Loading...
HomeMy WebLinkAbout321 W 4th St - Building . CITY OF PORT ANGELES LIGHT DEPARTMENT 321 E. Fifth Street Port Angeles, WA 98362 (206) 457-0411 PERMIT NO. .$:;;lS7 /2.. /11,/ f!r , . DATE ELECTRICAL PERMIT Installed By: o READY FOR INSPECTION License Number: o WILL CALL FOR INSPECTION Phone: Site Address: Owner/Business: Phone: Owner/Business Address: Sq. Ft. ELECTRIC HEAT o BASEBOARD KW _ o FURNACE KW _ o HEAT PUMP KW_ ~ FAN/WALL KW ...!l- o RISER ~ OVERHEAD SERVICE o UNDERGROZD SERVICE VOLTAGE:I.zo '.21/0 ~1l1S D3l1S SERVICE SIZEc9&O o TEMPORARY SERVICE FEEDER SIZE 0"""0=';0;'" ~tJ ~ 11#. ~ ~CM r7;;!,,- . ~vJ ~ ~ RESIDENTIAL o COMMERCIAL o NEW CONSTRUCTION ~' REMODEL M' ADD/ALTER CIRCUITS "l>r SERVICE UPGRADE/REPAIR AMPS AMPS . C -? --- r W.S. No. SERVICE SIZE CAPACITY: o O.K. 0 NOT O.K. ACTION REQUIRED: 0 CHANGE TRANSFORMER o INSTALL SERVICE POLE DATE ENGR. o OVERHEAD SERVICE APPROVED o CHANGE SERVICE WIRE o OTHER o Ditch Inspection O.K. o Rough-in/cover O.K. ~ ~O.K. to connect service b Final O.K. Site Address: $I Permit/Receipt No. ~S;7 .-' Installer: New Meters . Notify Port Angele City Light by Street Address and Permit Numberwhen ready for inspection. Work must not be covered before inspection and O.K. for covering has been given by the electrical inspector in writing on either the Wiring Report or on the Builgjog Permit. PHONE 457-0411, EXT. 224. (~ NO OCCUPANCY OA USE ESTABLISHED UNOEA THIS PEAMIT $ #' .s-o Electrical Inspector Permit Fee WHITE - File by address PINK - Top: Eng, Bottom, Customer GREEN - Top: Meter Dept., Bottom: City Hall OLYMPIC PRINTERS INC '1 f--W ~ {:L;r PORT ANGELES HOUSING REHABILITATION PROGRA~ 129 E 1st Street Port Angeles, WA 98362 rel ephone #452.....2iJ23 August 30, 1995 (revised September 19 and November 6, 1995) Final worklist specifications for: Betty J. Fuson (95PA22) 321 W 4th St Port Angeles, WA 98362 Telephone #1/57...9693 SELECTED CONTRACTOR: Cozi Homes Construction 324 E 9th St Port Angeles, WA 98362 Telephone #1/52-99'6 PROJECT A (HEALTH ANO SAFETY REPAIRS) 0400 1)Front entry: Install new concrete steps and landing to replace existing. 2)Rear main floor entry: Remove the existing wood decking and framing and install a new concrete slab and step to match the existing configuration. 0500 1)Front entry: Install new hand railing on each side of the entry steps. 0900 1)Rear entry/hallway: Install new underlayment and sheet vinyl floor covering. 2)Bathroom: Install new underlayment and sheet vinyl floor covering. 3)Kitchen: Install new underlayment and sheet vinyl floor covering. 4)Living and dining areas: Install new pad and carpet. 5)Front entry: Install new underlayment and sheet vinyl floor covering. 6)Main floor west bedroom: Install new pad and carpet. 1 7)Main floor ne bedroom: Install new pad and carpet. 8)Bathroom: Sheetrock, tape, finish, and make ready for paint the wall and ceiling areas. Include water resistant concrete wall board in the tub area. Homeowner to complete painting. 9)Bathroom: Install a new fiberglass or plastic laminate tub wrap. Reframe window to be located above tub wrap/surround. 10)Living room, kitchen and dining room: Sheetrock, tape, texture, and make ready for paint the ceiling areas. Include new cove mould ceiling trim. Homeowner 1:0 complet:e paint:ing" No t:e: Floor coveri /1g allowance is $17 per square ya'rd for carpet: and pad and $16 per square yard for vinyl.. 1500 1) Bathroom: Install a new 24" vanity sink package. 2)Bathroom: Install a new bathtub package with shower faucet and diverter and trim and fittings. Include a hand-held shower with a stainless steel flex hose and wall mount bracket. 3)Bathroom: Install a new toilet package. 1600 l)Basement entry: Install a new exterior motion detector security light and connect to a new switch inside the entry. 