Loading...
HomeMy WebLinkAbout909 W 10th St - Building I . Site Address: Installed By: (/(/. /~ 3 Owner/Business: Owner/Business Address: ELECTRIC HEAT o BASEBOARD KW _ o FURNACE KW o HEAT PUMP KW----zr- ~ FAN/WALL KW ---F-- ;. CITY OF PORT ANGELES LIGHT DEPARTMENT 321 E. Fifth Street Port Angeles. WA 98362 (206) 457-0411 PERMIT NO. -7'172 <9-/2/7 tj DATE ELECTRICAL PERMIT D READY FOR INSPECTION License Number: D WILL CALL FOR INSPECTION Phone: 7O/l~ Phone: Sq. Ft. tS( RESIDENTIAL tf COMMERCIAL D NEW CONSTRUCTION D REMODEL ~ ADD/ALTER CIRCUITS Y'C SERVICE UPGRADE/REPAIR D TEMPORARY SERVICE D RISER )>'l' OVERHEAD SERVICE D UNDER~R9!J...ND SERVICE VOLTAGE~ ~q\ D3s6 SERVICE SIZE ~J20 AMPS FEEDER SIZE AMPS """;,,,",~,;p~;," ~~, I. ~~, ~ "fe:t:. IA llJ ' t4I! W-r j!. L, I' . / ' . W.S. No. SERVICE SIZE CAPACITY: D O.K. D NOT O.K. ACTION REQUIRED: D CHANGE TRANSFORMER D INSTALL SERVICE POLE DATE ENGR. D OVERHEAD SERVICE APPROVED o CHANGE SERVICE WIRE D OTHER D Ditch Inspection O.K. D Rough-in/cover O.K. D O.K. to connect service MFinalo.K. t~~,~~I.-....Q-t"A2/ /tJ >L4 ~ ~. 'r'I( /l f zA ( Site Address: Permit/Receipt No. 4.97 L Installer: New Meters Notify Port Angeles City Light by Street Address and Permit Number when ready for inspection. Work must not be covered before inspection and O.K. for covering has been given by the electrical inspector in writing on either the Wiring Report or on the Building Permit. PHONE 457-0411, EXT. 224. 8' .~ NO OCCUPANCY OR USE ESTABLISHED UNDER THIS PERMIT ~ SO , ~ $ Eleclricallnspector Permit Fee . WHITE - File by address OLYMPIC PRINTERS INC PINK - Top: Eng, Bottom, Customer GREEN - Top: Meter Dept., Bottom: City Hall ~ -~ .. PORT ANGELES HOUSING REHABILITATION PROGRAM 129 E 1st St Port Angeles, WA 98362 rei ephone #452. ..2023 October 14, 1994 (revised November 4 and Oecember 27, 1994) Worklist specifications for: Jean Tolliver (94PA48) 909 W 10th Port Angeles, WA 98362 rei ephone # 457....J 484 PROJECT A (REQUIRED HEALTH AND SAFETY REPAIRS) 0200 1)House: Complete pest inspection and extermination of powder post beetles and other wood destroying insects and organisms. 0500 1)Rear entry: Install (2) wood handrails on the rear entry steps. 0600 1)Garage: Install new treated wood steps and handrailing at the garage entry. 2)Basement: Replace (2) support posts near the bottom of the basement stairway. Use pressure treated structural support posts. Shim and level the beam as much as possible. 3)Basement: Replace (1) support post located near the furnace and chimney, and (2) additional support posts in the rear basement area. Use pressure treated structural support posts. 4)Basement: Replace (1) basement steps. Use a post. support post directly in front of the pressure treated structural support 5)Basement stairwell: Install a proper handrail. 0700 1)Tear off, resheath, and reroof the entire house with 25 year three-tab composition seal down shingles. Shim and level roof as much as possible. Remove chimney to below the roof line and patch the roof. Install new metal trim around perimeter gable and eave areas. 1 ". , 0900 l)Kitchen, rear hallway, utility and bathroom areas: Install tapered thresholds and metal strips as required to repair and secure the seams in the floor covering and eliminate trip hazard. 2)Living room: Repair the damaged wall areas near the south and east windows. Homeowner to complete painting. 1500 l)Install a pressure/temp 1600v1lInstall new proper extension pipe on the valve. water heater overhead service to the garage. ~ ~)Rear entry: Install a new exterior dusk to dawn or motion ~ detector security light (homeowner choice).fconnect to a new 1P switch to be located _i!JJ>,uethe entry} f;.. ~Bathroom: Insure that existing outlet located near the sink has GFI protection. ~Install new 200 amp service complete. 5)Safe up all wiring, outlets, fixtures, switches and connections throughout the house. Insure that all fixtures and connections have proper junction boxes. All three prong outlets to have proper grounding and all other outlets to have proper polarity. Insure proper bonding of all water lines. All outlets, switches, and junction boxes to have proper cover plates. v6lNE bedroom: Install (1) additional outlet. ~SW TV room: Replace defective outlet On the west wall. ~SW TV room: Install (1) additional outlet to be located on the south wall. ~iVing room: Replace (2) defective outlets near the front entry. ~0)LiVing room: Install (2) additional outlets. Homeowner to designate location. y"ll)Kitchen: Insure that the existing outlets near the sink have GFI protection. 02)Kitchen: Split out the kitchen circuit and install (1) additional outlet. ~~)Kitchen: Install a new separate circuit and outlet for the m1.crowave oven. 2 '-.' U)Install new hardwired smoke alarms with battery V'throughout the house to code. Include one (1) in the room. All smoke alarms to be inter-tied. backup SW TV ~)Basement: Install (4) new porcelain keyless ceiling light ?/fixtures and connect to a new switch to be located near the top of the stairs. ~)Insure that the oil furnace has been disconnected from the electrical service panel. ~7)Rear hallway: Install a new outlet for the refrigerator. 