HomeMy WebLinkAbout234 W 11th St - Building
CITY OF PORT ANGELES
LIGHT DEPARTMENT
ELECTRICAL PERMIT
N'?
16828
Port Angeles, wasb1ngton_________f_:=~~?______________________________, 19:::~2
In accordance with the City Ordinance to regulate the installation, extension, or repair of elec-
trical equipment in, on, or about any building or other structure In the City of Port Angeles, per-
mission is hereby granted to d6 electrical work as listed below.
Address ---:i(2~-u---?!:~-m------m--m-----m------- Occupancy__T___m__________m___m________u___u___
~::~~-~~~~~~~~-::~~:~~~;::2:~~;::::::::::::::.::---~::::::::::=::::::::::::::::==:::::::::::::::::::
Light Outlets....n......._._...nm____m_____.... Service, volts n__/~~-!'::?!.'?. Type of WIring:
Receptacle Outlets...._._mmm_m._m____n No. wires ....._._._.......................,;;:"... Armored Cable .__._mm..m..............
X/OtJf.//
Size wires......_._.........................._..
Main fuse n___~{.:2A1..-----...
Enclosure n.mmm..__..._m___.m..._.....
Dryer, KW..nn._..............__....__._._.._.____
Non.Metallic .n.._._m__m.........._....._
Range, KW ___00__00_._.___._.._
Knoh & Tubemnnmn_m__...________..._
RIgid Conduit 0000...........00____00.__0000_
Water Heater:
Metallic Tubing .mm..mm_m..m...
KW.m_mnn___h.nnmnnmmn__nnn_
Heat: Kw-/J.d2n1.J:"nJld___
Type of wiring:
Entrance Cable ......m..mm._..._
Motors: size, volts and phase:
Rigid Conduit ....mmmm....n___
Metallic TUbing ...'h........n.
Raceway _._.._......._................._._..._
Circuits, Light._______.____.__..______.....___.......
Utillty.mnmn...nn____nnnn.............n
Heat ___.__..._.._______.._......._........._......
SeT. NO...nn.___..n.n_.___nn_._......._._......
Range .......................____......_.____.__._.
Water Heater ...............................
Motor ____........__...._...................._....
Current transformers:
No. & Size...................._nnn..
Ser. No. ...................._..........00..0000......
Dryer..._......._.._.._........___.____._....__..__....
Furnace _.n........__............_n......._...._.._.
SeT. NO..n_.._.nnn.nn...._..___.................
Total Loadnn_...nn_..n............ Ser. NO.n....n_._.._................~.::-~hu_.~ Total ....._.._........................_.._._
I"! ".
Remarks:' _____mu/-1!l:e~.:......-,:---u:---U-"~.:.LhY.-u-k:;Zt!!ifu ~~uu__________________________u____uu.._____.__.u__....._
. ~~
___..__...n...nnn...u..__________...n.nn...n.nn..____n_.___nnn.hnnnnuu....u..hn_____.....n.nn_.nuuu._u...n......nn...n.n_unun....._.n
__u________m__m_______u____uu______mm___u______u___m_mmm__mm________________muuu_:;.:';______m______;_.u,___________________________~
;~_::_~__~::____m_______u___ ::~_~_~:__:~_~::_~_~_______ By /J{;;f"J:::c~_~/1~'-.'-~
. ./ r
, NOTICE-Current must not; be turned on until Certificate of Inspection has been issued. If work is to be con.
cealed due notice must be given the Inspector so that work may be inspected before concealment.
NOTIFY THE INSPECTOR BY PERMIT NUMBER WHEN READY FOR INSPECTION
ELECTRICAL PERMIT
N?
16828
Address_______.__............_......_...................___......_..___.____.....................___...._......._............._.._.___.____....Date..._._._______.._.._.........._......_......_.....__..
;."'....,
Owiler_.......____________..............._....__.._____.._..._.__.___.____._....____.._n_...._..._...____________.._____.........Tenant._._....._._.._._________._.._..___.__._.._.........._...._h.______
. Wiring Contractor ..............._.__.____....._.......___~....-......-...........................__.__..._________................._._.____ By......_.______._..___...._..................................._
\~.
r
NOTICE-Current must not .be'turned on until Certificate of Inspection has been issued. If work Is to be con.
cealed due notice must be given the Inspector so that work may be inspected before concealment.
1M Olympic Printers, Inc.