Loading...
HomeMy WebLinkAbout708 E 9th St - Building . CITY OF PORT ANGELES LIGHT DEPARTMENT 321 E. Fifth Street Port Angeles, WA 98362 (206) 457-0411 PERMIT NO. $..3/6' // /8 /?~ DATE ELECTRICAL PERMIT Site Address: SJ-. o READY FOR INSPECTION license Number: o WILL CALL FOR INSPECTION Phone: Installed By: Owner/Business: Phone: Owner/Business Address: Sq. Ft. ELECTRIC HEAT o BASEBOARD KW _ o FURNACE KW _ o HEAT PUMP KW o FAN/WALL KW _ ~RESIDENTIAL o COMMERCIAL o NEW CONSTRUCTION o REMODEL ~ ADD/ALTER CIRCUITS o SERVICE UPGRADE/REPAIR o TEMPORARY SERVICE o RISER o OVERHEAD SERVICE o UNDERGROUND SERVICE VOLTAGE: 01rD 03rD SERVICE SIZE FEEDER SIZE AMPS AMPS Details/Description: ~f~ ~If,~e-'~, . W.S. No. SERVICE SIZE CAPACITY: o O.K. 0 NOT O.K. ACTION REQUIRED: 0 CHANGE TRANSFORMER o INSTALL SERVICE POLE DATE ENGR. o OVERHEAD SERVICE APPROVED o CHANGE SERVICE WIRE o OTHER o Ditch Inspection O.K. o Rough-in/cover O.K. o O.K. to connect service o Final O.K. Site Address: New Meters .- .J Installer; . Notify Port Angeles City Light by Street Address and Permit Numberwhen ready for inspection. Work mus not be covered before inspection and O.K. for covering has been given by the electrical inspector in writing on either the Wiring Report or on the Building~mit. PHONE 457-0411, EXT. 224. .Lt r; ~ NO OCCUPANCY OR USE ESTABLISHED UNDER THIS PERMIT ~- sO . $ Electrical Inspector Permit Fee WHITE - File by address PINK - Top: Eng, Bottom, Customer GREEN - Top: Meter Dept., Bottom: City Hall , ---. /~ OLYMPIC PRINTEAS INC. \ w,i;(}J- . /D};/'?) W.i'.cJ ) J PORT ANGELES HOUSING REHABILITATION 129 1st st Port Angeles, WA,9B362 PROGRAM T"elephone #452--2023 C(Q)[pY November 22, 1994 (revised August 28,1995 and September 27, 1995) Final worklist specifications for: William and Wanda Wilson (95PA05) 708 E 9th Port Angeles, WA 98362 l"elephone #45.7--11213 SELECTED CONTRACTOR: Hoch Construction Inc. 4201 Tumwater Truck Route Port Angeles, WA 98363 Telephone #452-5381 Project A (REQUIRED HEALTH AND SAFETY REPAIRS) 0200 l)Excavate (dig out) the crawl space for proper clearance and eliminate earth/wood contact throughout. Include installation of adequate footings, posts, and beams under the living room and throughout the crawl space area. 0400 l)Install a new 36" sidewalk from the front entry steps to the city sidewalk. Speciricat:ions include repairs ou~lined in t:he Paratex pest: inspect:ion report: of Sept:ember 1M 1995 (att:achedJ.. EXCBOt:iofU Proiect:s #1" #6, and #7 of t:his report: are not: t:o be included in t:his cont:ract: and will be complet:ed direct:lv t:hrouqh t:he weat:herizat:ion proqrarn.. 1 (yA~ .w I-J~~' ~j. .lC> {D (<fS- ) ) 0600 1)Front entry: Remove existing porch decking and install new pressure treated decking and steps. Install new skirting around the perimeter of the front porch (homeowner to provide materials). Remove existinQ porch canopy and replace with new canopy to cover existioQ footprint of porch area. in lieu of increasilJQ size of exIstinq roof framino. Include installation of new roofin~ to match existing roof(homeowner to provide one (1) square of roofing, additional roofing to be included in bid). Stain and finish or paint the porch decking, framing, railings, and steps. 2)Attic: Complete access framing and install a new attic access door. 3)Upper hallway/stairway landing: Shim and level the floor as much as possible. Include new underlayment. 0900 1)Living room and dining room: Install new pad and carpeting. Include alcove areas. Homeowner 1:0 remove exist:ing t:i1e floor covering in t:he dining room. 2)Main floor bathroom: Complete patch, tape, texture and paint the wall and ceiling areas. 3)Upper stairwell, hallway and NW bedroom areas: Sheetrock, tape, texture and paint the wall and ceiling areas. Include installation of an attic access door. 1600 1)Install new hardwired smoke alarms with battery backup throughout the house to code. Alarms to be inter-tied. 2)Insure the upper open wall areas are wired to code. Insure that the stairwell light switches and fixtures are properly attached and the attic wiring is suitable (safe) for installation of blown in attic insulation. 3)Insure that service panel is properly wired, grounded, and labeled. PROJECT B (COST EFFECTIVE ENERGY CONSERVATION) 0800 1)Living room: Remove the front entry door and sidelites and install a new prehung embossed panel steel insulated door package with a deadbolt, lock, and peephole. Trim and finish the interior and exterior. Stain and finish or paint the trim. Include framing, insulation, siding, sheetrock and trim to complete the front entry door installation. 