Loading...
HomeMy WebLinkAbout416 S Chambers St - Building I1~U . CITY OF PORT ANGELES LIGHT DEPARTMENT 321 E. Fifth Street Port Angeles, WA 98362 (206) 457-0411 Sile Address: Installed By: Owner/Business: Owner/Business Address: ELECTRIC HEAT o BASEBOARD KW - o FURNACE KW - o HEAT PUMP KW_ o FAN/WALL KW - DetailslDescription: --nil . I 'f tSc . fl1-- e , . ELECTRICAL PERMIT ~ PERMIT NO. 6"(;) 1 L 7" /~~/7..s DATE o READY FOR INSPECTION License Number: o WILL CALL FOR INSPECTION Phone: ~RESIDENTIAL o COMMERCIAL o NEW CONSTRUCTION J'1. REMODEL J! ADD/ALTER CIRCUITS o SERVICE UPGRADE/REPAIR o TEMPORARY SERVICE Phone: Sq. Ft. o RISER o OVERHEAD SERVICE o UNDERGROUND SERVICE VOLTAGE: oql 03Jl1 SERVICE SIZE FEEDER SIZE AMPS AMPS :/-0 rfJ, ~~. '4.r) /W'.M9ILdi~1 d~~ ej~. DATE W.S. No. SERVICE SIZE CAPACITY: o O.K. 0 NOT O.K. ACTION REQUIRED: 0 CHANGE TRANSFORMER o INSTALL SERVICE POLE ENGR. o OVERHEAD SERVICE APPROVED o CHANGE SERVICE WIRE o OTHER PINK - Top: Eng, Bottom, Customer Permit/Receipt No. S07'L New Meters J--- Notify Port Angeles City Light by Street Address and Permit Number when ready for inspection. Work must not be covered before inspection and O.K. for covering has been given by the electrical inspector in writing on either the Wiring Report or on the Building Permit. PHONE 457-0411, EXT. 224. j(j T~ NO OCCUPANCV OR USE ESTABLISHED UNDER THIS PERMIT $ !r ~D Electrical Inspector Permit Fee o Ditch Inspection O.K. o Rough-in/cover O.K. J~O O.K. to connect service fV' 1fFinal O.K. Installer: . WHITE - File by address OLYMPIC PRINTERS INC. GREEN _ Top: Meter Dept., Bottom: City Hall 04/21195 08:08 '3'2064521618 Alty PT Angeles @002 . J ~l)lnstall (2) exterior GFI protected outlets. (1) each at ~ front and rear of house. Consult homeo~ner for location. 2)Kitchen: Install a separate cir~uit. outlet, and.~iring for the microwave oven. Homeo~ner to designate location. 3)Utility rOOm: Install a new Zq" electric baseboard heater ~nd thermostat s~ltch. q)Mai~ floor bathroom: Install a ne~ Gel protected outlet near the sink. 5)Install new hardwired smoke alarms with battery backup throughout house to code. Minimum: (1) in each bedroom, (1) in the upper hallway, and (1) in the lower hallway. All smoke alarms to be inter-tied. 6)Upper hallway area: Install a new ceiling or wall mount light fixture and connect to new 3-way switches. one (1) each at Upper and lower levels. 7)Upper south bedroom: Install (~) new outlets. Homeowner to designate location. 8)Upper south bedroom: Install a new ceiling light fixture and connect to a new switch to be loc3ted near the doorway. 9)Rear entry: Insure that the breaker panel is properly wired and labeled. 10)Rej~ entry: In~tall a new exterior light and connect to a new switch to replace existing defective swItch. 11)NE main floor bedroom. Properly secure the baseboard ~" heater on the east wall. lZ)Upper north bedroom: Install (1) new ceiling light and connect to a new switch to be located near the doorway. 13)Insure that all 2-prong outlets throughout the hOuse have proper polarity. All 3-prong outlets to have proper grounding.. InSure thet all fixtures. outlets, and connections hav. proper Junction boxes. Insure proper grounding for all water. lines. All outlets. switches, and junction boxes to have co~er plates. 9\f 14)Living room. Properly install (1) hew outlet on the wj~t wall to replace cn existing outlet. 15)Garage. Install (1) new outlet on the north wall to replace an existing outlet. Insure that it is properly and working. .)7-- 3 -?---eJ ~, -- Cf"'1 l..:.i red ~.5 3~rO~ (j/ -..0- 2 08:09 '8'2064521618 Aity PT Angeles f4J 003 1 .... 04(21/95 i I I 16)Garage: Install (2) new 2-1ight motion detector fixtures. One (1) each at the N~ and NE corners of the garage. 1700 l)Clean out the wood stove chimney. 2)Safe up wood stove: ie., insure that all pipe connections are properly screwed together. ,. PROJECT B (Exterior deterioration and bliQhtinQ) I 0100 l)Tear off, re-sheath and re-roof the entire house with 25 year 3-tab composition seal down roofing. Include, tear off . and re-roof the low slope garage area with torch down roofing. PROJECT C (EnerQV cQnservation) 0600 l)Kitchen: Install flashing or metal drip edge and caulk along the top of the greenhouse window trim, to eliminate leaks. 0S0e l)Utility: Install a new pre-hung steel insulated door package with a deadbolt, lock, window in the upper half, and magnetic or bulb type weather stripping. Trim and finish the inter!o~ and exterior. Stain and finish or paint the door and trim. 2)Utility: Install a new aluminum framed combination .~ storm/screen door package. 