HomeMy WebLinkAbout4.611 Original Contract <It {j) J I PROJECT MANUAL Original #2 for Front Street Storm Drain Construction Project DR99-20 CITY OF PORT ANGELES WASHINGTON March, 2009 GLENN A. CUTLER, P.E., DIRECTOR OF PUBLIC WORKS & UTILITIES STEPHEN P. SPERR, P.E., DEPUTY DIRECTOR OF ENGINEERING SERVICES For information regarding this project, contact: Michael Szatlocky, PE, Project Engineer, City of Port Angeles 360-417 -4808 PROJECT MANUAL for Front Street Storm Drain Construction Project DR99-20 CITY OF PORT ANGELES WASHINGTON March, 2009 GLENN A. CUTLER, P.E., DIRECTOR OF PUBLIC WORKS & UTILITIES STEPHEN P. SPERR, P.E., DEPUTY DIRECTOR OF ENGINEERING SERVICES <:ctrjr-- For information regarding this project, contact: Michael Szatlocky, PE, Project Engineer, City of Port Angeles 360-417 -4808 PROJECT MANUAL Front Street Storm Drain Project Project DR99-20 SCOPE OF WORK Replace storm drain inlet in City parking lot with a Type 2 catch basin with one 6" reducing section, one 6" rectangular adjustment section, and one rectangular frame and vaned grate. Construct approximately 87 feet of 8-inch PVC storm drain across Front Street and connect to an existing 8-inch concrete storm drain on the northerly side of Front Street. Replace asphalt concrete paving, concrete curb & gutter, and concrete sidewalk as necessary to restore street and parking lot surfaces. Raise storm drain manhole grate and cover at the northeast corner of the intersection of Cherry and Front Streets to street grade. Restore road surface as required. All work to complete the installation, including the furnishing of all labor, tools, equipment and material needed in the placing of all necessary pipe, structures, fittings and appurtenances, and restoration of pavement and other surfaces is included in the bid. All work shall meet the requirements of the City of Port Angeles' Urban Services Standards and Guidelines and the latest edition of Washington State Department of Transportation's Standard Specifications for Road, Bridge and Municipal Construction, and/or their Standard Plans. See the attached plans for more information. ADDITIONAL REQUIREMENTS 1. The bid shall be submitted on the attached Bid Form and mailed or delivered to the Director of Public Works & Utilities, City of Port Angeles, 321 East Fifth Street, P. O. Box 1150, Port Angeles, Washington 98362. Questions may be directed to Michael Szatlocky, PE, Project Manager, at 360-417-4808. 2. The most recently issued Washington State Prevailing Wage Rates for Clallam County, a copy of which is attached to this Project Manual, shall apply to this Contract. These can be accessed on the internet at www.lni.wa.qov/prevailinqwaqe/Default.htm . 3. The bid may be awarded to the lowest responsible bidder from the group of Small Works Roster contractors asked to bid on this work. If the bid is awarded, the attached Contract will then be signed, requiring the Contractor to meet the requirements in the Contract as well as the entire Project Manual. No bidder will be permitted to withdraw its bid between the closing time for receipt of bids and Small Works Roster Project Manual - Project 99-20 Front Street Storm Drain Construction Page 1 of 10 the execution of a Contract, unless the award is delayed for a period exceeding sixty (60) calendar days. 4. Bids shall be submitted no later than 3:00 PM, March 30, 2009. 5. A bid bond, performance and payment bond, and retainage will be required for this work. A completed bid bond will need to be submitted with the bid. The Contractor will be required to submit a Performance and Payment Bond and a completed Escrow Agreement for Retained Percentage forms after award of Contract. 6. The performance period for this work is 20 working days. Contractor is to mobilize and start work within 10 working days of Notice To Proceed. Small Works Roster Project Manual - Project 99-20 Front Street Storm Drain Construction Page 2 of 10 CITY OF PORT ANGELES ... FRONT STREET STORM DRAIN CONSTRUCTION PROJECT DR99-20 ADDENDUM NO. 1 TO THE PROJECT MANUAL FOR FRONT STREET STORM DRAIN CONSTRUCTION, PROJECT NO. DR99-20 NOTICE. TO PROSPECTIVE BIDDERS (March 2009) The following changes, additions, and/or deletions are hereby made a part of the Project Manual for the construction of First Street Storm Drain Construction dated March, 2009 as fully and completely as if the same were fully set forth therein: SCOPE OF WORK Delete the next to last sentence of the first paragraph, "Raise storm drain manhole grate and cover at the northeast corner of the intersection of Cherry and Front Streets to street grade." There are no other changes to the Project Manual. The deadline date and time for s bmittal remain unchanged. Steven per . E. Deputy Director Engineering/City Engineer This addendum must be acknowledged in the space provided on the Bid Form in the Project Manual when it is submitted .to the City with your bid. Failure to do so may result in the bid being rejected as being non-responsive. END OF ADDENDUM Addendum NO.1 Page 1 of 1 BID FORM Front Street Storm Drain Construction Project 99-20 The bidder hereby bids the following amounts for all work (including labor, equipment, time and materials) required to install all work and related appurtenances as required in the Scope of Work. Lump Sum $ I ~ g2q ~! Sales Tax (8.4%) $ /1 e:/3Q. ~q Total Bid $ IQ, 1& 1. $ 7 The bidder hereby acknowledges that it has received Addenda No(s). I (Enter "N/A" if none were issued) to this Project Manual. The name of the bidder submitting this bid and its business phone number and address, to which address all communications concerned with this bid and with the contract shall be sent, are listed below. By signing below, bidder represents it is not disqualified from bidding on this project. Bidder's firm name :1V-r De Ve/opmli\1. , in, d bt4..:Ja.rnLI to '-<Jr1 Z-J(uucuh ~9 Complete address I D '3'3 0 l ci J31!j VI fl-wlj (Street address) Registration Number lAJA q~'3!2. (State) (Zip) UBI Number Signed by llVla~ err JOn n kLL-vj Telephone No. Title Printed Name: ActV1.0"vild.~f., h14J WL vtCt,"lftrd..- A-cld.ti1(,~u~ tJO I. 't1z~1 () tl -bJJ Small Works Roster Project Manual- Project 99-20 Front Street Storm Drain Construction Page 3 of 10 PUBLIC WORKS CONTRACT This Contract is made and entered into in duplicate this ti!Jd^ day of ~ril , 2009, by and between the City of Port Angeles, a non-charter code city of e State of Washington, hereinafter referred t~ as "the City", and ::J\L.1"' ~~ ~~ ' a d\:;!g ~~~n ~ ""'F"I.lioo, hereinafter referred to as ' the Contractor". WITNESSETH: Whereas, the City desires to have certain public work performed as hereinafter set forth, requiring specialized skills and other supportive capabilities; and Whereas, the Contractor represents that it is qualified and possesses sufficient skills and the necessary capabilities to perform the services set forth in this Contract. NOW, THEREFORE, in consideration of the terms, conditions, and agreements contained herein, the parties hereto agree as follows: 1. Scope of Wark. The Contractor shall do all work and furnish all tools, materials, and equipment in order to accomplish the following project: Front Street Storm Drain Construction Project 99-20 in accordance with and as described in this Contract and the Project Manual, which include the attached plans and scope of work, and shall perform any alterations in or additions to the work provided under this Contract and every part thereof. The Contractor shall provide and bear the expense of all equipment, work, and labor of any sort whatsoever that may be required for the transfer of materials and for constructing and completing the work provided for in this Contract, except as may otherwise be provided in the Project Manual. 2. Time for Performance and Liquidated Damages. a. Time is of the essence in the performance of this Contract and in adhering to the time frames specified herein. The Contractor shall commence work within 10 working days of Notice to Proceed, and said work shall be physically completed within 20 working days after commencing work, unless a different time frame is expressly provided in writing by the City. b. If said work is not completed within the time for physical completion, the Contractor may be required at the City's sole discretion to pay to the City Small Works Roster Project Manual - Project 99-20 Front Street Storm Drain Construction Page 4 of1 0 liquidated damages of $2,000 for each and every day said work remams uncompleted after the expiration of the specified time. 3. Compensation and Method ofPavment. a. The City shall pay the Contractor for work performed under this Contract as detailed in the bid, at the completion of work and submission of a detailed mVOIce. b. Payments for any alterations in or additions to the work provided under this Contract shall be on a negotiated time and materials basis. 4. Independent Contractor Relationship. The relationship created by this Contract is that of independent contracting entities. No agent, employee, servant, or representative ofthe Contractor shall be deemed to be an employee, agent, servant, or representative of the City, and the employees of the Contractor are not entitled to any of the benefits the City provides for its employees. The Contractor shall be solely and entirely responsible for its acts and the acts of its agents, employees, servants, subcontractors, or representatives during the performance of this Contract. The Contractor shall assume full responsibility for payment of all wages and salaries and all federal, state, and local taxes or contributions imposed or required, including, but not limited to, unemployment insurance, workers compensation insurance, social security, and income tax withholding. 