HomeMy WebLinkAbout4.475 Original Contract ~ COR' F'oRft/% 1- </. <175 , ! .. PROJECT MANUAL 'Oak Street Sewer Repair Project 04-03 SCOPE OF WORK The project to be bid consist of three elements. The first is for the installation of a manhole and approximately 12 feet of 12" PVC pipe sanitary sewer main. The second is two service reconnections. The third element is the realignment of approximately 43 feet of 8-inch PVC pipe storm sewer line. All work to complete the installation, including the furnishing of all labor, tools, equipment and matenal needed in the placing of all necessary pipe, manholes, JOint restraints, fittings, bedding, CDF backfill, concrete and asphalt roadway and sidewalk resurfacing, pavement markings, restoration and clean up is included in the bid In the area of work, existing concrete slab thickness in the road IS expected to be less than or equal to 8". Concrete IS to be sawcut and replaced with new concrete doweled at the joints with #5 size rebar space 18" OC and with a penetrating length of 6 Inches Pipeline bedding shall be Imported 3/4" minus sand and/or gravel miX, 6 inches below pipe to 6 inches above pipe. Control DenSity Fill must be used for backfill above the bedding. The Contractor is responsible for protecting the sculpture and sculpture pedestal located in the sidewalk immediately north or the Railroad Street and Oak Street Intersection (See attached plan sheets), during the realignment of the 8-inch PVC Pipe storm sewer. All eXisting live sanitary sewers shall be kept In service at all times. Provisions shall be made by the Contractor for sewer flow bypass while repairs are made to the sanitary sewer main. All other work shall meet the requirements of the City of Port Angeles' Urban Services Standards and Guidelines. ThiS Contract incorporates the Washington State Department of Transportation's 2004 Standard Specifications for Road, Bridge, and Municipal Construction (English Units), referred to herein as the Standard Specifications. The following Special Provisions supersede any conflicting prOVisions of the Standard SpeCification and made a part of thiS Contract. The sections referenced In these SpeCial Provisions refer to sections of the Standard Specifications 1-10 TEMPORARY TRAFFIC CONTROL 1-10.2 Traffic Control Management 1-10.2(1) General The third sentence of the first paragraph of Section 1-10.2(1) is revised to read: The Contractor may designate the project superintendent as the TCM. 1-10.2(2) Traffic Control Plans (TCP's) The first sentence of Section 1-10.2(2) is to be replaced with the following: The Contractor shall develop a traffic control plan necessary for their method of performing the Small Works Roster Project Manual 1 4 (. work, and submit it to the City Engineer for approval at least 10 calendar days before any work involving the plan begins. No work shall occur that alters existing traffic control before approval of the plan. The plan shall be in accordance with this section, the Standard Plans, and the Manual on Uniform Traffic Control Devices (MUTCD). The following is a list of special traffic control requirements that shall be Incorporated Into the traffic control plan' 1. If It IS necessary to conduct work along Front Street, the contractor must use traffic safety cones to maintain two open lanes at all times. 2. The traffic control plan shall incorporate temporary chain link fence barriers, or other barrier approved by the Engineer, to be used for pedestrian barriers adjacent to roadways. 3. The use of existing parking lanes (i.e., indicate if parking lanes will be used as pedestrian walkways, traffic lanes, closed to all pedestrian and traffic travel, or a combination of uses). 4. Bus service to the Oak Street Bus Station shall be maintained during sewer repair work. The Contractor shall coordinate with Clallam Transit at 1-800-858-3747. The last sentence of Section 1-10.2(2) is revised to read: The Contractor's letter designating and adopting the specific traffic control plan(s) or any proposed modified plan(s) shall be submitted to the Engineer for approval at least ten calendar days in advance of the time the new plan will be Implemented. All costs associated with the development and implementation of the traffic control plan(s), except Traffic Control Labor shall be incidental to contract prices. See the attached drawings (5 Sheets) for more information. ADDITIONAL REQUIREMENTS 1. The bid shall be submitted on the attached Bid Form and mailed or delivered to the Director of Public Works & Utilities, City of Port Angeles, 321 East Fifth Street, P. O. Box 1150, Port Angeles, Washington 98362. Questions may be directed to Jeremy Andrews, at 360-417-4812. 2. The most recently issued Washington State Prevailing Wage Rates for Clallam County, a copy of which IS attached to this Project Manual, shall apply to thiS Contract. 3. The bid will be awarded to the lowest responsible bidder from the group of Small Works Roster contractors asked to bid on thiS work. The attached Contract will then be signed, requiring the Contractor to meet the requirements in the Contract as well as the entire Project Manual. No bidder will be permitted to withdraw its bid between the closing time for receipt of bids and the execution of a Contract, unless the award is delayed for a period exceeding sixty (60) calendar days. 4. Bids shall be submitted no later than 1 :30 P.M. September 1, 2004. 5. Because this Contract is for an amount less than $35,000, a bid bond, performance and payment bond, and retainage will not be required for this work. However, the City shall have the right of recovery against the Contractor for any payments made on the Contractor's behalf. Small Works Roster Project Manual 2 ~ (, 6. The performance period for this work is 20 working days. Contractor is to mobilize and start work within 20 working days of Notice To Proceed. Small Works Roster Project Manual 3 (. i. BID FORM Oak Street Sewer Repair Project 04-03 The bidder hereby bids the following amounts for all work (including labor, equipment, time and materials) required to install the sanitary sewer pipe, sanitary service pipes and storm sewer pipe as required in the Scope of Work. -- - .. ~~--~-. -~------- -- - - ~- - - ~ 1. Manhole and Sewer Main 1 LS $ 9500 ?O $ 6SDo.O 2. 2 - Service Lines 2 EA $ l/P e b, (XJ $ 3370. ~. 3. Storm Sewer 1 LS $ I L 5qD,OD $ III 5'00 . I 4. Traffic Control Labor 40 HR $ 3e.OO $ 1570.0 Sales Tax (8.3%) $ 20"'5,6 Quantitv Units Unit Price I~otal E>rice o ()U o~ o 7 Total Bid I $ ~ ~/q))-, 97 The bidder hereby acknowledges that it has received Addenda Nos. $- to this Project Manual. The name of the bidder submitting this bid and its business phone number and address, to which address all communications concerned with this bid and with the contract shall be sent, are listed below. Bidder's firm name j( U 6han Lo",,^- s-"iY IJ c\1~ (_0 . -:LrLc . Complete address 3 6 ~ p6f. /)Ja- ~ q 7J '3 to 2- (Street address) (State) Registration Number K LJC:Jt1t4.C-COCO G4 UBI Number 19o.\ - q5 0 - q~ 2- Telephone No. 3&,0 1-/ S 7 .. '7 141.. o-y L..{ &() -{ O,?- Z- Signed by ~D1uJ,- /:AJ oL- Title O\J..MQ/ / ()~ Printed Name: /Oo.J\C\.. k( u( h-CUh Small Works Roster Project Manual 4 (. ~ PUBLIC WORKS CONTRACT ThIS Contract is made and entered into m duplicate trus ~y of .~" ,..I. , 20M by and between the CIty of Port Angeles, a non-charter code city of the State of Washi~eferred to as "the City", and Kuchan Construction, Inc., a Washington State Corporation, hereinafter referred to as "the Contractor". WITNESSETH: Whereas, the CIty desires to have certam publIc work performed as heremafter set forth, reqUIrmg specIalIzed sktlls and other SupportIve capabIlItIes; and Whereas, the Contractor represents that It IS qualIfied and possesses sufficIent skIlls and the necessary capabIlIties to perform the servIces set forth m thIS Contract. NOW, THEREFORE, in consIderatIOn of the terms, condItIons, and agreements contamed herem, the partIes hereto agree as follows: 1. Scope of Work. The Contractor shall do all work and furnish all tools, matenals, and equipment in order to accomplIsh the following project: Oak Street Sewer Repair Project 04-03 m accordance WIth and as descnbed m this Contract and the Project Manual, wruch include the attached plans and scope of work, and shall perform any alterations m or addItions to the work provIded under this Contract and every part thereof. The Contractor shall provIde and bear the expense of all eqUIpment, work, and labor of any sort whatsoever that may be required for the transfer of matenals and for constructing and completmg the work provIded for in this Contract, except as may otherwise be provided in the Project Manual. 