Loading...
HomeMy WebLinkAbout322 S Jones St - Building :Y . . ,.;2.;2.. .so ' ::r-~U-U D1-~: J .s~~ C~~~""'- Sit~ Address: In ailed By: o ner/Business: Qv ner/Business Address: EL CTRIC HEAT o ASEBOARD KW _ ~ ~'URNACE KW ~ o EAT PUMP KW o AN/WALL KW _ I I , CITY OF PORT ANGELES LIGHT DEPARTMENT 321 E, Filth Street Port Angeles, WA 98362 (206) 457.0411 PERMIT NO. ~(;() 7 DATE 7/lt/'l[ ELECTRICAL PERMIT o READY FOR INSPECTION license Number: o WILL CALL FOR INSPECTION Phone: Phone: Sq, Ft. }! RESIDENTIAL o COMMERCIAL o NEW CONSTRUCTION o REMODEL J2'1' ADD/ALTER CIRCUITS l2f SERVICE UPGRADE/REPAIR o TEMPORARY SERVICE o RISER "%' OVERHEAD SERVICE o UNDERGROUND SERVICE VOLTAGE: /ZOk;fD )i'f 1 rjJ '0 3 'rjJ SERVICE SIZE ,;:/,9D FEEDER SIZE AMPS AMPS 4k.-L ' Del ils/Description: .~'f:,_ =~)f,1'(/ ~/0 =~&~ W.S, No. I CAPACITY: I 0 O.K. 0 NOT O.K. ACTION REQUIRED 0 CHANGE TRANSFORMER J : 0 INSTALL SERVICE POLE I I o lDitch Inspection O.K. 9 +ough.in/cover o.K, 1&,1A~" ?K. to connect service A: ' rrl inal O.K. /t{Q.vL1 Sitb Address: . (JIJ ~tL~ 't ~ ,41"1 c/f}(A1Ctfr;' k~) ,~(~ ./ /0 J-w tf?t&A:< ( SERVICE SIZE DATE ENGR. o OVERHEAD SERVICE APPROVED o CHANGE SERVICE WIRE o OTHER 'lil-J Permit/Receipt No. $007 In afler: New Meters '. Notify Port Angeles City Light by Street Address and Permit Number when ready for inspection. Work must not be covered bef~re inspection and O.K. for covering has been given by the electrical inspector in writing on either the Wiring Report or qn the Building Permit. PHONE 457-0411, EXT. 224. I ---r-- NO OCCUPANCY OR USE ESTABLISHED UNDER THIS PERMIT t1 z:-7") I [(0-11/1 $ (F , ;I v I Electrical Insp'ctor ' Permit Fee WHlliE - File by address PINK - Top: Eng, Bottom, Customer GREEN _ Top: Meter Dept., Bollom: City Hall OLYMP C PRINTERS INC . I PORT ANGELES HOUSING REHABILITATION PROGRAM 129 E 1st st Port Angeles, WA 98362 telephone #452,'.2lJ23 ate: April 5, 1996 (revised April 30 and June 6, 1996) inal worklist specifications for: Gordon and Violet Holman 322 S Jones Port Angeles, WA 98362 rei ephone #457....iJl.12 I jelected Contractor: Lindquist Construction 1509 W 8th Street Port Angeles, WA 98363 Telephone #4S-2.""4828 ROJECT A (REQUIREO HEALTH ANO SAFETY REPAIRS) 600 l)Install an additional concrete pad and support post under the utility room washer/dryer area to support the floor. 500 l)Kitchcn. InGtull a new double tub pOI"cclain/cuGt il"on Ginl, paelca~e to replacc the c)(iGting Ginl,. DELETED 600 l)Install new hardwired smoke alarms with battery backup throughout the house to code. Smoke alarms to be inter-tied. 2)Install a new 200 amp service complete and safe up all electrical throughout the house and garage. All three-prong outlets to be properly grounded. Check all other outlets for proper polarity. Insure that all fixtures, junction boxes, and outlets have cover plates and all fixtures and connections have junction boxes. 3)Kitchen: Install a new GFCI protected outlet near the sink to replace (1) existing 2-prong outlet. 1 4)Kitchen: Install (1) additional GFCI protected outlet near the sink. Homeowner to designate location. 5)Kitchen: Install a new separate circuit and outlet for the microwave oven. 5)Utility room: Install a new properly grounded 3-prong outlet on the north wall to replace an existing 2-prong outlet. 7)Utility room: Install (1) additional outlet. Homeowner to designate location. 8)Utility room: Install a new 4' 2-tube florescent ceiling light fixture and connect to the existing switch near the doorway. 9)Kitchen nook: Install a new ceiling light fixture. 10)Kitchen: Install a new 4 foot 4-tube florescent ceiling light fixture to replace the existing ceiling light. Connect to the existing switch located near the utility room doorway. 11)Kitchen: Install (1) new outlet to near the dining room/living room entryway. Homeowner to designate location. 12)Living room: Install (2) additional outlets. Homeowner to designate location. 13)NW bedroom: Install a new ceiling light fixture and connect to existing switch near the doorway. 14)NW bedroom: Install (1) additional outlet. Homeowner to designate location. 15)8athroom: Install a new GFCI protected outlet near the toilet to replace the existing outlet. 16)Bathroom: Install a new GFCI protected outlet near the sink. , 17)Garage: Install (2) new outlets. Homeowner to designate location. 