5. Prevailing Wage Requirements. The Contractor shall comply with applicable prevailing wage requirements of the Washington State Department of Labor & Industries, as set forth in Chapter 39.12 RCW and Chapter 296-127 WAC. The Contractor shall document compliance with said requirements and shall file with the City appropriate affidavits, certificates, and/or statements of compliance with the State prevailing wage requirements. The Washington State Prevailing Wage Rates For Public Works Contracts, Clallam County, incorporated in this Contract have been established by the Department of Labor & Industries and are included as an Attachment to this Contract. The Contractor shall also ensure that any subcontractors or agents of the Contractor shall comply with the prevailing wage and documentation requirements as set forth herein. 6. Indemnification and Hold Harmless. a. The Contractor shall defend, indemnify, and hold harmless the City, its officers, officials, employees, and volunteers against and from any and all claims, injuries, damages, losses, or suits, including attorney fees, arising out of or in connection with the performance of this Contract, except for injuries and damages caused by the sole negligence of the City. Small Works Roster Project Manual- Project 99-20 Front Street Storm Drain Construction Page 5 of 10 b. Should a court of competent jurisdiction determine that this Contract is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, and volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. It is further specifically and expressly understood that the indemnification provided herein constitutes the Contractor's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Contract. 7. Insurance. The Contractor shall procure and maintain for the duration of the Contract, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees or subcontractors. Failure by the Contractor to maintain the insurance as required shall constitute a material breach of contract upon which the City may, after giving five working days notice to the Contractor to correct the breach, immediately terminate the Contract or at its discretion, procure or renew such insurance and pay any and all premiums in connection therewith, with any sums so expended to be repaid to the City on demand, or at the sole discretion of the City, off set against funds due the Contractor from the City. a. Minimum Scope of Insurance The Contractor shall obtain insurance of the types described below: 1. Automobile Liability insurance covering all owned, non-owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. 11. Commercial General Liability insurance shall be written on ISO occurrence form CG 00 0 I and shall cover liability arising from premises, operations, stop gap liability, independent contractors, products-completed operations, personal injury and advertising injury, and liability assumed under an insured contract. The Commercial General Liability insurance shall be endorsed to provide the Aggregate Per Project Endorsement ISO form CG 25 03 11 85. There shall be no endorsement or modification of the Commercial General Liability insurance for liability arising from explosion, collapse or underground property damage. The City shall be named as an insured under the Contractor's Commercial General Liability Small Works Roster Project Manual- Project 99-20 Front Street Storm Drain Construction Page 6 of 10 insurance policy with respect to the work performed for the City using ISO Additional Insured endorsement CG 20 10 10 01 and Additional Insured-Completed Operations endorsement CG 20 37 1001 or substitute endorsements providing equivalent coverage. 111. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. IV. Builders Risk insurance covering interests of the City, the Contractor, Subcontractors, and Sub-contractors in the work. Builders Risk insurance shall be on a all-risk policy form and shall insure against the perils of fire and extended coverage and physical loss or damage including flood and earthquake, theft, vandalism, malicious mischief, collapse, temporary buildings and debris removal. This Builders Risk insurance covering the work will have a deductible of $5,000 for each occurrence, which will be the responsibility of the Contractor. Higher deductibles for floor and earthquake perils may be accepted by the City upon written request by the Contractor and written acceptance by the City. Any increased deductibles accepted by the City will remain the responsibility of the Contractor. The Builders Risk insurance shall be maintained until final acceptance of the work by the City. b. Minimum Amounts of Insurance The Contractor shall maintain the following insurance limits: 1. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of$I,OOO,OOO per accident. 11. Commercial General Liability insurance shall be written with limits no less than $1,000,000 each occurrence, $1,000,000 general aggregate and a $1,000,000 products-completed operations aggregate limit. 111. Builders Risk insurance shall be written in the amount of the completed value of the project with no coinsurance provisions. c. Other Insurance Provisions The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile Liability and Commercial General Liability insurance. 1. The Contractor's insurance coverage shall be primary insurance as respect to the City. Any insurance, self-insurance, or insurance pool coverage maintained by the City shall be in excess of the Contractor's insurance and shall not contribute with it. Small Works Roster Project Manual - Project 99-20 Front Street Storm Drain Construction Page 7 of 10 11. The Contractor's insurance shall not be cancelled or reduced as to coverage by either party, except after forty-five (45) days prior written notice by certified mail, return receipt requested, has been given to the City. d. Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best rating of not less than A:VII. e. Verification of Coverage The Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the Automobile Liability and Commercial General Liability insurance of the Contractor before commencement of the work. Before any exposure to loss may occur, the Contractor shall file with the City a copy of the Builders Risk insurance policy that includes all applicable conditions, exclusions, definitions, terms and endorsements related to this project. f. Contractor's Insurance For Other Losses The Contractor shall assume full responsibility for all loss or damage from any cause whatsoever to any tools, Contractor's employee owned tools, machinery, equipment, or motor vehicles owned or rented by the Contractor, or the Contractor's agents, suppliers or contractors as well as to any temporary structures, scaffolding and protective fences. g. Waiver of Subrogation The Contractor and the City waive all rights against each other, any of their Subcontractors, Subcontractors, agents and employees, each of the other, for damages caused by fire or other perils to the extent covered by Builders Risk insurance or other property insurance obtain pursuant to the Insurance Requirements Section of this Contract or other property insurance applicable to the work. The policies shall provide such waivers by endorsement or otherwise. 8. Compliance with Laws. a. The Contractor shall comply with all applicable federal, state, and local laws, including regulations for licensing, certification, and operation of facilities and programs, and accreditation and licensing of individuals, and any other standards or criteria as set forth in the Project Manual. b. The Contractor shall pay any applicable business and permit fees and taxes which may be required for the performance of the work. Small Works Roster Project Manual- Project 99-20 Front Street Storm Drain Construction Page 8 of 10 c. The Contractor shall comply with all legal and permitting requirements as set forth in the Project Manual. 9. Non-discrimination. The parties shall conduct their business in a manner which assures fair, equal and nondiscriminatory treatment of all persons, without respect to race, creed, color, sex, Vietnam era veteran status, disabled veteran condition, physical or mental handicap, or national origin, and, in particular: a. The parties will maintain open hiring and employment practices and will welcome applications for employment in all positions from qualified individuals who are members of the above-stated minorities. b. The parties will comply strictly with all requirements of applicable federal, state or local laws or regulations issued pursuant thereto, relating to the establishment of nondiscriminatory requirements in hiring and employment practices and assuring the service of all patrons and customers without discrimination with respect to the above-stated minority status. 