2. Time for Performance and LIqUIdated Damages. a. Time IS of the essence m the performance of this Contract and in adhering to the tIme frames speCIfied herem. The Contractor shall commence work wItrun 20 workmg days of NotIce to Proceed, and saId work shall be phYSIcally completed withm 20 workmg days after commencing work, unless a dIfferent tIme frame is expressly prOVIded in writing by the CIty. b. If saId work is not completed WIthin the tIme for physical completIon, the Contractor may be required at the City's sole discretIOn to pay to the City liquidated damages of $1000.00 for each and every day said work remains uncompleted after the expIratIon of the speCIfied time. 3. CompensatIon and Method of Payment. a. The CIty shall pay the Contractor for work performed under trus Contract as detailed in the bid, at the completIOn of work and submission of a detailed mvoice. Small Works Roster Project Manual 5 t i- b. Payments for any alteratIons m or addItIons to the work provided under this Contract shall be on a negotiated time and materials basIs. 4. Independent Contractor Relationship. The relationshIp created by thIs Contract IS that of independent contractmg entItIes. No agent, employee, servant, or representatIve of the Contractor shall be deemed to be an employee, agent, servant, or representative of the City, and the employees of the Contractor are not entitled to any of the benefits the City provides for its employees. The Contractor shall be solely and entirely responsIble for its acts and the acts of its agents, employees, servants, subcontractors, or representatIves during the performance of thIs Contract. The Contractor shall assume full responsibility for payment of all wages and salaries and all federal, state, and local taxes or contnbutions Imposed or required, mcludmg, but not limited to, unemployment insurance, workers compensation insurance, social securitY, and mcome tax withholding. 5. PrevaIling Wage Requirements. The Contractor shall comply with applIcable prevailmg wage requirements of the Washington State , Department of Labor & Industries, as set forth m Chapter 39.12 RCW and Chapter 296-127 WAC. The Contractor shall document complIance with said requirements and shall file with the City appropriate affidavits, certificates, and/or statements of complIance with the State prevailing wage requIrements. The Washington State Prevailing Wage Rates For Public Works Contracts, Clallam County, incorporated m this Contract have been established by the Department of Labor & Industnes and are mcluded as an AttachInent to thIS Contract. The Contractor shall also ensure that any subcontractors or agents of the Contractor shall comply With the prevailmg wage and documentation requirements as set forth herein. 6. IndemnificatIon and Hold Harmless. a. The Contractor shall defend, indemnify, and hold harmless the City, its officers, officials, employees, and volunteers against and from any and all claims, injurIes, damages, losses, or lawsUIts, mcludmg attorney fees, arising out of or m connectIon With the performance of this Contract, except for injuries and damages caused by the sole neglIgence of the City. It is further provided that no liability shall attach to the CIty by reason of entering into this Contract, except as expressly provided herein. b. Should a court of competent jurisdiction determine that thIs Contract is subject to RCW 4.24.115, then, in the event ofliability for damages arising out of bodily mjury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, and volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. It is further specifically and expressly understood that the indenmification provided herein constitutes the Contractor's waiver of immunity under 'Industna1 Insurance, TItle 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotIated by the parties. The provisIOns of thIs section shall survIve the expuation or terminatIon of this Contract. 7. Insurance. The Contractor shall procure and maintam for the duration of the Contract, msurance against claims for mjuries to persons or damage to property which may anse from or in connectIOn with the performance of the work hereunder by the Contractor, their agents, representatives, employees or subcontractors. Failure by the Contractor to mamtam the insurance as required shall constitute a material breach of contract upon whIch the City may, after giving five working days notice to the Contractor to correct the breach, immediately terminate the Contract or at its dIscretion, procure or renew such Insurance and pay any and all prerrnums m connection thereWith, with any sums Small Works Roster Project Manual 6 ( \. so expended to be repaid to the City on demand, or at the sole dIscretion of the CIty, off set agamst funds due the Contractor from the CIty. a. MlDlmum Scope of Insurance The Contractor shall obtam msurance of the types described below: 1. Automobile Liability msurance covering all owned, non-o'Ylled, hIred and leased vehIcles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 I or a substitute form providing equivalent liabIlIty coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. 11. Commercial General Liabilitv msurance shall be written on ISO occurrence form CG 00 01 and shall cover liability ansmg from premises, operations, stop gap lIability, mdependent contractors, products-completed operatIOns, personal injury and advertising mJury, and lIability assumed under an insured Contract. The CommercIal General Liability insurance shall be endorsed to provide the Aggregate Per Project Endorsement ISO form CG 2503 11 85. There shall be no endorsement or modIfication of the , Commercial General Liability insurance for liability arismg from explosion, collapse or ' underground property damage. The City shall be named as an msured under the ' Contractor's Commercial General Liability insurance policy with respect to the work performed for the City using ISO AddItional Insured endorsement CG 20 10 10 Oland Additional Insured-Completed Operations endorsement CG 20 37 1001 or substitute endorsements provIding equivalent coverage. lll. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. i b. MinImum Amounts of Insurance The Contractor shall maintain the followmg insurance limits: 1. Automobile Liability msurance with a minimum combined single limit for bodily injury and property damage of $1 ,000,000 per accident. 11. Commercial General Liabilitv insurance shall be written with limits no less than $1,000,000 each occurrence, $2,000,000 general aggregate and a $2,000,000 products- completed operatIons aggregate limit. c. Other Insurance Provisions The insurance policies are to contain, or be endorsed to contain, the followmg provisions for Automobile LiabIlIty and Commercial General LIability insurance. 1. The Contractor's insurance coverage shall be primary insurance as respect to the City. Any Insurance, self-insurance, or insurance pool coverage maintained by the CIty shall be m excess of the Contractor's insurance and shall not contribute with it. 11. The Contractor's insurance shall not be cancelled or reduced as to coverage by either party, except after forty-five (45) days prior written notice by certified mail, return receipt requested, has been given to the City. d. Acceptability of Insurers Small Works Roster Project Manual 7 ... Insurance IS to be placed wIth insurers with a current A.M. Best rating of not less than A:VII. e. VerificatIOn of Coverage The Contractor shall furnish the CIty With origmal certIficates and a copy of the amendatory endorsements, including but not necessarily hrmted to the addItIonal msured endorsement, eVldencmg the msurance requirements of the Contractor before commencement of the work. 8., Com1Jhance with Laws. a. The Contractor shall comply With all applicable federal, state, and local laws, including -regulations for hcensing, certification, and operatIOn of facilities and programs, and accreditation and licensing of individuals, and any other standards or cntena as set forth in the Project Manual. b. The Contractor shall pay any apphcable business and perrmt fees and taxes WhICh may be required for the performance of the work. c. The Contractor shall comply With all legal and pennittmg requrrements as set forth in the Project Manual. 9. Non-discnmination. The partIes shall conduct their business in a manner which assures fair, equal and nondlscnminatory treatment of all persons, Without respect to race, creed, color, sex, VIetnam era veteran status, dIsabled veteran condition, physical or mental handIcap, or natIOnal ongm, and, in particular: A. The parties will mamtain open hmng and employment practices and will welcome apphcations for employment in all pOSItIOns from quahfied mdivlduals who are members of the above-stated minontIes. B. The parties will comply strictly with all requirements of applicable federal, state or local laws or regulations Issued pursuant thereto, relatmg to the estabhshment of nondiscnrninatory reqmrements in mring and employment practIces and assuring the service of all patrons and customers without discrimination with respect to the above-stated mmority status. 