Loading...
HomeMy WebLinkAbout2923 Maple St - Building . CITY OF PORT ANGELES LIGHT DEPARTMENT 321 E. Fifth Street Port Angeles, WA 98362 (206) 457-0411 ELECTRICAL PERMIT PERMIT NO. .,,5'023 ~ DATE /0//3 ~ . , Installed By: sJ: o READY FOR INSPECTION License Number: o WILL CALL FOR INSPECTION Phone: Site Address: Owner/Business: Phone: Owner/Business Address: Sq. Ft. ELECTRIC HEAT o BASEBOARD KW _ o FURNACE KW _ o HEAT PUMP KW o FAN/WALL KW _ o RESIDENTIAL o COMMERCIAL o NEW CONSTRUCTION o REMODEL 'SADD/ALTER CIRCUITS to SERVICE UPGRADE/REPAIR o TEMPORARY SERVICE o RISER o OVERHEAD SERVICE o UNDERGROUND SERVICE VOLTAGE: 0195 0395 SERVICE SIZE FEEDER SIZE AMPS AMPS DetailslDescription: . W.S. No. SERVICE SIZE CAPACITY: o O.K. 0 NOT O.K. ACTION REQUIRED: 0 CHANGE TRANSFORMER o INSTALL SERVICE POLE DATE ENGR. o OVERHEAD SERVICE APPROVED o CHANGE SERVICE WIRE o OTHER o Ditch Inspection O.K. o Rough-in/cover O.K. o O.K. to connect service .~i"~Final O.K. .. permit/5~t 801 New Meters Date: Installer: . Notify Port Angeles City Light by Stree Addr and Permit Number when ready for inspection. Work must not be covered before inspection and O.K. for covering has been given by the electrical inspector in writing on either the Wiring Report or on the Building Permit. PHONE 457-0411, EXT. 224. of .----;-~ NO OCCUPANCY OR USE ESTABliSHED UNDER THIS PERMIT ". ? I . $ ~O Electrical Inspector Permit Fee WHITE - File by address PINK - Top: Eng, Bottom, Customer GREEN - Top: Meter Dept., Boltom: City Hall OLYl!PIC PRINTERS INC. PORT ANGELES HOUSING REHABILITATION PROGRAM 129 E 1st St Port Angeles, WA 98362 /:- Telephone #452:-2023 August 4, 1995 (revised August 22, 1995) Final worklist specifications for: Edmund & Dolores Jackson 2923 Maple Street Port Angeles, WA 98362 Telephone #452-2551 ATTENTION CONTRACTORS: SubmLt all bLds to the Port Angeles HousLng RehabL1LtatLon Program off Lee no later than FrLday, September 7, 1995. PROJECT A (REQUIRED HEALTH AND SAFETY REPAIRS) Lt6'0:a-rrI""i1sJ:a 11 new ha rdwi r ed smoke al a rms wi th batte r y bac k up throughout the house (sleeping and hallway areas)to code. Smoke alarms to be inter-tied. , 12T8)l t h roo mar e as: Ins tall pro per G F I pro t e c t e d c i r cui tan d outlets to replace existing outlets. r---Y)~tchen: Install new GFI protected circuit and outlets near the sink to replace existing outlets. 4-)-I-n's'~re that exterior outlets have proper GFI protection. 1700 l)Clean out the wood stove chimney. PROJECT B (COST EFFECTIVE ENERGY CONSERVATION) 0700 l)Insulate the attic area over the east (2-story) addition to R-38. 1 ~ . .. PROJECT C (EXTERIOR DETERIORATION AND BLIGHTING) l)Reroof the east 2-story addition with 25 year 3-tab composition seal down shingles to match the new roofing on the west addition. Include proper attic ventilation. A~~en~ion con~rac~ors: Please bid. all projec~s separa~ely. Include applicable ~ax and permi~ rees. ~ 2