2 0\i'IY , ffF1' IJ-J'- ~ .;/, W (0/13 ('Tr ) ) 2)Living room: Modify the window opening on the north wall and install a new viflvl framed window wi th insulating glass. Trim and finish the interior and exterior. Stain and finish or paint the trim. Match configuration and color of west window as close as possible. 3)NE main floor bedroom: Modify the window opening on the north wall and install a new vinvl framed slideby window with insulating glass. Trim and finish the interior and exterior. Stain and finish or paint the trim. Nol:e: I:l1is mus C be a proper egress wj f]dow~ 4)NE main floor bedroom: Install a new vinvl framed slideby window with insulating glass on the east wall. Trim and finish the interior and exterior (reframe and install new window trim). Stain and finish or paint the trim. 5)Rear entry: Install a new steel insulated prehung door package with a deadbolt, lock, and a window in the upper half. Trim and finish the interior and exterior. Stain and finish or paint the trim. Note: Front: and rear entry doors 1:0 be keyed alike. 6)Kitchen: Install a new vinvl framed slideby window with insulating glass on the south wall. Trim and finish the interior and exterior (reframe and install new window trim). Stain and finish or paint the trim. 7)Kitchen: Install a new vinvl framed slideby picture window with insulating glass on the east wall. Trim and finish the interior and exterior (reframe and install new window trim). Stain and finish or paint the trim. 8)Utility area: Install a new vinyl framed casement or single hung window with insulating/obscured glass. Trim and finish the interior and exterior (reframe and install new window trim). Stain and finish or paint the trim. 9) Upper stairwell area: Install a new vinvl framed awning or slideby window on the south wall with insulating glass. Trim and finish the interior and exterior (reframe and install new window trim). Stain and finish or paint the trim. 10)Upper NW bedroom: Modify the window opening on the west wall and install a new vinvl framed slideby or single hung window with insulating glass. Trim and finish the interior and exterior. Stain and finish or paint the trim. /Vol:e: I:his must: be a proper egress w.i,.,dow. 3 '7ftA/~ W~hvJ' \D(13!1S-- vJ: l~' ') ) 11)Upper NW bedroom: Install a vinvl framed slideby window with insulating clear glass on the north wall. Trim and finish the interior and exterior (reframe and install new window trim). Stain and finish or paint the trim. 12) Upper SW bedroom: Install a new vinvl framed single hung window with insulating glass on the south wall. Trim and finish the interior and exterior (reframe and install new window trim). Stain and finish or paint the trim. 13)Upper NE bedroom: Install a new vinvl framed slideby window with insulating glass on the north wall. Trim and finish the interior and exterior (reframe and install new window trim). Stain and finish or paint the trim. 14)Upper NE bedroom: Install a new vinvl framed slideby window with insulating glass on the east wall. Trim and finish the interior and exterior (reframe and install new window trim). Stain and finish or paint the trim. 15 !Livinq room: Inst:a.Il a new vinv.I framed pict:ure window wi t:h bo t:t:om sl i der and .I nsul a t:inq qlass on t:he eas t: wall. Trim and f.lnish che int:erior and ext:er.lor. Scain and finish or paint: che t:rirn. 16)Fl'ont: ent:rv: Inst:all a new st:orrn door packaqe. l.7!Rear ent:rv: Inst:all a new st:orrn door packaqe. PROJECT C (EXTERIOR OETERIORATION AND BLIGHTING) 0500 l)Exterior crawl space access: Install a new treated plywood access door and a metal window well with a rock/gravel base for drainage. 0600 l)Complete installation of siding and tri~ around the perimeter of the house. Homeowner to provide materials. 2)Install new frieze board on the north and west sides of the house. PROJECT D (EXTERIOR DETERIORATION AND BLIGHTING) 1800 l)Properly prepare and paint the exterior of the house complete. 4 jrJ ~:'Jlj: , jO /<3 11s ) ) PROJECT E (BUILDING CONSERVATION) 0700 1) Install new seamless aluminum raingutters, downspouts and splash blocks around the perimeter eave areas. PROJECT F (GENERAL REPAIR AND MOOERNIZATION) e8ee llNW bedroom: Inst:all (21 new prelwnq int:erior door pacl,aqes wit:h hard/./are. Include st:ain and finish or paint:inq. ((1) closet: door and (1) passaqe door. 7 0900 l)Living room: Sheetrock, tape, texture and paint the ceiling. Include the alcove area. 2)NE main floor bedroom: Patch, tape, texture and paint the ceiling and north wall areas. 3)Dining, kitchen and nook areas: Complete sheetrock, patch, tape, texture and paint the unfinished wall and ceiling areas. 