Loading...
HomeMy WebLinkAbout1115 E Front St - Engineering CITY OF PORT ANGELES DEPARTMENT OF COMMUNITY DEVELOPMENT - BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 A~plication Nlnnb~r ..... 03-00001092 Date 12/03/03 Property Address ...... 1118 E FRONT ST ASSESSOR PARCEL NUMBER: 06-30-00-8-1-0445-0000- Application description . . . CO~ NEW ~NST Property Zoning ....... CO~ERCI~ ~T~I~ ~licagion valuat ion .... 589610 Contractor ~ NI~OLS PROPERTIES LBR ~NSTRUCTION 330 E ~0~ ST 618 SO P~ODY ~RT ~O~ES WA 983620104 ~RT ~GELES WA 98362 ...... St~cture Info~ation ~W 8531SF OFFI~ B~ ..... Q~y Unit ~tge Per B~g FB~ gxgeneion600.00 Oey Unit C~e Ve~ ~teneion 1.00 45.0000 ~CH RIG~ OF ~Y P~IT 45.00 ............................................................................ ~ditio~l desc . . ............................................................................ ~ditio~l ............................................................................ Separate Perm~ts 8~e reqcred ~0~ e[ectdca~work, S5PA, Sho[e[ine, 5SA, u[~lJti8s, 0fivste 8nd public ~mproveme~ts./h~s permit becomes nub and void ~ work ot coustructioo 8uthodzed Js not commenced w~[hin ~ 80 day~, ~f construction or work ~s ~usDended or abandoned for a Dedod o~ ~ 80 da~s 8~er the work as commenced, or i~ required inspections here ~0~ bee~ [eques%ed w~thin ~ 80 da~s from the last ;nsDec~on. ~ hereby ce~ thst ~ have read amd exsm~ed th~s ao~]ca[~ou 80d kuow the ssme to be true aod correct AI~ ptov~s~oss of ~aws and ord~nsoces ~ovem~n~ this type of work wJ}l be comp~ed with whethec sDecified bere~n or sol The ~rant~u~ of s permit does not presume ~o-~]ve 8uthodty to v~o}ste or ca~ce~ the provisions of any s~ate o[ ~0c8~ ~sw regu~stJn~ construction or ~he pedot~8uce of constrff~5 Signat6~*~f Contractor or Authorized Agent Date Signature of Owner (if owner is builder) Date BUILDING PERMIT INSPECTION RECORD ' ' CALL 417-4815 FOR BU1LD]NG INSPECTIONS. CALL 417-4735 FOR ELECTRICAL INSPECTIONS. PLEASE PROVIDE A MINIMUM 24 HOUR NOTICE. IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT IN A CONSPICUOUS LOCATION KEEP PERMIT CARD AND APPROVED PLANS AT JOB SITE. INSPECTION TYPE DATE ACCEPTED COMMENTS YES I NO FOUNDATION: FOOTINGS WALLS FOUNDATION DRAINAGE/DOWN SPOUTS ELECTRICAL (LIGHT DEPT) SEPARATE PERMIT: # PLUMBING UNDER FLOOR / SLAB CITY OF PORT ANGELES DEPARTMENT OF COMMUNITY DEVELOPMENT - BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 Page 2 Application Number ..... 03-00001092 Date 12/03/03 Other Fees ......... STATE SURCHARGE 4.50 Fee summary Charged Paid Credited Due Permit Fee Total 875.00 875.00 .00 .00 Plan Check Total .00 .00 .00 .00 Other Fee Total 4.50 4.50 .00 .00 Orand Total 879.50 879.50 .00 .00 Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned for a period of 180 days after the work as commenced, or if required inspections have not been requested within '180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. Signature of Contractor or Authorized Agent Date Signature of Owner (if owner is builder) Date T:~PLANNING\FORMS\] ]02.15 [[ ]/]4/2003] BUILDING PERMIT INSPECTION RECORD CALL 417-4815 FOR BUILDING INSPECTIONS. CALL 417-4735 FOR ELECTRICAL INSPECTIONS. PLEASE PROVIDE A MINIMUM 24 HOUR NOTICE. IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT IN A CONSPICUOUS LOCATION. KEEP PERMIT CARD AND APPROVED PLANS AT JOB SITE. INSPECTION TYPE I DATE ACCEPTED COMMENTS YES I NO FOUNDATION: FOOTINGS WALLS FOUNDATION DRAINAGE/DOWN SPOUTS ELECTRICAL (LIGHT DEPT) SEPARATE PERMIT: g PLUMBING UNDER FLOOR / SLAB ROUGR-1N WATER LINE (METER TO BLDG) GAS LINE BACK FLOW / WATER AIR SEAL WALLS CEILING FRAMING JOISTS / GIRDERS SHEAR WALL/HOLD DOWNS WALLS / ROOF / CEILING DRYWALL (INTER]OR BRACED PANEL ONLY) T-BAR INSULATION WALL / FLOOR / CEILING M ECItAN1CAL HEAT PUMP GAS LINE WOOD STOVE / PELLET / CHIMNEY ROOD / DUCTS PW UTILITIES / SITE WORK (Engineering Division) SEPARATE PERMIT #'s: WATERLINE / METER SEWER CONNECTION SANITARY STORM PLANNING DEPT. SEPARATE PERMIT #'s SEPA: PARKING/LIGHTING ESA: LANDSCAPING SHORELINE: FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE RESIDENTIAL DATE YES NO COMMERCIAL DATE ACCEPTED YES NO ELECTRICAL - LIGHT DEPT. 417-4735 ELECTRICAL LIGHT DEPT CONSTRUCTION R,W. / PW/ CONSTRUCTION- R.W. ~/~/ ' ~'~f~'r ENGINEER]NG 417-4807 PW / ENGINEERING FIRE 417-4653 FIRE DEPT. PLANNING DEPT. 417-4750 PLANNING DEPT. BUILDING 417-4815 BUILDING T:\PLANNING\FORIVlS\ 1102.15 [ I 1 / 14/20031 ~ f pORT ~ ^..O~"':<;. ."~'" W~ "- &;:;;.a ~ "41;~ CITY OF PORT ANGELES DEPARTMENT OF COMMUNITY DEVELOPMENT _ BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 = o 3-/ DQ2.- Application Number Property Address ASSESSOR PARCEL NUMBER Application description Subdivision Name Property Zoning Application valuation Owner 03-00001092 Date 12/03/03 1115 E FRONT ST 06-30-00-8-1-0445_0000_ COMM NEW CONST COMMERCIAL ARTERIAL 589610 Contractor ------------------------ ------------------------ GASE NICHOLS PROPERTIES 330 E FRONT ST PORT ANGELES ( 36) 452-5403 Structure Information Construction Type Occupancy Type Other struct info ---------------------------------------------------------------------------- Permit Additional desc Permit Fee Issue Date Expiration Date LBR CONSTRUCTION 618 SO PEABODY PORT ANGELES (360) 452-1232 NEW 8531SF OFFICE BLDG TYPE V NON-RATED BUSINESS OFF/PRO/MED/REST NUMBER OF UNITS 1 00 WA 983620104 WA 98362 PUBLIC WORKS COMM WATER SERV 2" FIRE SPRINKLER LINE 600 00 Plan Check Fee 12/03/03 Valuation 6/01/04 00 o Qty Unit Charge Per Extensio~ ---------------------------------~~~_:~~--------------------------~) Permit Additional desc Permit Fee Issue Date Expiration Date RIGHT OF WAY SIDE WALK, ALLEY 45 00 12/03/03 6/01/04 IMPROVMENTS Plan Check Fee Valuation 00 589610 Qty Unit Charge Per 1 00 45 0000 ECH RIGHT OF WAY PERMIT E~ 45.0 ---------------------------------------------------------------------------- .-. l Permit Additional desc Permit Fee Issue Date Expiration Date SANITARY SEWER HOOK UP 95 00 12/03/03 6/01/04 Plan Check Fee Valuation 00 589610 6~ I1\S ~~~ n:~ pi- ~ a~ 10'2 7230 322/032- ;f12.0D ~ c:2 fiX Z. /1 ~ ~~ Qty Unit Charge Per Ex~ ~ ~ 1 00 95 0000 EA SAN SEWER HOOKUP ~ k-~ ---------------------------------------------------------------------------- Permit Additional desc Permit Fee Issue Date Expiration Date SANITARY SEWER HOOK UP 135 00 12/03/03 6/01/04 Plan Check Fee Valuation 00 589610 Qty Unit Charge Per Extension 3 00 45 0000 EA STORM DRAIN C/B C 135 00::::::> ------------------------------------------------------------------ - - Special Notes and Comments Address numbers shall be plainly visible from the street Address numbers shall be a minimum of six inches high and be in contrast in color of there background Separate Permits are required for electrical work, SEPA, Shoreline ESA, utilities, private and public improvements. This permit becomes null and void jf work or construction authorized is not commenced within 180 days if construction or work is Suspended or abandoned for a period of 180 days after the work as commenced or if required inspections have not been requested within 180 days from the last inspection , hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume -to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of constructi .