2)Exterior: Disconnect and remove the overhead service to the storage building on the north side of the house. 3)Basement and crawlspace areas: Properly secure all loose romex wiring. 4)Front entry: Install a new entry light and connect to existing switch inside the entry way. 5)Safe up the wiring, outlets, fixtures, connections, and junction boxes throughout the house. Insure that service panel is properly labeled, grounded and wired. All switches, outlets, connections, and fixtures to have proper junction boxes. All 3-prong outlets to be properly grounded and all other outlets to have proper polarity. 6)Bathroom: Install a new GFCI outlet near the sink: 7)Bathroom: Install a new wall mount light over the vanity sink. Connect to existing switch near the doorway~ 2 ;-' ~:'.''-i.,,,....,. 8)Living room: Install (2) additional outlets. Homeowner to designate location. 9)Dining room: Install (2) additional outlets. Homeowner to designate location. 10)Kitchen: Replace (2) existing outlets near the sink with GFCI protected outlets. 11)Kitchen: Install (1) additional GFCI protected outlet. 12)Kitchen: Install a new 2-foot 2-tube florescent ceiling light and switch over the kitchen sink. 13)Kitchen: Install a new 4-foot 2-tube florescent ceiling light to replace existing ceiling light. 14)Kitchen: Install a new separate circuit and outlet for the microwave oven. 15)Living room: Install a new ceiling light fixture to replace existing pull chain fixture. Connect to a new switch to be located near the front entry. 16)Replace three (3) existing wall heaters with (3) new electric wall heaters with thermostat switches. Include repair of wall areas. Homeowner 1:0 complet:e pa.int:ing.. F/A 17)Living room, dining room, and kitchen: Install new electric wall heaters sized and located to adequately the main living area of the house. F/A heat 18)Install a new 200 amp service panel complete. PROJECT B (OPTIONAL-HEALTH ANO SAFETY) 0200/1700 1)Provide a new EPA approved wood stove package. Include reframing wall, installing insulation, and finishing the interior and exterior walls. Install new proper floor and wall protection. Homeowner to complet:e removal of exist.ing chimney a'nd st:oveJI new wood st:ove inst:al1i:."'tt:ion and pain!:inq. (stove allowance $1,000) 3 PROJECT C (ENERGY CONSERVATION) 0800 l)Front entry: Install a new steel insulated prehung door package with a deadbolt, lock, and window in the upper half. Trim and finish the interior and exterior. Homeowner to stain and finish Of' paint the door i:.~nd t:rim. 2)Kitchen: Install a new vinyl framed slideby window with insulating glass on the north wall. Trim and finish the interior and exterior. Homeowner 1:0 stain and fini5'h or paint the trim. 3)Upper NW bedroom: Modify the window opening on the north wall and install a new vinyl framed slideby window with insulating glass. Trim and finish the interior and exterior. Homeowner to stain and finish or paint t:he trim.. No~e: Chis mLlst be a proper egress window.. 4)Upper NE bedroom: Modify the window opening on the north wall and install a new vinyl framed slideby window with insulating glass. Trim and finish the interior and exterior. Homeowner to st:a.in and finish or paint: the trim. No~e: this mus t be a proper egress window.. 5)Basement utility area: Install a new vinyl framed slideby window with insulating glass. Trim and finish the interior and exterior. Homeowner to stain and finish or paint the trim. 6)8asement entry: Install a new steel insulated prehung door package with a deadbolt and lock. Trim and finish the exterior. Homeowner to stain and f1n16'/7 or paint: the door and trim. 7)Rear main floor entry: Install a new steel insulated prehung door package with a deadbolt, lock, and a window in the upper half. Trim and finish the interior and exterior. Homeowner to stain and fin.ish or paint t:he door and t:"im. Note: all entry doors to be keyed alike. 