Loading...
HomeMy WebLinkAbout419 1/2 E 3rd St - Building . ,.. ....-..". /~ ---- CITY OF PORT ANGELES LIGHT DEPARTMENT 321 E. Fifth Street Port Angeles. WA 98362 (206) 457-0411 ELECTRICAL PERMIT PERMITNo. S3S.-(, DATE /Z//~~ Installed By: Jd o READY FOR INSPECTION License Number: o WILL CALL FOR INSPECTION Phone: Site Address: Owner/Business: Phone: Owner/Business Address: Sq. Ft. ELECTRIC HEAT o BASEBOARD KW _ o FURNACE KW o HEAT PUMP KW_ o FAN/WALL KW o RESIDENTIAL o COMMERCIAL o NEW CONSTRUCTION o REMODEL o ADD/ALTER CIRCUITS ~ SERVICE UPGRADE/REPAIR o TEMPORARY SERVICE o RISER ~ OVERHEAD SERVICE o UNDERGRO~ SERVICE VOLTAGE: /ZQ Zj/D ~ 1 tJ 0 3' tJ SERVICE SIZE 2CJD FEEDER SIZE AMPS AMPS Details/Description: . W.S. No. SERVICE SIZE CAPACITY: o O.K. 0 NOT O.K. ACTION REQUIRED: 0 CHANGE TRANSFORMER o INSTALL SERVICE POLE DATE ENGR. o OVERHEAD SERVICE APPROVED o CHANGE SERVICE WIRE o OTHER o Ditch Inspection O.K. o Rough-in/cover o.K. ~ O.K. to connect service o Final O.K. Site AddrW 'f ~ Installer: d~ L d Permit/Receipt No. S3sGo . Date: ...- /2 '/iI ?5 Notify Port Angeles City Light by Street Address and Permit Numberwhen ready for inspection. Work must not be covered before inspection and O.K. for covering has been given by the electrical inspector in writing on either the Wiring Report or on the Building Permit. PHONE 457-0411, EXT. 224. ~ NO OCCUPANCY OR USE ESTABLISHED UNDER THIS PERMIT $ , New Meters Electrical Inspector #5"'0 Permit Fee WHITE - File by address PINK - Top: Eng, Bottom, Customer GREEN - Top: Meter Dept., Bottom: City Hall OLYMPIC PRINTERS INC '~,'-~" '" ) COpy ) PORT ANGELES HOUSXNG REHABILITATION PROGRAM 129 E 1st St .Port Angeles, WA-98362 Telephone #452-2023 August 21, 1995 Final worklist specifications for. Thomas C. Lelo 419 1/2 E 3rd St Port Angeles, WA 98362 Telephone: for appointments call Theresa Beatty #457-0201 ATTENTION CONTRACTORS. Submit all bids to the Port Angeles Housing Rehabilitation Program office no later than Friday, September 7, 1995. PROJECT A (HEALTH AND SAFETY REPAIRS) l)Remove the vines and shrubbery on the East and SE sides of the house. Vegetation should be cleared approximately 4'-6' away frame the house, include any vegetation/branches hanging on the roof of the house. - 2)Eliminate earth/wood contact along the south side of the house. Include removal of grass and brush. 3)Complete extermination of powder post beetles and other wood destroying insects and organisms. 0400 l)Basement entry. Install a concrete step and pad 2)East bedroom entry. Install a new concrete slab/sidewalk and entry step. Excavate along the wall adjacent'to the kitchen and clean out the crawl space vent. 3)Basement/exterior. Install new sidewalk and steps from the rear entry to the upper side yard/driveway area. Include a handrail on the steps. 4)Front entry. Install new concrete steps and pad to code. 0500 l)Install new hand railing at each side of the front entry steps. iL I O~ rzG - c, ) 1 j' J 'i \., ,[ 0600 l)Basement: Replace the damaged subfloor and framing. Note: at this time it is difficult to determine the extent of the repairs necessary to properly complete this project. Contractors to specify a "not to exceed" material and labor allowance in the bid. 2)Kltchen: Install new base cabinet and plastic laminate countertop and backsplash (approx. 9 If-L shaped configuration). Cabinet to replace utility cabinet on the east wall. 3)Kitchen: Install new upper wall cabinets. Wall cabinets to wrap into the window. 4)Living room: Remove the existing wall heater frame in the fireplace and close off the fireplace opening with paneling to match the existing as close as possible. 0800 l)Bathroom/east bedroom: Install a new prehung hollow door package with a privacy lock on the east bedroom doorway. Trim and finish both sides. Stain and finish paint the door and trim. core or , 2)SW bedroom. Modify the window opening on the west wall and install a new vinyl framed single hung window with insulating glass. Trim and finish the interior and exterior. Stain and finish or paint the trim. Note: this must be a proper egress window. 0600/0900 l)East bedroom addition. Install new underlayment. pad and carpeting. 