~ T'\PLANNINGIFORMSIII02.15 [11/14/2003J '- /2 Date Signature of Owner (if owner is builder) Date ~. f pORT ~ $~O~~~ ha ~ ---- - "41;,,~ ..)i .,c,;", .~, CITY OF PORT ANGELES DEPARTMENT OF COMMUNITY DEVELOPMENT _ BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 Application Number 03-00001092 Page :2 Date 12/03/03 ---------------------------------------------------------------------------- Other Fees STATE SURCHARGE 4 50 Fee summary Charged Paid Credited Due ----------------- ---------- ---------- ---------- ---------- Permit Fee Total 875 00 875 00 00 00 Plan Check Total 00 00 00 00 Other Fee Total 4 50 4 50 00 00 Grand Total 879 50 879 50 00 00 Separate Permits are required for electrical work, SEPA, Shoreline ESA, utilities private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days if construction or work is suspended or abandoned for a period of 180 days after the work as commenced, or if required inspections have not been requested within 180 days from the last inspection I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction Signature of Contractor or Authorized Agent Date Signature of Owner (if owner is builder) Date T'\PLANNINGIFORMSII 102.15 [11/14/2003J ..... CITY OF PORT ANGELES DEPARTMENT OF PUBLIC WORKS . INSPECTION REPORT. . . . . . ..... REQUEST Date L - ? -C> <-{ Time A 'YI Received by (phone, person) Location of Work to be inspected 1//6> E F /Z.ncZ: Name of person requesting inspection C ~ ~I e;t6. Address of person requesting inspection Phone No Type of Inspection (circle appropriate one) Permit No Sewer Foundation Framing Chimney Plumbing Final \S~wer Exc~ Other '--------- (/~-/~c72- INSPECTION NOTES Inspected Remarks Date I - 2 - 0 <...1 L.O'~'l' t f.....-' I Time 1::::'- tv 1 ') 8 ,,-,--.j))~r y -,- I .... I I -+____ ...(" .",- -1{\ 0- -~ \ \ I i RESTORATION REQUIRED \- - YES NO Y I I ~ ~ :..i i' t. r- L_ -:~i r= r 0"1 r / G eo Y' J I Q. V' a .., II e... y /". f' y S 1 d (" " 4 ~d ~ "9 L..'L" I ~) 3 Co C>' I I V) \, c. ) ~ I 1 I L_ ,;> y~ o /" -r:-- (' '" " -z (. ( - i -_L ' rv (\) (',t" S' \\..1', c r=-;-:;r~! SURFACE RESTORATION SURFACE TYPE 0 Unimproved 0 Gravel 0 Asphalt 0 PCC o Other o Repaired by City o Repaired by Permittee [] No Damage Found Work Order # o COMPLETE o INCOMPLETE (Continue on reverse side if necessary) STREET SUPERINTENDENT (DATE) CITY OF PORT ANGELES DEPARTMENT OF PUBLIC WORKS . . . . . . . . . . . INSPECTION REPORT . . . . . . . . . . . REQUEST Date / A -( q - 6 7 Time , Received by (phone, person) location of Work to be inspected - ,n;. ~ if: I~rc Y/;+-- ,J. Name of person requesting inspection , , , '. _:_ _ T 4..J ( / Cd ~ Address of person requesting inspection 11M if) LA.. J~ -;f-e ~ ' Phone No ' Type of Inspection (circle appropriate one) Permit No O~-/O tf ~ Sewer Foundation Framing Chimney Plumbing Final Sewer Excav Other t .A.JG(:f--t't~ INSPECTION NOTES Inspected Remarks Date ()lJ }..tc Time , By ~All~~ 9,1( ~~~-eYU/~ c- ,hJ ~;i ((? 1./4/~ 941-'?~~ !V{) RESTORATION REQUIRED YES ~- NO'-"" VttluJof; {).' ~-J'.e ~ J..(~ C-~ X'p'jJ.i€ Nt ~~ ~ t ~ o / ':) cr {' Fnm+ s-+- L,\ ~ ~ SURFACE RESTORATION SURFACE TYPE 0 Unimproved 0 Gravel o Repaired by City CJ Repaired by Permittee Cl No Damage Found j o Asphalt 0 PCC 0 Other Work9rder # -..)17 5 12~ 6~ ~MPLETE o INCOMPLETE (Continue on reverse side if necessary) STREET SUPERINTENDENT (D~ I Annette Owens:rnove water serVice .'-'-----~~..~""'-'-.-----'--'--'-.. Page 1 I From To Date. Subject: Trenia Funston Annette Owens Tuesday, December 23, 2003 2.30PM move water service LBR Construction has the building contract for the new Coldwell Banker site on Front Street. They are asking to have the most easterly (existing) water meter moved about 10' west of it's present location. I said this would be a time & material job C & J will be working on the site next week. They will put a stake in the ground to indicate new proposed location Water card will be in the mail. thanks TF ? tJn". ~~ ::::1J:\\:~~. ~.:~L ~/~/ ? - /.-~- %'// .:....,/" ,/ '-...J... '-1 UJ- REQ7,.T" CREW LOCATION GEN LOC REQ DEPT REQUESTOR USER ID 1115 E .c:u...&.':j '- -L. \.... 0 WORK REQUEST WF0014537 I 001 PROJECT PW-Drinking Water Owens AOWENS AUTH AOWENS Front St - Move water service PAGE REQUEST DATE PRINT DATE PRINT TIME SCHEDULE START COMPLETION REF NBR Medium Staff Routine 1 1/16/04 1/16/04 10 46 07 DATES 1/20104 1/23/04 LOC ID PRIORITY ORIGIN WORK TYPE =============================================================================== REQUEST COMMENTS Move most Easterly existing water meter about 10' West of present location, out of driveway location TIME & MATERIAL JOB COST! ! ============================================================================== 1115 E Front St Category code Task coae Facility ID Assigned Department Start time - Relocate water meter Water Dist System Relocate PW-Drinking Water ~ ac p~ DWDS RELO Stop time 2-- ov P #-\.. ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- START DATE ~I --1:.21 ~ UNIT OF PRODUCTION Each .N L ( Se" V ,-c.. e. ( iA.. <;'4.. d... -t i 0 II\.. -LI -Ill O'f- QUANTITY 5e ~- i) ( ce. Y C "^-D vc,--- \ COMPLETION DATE [ 3/'-1('{' cu.-\..6.. ( ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- LABOR EQUIPMENT MATERIAL EMPLOYEE HRS NUMBER HRS ITEM QTY COST lev-v"Y \rJ L (1't'?.. ~L- 25xJ:rc...L' 5~J.\.L V"" ~ !d. aOf {)~~\.V\(., E-. -Z:... (75("''/ -:z- '~Cb~p ~/~ 13. '15 [kv\.,-, rL F ~ L- II' qo" v' I I ,81 yVt(-k~ B - 2- if' fVlt"lL /~t5T ~ 8.13 PlU"L .!~._A_~..._ ~...............~.-~~~-~~+~-~-~~~~~-----~.~~;r~ .h> ti:;iP- lit X 3~" Met,,"' ~"fte'-5 v{ 4 If 7 e....J-- 578"t' y1~t-et- / I 3S 9\ -~~ \ ttl.-W pl~<;f-;-,- ~V\..t-r bc'j /r dO~;W \ U\ ' - to ~ct:. ~~ f(IJ-~.l~ V>~ ?A-Dt\: \) ~ oX\/o~ CITY OF PORT ANGELES DEPARTMENT OF PUBLIC WORKS . . . . . . . . INSPECTION REPORT. . . . . . REQUEST Date I - l 7 - Of Time (Z () (l ;JIve. Received by D~"uu S l~ (phone, person) Location of Work to be inspected III ~ E..- Name of person requesting inspection Vl!..t-lV\, I S Address of person requesting inspection C'Dt if f Type of Inspection (circle appropriate one) Sewer Foundation Framing Chimney Plumbing F rO~"-- f- E- 'r~ I'"' ~ Phone No Permit No. ~ Final Sewer Excav OtEJ~ INSPECTION NOTES Inspected Date (- Z 7 - oLf Remarks L I>L <? +-~ I ( I/Le kJ Time bOO P b"'-- By '7Jt' H.ot ( ::> E . q - ? ( XV-\)tce r-evv\.o\..'<. -~/'1 Se",-'.( c / RESTORATION REQUIRED YES NO X (( (S' 6 F yovdt l}I ~&-\ . ve...!~. J\ "?-e,.Ac @ ~V ~ r 1-'. l' '2' ~ ':\j ZIO' ..... CI Dup - -S:J " z.. "LD ( 'lif \J\ ..; "" .. ~ .-'> '5 ~ ~~ ~ E FrOt....t \J SURFACE RESTORATION SURFACE TYPE 0 Unimproved 0 Gravel o Repaired by City [] Repaired by Permittee o No Damage Found o Asphalt 0 PCC 0 Other Work Order # ('-{-53? -00 I o COMPLETE o INCOMPLETE (Continue on reverse side if necessary) STREET SUPERINTENDENT (DATE) e ~ORT.ANGELES ~(''''' ~ -'\ ,----- CITY OF WAS H I N G TON, USA PUBLIC WORKS & UTILITIES DEPARTMENT April 19, 2004 Rick Anderson, President LBR Construction Inc 618 S Peabody Street Port Angeles, W A 98362 4 \~/o 't Is-r oFjA~ - , JC.