Loading...
HomeMy WebLinkAbout4.618 Original Contract </.~/8 ~ORT ANGELES WAS H I N G TON, U. S. A. Public Works & Utilities Department June 29, 2009 Eddie Miller Contracts Specialist Facilities Division Engineering and Architectural Services Department of General Administration PO Box 41012 Olympia, WA 98504-1012 Dear Eddie, On behalf of the City of Port Angeles, I am pleased to provide the executed Authorization No. 2009-269A(1) for the detailed investment grade audit and energy services proposal for City Hall from McKinstry Essention. Please feel free to contact me if you have any questions. Sincerely, ~~ Philip D. Lusk Power Resources Manager Ic: Becky Upton, City Clerk Phone: 360-417-4800/ Fax: 360-417-4542 Website: www.cityofpa.us / Email: publicworks@cityofpa.us 321 East Fifth Street - P.O. Box 1150/ Port Angeles, WA 98362-0217 State of Washington Department of General Administration Facilities Division Engineering & Architectural Services . 210 11 th Avenue, SW. PO Box 41012 · Olympia, WA 98504-1012 (360) 902.7272 · FAX (360) 753.2848 June 22, 2009 TO: Philip Lusk, City of Port Angeles FROM: ~die Miller, Contracts Specialist, (360) 902-7219 RE: Authorization No. 2009-269 A (1) Detailed Investment Grade Energy Audit & Energy Services Proposal City Hall McKinstry Essention SUBJECT: Funding Approval . The Department of General Administratio~ E&AS, requires funding approval for the above referenced contract document(s). The amount required is as follows: Energy Audit and Energy Services Proposal $29,370.00 In accordance with the provisions or RCW 43.88, the signature affixed below certifies to the Division of Facilities, Engineering & Architectural Services that the above identified funds are appropriated, allotted, and that the using/client agency bears the Jiability for any issues related to the funding for this project. Otherwise it is the intent of the facility to obtain funding from the State Treasurer's lease/purchase or LOCAL program and/or obtain the balance from . By ~ I A- '1>,t'llE't.rclR.. 'P"'G'-l ~ j..,-E 2. 4\" "LOO~ Name "-:I rtIU. """""" 'Odfitle Date Please sign and return this form to E&AS. If you have any questions, please call me. ....... (;, '0 ~ e ~ORTANGELES WAS H I N G TON, U. S. A. CITY ,OF CITY COUNCIL MEMO DATE: March 17, 2009 To: CITY COUNCIL FROM: Glenn A. Cutler, Director of Public Works & Utilities SUBJECT: Interagency Agreement For Performance-Based Contracting Amendment Summary: The proposed amendment to the Interagency Agreement would authorize staff to negotiate a proposal for the Conservation Voltage Reduction and City Hall Complex Energy Conservation projects with a performance contractor. Another amendment to the Interagency Agreement would be sought later to authorize the projects to be implemented. Recommendation: Authorize the Public Works and Utilities Director to negotiate and sign two amendments to the Interagency Agreement for Performance Based Contracting; one for the Conservation Voltage Reduction project, and one for the City Hall Complex Energy Conservation project. Background/Analysis: On February 17, 2009, City Council authorized the Public Works and Utilities Director to sign the Interagency Agreement for Performance Based Contracting with the State of Washington. This approach can be used to implement needed improvements to City facilities without capital outlay where the utility cost savings, Bonneville Power Administration conservation program incentives, and the conservation fund are used to pay all project costs. During the week of March 2,2009, staff interviewed several Washington State qualified performance contractors. The proposed amendments to the Interagency Agreement would authorize staff to negotiate proposals for the Conservation Voltage Reduction and City Hall Complex Energy Conservation projects with a performance contractor.' As part of each project proposal, the performance contractor is required to guarantee the maximum cost and minimum utility cost savings. In the event the City does not proceed with the proposal, a termination fee could apply. On March 10,2009, the Utility Advisory Committee forwarded a favorable recommendation to City Council to authorize the Public Works and Utilities Director to negotiate and sign two amendments to the Interagency Agreement for Performance Based Contracting for proposals for the Conservation Voltage Reduction and City Hall Complex Energy Conservation projects. Staff will return to the Utility Advisory Committee and City Council after each proposal is received to consider two additional amendments to the interagency agreement that would authorize each project to be implemented. N:\CCOUNCIL\CC2009\CC0317\Interagency Agreement for Performance Based Contracting Arnendment.doc " State of Washington Department of General Administration Facilities Division Engineering & Architectural Services 210 1 Jlh Avenue, SW. PO Box 41012 · Olympia, WA 98504-1012 (360) 902.7272 · FAX (.360) 753.2848 June 22, 2009 McKinstry Essention 5005 3rd Avenue South PO Box 24567 Seattle, W A 98124-0567 RE: Authorization No. 2009-269 A (1) Detailed Investment Grade Energy Audit & Energy Services Proposal City of Port Angeles Enclosed is the above-referenced Authorization for your signature. Please sign and return it to this office as soon as possible. Please note that this Authorization is not binding upon the