8)Reglaze the broken window pane in the attic window over the front entry. 9)Bathroom: Install a new vinyl framed casement or awning window with insulating tempered glass on the north wall. Trim and finish the interior and exterior. Homeowner to stain and finish or pai-nt t:he trim. Interior window wrap/trim to be an impervious/waterproof surface. 4 Not:e~o all new windowS' t:o be provided by cont:ract:or and inst:al1ed by homeowner'5' S'on (a profeS'5'ioni.~l window 1ns'ta11erJ'. working- for l'Iat:hews Glass). PROJECT D (OPTIONAL ENERGV CONSERVATION) 0B00 l)Living room: Reglaze the window on the west side of the front entry with insulating glass. Trim and finish the interior and exterior. Homeowner t:o sti.~in and finish or paint: t:he t:rim. 2)Living room: Reglaze the window on the east side of the front entry with insulating glass. Trim and finish the interior and exterioro Homeowner t:o stain and finish or pa'i n t.: t:he t:rim~ 3)Front entry: Install a new aluminum framed combination storm/screen door package. (material allowance $200) 4)Rear main floor entry: Install a new aluminum framed combination storm/screen door package. (material allowance $200) 5)Dining area: Reglaze the window on the east wall with insulating glass. Trim and finish the interior and exterior. Homeowner to st:a1n and finish or pa1nt t:he t:rim~ 6)Front entry: Reglaze (2) windows with insulating glass. Trim and finish the interior and exterior. Homeowner t:o st:ain and finish or paint: t:he Crim. PROJECT E (EXTERIOR DETERIORATION AND BLIGHTING) 0400 l)Complete foundation footings and concrete wall around the perimeter of the house and front entry area. Homeowner to excavate and remove dirt to grade. 2)Install new proper footings and support posts throughout the basement and crawl space areas. Include elimination of all earth/wood contact throughout this area. 0600 l)Install new support beams, sill plate and rim and end joist around the perimeter of the front porch. 0700 l)Complete installation of metal flashing and frieze board around perimeter foundation area. Include replacement of damaged sill plate and rim joist on the east side of the house. 5 .. . . ~ . . . 2)Complete siding installation on the north and west sides of the house. Match existing as close as possible. Include installation of metal flashing. Homeowner to complete painting. PROJECT F (BUILOING CONSERVATION) 0500 1)Install new seamless aluminum raingutters, downspouts, and splash blocks around the perimeter of the house. Confirm drainage requirement:s wit:11 cit:y. 0600 1)Rear main floor entry area: Patch the hole in the siding near the entry door. 1100 1)Kitchen: Install a new ceiling exhaust fan. Insure proper venting to the exterior. PROJECT G (OPTIONAL-BUILDING CONSERVATION) 0B00 1)Basement utility area: Install a new prehung hollow core door package. Trim and finish both sides. Homeowner to stain and finish or paint the door and trim. 0900 1)Basement utility area: Sheetrock, tape, finish and make ready for paint the wall and ceiling areas. Fir out perimeter walls and install insulation. Homeowner t:o complete painting. PROJECT H (ADDITIONAL EXTERIOR DETERIORATION) 0200 1)Refer to the attached Paratex pest inspection report of September 14, 1995. Contractor to complete repairs outlined in projects #1,#3, and #11. All other projects on the pest report are specifically included in this worklist (#5, #7, and #9), will be completed through the weatherization program (#4 and #6), or will be completed by the homeowner (#B and #10). NOTE TO CONTRACTORS: Please bid eacl1 project: separat:ely and include applicable