~ RE Coldwell Banker building water line replacement. Rick. In response to your letter of April 13, 2004 the City has revised the sharing of water main replacement costs to serve the Coldwell Banker building In lieu of replacement with an 8" water line in the street, our current standard, the City will be replacing the 2" line in the parkway to the building site The City will provide all replacement materials and make the service and main connections Your firm's responsibility will be for the trenching, driveway sawcuttng (one), and exposing the connections to the existing main and water services Once the City crews have made the main connection, installed the piping, and reconnected the services your firm would be responsible for the trench backfill, driveway repair, and seeding of the disturbed areas The City will handle permits for the water line replacement. Your firm would still be responsible for all fees and charges associated with the Coldwell Banker building If this is acceptable please sign below and return Please call if you have questions Rick Anderson, President LBR Construction, Inc /1 J.. --+ f/ .' ." ,,; , veL ~ft.') \.", t1.. 'O,1-",} .::. Sincerely, vCt f 'L I~ II ~~h~ ~t~:, r" (~>:'~~:,;'I~l'" I Deputy Director of Public Works and Utilities/City Engineer ~ 1 / r t t ""~; 4/q,vh 11f Steve Sperr Bill Beverford COPY' N:\PWKS\ENGINEER\WTRCRSP\Rick Anderson - Coldwell Banker Bldg.wpd 321 EAST FIFTH STREET · POBOX 1150 · PORT ANGELES, WA 98362-0217 PHONE 360-417-4805. FAX 360-417-4542 · TTY 360-417-4645 E-MAIL PUBWORKS@CI PORT-ANGELES WA US 04/19/2004 10.24 13604526145 04/1V/ZUQ4 MON 08 34 FA! LBP ANDERSON HOMES PAGE 02/02 14l 00 I ~~~"i.t~, ~ .;.:~" At; "~'~~>~?~"~.\' J~~: ., ~.~.~~~~: :..'-;'-' ~,I -\,. '~." .. ~\:_.~;"! ~.~;.~ ~. -t" .j.~,::'. t,~~~ ::"::-:,1 ~1";1':~\;. \ 'li{;:";'~~'?i1(~' ~ ~t ,~,~.: ~~.~~r~;~:;:~~~'f 1'~:j:~ ;:~.'~'~:~:~~ '~~:~': t:~t~f,hIJ~I~~tl) ,( ~:~:f:.f}~..::~1;~~:t{" ; ;~i~~~ii~~!~~ii i'~~~~~~~~:~~':,~~:~i~w;t{;~'i !~:' j:i~~~~~~~-~:~i~~~:j~~~,~ i.il~i:~1~~,e~:~,~ .~ :~~~~, ;:r~..~7:~.~~t~. ~~>t;: ~S~~~:~I,. 'f:'.,."t. ~.~~~:&~... ,-r:'i';!:'"""..,,,...~t,,.. :Z;.~.~~~~~i~x~ "~~~,). . "f;""; ~"" EAS. FiFTH S'jR~tT :0 P: 0 tlO./\: I 150 · PORT ANGE1..E:S WA a63Eiz-021 7 .1 PHONE 360-417-4805. FAX 360-417-4542 . TiY: 360-417-4645 l!:-MAIl-: PUI9WORK5@CI PORT-A.NGELES WA.US ~f.~~~f:. '~~f~t; ~ f ~1~;ft~' !{~~f E;~j~~i"~:\\~~;.'~~~ ' :.~./;t.~r 4!t~iii4tl t} '" .. """ .. .",,~e(f';'" l"'i!Wt,~, '";"!'1)! '.\ ,"'" k;;~~~ti)~;;:,;~.. tl5:~~~~::_ jg~:~:> ,~t~~.r ~~;}~;~:'fl~;~::t~ *':;:j~~';f:r'l:f~~, ~'~:I -.:t; .",*'; . ":., . I'~;:.' ~," <\'>>i~;'...~..,t,. ~~~:~~7:~~~~~Jl,:~d'i . ~:;;~l~i~i~Wt~:';,' ,;', ~,r?~;;l~;: ~~::~ ~?{+~t~ ~~? )...;~/:~Jtf~~~'r~,~ ~.~.:;~~~~,t~~"i~~':~; ~ 1~1~ITo;;~!~:,;,:~'i~ *;f~io.~g;:tt:.~~ ~ :j.~,{:l::~~.:;~~~~ /.;~~;j ;'; .ii .~;~':',: ~"~"-:....tt d-t 1 }?<>RTANGELHS WAS H i N G lON, U_ S A P1.JSLiC WORKS & UTIi..iTiE5 DE.:F'ARTiviENT April 19,2004 Rick Anderson. President lBR Construdion Inc. 618 S Peabody Straet Port Angeles, W_A. 98362 RE. Co!d\"!e!! Banker building "'/ater lins replacement. Rick: In i6sponse tv your Jetter Vi Aprii IS, 2004 the City has revised the sharing of water malii replacement costs to serve the Coiciweli Banker buiiding. in lieu of repiacement 'With an 0" water .iine in the street, our current standard, the City will be repiacing the 2" tine in the parkway to the.buildlng Site. The City will provide ailrepiacement materials and make the service and main connectiOns. Your firm's respo.nsibifity will be for the trenching, driveway sawcuttng (one), and exposing the connections to the existing main and water services. Once the City crews have made the main connection, installed the piping, and reconnected.the services your flnn would be responaible for the trench backfill, driveway repair, and seeding of the disturbed areas. The City will handle permits for the water line rep!!!cement. Your firm \\'Outd still be responsible fnr ell fees and charges associated vJith the Co!dweU Sa...,ker hUi1di"9 If this is acceptable pfease...sJgn below and return. ~"~~. 0/ I/'f') l~~ Ri Anderson, Pre dent LBR Construction, fne. I . Please call if YOu have Sincerely, ~ . y .. ~ .L-_-~ I~ Gary W Ke rthy. PE Deputy Director of Public Works and Utilities/City Eng;neer IX!PY' Stew $perr t;;i oev8rion:i N:\PWKSIENGlNEER\WTRCRSP\RIck Andereon . Caldwell BltIlICer SI~.WIld ~ORT.ANGELES WAS H I N G TON, USA PUBLIC WORKS & UTILITIES DEPARTMENT April 19, 2004 Rick Anderson, President LBR Construction Inc 618 S Peabody Street Port Angeles, W A 98362 RE Coldwell Banker building water line replacement. Rick. In response to your letter of April 13, 2004 the City has revised the sharing of water main replacement costs to serve the Coldwell Banker building In lieu of replacement with an 8" water line in the street, our current standard, the City will be replacing the 2" line in the parkway to the building site The City will provide all replacement materials and make the service and main connections Your firm's responsibility will be for the trenching, driveway sawcuttng (one), and exposing the connections to the existing main and water services Once the City crews have made the main connection, installed the piping, and reconnected the services your firm would be responsible for the trench backfill, driveway repair, and seeding of the disturbed areas The City will handle permits for the water line replacement. Your firm would still be responsible for all fees and charges associated with the Coldwell Banker building If this is acceptable please sign below and return Please call if you have questions Rick Anderson, President LBR Construction, Inc Sincerely, ~~h~ Deputy Director of Public Works and utilities/City Engineer COPY' Steve Sperr Bill Beverford N:\PWKS\ENGINEER\WTRCRSP\Rick Anderson - Coldwell Banker Bldg.wpd 321 EAST FIFTH STREET · POBOX 1150 · PORT ANGELES, WA 98362-0217 PHONE 360-417-4805. FAX 360-417-4542 · TTY 360-417-4645 E-MAIL PUBWORKS@CI PORT-ANGELES WA US \ Vlin (' (fI {(f II h, 1\ alwn\'\ I Ii e he\1 Inn' City of Port Angeles POBox 1150 Mr Steve Sperr Engmeenng Manager April 13, 2004 RE FIre lme for Coldwell Banker Buildmg Steve, Thank you for responding to our request for assIstance regarding the water line extensIOn for the Coldwell Banker Building. As you know when we dId our due dilIgence before corrumttmg to the project we mvestigated the costs associated wIth the utilItIes, (water, power, storm & sanitary sewer). We also went through plan reVIew Out of the reVIew we were mformed that asphalt overlay needed to placed, whIch we have agreed to ($ 3,000), that the sIdewalk on Front Street needed to be replaced WIth a 7' wIde sIdewalk, whIch you agreed to reduce to 5' The review dId not mdIcate the storm sewer not bemg at the elevatIOn that was estImated and reqUIred that we redesIgn the system to meet the mvert elevation ($5,000). The reVIew made no mentIOn of CIty LIght needmg a transformer ($3,600) We ran water lIne pressure tests at each end of the block whIch indIcated that it could support a fire line, yet when we went to make the connectIon we found the line badly corroded and unable to provIde adequate flow for the fire line requirement of the CIty, though there is adequate domestic supply You have proposed provIdmg the deSIgn, tap, valves and 8" pIpe reqUIred to provide the bUIldmg WIth adequate fire flow, whIle we provide the mstallatIOn and all assocIated costs ($13,000) In lIght of the fact the we have already absorbed the above-mentioned costs and that the CIty of Port Angeles has future plans to replace this water line I respectfully request that the City of Port Angeles solely bear the cost ofupgradmg thIS lme. Thank you for your conSIderatIon on thIS matter ( GJJ- ~Jc;.