18)Oining/kitchen: Install a new F/A electric wall heater with ~ thermostat switch, sized to adequately heat this area. 19)NE bedroom: Install a lJftater/light combination. The ~switched separate from light. new new F/A electric ceiling thermostat switch to be ~)Bathroom: Install a new F/A electric wall thermostat switch, sized to adequately heat this heater area. with PROJECT B (HEALTH AND SAFETY/REMOVAL OF ARCHITECTURAL BARRIERS) 0400 1) Remove the concrete slab and porch floor framing and decking at the front of the house, and install a new continuous concrete slab. Include replacement of the dry rot damaged rim joist on the south side of the house and installation of new support posts, framing and T-111 siding and trim, on the porch only, to match the existing configuration. Install flashing along the exposed south wall of the house. Primer paint the new siding and trim. Homeowner to comp1et:e all other painting. 0800 1) Front entry: Modify the front door opening and install a new 36" prehung embossed panel steel insulated door package with a deadbolt, lock, and a window in the upper half. Trim and finish the interior and exterior. Stain and finish or paint the interior door and trim. Primer the exterior. Homeowner to complete all other pa1nting. PROJECT C (COST EFFECTIVE ENERGY CONSERVATION) 0800 l)Rear entry: Install a new prehung steel flush panel insulated door package with a deadbolt, lock, and window in the upper half. Trim and finish the interior and exterior. Stain and finish or paint the interior door and trim. Primer the exterior. Homeowner to complete all other paint:1ng. 3 '." . . - 2)Rear entry: Install a storm/screen door package. new aluminum framed combination Mat:erJal allowance $16iJ. iJiJ. 3) Front entry: Install a storm/screen door package. new aluminum framed combination Mat:erJal allowance $16iJ.iJiJ. 4)NE bedroom: Install (1) new vinyl framed casement window with insulating glass and (1) new vinyl framed single hung window with insulating glass. Trim and finish the interior and exterior. Stain and finish or paint the interior trim. PrJmer rho exterior. Homeowner 1:0 complete all other painCing~ Not:e: t:he casemen t: window mus t: be a proper egress wi ndow~ 5)Utility area: Install a new vinyl framed slide-by window with insulating glass on the north wall. Trim and finish the interior and exterior. Stain and finish or paint the interior trim. Primer the exterior. Homeowner eo complet:e all ot:her paJnt:Jng. 6)Bathroom: Install a new vinyl framed slide-by window with insulating obscured and tempered glass on the west wall. Trim and finish the interior and exterior. Stain and finish or paint the interior trim. Primer the exterior. Homeowner to complet:e all ot:her paJnt:Jng. Slope the interior sill for drainage and wrap the interior window frame with plastic laminant. 7)SW TV room: Install a new vinyl framed fixed window with insulating glass on the west wall. Trim and finish the interior and exterior. Stain and finish or paint the interior trim. Primer the exterior. Homeowner 1:0 compiet:e all oCher pa'1nt:ing. 8)Living room: Install (2) new vinyl framed fixed windows with insulating glass. Trim and finish the interior and exterior. Stain and finish or paint the interior trim. Primer the exterior. Homeowner to complete all other painting. 9)Dining room/kitchen: Install (1) new vinyl framed picture window with slide-by vent windows on the bottom. Trim and finish the interior and exterior. Stain and finish or paint the interior trim. Primer the exterior. Homeowner 1:0 complet:e all ocher pa.inl-ing~ 10)Center storage room: Install a new vinyl framed slide-by window with insulating glass. Trim and finish the interior and exterior. Stain and finish or paint the interior trim. Primer the exterior. H'lmeOWller 1:0 complet:e all ot:her pa-int:ing. 4 '. ,0 . 11)Basement: Replace (2) damaged window subsills and frames with treated wood and install new metal window wells with rock and gravel base for drainage. Units to be repaired are located on the west side of the house. Primer the exterior. Homeowner' 1:0 complet:e all ot:her paint:ing. PROJECT D (EXTERIOR DETERIORATION AND BLIGHTING) 1800 l)Properly prepare the exterior of the house for painting. Complete spot priming of all new and bare wood. Homeowner t:o complet:e all ot:ller pa.int:.ing. Include caulking and minor repair of siding around the perimeter of the house. PROJECT E (BUILDING CONSERVATION) 0500 l)Tighten up and properly install the existing rain gutters. Connect downspouts to the new drainage system. 1700 2)Basement: Remove the chimney flu pipe and seal off two (2) chimney breaching. PROJECT F (HEALTH AND SAFETY AND EXTERIOR DETERIORATION/DETACHED GARAGE) 0200 l)Garage: Remove vegetation around perimeter of garage and' eliminate earth/wood contact. 0600 l)Garage: Straighten the exterior walls as much as possible and install new diagonal shear bracing on all walls. 2)Garage: Install additional roof bracing to support, secure, and level the roof as much as possible. 0700 l)Garage: Re-roof the garage with 20 year 3-tab composition seal down shingles(color is homeowners choice). Include gable and eave trim and adequate overhang on the eaves. Not:e t:o cont:ract:ors: Please b1d all project:s separat:ely. Include app11cable t:ax and perm1t: Tees 1n b1ds. 5