18)Garage: Install a new motion sensor or dusk-to-dawn security light near the garage entry and connect to a switch rnside the garage. 19)Install a new GFCI exterior outlet near the SE corner of the house. Homeowner to designate location. 2 1ROJECT B (ENERGY CONSERVATION) B00 1) Kitchen nook area: Install (3) new vinyl framed single hung windows with insulating glass. Trim and finish the interior and exterior. Stain and finish or paint the trim. 2)Kitchen: Install a new vinyl framed single hung window with insulating glass over the kitchen sink. Trim and finish the interior and exterior. Stain and finish or paint the trim. 3)Kitchen pantry: Install a new vinyl framed single hung window with insulating obscured glass on the west wall. Trim and finish the interior and exterior. Stain and finish or paint the trim. 4)Utility room: Install (2) new vinyl framed single hung windows with insulating glass on the north wall. Trim and finish the interior and exterior. Stain and finish or paint the trim. 5)Utility room entry: Install a new steel insulated prehung door package with a deadbolt, lock, and window in the upper half. Trim and finish the interior and exterior. Stain and finish or paint the door and trim. 6)Utility room entry. InGtall a new aluminum framed DELETED 7)Front entry: Install a new aluminum framed combination storm/screen door package. 8)Living room: Install (2) new vinyl framed single hung windows with insulating glass on the west side of the fireplace. Trim and finish the interior and exterior. Stain and finish or paint the trim. 9)Living room nook: Install (2) new vinyl framed single hung windows with insulating glass on the east wall. Trim and finish the interior and exterior. Stain and finish or paint the trim. 10)Living room nook: Install (2) new vinyl framed single hung windows with insulating glass on the south wall. Trim and finish the interior and exterior. Stain and finish or paint the trim. 11)Living room: Install (3) new vinyl framed single hung windows with insulating glass on the south wall near the fireplace. Trim and finish the interior and exterior. Stain and finish or paint the trim. 3 12)NW bedroom: Install (3) new vinyl framed single hung windows with insulating glass. Trim and finish the interior and exterior. Stain and finish or paint the trim. 13)NE bedroom: Install a new vinyl framed single hung window with insulating glass on the east wall. Trim and finish the interior. Stain and finish or paint the trim. 900 1)Insulate the underfloor area to R-19. 100 1)Bathrooffi. In3tall a new oeiling eMhaust fan/light cOffibination with separate new Gwitehes te be located near the doorway. Insure proper venting to the eNterior. DELETED ROJECT C (EXTERIOR DETERIORATION) 700 1)Tear off, resheath, and reroof the entire houso with 25 year 3-tab composition seal down shingles. Include installation of proper flashing along the rear addition. Remove the upper chimney to below roof line and patch the roof. ~ROJECT C-1 (EXTERIOR DETERIORATION) J200/0600 1)Complete all comprehensive repairs attached Paratex report of April 25, 1996 . .. . . iteln 18.-back porch/deck and stair repairs. outlined in the (cHccpt:la:;' Include CHANGE IROJECT D (BUILDING CONSERVATION) 500 1)Install new seamless aluminum rain gutter and downspout on the NW corner of the house to replace the original wood gutters. 2)Install new seamless aluminum rain gutter and downspout on the NE corner of the house to replace the original wood gutters. 3)Front entry: Install new seamless aluminum rain gutter and downspout near the front entry porch to replace original wood gutters. 4 .' . ... " ~. 700 l)Install a new horizontal F/A electric furnace in the crawl space to replace the existing oil furnace (cNisting ducting te be ffiedificd as needed te faeilitate ~r6per inGtallatien ef the new furnace). Furnace to be sized to adequately heat the entire house. Include removal of existing oil furnace and tank and modification of crawl space access to accommodate furnace change. Include remO'val O'f exist:inq duct: work and insl:al1at'ion of new insulal:ed ducl:inq t'hrouqhoul: t:he crawl space. CHANGE 2)Cleaneut the furnace duoting. DELETE 800 l)rroperly prepare and ~aint the eNterior of the heu3e e-<l-ffipl€te. NO't:e: funding fO'r t:his prO'ject: t:O' be held ill con 1:1 ngency due t'o uncer I:ain I:"v 0 f homeonwers abi 1 i I:y 1:0 qual i fy for /"rai n I: I:he T"own assi s I:ance. DE LETE 5