~ \ZIC\:- ~ r2-... eJC--J I'- i!, j (i) - 0- <:: -....:. ~I ~ <--k- ~ \ \ -C-- 2- c< ( L-,.."'t- (. ....~ 6).- b.K{l a~ <Co", _ ~ $Q...-y~ ~-- L"-r- Dy"{~'---1(~<- S~ly, q2 /c/L Ri~ Anderson ~ President, LBR ConstructIon Inc. 0P- C. I 1"'-1 ~ rLv ./( ~ k. P(T · L;5 ~/ LM<S/o- Fe.:> It-- f? (17 t='. .;. ~o I'-- ~ . / .$'e .rlv0 . 1'!l()IH I \()()I --),..' I';' . f j\ '(,il l ~ I ,1",,1, "1111, f! . IlIn \11~( I\'~ \V,l~!lIl1~t(,1l 'I(; ;(,) FAX TRANSMISSION CITY OF PORT ANGELES, DEPT. OF PUBLIC WORKS & UTILITIES POBox 1150 Port Angeles, WA 98362 360-417 -4821 Fax. 360-417-4709 To Rob Owens LBR ConstructIon Date. March 23, 2004 Subject: 452-6145 Steve Sperr ~ X ^. I Engmeenng MC;;a;4v '-"-"..J FIre Ime for Coldwell Banker bUIldmg on Front Street east of Chambers Pages. 1 Fax # From: Rob- As a follow up to our dIScussIons yesterday regardmg the CIty assIstmg m the constructIon of a water Ime to ensure adequate fire flow to the bUIldmg, I am summanzmg what the CIty's mvolvement m the two proposed optIOns could be 1 The CIty has future plans to replace the 2-mch galvamzed water lme runmng along the north sIde of Front Street m that block wIth larger pIpe If an 8-mch ductIle Iron pIpe was mstalled from Chambers to and mcludmg Coldwell Bankers' frontage on Front Street (approxImately 170 feet), the CIty could denve some future benefit from It after It IS transferred to the CIty In lIght OfthIS the CIty could provIde the followmg: · DesIgn of the 8-mch water lme mstallatIon along Front Street. Tappmg and mstallatIon of an 8-mch cross and three valves at the connectIOn pomt at the mtersectIOn of Chambers and Front Streets · ProvIde to LBR or ItS subcontractor the necessary 8-mch pIpe and addItIonal valve (for the mId-block stub-out) to complete the water lme mstallatIOn. The fire lme and water servIce lme mstallatIOns, as well as all trenchmg, traffic control, thrust blockmg, beddmg, backfill, compactIOn, asphalt resurfacmg, etc to mstall the 8-mch water mam would be completed by LBR or ItS subcontractor 2 If LBR chooses to mstall a fire lme for the bUIldmg m the alley from Chambers, a backflow preventIOn deVIce would have to be mstalled at or near where the tap of the eXIstmg 8-mch water lme runmng up Chambers Street would be located. As there would be no benefit to the CIty or ItS customers to thIS fire lme, the CIty would not contribute anythmg towards the cost of completmg thIS optIOn. C&J EXCAVATING INC. 206 683 7741 P.01 q~,l L( (t: .....A.~~....> ,[' ,~ ( C & J Excavating; tnc. .' () [kl>', ,r.lO <.lfl::borq. W ~2~\.~:?~:~J4:'l\~_._ .__.,._..'."'"'_' ____,__..,----'"...,-"----.,..,.-..J.,-----..N'..,---,..----'~w.,- """"'Ull _1I11'1n1l telephone (:,~60) 683-7741 FoX (3601 681-3165 ~11I11Il~~I';lIINllI.~~lMIIlltlflidlluliM~IIH~IIIiIIII~IIIIIID!I..~-VDllIII~lIml~~~Il1Il~llI\lnIllIl!M1II~IMllllmll.IMijlUI\IINIliadlYl-~ n 1 January 5, 2004 t,BIZ Construt,lion, Am: (1 J g \;~outhPel'l.body 'Stn.:et. ~iuite II Ill(lrt i\nge;les. W A 9lB 6'2 I(E Coldwell Ilanker Build~ll'lg Change Ordc.r #2 E"{ti:':nd City Watennain for Fireline rlli~ foUowmg IS an estJn~late for the two options to extend the CIty of Port Angeles Watt:rlllain from ChlUl1Jb~",rs 'Iit:reet to the New Coldwell Banker Buildmg. Option 1/ I Tap e~xiil-ting 8" wat~:rmail1 in Chambers Street and supply and install ,i'lppro)(lmatdy 170...t1;\(:.t of 8" chlc,tile iron watermam that will run east down Front Strc,e,t. Pnee mdudc:s instalhl1g illfl R') x 4" tee with a 4" gate valve for the fireline to the new bUildulg, CDF fbr ba<::kHll and trendl patching. Price is based on not removIng the eXI'strng curb and g1.1tt(~r on Front Street, except where the fireline will extend to the new buIldIng. Our origina\prwe fbr trenching and backfillmg for the fireline will remain linc11ang(~:d $ 18,00000 ()plion #2 Tap (:xlsIJng 8" wah~nnalO 111 Chambers Street and supply and install apprO'~H1)ately 170"I"Cet of 4" d\letile iron watermain that will run east from Chambers down the aH(~y Pncl~; Indudl:::S installing a 4" x 4" tee with a 4" gate valve for the firehnc to the fleW bUIlding, CDF fc~r backfill and trench patching. Our price for trenchmg and tl,:\ckfiHlng for th(~ HrdUJe firmn the alley to the building villl be $70000 less WIth this option. $ 16,00000 PICii.se l;alllf you have any qW;:stlOl1S rcgardmg our pricing. The above pf1Ges do 110t metlllk WllshH1gtoll'\ Slall!:': '::al(~:) Tax 'Slllt.(':Holy, ~'i6 f)tJ50, LdL UJA.!J~T" 4~Z-ILS''- .f"'6,)( 45 2- - &:, 14- S- KeVII\ r Root !'rlJ.lcl..l Manager FAX TRANSMISSION CITY OF PORT ANGELES, DEPT. OF PUBLIC WORKS & UTILITIES POBox 1150 Port Angeles, W A 98362 360-417 -4821 Fax: 360-417-4709 To' Rob Owens LBR ConstructIOn Date. March 23, 2004 From: 452-6145 Steve Sperr ~ X ^ ...,..j Engmeenng M~~;&v V' Subject: FIre Ime for Coldwell Banker bUIldmg on Front Street east of Chambers Pages: 1 Fax #: Rob- As a follow up to our dIScussIons yesterday regardmg the CIty asslstmg m the constructIon of a water lme to ensure adequate fire flow to the bUIldmg, I am summanzmg what the CIty'S mvolvement m the two proposed optIOns could be: 1 The CIty has future plans to replace the 2-mch galvanIzed water lme runmng along the north sIde of Front Street m that block wIth larger pIpe. If an 8-mch ductIle Iron pIpe was mstalled from Chambers to and mcludmg Coldwell Bankers' frontage on Front Street (approxImately 170 feet), the CIty could denve some future benefit from It after It IS transferred to the CIty In lIght of thIS the CIty could prOVIde the followmg. . DesIgn of the 8-mch water Ime mstallatIon along Front Street. . Tappmg and mstallatIon of an 8-mch cross and three valves at the connectIOn pomt at the mtersectIOn of Chambers and Front Streets. . PrOVIde to LBR or ItS subcontractor the necessary 8-mch pIpe and addItIOnal valve (for the mId-block stub-out) to complete the water lIne mstallatIOn. The fire lme and water servIce lme mstallatIOns, as well as all trenchmg, traffic control, thrust blockmg, beddmg, backfill, compactIOn, asphalt resurfacmg, etc to mstall the 8-mch water mam would be completed by LBR or ItS subcontractor 2 If LBR chooses to mstall a fire lme for the bUIldmg m the alley from Chambers, a backflow preventIOn deVIce would have to be mstalled at or near where the tap of the eXlstmg 8-mch water Ime runnmg up Chambers Street would be located. As there would be no benefit to the CIty or ItS customers to thIS fire lme, the CIty would not contribute anythmg towards the cost of completmg thIS optIOn. C&J EXCAVATING INC 2136 683 7741 q~12 t.