3)Front entry: Install a new pre-hung steel insulated door package with a deadbolt, look, peephole, and magnetic or bulb type weather etripping. Trim and finish the interior and exterior. SCain and finish or paint the door and trim. Noee: Franc and rear enery doors co be keyed alike. 4)Front entry: Tnstall d new aluminum framed combination storm/screen door p~ckage.. 5)Kitchen: Replace the large section of insulating glass ~n the green house window. 3 .r- /o..f rV~~<~ _<~b // .- . 3~U ".- :?- ;" .. 04/21/95 .08: 11 5'2064521618 Ai ty PT Angeles ~004 5)Bathroom: Install a new vinyl framed casement window with insulating, tempered and obscured glass. Trim and finish the interior and exterior. Stain and finish or paint the trim. glope int<!rior sill for proper' drainage. 109 )Main floor bathroom: Install a new properly vented ceiling exhaust fan/light combination. Fan and light to be connected to new separate switches to be located near the doorway. , 1690 l)Main floor bathroom: Re-install the toilet after the new flooring has been instalied. PRO~ECT 0 (Bul1dinq conservation) 1600 l)Kitchen: Install shutoff valves for the hot and cold water lines servicing the kitchen sink, 2)Install a curb to the Water lines water lines new water line from the shutoff near the city crawl space. Include replacement of accessible throughout the crawl space. Insulate all ne~ in the crawl space area. PRO~ on) IIGBII deck at the rear entry. e landing, footings, support erimeter of deck and steps. or painting. ..;:-.;" 119011 curtain rods for the drooms: In5t~1 ew curtains and curtain bedroom windows (2). 3)Kitch Install miniblinds on all :~cont:r..ct:or t:o provId,e allowanc:e f'or cur. Ins. (3) . Contractor t:o Lnc1ude ~pp1Lcable Cax and,permIt fees in bId. "15 o~ 1/ '3~~. U d- 4 - yo ~,; ~ 04/21195 " { 08:06 '8'2064521618 I4J 001 Ai t;y PT Angeles PORT ANGELES HOUSING REHABILITATION PROGRA~ 129 E 1st St Port Angeles, WA98362 Telephone #452-2823 February 9, 1995 (revised Feb. 15, 1995) Final worklist specifications for: , Jill Coughenour (94PA82) 416 S Chambers Port Angeles. WA 98362 Telephone #452-5847 PROJECT A (Health and Safety repairs) 0400 ~09 /!or-- ~ 0999 .,.-.~ l)Garage entry: Install a concrete step and pad. (approx. 48"x48") l)Install (3) interior passage door knobs. (1) each at upper bedroom doorways and the lower sta1rwell doorway. These will not be privacy locks. 2)Uppar stairwell: Install a handrail. l)Kitchen/utility areas: Install new unde~layment aAd sheet vinyl floor covering. 2)Bathroom: Install new underlayment and sheet vinyl floor covering. 3)Living room, main floor hallway. and main floor bedrooms: Refinish and seal the hardwood floors. Include repair of the hallway floor. 4)Front entry: Refinish and seal the hardwood parkay flooring. Include i~stallation of a metal strip ~r beveled edge between li~ing~room and hallway. 5)/llain floor bathroom: Install a new 3-piece fiberglass__or plastic laminant tub enclosure. Include water re~i6tant . sheetrock in the tub area and a soap dish and 24" stainless steel safety hand rail.: HomeoCJner ~o comple~e ba~hroom "IMIna- ~ ~ q-;~,) Phone' Phone'~ ;2,-:i{.f37 FaXl4!fi -'~1/"3 Fax'45".<,,-'/bl I Site Address: I Installed By: CITY OF PORT ANGELES LIGHT DEPARTMENT . ELECTRICAL PERMIT PERMIT NO. ); ~y DATE ~ ]2f/ t / o READY FOR INSPECTION f~ILL CALL FOR INSPECTION Phone: License Number: Owner/Business: I Phone: Owner/Business Address: I Sq. Ft. rY Residential 1'Heat KW , [] Baseboard 0 Furnace/Boiler ib Heatpump 0 Other ib Commercial/Industrial load I Total Connected load , (attach breakdown) i Total Motor load (attach breakdown) ~New Construction o Remodel o Service update/alter/repair o Add/alter circuits o Auxiliary power (list below) o Special equipment (list below) o Overhead o Underground prO Voltage 1c;kt1. ~ tr':10 D3.0~ !Se'rvice size .LJ Amps o Temporary DetailslDescription: (~z hJ;c.e ~/J / 'tJ~, . W.S'. No. Service Capacity: 0 O.K. 0 Not O.K. o Ditch inspection O.K. Ij'ORough-in/cover O.K. o O.K. to connect service 1n iinal O.K. Size Comments Date Hold for: 0 Easement 0 Letter o Signed up for service/meter o Meter Department notified for installation o Fire Department notified of inspection o Plan Review approved/pending Site Address: '/6 ~. . I Notify the Department Cit ight by Street Address and Permit Number when ready for inspection. Work must not be covered or electrically energized before inspection and O.K. for covering or service has been given by the Inspector in Writing on the Wiring Report or the Building Permit. PHONE 457.041]; EXT.158 or EXT. 224. ~I ~ . NO OCCUPANCY OR USE ESTABLISHED UNDER THIS PERMIT if/' ,;;2 0 !J:f2 I Inspector Amount paid WHITE - file by address YELLOW - file by number PINK - Top: Eng, Bottom: Customer GREEN - Top: Inspector, Bottom: City Hall .uL uu__ ...