eo.. J:<,~ Paul T. Brufln ~ *\ ~C p.."/*li ST~i~~OllX~e~A COUN~~~ On this _ ::lOth chl.:v of .~J::l'lflber . In the year...~ -, before mEl, a nobry p\lblic, par"onally appeared P~u1 T. BrutlAf., who beUl.e' to roe duly sWOrn, acknowl&d~d that. he oi~od th.. Qbave POWA!.' of Attorney M the afbresaid officer of WESTERN SURETY COMPANY and acknawll d~ed Bald Instrument ta be the voluntary /tct and deed at id corporllti.;m. ~~~~~-~~~~------~~~~~~~1 ~f) ~ D. I<R~LL ~ ,.~ ~~NOT^RYPUB"IC~ - -. ;l:~SOUTH DAl(aTA~S +~~~~~~--~~~~~~~----~~~~+ My Commission Expires November 30. 2006 I the u naenllgned ot'Iicer of Weatcrn Sure y Company, 8 RtOcll:: corporation of the State of South DakotZl, do horeby CElttily that ~he attached power of Attornoy ill in full forcEl llnd effect and 18 irrevocable, and !U1'thermo:re, thllt Section 1 or the bY~Wll of the Company as set forth 111 the power of Attornoy 15 nOW 1n orce. In testimony whereof, I hl'Vll hereunto set my hllnd and llQal of Weatern SuretY Company thi.!o --- -~q-.- day of - DeCe~<U:-_, ----A9Q.L-. WE S~ SURE ~ COMPANY _r~LI. .-- - Paul T. BrWlnt }~ Form FS$DS-4-:2002 Re~elve~ lZ-Z0-Z004 10:41am From-605 335 0357 To-PETRA INSURANCE AGEN Pale 005 __ D~.9-~0-20_0.~J!.ON_ 11: 37 AM CNA SURETY '- FAX NO. 605 335 0357 P. 04 ACKNOWLEDGMENT OF SURETY STATE OF _ Wash~ngt:Qn _} (Attol'nfily-ln-Faot) COUNTY OF _ !..@wi s .. ss On thi3___ 20e.L _day of __Decemb~r .'___ -, ~O.O~, before me, a notarypubllc in and for ssid County, perBon::llly appeared _ __ _ .._ _----II.. ~a'" 1 tletr'" ---- to me personally known ::lnd beiag by me duly SHorn, did say, that he is the Attorney-in-Fact of WESTERN SURETY COMPANY, a corpor;:Ltion of Sioux Falls. South Dak Ita, created, oJ"[l'amzod and exiSlting undqr :and by vil:me of the laws of the Stato of South Dakota. that the said instrument Wi ,8 execu~d on behalf of the said corporatl.on by authority of its Board of Director~ :and that the said_ . _ _ .~. ~e.i....I!at-r;! - --. acknowledges said instrUment to be the free act and deed of said corporation and that he has authority to sign said in~tnunent \1nthout affixing tbe corporate seal of said corp01"atioD. IN WITNESS WHEREOF, I have hereunto subsc ribed my.name and affixed my official seal at - --- _ Ch'?lta1.i.o _ __ _ _ _, _ wasni~n _ . the day and year lill:lt above WJ."hten. MYCOmm1"ionl'r'"P(.~ I 13;$: _ ~ . - .. -- -- - ~ - Natary Publ.1!: I=orm 106-4-2000 Received 12-20-2004 10:41am From-605 335 0357 To-PETRA INSURANCE AGEN Paie 004 "II ~ . ~ .. ACORD CERTIFICATE OF LIABILITY INSURANCE I DATE (MMIDD/YYYY) TM DEC 30 04 PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION PETRA INSURANCE AGENCY, INC. ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE POBOX 936 HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR CHEHALlS WA 98532 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW INSURERS AFFORDING COVERAGE I NAIC# I I I INSURED INSURER A ATLANTIC CASUALTY CO. I GRECOR CONSTRUCTION INSURER B I I CIO LANGEMO, GREY INSURER C I 439 DUTERROW OLYMPIA WA 98513 INSURER D , i INSURER E I I COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS INSR ADD'L TYPE OF INSURANCE I POLICY NUMBER Pgi~i~~:~g~~ I P~;~:/~~~;~N I LIMITS L TR INSRD GENERAL LIABILITY I M088000132 SEP 29 04 SEP 29 05 EACH OCCURRENCE I: 1,000,000 X COMMERCIAL GENERAL L1ABILlT'r: DAMAGE TO RENTED 50,000 PREMISES (Ea occurence) 1$ CLAIMS MADE: X OCCUR MED EXP (Anyone person) 5,000 A PERSONAL & ADV INJURY $ 1,000,000 GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER PRODUCTS-COMP/OP AGG $ 2,000,000 POLICY PROJECT LOC AUTOMOBILE LIABILITY I COMBINED SINGLE LIMIT 1$ ANY AUTO (Ea accident) I ALL OWNED AUTOS BODILY INJURY 1$ SCHEDULED AUTOS (Per person) HIRED AUTOS BODILY INJURY 1$ NON-OWNED AUTOS (Per aCCIdent) I PROPERTY DAMAGE i$ (Per aCCIdent) I GARAGE LIABILITY AUTO ONLY - EA ACCIDENT 1$ ANY AUTO OTHER THAN EAACC 1$ AUTO ONLY ,~~ 1$ EACH OCCURRENCE I EXCESS / UMBRELLA LIABILITY 1$ OCCUR I AGGREGATE 1$ , CLAIMS MADE ,$ I DEDUCTIBLE I: RETENTION $ WORKERS COMPENSATION AND I WC STATU- I I OTHER EMPLOYERS' LIABILITY TORY LIMITS E L EACH ACCIDENT $ ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED? E L DISEASE-EA EMPLOYEE $ If yes, desCribe under E L DISEASE-POLICY LIMIT $ SPECIAL PROVISIONS below OTHER I DESCRIPTION OF OPERATIONS/LOCATIONSNEHICLES/EXCLUSIONS ADDED BY ENDORSEMENTI SPECIAL PROVISIONS CERTIFICATE HOLDER ADDED AS ADDITIONAL INSURED ONLY AS THEIR INTERESTS MAY APPEAR. UPGRADE OF PUMP STATION CERTIFICATE HOLDER CITY OF, PORT ANGELES PUBLIC WORKS & UTILITIES DEPARTMENT POBOX 1150 Port Angeles WA 98362 CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL ENDEAVOR TO MAIL 10 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, IT'S AGENTS OR REPRESENTATIVES AUTHORIZED REPRESENTATIVE ACORD 25 (2001/08) Certificate # 2144 @ACORDCORPORATION 1988 Attention STEPHEN SPERR