( ~ cU<Jo ,n1c( '-( C & J Excavating, Inc.. ~'o Bc;)~,~:.lO =- a~~?r9.. _w~~~~~~!O_ - "~A" "II'""' Telephone (360) 683.7741 FdX (360) 681-3165 ...~ J J___l. IITr~. .Jl ~""'I_~ January 5, 2004 LBR Construction, Inc 618 South Peabody Street, Suite II Port Angeles, W A 98362 RE Coldwell Banker BuildlOg Change Order #2 - Extend City Watennain for Fireline The following IS an estimate for the two options to extend the City of Port Angeles Watennain from Chambe.rs ~treet to the New Coldwell Banker Building. Opllon '# 1 - fap existing 8" watennain ill Chambers Street and supply and install appfo>umately 170-feet of 8" ductile iron watermam that Will run east down Front Street. Price includes installing un 8" x 4" tee with a 4" gate valve for the fireline to the new buildmg, CDF for backfill and trench patching. Price is based on not removing the eXlstmg curb and gutter Oft Front Street, except where the fireline will extend to the new btllldmg. Our origina\ pric,e for trenching and backfilling for the fireline will remain unchanged $ 18,00000 Option #2 - Tap existIng 8" watermalO in Chambers Street and supply and install approximately 170-fett of 4" ductile iron watermain that will run east from Chambers down the alley Price includes installin.g a 4" x 4" tee with a 4" gate valve for the firehne to 1he new building, CDF for backfill and trench patching. Our price for trenching and l)ackfiUing {or the tlrehne fwm the alley to the building !NiU be $700 00 less with this option. $ 16,00000 P\cas(: call If you havl~ any questions regarding our pricing. The above prkes do 110t mclurk Washington State Salc~s Tax. Slllcc::rcly, ~~6 t)~, LaSL UJJJ~T 4~z-I?!'- .f"6,)( 45 2- - tJ? 14- ~ Kl;1f111 T Root PruJect Manager ---,--,--,~,-,-,-_."''''II"""-,~,-""",,,.., ~ORT.ANGELES APR 2 0 200\ WAS H I N G TON, USA PUBLIC WORKS & UTILITIES DEPARTMENT o IECIIUVIE n APR 2 2 3lO4 lU April 19, 2004 Rick Anderson, President LBR Construction Inc 618 S Peabody Street Port Angeles, W A 98362 RE:: Coidweii BanKer bUlidlllY water iine ret.;iCiC6rii€;i It. Rick In response to your letter of April 13, 2004 the City has revised the sharing of water main replacement costs to serve the Coldwell Banker building In lieu of replacement with an 8" water line in the street, our current standard, the City will be replacing the 2" line in the parkway to the building site The City will provide all replacement materials and make the service and main connections Your firm's responsibility will be for the trenching, driveway sawcuttng (one), and exposing the connections to the existing main and water services Once the City crews have made the main connection, installed the piping, and reconnected the services your firm would be responsible for the trench backfill, driveway repair, and seeding of the disturbed areas The City will handle permits for the water line replacement. Your firm would still be responsible for all fees and charges associated with the Coldwell Banker building If this is acceptable please si ques~ ,~ ' / ' 1/ .'JA___ Rick nderson, Preside elow and return Please call if you have Sincerely, ~~h~ Deputy Director of Public Works and Utilities/City Engineer COPY. Steve Sperr Bill Beverford N \PWKS\ENGINEER\WTRCRSP\Rick Anderson - Coldwell Banker Bldg,wpd 321 EAST FI FTH STREET · POBOX 1 150 · PORT ANGELES WA 98362-0217 PHON E 360-417-4805. FAX 360-417-4542. TTY 360-417-4645 E-MAIL PUBWORKS@CI PORT ANGELES WA US STATE OF WASHINGTON DEPARTMENT OF HEALTH WATER BACTERIOLOGICAL ANALYSIS SAMPLE COLLECTION: READ INSTRUCTIONS ON BACK OF GOLDENROD COpy Iflnatructlona are not followed, aample will be reJected. DATE COLLECTED TIME COLLECTED COUNTY NAME M~TH / _;AY / YEAR -.., ~ ---1..L.- ; ,... J,~. /r. rt J 'I ~ ~ IE] AM DpM -~"...' / ".(:' j TYPE OF SYSTEM IF PUBLIC SYSTEM, COMPLETE: o PUBLIC II.DNO.I~ CIRCLE GROUP o INDIVIDUAL (A B (selVes only' residence) NAME OF SYSTEM SPECIFIC LOCATION WHERE SAMPLE COLLECTED TELEPHONE NO. DAY( , " 'J EVENING ( ) SAMPLE COLLECTED BY' (Name) SYSTEM OWNERlMGR.. (Name) ~~. t+- ~._ J i i V, \.. ,," i~; ,.i/ d. SOURCE TYPE WGROUND WATER UNDER SURFACE INFLUENCE o SURFACE 0 WELL or 0 SPRING 0 PURCHASED or 0 COMBINATION WELL FIELD INTERTIE or OTHER SEND REPORT TO' (Print Full Name, Address and Zip Code) _ /, JtI. fr,t:::'::' p I r' i , . H,' ~_......d ; i . -L,..\ I. f--'J:'.L {\ ~ u i,.( i {' \ . ~- . I \' i iJ r ,. :-,y i i ~'"~ r~ ~... '\ i \ /} "1; ~ ' "'-if1-- ~ ,.& . \ 'i-I." , WASHINGTON '--/;~ :) I., ,+ TYPE OF SAMPLE(cI\eCk only one in this column) /-/2- O ROUTINE r""l'C . ed R' . li DRINKING WATER lL::!- hlonnat (esldual. _ otaJ_ Free) check treatment · 0 Filtered o Untreated or Other o REPEAT SAMPLE Previous coliform presence Lab # Date o RAW SOURCE WATER Source # ~ rn Gl NEW CONSTRUCTION or REPAIRS o OTHER (Specify) REMARKS: o Total Coliform o Fecal Coliform (LAB USE ONLY) DRINKING WATER RESULTS / , o UNSATISFACTORY Coliforms present ~TISFACTORY REPEAT o E. Coli present o E. Coli absent . Colnorms absent SAMPLES REQUIRED o Fecal present o Fecal absent OTHER LABORATORY RESULTS TOTAL COLIFORM _ 1100 ml E. COLI _ 1100ml FECAL COLIFORM _/100 ml PLATE COUNT Iml ANOTHER SAMPLE REQURED SAMPLE NOT TESTED BECAUSE: TEST UNSUITABLE BECAUSE: o Sampie too old o Confluent growth o Wrong container o TNTC o Incomplete form o Turbid culture 0 o Excess debris SEE REVERSE SIDE OF GREEN COpy FOR EXPLANATION OF RESULTS LAB NO. (7 DIGITS) DATE, TIME RECEIVED RECEIVED BY -"" i i DATE REPOATED t" t -- ~ '-~ LABORATORY' REMARKS DOH :1tVi-M' tRJ:V L'O?\ BUILDING PERMIT INSPECTION RECORD CALL 417-4815 FOR BUILDING INSPECTIONS. CALL 417-4735 FOR ELECTRICAL INSPECTIONS. PLEASE PROVIDE A MINIMUM 24 HOUR NOTICE. IT IS UNLA WFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT IN A CONSPICUOUS LOCA nON KEEP PERMIT CARD AND APPROVED PLANS AT JOB SITE. INSPECTION TYPE DATE ACCEPTED COMMENTS YES NO FOUNDA TION FOOTINGS WALLS FOUNDATION DRAINAGEIDOWN SPOUTS ELECTRICAL (LIGHT DEPT) SEPARATE PERMIT # ROUGH-IN PLUMBING UNDER FLOOR / SLAB ROUGH-IN WATER LINE (METER TO BLDG) GAS LINE BACK FLOW / WATER AIR SEAL WALLS I CEILING I FRAMING JOISTS / GIRDERS SHEAR WALL/HOLD DOWNS WALLS / ROOF / CEILING DR YW ALL (INTERIOR BRACED PANEL ONLY) T-BAR INSULATION SLAB WALL / FLOOR / CEILING I I MECHANICAL HEA T PUMP GAS LINE WOOD STOVE / PELLET / CHIMNEY HOOD / DUCTS PW UTILITIES / SITE WORK (Engineering Division) SEPARATE PERMIT #'s: WATERLINE / METER SEWER CONNECTION SANITARY STORM PLANNING DEPT SEPARATE PERMIT #'s SEPA. PARKING/LIGHTING ESA. LANDSCAPING SHORELINE. FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE RESIDENTIAL DATE YES NO COMMERCIAL DATE ACCEPTED YES NO ELECTRICAL LIGHT DEPT 417-4735 ELECTRICAL LIGHT DEPT CONSTRUCTION R.W / PW/ CONSTRUCTION R.W ENGINEERING 417-4807 PW / ENGINEERING FIRE 417-4653 FIRE DEPT PLANNING DEPT 417-47"0 PLANNING DEPT BUILDING 417-4815 BUILDING I T \PLANNING\FORMS\1102.15 [11/14/2003J r.T;;(_;:~.'