10. Assignment. a. The Contractor shall not assign this Contract or any interest herein, nor any money due to or to become due hereunder, without first obtaining the written consent of the City, nor shall the Contractor subcontract any part of the services to be performed hereunder without first obtaining the consent of the City. b. The Contractor hereby assigns to the City any and all claims for overcharges resulting from antitrust violations as to goods and materials purchased in connection with this Contract, except as to overcharges resulting from antitrust violations commencing after the date of the bid or other event establishing the price of this Contract. In addition, the Contractor warrants and represents that each of its suppliers and subcontractors shall assign any and all such claims for overcharges to the City in accordance with the terms of this provision. The Contractor further agrees to give the City immediate notice of the existence of any such claim. 11. Contract Administration. This Contract shall be administered by Contractor and by Michael Szatlocky, PE, Proje notices required by the terms of this Contract addresses: l!\ on behalf of the Manger on behalf of the City. Any written shall be served or mailed to the following Small Works Roster Project Manual- Project 99-20 Front Street Storm Drain Construction Page 9 of 10 I City: Contractor: City of Port Angeles P.O. Box 1150 321 East Fifth Street Port Angeles, W A 98362-0217 12. Interpretation and Venue. This Contract shall be interpreted and construed in accordance with the laws of the State of Washington. The venue of any litigation between the parties regarding this Contract shall be Clallam County, Washington. IN WITNESS WHEREOF, the parties hereto have caused this Contract to be executed the day and year first set forth above. CONTRACTOR: 11lr 1Xv~lofrull-t ~ e., dl?D.1~tW.it/)w~ txCIWo1Ilt 0) Name of Contractor I CITY OF PORT ANGELES: By: ~~~ Mayor By: Attest: I I I .___..._______~L~._____~ ~ ) ,.J :"" Small Works Roster Project Manual - Project 99-20 Front Street Storm Drain Construction Page 10 of 10 ATTACHMENTS Attachment A Washington State Prevailing Wage Rates for Clallam County Available at: www.lni.wa.qov/prevailingwaqe/Default.htm or http://www.wsdot.wa.qov/eesc/desiqn/proiectdev/AdReadv/CombinedWaqe.htm BENEFIT CODE KEY - EFFECTIVE 03-04-2009 ::ht""l.l- ************************************************************************************************************************ OVERTIME CODES OVERTIME CALCULATIONS ARE BASED ON TIIE HOURLY RATE ACTUALLY PAID TO TIIE WORKER. ON PUBLIC WORKS PROJECTS, TIIE HOURLY RATE MUST BE NOT LESS THAN TIIE PREVAILING RATE OF WAGE MINUS TIIE HOURLY RATE OF TIIE COST OF FRINGE BENEFlTS ACTUALLY PROVIDED FOR THE WORKER. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURL Y RATE OF WAGE. A. ALL HOURS WORKED ON SATURDAYS, SUNDAYS AND HOLIDAYS SHALL ALSO BE PAID AT ONE AND ONE-HALF TIMES THE HOURL Y RATE OF WAGE. B. ALL HOURS WORKED ON SA TURDA YS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND HOLIDA YS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. C. THE FIRST TWO (2) HOURS AFTER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST TEN (10) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL OTHER OVERTIME HOURS WORKED SHALL BE PAID AT DOUBLE THE HOURL Y RATE OF WAGE. D. THE FIRST TWO (2) HOURS BEFORE OR AFTER A FIVE - EIGHT (8) HOUR WORKWEEK DAY OR A FOUR - TEN (10) HOUR WORKWEEK DAY AND THE FIRST EIGHT (8) HOURS WORKED THE NEXT DAY AFTER EITHER WORKWEEK SHALL BE P AID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL ADDITIONAL HOURS WORKED AND ALL WORKED ON SUNDAYS AND HOLIDA YS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. E. THE FIRST TWO (2) HOURS AFTER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST EIGHT (8) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL OTHER HOURS WORKED MONDAY THROUGH SATURDAY, AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURL Y RATE OF WAGE. F. THE FIRST TWO (2) HOURS AFTER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST TEN (10) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL OTHER OVERTIME HOURS WORKED, EXCEPT LABOR DAY, SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON LABOR DAY SHALL BE PAID AT THREE TIMES THE HOURLY RATE OF WAGE. G. THE FIRST TEN (10) HOURS WORKED ON SATURDAYS AND THE FIRST TEN (10) HOURS WORKED ON A FIFTH CALENDAR WEEKDAY IN A FOUR - TEN HOUR SCHEDULE, SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED IN EXCESS OF TEN (10) HOURS PER DAY MONDAY THROUGH SATURDAY AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. H. ALL HOURS WORKED ON SATURDAYS (EXCEPT MAKEUP DAYS IF WORK IS LOST DUE TO INCLEMENT WEATHER CONDITIONS OR EQUIPMENT BREAKDOWN) SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED MONDAY THROUGH SATURDAY OVER TWELVE (12) HOURS AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. I. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURL Y RATE OF WAGE. 1. THE FIRST TWO (2) HOURS AFTER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST TEN (10) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED OVER TEN (10) HOURS MONDAY THROUGH SATURDAY, SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. K. ALL HOURS WORKED ON SA TURD A YS AND SUNDAYS SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RA TE OF WAGE. ALL HOURS WORKED ON HOLIDA YS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. L. ALL HOURS WORKED IN EXCESS OF TEN (10) HOURS PER DAY MONDAY THROUGH SA TURDA Y AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. M. ALL HOURS WORKED ON SATURDAYS (EXCEPT MAKEUP DAYS IF WORK IS LOST DUE TO INCLEMENT WEATHER CONDITIONS) SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. N. ALL HOURS WORKED ON SATURDAYS (EXCEPT MAKEUP DAYS) SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. O. THE FIRST TEN (10) HOURS WORKED ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS, HOLIDAYS AND AFTER TWELVE (12) HOURS, MONDAY THROUGH FRIDAY, AND AFTER TEN (10) HOURS ON SATURDAY SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. P. ALL HOURS WORKED ON SA TURDA YS (EXCEPT MAKEUP DAYS IF CIRCUMSTANCES WARRANT) AND SUNDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURL Y RATE OF WAGE. BENEFIT CODE KEY - EFFECTIVE 03-04-2009 Q. THE FIRST TWO (2) HOURS AFTER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDA Y AND UP TO TEN (10) HOURS WORKED ON SATURDAYS SHALL BE PAID AT ONE AND ONE-HALFTIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED IN EXCESS OF TEN (10) HOURS PER DAY MONDAY THROUGH SA TURDA Y AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS (EXCEPT CHRISTMAS DAY) SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON CHRISTMAS DAY SHALL BE PAID AT TWO AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. R. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. S. THE FIRST TWO (2) HOURS AFfER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST EIGHT (8) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL OTHER OVERTIME HOURS WORKED, EXCEPT LABOR DAY, SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON LABOR DA Y SHALL BE PAID AT THREE TIMES THE HOURLY RATE OF WAGE. T. WORK PERFORMED IN EXCESS OF EIGHT (8) HOURS OF STRAIGHT TIME PER DAY, OR TEN (10) HOURS OF STRAIGHT TIME PER DA Y WHEN FOUR TEN (IO) HOUR SHIFfS ARE ESTABLISHED, OR FORTY (40) HOURS OF STRAIGHT TIME PER WEEK, MONDAY THROUGH FRIDAY, OR OUTSIDE THE NORMAL SHIFf, AND ALL WORK ON SA TURDA YS SHALL BE PAID AT TIME AND ONE-HALF THE STRAIGHT TIME RATE. HOURS WORKED OVER TWELVE HOURS (12) IN A SINGLE SHIFf AND ALL WORK PERFORMED AFfER 6:00 PM SA TURDA Y TO 6:00 AM MONDAY AND HOLIDAYS SHALL BE PAID AT DOUBLE THE STRAIGHT TIME RATE OF PAY. THE EMPLOYER SHALL HAVE THE SOLE DISCRETION TO ASSIGN OVERTIME WORK TO EMPLOYEES. PRIMARY CONSIDERATION FOR OVERTIME WORK SHALL BE GIVEN TO EMPLOYEES REGULARLY ASSIGNED TO THE WORK TO BE PERFORMED ON OVERTIME SITUATIONS. AFTER AN EMPLOYEE HAS WORKED EIGHT (8) HOURS AT AN APPLICABLE OVERTIME RATE, ALL ADDITIONAL HOURS SHALL BE AT THE APPLICABLE OVERTIME RATE UNTIL SUCH TIME AS THE EMPLOYEE HAS HAD A BREAK OF EIGHT (8) HOURS OR MORE.. U. ALL HOURS WORKED ON SATURDAYS SHALL BE PAID ATONE AND ONE-HALFTIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND HOLIDA YS (EXCEPT LABOR DA Y) SHALL BE PAID AT TWO TIMES THE HOURL Y RATE OF WAGE. ALL HOURS WORKED ON LABOR DA Y SHALL BE PAID AT THREE TIMES THE HOURLY RATE OF WAGE. V. ALL HOURS WORKED ON SATURDAYS, SUNDAYS AND HOLIDAYS (EXCEPT THANKSGIVING DAY AND CHRISTMAS DAY) SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON THANKSGIVING DAY AND CHRISTMAS DA Y SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. W. ALL HOURS WORKED ON SATURDAYS AND SUNDAYS (EXCEPT MAKE-UP DAYS DUE TO CONDITIONS BEYOND THE CONTROL OF THE EMPLOYER) SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. X. THE FIRST FOUR (4) HOURS AFTER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST TWELVE (12) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALFTIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED OVER TWELVE (12) HOURS MONDAY THROUGH SATURDAY, SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. WHEN HOLIDAY FALLS ON SATURDAY OR SUNDAY, THE DAY BEFORE SA TURDA Y, FRIDAY, AND THE DAY AFfER SUNDAY, MONDAY, SHALL BE CONSIDERED THE HOLIDA Y AND ALL WORK PERFORMED SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. Y. ALL HOURS WORKED OUTSIDE THE HOURS OF 5:00 AM AND 5:00 PM (OR SUCH OTHER HOURS AS MAYBE AGREED UPON BY ANY EMPLOYER AND THE EMPLOYEE) AND ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DA Y (10 HOURS PER DAY FOR A 4 X 10 WORKWEEK) AND ON SATURDAYS AND HOLIDAYS (EXCEPT LABOR DAY) SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. (EXCEPT FOR EMPLOYEES WHO ARE ABSENT FROM WORK WITHOUT PRIOR APROV AL ON A SCHEDULED WORKDAY DURING THE WORKWEEK SHALL BE PAID AT THE STRAIGHT-TIME RATE UNTIL THEY HAVE WORKED 8 HOURS IN A DAY (10 IN A 4 X 10 WORKWEEK) OR 40 HOURS DURING THAT WORKWEEK.) ALL HOURS WORKED MONDAY THROUGH SA TURDA Y OVER TWELVE (12) HOURS AND ALL HOURS WORKED ON SUNDAYS AND LABOR DAY SHALL BE PAID AT DOUBLE THE HOURLY RA TE OF WAGE. Z ALL HOURS WORKED ON SATURDAYS AND SUNDA YS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON HOLIDA YS SHALL BE PAID THE STRAIGHT TIME RATE OFPA Y IN ADDITION TO HOLIDA Y PA Y. 2 ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DA Y OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. A. THE FIRST SIX (6) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED IN EXCESS OF SIX (6) HOURS ON SA TURDA Y AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. B. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. C ALL HOURS WORKED ON SUNDA YS SHALL BE PAID ATONE AND ONE-HALFTIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON HOLIDA YS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. 2. BENEFIT CODE KEY - EFFECTIVE 03-04-2009 D. ALL HOURS WORKED ON SATURDAYS AND SlJNDA YS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. THE FIRST EIGHT (8) HOURS WORKED ON HOLIDAYS SHALL BE PAID AT STRAIGHT TIME IN ADDITION TO THE HOLIDAY PAY. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON HOLIDAYS SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. E. ALL HOURS WORKED ON SATURDAYS OR HOLIDAYS (EXCEPT LABOR DAY) SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS OR ON LABOR DAY SHALL BE PAID AT TWO TIMES THE HOURL Y RATE OF WAGE. F. THE FIRST EIGHT (8) HOURS WORKED ON HOLIDAYS SHALL BE PAID AT THE STRAIGHT HOURLY RATE OF WAGE IN ADDITION TO THE HOLIDAY PAY. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. G. ALL HOURS WORKED ON SUNDAY SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON PAID HOLIDAYS SHALL BE PAID AT TWO AND ONE-HALF TIMES THE HOURLY RATE OF WAGE INCLUDING HOLIDAY PAY. H. ALL HOURS WORKED ON SUNDAY SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SA TURDA YS AND HOLIDA YS (EXCEPT LABOR DAY) SHALL BE PAID AT ONE AND ONE- HALF TIMES THE HOURL Y RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND ON LABOR DA Y SHALL BE PAID AT TWO TIMES THE HOURL Y RATE OF WAGE. J. ALL HOURS WORKED ON SUNDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON PAID HOLIDAYS SHALL BE PAID AT TWO AND ONE-HALF TIMES THE HOURLY RATE OF WAGE, INCLUDING THE HOLIDAY PAY. ALL HOURS WORKED ON UNPAID HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. K. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE IN ADDITION TO THE HOLIDAY PAY. L. ALL HOURS WORKED ON SA TURDA YS (OR ON THE REGULAR DAY OFF DURING A WORKWEEK OTHER THAN MONDA Y THROUGH FRIDA Y) AND HOLIDAYS SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE, EXCEPT LABOR DAY WHICH SHALL BE PAID AT DOUBLE THE HOURLY RATE. ALL HOURS WORKED MONDA Y THROUGH SA TURDA Y OVER TWELVE (12) HOURS AND ALL HOURS WORKED ON SUNDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. M. ALL HOURS WORKED ON SATURDA YS, SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. O. ALL HOURS WORKED ON SUNDA YS AND HOLIDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. P. THE FIRST EIGHT (8) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED IN EXCESS OF EIGHT 8) HOURS ON SATURDAY AND ALL HOURS WORKED ON SUNDA YS AND HOLJDA YS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. Q. ALL HOURS WORKED ON LABOR DA Y SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. R. ALL HOURS WORKED ON SUNDAYS AND HOLIDA YS AND ALL HOURS WORKED OVER SIXTY (60) IN ONE WEEK SHALL BE PAID AT DOUBLE THE HOURL Y RATE OF WAGE. S. ALL HOURS WORKED ON SATURDAYS SHALL BE PAID AT ONE AND ONE-HALFTIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE, EXCEPT THE DAY AFTER THANKSGIVING, THE DA Y AFTER CHRISTMAS AND A FLOATING HOLIDAY, WHICH SHALL BE PAID AT THE STRAIGHT TIME RATE IF WORKED, IN ADDITION TO HOLIDAY PAY. 4A ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DA Y OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SATURDA YS, SUNDA YS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURL Y RATE OF WAGE. 5 HOLIDA Y CODES A. HOLIDA YS: NEW YEAR'S DA Y, MEMORIAL DA Y, INDEPENDENCE DA Y, LABOR DA Y, THANKSGIVING DA Y, FRIDAY AFTER THANKSGIVING DA Y, AND CHRISTMAS DA Y (7). BENEFIT CODE KEY - EFFECTIVE 03-04-2009 ""4~ B. HOLIDA YS: NEW YEAR'S DAY, MEMORIAL DA Y, INDEPENDENCE DAY, LABOR DA Y, THANKSGIVING DAY, FRIDAY AFfER THANKSGIVING DAY, THE DA Y BEFORE CHRISTMAS, AND CHRISTMAS DAY (8). C. HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DA Y (8). D. HOLIDA YS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DA Y, LABOR DA Y, THANKSGIVING DA Y, THE FRIDA Y AND SA TURDA Y AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8). E. HOLIDA YS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DA Y, PRESIDENTIAL ELECTION DA Y, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8). F. HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING JR. DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DA Y, AND CHRISTMAS DAY (I I). G. HOLIDA YS: NEW YEAR'S DAY, MEMORIAL DA Y, INDEPENDENCE DA Y, LABOR DA Y, THANKSGIVING DAY, THE LAST WORK DAY BEFORE CHRISTMAS DAY, AND CHRISTMAS DA Y (7). H. HOLIDA YS: NEW YEAR'S DAY, MEMORIAL DA Y, INDEPENDENCE DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING DAY, AND CHRISTMAS (6). I. HOLIDA YS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DA Y, LABOR DA Y, THANKSGIVING DAY, AND CHRISTMAS DAY (6). 1. HOLIDA YS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, THANKSGIVING DAY, FRIDA Y AFTER THANKSGIVING DAY, CHRISTMAS EVE DA Y, AND CHRISTMAS DAY (7). K. HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DA Y, THE DA Y BEFORE CHRISTMAS, AND CHRISTMAS DAY (9). L. HOLIDA YS: NEW YEAR'S DAY, MARTIN LUTHER KING JR. DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DA Y, THANKSGIVING DA Y, FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8). M. HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING JR. DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DA Y, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY, THE DAY BEFORE CHRISTMAS AND CHRISTMAS DA Y (9). N. HOLIDA YS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DA Y, LABOR DAY, VETERANS' DA Y, THANKSGIVING DAY, THE FRIDA Y AFTER THANKSGIVING DAY, AND CHRISTMAS DA Y (9). P. HOLIDA YS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY AND SA TURDA Y AFTER THANKSGIVING DAY, THE DAY BEFORE CHRISTMAS, AND CHRISTMAS DAY (9). IF A HOLIDA Y FALLS ON SUNDA Y, THE FOLLOWING MONDA Y SHALL BE CONSIDERED AS A HOLIDAY. Q. PAID HOLIDAYS: NEW YEAR'S DA Y, MEMORIAL DA Y, INDEPENDENCE DA Y, LABOR DA Y, THANKSGIVING DAY, AND CHRISTMAS DAY (6). R. PAID HOLIDAYS: NEW YEAR'S DA Y, MEMORIAL DA Y, INDEPENDENCE DA Y, LABOR DA Y, THANKSGIVING DAY, DA Y AFTER THANKSGIVING DAY, ONE-HALF DAY BEFORE CHRISTMAS DAY, AND CHRISTMAS DA Y. (7 1/2). 5. s. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DA Y, LABOR DA Y, THANKSGIVING DA Y, AND CHRISTMAS DA Y (7). T. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DA Y, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS DAY, AND THE DAY BEFORE OR AFTER CHRISTMAS (9). U. PAID HOLIDA YS: NEW YEAR'S DAY, MARTIN LUTHER KING JR. DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DA Y, LABOR DA Y, THANKSGIVING DAY, AND CHRISTMAS DA Y (8). V. PAID HOLlDA YS: SIX (6) PAID HOLlDA YS. W. PAID HOLIDA YS: NINE (9) PAID HOLIDA YS. X. HOLIDA YS: AFTER 520 HOURS - NEW YEAR'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY. AFTER 2080 HOURS - NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DA Y, THANKSGIVING DAY, CHRISTMAS DA Y AND A FLOATING HOLIDAY (8). BENEFIT CODE KEY - EFFECTIVE 03-04-2009 ;;5:0 Y. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, THANKSGIVING DAY, THE FRIDA Y FOLLOWING THANKSGIVING DAY, AND CHRISTMAS DAY (8). Z. HOLIDA YS: NEW YEAR'S DAY, MEMORIAL DA Y, INDEPENDENCE DA Y, LABOR DA Y, VETERANS DA Y, THANKSGIVING DA Y, THE FRIDAY AFTER THANKSGIVING DA Y, AND CHRISTMAS DAY (8). 6 A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDA Y AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8). B. PAID HOLIDAYS: NEW YEAR'S EVE DAY, NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS EVE'S DAY, AND CHRISTMAS DAY (9). C. HOLIDA YS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING DAY, THE LAST WORK DAY BEFORE CHRISTMAS DAY, AND CHRISTMAS DAY (9). D. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS DAY, THE DAY BEFORE OR THE DAY AFTER CHRISTMAS DAY (9). E. PAID HOLIDAYS: NEW YEAR'S DAY, DAY BEFORE OR AFTER NEW YEAR'S DAY, PRESIDENTS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING DAY, CHRISTMAS DAY, AND A HALF-DAY ON CHRISTMAS EVE DAY. (9 1/2). F. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING JR. DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (I I). G. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING JR. DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DA Y, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DA Y, CHRISTMAS DAY, AND CHRISTMAS EVE DAY (11). H. PAID HOLIDAYS: NEW YEAR'S DAY, NEW YEAR'S EVE DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS DAY, THE DAY AFTER CHRISTMAS, AND A FLOATING HOLIDAY (10). 1. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DA Y, INDEPENDENCE DA Y, LABOR DAY, THANKSGIVING DA Y, FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DA Y (7). J. PAID HOLIDA YS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DA Y, THANKSGIVING DA Y, FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS DAY, THE DAY AFTER CHRISTMAS, AND A FLOATING HOLIDAY (9). L HOLIDA YS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DA Y, LABOR DAY, THANKSGIVING DA Y, THE FRIDA Y AFTER THANKSGIVING DAY, THE LAST WORKING DAY BEFORE CHRISTMAS DAY, AND CHRISTMAS DAY. (8) Q. PAID HOLIDAYS: NEW YEAR'S DA Y, MEMORIAL DA Y, INDEPENDENCE DA Y, LABOR DA Y, VETERANS DA Y, THANKSGIVING DA Y, THE DA Y AFTER THANKSGIVING DAY AND CHRISTMAS DAY (8). UNPAID HOLIDAY: PRESIDENTS' DAY. T. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, THE LAST WORKING DAY BEFORE CHRISTMAS DA Y, AND CHRISTMAS DA Y (9). U. HOLIDA YS: NEW YEAR'S DAY, DAY BEFORE NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, THE DAY BEFORE CHRISTMAS DAY, CHRISTMAS DAY (9). V. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DA Y, LABOR DAY, THANKSGIVING DA Y, DAY AFTER THANKSGIVING DAY, CHRISTMAS EVE DAY, CHRISTMAS DAY, AND ONE DAY OF THE EMPLOYEE'S CHOICE (9). W. PAID HOLIDAYS: NEW YEAR'S DAY, DAY BEFORE NEW YEAR'S DAY, PRESIDENTS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING DA Y, CHRISTMAS DA Y, DA Y BEFORE OR AFTER CHRISTMAS DAY (10). X. PAID HOLIDAYS: NEW YEAR'S DAY, DAY BEFORE OR AFTER NEW YEAR'S DAY, PRESIDENTS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DA Y, DAY AFTER THANKSGIVING DA Y, CHRISTMAS DA Y, DA Y BEFORE OR AFTER CHRISTMAS DA Y, EMPLOYEE'S BIRTHDAY (11). BENEFIT CODE KEY - EFFECTIVE 03-04-2009 :::6~ Y. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DA Y, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS DAY, AND A FLOATING HOLIDAY (9). BENEFIT CODE KEY - EFFECTIVE 03-04-2009 n;' Z HOLIDA YS: NEW YEAR'S DA Y, MEMORIAL DA Y, INDEPENDENCE DA Y, LABOR DA Y, THANKSGIVING DAY, FRIDAY AFrER THANKSGIVING DAY, AND CHRISTMAS DAY (7). IF A HOLIDAY FALLS ON SATURDAY, THE PRECEDING FRIDA Y SHALL BE CONSIDERED AS THE HOLIDAY. IF A HOLIDAY FALLS ON SUNDAY, THE FOLLOWING MONDAY SHALL BE CONSIDERED AS THE HOLIDAY. NOTE CODES 8 A. IN ADDITION TO THE HOURLY WAGE AND FRINGE BENEFITS, THE FOLLOWING DEPTH PREMIUMS APPLY TO DEPTHS OF FIFrY FEET OR MORE: OVER 50' TO 100' - $2.00 PER FOOT FOR EACH FOOT OVER 50 FEET OVER 100' TO 150' - $3.00 PER FOOT FOR EACH FOOT OVER 100 FEET OVER 150' TO 220' - $4.00 PER FOOT FOR EACH FOOT OVER 150 FEET OVER 220' - $5.00 PER FOOT FOR EACH FOOT OVER 220 FEET C. IN ADDITION TO THE HOURLY WAGE AND FRINGE BENEFITS, THE FOLLOWING DEPTH PREMIUMS APPLY TO DEPTHS OF FIFrY FEET OR MORE: OVER 50' TO 100' - $1.00 PER FOOT FOR EACH FOOT OVER 50 FEET OVER 100' TO 150' - $1.50 PER FOOT FOR EACH FOOT OVER 100 FEET OVER 150' TO 200' - $2.00 PER FOOT FOR EACH FOOT OVER 150 FEET OVER 200' - DIVERS MAY NAME THEIR OWN PRICE D. WORKERS WORKING WITH SUPPLIED AIR ON HAZMAT PROJECTS RECEIVE AN ADDITIONAL $1.00 PER HOUR. L. WORKERS ON HAZMA T PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS FOLLOWS - LEVEL A: $0.75, LEVEL B: $0.50, AND LEVEL C: $0.25. M. WORKERS ON HAZMAT PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS FOLLOWS: LEVELS A & B: $1.00, LEVELS C & D: $0.50. N. WORKERS ON HAZMA T PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS FOLLOWS - LEVEL A: $1.00, LEVEL B: $0.75, LEVEL C: $0.50, AND LEVEL D: $0.25 P WORKERS ON HAZMA T PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS FOLLOWS - CLASS A SUIT: $2.00, CLASS B SUIT: $1.50, CLASS C SUIT: $1.00, AND CLASS D SUIT $0.50. State of Washington DEPARTMENT OF LABOR AND INDUSTRIES Prevailing Wage Section ~ Telephone (360) 902-5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage Rates For Public Works Contracts The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, workers' wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements is provided on the Benefit Code Key. CLALLAM COUNTY EFFECTIVE 03-04-2009 ********************************************************************************************************** Classification ASBESTOS ABATEMENT WORKERS JOURNEY LEVEL BOILERMAKERS JOURNEY LEVEL BRICK AND MARBLE MASONS JOURNEY LEVEL CABINET MAKERS (IN SHOP) JOURNEY LEVEL CARPENTERS ACOUSTICAL WORKER BRIDGE, DOCK AND WARF CARPENTERS CARPENTER CREOSOTED MATERIAL DRYWALL APPLICATOR FLOOR FINISHER FLOOR LAYER FLOOR SANDER MILLWRIGHT AND MACHINE ERECTORS PILEDRIVERS, DRIVING, PULLING, PLACING COLLARS AND WELDING SAWFILER SHINGLER STATIONARY POWER SAW OPERATOR STATIONARY WOODWORKING TOOLS CEMENT MASONS JOURNEY LEVEL DIVERS & TENDERS DIVER DIVER ON STANDBY DIVER TENDER DREDGE WORKERS ASSISTANT ENGINEER ASSISTANT MATE (DECKHAND) BOATMEN ENGINEER WELDER LEVERMAN, HYDRAULIC MAINTENANCE MATES OILER DRYWALL TAPERS JOURNEY LEVEL ELECTRICAL FIXTURE MAINTENANCE WORKERS JOURNEY LEVEL P",m> 1 (See Benefit Code Key) Over Time Holiday Note Code Code Code 1H 5D 1C 5N 1M 5A PREVAILING WAGE $38.12 $53.37 $45.05 $14.67 $46.32 $46.16 $46.16 $46.26 $46.42 $46.16 $46.16 $46.16 $47.16 $46.36 $46.16 $46.16 $46.16 $46.16 1M 5D 1M 5D 1M 5D 1 M 5D 1M 5D 1M 5D 1M 5D 1M 5D 1M 5D 1M 5D 1M 5D 1M 5D 1 M 5D 1M 5D 1H 5D 1M 5D 1M 5D 1M 5D 1T 5D 1T 5D 1T 5D 1T 5D 1T 5D 1T 5D 1T 5D 1T 5D 1E 5P $38.12 $96.81 $54.19 $49.84 $47.09 $46.58 $47.09 $47.14 $48.71 $46.58 $47.09 $46.71 $46.34 $9.37 8A 8L 8L 8L 8L 8L 8L 8L 8L CLALLAMCOUNTY EFFECTIVE 03-04-2009 ***************************************************~*~**************************************************** Classification ELECTRICIANS - INSIDE CABLE SPLICER CABLE SPLICER (TUNNEL) CERTIFIED WELDER CERTIFIED WELDER (TUNNEL) CONSTRUCTION STOCK PERSON JOURNEY LEVEL JOURNEY LEVEL (TUNNEL) ELECTRICIANS - MOTOR SHOP CRAFTSMAN JOURNEY LEVEL ELECTRICIANS - POWERLlNE CONSTRUCTION CABLE SPLICER CERTIFIED LINE WELDER GROUNDPERSON HEAD GROUNDPERSON HEAVY LINE EQUIPMENT OPERATOR JACKHAMMER OPERATOR JOURNEY LEVEL L1NEPERSON LINE EQUIPMENT OPERATOR POLE SPRAYER POWDERPERSON ELECTRONIC TECHNICIANS ELECTRONIC TECHNICIANS JOURNEY LEVEL ELEVATOR CONSTRUCTORS MECHANIC MECHANIC IN CHARGE FABRICATED PRECAST CONCRETE PRODUCTS ALL CLASSIFICATIONS FENCE ERECTORS FENCE ERECTOR FENCE LABORER FLAGGERS JOURNEY LEVEL GLAZIERS JOURNEY LEVEL HEAT & FROST INSULA TORS AND ASBESTOS WORKERS MECHANIC HEATING EQUIPMENT MECHANICS MECHANIC HOD CARRIERS & MASON TENDERS JOURNEY LEVEL INDUSTRIAL ENGINE AND MACHINE MECHANICS MECHANIC INDUSTRIAL POWER VACUUM CLEANER JOURNEY LEVEL INLAND BOATMEN CAPTAIN COOK DECKHAND ENGINEER/DECKHAND MATE, LAUNCH OPERATOR PREVAILING WAGE $58.34 $62.86 $56.29 $60.60 $28.83 $54.25 $58.34 $15.37 $14.69 $58.36 $53.30 $38.14 $40.25 $53.30 $40.25 $53.30 $45.14 $53.30 $40.25 $12.07 $64.81 $70.60 $13.50 $13.80 $11.60 $32.47 $45.25 $48.28 $16.00 $39.31 $15.65 $9.24 $59.22 $34.81 $34.52 $58.62 $50.20 P"'9p? (See Benefit Code Key) Over Time Holiday Note Code Code Code 1E SA 1E SA 1E SA 1E SA 1 E SA 1E SA 1E SA 2A 6C 2A 6C 4A 5A 4A 5A 4A 5A 4A 5A 4A 5A 4A 5A 4A 5A 4A 5A 4A 5A 4A 5A 4A 4A 6Q 6Q 1H 5D 1Y 5G 1S 5J 1H 5D CLALLAM COUNTY EFFECTIVE 03-04-2009 *****************************************************~**************************************************** (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code INSPECTION/CLEANING/SEALING OF SEWER & WATER SYSTEMS BY REMOTE CONTROL CLEANER OPERATOR, FOAMER OPERATOR $9.73 1 GROUT TRUCK OPERATOR $11 .48 1 HEAD OPERATOR $12.78 1 TECHNICIAN $8.55 1 TV TRUCK OPERATOR $10.53 1 INSULATION APPLICATORS JOURNEY LEVEL $20.50 IRONWORKERS JOURNEY LEVEL $51.01 10 5A LABORERS ASPHALT RAKER $39.31 1H 5D BALLAST REGULATOR MACHINE $38.12 1H 5D BATCH WEIGHMAN $32.47 1H 5D BRUSH CUTTER $38.12 1H 5D BRUSH HOG FEEDER $38.12 1H 5D BURNERS $38.12 1H 5D CARPENTER TENDER $38.12 1H 5D CASSION VVORKER $39.31 1H 5D CEMENTDUMPERlPA~NG $38.83 1H 5D CEMENT FINISHER TENDER $38.12 1H 5D CHANGE-HOUSE MAN OR DRY SHACKMAN $38.12 1H 5D CHIPPING GUN (OVER 30 LBS) $38.83 1 H 5D CHIPPING GUN (UNDER 30 LBS) $38.12 1H 5D CHOKER SETTER $38.12 1H 5D CHUCK TENDER $38.12 1H 5D CLEAN-UP LABORER $38.12 1H 5D CONCRETE DUMPER/CHUTE OPERATOR $38.83 1 H 5D CONCRETE FORM STRIPPER $38.12 1H 5D CONCRETE SAW OPERATOR $38.83 1 H 5D CRUSHER FEEDER $32.47 1H 5D CURING LABORER $38.12 1H 5D DEMOLITION, WRECKING & MOVING (INCLUDING CHARRED MATERIALS) $38.12 1H 5D DITCH DIGGER $38.12 1H 5D DIVER $39.31 1H 5D DRILL OPERATOR (HYDRAULIC, DIAMOND) $38.83 1H 5D DRILL OPERATOR, AIRTRAC $39.31 1H 5D DUMPMAN $38.12 1H 5D EPOXY TECHNICIAN $38.12 1H 5D EROSION CONTROL WORKER $38.12 1H 5D FALLERlBUCKER, CHAIN SAW $38.83 1H 5D FINAL DETAIL CLEANUP O.e., dusting, vaOJuming, window deaning; NOT $29.65 1H 5D construction debris deanup) FINE GRADERS $38.12 1H 5D FIRE WATCH $32.47 1H 5D FORM SETTER $38.12 1H 5D GABION BASKET BUILDER $38.12 1H 5D GENERAL LABORER $38.12 1H 5D GRADE CHECKER & TRANSIT PERSON $39.31 1 H 5D GRINDERS $38.12 1H 5D GROUT MACHINE TENDER $38.12 1H 5D P::>gP .