10. Assignment. a. The Contractor shall not assign this Contract or any interest herein, nor any money due to or to become due hereunder, without frrst obtainmg the wntten consent of the City, nor shall the Contractor subcontract any part of the services to be performed hereunder without frrst obtaining the consent of the City. b. ,The Contractor hereby aSSIgns to the City any and all claims for overcharges resulting from antItrust VIOlatIOns as to goods and materials purchased in connection With tills Contract, except as to overcharges resultmg from antitrust violations commencmg after the date of the bid or other event establismng the pnce of this Contract. In addItIon, the Contractor warrants and represents that each of its supphers and subcontractors shall assign any and all such claims for overcharges to the City in accordance with the terms of tills provlSlon. The Contractor further agrees to give the City immediate notIce of the eXIstence of any such claim. 11. Contract AdministratIon. This Contract shall be adrmmstered by Dana Kuchan on behalf of the Contractor and by Jeremy Andrews, Assistant Civil Engineer on behalf of the City. Any wntten notices required by the terms of this Contract shall be served or mailed to the followmg addresses: Small Works Roster Project Manual 8 , City: Contractor: Kuchan ConstructIon Co. Inc. 3049 E. HICkory Street Port Angeles, W A 98362 CIty of Port Angeles P.O. Box 1150 321 East FIfth Street Port Angeles, W A 98362-0217 1. InterpretatIon and Venue. ThIs Contract shall be mterpreted and construed in accordance WIth the laws of the State ofWashmgton. The venue of any lItIgatIOn between the partIes regarding this Contract shall be Clallam County, Washmgton. IN WITNESS WHEREOF, the partIes hereto have caused this Contract to be executed the day and year fIrst set forth above. CONTRACTOR: fiU'-f1/AiV C~/. Name of Contractor By: '0~-,gd~ CITY OF PORT ANGELES: TItle: ?reJ: IJ~, By: li~~~.~~ Ik- AITr9ved as to Form: /,,!~ <C CIty Attorney Attest: ~:!~~ \ . " - Small Works Roster Project Manual 9 ... State of Washrngton DEPARTMENT OF LABOR AND INDUSTRIES Prevailing Wage Section - Telephone (360) 902-5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage Rates For Public Works Contracts The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fnnge benefits. On public works projects, workers' wage and benefit rates must add to not less than this total. A brief description of overtime calculation reqUirements is prOVided on the Benefit Code Key. CLALLAM COUNTY Effective 09-01-04 ***************************************************************************************************************** Classification ASBESTOS ABATEMENT WORKERS JOURNEY LEVEL BOILERMAKERS JOURNEY LEVEL BRICK AND MARBLE MASONS JOURNEY LEVEL CABINET MAKERS (IN SHOP) JOURNEY LEVEL CARPENTERS ACOUSTICAL WORKER BRIDGE, DOCK AND WARF CARPENTERS CARPENTER CREOSOTED MATERIAL DRYWALL APPLICATOR FLOOR FINISHER FLOOR LAYER FLOOR SANDER MILLWRIGHT AND MACHINE ERECTORS PILEDRIVERS, DRIVING, PULLING, PLACING COLLARS AND WELDING SAWFILER SHINGLER STATIONARY POWER SAW OPERATOR STATIONARY WOODWORKING TOOLS CEMENT MASONS JOURNEY LEVEL DIVERS & TENDERS DIVER DIVER TENDER DREDGE WORKERS ASSISTANT ENGINEER ASSISTANT MATE (DECKHAND) BOATMEN ENGINEER WELDER LEVERMAN, HYDRAULIC MAINTENANCE MATES OILER DRYWALL TAPERS JOURNEY LEVEL ELECTRICAL FIXTURE MAINTENANCE WORKERS JOURNEY LEVEL Page 1 PREVAILING WAGE $32.61 $43.47 $39.87 $14.67 $39.11 $38 95 $38.95 $39 05 $39.63 $39.08 $39 08 $39.08 $39 95 $39.15 $39.08 $39.08 $39.08 $39.08 $32.61 $80.62 $41.72 $39.52 $38.76 $39.52 $39 57 $41.04 $38.76 $39.52 $39.16 $39.44 $9.37 (See Benefit Code Key) Over Time Holiday Note Code Code Code 1N 5D 1B 5N 1M 5A 1M 5D 1M 5D 1M 5D 1M 5D 1M 5D 1M 5D 1M 5D 1M 5D 1M 5D 1M 5D 1M 5D 1M 5D 1M 5D 1M 5D 1N 5D 1M 5D 8A 1M 5D 1B 5D 8L 1B 5D 8L 18 5D 8L 1B 5D 8L 1B 5D 8L 1B 5D 8L 1B 5D 8L 1B 5D 8L 1J 5B ~ CLALLAM COUNTY Effective 09-01-04 ***************************************************************************************************************** (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code ELECTRICIANS - INSIDE CABLE SPLICER $49.51 1D 6H CABLE SPLICER (TUNNEL) $53.31 10 6H CERTIFIED WELDER $47.79 10 6H CERTIFIED WELDER (TUNNEL) $51.41 1D 6H CONSTRUCTION STOCK PERSON $24.33 10 6H JOURNEY LEVEL $46.06 1D 6H JOURNEY LEVEL (TUNNEL) $49.51 10 6H ELECTRICIANS - MOTOR SHOP CRAFTSMAN $15.37 2A 6C JOURNEY LEVEL $14.69 2A 6C ELECTRICIANS - POWERLlNE CONSTRUCTION CABLE SPLICER $49.54 4A 5A CERTIFIED LINE WELDER $45.15 4A 5A GROUNDPERSON $32.63 4A 5A HEAD GROUNDPERSON $34.43 4A 5A HEAVY LINE EQUIPMENT OPERATOR $45.15 4A 5A JACKHAMMER OPERATOR $34.43 4A 5A JOURNEY LEVEL L1NEPERSON $45.15 4A 5A LINE EQUIPMENT OPERATOR $38.37 4A 5A POLE SPRAYER $45.15 4A 5A POWDERPERSON $34.43 4A 5A ELECTRONIC & TELECOMMUNICATION TECHNICIANS JOURNEY LEVEL $12.07 ELEVATOR CONSTRUCTORS MECHANIC $49.28 4A 6Q MECHANIC IN CHARGE $54.18 4A 6Q FABRICATED PRECAST CONCRETE PRODUCTS ALL CLASSIFICATIONS $13.50 FENCE ERECTORS FENCE ERECTOR $13.80 FENCE LABORER $11.60 FLAGGERS JOURNEY LEVEL $27.93 1N 5D GLAZIERS JOURNEY LEVEL $39.96 2E 5G HEAT & FROST INSULATORS AND ASBESTOS WORKERS MECHANIC $41.93 1F 5E HEATING EQUIPMENT MECHANICS MECHANIC $16.00 HOD CARRIERS & MASON TENDERS JOURNEY LEVEL $33.09 1N 5D INDUSTRIAL ENGINE AND MACHINE MECHANICS MECHANIC $15.65 INDUSTRIAL POWER VACUUM CLEANER JOURNEY LEVEL $9.07 INLAND BOATMEN CAPTAIN $35.14 1K 5B COOK $30 11 1K 5B DECKHAND $29.09 1K 5B ENGINEER/DECKHAND $31.66 1K 5B MATE, LAUNCH OPERATOR $33.24 1K 5B Page 2 .. CLALLAM COUNTY Effective 09-01-04 ***************************************************************************************************************** ClaSSification INSPECTION/CLEANING/SEALING OF SEWER & WATER SYSTEMS BY REMOTE CONTROL CLEANER OPERATOR, FOAMER OPERATOR GROUT TRUCK OPERATOR HEAD OPERATOR TECHNICIAN TV TRUCK OPERATOR INSULATION APPLICATORS JOURNEY LEVEL IRONWORKERS JOURNEY LEVEL LABORERS ASPHALT RAKER BALLAST REGULATOR MACHINE BATCH WEIGHMAN BRUSH CUTTER BRUSH HOG FEEDER BURNERS CARPENTER TENDER CASSION WORKER CEMENT DUMPER/PAVING CEMENT FINISHER TENDER CHANGE-HOUSE MAN OR DRY SHACKMAN CHIPPING GUN (OVER 30 LBS) CHIPPING GUN (UNDER 30 LBS) CHOKER SETTER CHUCK TENDER CLEAN-UP LABORER CONCRETE DUMPER/CHUTE OPERATOR CONCRETE FORM STRIPPER CONCRETE SAW OPERATOR CRUSHER FEEDER CURING LABORER DEMOLITION, WRECKING & MOVING (INCLUDING CHARRED DITCH DIGGER DIVER DRILL OPERATOR (HYDRAULIC, DIAMOND) DRILL OPERATOR, AIRTRAC DUMPMAN EPOXY TECHNICIAN EROSION CONTROL WORKER FALLER/BUCKER, CHAIN SAW FINAL DETAIL CLEANUP (i e ,dusling, vacuuming, window cleaning, NOT construclion debris cleanup) FINE GRADERS FIRE WATCH FORM SETTER GAB ION BASKET BUILDER GENERAL LABORER GRADE CHECKER & TRANSIT PERSON GRINDERS GROUT MACHINE TENDER PREVAILING WAGE $9.73 $11.48 $12.78 $7.16 $10.53 $20.50 $43.12 $33.09 $32.61 $27.93 $32.61 $32.61 $32.61 $32.61 $33.45 $33.09 $32.61 $32.61 $33 09 $32.61 $32.61 $32.61 $32.61 $33.09 $32.61 $33.09 $27.93 $32.61 $32.61 $32.61 $33.45 $33.09 $33.45 $32.61 $32.61 $32.61 $33.09 $25.61 $32.61 $27.93 $32.61 $32.61 $32.61 $33.09 $32.61 $32.61 Page 3 (See Benefit Code Key) Over Time Holiday Code Code Note Code 1B 5A 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 50 1N 5D 1N 5D 1N 50 1N 5D 1N 5D 1N 5D 1N 50 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 50 1N 5D CLALLAM COUNTY Effective 09-01-04 ***************************************************************************************************************** Classification GUARDRAIL ERECTOR HAZARDOUS WASTE WORKER LEVEL A HAZARDOUS WASTE WORKER LEVEL B HAZARDOUS WASTE WORKER LEVEL C HIGH SCALER HOD CARRIERlMORTARMAN JACKHAMMER LASER BEAM OPERATOR MANHOLE BUILDER-MUDMAN MATERIAL YARDMAN MINER NOZZLEMAN, CONCRETE PUMP, GREEN CUTTER WHEN USING HIGH PRESSURE AIR & WATER ON CONCRETE & ROCK, SANDBLAST, GUNITE, SHOTCRETE, WATER BLASTER PAVEMENT BREAKER PILOT CAR PIPE POT TENDER PIPE RELlNER (NOT INSERT TYPE) PIPELAYER & CAULKER PIPELAYER & CAULKER (LEAD) PIPEWRAPPER POT TENDER POWDERMAN POWDERMAN HELPER POWERJACKS RAILROAD SPIKE PULLER (POWER) RE-TIMBERMAN RIPRAP MAN RODDER SCAFFOLD ERECTOR SCALE PERSON SIGNALMAN SLOPER (OVER 20") SLOPER SPRAYMAN SPREADER (CLARY POWER OR SIMILAR TYPES) SPREADER (CONCRETE) STAKE HOPPER STOCKPILER TAMPER & SIMILAR ELECTRIC, AIR & GAS TAMPER (MULTIPLE & SELF PROPELLED) TOOLROOM MAN (AT JOB SITE) TOPPER-TAILER TRACK LABORER TRACK LINER (POWER) TRUCK SPOTTER TUGGER OPERATOR VIBRATING SCREED (AIR, GAS, OR ELECTRIC) VIBRATOR VINYL SEAMER WELDER WELL-POINT LABORER Page 4 PREVAILING WAGE $32.61 $33.45 $33.09 $32.61 $33.45 $33.09 $33.09 $33.09 $33.09 $32.61 $33.45 $33.09 $33.09 $27.93 $33.09 $33.09 $33 09 $33 45 $33 09 $32 61 $33 45 $32.61 $33.09 $33 09 $33 45 $32.61 $33.09 $32.61 $32 61 $32.61 $33.09 $32.61 $33.09 $33.09 $32.61 $32.61 $33.09 $33.09 $32.61 $32.61 $32.61 $33.09 $32.61 $33.09 $32.61 $33.09 $32.61 $32.61 $33.09 (See Benefit Code Key) Over Time Holiday Note Code Code Code 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D 1N 5D CLALLAM COUNTY Effective 09-01-04 ***************************************************************************************************************** (See Benefit Code Key) Over PREVAILING Time