-;"c:.r: BUILDING PERMIT INSPECTION RECORD CALL 417-4815 FOR BUILDING INSPECTIONS. CALL 417-4735 FOR ELECTRICAL INSPECTIONS. PLEASE PROVIDE A MINIMUM 24 HOUR NOTICE. IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT IN A CONSPICUOUS LOCATION KEEP PERMIT CARD AND APPROVED PLANS AT JOB SITE INSPECTION TYPE DATE ACCEPTED COMMENTS YES NO FOUNDATION: FOOTINGS WALLS FOUNDATION DRAINAGEIDOWN SPOUTS ELECTRICAL (LIGHT DEPT) SEPARATE PERMIT # ROUGH-IN I PLUMBING UNDER FLOOR / SLAB ROUGH-IN WATER LINE (METER TO BLDG) GAS LINE BACK FLOW / WATER AIR SEAL WALLS CEILING FRAMING JOISTS / GIRDERS SHEAR WALL/HOLD DOWNS WALLS / ROOF / CEILING DR YW ALL (INTERIOR BRACED PANEL ONLY) T-BAR INSULA TlON SLAB WALL / FLOOR / CEILING MECHANICAL HEAT PUMP GAS LINE WOOD STOVE / PELLET / CHIMNEY HOOD / DUCTS PW UTILITIES / SITE WORK (Engineering Division) SEPARATE PERMIT #'s: WATERLINE / METER SEWER CONNECTION SANITARY STORM PLANNING DEPT SEPARATE PERMIT#'s SEPA. PARKING/LIGHTING ESA. LANDSCAPING SHORELINE. FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE RESIDENTIAL DATE YES NO COMMERCIAL DATE ACCEPTED YES NO ELECTRICAL LIGHT DEPT 417-4735 ELECTRICAL LIGHT DEPT CONSTRUCTION R.W / PW/ CONSTRUCTION R.W ENGINEERING 417-4807 PW / ENGINEERING FIRE 417-4653 FIRE DEPT PLANNING DEPT 417-4750 PLANNING DEPT BUILDING 417-4815 BUILDING T IPLANNING\FORMS\ll02.15 [ll/14/2003J I he,eby apply la, wate, to be f"nl,hed In aeea,danee w th 'ate, and "Ie, of the City for the following premises -Name of Applicant C.a lei U)e.J I Ba,;)..J:::~ ~dd,e"___ !l1:5 --E r r'Ol'1q:: OT Renewal 0 New Service 0 B/k___ Lot___ Add_ . . .4" /hot.Je~o{..lTo'=-dL<.J'1 ~.. S"e 01 Se,v""-__73- :5 Y c; Mete, Numbe, {.tC 1-- 4 I '"V 1?2.-:j I S"vke Left On [] Se'vke Lelt Ol! r-1 Signed -F= <:d{Y 7'1/'1 AI1} '7-(iV,L-(' 'A/ri'L) /h' l ( 1/ Li'"l57 I n "ailed by I" " ["rei" ?yo Irp'- - ----LI -€.<I (( _ () I< l. Remarks ~ ~O l) E toil11iL 'S.eJt~ ~ W~ Y~Dqc. APPLICA TlON FOR WA TER City Water Department Port Angeles, Wash. JI1/ot-, J9___ COST ANALYSIS LABO R EQUIPMENT MATERIALS TAX TOTAL CHARGE TO ADDRESS DESCRIPTION WORK ORDER NO 3,"\"5.'to q~. 0() dCO. 4,L.' 1t..tt1S $IaSL.05 CITY OF PORT ANGELES PUBLIC WORKS DEPARTMENT WORK ORDER REPORT PERMIT NO ACCOUNT NO u. o DATE DIVISION I- w W :I: Vl o DEPOSITPAIDAMT $ o BALANCE DUE $ o REFUND DUE $ LOCATION SPECIAL INSTRUCTIONS labor DATE ~1d-1 TOTAL HOU"LY "ATE HOURS SIZE STOCK 0" AMOUNT Ale 0' EMPLOYEE OUANT. No No UNIT P"'C[ DIST 'I:' ~,\l <:. oK Z- 'l.. I t.\\ . C\~ 'p;i;_1ii. D, cd '" I '" n-t l'-, jI'\ 2- ;) ~\ . 7~~ ~. G") ~ FR"Q~~ ::J ~ :)". c:.,:~ G: q . nl... m f2.:::"r " _ ,... D 5 A- J1L ~ i:J Ul_ R.~...I -<'-.......... ;) ;). ~O. qLr L\\ ~~ equipment Nn n~-c:rRlpTlnN T1ti 1- P IA 17~ If. RENTAL ma ter ia Is ::i'~ , "It>>..L"" . ,11. l " ('I ,..~ .... c...\.... n. I,,, R...,,~:9DCt I...__...L S/R-" - , I" )l.1") """'...L..... .,.~,. - \ - - 1 -I ~- 'r--..<~ , _~.J _ __ I" p~ - . 'O\^.. ~In-,. \" W\ I:l.~_, 1....1 I "~~~:::iI'lllflllllllllllllltllIIJIIIIIIIIIIIIIJIIIIIIIII1IIIlllt111111111~.IIJlflllljlll~t: :IIIIIi. ~::~:~:;~: m ....... ,,:::,':l::::::::::::::!!I!!!i!K~:.:~:::::~ '::*~~IIIII"llIitf~:::::::::~::::::::::}l ;;1 pL- ..:l 5 ;) ,. so I 5. 00 40, 00 'QA. co . - z a: ::::> ~ w a: -~ \ 8..8C\ ~.89 5 \ l'~.~'5 \~.GS ~ , (.~.~ ~ \ '~9 S1 3~.51 g , rw:f. 5i II"q s1 ~ 4. '1,- ~. qq- \ :io do ..:10 ~ 1\'7.,. .3() !~.q~ L.\ B. ~~ !33.12 r.... '" L.l::.q In "7::t. '............01 Ink.) L.~q On. ',.,..",.,LI l"ll. n foSCl' I'll., I...~__ ~ IIoC;q- ....~2.,. - h~ I,.~q O~\ , ''''-...'") ICD~q lanA. .- ~..." IIn~q lo~' rnnnd ~ I ~q lhC:tI. ,- h.....'\ ~q coy, o ...J <( Z o L:: CITY OF PORT ANGELES DEPARTMENT OF COMl\1UNITY DEVELOPMENT - BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 Application Number pin number Property Address ASSESSOR PARCEL NUMBER: Application description Subdivision Name Property Use Property Zoning . Application valuation 04-00000534 Date .240832 1115 E FRONT ST 06-30-00-8-1-0445-0000- PUBLIC WORKS UTILITES 6/16/04 01- 634 COMMERCIAL ARTERIAL o / 110 E Fro-rJ.. Owner Contractor GASE NICHOLS PROPERTIES 330 E FRONT ST PORT ANGELES WA 983620104 ( 36) 452-5403 OWNER Permit Additional desc Permi t Fee Issue Date Expiration Date STREET ALLEY RESTORATION 3200.00 6/16/04 12/13/04 Plan Check Fee valuation .00 o Qty Unit Charge BASE FEE Extension 3200.00 Per Fee sununary Charged Paid Credited Due ----------------- ---------- ---------- ---------- ---------- Permit Fee Total 3200.00 3200.00 .00 .00 Plan Check Total .00 .00 .00 .00 Grand Total 3200.00 3200.00 .00 .00 Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes null and void jfwork or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned for a period of 180 days after the work as commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this applicalion and know the same to be true and correct All provisions of laws and ordinances governing this type of work wjll be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. Signature of Contractor or Authorized Agent Dale Signature of Owner (if owner is builder) Date T:\I'LANNING\FORMS\II02.15 [ll/1412003J CITY OF PORT ANGELES PUBLIC WORKS DEPARTMENT ACCOUNT PERMIT ACCOUNT DOLLAR NAME NUMBER NUMBER AMOUNT 62 Surcharge~4.50)__ _____ __ ___ 001-0000-2291000 _ 63 D.RA Fees Plus Interest 001-0000-2392000 64 Buming Permit Fee--=-=-- - - - --=--=-=- _-= - _ _ 001-6030-322901t _-=-=-=-= _ 65 Fire Inspect/Permit Fee - - 001-6030-3422015 _ ___ _ _ 66 -Fire Sprinkler Pian Review Fee- -- - - -= == _ _ 001-6030-3422016- -- 67 Construction== -=-- -= == =-= _ _ _ _r{)()1-4020:.3221012 _ _~=~ - = =- ~ 68 Plumbing__ __ __ __ _ ___ __ __ _ _ ___ _()()1-4020.:3221018_ __ __ _ _ _ _ _ 69 Me~hanical _ _ _ _ _ _ ___ _ __ __ ~01-4020-3221019 ____ ___ 70 Sign________________ _ __ 001-4020-3221020 ___ 71 Clear/Grade Permit _ __ _ __ ___ ___ ___ _ 001-7010-3221021 ___ _ 72 House Moving 001-7010-3221033 73 SidewalklD,Fieway/Curb Permit/Right of Way Permit" ___ ~1-7010-32240.!.!. ____ =_=--=- 74 ..f'ublicatio~_ ___ __ ____ __n 001-7010-3415000 75 Blueprints- Aerial___ ___ ___ ____ _ __ 001-7010-3432000 76 P~CheckFee __ _____ ___ ____ 001-7010-3458300 77 El1llin-"erinll Service Fees_ _____ ____ _ _ ___ _ 001-7010-3489500 78 t\,1~celianeous Revenues _ _____ ____ __ _ 001:402.2~3699000 -- ---TOTAL GENERAL FUND- 79 Street/ Aliey Restoration LtfR,- 80 Storm Drainl Tap 81 _stWCo~Op _ .::-:-~-==--=- ==~==-- TOTAL 001-0000-1111000 102-7230-3221032 102-7230-3449010 - 102-7230-3699000 .""J9. F), -- -- TOTAL STREET FUND 82 Electrical Permits I Inspections TOTAL '1 02-0000'1111 000' 401-7180-3221028 - TOTAL LIGHTDIVISION 1 TOTAL ,401-0000,1111000_"' 83 P.B.I.A. 650-0000-2319200 TOTAL PBIA -TOTAL 650-0000'1111000--- -- 84 Hot Tap (watermain) -- 0 -- 402-7380-3434023 -- -.- 85F.H.lnstaIi/Meter-- - --- - - - - -- 402-7380-3434024 - - -- - -- 86 W/M inst8ITatlon - - - - - - - - --- = _ _==-=-= ~02-h80-3434025 -.: =- -.:- - 87 lj,)"alerSyslem DevelopementCharge. = -==- __ ____ _ ~02-7380-3434050 __ __ no ~ =_ -- TOTACWATERFUN~-- - -tOTAL - ~02..oooo~ff1foo(j---- 88 Sanitary Sewer Permit 403-7480-3221029---- 89 SanililrySew-",Tap/CaporMHTap- ---- ~~3-7480-3435018- -- ---=-_= gO Sewer System DevelopmentCharge__ ___ 403-7480-3435~ _ __ __ __ -------roTAL WASTEWATER FUND 91 Milwaukee Dr Assessment TOTAL SOLID WASTE FUNO---- ---- -0403-0000-1111000 404-7580-343701Q.. __ _ _ _ 404-0000-1111000 --- --- ---- -- -- - - --- -- -- ------ -- -- RECEIPT # GRAND TOTAL FILL-IN COMPLETELY - TOTAL EACH FUND AND GRAND TOTAL G:\Group'Acct\Forms\Rev.Rec\Pub-Wks laslReviSed Dec. 1999 ., -:5/17/2004 MO~ 08:27 FAX ~002 ~"q:~ii~'K~: "-:,"'t.,..' ~~~~~ij i1~~! ; -l~~~-,~. ~tJ}~ ~."