Loading...
HomeMy WebLinkAbout4.625D Original Contract , . ~ City of Port Angeles Public Works & UtIlitIes Dept OperatIOns Office 1703 South B Street Port Angeles W A 98362 Tel 360-417-4541 Fax 360-452-4972 LIMITED PUBLIC WORKS PROCESS o Request for Quotation L8J Contract Contract Title: Culvert lIn1na Installation, Project Number. ST-09-015 THIS CONTRACT IS entered Into the date last below wntten between the CITY OF PORT ANGELES, WASHINGTON ("CITY") AND GRECOR Construction. LLC ("CONTRACTOR"). 1. WORK BY CONTRACTOR The Contractor shall perform the work as descnbed In Attachment "AU (Attachment "AU may Include Contractor's Proposal, Scope of Work, Statement of Work, Plans, SpeCifications, and any other related Contract Documents) which IS attached hereto and by thiS reference IS Incorporated herein 2. TERM OF CONTRACT All work under thiS Contract IS to be completed as indicated (check one)' o All work under thiS Contract IS to be completed by thiS date: ~ L8J All work under thiS Contract IS to be completed 30 days from the Notice to Proceed. No work IS to be performed pnor to wntten Notice to Proceed by the City. o The performance penod under thiS Contract commences _ calendar days after contract award and ends _ calendar days after contract award. 3. PAYMENT A. The City shall pay the Contractor for the work performed under thiS contract (check one). o Time and matenal, not to exceed: $_ o Time and actual expenses Incurred, not to exceed' $_ o Unit pnces set forth In the Contractor's bid or quote, not to exceed $_ L8J Firm Fixed Pnce set forth In Contractor bid or quote In the amount of $ 20.719 66 The Contractor shall do all work and furnish all tools, matenals, and equipment, In accordance With and as descnbed In the Attachment "A". The Contractor shall proVide and bear the expense of all equipment, work and labor of any sort whatsoever that may be required for the transfer of matenals and for constructing and completing the work proVided for In thiS contract and every part thereof, except as are mentioned In the speCifications to be furnished by the City of Port Angeles B The Contractor shall maintain time and expense records, which may be requested by the City The contractor shall submit inVOices to the City for payment for work performed. All InVOices must reference the City's contract number InVOices shall be In a format acceptable to the City C. The City shall pay all Invoices from the Contractor by mailing a City warrant Within 30 days of receipt of a properly completed inVOice D. All records and accounts pertaining to thiS Contract are to be kept available for Inspections by representatives of the City for a penod of three (3) years after final payment Copies shall be made available to the City upon request. Project ST-09-015 Page 1 Rev 08/26/2008 \ . E If durmg the course of the Contract, the work rendered does not meet the requirements set forth m the Contract, the Contractor shall correct or modify the required work to comply with the requirements of this Contract The City shall have the right to withhold payment for such work until It meets the reqUIrements of the Contract Documents. 4. RESPONSIBILITY OF CONTRACTOR A. Safety. Contractor shall take all necessary precautions for the safety of employees on the work site and shall comply with all applicable prOVISions of federal, state and local regulations, ordinances and codes. Contractor shall erect and properly malntam, at all times, as required by the conditions and progress of the work, all necessary safeguards for the protection of workers and the public and shall post danger signs warnmg agamst known or unusual hazards. B. Correction of Defects. Contractor shall be responsible for correctmg all defects m workmanship and/or materials discovered wlthm one year after acceptance of thiS work When corrections of defects are made, Contractor shall be responSible for correcting all defects m workmanship and/or materials m the corrected work for one year after acceptance of the corrections by the City The Contractor shall start work to remedy such defects Within seven (7) days of mailing notice of discovery thereof by City and shall complete such work wlthm a reasonable time. In emergencies where damage may result from delay or where loss of service may result, such corrections may be made by the City, m which case the cost shall be borne by the Contractor In the event the Contractor does not accomplish corrections at the time specified, the work Will be otherwise accomplished and the cost of same shall be paid by the Contractor C. Warranty. Contractor shall be liable for any costs, losses, expenses or damages Including consequential damages suffered by the City resultmg from defects m the Contractors work Includmg, but not limited to, cost of materials and labor expended by the City In makmg emergency repairs and cost of engineering, mspectlon and supervision by the City. The Contractor shall hold the City harmless from any and all claims which may be made agamst the City as a result of any defective work and the Contractor shall defend any such claims at Its own expense Where materials or procedures are not specified m the Contract Document, the City Will rely on the profeSSional Judgment of the Contractor to make appropriate selections D. Nondlscrlmmatlon/Affirmatlve Action Contractor agrees not to dlscrlmmate against any employee or applicant for employment or any other persons In the performance of thiS Contract because of race, creed, color, national origin, marital status, sex, age or handicap, or other circumstances as may be defined by federal, state or local law or ordmance, except for a bona fide occupational qualification. Contractor agrees to post m conspIcuous places, available to employees and applicants for employment, notices to be provided by Contractor settmg forth the proVIsions of the nondlscrlmmatlon clause E Employment Any and all employees of the Contractor, while engaged In the performance