Holiday Note ClaSSification WAGE Code Code Code LABORERS - UNDERGROUND SEWER & WATER GENERAL LABORER $32.61 1N 5D PIPE LAYER $33.09 1N 5D LANDSCAPE CONSTRUCTION IRRIGATION OR LAWN SPRINKLER INSTALLERS $11.42 LANDSCAPE EQUIPMENT OPERATORS OR TRUCK DRIVERS $7.81 LANDSCAPING OR PLANTING LABORERS $7.93 LATHERS JOURNEY LEVEL $39.63 1M 5D MACHINISTS (HYDROELECTRIC SITE WORK) MACHINIST $16.84 METAL FABRICATION (IN SHOP) FITTERlWELDER $15.16 LABORER $11.13 MACHINE OPERATOR $10.66 PAINTER $11.41 PAINTERS JOURNEY LEVEL $30.76 2B 5A PLASTERERS JOURNEY LEVEL $25.83 PLAYGROUND & PARK EQUIPMENT INSTALLERS JOURNEY LEVEL $793 PLUMBERS & PIPEFITTERS JOURNEY LEVEL $48.86 1G 5A POWER EQUIPMENT OPERATORS ASSISTANT ENGINEERS $37 26 1T 5D 8L BACKHOE, EXCAVATOR, SHOVEL (3 YD & UNDER) $39 88 1T 5D 8L BACKHOE, EXCAVATOR, SHOVEL (OVER 3 YD & UNDER 6 YD) $40.34 1T 5D 8L BACKHOE, EXCAVATOR, SHOVEL (6 YD AND OVER WITH $40 86 1T 5D 8L BACKHOES, (75 HP & UNDER) $39 49 1T 5D 8L BACKHOES, (OVER 75 HP) $39.88 1T 5D 8L BARRIER MACHINE (ZIPPER) $39.88 1T 5D 8L BATCH PLANT OPERATOR, CONCRETE $39.88 1T 5D 8L BELT LOADERS (ELEVATING TYPE) $39.49 1T 5D 8L BOBCAT $37.26 1T 5D 8L BROOMS $37.26 1T 5D 8L BUMP CUTTER $39.88 1T 5D 8L CABLEWAYS $40.34 1T 5D 8L CHIPPER $39.88 1T 5D 8L COMPRESSORS $37.26 1T 5D 8L CONCRETE FINISH MACHINE - LASER SCREED $37.26 1T 5D 8L CONCRETE PUMPS $39.49 1T 5D 8L CONCRETE PUMP-TRUCK MOUNT WITH BOOM ATTACHMENT $39 88 1T 5D 8L CONVEYORS $39 49 1T 5D 8L CRANES, THRU 19 TONS, WITH ATTACHMENTS $39.49 1T 5D 8L CRANES, 20 - 44 TONS, WITH ATTACHMENTS $39.88 1T 5D 8L CRANES, 45 TONS - 99 TONS, UNDER 150 FT OF BOOM (INCLUDING $40 34 1T 5D 8L JIB WITH ATACHMENTS) CRANES, 100 TONS -199 TONS, OR 150 FT OF BOOM (INCLUDING JIB $40.86 1T 5D 8L WITH ATTACHMENTS) CRANES, 200 TONS TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB $41 .40 1T 5D 8L WITH ATTACHMENTS) CRANES, A-FRAME, 10 TON AND UNDER $37.26 1T 5D 8L Page 5 CLALLAM COUNTY Effective 09-01-04 ***************************************************************************************************************** (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code CRANES, A-FRAME, OVER 10 TON $39.49 1T 50 8L CRANES, OVER 300 TONS, OR 300' OF BOOM INCLUDING JIB WITH $41.92 1T 50 8L ATTACHMENTS CRANES, OVERHEAD, BRIDGE TYPE ( 20 - 44 TONS) $39.88 1T 50 8L CRANES, OVERHEAD, BRIDGE TYPE ( 45 - 99 TONS) $40.34 1T 50 8L CRANES, OVERHEAD, BRIDGE TYPE (100 TONS & OVER) $40.86 1T 50 8L CRANES, TOWER CRANE UP TO 175' IN HEIGHT, BASE TO BOOM $40.86 1T 50 8L CRANES, TOWER CRANE OVER 175' IN HEIGHT, BASE TO BOOM $41 .40 1T 50 8L CRUSHERS $39.88 1T 50 8L DECK ENGINEER/DECK WINCHES (POWER) $39.88 1T 50 8L DERRICK, BUILDING $40.34 1T 50 8L DOZERS, 0-9 & UNDER $39.49 1T 50 8L DRILL OILERS - AUGER TYPE, TRUCK OR CRANE MOUNT $39.49 1T 50 8L DRILLING MACHINE $39.88 1T 50 8L ELEVATOR AND MANLlFT, PERMANENT AND SHAFT-TYPE $37.26 1T 50 8L EQUIPMENT SERVICE ENGINEER (OILER) $39.49 1T 50 8L FINISHING MACHINE/BIDWELL GAMACO AND SIMILAR EQUIP $39.88 1T 50 8L FORK LIFTS, (3000 LBS AND OVER) $39.49 1T 50 8L FORK LIFTS, (UNDER 3000 LBS) $37.26 1T 50 8L GRADE ENGINEER $39.49 1T 50 8L GRADECHECKER AND STAKE MAN $37.26 1T 50 8L GUARDRAIL PUNCH $39 88 1T 50 8L HOISTS, OUTSIDE (ELEVATORS AND MANLlFTS), AIR TUGGERS $39 49 1T 50 8L HORIZONTAUDIRECTIONAL DRILL LOCATOR $39 49 1T 50 8L HORIZONTAUDIRECTIONAL DRILL OPERATOR $39 88 1T 50 8L HYDRALlFTS/BOOM TRUCKS (10 TON & UNDER) $37 26 1T 50 8L HYDRALlFTS/BOOM TRUCKS (OVER 10 TON) $39.49 1T 50 8L LOADERS, OVERHEAD (6 YO UP TO 8 YO) $40 34 1T 50 8L LOADERS, OVERHEAD (8 YO & OVER) $40.86 1T 50 8L LOADERS, OVERHEAD (UNDER 6 YO), PLANT FEED $39.88 1T 50 8L LOCOMOTIVES, ALL $39.88 1T 50 8L MECHANICS, ALL $40.34 1T 50 8L MIXERS, ASPHALT PLANT $39.88 1T 50 8L MOTOR PATROL GRADER (FINISHING) $39.88 1T 50 8L MOTOR PATROL GRADER (NON-FINISHING) $39.49 1T 50 8L MUCKING MACHINE, MOLE, TUNNEL DRILL AND/OR SHIELD $40.34 1T 50 8L OIL DISTRIBUTORS, BLOWER DISTRIBUTION AND MULCH SEEDING $37.26 1T 50 8L OPERATOR PAVEMENT BREAKER $37 26 1T 50 8L PILEDRIVER (OTHER THAN CRANE MOUNT) $39.88 1T 50 8L PLANT OILER (ASPHALT, CRUSHER) $39.49 1T 50 8L POSTHOLE DIGGER, MECHANICAL $37.26 1T 50 8L POWER PLANT $37 26 1T 50 8L PUMPS, WATER $37 26 1T 50 8L QUAD 9,0-10, AND HD-41 $40 34 1T 50 8L REMOTE CONTROL OPERATOR ON RUBBER TIRED EARTH MOVING $40.34 1T 50 8L EQUIP RIGGER AND BELLMAN $37.26 1T 50 8L ROLLAGON $40.34 1T 50 8L ROLLER, OTHER THAN PLANT ROAD MIX $37.26 1T 50 8L ROLLERS, PLANTMIX OR MUL TILlFT MATERIALS $39.49 1T 50 8L ROTO-MILL, ROTO-GRINDER $39.88 1T 50 8L SAWS, CONCRETE $39.49 1T 50 8L Page 6 CLALLAM COUNTY Effective 09-01-04 ***************************************************************************************************************** Classification SCRAPERS - SELF PROPELLED, HARD TAIL END DUMP, ARTICULATING OFF-ROAD EQUIPMENT ( UNDER 45 YD) SCRAPERS - SELF PROPELLED, HARD TAIL END DUMP, ARTICULATING OFF-ROAD EQUIPMENT (45 YD AND OVER) SCRAPERS, CONCRETE AND CARRY ALL SCREED MAN SHOTCRETE GUNITE SLlPFORM PAVERS SPREADER, TOPSIDE OPERATOR - BLAW KNOX SUBGRADE TRIMMER TOWER BUCKET ELEVATORS TRACTORS, (75 HP & UNDER) TRACTORS, (OVER 75 HP) TRANSFER MATERIAL SERVICE MACHINE TRANSPORTERS, ALL TRACK OR TRUCK TYPE TRENCHING MACHINES TRUCK CRANE OILER/DRIVER ( UNDER 100 TON) TRUCK CRANE OILER/DRIVER (100 TON & OVER) TRUCK MOUNT PORTABLE CONVEYER WHEEL TRACTORS, FARMALL TYPE YO YO PAY DOZER POWER EQUIPMENT OPERATORS- UNDERGROUND SEWER & (SEE POWER EQUIPMENT OPERATORS) POWER LINE CLEARANCE TREE TRIMMERS JOURNEY LEVEL IN CHARGE SPRAY PERSON TREE EQUIPMENT OPERATOR TREE TRIMMER TREE TRIMMER GROUNDPERSON REFRIGERATION & AIR CONDITIONING MECHANICS MECHANIC RESIDENTIAL BRICK & MARBLE MASONS JOURNEY LEVEL RESIDENTIAL CARPENTERS JOURNEY LEVEL RESIDENTIAL CEMENT MASONS JOURNEY LEVEL RESIDENTIAL DRYWALL TAPERS JOURNEY LEVEL RESIDENTIAL ELECTRICIANS JOURNEY LEVEL RESIDENTIAL GLAZIERS JOURNEY LEVEL RESIDENTIAL INSULATION APPLICATORS JOURNEY LEVEL RESIDENTIAL LABORERS JOURNEY LEVEL RESIDENTIAL PAINTERS JOURNEY LEVEL RESIDENTIAL PLUMBERS & PIPEFITTERS JOURNEY LEVEL Page 7 PREVAILING WAGE $39.88 $40.34 $39.49 $39.88 $37.26 $40.34 $39.88 $39.88 $39.49 $39.49 $39.88 $39.88 $40 34 $39.49 $39.49 $39.88 $39 88 $37.26 $39 88 $33.06 $31.34 $31.76 $29.48 $21.94 $27.68 $39.87 $17.85 $25.63 $18.00 $27.78 $16.84 $9.86 $18.08 $15.97 $14.60 (See Benefit Code Key) Over Time Holiday Note Code Code Code 1T 50 8L 1T 5D 8L 1T 5D 8L 1T 5D 8L 1T 5D 8L 1T 50 8L 1T 50 8L 1T 50 8L 1T 50 8L 1T 50 8L 1T 50 8L 1T 5D 8L 1T 50 8L 1T 5D 8L 1T 50 8L 1T 50 8L 1T 50 8L 1T 5D 8L 1T 50 8L 4A 5A 4A 5A 4A 5A 4A 5A 4A 5A 1M 5A CLALLAM COUNTY Effective 09-01-04 ***************************************************************************************************************** (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code RESIDENTIAL REFRIGERATION & AIR CONDITIONING JOURNEY LEVEL $46.41 1G 5A RESIDENTIAL SHEET METAL WORKERS JOURNEY LEVEL (FIELD OR SHOP) $30 22 1J 6L RESIDENTIAL SOFT FLOOR LAYERS JOURNEY LEVEL $10.88 RESIDENTIAL SPRINKLER FITTERS (FIRE PROTECTION) JOURNEY LEVEL $19.67 ROOFERS JOURNEY LEVEL $34.53 1R 5A USING IRRITABLE BITUMINOUS MATERIALS $37.53 1R 5A SHEET METAL WORKERS JOURNEY LEVEL (FIELD OR SHOP) $46.74 1J 6L SIGN MAKERS & INSTALLERS (ELECTRICAL) JOURNEY LEVEL $19.29 SIGN MAKERS & INSTALLERS (NON-ELECTRICAL) JOURNEY LEVEL $12.15 SOFT FLOOR LAYERS JOURNEY LEVEL $32.24 1B 5A SOLAR CONTROLS FOR WINDOWS JOURNEY LEVEL $10.31 1B 50 SPRINKLER FITTERS (FIRE PROTECTION) JOURNEY LEVEL $19.67 STAGE RIGGING MECHANICS (NON STRUCTURAL) JOURNEY LEVEL $13.23 SURVEYORS CHAIN PERSON $9.35 INSTRUMENT PERSON $11.40 PARTY CHIEF $13.40 TELEPHONE LINE CONSTRUCTION - OUTSIDE CABLE SPLICER $28.29 2B 5A HOLE DIGGER/GROUND PERSON $15.91 2B 5A INSTALLER (REPAIRER) $27.13 2B 5A JOURNEY LEVEL TELEPHONE L1NEPERSON $26.32 2B 5A SPECIAL APPARATUS INSTALLER I $28.29 2B 5A SPECIAL APPARATUS INSTALLER II $27.72 2B 5A TELEPHONE EQUIPMENT OPERATOR (HEAVY) $28.29 2B 5A TELEPHONE EQUIPMENT OPERATOR (LIGHT) $26.32 28 5A TELEVISION GROUND PERSON $15.10 2B 5A TELEVISION L1NEPERSON/INSTALLER $20.11 2B 5A TELEVISION SYSTEM TECHNICIAN $23 80 2B 5A TELEVISION TECHNICIAN $21.43 2B 5A TREE TRIMMER $26.32 28 SA TERRAZZO WORKERS & TILE SETTERS JOURNEY LEVEL $37 03 1H SA TILE, MARBLE & TERRAZZO FINISHERS FINISHER $30.86 1H SA TRAFFIC CONTROL STRIPERS JOURNEY LEVEL $31.90 1K SA TRUCK DRIVERS ASPHALT MIX (TO 16 YARDS) $36.89 1T SD 8L ASPHALT MIX (OVER 16 YARDS) $37.47 1T SD 8L Page 8 CLALLAM COUNTY Effective 09-01-04 ***************************************************************************************************************** Classification DUMP TRUCK DUMP TRUCK & TRAILER OTHER TRUCKS TRANSIT MIXER WELL DRILLERS & IRRIGATION PUMP INSTALLERS IRRIGATION PUMP INSTALLER OILER WELL DRILLER PREVAILING WAGE $20.23 $20.23 $37.47 $23.73 $11.60 $9.45 $11.60 (See Benefit Code Key) Over Time Code Holiday Code Note Code 1 1 1T 1 5D 8L Page 9 . CLALLAM County -- Apprentices -- Effective 9/1/2004 -- Benefit Code Kev ,---- -~ . -~"--, "-"'" '-"P;e~aIi1ng~ Overtime-~~~iioIMay'---"Note'-'~--'-"%_-,-~~~ -,--~ Stage of ProgressIOn & Hour Range Wage Code Code Code ASBESTOS ABATEMENT WORKERS ENVIRONMENTAL CONTROL PAINTERS $17.53 JJ~. 