~f::~1~!};.t.':.,',~~S: ';;:, '}"--~;~'~.::> . _ ',:"'; "..:s....;-~.;:; " :;~.~~:., ./ ..;:~~/) :.>f;; ,../}'. . '. \,~.. ',0 . CITY OF J~ ~ . _ ,'. . 7':.: ~ -f. "-'-. ~ : " ; , I~.r". .'.; ~ . , ,-, ,.... ',""': >';.'. .:< ,', .' . ,'~ .:. '120RTANGELES WAS H I N G TON, U. S. A, PUBLIC WORKS & UTILITIES DEPARTMENT May 14, 2004 . Mr. Rob Owens LBR Construction 618 S. Peabody SI. Port Angeles, WA 98362 f~ ()~-C;~4 RE: Paving of Front/Georgiana Alley along Coldwell Banker Office Property Frontage Dear Rob: , . "- ", \ ~"- / We agree with your proposal to particip~~'(n the full alley rehabilitation in lieu of making a spot improvement for your project. WfjI also agree that your fair share would be the estimated cost of the overl , ut would include the prep estimate of $750 for a total participation amount $3,200.00_,,Any added costs for engineering, traffic control, or added work for this section wou be the City's responsibility. With your participation this work can be included in the Street Division work planned for this year. If you are in agreement please sign below and return the enclosed copy o(this letter. Sincerely, ~ ~orth~'P.E. Deputy Director of Public Works and Utilities/City Engineer I, Rick Anderson, agree to participate in the alley improvements described above and agree to pay my share of the costs in the total amount of $3,200.00 payable upon completion of the aile ving. u r ~ fP '{-2.I-o+ Date cc: Ken Ridout/Gary Stempin N:IPWKSIENGINEERISTRMCRSP\Coldwell Banker Alley Paving.wpd ~fLe-""'", 321 EAST FIFTH STREET. P. O. BOX t 150 · PORT ANGELES, WA 98362-0217 PHONE: 360-417-4805 . FAX: 360-417-4542 · TTY: 360-417-4645 E-MAIL.PUBWORKS@CI.PORT-ANGELES.WA.US LBR CONSTRUCTION. INC. ~-- -- - -- 7893 DATe INVOICE NO. DESCRIPTION I INVOICE AMOUNT DEDUCTION BALANCE -?~~~ /'rMWM?/..u?I C-{)L l'J W.R. ~ !3 fh/lALUG' I I I I , I I I CHECI< I I CHEC\I I DATE ,NUMBER I TOTALS I - - _c____.'_ ~ LBR CONSTRUCTION. INC, ~ TAX NO. 600 607 705 . LICENSE NO. LBRCOI'141NF 0. o' 618S. PEABODY ST.. STE. H 13601451-1l31 PORT ANGELES. WA 98361 ~bank ".HOUR BANlONG ~ ~ 1-800-673-3555 19-10/1250 7893 PAY '-n+vz..e.L -n+oltJ ttJ..Vt7 TO THE ORDER C-l -t-vJ 0 F -f'Or'L4 OF I DATE t-0--oL( --ruJ 0 r0 '1 0 j~ 1\<.-1::> f\YJ I(U if S CHECK NO. AMOUNT 7 vq 3 $3::1.00 .- OO/IQ:- .:poLL-/fJ.(S ~~ "'00 7B 9 jII' I: L 25000 W 51: L 5:! 50 20B ~5 :!B-;;;-~- c.cc:.'::"::" rEA".),''l'S ...,...ROPR'........CP' bO~C" _ ~ .. "'" E:::"C~RS ce. OQEJ p.:.r"~R'. Aq""F,(;,",,_ :;ATfE",'AR-<. C'i Rf'ifRSE ,:cc . '.'.$5'.':G ,~AT..;F'~ 1',C';:.A""E5 A copy fPORT~ "....O~~ (;~~ 11... -- "'C~ CITY OF PORT ANGELES DEPARTMENT OF COMMUNITY DEVELOPMENT - BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 Application Number pin number Property Address ASSESSOR PARCEL NUMBER: Tenant nbr, name Application description Subdivision Name Property Use Property Zoning . . . Application valuation 04-00000363 Date .310841 321 E 5TH ST 06-30-00-0-1-7050-0000- 1115 E FRONT ST PUBLIC WORKS UTILITES 5/03/04 PUBLIC BUILDINGS & PARKS o ~ ...---' y~ /tt 1 \ \ LJ Owner Contractor CITY OF PORT ANGELES PO BOX 1150 PORT ANGELES WA 983620217 OWNER Permi t Additional desc Permit Fee Issue Date Expiration Date PUBLIC WORKS COMM WATER SERV HOT TAP 2" ON 8" MAIN .00 Plan Check Fee 5/03/04 Valuation 10/30/04 .00 o Special Notes and Comments PROPJECT #WF16077-16077-17US0401 Fee summary Charged Paid Credited Due ----------------- ---------- ---------- ---------- ---------- Permit Fee Total .00 .00 .00 .00 plan Check Total .00 .00 .00 .00 Grand Total .00 .00 .00 .00 Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned for a period of 180 days after the work as commenced, or if required inspections have not been requested within 180 days from the last inspection. i hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. Signature of Contractor or Authorized Agent Date Signature of Owner (if owner is builder) Date T:\PLANNING\FORM$\1102.15 [11/14/2003) clPORr>\.v .,:..~~ Cl~~ ~~ ~ "l.ti.oc-~~ ; , CITY OF PORT ANGELES DEPARTMENT OF COMMUNITY DEVELOPMENT - BUILDING DIVISION 32t EAST 5TH STREET, PORT ANGELES, WA 98362 PC:; - ,3!J3 Application Number pin number Property Address ASSESSOR PARCEL NUMBER: Tenant nbr, name Application description subdivision Name Property Use Property Zoning . . . Application valuation 04-00000363 .310841 321 E 5TH ST 06-30-00-0-1-7050-0000- 1115 E FRONT ST PUBLIC WORKS UTILITES Date 5/03/04 PUBLIC BUILDINGS & PARKS o Owner Contractor !loT /;4-p {!tl~ &dwv ///:5 E. ~ CITY OF PORT PO BOX 1150 PORT ANGELES ANGELES OWNER WA 983620217 Permit Additional Permit Fee Issue Date Expiration desc PUBLIC WORKS COMM WATER SERV HOT TAP 2" ON 8" MAIN .00 Plan Check 5/03/04 Valuation 10/30/04 Fee .00 o Date Special Notes and Comments PROPJECT #WF16077-16077-17US0401 Fee surrunary Charged Paid Credited Due ----------------- ---------- ---------- ---------- ---------- Permi t Fee Total .00 .00 .00 .00 Plan Check Total .00 .00 .00 .00 Grand Total .00 .00 .00 .00 Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days, if construction orwork is suspended or abandoned for a period of 180 days after the work as commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. Signature of Contractor Dr Authorized Agent Date Signature of Owner (if owner is builder) Date T:\PLA!'\'NING\FQRMS\l102.15 [11/14/2003] . .4 APPLICATION FOR WATER City Water Department~~ Port Angeles, Wash. _' 19 ,- I hereby appl~ for water to be furni shed in accordance w;th rates and rules of the Cit for the fol/owlng premises: Y Name 01 Applicant CIT~~e(( 452 -;;?770 Address 2DIX/ IC!(1fJ/[lhl(~ P'7Af~6: 04-lJ/ ~'1 Renewal 0 N:w Service 0 '( Blk_ Lat_ Add P~.:t: Size 01 Service !-/rJfTt9j2 8 OJ?!~'~et~8,r;r/(~/98:30F Service Left On 0 Service Left Off 0 Signed Installed by . -~. =301 , Remarks C~d;i .joepCJJ7~ftlwtC;?U?C;Cf2.d . .JeFF kOho!*'5K/ '. ~ APPLICATION FOR WATER City Water Department -!:--k' Part Angeles, Wash. SJ '> 01 , 19_ I hereby apply for water to be furni shed in accordance w;th rates and rules of the City for the following premises: Name'ol Applicant (!I'hf OF fbY,I1Jn7 e/PS - 32-1 E 5 -fJl Co /dw~t( BCUh~ . gjd.?J, - Jl11>d 'if ~10 Renewal,D NewServiceD Blk_ Lat_ 4dd ,')l'JCP,(Jr')T Size 01 Service /kit/If) ;) 01'1 7) Meter Number Service Left On 0 Service Lelt Off 0 Signed Address Installed by Pt?I014-IT 04 - ~(/?~ Remarks: J-I If. <d:L VvF 1&077-/7 /)~ 040 ( ~ia Funsto~-:.P.i'~!Il"nt f'?!.2!l"YS91~~k.'!r::~ill~"EO~a~1i.r.(),r1t._"~~~"'~= ""~=~"~_.=~~~_~."==~=.~=:f'~gill From: To: Subject: Trenia Funston Gary Kenworthy pavement for alley Coldwell Banker 1115 East Front Gary I have had an sugestion from Rob Owens, (Anderson Homes) about the required improvements for the alley at Coldwell Banker. 