of any work or services reqUired by the Contractor under thiS Contract, shall be considered employees of the Contractor only and not of the City. Any and all claims that may arise under the Workers Compensation Act on behalf of said employees, while so engaged, and all claims made by a third party as consequence of any negligent act or omiSSion on the part of the Contractor's employees, while so engaged on any of the work or services proVided or rendered herein, shall not be the obligation of the City. 5. COMPLIANCE WITH LAWS The Contractor shall comply With all federal, state and local laws and regulations applicable to the work done under thiS Contract Any Violation of the provIsions of thiS paragraph shall be considered a Violation of a material prOVISion of thiS Contract and shall be grounds for cancellation, termination or suspension of the Contract by the City, m whole or m part, and may result m Ineligibility for further work for the City. 6. TERMINATION OF CONTRACT A This Contract shall term mate upon satisfactory completion of the work deScribed In Attachment "A" and final payment by the City. B. The City may term mate the Contract and take possession of the premises and all materials thereon and finish the work by whatever methods It may deem expedient, by giving 10 days written notice to the Contractor, upon the occurrence of anyone or more of the events hereafter specified. Project ST -09-015 Page 2 Rev 0812612008 \ . 1 The Contractor makes a general assignment for the benefit of Its creditors. 2 A receiver IS appointed as a result of the Insolvency of the Contractor 3. The Contractor persistently or repeatedly refuses or falls to complete the work required herein. 4. Contractor fails to make prompt payment to subcontractors for matenal or labor 5. Contractor persistently disregards federal, state or local regulations and ordinances. 6 Contractor persistently disregards Instructions of the Contract Administrator, or otherwise substantially Violates the terms of thiS Contract 7. The City determines that suffiCient operating funds are not available to fund completion of the work contracted for. C. In the event thiS Contract IS terminated by the City, Contractor shall not be entitled to receive any further amounts due under this Contract until the work speCified In Attachment "A" IS satlsfactonly completed, as scheduled, up to the date of termination. At such time, If the unpaid balance of the amount to be paid under thiS Contract exceeds the expense Incurred by the City In finishing the work, and all damages sustained by the City or which may be sustained by reason of such refusal, neglect, failure or discontinuance of employment, such excess shall be paid by the City to the Contractor. If the City's expense and damages exceed the unpaid balance, Contractor and hiS surety shall be JOintly and severally liable therefore to the City and shall pay such difference to the City Such expense and damages shall Include all legal costs Incurred by the City to protect the nghts and mterests of the City under the Contract, prOVided such legal costs shall be reasonable 7. OWNERSHIP OF DOCUMENTS A On payment to the Contractor by the City of all compensation due under thiS Contract, all finished or unfinished documents and matenal prepared by the Contractor With funds paid by the City under thiS Contract shall become the property of the City and shall be forwarded to the City upon Its request B. Any records, reports, information, data or other documents or matenals given to or prepared or assembled by the Contractor under thiS Contract Will be kept confidential and shall not be made available to any indiVidual or organization by the Contractor Without pnor wntten approval of the City or by court order. 8. CLAIMS Any claim against the City for damages, expenses, costs or extras anslng out of the performance of thiS Contract must be made In wntlng to the City wlthm thirty days after the discovery of such damage, expense or loss, and In no event later than the time of approval by the City for final payment Contractor, upon making application for final payment, shall be deemed to have waived Its nght to claim for any other damages for which application has not been made, unless such claim for final payment Includes notice of additional claim and fully deScribes such claim 9. GENERAL ADMINISTRATION AND MANAGEMENT The Director of the Pubilc Works and Utilities Department or his/her deSignee shall have primary responsibility for the City under thiS Contract and shall oversee and approve all work to be performed, coordinate commUniCations, and review and approve all mVOlces, under thiS Contract 10. HOLD HARMLESS A The Contractor shall protect, defend, mdemnlfy and save harmless the City, Its officers, employees and agents from any and all costs, claims, judgments or awards of damages, anslng out of or In any way resultmg from the negligent acts or omiSSions of the Contractor. The Contractor agrees that Its obligations under thiS subparagraph extend to any claim, demand, and/or cause of action brought by, or on behalf of, any of Its employees or agents. For thiS purpose, the Contractor, by mutual negotiation, hereby waives, as respects the City only, any Immunity that would otherwise be available against such claims under the mdustnallnsurance provIsion of Title 51 RCW. In the event the City obtainS any judgment or award, and/or Incurs any cost arlsmg therefrom Includmg attorneys' fees to enforce the provIsions of thiS article, all such fees, expenses, and costs shall be recoverable form the Contractor B The City shall protect, defend, mdemnlfy and save harmless the Contractor, Its officers, employees and agents from any and all costs, claims, judgments or awards of damages, anslng out of or m any way resulting from the negligent acts or omissions of the City. The City agrees that Its obligations under thiS subparagraph extend to any Project ST-09-015 Page 3 Rev 08/26/2008 \ . claim, demand, and/or cause of action brought by, or on behalf of, any of Its employees or agents. For thiS purpose, the City, by mutual negotiation, hereby waives, as respects the Contractor only, any Immunity that would otherwise be available against such claims under the Industnallnsurance prOVIsion of Title 51 RCW. In the event the Contractor obtains any judgment or award, and/or Incurs any cost anslng therefrom including attorneys' fees to enforce the prOVISions of thiS article, all such fees, expenses, and costs shall be recoverable from the City 11. INSURANCE The Contractor shall maintain Insurance as set forth In Attachment B. 12. PREVAILING WAGE This Contract IS subject to the requirements of Chapter 39.12 RCW, and as It may be amended, relating to prevailing wages. On Public Works projects, funded In part or In whole with Federal funds, Federal wages laws and regulations shall also be applicable. NO WORKER, LABORER OR MECHANIC EMPLOYED IN THE PERFORMANCE OF ANY PART OF THIS CONTRACT SHALL BE PAID LESS THAN THE PREVAILING RATE OF WAGE as determined by the Industnal Statistician of the Department of Labor and Industnes for the State of Washington. The schedule of prevailing wage rates for thiS Contract IS made a part of thiS contract as though fully set forth herein Pnor to making any payment under thiS Contract, the City must receive an approved copy of the "Statement of Intent to Pay Prevailing Wages on Public Works Contracts" from the Department of Labor and Industnes It IS the Contractor's responsibility to obtain and file the "Statement of Intent to pay Prevailing Wage" The Contractor shall be responsible for all filing fees. Each inVOice shall Include a Signed statement that prevailing wages have been paid by the Contractor and all subcontractors. FollOWing the final acceptance of services rendered, Contractor shall submit an "Affidavit of Wages Paid". For a contract award or an on-call contract work order under $2,500, and In accordance with RCW 39.12.040(2), the contractor or subcontractor IS authonzed to submit a combined Statement Of Intent To Pay Prevailing Wages & AffidaVit Of Wages directly to the City of Port Angeles at final InvoIcing SubmiSSion shall be made on the form developed by the Washington State Department of Labor and Industnes and available from the City of Port Angeles Public Works and Utilities Department. In case any dispute anses as to what are the prevailing rates of wages for a speCific trade, craft or occupation and such dispute cannot be adjusted by the parties In Interest, including labor and management representatives, the matter shall be referred for arbitration to the Director of the Department of Labor and Industnes, and hiS deCISion shall be final, conclUSive, and binding on all parties Involved In the dispute. 13. INTERPRETATION AND VENUE ThiS Contract shall be Interpreted and construed In accordance with the laws of the State of Washington The venue of any litigation between the parties regarding thiS Contract shall be Clallam County, Washington. 14. BRANDS OR EQUAL When a speCial "brand or equal" IS named It shall be construed solely for the purpose of indicating the standards of quality, performance, or use deSired Brands of equal quality, performance, and use shall be conSidered, prOVided Contractor speCifies the brand and model and submits deScriptive literature when available. Any bid containing a brand which IS not of equal quality, performance, or use speCified must be represented as an alternate and not as an equal, and failure to do so shall be suffiCient reason to disregard the bid 15. INSPECTION AND REJECTION All goods, services, work, or matenals purchased herein are subject to Inspection and to approval by the City. Any rejection of goods, services, work, or matenals resulting because of nonconformity to the terms and speCifications of thiS order, whether held by the City or returned, Will be at Contractor's nsk and expense. 16. SUBLETTING OR ASSIGNING OF CONTRACTS Project ST-09-015 Page 4 Rev 08/26/2008 . Neither the City nor the Contractor shall assign, transfer, or encumber any nghts, duties or Interest accrUing from this Contract without the express pnor wntten consent of the other 17. INDEPENDENT CONTRACTOR The Contractor IS and shall be at all times dunng the term of this Contract an mdependent contractor and not an employee of the City 18. EXTENT OF CONTRACT IMODIFICATION This Contract, together with the attachments and/or addenda, represents the entire and mtegrated Contract between the parties hereto and supersedes all pnor negotiations, representations, or agreements, either written or oral ThiS contract may be amended, modified or added to only by wntten mstrument properly signed by both pa rtles hereto 19. SUBCONTRACTOR RESPONSIBILITY A The Contractor shall Include the language of thiS section m each of Its first tier subcontracts, and shall require each of Its subcontractors to mclude substantially the same language of thiS section In each of their subcontracts, adJustmg only as necessary the terms used for the contractmg parties. The requirements of thiS section apply to all subcontractors regardless of tier B. At the time of subcontract execution, the Contractor shall venfy that each of Its first tier subcontractors meets the followmg bidder responsibility cntena: - At the time of subcontract bid submittal, have a certificate of registration In compliance with chapter 18.27 RCW; Have a current state unified busmess Identifier number; If applicable, have . Industnal msurance coverage for the subcontractor's employees workmg m Washmgton as reqUired m TItle 51 RCW, . An employment secunty department number as required m Tile 50 RCW, and . A state excise tax registration number as reqUired m Tile 82 RCW, . An electncal contractor license, If required by Chapter 19.28 RCW, . An elevator contract license, If required by Chapter 70 87 RCW - Not be disqualified from blddmg on any public works contract under RCW 39 06 010 or 39.12.065(3) Project ST-09-015 Page 5 Rev 08/26/2008 IN WITNESS WHEREOF, the parties have executed this Contract as of ~' 2009 CONTRACTOR By: ~~crw Printed Name: (;'Ge-y L-Itl'/6tC/YI. D \ . TItle: rY'i.LtYlb.LA... Address: 'f39 /)l/l~w /ld. ~C I(; .' {.I-e- 4f l' City tJl'1A1j);~, w4. 