51.2 $20.03 IN 5D $25.72 ill. 5D $29.85 IN 5D LABORERS $22.63 IN $25.12 IN $27.62 IN $30.11 IN BOILERMAKERS $35.04 In 5K $36.45 In 5N $37.85 1B 5N $39.26 In 5N $40.66 1B 5K $42.07 ill 5N BRICK AND MARBLE MASONS $23.96 1M 5A $2538 1M 5A $26.84 1M 5A $29.76 1M 5A $32.68 1 M 5A $3560 1M ~A $37.06 1M 5A CARPENTERS ACOUSTICAL WORKER 1: 0 - 1000 Hours - 50.00% $20.96 1 M 5 I~ 2: 1001 - 2000 Hours - 60.00% $27.69 1M 5D 3: 2001 - 3000 Hours - 68.00% $29.97 1M 5D 4: 3001 - 4000 Hours - 76.00% $32.26 1M 5D 5: 4001 - 5000 Hours - 84.00% $34.54 1M 5D 6: 5001 - 6000 Hours - 92.00% $36 83 1M 5D BRIDGE, DOCK AND W ARF CARPENTERS $23.72 1M 5D $29.01 1M 5D $30.43 1M 5D $31 85 1M 5D $33.27 1M 5D $34.69 1M 5D $36.11 1M 5D $37.53 1M 5D CARPENTER $23.72 1M $29.01 1M $30.43 1M $31.85 1M $33.27 1M $34.69 1~..1 1: 0 - 1000 Hours - 50.00% 2: 1001 - 2000 Hours - 60.00% 3: 2001 - 3000 Hours - 75.00% 4: 3001 - 4000 Hours - 90.00% 1: 0 - 1000 Hours - 60.00% 2: 1001 - 2000 Hours - 70.00% 3: 2001 - 3000 Hours - 80.00% 4: 3001 - 4000 Hours - 90.00% 1: 0 - 1000 Hours - 70.00% 2: 1001 - 2000 Hours - 75.00% 3: 2001 - 3000 Hours - 80.00% 4: 3001 - 4000 Hours - 85 00% 5: 4001 - 5000 Hours - 90.00% 6: 5001 - 6000 Hours - 95.00% 1: 0 - 750 Hours - 50.00% 2: 751 - 2250 Hours - 55.00% 3.2251 - 3000 Hours - 60.00% 4. 3001 - 3750 Hours - 70.00% 5' 3751 - 4500 Hours - 80.00% 6' 4501 - 5250 Hours - 90.00% 7: 5251 - 6000 Hours - 95.00% 1: 1st PerIod - 60.00% 2: 2nd PerIod - 65.00% 3: 3rd PerIod - 70.00% 4: 4th PerIod - 75.00% 5: 5th PerIod - 80.00% 6: 6th PerIod - 85.00% 7: 7th PerIod - 90.00% 8: 8th PerIod - 95.00% 1. 151 PerIod - 60.00% 2: 2nd PerIod - 65.00% 3: 3rd Period - 70.00% 4: 4th PerIod - 75.00% 5' 5th Period - 80.00% 6: 6th PerIod - 85.00% 5D 5D 5D 5D 5D 5D 5D .~J2 5Q 5]) 7: 7th Period - 90.00% 8: 8th Penod - 95.00% $36.11 1M $37.53 1M DRYWALL APPLICATOR DRYWALL. METAL STUD. AND CEILING APPLICATORS 1: 0 -700 Hours - 50.00% $21.22 1M 5D 2: 701 - 1400 Hours - 60.00% $28.00 1M 5D 3: 1401 - 2100 Hours - 68.00% $30.32 1M 5D 4: 2101 - 2800 Hours - 76.00% $32.65 1 M 5D 5: 2801 - 3500 Hours - 84.00% $34.98 1M 5D 6: 3501 - 4200 Hours - 92.00% $37.30 1M 5D MILLWRIGHT AND MACHINE ERECTORS 1:1slpenod-60.00% $24.32 1M 5D 2: 2nd Penod - 65.00% $29.66 1 M 5D 3: 3rd Penod -70.00% $31.13 1M 5D 4: 4th Period - 75.00% $32.60 . 1 M 5D 5: 5th Period - 80.00% $34.07 1M 5D 6: 6th Period - 85.00% $35.54 1 M 5D 7: 7th Period - 90.00% $37.01 1M 5D 8: 8th Period - 95.00% $38.48 1 M 5D PILEDRIVERS, DRIVING, PULLING, PLACING COLLARS AND WELDING 1: 1st Period - 6000% $23.84 1M 5D 2: 2nd Penod - 65.00% $29 14 1M SD 3' 3rd Penod - 70.00% $3057 1-M 5[) 4: 4th Period - 75.00% $32.00 iM SD 5 5th Penod - 80.00% $33.43 1M sri 6: 6th Penod - 85.00% $34.86 1M 5D 7. 7th Penod - 90.00% $36.29]M SD 8: 8th Peri 0 d-95.00% $37.72]M SD CEMENT MASONS $12.48 11\ $14.98 11\ $]7.47 lli $19.97 ill $22.46 ill $23.71 lli DRYWALL TAPERS $25.78 11 $27.14 11 $29.87 11 $32.61 1J $35 34 11 $36.71 11 ELECTRICIANS - INSIDE 1: 0 - 1000 Hours - 40.00% $19.55 11) 6H 2: 1001 - 2000 Hours - 50.00% $23.00 lD fil:l 3: 2001 - 3500 Hours - 55.00% $27.92 1D 6H 4: 3501 - 5000 Hours - 65.00% $31.95 1D 6H 5: 5001 - 6500 Hours - 75.00% $35.98 lQ 6H 6: 6501 - 8000 Hours - 85.00% $40.01 11) 6H ELECTRICIANS - POWERLINE CONSTRUCTION JOURNEY LEVEL LINEPERSON $29.04 4A SA $30.11 4A SA $31.55 4A SA $33.35 4A 5A 1: 0 - 1000 Hours - 50.00% 2: 1001 - 2000 Hours - 60.00% 3: 2001 - 3000 Hours - 70.00% 4: 3001 - 4000 Hours - 80 00% 5: 4001 - 5000 Hours - 90.00% 6: 5001 - 6000 Hours - 95.00% 1: 0 - 1000 Hours - 50.00% 2: 1001 - 2000 Hours - 55.00% 3: 2001 - 3000 Hours - 65.00% 4' 3001 - 4000 Hours - 75.00% 5: 4001 - 5000 Hours - 85.00% 6: 5001 - 6000 Hours - 90.00% 1: 0 - 1000 Hours - 60.00% 2: 1001 - 2000 Hours - 65.00% 3: 2001 - 3000 Hours - 71.00% 4: 3001 - 4000 Hours - 81.00% 5Q 5D Sf) Sf) 5D 5f) 5f) 5D 58 5B 5B 5B 513 5B $35.51 4A $38.37 4A $39 80 ~A POLE SPRAYER 1: 0 - 1000 Hours - 85.70% $38.27 4A 5A 2: 1001 - 2000 Hours - 89.80% $39.73 4A 5A 3: 2001 - 3000 Hours - 92.80% $40.81 4A 5A ELECTRONIC & TELECOMMUNICATION TECHNICIANS 5: 4001 - 5000 Hours - 85.00% 6: 5001 - 6000 Hours - 89.00% 7: 6001 - 7000 Hours - 93.00% 1: 0 - 1000 Hours - 55.00% 2: 1001 - 2000 Hours - 60.00% 3: 2001 - 3000 Hours - 65.00% 4: 3001 - 4000 Hours - 70.00% 5: 4001 - 5000 Hours - 75.00% 6: 5001 - 6000 Hours - 80.00% 7: 6001 - 7000 Hours - 85.00% 8: 7001 - 8000 Hours - 95.00% 1: 1 st Period - 50.00% 2: 2nd Penod - 55.00% 3: 3rd Penod - 65.00% 4: 4th Penod - 70.00% 5: 5th Penod - 80.00% 5A 5A 2A $7.16 1 $7.24 1 $7.85 1 $8.45 1 $9.05 1 $9.66 1 $10.26 1 $11.47 1 ELEVATOR CONSTRUCTORS MECHANIC $17.67 4A 2.Q $32.66 4A 2.Q $36.20 4A .Q.Q $37.96:!A .Q.Q $41.50 4A 6Q GLAZIERS 1:0-1000Hours-45.00% $21.76 2E 50 2: 1001 - 2000 Hours - 50.00% $23.41 2E 50 3: 2001 - 3000 Hours - 55.00% $25.07 2F 50 4: 3001 - 4000 Hours - 60.00% $26.72 2E 50 5: 4001 - 5000 Hours - 65.00% $28.38 2E 5G 6: 5001 - 6000 Hours - 70.00% $3003 2F 50 7: 6001 - 7000 Hours - 80.00% $33.34 2E 5G 8: 7001 - 8000 Hours - 90.00% $36.65 2E 5G HEAT & FROST INSULATORS AND ASBESTOS WORKERS MECHANIC 1: 0 - 1000 Hours - 50.00% $2597 IF 5E 2: 1001 - 2000 Hours - 55.00% $27 57 IF 5E 3: 2001 - 4000 Hours - 65.00% $30.76 IF 5E 4: 4001 - 6000 Hours -75.00% $33.95 IF SE 5: 6001 - 8000 Hours - 85.00% $37.14 IF SE HOD CARRIERS & MASON TENDERS 1: 0 - 1000 Hours - 60.00% 2: 1001 - 2000 Hours - 70.00% 3: 2001 - 3000 Hours - 80.00% 4: 3001 - 4000 Hours - 90.00% 1: 0 - 1000 Hours - 50.00% 2: 1001 - 2000 Hours - 60.00% 3: 2001 - 3000 Hours - 75.00% 4: 3001 - 4000 Hours - 90.00% 1: 1st Penod - 65.00% 2: 2nd Period - 70.00% 3: 3rd Period - 75.00% $22.63 IN .?P $25.12 IN SD $27.62 JJ'{ .~D $30.11 IN .2Ll INSULATION APPLICATORS $10.25 1 $12.30 1 $15.38 1 $18.45 1 IRONWORKERS $25.68 ill 5A $27.17 1B SA $35.67 ill SA 4: 4th Penod - 80.00% $37.16 l~ 5A 5: 5th Period - 90.00% $40.14 J.n 5A 6: 6th Period - 90.00% $40.14 III 5A 7: 7th Penod - 95.00% $41.63 IE 5A 8: 8th Period - 95.00% $41.63 ill 5A LABORERS 1: 0 - 1000 Hours - 60.00% $22.63 1 ~ 50 2: 1001 - 2000 Hours -70.00% $25.12 IN 50 3: 2001 - 3000 Hours - 80.00% $27.62 IN 50 4: 3001 - 4000 Hours - 90.00% $30.11 1 N 50 LABORERS - UNDERGROUND SEWER & WATER 1: 0 - 1000 Hours - 60.00% $22.63 1 N 5D 2: 1001 - 2000 Hours - 70.00% $25.12 IN 50 3: 2001 - 3000 Hours - 80.00% $27.62 1 N 5D 4: 3001 - 4000 Hours - 90.00% $30.11 1 ~ 50 LATHERS 1: 0 -700 Hours - 50.00% $21.22 1M 5D 2: 701 - 1400 Hours - 60.00% $28.00 1M 5D 3: 1401 - 2100 Hours - 68.00% $30.32 1M 5D 4: 2101 - 2800 Hours - 76.00% $32.65 1M 5D 5: 2801 - 3500 Hours - 84.00% $34.98 1M 5D 6: 3501 - 4200 Hours - 92.00% $37.30 1M 5D PAINTERS 1: 0 - 750 Hours - 55.00% $16.18 28 5A 2:751-1500Hours-6500% $17.23 ~~ 5A 3: 1501 - 2250 Hours -75.00% $19.11 ~8 ~1, 4: 2251 - 3000 Hours - 80 00% $20.82 28 5A 5: 3001 - 3750 Hours - 85.00% $21.81 213 5A 6: 3751 - 4500 Hours - 95.00% $23.78 213 5A PLASTERERS l' 0 - 500 Hours - 40.00% $10.33 1 2: 501 - 1000 Hours - 45.00% $11.62 1 3'1001-1500Hours-45.00% $11.62 1 4: 1501 - 2000 Hours - 50.00% $12.92 1 5: 2001 - 2500 Hours - 55.00% $14.21 1 6: 2501 - 3000 Hours - 60.00% $15.50 1 7: 3001 - 3500 Hours - 65.00% $16.79 1 8: 3501 - 4000 Hours - 70.00% $18.08 1 9: 4001 - 4500 Hours -75.00% $19.37 1 10: 4501 - 5000 Hours - 80.00% $20.66 1 11: 5001 - 5500 Hours - 85.00% $21.96 1 12: 5501 - 6000 Hours - 90.00% $2325 1 13: 6001 - 6500 Hours - 95.00% $24.54 1 14: 6501 - 7000 Hours - 95.00% $24.54 1 PLUMBERS & PIPE FITTERS 1: 0 - 2000 Hours - 50.00% $27.00 lQ 2-A 2: 2001 - 4000 Hours - 62.50% $36.95 1G 5A 3: 4001 - 6000 Hours - 70.00% $39.54 1G 5A 4: 6001 - 8000 Hours - 75.00% $41.25 lQ ~<\ 5: 8001 - 10000 Hours - 85.00% $44.70 1G 5A POWER EQUIPMENT OPERATORS ALL EOUIPMENT 1: 0 - 1000 Hours - 65.00% $29.26 IT 50 gL 2: 1001 - 2000 Hours - 70.00% $30.72 IT 5D gL 3: 2001 - 3000 Hours - 75.00% $32.18 IT 50 8L 4: 3001 - 4000 Hours - 80.00% $33.64 IT 5D 8L 5: 4001 - 5000 Hours - 90.00% $36.57 1 T 5D 8L 6: 5001 - 6000 Hours - 95.00% $38 03 _U 212 ~1 POWER EQUIPMENT OPERATORS- UNDERGROUND SEWER & WATER (SEE POWER EQUIPMENT OPERATORS) 1: 0 - 1000 Hours - 65.00% $29.26 2. 1001 - 2000 Hours - 70.00% $30.27 3: 2001 - 3000 Hours - 75.00% $32.18 4: 3001 - 4000 Hours - 80.00% $33.64 5: 4001 - 5000 Hours - 90.00% $36.57 6: 5001 - 6000 Hours - 95.00% $38.03 POWER LINE CLEARANCE TREE TRIMMERS TREE TRIMMER 1: 0 - 1000 Hours - 65.00% $20.68 4A 5A 2: 1001 - 2000 Hours - 75.00% $23.04 4A 5A 3: 2001 - 3000 Hours - 80.00% $24.15 4A 5A 4: 3001 - 4000 Hours - 90.00% $26.41 4A 5A REFRIGERATION & AIR CONDITIONING MECHANICS MECHANIC $13.84 1 $15.22 1 $16.61 1 $19.38 1 $23.53 J_ RESIDENTIAL CARPENTERS 1: 0 - 2000 Hours - 50.00% 2: 2001 - 4000 Hours - 55.00% 3: 4001 - 6000 Hours - 60.00% 4.6001 - 8000 Hours - 70.00% 5: 8001 - 10000 Hours - 85.00% 1: 151 Period - 60.00% 2: 2nd Penod - 65.00% 3: 3'd Penod - 70.00% 4: 4th Period - 75.00% 5: 5th Penod - 80.00% 6: 61h Penod - 85.00% 7: 7th Penod - 90.00% 8: 8th Penod - 95.00% $10.71 1. $11.60 1 $12.50 1 $13 39 1 $14.28 1 $15.17 1 $16.07 1 $16.96 1 RESIDENTIAL ELECTRICIANS 1: 0 - 900 Hours - 50.00% $13.89 1 2: 901 - 1800 Hours - 55.00% $15.28 1 3. 