472--/2-32- Rob Owens has 2 estimates for the alley improvements. As stated in the agenda we indicated that the alley would require overlaying. He thinks that overlaying the existing material would not benifit the city long term. He has one estimate for just overlaying the existing material, and a second estimate for removing the existing and redoing the alley correctly. He also said that they would be willing to deposit money (amount of the estimate) so that it can be held in reserve until the alley is resurfaced by the city, not just the area adjacent to Coldwell. Any comments as to what we would like done here? cc: Glenn Cutler \f~o1- 3&3 ! Trenia Funston - Purchasing water mElin & related for Front St. Page 1 i From: To: Date: Subject: Steve Sperr Bill Beverford; Trenia Funston 4/8/04 2: 13PM Purchasing water main & related for Front St. . C~ 11~&f~ ___}d1~ J 07 ~~~ 1ft Here's the HTE number to use for materials associated with the 8" water line on Front east of Chambers: 452-7388-594-6510 WF16077-17 US0401 Lse 4&/-1 Z Be ' C oii ~ ~0 ~ rmoltiJudu (Yiduul / Iv-~ 'll c/<J .~- CITY OF PORT ANGELES DEPARTMENT OF PUBLIC WORKS . . . . . . . INSPECTION REPORT. . . . . . REQUEST' Date 5-iro'-l Time 7.' 00 A bvt Received by ///-5 C ;;-~ Location of Work to be inspected 32-1 E- . ,~,reH~ Name of person requesting inspection DeV\V'\.; 'S E::. Address of person requesting inspection urf Yo..,rd (7<f- is Type of Inspection (circle appropriate one): Sewer Foundation Framing Chimney Plumbing Final f)61..vt;S L (phone,.person) Phone No. 03--1 Dtl.9- p"m;'?!i~1 Sewer Excav. Ot er a.f-<::.-~'-' INSPECTION NOTES: Inspected: Date 5" - t../ r 0 <-{ r:-- 0" - . Remarks: iat) (] C.oL. (A), t"t.... t"' ~ I. -'r,re. $;erV{Le.. Time .3: OD PIv\. By De",-Vl.'s E.... 2~'r:;-delA..d 2..." P-i/c... -ro bv:tJ(~ .fDr RESTORATION REQUIRED . . . . .. YES NOX Vl v"Jve 3./{fr".... 1"'" i~" ~ ( ~ _ ~ / GJr~ -\'o.<.</. -t""fers F" re. Va-till:. "- j ,/ \fI ~ .F -' 2" Pole. z{' ~~~ 9, ~ J /-'-iJ, /57' )j e-tu....e use ,\JCi.I..-e... . ~ ~(), MA.;l"\ e)(+~....tl..'" \~ \j , '00 n ' ~ f) """'rI E. ~ <:l F rDV\.. + $-r . ~ I[J SURFACE RESTORATION: SURFACE TYPE: 0 Unimproved DGravel o Repaired by City o Repaired by Permittee D No Damage Found o Asphalt 0 PCC 0 Other Work Order # 1'8'7'i8-DO( o COMPLETE o INCOMPLETE IContinue.on.rev.erse sid.e if necessary) STREET SUPERINTENDENT (DATE) 05/17/2004 MO, 08:27 FAX \2-,'"") {ILG'-'!__ .J";2.. - j"/"S L 141002 '120RTANGELES WAS H I N G TON, U. S. A. ///'3 E F~ PUBLIC WORKS & UTILITIES DEPARTMENT May 14, 2004 Mr. Rob Owens LBR Construction 618 S. Peabody SI. Port Angeles, WA 98362 RE: Paving of FronUGeorgiana Alley along Coldwell Banker Office Property Frontage Dear Rob: ,.';. We agree with your proposal to participClte in the full alley rehabilitation in lieu of making a spot improvement for your project. We also agree that your fair share would be the estimated cost of the overl~2;450;..t>ut would include the prep estimate of $750 for a total participation amount o't.~3,200.00. Any added costs for engineering, traffic control, or added work for this section would be the City's responsibility. ,7 .~ With your participation this work can be included in the Street Division work planned for this year. If you are in agreement please sign below and return the enclosed copy ot"this letter. J\eIY, _ '---. ~a~~orthY P.E. Deputy Director of Public Works and Utilities/City Engineer I, Rick Anderson, agree to participate in the alley improvements described above and agree to pay my share of the costs in the total amount of $3.200.00 payable upon completion of the aile ving. ./ j Ii., , ~-t:.h'+ Date cc: Ken RidouVGary Stempin N:\PWKSIENGINEERISTRMCRSPlColdwell Banker Alley Paving.wpd ICLl?l->,"I . . 321 EAST FIFTH STREET. P O. BOX 1150. PORT ANGELES, WA 98362-0217 PHON E; 360-417-4805 . FAX: 360-417-4542 . TTY: 360-417-4645 E-MAIL: PUBWORKS@CIPORT.ANGELES.WA.US . . CITY OF PORT ANGELES DEPARTMENT OF PUBLIC WORKS . . . . . . . . . . . INSPECTION REPORT. . . . . . . . . . . REQUEST: Date Time Received by (phone, person) II \ S F Frun-J-- CiJ l.d.ll;..p 0 1 ~ IV Phone No. , Permit NO.o/- 5?<? Sewer Excav. Other Location of Work to be inspected Name of person requesting inspection Address of person requesting inspection Type of Inspection (circle appropriate one): Sewer Foundation Framing Chimney Plumbing Final INSPECTION NOTES: I Inspected: Date . lit u~ ot-::; Time 2.. 'Pl-1 By 1!f;/c.. R.m"k'~1~?iii,;&~Et~::::- RESTORATION REQUiRED...... YES NO -$l-r:'PI"'? u....plele- "Jhu/~+ofS ifl'i.(.;r/I~I Dr ;\.1.. \o<A71 l>.I::::, ?" (~ ,vi e A/I~'j m;F;j b~ <In /.$$uc:. - eked: (,J/ j I"'" ",. ,e"i~" SURFACE RESTORATION: SURFACE TYPE: 0 Unimproved 0 Gravel 0 Asphalt 0 PCC o Other o Repaired by City o Repaired by Permittee o No Damage Found Work Order # o COMPLETE o INCOMPLETE CITY OF PORT ANGELES DEP ARTMENT OF COMMUNITY DEVELOPMENT - BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES, W A 98362 Application Number pin number Property Address ASSESSOR PARCEL NUMBER: Application description Subdivision Name Property Use Property Zoning . . . Application valuation 04-00000534 Date .240832 1115 E FRONT ST 06-30-00-8-1-0445-0000- PUBLIC WORKS UTILITES 6/16/04 COMMERCIAL ARTERIAL o Owner Contractor GASE NICHOLS PROPERTIES 330 E FRONT ST PORT ANGELES WA 983620104 ( 36) 452-5403 OWNER Permit Additional desc Permit Fee Issue Date Expiration Date STREET ALLEY RESTORATION 3200.00 6/16/04 12/13/04 Plan Check Fee Valuation .00 o Qty Unit Charge BASE FEE Extension 3200.00 Per Fee summary Charged Paid Credited Due ----------------- ---------- ---------- ---------- ---------- Permit Fee Total 3200.00 3200.00 .00 .00 Plan Check Total .00 .00 .00 .00 Grand Total 3200.00 3200.00 .00 .00 \J( \\1 TJ -0 ~ r--- Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned for a period of 180 days after the work as commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. Signature of Contractor or Authorized Agent Date Signature of Owner (if owner is builder) Date T:\PLANNING\FORMS\1102.15 [11/14/2003] BUILDING PER1VIIT INSPECTION RECORD CALL 417-48]5 FOR BUILDING INSPECTIONS. CALL 4] 7-4735 FOR ELECTRICAL ]NSPECTIONS. PLEASE PROVIDE A MINIMUM 24 HOUR NOTICE. IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT IN A CONSPICUOUS LOCATION. KEEP PERMIT CARD AND APPROVED PLANS AT JOB SITE. INSPECTION TYPE DATE ACCEPTED COMMENTS YES ,,~ '''' FOUNDATION: FOOTINGS WALLS FOUND A TlON DRAINAGE/DOWN SPOUTS ELECTRICAL (LIGHT DEPT) SEP ARA TE PERMIT: # ROUGH-IN PLUMBING UNDER FLOOR I SLAB ROUGH-IN WATER LINE (METER TO BLDG) GAS LINE BACK FLOW I WATER AIR SEAL WALLS CEILING FRAMING JOISTS I GIRDERS SHEAR WALL/HOLD DOWNS WALLS I ROOF I CEILING DR YW ALL (INTERJOR BRACED PANEL ONLY) T-BAR INSULATION SLAB W ALL I FLOOR I CEILING MECHANICAL HEAT PUMP GAS LINE WOOD STOVE I PELLET I CH1MNEY HOOD I DUCTS PW UTILITIES I SITE WORK (Engineering Division) SEPARATE PERMIT #'s: WATERLINE I METER SEWER CONNECTION SANITARY STORM PLANNING DEPT. SEPARATE PERMIT #'s SEPA: PARKIN GiLl G HTING ESA: LANDSCAPING SHORELINE: FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE RESIDENTIAL DATE YES NO COMMERCIAL DATE ACCEPTED YES NO ELECTRJCAL - LIGHT DEPT. 417-4735 ELECTRJCAL LIGHT DEPT CONSTRUCTION R.W. I PWI CONSTRUCTION - R.W. ENGINEERING 4 I 7-4807 PW I ENGINEERJNG FIRE 417-4653 FIRE DEPT. PLANNING DEPT. 417-4750 PLANNING DEPT. BUILDING 417-4815 BUILDING T:\PLANNING\FORMS\1102.15 [11/14/2003]