9C5'/3 Tax ID #' (,D 2- 57.1.. 2-0 / Phone Number 3/,O'-7'B'J - 5l> '2-'} By. Printed Name Title Purchase Order #: C) 14 )'60 Project ST-09-015 Page 6 Rev 08/26/2008 \ . City of Port Angeles Operations Office Public Works and Utilities Department 360-417-4541 ATTACHMENT "A" WORK BY CONTRACTOR The contractor shall do all work and furnish all tools, matenals, and equipment In order to accomplish the proJect descnbed below. Unless otherwise provided for In the Statement of Work, the Contractor Will be responsible for obtaining and paYing for any and all permits reqUIred for this work. Safely secure work zone and access road from public. General Scope: Lining the inSide of a 97 foot long, 36" corrugated metal pipe culvert With 28" HOPE 3408 PPL. Grout between the eXisting culvert and liner. Location: Intersection of McDougal and Church St. Port Angeles, Washington. Site Point of Contact: ASSistant Supenntendent Enc Wheatley at 360-417-4825. Work Hours: The Contractor shall be allowed to work from 7:00 AM to 3:30 PM, Monday through Fnday. Work outside of these hours may be requested from and IS at the discretion of the Parks/Streets ASSistant Supenntendent. Performance Period: Contractor shall have 21 days to complete work from the "Notice to Proceed". Work shall be performed dunng the dry penods In Port Angeles, August 10th thru September 18th, 2009. Any needed stormwater mitigatIOn (coffer dam, pumps, personnel, etc) to prOVide a dry work area and minimize the Impact to storm water quality shall be proVided by the City of Port Angeles. Traffic Controls: The City of Port Angeles' personnel shall proVide all needed traffic control, including warning signs and flagging. Qualifications: Bidders are reqUired to have achieved 25 successful culvert lining and grouting proJects (a proJect being one culvert). Training: Bidders Will be reqUired to train City of Port Angeles Public Works and Utilities employees on each phase of the proJect throughout the course of the liner Installation and grouting procedure. Specifications: Bidders are cautioned to read the speCification carefully, as there may be speCial requirements not commonly offered by the pipe liner manufacturer. Pipe liners furnished shall meet or exceed all requirements here In. Pipe liners to be Snap-Tlte or eqUivalent. SpeCifications are for HOPE 3408 pipe liners (PPL). Materials: Pipe liner shall meet the follOWing requirements and contractor must conform to the reference specifications: PrOject ST -09-015 Page 7 Rev 08/26/2008 \ . 1.) All matenals shall conform to the latest edition of the Amencan Society for Testing and Matenals (ASTM) standard specifications. 2.) The liner pipe shall be made of high-density polyethylene resins In accordance with the requirements of ASTM 0-335-00 or later The cell classification Will be 345464C and shall have the PlastiC Pipe Institute deSignation of PE 3408 3.) Pipe liner shall be a minimum DimenSion RatiO (DR) of 325 The Installed pipe shall have a smooth non-corrugated Interior surface 4.) The diameter dimenSions of PPL shall be capable of maintaining a minimum flow rate eqUivalent to 100% of the original In-place culvert and meet the requirement of Table 1 of thiS speCification With a certified Manning of not less 00914 5.) The PPL shall be capable of being JOined Into a continuous length by an approved interlocking method The JOints shall not create an Increase In the outSide diameter the liner pipe to eliminate Interference With eXisting host The JOints must be water-tight With gaskets that are capable of handling pressures In excess of 25 feet of head per ASTM 0-3212 The JOIning system for the liner pipe shall be Snap-Tlte or equal 6.) Each PPL shall have a male and a female end that Interlock forming a restrained JOint 7.) Each length of PPL furnished shall be permanently marked by the manufacturer With the manufacturer's name and applicable ASTM deSignation The marking shall be such that It Will not be obliterated dUring handling, shipment or placement 8.) The table below depicts the eXisting pipe and liner measurements. Project ST -09-015 Page 8 Rev 0812612008 \ . EXISTING PIPE & LINER MEASUREMENT LINER Existing Pipe CLEARANCE 00" CLEARANCE 10 Size (10) Minimum Maximum Minimum 36 inches 3.60 inches 4.00 inches 5.970 inches Clearance is different between the inside (10) of existing pipe and the outside (00) of the PPL (pipe liner). Approximately 10% maximum 00 column allows enough annular space to grout properly. Maximum ID column allows enough annular space to give minimum 100% flow. Based on HOPE having an "N" value of .009 as certified by an independent testing facility. "" Distance between 10 of existing pipe & minimum 10 of the liner pipe. Work Requirements: 1.) The eXisting culvert to be lined IS 36 Inch CMP and 97 feet long. 2.) The eXisting culvert shall be lined with 28" HDPE 3408 PPL. 3.) Before inserting the liner, the pipe must be cleaned. All debris In the eXisting culvert shall be cleaned thoroughly prior to inserting the plastiC pipe liner. Earthy material, trash, cuttings, and other waste materials removed from the eXisting culverts shall be disposed of by the City of Port Angeles. 