0900 l)Basement. Replace water damaged sheetrock in tQe east basement area. 2)Bathroom. Sheetrock, tape. finish and paint the wall and ceiling areas. 3)East bedroom. Sheetrock. tape, texture and paint the bedroom wall and ceiling areas. 1500 l)Bathroom. Install a new toilet package. 2)Bathroom: Install a new 36" vanity sink package. 3)Kitchen. Install a new double tub stainless steel or porcelain enamel sink.package with a hand !leld sprayer attachment. Include installation of shutoff valves under the sink;' r-L IO-'LC.... 1100 l)Kitchen. Install a new ceiling exhaust fan and switch and insure that it is properly vented to the exterior. '1 r- 2 ( r" l 2)Kitchen: Install a new kitchen range/oven. (Material allowance is $500.00) l)East bedroom entry: Install a new motion sensor or dusk/dawn exterior security light and connect to a new switch to be located inside the bedroom entry. 2)Basement entry. Install a new motion sensor or dusk/dawn exterior security light and connect to a new switch to be located inside the entry area near the doorway. 3)East bedroom addition. Install (2) additional outlets. 4)East bedroom addition: Install a new ceiling light fixture and connect to the existing switch near the entry. 5)Bathroom: Install a new'GFI protected outlet near the sink. 6)Install a new 200 amp service panel complete. 7)Safe up all accessible electrical outlets, fixtures, junction boxes, switches, and wiring. Insure that all 3- prong outlets are properly grounded an~ all other outlets have proper polarity. Insure that all fixtures, outlets, switches, and connections have proper junction boxes and cover plates. , 8)Install new hardwired smoke alarms with battery back-up throughout the house to code. Include and alarm in the unfinished basement' area. All smoke alarms to be inter-tied. 9)Dining area. Install a new ceiling light fixture and connect to existing switch near the doorway. 10)Kitchen. Insure that eXisting outlets near the sink have GFI protection. 11)Kitchen: Install (1) additional GFI protected outlet near the sink. 12)Kitchen. Install a new 2-foot/2-tube florescent type ceiling light fixture over the kitchen sink and connect to a new switch to be located near the sink area. ,0 13)Frontentry. Install a new front entr~ light and connect to the existing switch inside the entrya~ea. ~L ,14)Basement area. Complete electrical to code. Install I ' outlets, switches, and ceramic keyless light fixtures. Include proper cover plates. t ()- fl C - G\)' 3 ( ( 15)SW bedroom: Install a new ceiling light fixture and connect to a new switch to replace the existing switch. Locate the switch inside the bedroom. PROJECT B (EXTERIOR DETERIORATION AND BLIGHTING) 0400 l)Install new footings and foundation to complete foundation repairs on the west side of the house and to close off the crawl space. 0600 l)Install new skirt board (freze board) around the perimeter of the house to repair/replace deteriorated areas. Include replacement of bottom row of shingle siding on the south side of the house, and install flashing to 'eliminate leaks/moisture problems behind T-l11 siding. Complete siding on east end at the rear of the house. Install proper 1/4" screening on foundation vents around the perimeter of the house. , 0700 l)Tearoff, resheath. and reroof the entire house with 25 year 3-tab composition seal down shingles. Include installation of new metal gable and eave trim around perimeter of house (Include the front entry overhang). the roof-as much_as-possible. .- ------~.--_.-_. - Le Y_e1 ,----- PROJECT C (OPTIONAL-COST EFFECTIVE ENERGY CONSERVATION) 0800 l)East bedroom entry. Install a new steel insulated pre-hung door package with a deadbolt, lock, and peephole or window in the upper half. Trim and finish the interior and exterior. Stain and finish or paint the door and trim. 2)Front entry. Install a new steel insulated pre-hung door package with a deadbolt. lock, and peephole. Trim and finish the interior and exterior. Stain and finish or paint the door and trim. Note, Entry doors to be keyed alike. 3)Kitchen. free up the window on the east wall. (L )(J- t'L C - q ~ No evidence of a lead based paint 4