HomeMy WebLinkAbout416 S Chambers St - Building
I1~U
.
CITY OF PORT ANGELES LIGHT DEPARTMENT
321 E. Fifth Street
Port Angeles, WA 98362
(206) 457-0411
Sile Address:
Installed By:
Owner/Business:
Owner/Business Address:
ELECTRIC HEAT
o BASEBOARD KW -
o FURNACE KW -
o HEAT PUMP KW_
o FAN/WALL KW -
DetailslDescription: --nil .
I 'f tSc .
fl1--
e ,
.
ELECTRICAL PERMIT
~
PERMIT NO. 6"(;) 1 L
7" /~~/7..s
DATE
o READY FOR
INSPECTION
License Number:
o WILL CALL FOR
INSPECTION
Phone:
~RESIDENTIAL
o COMMERCIAL
o NEW CONSTRUCTION
J'1. REMODEL
J! ADD/ALTER CIRCUITS
o SERVICE UPGRADE/REPAIR
o TEMPORARY SERVICE
Phone:
Sq. Ft.
o RISER
o OVERHEAD SERVICE
o UNDERGROUND SERVICE
VOLTAGE:
oql 03Jl1
SERVICE SIZE
FEEDER SIZE
AMPS
AMPS
:/-0
rfJ, ~~. '4.r) /W'.M9ILdi~1
d~~ ej~.
DATE
W.S. No. SERVICE SIZE
CAPACITY:
o O.K. 0 NOT O.K.
ACTION REQUIRED: 0 CHANGE TRANSFORMER
o INSTALL SERVICE POLE
ENGR.
o OVERHEAD SERVICE APPROVED
o CHANGE SERVICE WIRE
o OTHER
PINK - Top: Eng, Bottom, Customer
Permit/Receipt No.
S07'L
New Meters
J---
Notify Port Angeles City Light by Street Address and Permit Number when ready for inspection. Work must not be covered
before inspection and O.K. for covering has been given by the electrical inspector in writing on either the Wiring Report
or on the Building Permit. PHONE 457-0411, EXT. 224. j(j
T~ NO OCCUPANCV OR USE ESTABLISHED UNDER THIS PERMIT $ !r ~D
Electrical Inspector Permit Fee
o Ditch Inspection O.K.
o Rough-in/cover O.K.
J~O O.K. to connect service
fV' 1fFinal O.K.
Installer:
.
WHITE - File by address
OLYMPIC PRINTERS INC.
GREEN _ Top: Meter Dept., Bottom: City Hall
04/21195
08:08
'3'2064521618
Alty PT Angeles
@002
.
J
~l)lnstall (2) exterior GFI protected outlets. (1) each at
~ front and rear of house. Consult homeo~ner for location.
2)Kitchen: Install a separate cir~uit. outlet, and.~iring
for the microwave oven. Homeo~ner to designate location.
3)Utility rOOm: Install a new Zq" electric baseboard heater
~nd thermostat s~ltch.
q)Mai~ floor bathroom: Install a ne~ Gel protected outlet
near the sink.
5)Install new hardwired smoke alarms with battery backup
throughout house to code. Minimum: (1) in each bedroom, (1)
in the upper hallway, and (1) in the lower hallway. All
smoke alarms to be inter-tied.
6)Upper hallway area: Install a new ceiling or wall mount
light fixture and connect to new 3-way switches. one (1)
each at Upper and lower levels.
7)Upper south bedroom: Install (~) new outlets. Homeowner to
designate location.
8)Upper south bedroom: Install a new ceiling light fixture
and connect to a new switch to be loc3ted near the doorway.
9)Rear entry: Insure that the breaker panel is properly
wired and labeled.
10)Rej~ entry: In~tall a new exterior light and connect to a
new switch to replace existing defective swItch.
11)NE main floor bedroom. Properly secure the baseboard
~" heater on the east wall.
lZ)Upper north bedroom: Install (1) new ceiling light and
connect to a new switch to be located near the doorway.