4.) After cleaning the culvert It must be Inspected for any sharp or protruding appurtenances. If any are found they shall be removed or made to not Impede Insertion of the liner, 5.) After Installation of 28" HDPE 3408 PPL, the area between the eXisting culvert and liner shall be completely filled With grout In such a manner as to obtain a substantially uniform space between the liner and the eXisting culvert; on the top, the bottom, and Sides. Flowable Controlled DenSity Fill (CDF) concrete With a minimum strength of 180 pSI Will be acceptable. Note' The pictures below depict the eXisting culvert Project ST-09-015 Page 9 Rev 08/26/2008 \ . Picture A: UTILITY EASEMENT il I . LEGEND --- I'EHCl -R/W ~ banou OF DlTCI1 :-: t_'SlIl;lG PIPE ---(LtetItIC 61(U !;;..eu: C W/M 1>01 'fiN o vA'lHDU ()oO IO'QJl.....T " ~ I I o :1r~ -.m - ,.....,.....w -- ......., e i , +-> " " " " - ~(1.l~~' ~ - , , '0' Picture B: 1+ ~;-~: :' '. Project ST -09-015 Page 10 Rev 08/26/2008 . . Picture C: , I ,/ f , /~//. '/ /1 "; ,. ~ l' Ij. _ J Project ST-09-015 Page 11 Rev 08126/2008 ~ City of Port Angeles Operations Office Public Works and Utilities Department 360-417-4541 ATT ACHMENT B INSURANCE Insurance Requirements: The Contractor shall procure and maintain for the duration of the Contract, Insurance against claims for InJunes to persons or damage to property which may anse from or In connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees or subcontractors. Failure by the Contractor to maintain the Insurance as required shall constitute a matenal breach of contract upon which the City may, after giVing five working days notice to the Contractor to correct the breach, Immediately terminate the Contract or at Its discretion, procure or renew such Insurance and pay any and all premiums In connection thereWith, With any sums so expended to be repaid to the City on demand, or at the sole discretion of the City, off set against funds due the Contractor from the City. 1 Minimum Scope of Insurance The Contractor shall obtain Insurance of the types descnbed below: a Automobile Liabllltv Insurance covenng all owned, non-owned, hired and leased vehicles Coverage shall be wntten on Insurance Services Office (ISO) form CA 00 01 or a substitute form proViding eqUivalent liability coverage If necessary, the policy shall be endorsed to provide contractual liability coverage. b. Commercial General Liabllltv Insurance shall be wntten on ISO occurrence form CG 00 01 and shall cover liability anslng from premises, operations, stop gap liability, Independent contractors, products- completed operations, personal injury and advertiSing inJury, and liability assumed under an Insured contract. The Commercial General liability Insurance shall be endorsed to provide the Aggregate Per Project Endorsement ISO form CG 2S 03 11 8S There shall be no endorsement or modification of the CommerCial General liability Insurance for liability anslng from explOSion, collapse or underground property damage The City shall be named as an Insured under the Contractor's Commercial General Liability Insurance policy With respect to the work performed for the City uSing ISO Additional Insured endorsement CG 20 10 10 01 and Additional Insured-Completed Operations endorsement CG 20 37 10 01 or substitute endorsements prOViding eqUivalent coverage. c Workers' ComDensatlon coverage as reqUired by the Industnal Insurance laws of the State of Washington 2. MInimum Amounts of Insurance The Contractor shall maintain the follOWing Insurance limits. a Automobile Liabllltv Insurance With a minimum combined Single limit for bodily injury and property damage of $1,000,000 per aCCident. b Commercial General Liabllltv Insurance shall be wntten With limits no less than $1,000,000 each occurrence, $2,000,000 general aggregate and a $2,000,000 products-completed operations aggregate limit 3. Other Insurance ProvIsions The Insurance poliCies are to contain, or be endorsed to contain, the follOWing prOVIsions for Automobile Liability and Commercial General Liability Insurance a. The Contractor's Insurance coverage shall be pnmary Insurance as respect to the City Any Insurance, self-Insurance, or Insurance pool coverage maintained by the City shall be In excess of the PrOject ST-09-015 Page 12 Rev 08/26/2008 ~ '0.. Contractor's Insurance and shall not contnbute with It b The Contractor's Insurance shall not be cancelled or reduced as to coverage by either party, except after forty-five (45) days pnor wntten notice by certified mall, return receipt requested, has been given to the City 4. Acceptability of Insurers Insurance IS to be placed with Insurers with a current A.M Best rating of not less than A:VI. 5. Venficatlon of Coverage The Contractor shall furnish the City with onglnal certificates and a copy of the amendatory endorsements, including but not necessanly limited to the additional Insured endorsement, eVidencing the Automobile Liability and Commercial General Liability Insurance of the Contractor before commencement of the work Before any exposure to loss may occur, the Contractor shall file with the City a copy of the BUilders Risk Insurance policy that Includes all applicable conditions, exclusions, definitions, terms and endorsements related to this project 6 Contractor's Insurance For Other Losses The Contractor shall assume full responsibility for all loss or damage from any cause whatsoever to any tools, Contractor's employee owned tools, machinery, equipment, or motor vehicles owned or rented by the Contractor, or the Contractor's agents, suppliers or contractors as well as to any temporary structures, scaffolding and protective fences. 7. Waiver of Subrogation The Contractor and the City waive all nghts against each other, any of their Subcontractors, Subcontractors, agents and employees, each of the other, for damages caused by fire or other penis to the extent covered by BUilders Risk Insurance or other property Insurance obtain pursuant to the Insurance ReqUirements Section of thiS Contract or other property Insurance applicable to the work. The policies shall provide such waivers by endorsement or otherwise. PrOject ST-09-015 Page 13 Rev 08/26/2008 '. ... City of Port Angeles Operations Office Public Works and Utilities Department 360-417-4541 ATTACHMENT "C" PREVAILING WAGE RATES See attached hstmg Washmgton State Prevalhng Wage Rates For Public Works Contracts, Clallam County, effective 03-04-2009 2 Washmgton State Prevalhng Wage Rates For Pubhc Works Contracts - Apprentices, Clallam County, effective 03-04-2009 Project ST-09-015 Page 14 Rev 08/26/2008 "7/1"6/'09 THU 00: 16 ()604391932 119604524972 # 2/ 3 QUOTATION FORM Culvert Llnlna Installation ST-09-01s The bidder hereby bids the following amounts for all work (Including labor, equipment, time and matenals) required to perform the work In the Statement of Work and this package Labor Subtotal .1/ BID AMOUNT 7'-1~ ~ BID ITEMS BID TYPE No A Iicable Sales Tax Total '-I, '7 Y. 8 ' 00 1'1 7}4,oD I. "2 ?, I. bb /5,(l7/,wb Materials Subtotal -- -- Sales Tax (8.4%) Total 1 The bidder hereby acknowledges that It has received Addenda No(s) tY 111 CEnter "N/A" If none were Issued) to this Request for Quotation package. 