State of Washington until it is signed by the state's contracting officer. Therefore, should you begin work prior to receiving a signed copy of this Authorization, your firm will assume all risk associated with your actions. Should you have any questions or concerns, please contact me at (360) 902-7179. Sincerely, =~ f Energy Engineer DK:em Enclosure cc: Philip Lusk, City of Port Angeles ....... o ENERGY SERVICES AUTHORIZATION NO. 2009-269 A (1) Detailed Investment Grade Energy Audit & Energy Services Proposal City of Port Angeles City Hall June 19,2009 MASTER ENERGY SERVICES AGREEMENT NO. 2007-041 C (3) The Owner and the Energy Services Company (ESCO) named below do hereby enter into this Authorization under tepns described in the following sections: Authorization to Proceed Compensation for Energy Services Project Conditions. I. AUTHORIZATION TO PROCEED: Energy Services Company: McKinstry Essention 5005 3rd Avenue South PO Box 24567 Seattle, WA 98124-0567 Telephone No. (206) 762-3311 Fax No. (206) 658-1769 E-Mail Addressasha@mckinstry.com By Name Title Date State of Washington Contractor's License No. State of Washington Revenue Registration No. Federal Tax Identification No. MWBE Certification No. MWBE Certification No. Owner: City of Port Angeles acting through the Department of General Administration, Division of Facilities, Engineering and Architectural Services PO Box 41012 Olympia, W A 98504 Telephone No. (360) 902-7272 By Name Roger Wigfield. P.E. Title Energv Program Manager Date MCKINEI942JO 602 039 273 91-2055773 II. COMPENSATION FOR ENERGY SERVICES: Name of Facilit Services Pro osal- COMPENSATION New Previous $ 29,370.00 $ 0.00 $ 29,370.00 $ 0.00 Energy Services Authorization No. 2009-269 A (I) Page 1 of2 '. . III. PROJECT CONDITIONS: The Project Conditions contained in the Master Energy Services Agreement will be used unless specifically changed herein. IV. SCOPE OF WORK: Per the fee proposal dated June I, 2009 conduct a Detailed Investment Grade Energy Audit of the City of Port Angeles City Hall, to identify cost effective energy conservation measures and present a written Energy Services Proposal, including all energy audit documentation. The ESCO shall prepare the final Energy Services Proposal, detailing the actual energy services and ESCO equipment to be provided, energy savings and cost guarantees, measurement and verification plans, and commissioning plans for the proposed measures. Measures will include items that save energy, water and other resources. The Cost Effectiveness Criteria for this proj ect shall be as established in the Master Energy Services Agreement or as modified in Section III above. V. SCHEDULE FOR COMPLETION Final completion of the Energy Audit and Energy Services Proposal by August 31, 2009. 2009269Aauthem Energy Services Authorization No. 2009-269 A (1) Page 2 of2 ENERGY SERVICES AUTHORIZATION NO. 2009-269 A (1) Detailed Investment Grade Energy Audit & Energy Services Proposal City of Port Angeles City Hall June 19, 2009 MASTER ENERGY SERVICES AGREEMENT NO. 2007-041 C (3) The Owner and the Energy Services COlnpany (ESCO) named below do hereby enter into this Authorization under tepns desc.:ribed in the fullowing sections: Authorization to Proceed Compensation for Energy Services Project Conditions' I. AUTHOlUZATION TO PROCEED: Energy Services Company: Owner: McKinstry Essention 5005 3rd Avenue Soutb PO Box 24567 Seattle, W A 98124-0567 Telephone No. (206) 762~3311 Fax No. (206) 658-1769 E-Mail Addressasha@mckinstry.com By >J::CR~='~ Name [Jd d~t1V- Title bi r"'{It-oV'" lOt' F='."'dV1~ Date City of Port Angeles acting through the Department of General Administration, Division of Facilities, Engineering and Architechlral Services PO Box 41012 Olympia, W A 98504 Telephone No. (360) 902-7272 By~r Name R Wi :fiel P.E. . Title ~y Program Manager Date'll 'j)' 0'1 State of-Washington Contractor's License No. State of Washington Revenue Registration No. Federal Tax Identification No. :MWBE Certification No. MWBE Certification No. MCKINEI942JO 602 039273 91-2055773 II. COMPENSATION FOR ENERGY SERVICES: Name of Facilit COMPENSATION New Previous $ 29,370.00 $ 0.00 Services Pro osa! ~ $ 29,370.00 $ 0.00 Energy Services Authorization No. 2009-269 A (1) Page 1 of2 <I. 1..0 I g p ",'!I. III. PROJECT CONDITIONS: The Project Conditions contained in the Master Energy Services Agreement will be used unless. specifically changed herein. IV. SCOPE OF WORK: Per the fee proposal dated June 1,2009 conduct a Detailed Inv~stment Grade Energy Audit ofthe City of Port Angeles City Hall, to identify cost effective energy conservation measures and present a written Energy Services Proposal, including all energy audit documentation. The ESCO shall prepare the fmal Energy Services Proposal, detailing the actual energy services and ESCO equipment to be provided,. energy savings and cost guarantees, measurement and verification plans, and commissioning plans for the proposed measures. Measures will include items that save energy. water and other resources. The Cost Effectiveness Criteria for this project shall be as established in the Master Energy Services Agreement or as modified in Section m above. v. SCHEDULE FOR COMPLETION Final completion of the Energy Audit and Energy Services Proposal by August 31, 2009. 2009269Aau!hcm Energy Services Authorization No. 2009.269 A (I) Page 2 of2