~ CLALLAM COUNTY EFFECTIVE 03-04-2009 ***************************************************~****************************************************** Classification GUARDRAIL ERECTOR HAZARDOUS WASTE WORKER LEVEL A HAZARDOUS WASTE WORKER LEVEL B HAZARDOUS WASTE WORKER LEVEL C HIGH SCALER HOD CARRIERlMORTARMAN JACKHAMMER LASER BEAM OPERATOR MANHOLE BUILOER-MUOMAN MATERIAL YARDMAN MINER NOZZLEMAN, CONCRETE PUMP, GREEN CUTTER WHEN USING HIGH PRESSURE AIR & WATER ON CONCRETE & ROCK, SANDBLAST, GUNITE, SHOTCRETE, WATER BLASTER PAVEMENT BREAKER PILOT CAR PIPE POT TENDER PIPE RELlNER (NOT INSERT TYPE) PIPELAYER & CAULKER PIPELAYER & CAULKER (LEAD) PIPEWRAPPER POT TENDER POWOERMAN POWDERMAN HELPER POWERJACKS RAILROAD SPIKE PULLER (POWER) RE-TIMBERMAN RIPRAP MAN ROOOER SCAFFOLD ERECTOR SCALE PERSON SIGNALMAN SLOPER (OVER 20") SLOPER SPRA YMAN SPREADER (CLARY POWER OR SIMILAR TYPES) SPREADER (CONCRETE) STAKE HOPPER STOCKPILER TAMPER & SIMILAR ELECTRIC, AIR & GAS TAMPER (MULTIPLE & SELF PROPELLED) TOOLROOM MAN (AT JOB SITE) TOPPER-TAILER TRACK LABORER TRACK LINER (POWER) TRUCK SPOTTER TUGGER OPERATOR VIBRATING SCREED (AIR, GAS, OR ELECTRIC) VIBRATOR VINYL SEAMER WELDER WELL-POINT LABORER PREVAILING WAGE $38.12 $39.31 $38.83 $38.12 $39.31 $39.31 $38.83 $38.83 $38.83 $38.12 $39.31 $38.83 $38.83 $32.47 $38.83 $38.83 $38.83 $39.31 $38.83 $38.12 $39.31 $38.12 $38.83 $38.83 $39.31 $38.12 $38.83 $38.12 $38.12 $38.12 $38.83 $38.12 $38.83 $38.83 $38.12 $38.12 $38.83 $38.83 $38.12 $38.12 $38.12 $38.83 $38.12 $38.83 $38.12 $38.83 $38.12 $38.12 $38.83 P::>gP 4 (See Benefit Code Key) Over Time Holiday Note Code Code Code 1H 50 1 H 5D 1 H 50 1H 50 1H 50 1H 50 1H 50 1H 5D 1H 5D 1H 50 1H 50 1H 50 1H 50 1H 50 1H 50 1 H 50 1H 50 1 H 50 1H 50 1H 50 1H 50 1H 5D 1H 50 1H 50 1H 5D 1H 50 1H 5D 1H 5D 1H 5D 1H 50 1 H 50 1H 5D 1 H 5D 1 H 50 1H 50 1H 50 1 H 50 1H 50 1 H 50 1H 50 1H 50 1H 5D 1H 5D 1 H 50 1H 50 1H 50 1H 50 1H 50 1H 50 CLALLAM COUNTY EFFECTIVE 03-04-2009 ********************************************************************************************************** (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code LABORERS - UNDERGROUND SEWER & WATER GENERAL LABORER $38.12 1H 5D PIPE LAYER $38.83 1H 5D LANDSCAPE CONSTRUCTION IRRIGATION OR LAWN SPRINKLER INSTALLERS $12.89 1 LANDSCAPE EQUIPMENT OPERATORS OR TRUCK DRIVERS $12.89 1 LANDSCAPING OR PLANTING LABORERS $12.89 1 LATHERS JOURNEY LEVEL $46.42 1M 5D METAL FABRICATION (IN SHOP) FITTERlWELDER $15.16 1 LABORER $11.13 1 MACHINE OPERATOR $10.66 1 PAINTER $11.41 1 PAINTERS JOURNEY LEVEL $34.87 2B 6Z PLASTERERS JOURNEY LEVEL $25.83 PLAYGROUND & PARK EQUIPMENT INSTALLERS JOURNEY LEVEL $8.55 PLUMBERS & PIPEFITTERS JOURNEY LEVEL $62.19 1G 5A POWER EQUIPMENT OPERA TORS ASSISTANT ENGINEERS $44.64 1T 5D 8P BACKHOE. EXCAVATOR SHOVEL, OVER 50 METRIC TONS TO 90 METRIC $48.46 1T 5D 8P TONS BACKHOE, EXCAVATOR SHOVEL, OVER 90 METRIC TONS $49.03 1T 5D 8P BACKHOE, EXCAVATOR, SHOVEL, OVER 30 METRIC TONS TO 50 $47.91 1T 5D 8P METRIC TONS BACKHOE, EXCAVATOR, SHOVEL, TRACTORS UNDER 15 METRIC TONS $47.00 1T 5D 8P BACKHOE, EXCAVATOR, SHOVEL, TRACTORS: 15 TO 30 METRIC TONS $47.42 1T 5D 8P BARRIER MACHINE (ZIPPER) $47.42 1T 5D 8P BATCH PLANT OPERATOR, CONCRETE $47.42 1T 5D 8P BELT LOADERS (ELEVATING TYPE) $47.00 1T 5D 8P BOBCAT (SKID STEER) $44.64 1T 5D 8P BROKK-REMOTE DEMOLITION EQUIPMENT $44.64 1T 5D 8P BROOMS $44.64 1T 5D 8P BUMP CUTTER $47.42 1T 5D 8P CABLEWA YS $47.91 1T 5D 8P CHIPPER $47.42 1T 5D 8P COMPRESSORS $44.64 1T 5D 8P CONCRETE FINISH MACHINE - LASER SCREED $44.64 1T 5D 8P CONCRETE PUMPS $47.00 1T 5D 8P CONCRETE PUMP-TRUCK MOUNT WITH BOOM ATTACHMENT $47.42 1T 5D 8P CONVEYORS $47.00 1T 5D 8P CRANE, FRICTION 100 TONS THROUGH 199 TONS $49.03 1T 5D 8P CRANE, FRICTION OVER 200 TONS $48.29 1T 5D 8P CRANES, THRU 19 TONS, WITH ATTACHMENTS $47.00 1T 5D 8P CRANES, 20 - 44 TONS, WITH ATTACHMENTS $47.42 1T 5D 8P CRANES, 45 TONS - 99 TONS, UNDER 150 FT OF BOOM (INCLUDING JIB $47.91 1T 5D 8P WITH ATACHMENTS) CRANES, 100 TONS - 199 TONS, OR 150 FT OF BOOM (INCLUDING JIB $48.46 1T 5D 8P WITH ATTACHMENTS) P"9P ~ CLALLAM COUNTY EFFECTIVE 03-04-2009 ********************************************************************************************************** (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Ccx:le Ccx:le Code CRANES, 200 TONS TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB $49.03 1T 5D 8P WITH ATTACHMENTS) CRANES, A-FRAME, 10 TON AND UNDER $44.64 1T 5D 8P CRANES,A-FRAME,OVER10TON $47.00 1T 5D 8P CRANES, OVER 300 TONS, OR 300' OF BOOM INCLUDING JIB WITH $48.29 1T 5D 8P ATTACHMENTS CRANES, OVERHEAD, BRIDGE TYPE ( 20 - 44 TONS) $47.42 1T 5D 8P CRANES, OVERHEAD, BRIDGE TYPE ( 45 - 99 TONS) $47.91 1T 5D 8P CRANES, OVERHEAD, BRIDGE TYPE (100 TONS & OVER) $48.46 1T 5D 8P CRANES, TOWER CRANE UP TO 175' IN HEIGHT, BASE TO BOOM $48.46 1T 5D 8P CRANES, TOWER CRANE OVER 175' IN HEIGHT, BASE TO BOOM $49.03 1T 5D 8P CRUSHERS $47.42 1T 5D 8P DECK ENGINEER/DECK WINCHES (POWER) $47.42 1T 5D 8P DERRICK, BUILDING $47.91 1T 5D 8P DOZERS, D-9 & UNDER $47.00 1T 5D 8P DRILL OILERS - AUGER TYPE, TRUCK OR CRANE MOUNT $47.00 1T 5D 8P DRILLING MACHINE $47.42 1T 5D 8P ELEVATOR AND MANLlFT, PERMANENT AND SHAFT-TYPE $44.64 1T 5D 8P EQUIPMENT SERVICE ENGINEER (OILER) $47.00 1T 5D 8P FINISHING MACHINE/BIDWELL GAMACO AND SIMILAR EQUIP $47.42 1T 5D 8P FORK LIFTS, (3000 LBS AND OVER) $47.00 1T 5D 8P FORK LIFTS, (UNDER 3000 LBS) $44.64 1T 5D 8P GRADECHECKER AND STAKEMAN $44.64 1T 5D 8P GUARDRAIL PUNCH $47.42 1T 5D 8P HOISTS, OUTSIDE (ELEVATORS AND MANLlFTS), AIR TUGGERS $47.00 1T 5D 8P HORIZONTAUDIRECTlONAL DRILL LOCATOR $47.00 1T 50 8P HORIZONTAUDIRECTIONAL DRILL OPERATOR $47.42 1T 5D 8P HYDRALlFTS/BOOM TRUCKS (10 TON & UNDER) $44.64 1T 5D 8P HYDRALlFTS/BOOM TRUCKS (OVER 10 TON) $47.00 1T 5D 8P LOADERS, OVERHEAD (6 YD UP TO 8 YD) $47.91 1T 5D 8P LOADERS, OVERHEAD (8 YD & OVER) $48.46 1T 5D 8P LOADERS, OVERHEAD (UNDER 6 YD), PLANT FEED $47.42 1T 5D 8P LOCOMOTIVES, ALL $47.42 1T 5D 8P MECHANICS, ALL $48.46 1T 5D 8P MIXERS, ASPHALT PLANT $47.42 1T 5D 8P MOTOR PATROL GRADER (FINISHING) $47.91 1T 5D 8P MOTOR PATROL GRADER (NON-FINISHING) $47.00 1T 5D 8P MUCKING MACHINE, MOLE, TUNNEL DRILL AND/OR SHIELD $47.91 1T 50 8P OIL DISTRIBUTORS, BLOWER DISTRIBUTION AND MULCH SEEDING $44.64 1T 5D 8P OPERATOR PAVEMENT BREAKER $44.64 1T 5D 8P PILEDRIVER (OTHER THAN CRANE MOUNT) $47.42 1T 5D 8P PLANT OILER (ASPHALT, CRUSHER) $47.00 1T 50 8P POSTHOLE DIGGER, MECHANICAL $44.64 1T 5D 8P POWER PLANT $44.64 1T 5D 8P PUMPS, WATER $44.64 1T 5D 8P QUAD 9, D-10, AND HD-41 $47.91 1T 5D 8P QUICK TOWER-NO CAB, UNDER 100 FEET IN HEIGHT BASED TO BOOM $44.64 1T 5D 8P REMOTE CONTROL OPERATOR ON RUBBER TIRED EARTH MOVING $47.91 1T 5D 8P EQUIP RIGGER AND BELLMAN $44.64 1T 5D 8P ROLLAGON $47.91 1T 5D 8P ROLLER, OTHER THAN PLANT ROAD MIX $44.64 1T 5D 8P P"9An CLALLAM COUNTY EFFECTIVE 03-04-2009 ********************************************************************************************************** Classification ROLLERS, PLANTMIX OR MUL TILlFT MATERIALS ROTO-MILL, ROTO-GRINDER SAWS, CONCRETE SCRAPERS - SELF PROPELLED, HARD TAIL END DUMP, ARTICULATING OFF-ROAD EQUIPMENT (45 YO AND OVER) SCRAPERS, CONCRETE AND CARRY ALL SCREED MAN SHOTCRETE GUNITE SLlPFORM PAVERS SPREADER, TOPSIDER & SCREEDMAN SUBGRADE TRIMMER TOWER BUCKET ELEVATORS TRACTORS, (75 HP & UNDER) TRACTORS, (OVER 75 HP) TRANSFER MATERIAL SERVICE MACHINE TRANSPORTERS, ALL TRACK OR TRUCK TYPE TRENCHING MACHINES TRUCK CRANE OILER/DRIVER ( UNDER 100 TON) TRUCK CRANE OILER/DRIVER (100 TON & OVER) TRUCK MOUNT PORTABLE CONVEYER WHEELTRACTORS,FARMALLTYPE YO YO PAY DOZER POWER EQUIPMENT OPERATORS- UNDERGROUND SEWER & WATER (SEE POWER EQUIPMENT OPERATORS) POWER LINE CLEARANCE TREE TRIMMERS JOURNEY LEVEL IN CHARGE SPRAY PERSON TREE EQUIPMENT OPERATOR TREE TRIMMER TREE TRIMMER GROUNDPERSON REFRIGERATION & AIR CONDITIONING MECHANICS MECHANIC RESIDENTIAL BRICK & MARBLE MASONS JOURNEY LEVEL RESIDENTIAL CARPENTERS JOURNEY LEVEL RESIDENTIAL CEMENT MASONS JOURNEY LEVEL RESIDENTIAL DRYWALL TAPERS JOURNEY LEVEL RESIDENTIAL ELECTRICIANS JOURNEY LEVEL RESIDENTIAL GLAZIERS JOURNEY LEVEL RESIDENTIAL INSULATION APPLICATORS JOURNEY LEVEL RESIDENTIAL LABORERS JOURNEY LEVEL RESIDENTIAL PAINTERS JOURNEY LEVEL RESIDENTIAL PLUMBERS & PIPEFITTERS JOURNEY LEVEL P"'9P 7 (See Benefit Code Key) Over PREVAILING Time Holiday Note WAGE Code Code Code $47.00 1T 50 8P $47.42 1T 50 8P $47.00 1T 50 8P $47.91 1T 50 8P $47.00 1T 50 8P $47.42 1T 50 8P $44.64 1T 50 8P $47.91 1T 50 8P $47.91 1T 50 8P $47.42 1T 50 8P $47.00 1T 50 8P $47.00 1T 50 8P $47.42 1T 50 8P $47.42 1T 50 8P $47.91 1T 50 8P $47.00 1T 50 8P $47.00 1T 50 8P $47.42 1T 50 8P $47.42 1T 50 8P $44.64 1T 50 8P $47.42 1T 50 8P $39.29 $37.21 $37.81 $35.18 $26.55 4A 4A 4A 4A 4A 5A 5A 5A 5A 5A $27.68 $45.05 1M 5A $17.85 $25.63 $18.00 $27.78 $21.36 $9.86 $18.08 $15.97 $14.60 CLALLAM COUNTY EFFECTIVE 03-04-2009 ********************************************************************************************************** (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code RESIDENTIAL REFRIGERATION & AIR CONDITIONING MECHANICS JOURNEY LEVEL $60.56 1G 5A RESIDENTIAL SHEET METAL WORKERS JOURNEY LEVEL (FIELD OR SHOP) $34.14 11 6L RESIDENTIAL SOFT FLOOR LAYERS JOURNEY LEVEL $10.88 RESIDENTIAL SPRINKLER FITTERS (FIRE PROTECTION) JOURNEY LEVEL $19.67 ROOFERS JOURNEY LEVEL $38.28 1R 5A USING IRRITABLE BITUMINOUS MATERIALS $41.28 1R 5A SHEET METAL WORKERS JOURNEY LEVEL (FIELD OR SHOP) $55.27 1 E 6L SHIPBUILDING & SHIP REPAIR BOILERMAKER $32.56 1H 6W HEAT & FROST INSULATOR $48.28 1S 5J LABORER $12.16 1 MACHINIST $17.16 1 SHIPFITTER $14.66 1 WELDER/BURNER $14.66 1 SIGN MAKERS & INSTALLERS (ELECTRICAL) JOURNEY LEVEL $19.29 SIGN MAKERS & INSTALLERS (NON-ELECTRICAL) JOURNEY LEVEL $12.15 SOFT FLOOR LAYERS JOURNEY LEVEL $38.18 1B 5A SOLAR CONTROLS FOR WINDOWS JOURNEY LEVEL $10.31 1B 50 SPRINKLER FITTERS (FIRE PROTECTION) JOURNEY LEVEL $19.67 STAGE RIGGING MECHANICS (NON STRUCTURAL) JOURNEY LEVEL $13.23 SURVEYORS CHAIN PERSON $9.35 INSTRUMENT PERSON $11 .40 PARTY CHIEF $13.40 TELECOMMUNICATION TECHNICIANS TELECOMMUNICATION TECHNICIANS JOURNEY LEVEL $32.34 1E 5A TELEPHONE LINE CONSTRUCTION - OUTSIDE CABLE SPLICER $31 .46 2B 5A HOLE DIGGER/GROUND PERSON $17.58 2B 5A INSTALLER (REPAIRER) $30.17 2B 5A JOURNEY LEVEL TELEPHONE L1NEPERSON $29.26 2B 5A SPECIAL APPARATUS INSTALLER I $31.46 2B 5A SPECIAL APPARATUS INSTALLER" $30.82 2B 5A TELEPHONE EQUIPMENT OPERATOR (HEAVY) $31 .46 2B 5A TELEPHONE EQUIPMENT OPERATOR (LIGHT) $29.26 2B 5A TELEVISION GROUND PERSON $16.67 2B 5A TELEVISION L1NEPERSON/INSTALLER $22.19 2B 5A TELEVISION SYSTEM TECHNICIAN $26.42 28 5A TELEVISION TECHNICIAN $23.76 2B 5A TREE TRIMMER $29.26 28 5A P:>9pR CLALLAM COUNTY EFFECTIVE 03-04-2009 ********************************************************************************************************** (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code TERRAZZO WORKERS & TILE SETTERS JOURNEY LEVEL $43.61 1M 5A TILE, MARBLE & TERRAZZO FINISHERS FINISHER $37.44 1B 5A TRAFFIC CONTROL STRIPERS JOURNEY LEVEL $37.90 1K 5A TRUCK DRIVERS ASP HAL T MIX ( TO 16 YARDS) $43.45 1T 50 8L ASPHALT MIX (OVER 16 YARDS) $44.25 1T 50 8L DUMP TRUCK $20.23 1 DUMP TRUCK & TRAILER $20.23 1 OTHER TRUCKS $44.25 1T 50 8L TRANSIT MIXER $23.73 1 WELL DRILLERS & IRRIGATION PUMP INSTALLERS IRRIGATION PUMP INSTALLER $11.60 1 OILER $9.45 1 \l\iELL DRILLER $11.60 1 P"9A q Attachment B Construction Plans Construction Plans Sheets 1 Of 2 and 2 Of 2 have not been inserted into this PDF document due to differing page formats. These sheets are formatted for Ledger size paper (11" x 17") are provided in a separate PDF file titled Construction Drawings. The drawings were prepared in color format and have been reproduced as black and white filed. Color copies are available and can be obtained by calling M. Szatlocky, Project Engineer, at 417-4808. Project DR99-10 Front Street Storm Drain Construction ~ i&: 0; G: Vicinity Map N.T.S. z e ;?! ~ ~ ~ (j ~ W ~ ;Y 00 ~ !-. 'V 0.> ~ * :?;-v:" (j ~ A r5' # <z l- e --' Q. 0; o Cl .... o j[ CALL BEFORE YOU DIG 1-800-424-5555 FOR UNDERGROUND UTILITY LOCA liON SERVICE General Notes 1. ALL WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDft.NCE WITH THE CITY OF PORT ANGELES STANDARDS, THE CURRENT EDITION OF THE STATE OF WASHINGTON STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION, AND ANY PROJECT SPECIFIC SPECIAL PROVISIONS OR CONDITIONS AND REQUIREMENTS. 2. TEMPORARY EROSION/WATER POLLUTION MEASURES ARE REQUIRED AND SHALL COMPLY WITH THE CITY CLEARING AND GRADING ORDINANCE AND WSDOT / APWA SPECIFICATION 1-07.15. 3. EXISTING AND NEWLY CONSTRUCTED STORM WATER DRAINAGE SYSTEMS SHAll BE PROTECTED FROM CONSTRUCTION SITE RUNOFF. 4. A PRECONSTRUCTION MEETING SHALL BE HELD WITH THE CITY PRIOR TO THE START OF CONSTRUCTION. 5. HORIZONTAL AND VERTICAL CONTROLS/DATUM AS ADOPTED BY THE CITY SHALL BE USED, UNLESS APPROVED OTHERWISE. 6. ALL APPROVALS AND PERMITS REQUIRED BY THE CITY SHALL BE OBTAINED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION, UNLESS OTHERWISE APPROVED BY THE CITY ENGINEER. 7. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES. THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR TO CONSTRUCTION BY CALLING UNDERGROUND LOCATE AT 1-800-424-5555 A MINIMUM OF 48 HOURS PRIOR TO ANY EXCAVATION WORK. 8. IF THE CURRENT WSDOT STANDARD UK" PLANS ARE NOT UTILIZED, THE CONTRACTOR SHALL PROVIDE A TRAFFIC CONTROL PLAN(S) FOR REVIEW AND APPROVAL BY THE CITY ENGINEER IN ACCORDANCE WITH THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD). THE WSDOT IS REQUIRW TO REVIEW AND APPROVE THE PLANS AT LEAST THREE DAYS PRIOR TO ANY WORK ON STATE ROUTES. 9. THE CONTRACTOR SHALL HAVE A COPY OF THE APPROVED PLANS AT THE CONSTRUCTION SITE AT ALL TIMES. 10. CONSTRUCTION WORK HOURS SHALL BE RESTRICTED TO 7 A.M. TO 10 P.M., UNLESS OTHERWISE APPROVED IN WRITING. 12. THE CITY CONSTRUCTION INSPECTOR SHALL BE NOTIFIED A MINIMUM OF 48 HOURS IN ADVANCE OF THE NEED FOR AN INSPECTION, UNLESS OTHERWISE INFORMED. 13. PER THE PROVISIONS OF THE CURRENT WSDOT STANDAlRD SPEaflCATIONS RELATED TO PUBLIC CONVENIENCE AND SAFETY, THE CONTRACTOR SHALL MAINTAIN READY ACCESS TO DRIVEWAYS, HOUSES, AND BUILDINGS ALONG THE LINE OF WORK. 14. A MINIMUM OF ONE WAY TRAVEL THROUGH THE PROJECT AREA SHALL BE MAINTAINED AT ALL TIMES. 15. SHOULD ACCESS TO A PROPERTY ADJOINING THE PROJECT REQUIRE TEMPORARY CLOSURE ANTICIPATED TO HAVE A DURATION EXCEEDING 15 MINUTES, THE CONTRACTOR SHALL COORDINATE THE TEMPORARY CLOSURE WITH THE PROPERTY OWNER/RESIDENT. A MINIMUM OF 24 HOURS ADVANCE NOTIFICATION SHALL BE PROVIDED TO THE PROPERTY OWNER/RESIDENT PRIOR TO Am SUCH TEMPORARY CLOSURE. 1 of 2 0> o o N o tON ~1O ~I"') XlO ;: 0 m..- (I) CD ...- ..r:::. w zoq- () i:iJ dOO ... (2)U)...... I o Z~a...Clr--. :::E <(~ ~l() o ::r:oq- ri:~ ~'O ~~8~~ u..CD~(f) O~I-W" a...(I)L:J~ ~ IClO 1:3 :n~a: w~ ,..0 No.. I"') @D ~ :<: W -l <( (.) (f) a c 0 '+=" () ::J 10- ....... en c 0 () C "cu '- 0 E !- 0 ...... +-' Q) (f) Q) +-' Q) ..c <D en '- ....... (j) (1) +-' C - 0 ...- '- I-- LL Plot Date: PI:DT \<:'~fgfg ::0 0 "lJ s:: r'l =::J' 0 (0)>< -j70r'l p-Pl Z [Tl G)\<:'~X cm"--Ui j;: :~-j ::0::0 lJ 0 r'l [Tl ::0 ;]~N~ )>)> Z S::ZO_ r'l G) ~ Z CO~ ~j;:I-j o;:Orn\<:, <)>C; )> 0 __ 7LZ fTiC~ O(J),,-- =::Jm G) Z : ~G);:o -j (J) r'l [Tl[Tl0 . OC =::JQ OZ ZG) (f) CD 0 0 (") Z (J) r-+ ;-1 _. 0 OJ :J lJ < 0 I 0 0 ;:0 ~ ~ II Q) Z :(Jl - . ~ ,::; -. : :J ~(C iTj i ';._: I: ,: ~ f ,~,,'i i.> r II ; ," t'i --, , I:~~ ~,TI :'""-j ,', ;.u ", ";"" lJO)> ;:OOlJ -ZlJ O-j;:O ;:0::00 -jPX 00' -j, oQo 0;:00 Z )> (J)-j-j --100 2!lJZ ~SO OI'l ZO[Tl . 'x [Tl- (J) 0!1:';-1 o z<m 7 [Tl :' fTi~ 0-110 -j.<~ "",0 -::::'0' mO(J) :)>-j <:,=::JO <0;:0 ~ZS:: \<:,0 ;:0 [Tl)> , -- P1 ?-'- < )> =::J o Z l,j, t:i ~: ;-J f\)1 01 -, \ ~ l\ " '.---'''.., '\.--d(-/<;l \ '-----:-~::o (', L"l/ ; II )>r'lr'l; \/, ]1 ~ ~ ~ ",. i-' ' I [Tl[Tl , -jx --- ;:0 Ui r'l -j ~r ~ ~ I ; [Tl ;:0 , 'r'l i ' 1'1 I:, <:,-j ("1 -< ) "-- -j ~: il\ ~ ~ } ~ .... II: ,---\ 1":"1 f:c' I L I \ I I , m U) )> lJ lJ ;:0 o ?< .-- n -- rCI II ~j ~1 ~;: I I, -l f-j .-_:J :r~ ,;= , ' ; I ,~,~ ~~ II , : .J. :::ti ~:~'_.'; g ~~! ":.;p;;~ ~c ,~~.! m .._\ ::c o r! i/'j March 1\.)1 , Front Street Storm Drain Construction Plan & Profile SCALE CITY OF PORT ANGEI_ES PUBLIC Wor~I<S 321 E. 5TH STREET P.O. BOX 1150 PORT ANGELES, WASHINGTON, 98362 PHmJE: (360) 457-0411 o I j 5 10 j ~ Attachment C Forms /D)tg@~ !I{}~@J CITY OF PORT ANGELES April 15, 2009 NOTICE OF AWARD (!cwU4 Mtkt k,~t ~~ 41~?1(fJ~ ~u~ oD.M-b1-(t~M (fy-ch~ cl ;~~r 0(;C-l clJd V"cLie..<-u.rrtJ t{ TO: Jamestown Excavating, Inc. 1033 Old Blyn Highway_ Sequim, WA 98382 Attn: John Kurtis PROJECT DESCRIPTION: First Street Storm Drain Construction, Project No. DR 09-02 The Owner has considered the bid submitted by you for the above described work in response to its Advertisement for Bids dated March 18, 2009 You are hereby notified that your bid has been accepted in the amount of $18,329.68. You are required, as stated in the Information for Bidders, to execute the contract and furnish the required Contractor's Performance and Payment Bond and certificates of insurance within ten (10) calendar days from the date of this notice to you. If you fail to execute said contract and to furnish said bonds within ten (10) days from the date of this Notice, said Owner will be entitled to consider all of your rights arising out of the Owner's acceptance of your bid as abandoned and as a forfeiture of your bid bond. The Owner will be entitled to such other rights as may be granted by law. You are required to return an acknowledged copy of this Notice of Award to the Owner. Dated this 15th day of April, 2009. CITY OF PORT ANGELES BY:1'f\U~ ~ Title: Project Manager ACCEPTANCE OF NOTICE BY CONTRACTOR Receipt of the above Notice of Award is hereby acknowledged this '30 day of k CJnu" ~~~ SIGNA RE 20M. Print Name: 'Tb/t1A) Lild: fVldf"\ Title: ~(b lee r- Car- dJ r1 ~'f1fV ---+...!v Please return signed original to the City of Port Angeles Public Works & Utilities Department, attn: Michael Szatlocky, PE, Project Manager cc: City Clerk PW 0407_17 [Revised 05/06] . AC.ORD. CERTIFICATE OF LIABILITY INSURANCE OPID LI' I DAnllMlMlDlTTTT) JAMJIl9-1 ' 04/24/09 PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATIO~ ONL.Y AND CONFERS NO RIGHTS UPON THE CERTIFICATE ~rown & Drown - Seattle HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR 2101 4th Avenue, Suit:. 600 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW Seatt:le WA 98121 Phone: 206-956-1600 Fax:206-9SS-9S00 INSURERS AFFORDING COVERAGE ., NAIC# INllUlll!D INISURER AI Hudson Insu~an~e Company 25054 INSURER B! JarMi.town S' Klallam 'l'zib. -.--..-........--.. -_. J1('J:' Deve~o~t: lnc. INSURER 0: 1033 Old B 83 aigbway INSURER 0: sequim WA 9 392 INSURER E; COVERAGES TI'lI: poucres OF INSURANCE LISTED BELOW HAve BeEN ISSUED TO THE INSU~EDNAMED ABOVE FOR THE POLley PERIOD INDICA'I'EO. No'I'WI'01sTANCING ANY REQUIREMENT. THRM OR CONDITION OF ANY CONTRACT OR OTHER OOCUMENTWlTH ~fSPfCT TO WMICH THIS CfRTIFICATI; MAY 8E ISSUED O~ MAY pePITA/N. THE INSURANce Al'PORDED BY THI! POUCIE!S DE!