2. The name of the bidder submltling this bid and ItS bUSiness phone number and address, to which address all communications concerned with this bid and With the contract shall be sent. are listed below Any written notices required by the terms of an awarded contract shall be served or mailed to the follOWing address' 3 Contractor Information: 1. Company Name: . (2R.E.LO/l. CONSrA-V'"-r/l:".,-, LLL '137 j).;felz-'2oLV i2.d ~E. !:...:k '1 01 '1m A' .4- . W.4-. 96~-/:S . 3b[)- 7'i3Cj -~-D-;"I' (2)iZELL><-L 9 <f:::'-k. fa /Po 2-~-7 to '2-0/ 11100100 7'1 - 3/ tA3(,2 7 - '-02. ')11,.2 6/ 7'1 - 3/l,f.1(:.2 7 2 Address. 3. City, State, Zip Code: 4. Phone Number 5. Contractor Registration Number 6. UBI Number: 7. WA State Industnal Insurance Account Number: 8 WA State Employment Security Dept Number 9. State Excise Tax Registration Number: ProJcct' ST-09-015 Pagc 2 Rov 8/1.1/21)118 \7/1 :;.09 THU on 16 (360~3S1982 ) 13604'14971 I 3/ 3 The bidder represents that It IS qualified and possesses suffiCient skills and the necessary capabilities to perform the services set forth In this contract, and that It IS not disqualified from bidding on this contract .1-1. n'A~~ Signed by ~ Title rn.e ,mb...t-t. Printed Name aRE)!" LIf'N6~ff1 0 Date .::JuI'f It, 2CK}? ProJ eet S 1'-09-0 15 Page 3 Rov, 81 J '121111K . . NOTICE TO PROCEED City of Port Angeles (360) 417-4541 TO Grecor Construction, LLC DATE August 11, 2009 PROJECT ST-09-015, Culvert LIning Installation You are hereby Issued this Notice to Proceed for Contract ST-09-015 You are to complete the work within 30 calendar days AJJJ M C Puntenney, Deputy Director of ACCEPTANCE OF NOTICE Receipt of the above NOTICE TO PROCEED IS hereby acknowledged this I II- day of AUQust, 2009 S'gM,"," ~ _By aRe y UtA! 6@1tV Tille rn 6/Yl PJO? Please return ORIGINAL to Public Works OperatIons, Lucy Hanley, P O. Box 1150, Port Angeles, WA 98362 Fax. 452-4972 - Retain a copy for YOUR files. . P.O #. 014500 DATE: 07/27/09 INVOICE TO' Clty of Port Angeles ATTN. ACCOUNTS PAYABLE PO BOX 1150 PORT ANGELES, WA 98362 TO: GRECOR CONSTRUCTION 439 DUTERROW RD SE STE 9 OLYMPIA, WA 98513 SHIP TO. Clty of Port Angeles BUILDING A 1703 S 'B' ST PORT ANGELES, WA 98363 VENDOR # 26817 REQ. NO 14557 REQUISITIONED BY LUCY HANLEY SHIP VIA F.O.B FREIGHT TERMS NET QUANTITYUOM ITEM NO AND DESCRIPTION 1 OOEA ST-09-015, CULVERT LINING INSTALLATION - LABOR 1 OOEA ST-09-015, CULVERT LINING INSTALLATION - MATERIALS EXTENDED UNIT CO COST 4748.00 4748.00 14734 00 14734.00 SUB-TOTAL TAX 8.4 TOTAL 19482.00 "1237.66 20719.66 AUTHORIZED BY . . Slale of Washington DEPARTMENT OF LABOR AND INDUSTRIES Prevailing Wage Section - Telephone (360) 902-5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage Rates For Public Works Contracts The PREVAILING WAGES listed here Include both the hourly wage rate and the hourly rate of fringe benefits On public works proJects, workers' wage and benefit rates must add to not less than thiS total A brief description of overlime calculation reqUirements IS proVided on the Benefit Code Key CLALLAM COUNTY EFFECTIVE 03-04-2009 ********************************************************************************************************** (See Benefit Code Key) Over PREVAILING Time Holiday Note Classlficalion WAGE Code Code Code ASBESTOS ABATEMENT WORKERS JOURNEY LEVEL $3812 1H 5D BOILERMAKERS JOURNEY LEVEL $53 37 1C 5N BRICK AND MARBLE MASONS JOURNEY LEVEL $45 05 1M 5A CABINET MAKERS (IN SHOP) JOURNEY LEVEL $1467 CARPENTERS ACOUSTICAL WORKER $46 32 1M 5D BRIDGE, DOCK AND WARF CARPENTERS $4616 1M 5D CARPENTER $4616 1M 5D CREOSOTED MATERIAL $46 26 1M 5D DRYWALL APPLICATOR $46 42 1M 5D FLOOR FINISHER $4616 1M 5D FLOOR LAYER $4616 1M 5D FLOOR SANDER $4616 1M 5D MILLWRIGHT AND MACHINE ERECTORS $4716 1M 5D PILEDRIVERS, DRIVING, PULLING, PLACING COLLARS AND WELDING $46 36 1M 5D SAWFILER $4616 1M 50 SHINGLER $4616 1M 5D STATIONARY POWER SAW OPERATOR $4616 1M 50 STATIONARY WOODWORKING TOOLS $4616 1M 5D CEMENT MASONS JOURNEY LEVEL $3812 1H 50 DIVERS & TENDERS DIVER $9681 1M 5D 8A DIVER ON STANDBY $5419 1M 5D DIVER TENDER $49 84 1M 50 DREDGE WORKERS ASSISTANT ENGINEER $4709 1T 5D 8L ASSISTANT MATE (DECKHAND) $46 58 1T 5D 8L BOATMEN $4709 1T 5D 8L ENGINEER WELDER $4714 1T 5D 8L LEVERMAN, HYDRAULIC $4871 1T 5D 8L MAINTENANCE $46 58 1T 5D 8L MATES $4709 1T 50 8L OILER $4671 1T 50 8L DRYWALL TAPERS JOURNEY LEVEL $46 34 1E 5P ELECTRICAL FIXTURE MAINTENANCE WORKERS JOURNEY LEVEL $937 Page 1 CLALLAM COUNTY EFFECTIVE 03-04-2009 . , ********************************************************************************************************** ClaSSification PREVAILING WAGE ELECTRICIANS - INSIDE CABLE SPLICER CABLE SPLICER (TUNNEL) CERTIFIED WELDER CERTIFIED WELDER (TUNNEL) CONSTRUCTION STOCK PERSON JOURNEY LEVEL JOURNEY LEVEL (TUNNEL) ELECTRICIANS - MOTOR SHOP CRAFTSMAN JOURNEY LEVEL ELECTRICIANS - POWERLlNE CONSTRUCTION CABLE SPLICER CERTIFIED LINE WELDER GROUNDPERSON HEAD GROUNDPERSON HEAVY LINE EQUIPMENT OPERATOR JACKHAMMER OPERATOR JOURNEY LEVEL L1NEPERSON LINE EQUIPMENT OPERATOR POLE SPRAYER POWDERPERSON ELECTRONIC TECHNICIANS ELECTRONIC TECHNICIANS JOURNEY LEVEL ELEVATOR CONSTRUCTORS MECHANIC MECHANIC IN CHARGE FABRICATED