1801 - 2700 Hours - 75.00% $20.84 1 4.2701 - 4000 Hours - 85.00% $23.61 1 RESIDENTIAL PLUMBERS & PIPE FITTERS 1: 0 - 1000 Hours - 55.00% $8.03 1 2: 1001 - 2000 Hours - 65.00% $9.49 1 3: 2001 - 4000 Hours - 75.00% $10.95 1 4: 4001 - 6000 Hours - 85.00% $12.41 1 RESIDENTIAL SHEET METAL WORKERS JOURNEY LEVEL (FIELD OR SHOP) $14.95 11 6L $15.81 11 6L $17.09 n 6L $17.95 11 6L $19.06 11 61. $19.93 11 6L ROOFERS 1: 1 - 1000 Hours - 50.00% 2: 1001 - 2000 Hours - 60.00% 3: 2001 - 3000 Hours - 65.00% 4: 3001 - 4000 Hours - 70.00% 5: 4001 - 5000 Hours - 80.00% 6: 5001 - 6000 Hours - 85.00% 1: 0 - 820 Hours - 60.00% 2: 821 - 1630 Hours - 67.00% 3: 1631 - 2450 Hours -74.00% $21.93 $23.78 $25.58 lR 1R lR SA SA SA 4: 2451 - 3270 Hours - 81.00% 5: 3271 - 4080 Hours - 88.00% 6: 4081 - 4899 Hours - 95.00% 1: 0 - 2000 Hours - 45.00% 2: 2001 - 3000 Hours - 50.00% 3: 3001 - 4000 Hours - 55.00% 4: 4001 - 5000 Hours - 60.00% 5: 5001 - 6000 Hours - 65.00% 6: 6001 - 7000 Hours - 70.00% 7: 7001 - 8000 Hours - 75.00% 8: 8001 - 9000 Hours - 80.00% 9: 9001 - 10000 Hours - 85.00% $29.66 1R $31.46 IR $33.25 1R SHEET METAL WORKERS JOURNEY LEVEL (FIELD OR SHOP) $20.23 11 6L $27.96 11 6L $29.72 11 6L $31.50 11 6L $33.28 11 6L $35.05 11 6L $36.83 11 6L $38.61 11 6L $40.39 11 6L SOFT FLOOR LAYERS 5A 5A 5A APPRENTICES INDENTURED ON OR AFTER JUNE I. 2003 1: 0 - 750 Hours - 45.00% $16.52 1B 5A 2:751-1500Hours-50.00% $17.74 1B 5A 3: 1501 - 2250 Hours - 60.00% $21.48 1B 5A 4: 2251 - 3000 Hours -70.00% $24.17 1B 5A 5: 3001 - 3750 Hours - 80.00% $26.86 1~ )1.). 6: 3751 - 4500 Hours - 90.00% $29.55 l~ ~i:\ APPRENTICES INDENTURED PRIOR TO JUNE I. 2003 1. 0 - 750 Hours - 45.00% $17.45 1~ ~A 2.751 - 1500 Hours - 50.00% $18.79 1B SA 3: 1501 - 2250 Hours - 60.00% $21.48 1B 5A 4: 2251 - 3000 Hours - 70.00% $24.17 1 B 5A 5. 3001 - 3750 Hours - 80.00% $26.86 1 B 5A 6.3751 - 4500 Hours - 90.00% $29.55 ill. SA. SPRINKLER FITTERS (FIRE PROTECTION) GRADE I (INDENTURED AFTER APRIL 1. 2000) 1: 0 - 1000 Hours - 45.00% $8.85 I 2: 1001 - 2000 Hours - 50.00% $9.84 1 3: 2001 - 3000 Hours - 55.00% $10.82 1 4: 3001 - 4000 Hours - 60.00% $11.80 1 GRADE 1 (INDENTURED BEFORE APRIL 1. 2000) 1: 0 - 1000 Hours - 40.00% $7.87 1 2: 1001 - 2000 Hours - 45.00% $8.85 1 3: 2001 - 3000 Hours - 50.00% $9.84 1 4: 3001 - 4000 Hours - 55.00% $10.82 1 GRADE 2 (INDENTURED AFTER APRIL 1. 2000) 1: 0 - 1000 Hours - 65.00% $12.79 1 2: 1001 - 2000 Hours - 70.00% $13.77 1 3: 2001 - 3000 Hours - 75.00% $14.75 1 4: 3001 - 4000 Hours - 80.00% $15.74 1 5: 4001 - 5000 Hours - 85 00% $16.72 1 6: 5001 - 6000 Hours - 90.00% $17.70 1 GRADE 2 (INDENTURED BEFORE APRIL 1. 2000) 1:0-1000Hours-60.00% $11.80 1 2: 1001 - 2000 Hours - 65.00% $12.79 1 3.2001 - 3000 Hours - 70.00% $13.77 1 4: 3001 - 4000 Hours - 75.00% $14.75 1 5.4001 - 5000 Hours - 80.00% $15.74 1 6: 5001 - 6000 Hours - 85.00% $16.72 1 TERRAZZO WORKERS & TILE SETTERS 1: 0 - 1000 Hours - 50.00% $22.07 1H 5A 2: 1001 - 2500 Hours - 55.00% $23.40 lJ:I SA 3: 2501 - 3500 Hours - 60.00% $24.73 1H SA 4: 3501 - 4500 Hours - 70.00% $27.39 1H SA 5: 4501 - 5500 Hours - 80.00% $30.06 1H SA 6: 5501 - 6250 Hours - 90.00% $32.72 IH SA 7: 6251 - 7000 Hours - 95.00% $34.05 1H 5A TILE, MARBLE & TERRAZZO FINISHERS FINISHER $21.46 HI 5A $22.74 IH 5A $24.00 IH 5A $26.56 1 H 5A TRAFFIC CONTROL STRIPERS 1: 0 - 1000 Hours - 50.00% 2: 1001 - 2500 Hours - 55.00% 3: 2501 - 3500 Hours - 60.00% 4: 3501 - 4500 Hours - 70.00% 1: 0 - 500 Hours - 60.00% 2. 501 - 1000 Hours - 60.00% 3: 1001 - 2333 Hours - 60.00% 4: 2334 - 4666 Hours - 73.00% 5: 4667 - 7000 Hours - 88.00% 1: 0 - 700 Hours - 70.00% 2: 701 - 1400 Hours - 80.00% 3: 1401 - 2100 Hours - 90.00% $13.50 1K $18.60 lK $21.22 lK $24.69 1K $28.70 1K TRUCK DRIVERS ALL TRUCKS $14.16 1 $16.18 1 $18.21 J 5A SA SA SA SA BENEFIT CODE KEY - EFFECTIVE 09-01-04 ************************************************************************************************************************ OVERTIME CODES OVERTIME CALCULATIONS ARE BASED ON THE HOURLY RATE ACTUALLY PAID TO THE WORKER. ON PUBLIC WORKS PROJECTS, THE HOURLY RATE MUST BE NOT LESS THAN THE PREVAILING RATE OF WAGE MINUS THE HOURL Y RATE OF THE COST OF FRINGE BENEFITS ACTUALLY PROVIDED FOR THE WORKER. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE A ALL HOURS WORKED ON SA TURDA YS, SUNDAYS AND HOLIDAYS SHALL ALSO BE P AID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE B. ALL HOURS WORKED ON SA TURDA YS SHALL BE P AID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. C. ALL HOURS WORKED ON SUNDAYS SHALL BE P AID AT DOUBLE THE HOURLY RATE OF WAGE. D. THE FIRST EIGHT (8) HOURS ON SA TURDA YS OF A FIVE - EIGHT HOUR WORK WEEK AND THE FIRST EIGHT (8) HOURS WORKED ON A FIFTH CALENDAR DAY, EXCLUDING SUNDAY, IN A FOUR - TEN HOUR SCHEDULE, SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY ON SA TURDA Y; ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS IN A FIFTH CALENDAR WEEKDAY OF A FOUR - TEN HOUR SCHEDULE; ALL HOURS WORKED IN EXCESS OF TEN (10) HOURS PER DAY MONDAY THROUGH FRIDAY, AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURL Y RATE OF WAGE. E ALL HOURS WORKED IN EXCESS OF 10 PER DAY SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE THE FIRST EIGHT (8) HOURS ON SA TURDA Y SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON SA TURDA Y, AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE F THE FIRST EIGHT (8) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON SA TURDA Y, AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS (EXCEPT LABOR DAY) SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE ALL HOURS WORKED ON LABOR DAY SHALL BE PAID AT THREE TIMES THE HOURLY RATE OF WAGE G THE FIRST TEN (10) HOURS WORKED ON SATURDAYS AND THE FIRST TEN (10) HOURS WORKED ON A FIFTH CALENDAR WEEKDAY IN A FOUR - TEN HOUR SCHEDULE, SHALL BE P AID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED IN EXCESS OF TEN (10) HOURS PER DAY MONDAY THROUGH SA TURDA Y, AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE H ALL HOURS WORKED ON SA TURDA YS (EXCEPT MAKEUP DAYS IF WORK IS LOST DUE TO INCLEMENT WEATHER CONDITIONS OR EQUIPMENT BREAKDOWN) SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE P AID AT DOUBLE THE HOURLY RATE OF WAGE ALL HOURS WORKED ON SA TURDA Y SHALL BE PAID ATONE AND ONE-HALF THE HOURL Y RATE OF WAGE WORK PERFORMED ON SUNDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE WORK PERFORMED ON A HOLIDAY SHALL BE PAID ONE AND ONE-HALF TIMES THEIR HOURLY RATE FOR ACTUAL HOURS WORKED PLUS EIGHT (8) HOURS OF STRAIGHT TIME FOR THE HOLIDAY THE FIRST EIGHT (8) HOURS ON SA TURDA Y SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURL Y RATE OF WAGE ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON SATURDAY, AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE K ALL HOURS WORKED ON SA TURDA YS AND SUNDAYS SHALL BE P AID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE L. ALL HOURS WORKED ON SA TURDA YS, SUNDAYS AND HOLIDAYS (EXCEPT THANKSGIVING DAY AND CHRISTMAS DA Y) SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON THANKSGIVING DAY AND CHRISTMAS DAY SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE M ALL HOURS WORKED ON SA TURDA YS (EXCEPT MAKEUP DAYS IF WORK IS LOST DUE TO INCLEMENT WEATHER CONDITIONS) SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURL Y RATE OF WAGE N ALL HOURS WORKED ON SA TURDA YS (EXCEPT MAKEUP DAYS) SHALL BE P AID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE " BENEFIT CODE KEY - EFFECTIVE 03-03-04 -2- P ALL HOURS WORKED ON SA TURDA YS (EXCEPT MAKEUP DAYS) AND SUNDAYS SHALL BE PAID ATONE AND ONE- HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE Q ALL HOURS WORKED ON SA TURDA YS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS (EXCEPT CHRISTMAS DAY) SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE ALL HOURS WORKED ON CHRISTMAS DAY SHALL BE PAID AT TWO AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. R ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE P AID AT TWO TIMES THE HOURLY RATE OF WAGE I. T. ALL HOURS WORKED ON SA TURDA YS, EXCEPT MAKE-UP DAYS, SHALL BE P AID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED AFTER 6 OOPM SA TURDA Y TO 6 OOAM MONDAY AND ON HOLIDAYS SHALL BE P AID AT DOUBLE THE HOURL Y RATE OF WAGE U ALL HOURS WORKED ON SA TURDA YS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS (EXCEPT LABOR DAY) SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON LABOR DAY SHALL BE PAID AT THREE TIMES THE HOURLY RATE OF WAGE W ALL HOURS WORKED ON SA TURDA YS AND SUNDAYS (EXCEPT MAKE-UP DAYS) SHALL BE PAID ATONE AND ONE- HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON HOLIDAYS SHALL BE P AID AT TWO TIMES THE HOURLY RATE OF WAGE 2 ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE A THE FIRST SIX (6) HOURS ON SATURDAY SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED IN EXCESS