&CRIBE!D I'IEREIN IS SUBJECT TO ALl THE TERMS. EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE UMIT9 SHOWN MAY HAVE BEEN REouest) BV PAID CLAIMS. ._~ ,,,- LTR ~SR TYPII 0' INSUIlANC! POLICY NUMBER DiI"i1l if,flWDlI/YYI . CATE IMMIl1O/YYT LIMITS ~ERAL UABIUTY EACH OCCURRENCE 56,000,000 A X ~ C:r'lEI'lCIAI. IOl;NERAL ~IAISILI1'( NACLOO19603 07/01/08 07/01/09 PAEMlliEli lEloaoura"oal S 250.000 I-- Cl./IIMS MAOS [jU OCCUR MEO GXP (Any 0110 pll/SOll) $ Excluded ~ PEASONAL I ADV INJURY S Ei 000.000 I-- GENERAL AGGREGATE ;7,000,000 I~t AOO~EnE ~IMrr APnlS PIiR: . PROOUCT8. COMPIOP AOO 17,000,000 POLICY ~ LOC EmP Ben. 6,000,000 4UTOt,tOISIUl LIAeILITY OOMIIINeCl8l/llG~E LIMrr l- 56,000,000 ~ ~ ANY AUTO NACLOO19603 07/01/09 07/01/09 lEa accld.n~ ~ ALl. OWNED AUTOS 1I00lL Y INJUAY SCHEIDULED AUTOS (I'll. parsan) $ I- " ~ HIRED AUTOS BOClL Y INJURY S ~ NON-OWNEO AUTCS (I'll. accident) PROPERlV DAMAGE S (per 9cald8ll0 ~QI! LIAIIIUTY AUTO ONLY -l!A ACCIDENT I ANY AUTO OTHER THAN EA ACC 5 AUTO ONLY! AGG , E1'CESliIUMBRELLA UABILITY EACH OCCURRENCE $ :=J OCCUR 0 CLAIMS MACE AGGREOATE S f =j DEDUCTIBLE 5 RETENTION 5 S WOIlK2IlS COMPI!NSATloN A~D ITORYtIM/r'S I )( IUe~' A EMPLCTERIS" LIABILITY OBH122693S22 06/15/08 05/15/09 11000000 . ANY PAOPAIETORlPARTNEFlII;XiCUT\VE E,L. EACH ACCIDENT OFFICERlI\oIEMIlSR EllCLUDE07 E,I" DleElA5C . Ell EMPLOYE!: 51000000 ~~~Mt~Jf~v1~8~ ~10ft' EoL. DISEASE. POLICY LIMIT = 1000000 OTHU DESCRlmON 01" OPI!RATIONS I LOCA'nQN8 I VEHlr;;:U;S I EXCLUSIONS ADClI!D BY ENDORllEMIMT I GPECIAL PROVIlllON8 RE: Replaoe ca~ch basin, in5~all PVC seo~ain, ruse etoJ:m rh'ain manhole g~&t:8 and covet'. C1.t.y of Po:~ Angeles Puh1ic Works a:e acid.i~ion&l i.nsureds as rBCIUired by w:it:~.n cont:ac~ ana 0: &q%e_nt: wi th the named insu:ed. CERTIFICATE HOLDER City of Po:t Angeles PI.1blio WO:Jc8 PO BOX 1150 Por~ Ange~es ~ 98362 CANCELLATION CI TY - 61 SHOULCl ANY Of THE ABOVE CE$CRIIIEC POLICIE5 at; CANCELLED BEfORE THE EXPIRATION ~Tt: THIRIO', THIIIUUING INSUftlll WILL IINClBAVO" TO MAIL ~ DAYS WIIITTI!N NDTICE TO 'n41! eMTIPICATI! HOl1lER NAMI;D TO THE 1.1.". BUT "AlLURE TO DO so al4ALL IMPOlll! NO OBLIOATIOIII DR l.IalllLllY ap ANY KIND UPON TilE INIIU~ElM. ITII AflllNTII 011 I\EPRESENTATlVES. AIITHOIt~D UPIWlI!~ATrvl! ' / ,,' ca> ACORD CORPORATION 988 ACORD 25 (2001/08) ",' 1=:00/7.00 IPI '~NT ~~~~~~/NMn~A~NMn~A OO~R ~GR ~O7. X~~ Rb:OL ROO7./b7./bO SudCt/J)~ckL 1f- 1 t/L/O f g' /q/IJbCf.31 PERFORMANCE and PAYMENT BOND Bond to the City of Port Angeles Bond # KNOW ALL MEN BY THESE PRESENTS: That we, the undersigned, as Principal, and a corporation, organized and existing under the laws of the State of Washington, as a surety corporation, and qualified under the laws of the State of Washington to become surety upon bonds of contractors with municipal corporations as surety, are jointly and severally held and firmly bound to the City of Port Angeles in the penal sum of $_ for the payment of which sum on der 3dministrators or personal representatives, as If! pe wi m SL ar p€ or a( bl S Thi ore Da co CO · CJ . -..:t ~ . r- -, Th WI Pri Stl the ~ - . . w . t;c a . . W un thl . . C") 0i B co -= ~'" '" c: W ~.9 ~ ~ !!Ii ;: J: T ~.~ . i~~ - . S ti;.~ - ~~ S . p ~I~ "'1 ," g;1~ . .J .;,; ~ ;3-.' ---: L.__. Wu; ~o Oll: I-W :>-0 ~ll: 0...0 +~~, .'- ~ :;: Cl:l C/) ll: ~ -oJ -oJ o o -........;..:.. .,...- -;:..-:: -::.:.~ '- '.Ll f~: s:.::..:.: ::J.) :1-=' -J-_~ ;::_.':t .""ol =1:' -d t ~.:? .'j -. . - 9 -:'.: :-- -. :- ~-"'.' <:: c -- \.. . ...."C-.,I ..~._. l.-l..".. ".... .'~ -- Li_.~ - ::-=J .5'.:= ~:l _. (:" .:':: ....~_. . .-;:1 t:' ~ . ~ f~~ v'-: "\.J a: 1.,,'-.1 w -l.... f- fi ~ 2 LL w a: (!) J: U iJl -' I- ~ (., (..) S:! )f the State of Washington and the _ day of ,20_. t to let to the said the above bounded mbered DR99-20, and providing for Front .0 herein and is made a part hereof as ~ C'- ..... ut to accept, the said contract, and he manner and within the time set forth; now, o C'- ..... n.J r1'l Ul ..... , shall faithfully nner and within the time therein set forth, or er said contract, and shall pay all laborers, lersons who shall supply said Principal or rrying on of said work, and shall indemnify lamage or expense by reason of failure of !cts appearing or developing in the material 1tract within a period of one year after its md in that event, this obligation shall be void; ~ffect. r1'l . . c..D n.J c..D C'- o ..... U1 n.J ..... ~O . . . - ~ co co o -r -r C'- rincipal y ~ Title .gent Address Igent Contact and Phone Number CONTRACT CHANGE ORDER (CCO) NO. Project Name: Front Street Storm Drain Construction Date Project: DR 99-20 Contractor DESCRIPTION OF WORK You are ordered to perform the following described work upon receipt of an approved copy of this Change Order: 1. Describe work here 2. Additional work, etc.... Such work will be compensated by: check one or more of the following as applicable [ ] Increase or [ Decrease in bid items; [ ] Force Account; [ ] Negotiated Price: The described work affects the existing contract items and/or adds and/or deletes bid items as follows: Item No. Description RFI # Qty. Unit $ Cost Per Unit $ Cost Orig. Rev. 2 Orig. Rev. ORIGINAL CURRENT EST. NET CHANGE TOTAL CHANGE ORDERS, EST. CONTRACT AFTER CONTRACT CONTRACT THIS CHANGE ORDER INCLUDING THIS ONE THIS CHANGE ORDER . * * . . DAYS: XX DAYS:YY DAYS: zz DAYS: XX+ZZ-YY DAYS: YY+ZZ . Amount with applicable sales tax included All work, materials and measurements to be in accordance with the provisions of the original contract and/or the standard specifications and special provisions for the type of construction involved. The payments and/or additional time specified and agreed to in this order include every claim by the Contractor for any extra payment or extension of time with respect to the work described herein, including delays to the overall project. PROJECT ENGINEER CITY ENGINEER CONTRACTOR PUBLIC WORKS & UTILITIES DIRECTOR CITY MANAGER CITY COUNCIL APPROVAL DATE: CONTRACTOR'S APPLICATION FOR PAYMENT Front Street Storm Drain Construction, Project DR 99-20 Page 1 of 2 TO: City of Port Angeles DATE: Public Works & Utilities Department P.O. Box 1150 Port Angeles, W A 98362 FROM: PAYMENT REQUEST NO. PERIOD From: to [end of period]: STATEMENT OF CONTRACT ACCOUNT 1 Original Contract Amount (Excluding Sales Tax) $ 2 Total Value of Approved Change Order No(s). (Excluding Sales Tax) $ 3 Adjusted Contract Amount [1 +2] $ 4 Value of Work Completed to Date (per attached breakdown) $ 5 Material Stored on Site (per attached breakdown and material receipts) $ 6 Subtotal [4+5] $ 7 8.4% Sales Tax (at 8.4% of Subtotal), As Applicable $ 8 Less Amount Retained (at 5% of subtotal) $ 9 Subtotal [6+7-8] $ 10 Total Previously Paid $ 11 AMOUNT DUE THIS REQUEST [9-10] $ WAIVER OF CLAIMS FOR EXTRA COST OR TIME: The undersigned Applicant waives and releases, up through the date hereof, any and all claims for costs or item extensions arising out of or relating to extra or changed work or delays or acceleration not specifically identified and reserved in the amounts identified below or previously acknowledged in writing by the City of Port Angeles. CERTIFICATE OF THE CONTRACTOR: I hereby certify that the work performed and the materials supplied through the ending period date noted above represent the actual value of accomplishment under the terms of the contract (and all authorized changes) between the Applicant and the City of Port Angeles, relating to the above referenced project, and that the remaining contract balance is sufficient to cover all costs of completing the work in accordance with the contract documents. Continu~d on Page 2 CONTRACTOR'S APPLICATION FOR PAYMENT Page 2 of 2 I also certify that all lower-tier payments, less applicable retention, have been made by the Applicant for the periods covered by previous payment(s) received by the Applicant to (1) all lower- tier subcontractors/ suppliers, and (2) for all materials, equipment and labor used or in connection with the performance of this contract. I further certify that I have complied with all federal, state and local tax laws, including Social Security laws and Unemployment Compensation laws and Workmen's Compensation laws, insofar as applicable to the performance of this work, and have paid all such taxes, premiums and/or assessments arising out of the performance of the work. I further certify that, to the best of my knowledge, information and belief, all work for which previous payment(s) have been received shall be free and clear of liens, claims, security interests and encumbrances in favor of the Contractor, subcontractors, material suppliers, or other persons or entities making a claim by reason of having provided labor, materials and equipment relating to the work. Within seven (7) days of receipt of the payment requested herein, all payments, less applicable retention, will be made through the period covered by this pay request to all my lower-tier subcontractors/suppliers and for all materials, equipment, labor, taxes and assessments arising out of the performance of all said lower-tire work. DATED: CONTRACTOR: SIGNATURE: PRINTED NAME AND TITLE: SUBSCRIBED AND SWORN to before me this day of ,20_. Notary Public in and for the State of residing at My appointment expires APPROVAL: Project Manager Date City Engineer Date