PRECAST CONCRETE PRODUCTS ALL CLASSIFICATIONS FENCE ERECTORS FENCE ERECTOR FENCE LABORER FLAGGERS JOURNEY LEVEL GLAZIERS JOURNEY LEVEL HEAT & FROST INSULATORS AND ASBESTOS WORKERS MECHANIC HEATING EQUIPMENT MECHANICS MECHANIC HOD CARRIERS & MASON TENDERS JOURNEY LEVEL INDUSTRIAL ENGINE AND MACHINE MECHANICS MECHANIC INDUSTRIAL POWER VACUUM CLEANER JOURNEY LEVEL INLAND BOATMEN CAPTAIN COOK DECKHAND ENGINEER/DECKHAND MATE, LAUNCH OPERATOR $58 34 $62 86 $56 29 $60 60 $28 83 $54 25 $58 34 $1537 $1469 $58 36 $53 30 $3814 $40 25 $53 30 $40 25 $53 30 $4514 $53 30 $40 25 $1207 $6481 $70 60 $1350 $1380 $1160 $3247 $45 25 $48 28 $1600 $3931 $1565 $924 $59 22 $3481 $34 52 $58 62 $50 20 Page 2 (See Benefit Code Key) Over Time Holiday Note Code Code Code lE 5A 1E 5A 1E 5A 1E 5A 1E 5A lE 5A lE 5A 2A 5C 2A 5C 4A 5A 4A 5A 4A 5A 4A 5A 4A 5A 4A 5A 4A 5A 4A 5A 4A 5A 4A 5A 4A 4A 5Q 5Q 1H 5D lY 5G lS 5J 1H 5D . . CLALLAM COUNTY EFFECTIVE 03-04-2009 ********************************************************************************************************** Classification INSPECTION/CLEANING/SEALING OF SEWER & WATER SYSTEMS BY REMOTE CONTROL CLEANER OPERATOR, FOAMER OPERATOR GROUT TRUCK OPERATOR HEAD OPERATOR TECHNICIAN TV TRUCK OPERATOR INSULATION APPLICATORS JOURNEY LEVEL IRONWORKERS JOURNEY LEVEL LABORERS ASPHALT RAKER BALLAST REGULATOR MACHINE BATCH WEIGHMAN BRUSH CUTTER BRUSH HOG FEEDER BURNERS CARPENTER TENDER CASSION WORKER CEMENT DUMPER/PAVING CEMENT FINISHER TENDER CHANGE-HOUSE MAN OR DRY SHACKMAN CHIPPING GUN (OVER 30 LBS) CHIPPING GUN (UNDER 30 LBS) CHOKER SETTER CHUCK TENDER CLEAN-UP LABORER CONCRETE DUMPER/CHUTE OPERATOR CONCRETE FORM STRIPPER CONCRETE SAW OPERATOR CRUSHER FEEDER CURING LABORER DEMOLITION, WRECKING & MOVING (INCLUDING CHARRED MATERIALS) DITCH DIGGER DIVER DRILL OPERATOR (HYDRAULIC, DIAMOND) DRILL OPERATOR, AIRTRAC DUMPMAN EPOXY TECHNICIAN EROSION CONTROL WORKER FALLER/BUCKER, CHAIN SAW FINAL DETAIL CLEANUP (I e , dusting, vacuuming, Window cleaning, NOT construction debriS cleanup) FINE GRADERS FIRE WATCH FORM SETTER GAB ION BASKET BUILDER GENERAL LABORER GRADE CHECKER & TRANSIT PERSON GRINDERS GROUT MACHINE TENDER Page 3 PREVAILING WAGE (See Benefit Code Key) Over Time Code Holiday Code Note Code $973 $1148 $1278 $855 $1053 $20 50 $5101 10 SA $38 83 1H 5D $3812 1H 5D $3247 1H 5D $3812 1H 5D $3812 1H 5D $3812 1H 5D $3812 1H 5D $3931 1H 5D $38 83 1H 5D $3812 1H 5D $3812 1H 5D $38 83 1H 5D $3812 1H 5D $3812 1H 5D $3812 1H 5D $3812 1H 5D $38 83 1H 5D $3812 1H 5D $38 83 1H 5D $3247 1H 5D $3812 1H 5D $3812 1H 5D $3812 1H 5D $3931 1H 5D $38 83 1H 5D $3931 1H 5D $3812 1H 5D $3812 1H 5D $3812 1H 5D $38 83 1H 5D $29 65 1H 5D $3812 1H 5D $3247 1H 5D $3812 1H 5D $3812 1H 5D $3812 1H 5D $38 83 1H 5D $3812 1H 5D $3812 1H 5D CLALLAM COUNTY .. EFFECTIVE 03-04-2009 ********************************************************************************************************** (See Benefit Code Key) Over PREVAILING Time Holiday Note ClaSSification WAGE Code Code Code GUARDRAIL ERECTOR $3812 lH 50 HAZARDOUS WASTE WORKER LEVEL A $3931 lH 50 HAZARDOUS WASTE WORKER LEVEL B $38 83 lH 50 HAZARDOUS WASTE WORKER LEVEL C $3812 lH 50 HIGH SCALER $3931 lH 50 HOD CARRIERlMORTARMAN $38 83 lH 50 JACKHAMMER $38 83 lH 50 LASER BEAM OPERATOR $38 83 lH 50 MANHOLE BUILOER-MUOMAN $38 83 lH 50 MATERIAL YARDMAN $3812 lH 50 MINER $3931 lH 50 NOZZLEMAN, CONCRETE PUMP, GREEN CUTTER WHEN USING HIGH $38 83 lH 50 PRESSURE AIR & WATER ON CONCRETE & ROCK, SANDBLAST, GUNITE, SHOTCRETE, WATER BLASTER PAVEMENT BREAKER $38 83 lH 50 PILOT CAR $3247 lH 50 PIPE POT TENDER $38 83 lH 50 PIPE RELlNER (NOT INSERT TYPE) $38 83 lH 50 PIPELA YER & CAULKER $38 83 lH 50 PIPELA YER & CAULKER (LEAD) $3931 lH 50 PIPEWRAPPER $38 83 lH 50 POT TENDER $3812 lH 50 POWOERMAN $3931 lH 50 POWOERMAN HELPER $3812 lH 50 POWERJACKS $38 83 lH 50 RAILROAD SPIKE PULLER (POWER) $38 83 lH 50 RE-TIMBERMAN $3931 lH 50 RIPRAP MAN $3812 lH 50 ROOOER $38 83 lH 50 SCAFFOLD ERECTOR $3812 lH 50 SCALE PERSON $3812 lH 50 SIGNALMAN $3812 lH 50 SLOPER (OVER 20") $38 83 lH 50 SLOPER SPRA YMAN $3812 lH 50 SPREADER (CLARY POWER OR SIMILAR TYPES) $38 83 lH 50 SPREADER (CONCRETE) $38 83 lH 50 STAKE HOPPER $3812 lH 50 STOCKPILER $3812 lH 50 TAMPER & SIMILAR ELECTRIC, AIR & GAS $38 83 lH 50 TAMPER (MULTIPLE & SELF PROPELLED) $38 83 lH 50 TOOLROOM MAN (AT JOB SITE) $3812 lH 50 TOPPER-TAILER $3812 lH 50 TRACK LABORER $3812 lH 50 TRACK LINER (POWER) $38 83 lH 50 TRUCK SPOTTER $3812 lH 50 TUGGER OPERATOR $38 83 lH 50 VIBRATING SCREED (AIR, GAS, OR ELECTRIC) $3812 lH 50 VIBRATOR $38 83 lH 50 VINYL SEAMER $3812 lH 50 WELDER $3812 lH 50 WELL-POINT LABORER $38 83 lH 50 Page 4 . . CLALLAM COUNTY EFFECTIVE 03-04-2009 ********************************************************************************************************** (See Benefit Code Key) Over PREVAILING Time Holiday Note ClaSSification WAGE Code Code Code LABORERS - UNDERGROUND SEWER & WATER GENERAL LABORER $3812 1H 5D PIPE LAYER $38 83 1H 5D LANDSCAPE CONSTRUCTION IRRIGATION OR LAWN SPRINKLER INSTALLERS $1289 LANDSCAPE EQUIPMENT OPERATORS OR TRUCK DRIVERS $1289 LANDSCAPING OR PLANTING LABORERS $1289 LATHERS JOURNEY LEVEL $46 42 1M 5D METAL FABRICATION (IN SHOP) FITTERlWELDER $1516 LABORER $1113 MACHINE OPERATOR $1066 PAINTER $1141 PAINTERS JOURNEY LEVEL $34 87 2B 6Z PLASTERERS JOURNEY LEVEL $25 83 PLAYGROUND & PARK EQUIPMENT INSTALLERS JOURNEY LEVEL $855 PLUMBERS & PIPEFITTERS JOURNEY LEVEL $6219 1G 5A POWER EQUIPMENT OPERATORS ASSIST ANT ENGINEERS $44 64 1T 5D BP BACKHOE, EXCAVATOR SHOVEL, OVER 50 METRIC TONS TO 90 METRIC $48 46 1T 5D BP TONS BACKHOE, EXCAVATOR SHOVEL, OVER 90 METRIC TONS $49 03 1T 5D BP BACKHOE, EXCAVATOR, SHOVEL (OVER 3 YD & UNDER 6 YD) $4791 1T 5D BP BACKHOE, EXCAVATOR, SHOVEL, OVER 30 METRIC TONS TO 50 $4791 1T 5D BP METRIC TONS BACKHOE, EXCAVATOR, SHOVEL, TRACTORS UNDER 15 METRIC TONS $4700 1T 5D BP BACKHOE, EXCAVATOR, SHOVEL, TRACTORS 15 TO 30 METRIC TONS $4742 1T 5D BP BACKHOES, (75 HP & UNDER) $4700 