OF SIX (6) HOURS ON SA TURDA Y AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE B ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE C ALL HOURS WORKED ON SUNDAYS SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURL Y RATE OF WAGE ALL HOURS WORKED ON HOLIDAYS SHALL BE P AID AT TWO TIMES THE HOURLY RATE OF WAGE D ALL HOURS WORKED ON SA TURDA YS AND SUNDAYS SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE THE FIRST EIGHT (8) HOURS WORKED ON HOLIDAYS SHALL BE PAID AT STRAIGHT TIME IN ADDITION TO THE HOLIDAY PAY ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON HOLIDAYS SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE E ALL HOURS WORKED ON SATURDAYS OR HOLIDAYS (EXCEPT LABOR DAY) SHALL BE PAID ATONE AND ONE- HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON SUNDAYS OR ON LABOR DAY SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE F THE FIRST EIGHT (8) HOURS WORKED ON HOLIDAYS SHALL BE PAID AT THE STRAIGHT HOURLY RATE OF WAGE IN ADDITION TO THE HOLIDAY PAY ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE G ALL HOURS WORKED ON SUNDAY SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON PAID HOLIDAYS SHALL BE PAID AT TWO AND ONE-HALF TIMES THE HOURLY RATE OF WAGE INCLUDING HOLIDAY PAY H ALL HOURS WORKED ON SA TURDA YS SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON SUNDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE IN ADDITION TO THE HOLIDAY PAY ALL HOURS WORKED ON SA TURDA YS AND HOLIDAYS (EXCEPT LABOR DAY) SHALL BE PAID AT ONE AND ONE- HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON SUNDAYS AND ON LABOR DAY SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE J ALL HOURS WORKED ON SUNDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON PAID HOLIDAYS SHALL BE PAID AT TWO AND ONE-HALF TIMES THE HOURL Y RATE OF WAGE, INCLUDING THE HOLIDAY PAY ALL HOURS WORKED ON UNPAID HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE K ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE IN ADDITION TO THE HOLIDAY PAY . BENEFIT CODE KEY - EFFECTIVE 03-03-04 -3- M. ALL HOURS WORKED ON SA TURDA YS, SUNDAYS AND HOLIDAYS SHALL BE P AID AT DOUBLE THE HOURLY RATE OF WAGE o ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. 4. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT DOUBLE THE HOURL Y RATE OF WAGE. ALL HOURS WORKED ON SA TURDA YS, SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE A HOLIDAY CODES 5. A HOLIDAYS. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (7) B HOLIDAYS. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY, THE DAY BEFORE CHRISTMAS, AND CHRISTMAS DAY (8) C HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8). D HOLIDA YS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AND SA TURDA Y AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8) E HOLIDA YS NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS , DAY (9) G HOLIDA YS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE LAST WORK DAY BEFORE CHRISTMAS DAY, AND CHRISTMAS DAY (7) H HOLIDA YS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING DAY, AND CHRISTMAS (6) I. HOLIDA YS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DA Y, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY (6) N HOLIDAYS NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DA Y, THANKSGIVING DAY, THE FRIDA Y AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (9) o PAID HOLIDAYS NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY (6) P. HOLIDA YS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY AND SA TURDA Y AFTER THANKSGIVING DAY, THE DAY BEFORE CHRISTMAS, AND CHRISTMAS DAY (9). Q PAID HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY (6) R PAID HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DA Y AFTER THANKSGIVING DAY, ONE-HALF DAY BEFORE CHRISTMAS DAY, AND CHRISTMAS DAY (7 II2) S. PAID HOLIDAYS NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY (7) T PAID HOLIDAYS SEVEN (7) PAID HOLIDAYS V PAID HOLIDAYS SIX (6) PAID HOLIDAYS W PAID HOLIDAYS. NINE (9) PAID HOLIDAYS X HOLIDA YS AFTER 520 HOURS - NEW YEAR'S DAY, THANKSGIVING DA Y AND CHRISTMAS DAY AFTER 2080 HOURS - NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND A FLOATING HOLIDAY (8) Y HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DA Y, THANKSGIVING DAY, THE FRIDAY FOLLOWING THANKSGIVING DAY, AND CHRISTMAS DAY (8) " BENEFIT CODE KEY - EFFECTIVE 03-03-04 -4- Z HOLIDA YS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8) 6 PAID HOLIDAYS' NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, cAB OR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8) A. B. PAID HOLIDAYS NEW YEAR'S EVE DAY, NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING DAY, CHRISTMAS EVE DAY, CHRISTMAS DAY (9) C HOLIDAYS NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING DAY, THE LAST WORK DAY BEFORE CHRISTMAS DAY, AND CHRISTMAS DAY (9). D. PAID HOLIDAYS NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS DAY, THE DA Y BEFORE OR THE DAY AFTER CHRISTMAS DAY (9) 6. HOLIDAYS NEW YEAR'S DAY, MARTIN LUTHER KING JR DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8) H PAID HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DA Y, FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (7) L HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, THE LAST WORKING DAY BEFORE CHRISTMAS DAY, AND CHRISTMAS DAY (8) Q PAID HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DA Y THANKSGIVING DAY, THE DAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY UNPAID HOLIDA Y_ PRESIDENTS' DAY S PAID HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS EVE DAY, AND CHRISTMAS DAY (8) T PAID HOLIDAYS NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DA Y, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, THE LAST WORKING DAY BEFORE CHRISTMAS DAY, AND CHRISTMAS DAY (9) U HOLIDAYS NEW YEAR'S DAY, DAY BEFORE NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, THE DAY BEFORE CHRISTMAS DAY, CHRISTMAS DAY (9) V PAID HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DA Y, DAY AFTER THANKSGIVING DAY, CHRISTMAS EVE DAY, CHRISTMAS DAY, EMPLOYEE'S BIRTHDAY, AND ONE DAY OF THE EMPLOYEE'S CHOICE (10) W PAID HOLIDAYS NEW YEAR'S DAY, DAY BEFORE NEW YEAR'S DAY, PRESIDENTS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING DAY, CHRISTMAS DA Y, DAY BEFORE CHRISTMAS DAY (10) X PAID HOLIDAYS NEW YEAR'S DAY, DAY BEFORE OR AFTER NEW YEAR'S DAY, PRESIDENTS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING DA Y, CHRISTMAS DAY, DAY BEFORE OR AFTER CHRISTMAS DAY, EMPLOYEE'S BIRTHDAY (I I) NOTE CODES 8 THE STANDBY RATE OF PAY FOR DIVERS SHALL BE ONE-HALF TIMES THE DIVERS RATE OF PAY IN ADDITION TO THE HOURLY WAGE AND FRINGE BENEFITS, THE FOllOWING DEPTH PREMIUMS APPLY TO DEPTHS OF FIFTY FEET OR MORE OVER 50' TO 100' - $ I 00 PER FOOT FOR EACH FOOT OVER 50 FEET OVER 100' TO 175' - $2 25 PER FOOT FOR EACH FOOT OVER 100 FEET OVER 175' TO 250' - $5 50 PER FOOT FOR EACH FOOT OVER 175 FEET OVER 250' - DIVERS MAY NAME THEIR OWN PRICE, PROVIDED IT IS NO lESS THAN THE SCALE LISTED FOR 250 FEET A C. THE STANDBY RATE OF PAY FOR DIVERS SHAll BE ONE-HALF TIMES THE DIVERS RATE OF PAY IN ADDITION TO THE HOURLY WAGE AND FRINGE BENEFITS, THE FOllOWING DEPTH PREMIUMS APPLY TO DEPTHS OF FIFTY FEET OR MORE OVER 50' TO 100' - $\ 00 PER FOOT FOR EACH FOOT OVER 50 FEET OVER \ 00' TO \50' - $\.50 PER FOOT FOR EACH FOOT OVER \ 00 FEET OVER 150' TO 200' - $2.00 PER FOOT FOR EACH FOOT OVER 150 FEET . " BENEFIT CODE KEY - EFFECTIVE 03-03-04 -5- OVER 200' - DIVERS MAY NAME THEIR OWN PRICE D. WORKERS WORKING WITH SUPPLIED AIR ON HAlMA T PROJECTS RECEIVE AN ADDITIONAL $1 00 PER HOUR L WORKERS ON HAlMA T PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS FOLLOWS - LEVEL A: $0 75, LEVEL B $0 50, AND LEVEL C $0 25 M. WORKERS ON HAlMAT PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS FOLLOWS' LEVELS A & B $100, LEVELS C & D. $0 50 N. WORKERS ON HAlMA T PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS FOLLOWS - LEVEL A: $ I .00, LEVEL B $075, LEVEL C $050, AND LEVEL D $0.25 , CITY OF PORT ANGELES OAK STREET SEWER REPAIR PROJECT NO. 04-03 VICINITY MAP SHEET INDEX TITLE TITLE SHEET (O~OK ~~ NOTES PROJECT SITE PLAN & PROFILE SHEET SERVICE CONNECTION SECTION VIEW PORT ANGELES HARBOR STORM DRAIN REALIGNMENT ,. " . eARK AVE I ,., " ~....< - ~, / "\\ ';> ,"" ~ .i PORT ANGELES SCALE 1"=2000' fu I-.. ~II ~il' lM ~ i:::: SHEET 1 ~IVIV ~ 8 g "" N N Y I I U U '" '" < < ~ ~ WIW ~~ 2 3 4 ~~lo :::)Qlo C)~:g :J::~~ ~ t\i ~llJ~ -.Jlte;) -.J~~ 'O:l;l(j~ ~ltl~ ~ ~ ~ W ~ ~a.:: ~ ~ f5 ~ ~ ,~CD"::: Il=:... ~ 0 5 ~ tft~a.