13)Insure that all 2-prong outlets throughout the hOuse have
proper polarity. All 3-prong outlets to have proper
grounding.. InSure thet all fixtures. outlets, and
connections hav. proper Junction boxes. Insure proper
grounding for all water. lines. All outlets. switches, and
junction boxes to have co~er plates.
9\f
14)Living room. Properly install (1) hew outlet on the wj~t
wall to replace cn existing outlet.
15)Garage. Install (1) new outlet on the north wall to
replace an existing outlet. Insure that it is properly
and working.
.)7--
3
-?---eJ
~,
--
Cf"'1
l..:.i red
~.5
3~rO~ (j/
-..0-
2
08:09
'8'2064521618
Aity PT Angeles
f4J 003
1
.... 04(21/95
i
I
I
16)Garage: Install (2) new 2-1ight motion detector fixtures.
One (1) each at the N~ and NE corners of the garage.
1700 l)Clean out the wood stove chimney.
2)Safe up wood stove: ie., insure that all pipe connections
are properly screwed together.
,.
PROJECT B (Exterior deterioration and bliQhtinQ)
I 0100 l)Tear off, re-sheath and re-roof the entire house with 25
year 3-tab composition seal down roofing. Include, tear off
. and re-roof the low slope garage area with torch down
roofing.
PROJECT C (EnerQV cQnservation)
0600 l)Kitchen: Install flashing or metal drip edge and caulk
along the top of the greenhouse window trim, to eliminate
leaks.
0S0e l)Utility: Install a new pre-hung steel insulated door
package with a deadbolt, lock, window in the upper half, and
magnetic or bulb type weather stripping. Trim and finish the
inter!o~ and exterior. Stain and finish or paint the door
and trim.
2)Utility: Install a new aluminum framed combination
.~ storm/screen door package.
3)Front entry: Install a new pre-hung steel insulated door
package with a deadbolt, look, peephole, and magnetic or
bulb type weather etripping. Trim and finish the interior
and exterior. SCain and finish or paint the door and trim.
Noee: Franc and rear enery doors co be keyed alike.
4)Front entry: Tnstall d new aluminum framed combination
storm/screen door p~ckage..
5)Kitchen: Replace the large section of insulating glass ~n
the green house window.
3
.r- /o..f
rV~~<~ _<~b //
.- . 3~U
".-
:?-
;"
..
04/21/95 .08: 11
5'2064521618
Ai ty PT Angeles
~004
5)Bathroom: Install a new vinyl framed casement window with
insulating, tempered and obscured glass. Trim and finish the
interior and exterior. Stain and finish or paint the trim.
glope int<!rior sill for proper' drainage.
109 )Main floor bathroom: Install a new properly vented ceiling
exhaust fan/light combination. Fan and light to be
connected to new separate switches to be located near the
doorway.
,
1690 l)Main floor bathroom: Re-install the toilet after the new
flooring has been instalied.
PRO~ECT 0 (Bul1dinq conservation)
1600 l)Kitchen: Install shutoff valves for the hot and cold water
lines servicing the kitchen sink,
2)Install a
curb to the
Water lines
water lines
new water line from the shutoff near the city
crawl space. Include replacement of accessible
throughout the crawl space. Insulate all ne~
in the crawl space area.
PRO~
on)
IIGBII
deck at the rear entry.
e landing, footings, support
erimeter of deck and steps.
or painting.
..;:-.;"
119011
curtain rods for the
drooms: In5t~1 ew curtains and curtain
bedroom windows (2).
3)Kitch Install miniblinds on all
:~cont:r..ct:or t:o provId,e allowanc:e f'or cur. Ins.
(3) .
Contractor t:o Lnc1ude ~pp1Lcable Cax and,permIt fees in bId.