t:ax and permit: fees. 6 CITY OF PORT ANGELES LIGHT DEPARTMENT ELECTRICAL PERMIT N? 15344 ---- 3 -If . ~<, Port Angeles. Washlngton...oo..oom.oo.....oooo......oo...oo.....................m.. 190000.00. In accordance with the City Ordinance to regulate the installation. extension. or repair of elec- trical equipment in, on. or about any building or other structure in the City of Port Angeles. per- mission is hereby granted to diftrical work as listed below. ~:::su:~::~~i::::~~~;::::u..;:=~~~:::m~::~~~~.:~:::::~~::=:=:::::::::::::::::::::::::: Wiring Contractor .u-;{;;..AL':f'""0':!'.-:.:-::-::.m.oooom__oooooooo....... By__..oommoooom....oom..m.moomooum.u..ooum__....... Light Outlets.......................................... Receptacle Outlets...m......................... Drye,. KWloo..m................................... Range, KW....m... \Vater Heater: KW..................oo... Heat: RW,...........m....... Motors: size, volts and phase: Total Load...n..nmn........m.... /",,0/"'/(:1 Service, volts .....................?:L.m....... 3. No. wires .....m.......:........mm..m.... . . /ffJ . SIze WIreS..._mm............m___..m..m Main fuse ...~1!.p.?..A............... s::: Enclosure mm..mm.m..................... Type of wiring: Entrance Cable ....................___mm Rigid Conduit ..n..nm.... Metallic Tubing ..nmm...m........... Current transformers: No. & Size.n....n.....___..m.mn........... Ser. NO..............................n.............. Ser. No............................................... Ser. NO.................._............n......n.... Ser. No. ......nn......................nn......n. Type of 'Wiring: Armored Cable .............m....m...... Non-Metallic ....mnm..n........m...... Knob~ & Tube.. Rigid Conduit .n....mn................... Metnll1c Tubing m..........m...nm... Raceway Circuits, Light Utility..... Heat ..........n......n....n.....n.............. Range ............................................. Water Heater ....n......................... Motor .n....n.................................... Dryer_............n.................n................ Furnace .......00................'....00............. Total n.....n...n.............n.......... Remarks : __..uu_u::::?.___~.~____~.__n.__..~~_g:-::-..-!.~___~.__".!2.__~~.._:n...urf?:::2~2z.-(..nn__.__.__...uuuu_u.U__u._h.un_uu._.uuu -- rT .___nnUnnUU.__UU.Un.UU__hU_h______.n__n..n.nh____n..n.._uUh..__.......nn..___u____.:~nnnu__..n...__..u_u.n_____uuh.uunnhnu.u__u. .;::;~.;~:m.moooooom.m....moo;~~~...;::~~~~oo..mmoo--.h...m....oo......h;roo~:lloo4mm.2h.h---moo.... $.mm.mmmmmm.....m.... NO..m.m...__m___m_... By oo.___'.___..rt..:..L....~__~__Y.2__.mC.:?'__L...oo... / NOTICE-Current must not be turned on until Certificate of Inspection has been issued. If work is to be con. cealed due notice must be given the Inspector so that work may be inspected before concealment. NOTIFY THE INSPECTOR BY PERMIT NUMBER WHEN READY FOR INSPECTION ~ / ELECTRICAL PERMIT N? 15344 Date called for Insp8ction............n.......n......u..n......n.....n....nnu..._....................................................nn..............nn........n............................ Preliminary inspection dates............................ .............................._..................................................u.........................................................._ Inspectioncompleted..._..................................................................._...................................................................__.................._.........._......._ , j Total Load nn.n.....~.............n....nnn.......n.n......n....... .....-;:_.. ..........._ nn....... ..............nnn.un........................................._..........__......._......_ , \ 1M -3.72 Olympic Printers, Inc. "