~~ ",," I V yU !Q- rn. >- t;j ~ ~ Il::!.!o.. I W .'" I- e::: Vl '"-" ~ ~ tn ~ ~ C)~~~~ ~ ~ w ~ I}:..,.. ~ NO- .... '" ~ @) 5 , .." GENERAL NOTES 1 ALL WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE WITH THE CITY OF PORT ANGELES URBAN SERVICES STANDARDS AND GUIDELINES, THE CURRENT EDITION OF THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION, THE MOST CURRENT AMENDMENTS TO STANDARD SPECIFICATIONS AND ANY PROJECT SPECIFIC SPECIAL PROVISIONS OR CONDITIONS AND REQUIREMENTS STATED IN THE PROJECT MANUAL 2 A PRECONSTRUCTION MEETING SHALL BE HELD WITH THE CITY PRIOR TO THE START OF CONSTRUCTION 3 HORIZONTAL AND VERTICAL CONTROLS/DATUM AS ADOPTED BY THE CITY SHALL BE USED, UNLESS APPROVED OTHERWISE 4 THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR TO CONSTRUCTION BY CALLING UNDERGROUND LOCATE AT 1 -800-424-5555 A MINIMUM OF 48 HOURS PRIOR TO ANY EXCAVATION WORK SEE SPECIAL PROVISION 1 -07 17 UTILITIES AND SIMILAR FACILITIES IN THE PROJECT MANUAL 5 TEMPORARY STREET PATCHING MAY BE ALLOWED WITH THE APPROVAL OF THE CITY ENGINEER 6 THE CONTRACTOR SHALL HAVE A COPY OF THE APPROVED TRAFFIC CONTROL PLANS AT THE CONSTRUCTION SITE AT ALL TIMES. 7. CONSTRUCTION WORK HOURS SHALL BE RESTRICTED TO 7 A M. TO 7 PM., UNLESS OTHERWISE APPROVED IN WRITING. 8 THE CITY CONSTRUCTION INSPECTOR SHALL BE NOTIFIED A MINIMUM OF 48 HOURS IN ADVANCE OF THE NEED FOR AN INSPECTION, UNLESS OTHERWISE INFORMED. 9 TEMPORARY STREET PATCHING A TEMPORARY RESTORATION OF TRENCHES SHALL BE ACCOMPLISHED BY USING 2" MINIMUM DEPTH CLASS B ASPHALT CONCRETE PAVEMENT WHEN AVAILABLE, MEDIUM-CURING (MC-250) LIQUID ASPHALT (COLD MIX), ASPHALT TREATED BASE (ATB), OR TRAFFIC BEARING THICKNESS STEEL PLATES B ATB USED FOR TEMPORARY RESTORATION MAY BE DUMPED DIRECTLY INTO THE TRENCH OR PATCH AREA, BLADED AND ROLLED AFTER ROLLING, THE TRENCH MUST BE FILLED FLUSH WITH THE EXISTING PAVEMENT TO PROVIDE A SMOOTH RIDING SURFACE C. ALL TEMPORARY PATCHES SHALL BE MAINTAINED BY THE CONTRACTOR UNTIL SUCH TIME AS THE PERMANENT PATCH IS IN PLACE IF THE CONTRACTOR IS UNABLE TO MAINTAIN A PATCH FOR WHATEVER REASON, THE CITY WILL PATCH THE AREA AT THE EXPENSE OF THE CONTRACTOR OR PERMIT APPLICANT. D TRAFFIC SHALL NOT BE ALLOWED TO CROSS GRAVEL OR CDF BACKFILL FOR MORE THAN 24 HOURS WITHOUT UTILIZATION OF TEMPORARY PATCHING MEASURES STATED ABOVE. 10 THE CONTRACTOR SHALL GIVE THE CITY A MINIMUM OF 72 HOURS NOTICE PRIOR TO SCHEDULING A PLANNED CUT-IN, LIVE TAP OR OTHER CONNECTION TO THE EXISTING SANITARY SEWER SYSTEM LEGEND: ROADWA Y CENTERLINE --. - -- ---- PROPERTY LINE ~ - - - - - --- EDGE OF PAVEMENT EDGE OF GRAVEL - - -- - -- -- -- .. EXISTING SANATARY SEWER - S$-- - >0- EXISTING STORM DRAIN SC SG EXISTING WATER - N-- -- w-- EXISTING VALVE M EXISTING FIRE HYDRANT tJ EXISTING WATER METER 83 EXISTING SANA TARY SEWER MANHOLE Os PROPOSED WATER PROPOSED VALVE ~ PROPOSED FIRE HYDRANT .... PROPOSED REDUCER ~ EX STORM DRAIN MANHOLE @ EX CATCH BASIN o EX LUMINAIRE ~ EX UTILITY POLE -0- EX FUEL TANK LID ~ 1;; z o ~ "' ~~ : 0< ~I'" ~.~; ~--o ~~~ ~gVl 8 >:1: '"' x,", ~H 00 < .., 0 Z o 0 < gi>i~~~~ ~ ~~ ~ z ~ ~ ~~ ~ (3 G: t5 i~ Li: g:?J ~ ~~ ~ g ~ ~ (!) 1- !t....iC) :::)~l() C>~l() :t:~", ~ ~ 't~1 .....,,1;:) .....~~ ~ll.jl '"'CQ..... ~ ~ 0 ~w~ N "'"'s!:. 0......... ~ ca;;;;. a::: x (0 <oEii" woO) ..... '~CDZ; L C) 0 0 0 F>too. 3 0.. b ,!. ft~ ~~ C i3 lQ 0- ii.~8:c. II ~ ~ ~ ~ ~3::I: C) 0 ,=,~tn~I ~ &: w ~ J....... t3 ~ a.. ~ @ I -l~-:-a4AS7REd~EWER PRQ liX -- ;. , 1 I r -- -----1: 040--c-------- -- ---- -1--- ---- - L-- -- --- -1- - -- --1----- 28 i SJA 0+ 3 i i ! I ! r>> ~ ~ - ----- : ~E~~!~i~} ~--~:~:g - ! - - + - -- 00-,- ----- 1 - - - --I --------- ---- - n ----- ---- ~,- - - - -- ----- 1f; "'tJ' I . -I : , I ' --', OLE I : I 2() c------ -- -------- ~;-~~TlbN ----- --r,7:21-t--------~------j------ -------- ---- INVERT IN (E~ = 2.64 ! - ----- --- ------ 1NVERT---etff-ttS)---='-2:64 I -- - - 1 - j- - t- - .J.__ I I i I I ~ - .--- --- ~--~__: ------ ~- - -1- --- - -- -----~ - -----~-- -- --- -- ----- I " I I ; \ . '" ~ -'" - -- -- - -~~-P.~~ -- - - --' --; r- ~~ o'i ..f\Sii/~~, -', j I! j. 0 ~ i ", ; It i I ~:~ [81 ~ : I I CNAL~ I I -'}~;;:~~~~~270~ v i I Ct: V> I wi ~i / ';; I L' - - -- .-. --- ---- - -- - -.- -- .__ _J ) C f\ ~~~T. ,=~^^ }\ ~~ .\.. - ,; w , , I I , . I' 32 1/6 T -,- -- - --- - III - --- II i ! I 1/2 i I I : I! ()8 I ---.----- ..-- --~'i -, -... r -- -.-- . - -------- . ----.-- -; -- ..-~-.., -- i -- - I' I I I -L . I -LEXIST~HL PIPE~ LOPE~ .08" L'~-JJ~+ - -- - - - - ~ - ~ -.-~--.=--: ~ -+ e- {ZQ___.J ___ _ _ _ _. ~__ _.__. __.___ _ . __ ___ ___~_____ ________~-------'-_ ._ . _ j ___ _ _ .L __._ _1_____ ()4?()() 1/4?()() 24?()() i I I I I i ~--- ()4J CAll 4J8 HOURS BEFORE YOU D//G 1/=8 ()() =4J24J =5555 DESIGNED BY JSA DRAWN BY JSA H SCALE 20' DATE 2/02/04 DATE 2/02/04 I ) l \ \ \ -~~-......, I '\ ( / I \ \ ,,/ ! I . \ 20 0 10 20 , \ ~..I I I ORIGINAL SCALE -'. // - .--. --.---- --- --- -- I ---- --- --- -1----- - -.I- -----OI- l '/ /( Jf I ____ __ _ __ . _.___ ___.1 _._ _ _ i P8/JFII F - 1---- --.--- - 'r I LLOS" I m ___u_ --;;) II~ -..;J+--'79 .--------- - ------- --- -- -- ---- -INST), L1: MA f..JHOLEi --- ----l 072"- ---- RIM ~I ruA1 ION = 16.41 c:"iT'A srA '='..1. ~g 0 I::. CT 1M ERT 1t'___(<SE>)__.f .__32:g1.11_- RIM ELEV~~~ = _17~~___~~j~~~~~hC?~i\:= H.98 . uu -=. IN\JERT IN ~E!=r ~.64 1.'ly&;.RT ~UT \HJ = .68 : iNV~i lTVlfltiS-J=r2;64 --- .------ -------------- -----1-- - - ------ ----------1-- ---- ------ '. r f..------ ---------1------ -------- -- -.. -------- - I .. Ii I II I --- ------ ---- -- f-- -- ,--- -, ---- ---. 1--- .--.+------- --- - n____ I I I I II' I it ;n: '-IT- -- --~---- Ir------ .- L--JI 1!fA. ~ I UY '-I NSTALL 12- pile PIPI !-- I I LEfilGTH = 36S..~6' I-I , I m___J. ____.-1 _.__ 34?()() I I -!- -!- I 4J.4?()() ()4?58. 1/2 PILAN AND PROF//lE ~ PUBLIC WORKS DEPARTMENT CITY OF PORT ANGELES V SCALE 8' GARY KENWORTHY P.E. CITY ENGINEER NO DATE REVISION CONTOUR INTERVAL NA FILE 04 03 BY APPEND PROJ NAME OAK ST SEWER REPAIR OAK STREET SEWER REPA//R PROJ/EC T ()4J=()3 321 EAST 5TH STREET POBOX 1150 PORT ANGELES, WA 98362 PHONE (206) 457-0411 40 I 1" ~ 20' 32 28 24J 2() 1/6 1/2 8 1------- - -- - 4J. () y: . .. CALL 4iJ HOURS BEFORE YOU DIG 1-800-424-5555 1 6 1 2 8 4 r-~'~"" NO DATE STA. 2+67 --T'^~ - , . , I I EXISTING OAK STREET ,~ J _~URF. E__ , 1~--~'- _1::.-1 - - ~ -1_ _ 1- I -; : I I ,6,M WATER,_~-+_ MAIN '\ I i ~ 48rINBUSTRtAI;;-_l"" : WATER' MAIN I __~,L" """ ,L,__", 6M EJCTRI~.-/i ; ,U i i , , I I I ' "'--r~--"- T'-'-', HJ 21M FORfE MAl' ~~= ~~/~~-= ~---~ j j I INSTALL 6M' I SERVICE PIPE: -40 -20 REVlSION 1 6 1 6 ~ -~~~~ 1 2 ~/ / CONNECT 0 8 ' ^EXISnNG~ RVlcEi , UNE I 1 2 I , I I I i 12- SANITARY SEWER ,- ,,~,~__';'H ,^-PIPE~Fl{>W--{)IRECTlON NORTH I I 4 I 12M SAN 'ARY SEwER PIPE ;, ",_ ",~OW D"!CTlON, SO o 20 DESIGNEO BY JSA 40 STA. 3+13 ,,_~~~~~~~ ~ ~~~~~__~~_~~~~_~_VA~~V ;-- -, --- . EXISTlNP OAK STREET, SURFACE 'r I ~"1' ~ _ _ ~';=:--=-:-"~- = ' 1 6 48M INDUSTRIAL WATE ' MAI~~" 6M stORM D~~ ^J' " , '_'H_'~' 6M WATERY~" ~N ' / -<,/ / 1 2 6M' I ELECTRICAL J CONDUIT' , 8 I I -^ -~T~~--r-~ 21M FORCE MAIN J 8 // 4 ?' CONNECT TO , 7 EXISTING ~ERVlC~ ',^" '~"'-i~""t1N~"--- I """"",J ~__~~_~,~~_"l,,^_ , 12M SANitARY i I : SEwER PIPE FLOW ""'^~'~~t2"-SAN~ARY'-SEWER~IPE,:l, ~__~~~CTI_~~~~O~_~ FLOW I DIRECTION SOUTH ' , , ' 4 "'-INSTALL' 6M~, SERVICE PIPE -40 -20 o 40 20 NOTE: THE LOCATION AND DEPTH OF ALL UTILITIES ARE APPROXIMATE AND SHALL BE FIELD VERIFIED. ~ DRAWN BY JSA H SCALE 1" 20' V SCALE 1" 4' CONTOUR INTERVAL CONTINT FILE DOWNTOWN DWG GARY KENWORTHY P.E. CITY ENGINEER BY APPEND PROJ NAME OAK STREET SEWER REPAIR PUBLIC WORKS DEPARTMENT SERV/lCE /L/lNE CROSS SECT/lONS OAK STREET SEWER REPA/lR PROJECT 04~03 CITY OF PORT ANGELES 321 EAST 5TH STREET POBOX 1150 PORT ANGELES, WA 98362 PHONE (206) 457-0411 .. ~ . - ~ ~-~---- - ---., , \ , - s';--- -- ss-- - m SS- - - ss- - ss- - ss-- , \ \ )r \ ! I :;. I i :;. \ \ /-~'\ ! -~ J-- -" \"j I )< L __J-- - SL --- S;)+- j' / I / // ! I i -~---~ --~- ~\ -- SD- ---- ,,1- - -- S1- - SD- \\ )r , / / SS - SS- - SS- -- ss -ss - ---<;s - -SS - - <<;; - -SS - --ss --- - ss - ~s - OAK STREET \ __ ss - -- -- SS- - SS--- -- ~ .,- ....-.- SS--- - - \S-'_- ss -- ..- SS- J -:J --- :; ~---- 3 '3 ] \ /,._'" ' --!, i -,- "J ! -~\- -A- - ---..- ~- / " / ;1 1__ CALL 48 HOURS BEFORE YOU DIG 1-800-424-5555 NO DATE -- A _. _. 1'\ i,<I\.. -- )>' .. ,'\ - I .-.--1 I I .J \ REVISION I ~ SS- -- SS- J ---- \ \/ \ J / ~<N-~ ~ ..- A - ~r ~ PR~TECT CONCRETE lBASE ~-~~-~~ __ ss- tl ss.-- - ssf - t ss-- , , , , l ,I 2.6' I ! ) ! INSTALL 8- PVC PIPE BETWEEN EXISTING MANHOLE AND CONCRETE BASE I, I DISCONNECT EXISTING STORM DRAIN AT EXISTING JOINT AND CONNECT 8- PVC PIPE - APPROXIMATE DEPTH = 5.5' " < i I \ \ ,r-\ \_j' \ , f') , (.I; V, n 1.>--: I V> v V> I I ~ 0 "'I I~ 0 0 II I 0 o. M IF '", -/ RAILROAD l STR~ I In GARY KENWORTHY P.E. CITY ENGINEER ~ , I , \ , , DESIGNED BY JSA ORA WN BY JSA H SCALE 1" 20' V SCALE ," 4' CONTOUR INTERVAL CONTINT FILE DOWNTOWN DWG BY APPEND PROJ NAME OAK STREET SEWER REPAIR \ \ , , .- --CONNECT 8- PVC PIPE . - - INTO EXISTING STORM ! DRAIN. APPROXIMATE i DEPTH TO PIPE = 6' / FIELD VERIFY DEPTH AND' LOCATION < , \ :: \ ' r-:'\: \,4<1 , ), I I ~ I' I ! PUBLIC WORKS DEPARTMENT CITY OF PORT ANGELES 321 EAST 5TH STREET POBOX 1150 PORT ANGELES, WA 98362 PHONE (206) 457-0411 , I { , , i I I , , \ \ \ \ \ \ \ 804 8 ~ 16 I ORIGINAL SCALE ," = 8 . -...j l\., ,\ r, (" ~ 1_, ...) R~'< , .. '" "'", " "\, \ STORM DRAIN REAlIGNMEN7f OAK S7fREE7r SEWER REPAIR PROJEC7f 04-03