"15
o~ 1/
'3~~. U
d-
4
-
yo ~,;
~
04/21195
"
{
08:06
'8'2064521618
I4J 001
Ai t;y PT Angeles
PORT ANGELES HOUSING REHABILITATION PROGRA~
129 E 1st St
Port Angeles, WA98362
Telephone #452-2823
February 9, 1995 (revised Feb. 15, 1995)
Final worklist specifications for:
,
Jill Coughenour (94PA82)
416 S Chambers
Port Angeles. WA 98362
Telephone #452-5847
PROJECT A (Health and Safety repairs)
0400
~09
/!or--
~
0999
.,.-.~
l)Garage entry: Install a concrete step and pad. (approx.
48"x48")
l)Install (3) interior passage door knobs. (1) each at upper
bedroom doorways and the lower sta1rwell doorway. These will
not be privacy locks.
2)Uppar stairwell: Install a handrail.
l)Kitchen/utility areas: Install new unde~layment aAd sheet
vinyl floor covering.
2)Bathroom: Install new underlayment and sheet vinyl floor
covering.
3)Living room, main floor hallway. and main floor bedrooms:
Refinish and seal the hardwood floors. Include repair of the
hallway floor.
4)Front entry: Refinish and seal the hardwood parkay
flooring. Include i~stallation of a metal strip ~r beveled
edge between li~ing~room and hallway.
5)/llain floor bathroom: Install a new 3-piece fiberglass__or
plastic laminant tub enclosure. Include water re~i6tant .
sheetrock in the tub area and a soap dish and 24" stainless
steel safety hand rail.: HomeoCJner ~o comple~e ba~hroom
"IMIna- ~ ~ q-;~,)
Phone' Phone'~ ;2,-:i{.f37
FaXl4!fi -'~1/"3 Fax'45".<,,-'/bl
I
Site Address:
I
Installed By:
CITY OF PORT ANGELES
LIGHT DEPARTMENT
.
ELECTRICAL PERMIT
PERMIT NO. ); ~y
DATE ~ ]2f/
t /
o READY FOR
INSPECTION
f~ILL CALL FOR
INSPECTION
Phone:
License Number:
Owner/Business:
I
Phone:
Owner/Business Address:
I
Sq. Ft.
rY Residential
1'Heat KW
,
[] Baseboard 0 Furnace/Boiler
ib Heatpump 0 Other
ib Commercial/Industrial load
I Total Connected load
, (attach breakdown)
i Total Motor load
(attach breakdown)
~New Construction
o Remodel
o Service update/alter/repair
o Add/alter circuits
o Auxiliary power
(list below)
o Special equipment
(list below)
o Overhead
o Underground prO
Voltage 1c;kt1. ~
tr':10 D3.0~
!Se'rvice size .LJ Amps
o Temporary
DetailslDescription:
(~z
hJ;c.e
~/J
/
'tJ~,
.
W.S'. No. Service
Capacity: 0 O.K. 0 Not O.K.
o Ditch inspection O.K.
Ij'ORough-in/cover O.K.
o O.K. to connect service
1n iinal O.K.
Size
Comments
Date
Hold for: 0 Easement 0 Letter
o Signed up for service/meter
o Meter Department notified for installation
o Fire Department notified of inspection
o Plan Review approved/pending
Site Address:
'/6 ~.
.
I
Notify the Department Cit ight by Street Address and Permit Number when ready for inspection. Work
must not be covered or electrically energized before inspection and O.K. for covering or service has been given
by the Inspector in Writing on the Wiring Report or the Building Permit. PHONE 457.041]; EXT.158 or EXT. 224.
~I ~ . NO OCCUPANCY OR USE ESTABLISHED UNDER THIS PERMIT if/' ,;;2 0 !J:f2
I Inspector Amount paid
WHITE - file by address YELLOW - file by number PINK - Top: Eng, Bottom: Customer GREEN - Top: Inspector, Bottom: City Hall
.uL uu__ ...