4)Utility area: Complete sheetrock, tape, texture and paint the wall and ceiling areas. 5)Upper bathroom: Complete sheetrock, tape, texture, and paint the wall and ceiling areas. 6)Upper SW bedroom: Complete sheetrock, tape, texture, and paint the wall and ceiling areas. Include closet area. 7)Upper NE bedroom: Sheetrock, tape, texture and paint the wall and ceiling areas. PROJECT G (GENERAL REPAIR AND MODERNIZATION) 0900 l)Upper SW bedroom: Install pad and carpet to be provided by homeowner. 2)Upper NE bedroom: Install new pad and carpet. 3)Stairway and upper hallway areas: Install new pad and carpet. 4)NW bedroom: Install new pad and carpet. No t:e.o con trac tor bids to i ncl ude permi t fees and appl i cabi e t:ax. Bid all project:s separat:ely. 5 1pJ! CITY OF PORT ANGELES LIGHT DEPARTMENT ELECTRICAL PERMIT Nt? 17490 ~ -;;~ ~ Port Angeles, Washlngton......._.........____.........................._.___.... 19........ In accordance with the City Ordinance to regulate the Installation. extension. or repair of elec- trical equipment In. on. or about any building or other structure In the City of Port Angeles, per- mission Is hereby granted to do electrical work as listed below. Address ..-61-....r-J.--.:f:IJi!:......--......-----...--.----m.---------- Occupancy__~~._________...__...__.__ ~::~ ~.::~:~-=:1l~::B&4~~~;:::::::::::::-....:...~::::::::::=::::=::::::::::=::::::::::=::::::::: ~ If ~.t Light Outlets_......_.._________...._________.._..... Service, volts _L?-._~L.:.!:..r.:..5... '3- No. wires ........_00__...._..0._00.......:(.;_ y/c) ~.p Size wiresn................................._.. '/. A- Main fuse ___.~.lr................... s. Enclosure ....m_mmm_m____n___....m__ Receptacle Outlets..............n..n........... Dryer, KW........._....._....____..._____._________ Range, KW...n_....__......._h_._____ Water Heater: H,a,~:~::::;zG.;~??~;,;B8 Moto~~:-size._-vo~~~_ and phase: .______nnmnmnn____n.::::::,___..n.___.n__..n \ .----------_..................._.........:~.--_._-_._..... , Type of wIring: Entrance Cable ...._........................ Rigid Conduit ....0.._......_................ Metallic Tubing.nnnnonmm Current transformers: No. & Size...........n__n....__nn_h......... Ser. NO............_n_._._..._.__..............._... Ser. No..................................__........__ Ser. NO.__........._....._........_..............h. Type of Wiring: Armored Cable ............................_ Non.MetallIc ._._.....______................._ Knob & Tuhem_..........______.___n_______ RIgid Conduit ___...______..______........... Metallic Tubing ....n._._.m........._.. Raceway .........._............_......_.__._ Circuits. Light.................n_....._..._._..._.. Utility .___._mn....____......__........___...._.. Heat ______......._..____._._......__...._.._ Range ._..__.................................__.... Water Heater ............___0000............ Motor ..._...._._..................__._.........._ Dryer _.....000000........._........._..........._.__ Furnace ..........._.............~__.._.............. Total ,Loadnnnn......n___.__.nn.. Ser. NO.....n._........._.._......._...h......._. Total ......00____.._..00_00_................ Remarks: .____.~?~L,J2d:ij.~.____....c.t,R.~~_................_____..............________................... -- r . ---~_......_--.--.....--_.._-_._----------(-::::-.....---.--...--..--..---.-----.---..----..-----.-....---............---..-----.....---------.-.----------......---......-....-- .;~;;;,;~--;;~~nn.......-nm...n.......;~~~~:.;~~~;~~--n.....m-....-n-n....(];?:....nnn.-."E....~~........~ $..........._.......................... No............................. BJ;...p.:...~~...,...t-.~<.,n....2'1:"....L,.....,~...,.,..-...... NOTICE-Current must not be turned on until Certificate of Inspection has been issued. If work fa to be con. cealed due noUce must be given the Inspector so that work may be inspected before concealment. NOTIFY THE INSPECTOR BY PERMIT NUMBER WHEN READY FOR INSPECTION \ , ""..... , ELECTRICAL PERMIT N? 17490 Address.__._.._;..____......_.................__.__...._............_.............................__._......._.___.......................~._._..Date..._......_.._.__.._.........._......_......_...____.. :~::~=~::~~~:~:::::::.:::::::~::::::~::~::::::~::::::~::~::::::::::~::~:::::::::::::::::::::::::::::::::::::::::::n~:~.~.:t.:~::::::::::::::::::::::::::::::::::::::::::..:::::::::::::::::: . \ NOTICE-Current must D-.ot be turned on untll Certificate of Inspection has been issued. If work is to be con- cealed due noUce must be given"'the Inspector so that work may be inspected before concealment. . ------- .' \. 1M Olympic Printers, Inc.