Loading...
HomeMy WebLinkAbout5.453 Original Contract 5. -</5-3 STATE OF WASHINGTON DEPARTMENT OF HEALTH SOUTHWEST DRINKING WATER OPERATIONS 2411 Pacific Ave. · P.O. Box 47823 · Olympia, Washington 98504-7823 (360) 664-0768 · FAX (360) 664-8058 TDD Relay Service: 1-800-833-6388 Bilateral Compliance Agreement between Washington State Department of Health and City of Port Angeles For Covering of Uncovered Finished Water Supply Reservoirs and Installation of Corrosion Control Docket # 7207 The following is hereby agreed to between the Washington State Department of Health, (hereinafter DOH), and the City of Port Angeles (hereinafter the City) regarding the City of Port Angeles Water System, ID #68550M, a Group A Community Water System, Clallam County. 1. Whereas: 1 . 1 . The City has completed sampling for lead and copper at the consumers' taps and has found that the sampling exceeds the 90th percentile action level for copper but not for lead. 1.2. The USEPA has established time frames for installation of corrosion control. Systems of the size of the City are required to have corrosion control in place by January 1998. 1.3. The City has requested approval to delay implementation of corrosion control because of uncertainties of the status of their water source due to the federal Elwha River Restoration Project. 1 .4. The City has proposed to pursue implementation of other projects at an accelerated schedule as a mitigation for delayed implementation of corrosion control. Specifically these projects are the covering of three uncovered distribution reservoirs which are: 1.4.1. Jones Street Reservoir, 2.0 MG, 1961 1.4.2. Black Diamond Reservoir, 7.0 MG, .1961 1.4.3. Peabody Heights Reservoir, 7.0 MG, 1925 ~. o '. 1.5. The City has also agreed to implement a public awareness and education program on corrosion byproducts and the corrosivity of the City's water with respect to copper. 1.6. DOH believes that covering the City's uncovered water reservoirs should be a higher public health priority than corrosion control due to a copper only action level exceedence. 1.7. DOH believes that the schedule proposed by the City is r:easonable. 1.8. The DOH recognizes that the compliance schedule for Task Items 2.5 through 2.14 are based on successfully obtaining a Public Works Trust Fund (PWTF) loan to fund the three covering projects. The PWTF loan will be applied for in the Spring of 1998 and funds are expected to be available for use by July 1999. If the City of Port Angeles is unsuccessful in obtaining a PWTF loan for this reservoir covering project from its Spring 1998 PWTF loan application, the compliance schedule presented herein for Task Items 2.5 through 2.14 will be delayed by 1 2 months and the City of Port Angeles will reapply for a PWTF loan in the Spring of 1999. In any event, the compliance schedule for completing the Jones Street Reservoir Cover project will be unaffected by the City of Port Angeles success or lack thereof in obtaining a PWTF loan. 2. Therefore DOH and the City hereby agree to the following: 2.1. Engineering Report: By March 31, 1998, the City shall submit to DOH for approval an engineering report evaluating alternatives and recommending covering plans for all three uncovered reservoirs. 2.2. Public Awareness: By November 1, 1998, the City shall submit to DOH a Public Awareness/Education Program plan including sample bill stuffers and newspaper advertisements, and a date and agenda for a public meeting and open house. Implementation of the public awareness program shall begin by December 31, 1998. 2.3. Jones Street Reservoir Cover Construction Documents: By December 31, 1998, the City shall submit to DOH construction documents for the Jones Street reservoir cover. 2.4. Jones Street Reservoir Cover Completion: By December 31, 1999, the City shall complete construction of and submit to DOH a construction report for the Jones Street reservoir cover. Bilateral Compliance Agreement Page 2 of 4 ". 2.5. Black Diamond Reservoir Cover Construction Documents: By February 28, 2000, the City submit to DOH a construction documents for the Black Diamond reservoir cover. 2.6. Black Diamond Reservoir Cover Completion: By December 31, 2000, the City shall complete construction of and submit to DOH a construction report for the Black Diamond reservoir cover. 2.7. Peabody Heights Reservoir Cover Construction Documents: By February 28, 2001, the City shall submit to DOH construction documents for the Peabody He.ghts reservoir cover. 2.8. Peabody Heights Reservoir Cover Completion: By December 31, 2001, the City shall complete construction of and submit to DOH a construction report for the Peabody Heights reservoir cover. 2.9. Lead and Copper Sampling 1: By June 30, 2002, the City shall complete a full round of lead and copper compliance sampling and submit to DOH a report of findings. 2.10. Lead and Copper Sampling 2: If no action level is exceeded in item 2.9 above then by December 31, 2002, the City shall complete a second full round of lead and copper compliance sampling and submit to DOH a report of findings. 2.11. Corros,ion Control Report: If an action level is exceeded in either item 2.9 or 2.10 above then the City shall submit a Corrosion Control Report to DOH within six months from the date of determination of the exceedence. 2.12. System-Wide Testing: If recommended in the Corrosion Control Report, system-wide testing of the impacts of the corrosion testing shall be completed within nine months from date of approval of the Corrosion Control Report. 2.13. Final Design: Final design shall be included in the Corrosion Control Report unless system-wide testing is recommended, in which case the City shall submit a final design for corrosion control within 3 months of the completion of the system-wide testing. 2.14. Construct Corrosion Control System: Within one year from the date of approval of the final design, the City shall complete construction of and submit to DOH a construction report for the completion of all required corrosion control facility improvements. Bilateral Compliance Agreement Page 3 of 4 ., ... All plans, reports and documents required by this agreement to be submitted to the Department shall include the Docket #7207 and be mailed directly to: Cheri Paine WSDOH Southwest Regional Office PO Box 47823 Olympia W A 98504-7823 The foregoing is hereby agreed to. DEPARTMENT OF HEALTH ~~.~ Tim Blake, Compliance Manager October 21, 1 997 (360) 664-8944 Bilateral Compliance Agreement , Director of Public Works K){ZfJ{~7 ~C:.o.... 4\ 1- 4 ~'O \ Telephone Jack Date ATTEST: DO~Q:>~ lApt-o,,- Becky J. U n, Cl Clerk Page 4 of 4