1T 5D BP BARRIER MACHINE (ZIPPER) $4742 1T 5D BP BATCH PLANT OPERATOR, CONCRETE $4742 1T 5D BP BELT LOADERS (ELEVATING TYPE) $4700 1T 5D BP BOBCAT (SKID STEER) $44 64 1T 5D BP BROKK-REMOTE DEMOLITION EQUIPMENT $44 64 1T 5D BP BROOMS $44 64 1T 5D BP BUMP CUTTER $4742 1T 5D BP CABLEWAYS $4791 1T 5D BP CHIPPER $4742 1T 5D BP COMPRESSORS $44 64 1T 5D BP CONCRETE FINISH MACHINE - LASER SCREED $44 64 1T 5D BP CONCRETE PUMPS $4700 1T 5D BP CONCRETE PUMP-TRUCK MOUNT WITH BOOM ATTACHMENT $4742 1T 5D BP CONVEYORS $4700 1T 5D BP CRANE, FRICTION 100 TONS THROUGH 199 TONS $49 03 1T 5D BP CRANE, FRICTION OVER 200 TONS $48 29 1T 5D BP CRANES, THRU 19 TONS, WITH ATTACHMENTS $4700 1T 5D BP CRANES, 20 - 44 TONS, WITH ATTACHMENTS $4742 1T 5D BP CRANES, 45 TONS - 99 TONS, UNDER 150 FT OF BOOM (INCLUDING JIB $4791 1T 5D BP WITH ATACHMENTS) Page 5 CLALLAM COUNTY , .. EFFECTIVE 03-04-2009 ********************************************************************************************************** (See Benefit Code Key) Over PREVAILING Time Holiday Note ClaSSification WAGE Code Code Code CRANES, 100 TONS - 199 TONS, OR 150 FT OF BOOM (INCLUDING JIB $48 46 1T 5D 8P WITH ATTACHMENTS) CRANES, 200 TONS TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB $49 03 1T 5D 8P WITH ATTACHMENTS) CRANES, A-FRAME, 10 TON AND UNDER $44 64 1T 5D 8P CRANES, A-FRAME, OVER 10 TON $4700 1T 5D 8P CRANES, OVER 300 TONS, OR 300' OF BOOM INCLUDING JIB WITH $48 29 1T 5D 8P ATTACHMENTS CRANES, OVERHEAD, BRIDGE TYPE (20 - 44 TONS) $4742 1T 5D 8P CRANES, OVERHEAD, BRIDGE TYPE ( 45 - 99 TONS) $4791 1T 5D 8P CRANES, OVERHEAD, BRIDGE TYPE (100 TONS & OVER) $48 46 1T 5D 8P CRANES, TOWER CRANE UP TO 175' IN HEIGHT, BASE TO BOOM $48 46 1T 5D 8P CRANES, TOWER CRANE OVER 175' IN HEIGHT, BASE TO BOOM $49 03 1T 5D 8P CRUSHERS $4742 1T 5D 8P DECK ENGINEER/DECK WINCHES (POWER) $4742 1T 5D 8P DERRICK, BUILDING $4791 1T 5D 8P DOZERS, D-9 & UNDER $4700 1T 5D 8P DRILL OILERS - AUGER TYPE, TRUCK OR CRANE MOUNT $4700 1T 5D 8P DRILLING MACHINE $4742 1T 5D 8P ELEVATOR AND MANLlFT, PERMANENT AND SHAFT-TYPE $44 64 1T 5D 8P EQUIPMENT SERVICE ENGINEER (OILER) $4700 1T 5D 8P FINISHING MACHINE/BIDWELL GAMACO AND SIMILAR EQUIP $4742 1T 5D 8P FORK LIFTS, (3000 LBS AND OVER) $4700 1T 5D 8P FORK LIFTS, (UNDER 3000 LBS) $44 64 1T 5D 8P GRADECHECKER AND STAKEMAN $44 64 1T 5D 8P GUARDRAIL PUNCH $4742 1T 5D 8P HOISTS, OUTSIDE (ELEVATORS AND MANLlFTS), AIR TUGGERS $4700 1T 5D 8P HORIZONTAUDIRECTIONAL DRILL LOCATOR $4700 1T 5D 8P HORIZONTAUDIRECTIONAL DRILL OPERATOR $4742 1T 5D 8P HYDRALlFTS/BOOM TRUCKS (10 TON & UNDER) $44 64 1T 5D 8P HYDRALlFTS/BOOM TRUCKS (OVER 10 TON) $4700 1T 5D 8P LOADERS, OVERHEAD (6 YD UP TO 8 YD) $4791 1T 5D 8P LOADERS, OVERHEAD (8 YD & OVER) $48 46 1T 5D 8P LOADERS, OVERHEAD (UNDER 6 YD), PLANT FEED $4742 1T 5D 8P LOCOMOTIVES, ALL $4742 1T 5D 8P MECHANICS, ALL $48 46 1T 5D 8P MIXERS, ASPHALT PLANT $4742 1T 5D 8P MOTOR PATROL GRADER (FINISHING) $4791 1T 5D 8P MOTOR PATROL GRADER (NON-FINISHING) $4700 1T 5D 8P MUCKING MACHINE, MOLE, TUNNEL DRILL AND/OR SHIELD $4791 1T 5D 8P OIL DISTRIBUTORS, BLOWER DISTRIBUTION AND MULCH SEEDING $44 64 1T 5D 8P OPERATOR PAVEMENT BREAKER $44 64 1T 5D 8P PILEDRIVER (OTHER THAN CRANE MOUNT) $4742 1T 5D 8P PLANT OILER (ASPHALT, CRUSHER) $4700 1T 5D 8P POSTHOLE DIGGER, MECHANICAL $44 64 1T 5D 8P POWER PLANT $44 64 1T 5D 8P PUMPS, WATER $44 64 1T 5D 8P QUAD 9, D-10, AND HD-41 $4791 1T 5D 8P QUICK TOWER-NO CAB, UNDER 100 FEET IN HEIGHT BASED TO BOOM $44 64 1T 5D 8P REMOTE CONTROL OPERATOR ON RUBBER TIRED EARTH MOVING $4791 1T 5D 8P EQUIP RIGGER AND BELLMAN $44 64 1T 5D 8P Page 6 .. . CLALLAM COUNTY EFFECTIVE 03-04-2009 ********************************************************************************************************** Classification ROLLAGON ROLLER, OTHER THAN PLANT ROAD MIX ROLLERS, PLANTMIX OR MUL TILlFT MATERIALS ROTO-MILL, ROTO-GRINDER SAWS, CONCRETE SCRAPERS - SELF PROPELLED, HARD TAIL END DUMP, ARTICULATING OFF-ROAD EQUIPMENT (45 YD AND OVER) SCRAPERS, CONCRETE AND CARRY ALL SCREED MAN SHOTCRETE GUNITE SLlPFORM PAVERS SPREADER, TOPSIDER & SCREEDMAN SUBGRADE TRIMMER TOWER BUCKET ELEVATORS TRACTORS, (75 HP & UNDER) TRACTORS, (OVER 75 HP) TRANSFER MATERIAL SERVICE MACHINE TRANSPORTERS, ALL TRACK OR TRUCK TYPE TRENCHING MACHINES TRUCK CRANE OILERlDRIVER ( UNDER 100 TON) TRUCK CRANE OILERlDRIVER (100 TON & OVER) TRUCK MOUNT PORTABLE CONVEYER WHEEL TRACTORS, FARMALL TYPE YO YO PAY DOZER POWER EQUIPMENT OPERATORS- UNDERGROUND SEWER & WATER (SEE POWER EQUIPMENT OPERATORS) POWER LINE CLEARANCE TREE TRIMMERS JOURNEY LEVEL IN CHARGE SPRAY PERSON TREE EQUIPMENT OPERATOR TREE TRIMMER TREE TRIMMER GROUNDPERSON REFRIGERATION & AIR CONDITIONING MECHANICS MECHANIC RESIDENTIAL BRICK & MARBLE MASONS JOURNEY LEVEL RESIDENTIAL CARPENTERS JOURNEY LEVEL RESIDENTIAL CEMENT MASONS JOURNEY LEVEL RESIDENTIAL DRYWALL TAPERS JOURNEY LEVEL RESIDENTIAL ELECTRICIANS JOURNEY LEVEL RESIDENTIAL GLAZIERS JOURNEY LEVEL RESIDENTIAL INSULATION APPLICATORS JOURNEY LEVEL RESIDENTIAL LABORERS JOURNEY LEVEL RESIDENTIAL PAINTERS JOURNEY LEVEL Page 7 (See Benefit Code Key) Over PREVAILING Time Holiday Note WAGE Code Code Code $4791 1T 5D 8P $44 64 1T 5D 8P $4700 1T 5D 8P $4742 1T 5D 8P $4700 1T 5D 8P $4791 1T 5D 8P $4700 1T 5D 8P $4742 1T 5D 8P $44 64 1T 5D 8P $4791 1T 5D 8P $4791 1T 5D 8P $4742 1T 5D 8P $4700 1T 5D 8P $4700 1T 5D 8P $4742 1T 5D 8P $4742 1T 5D 8P $4791 1T 5D 8P $4700 1T 5D 8P $4700 1T 5D 8P $4742 1T 5D 8P $4742 1T 5D 8P $44 64 1T 5D 8P $4742 1T 5D 8P $39 29 $3721 $3781 $3518 $26 55 4A 4A 4A 4A 4A SA SA SA 5A SA $27 68 $45 05 1M SA $1785 $25 63 $1800 $27 78 $2136 $986 $1808 $1597 CLALLAM COUNTY ... EFFECTIVE 03-04-2009 ********************************************************************************************************** (See Benefit Code Key) Over PREVAILING TIme Holiday Note Classification WAGE Code Code Code RESIDENTIAL PLUMBERS & PIPEFITTERS JOURNEY LEVEL $1460 RESIDENTIAL REFRIGERATION & AIR CONDITIONING MECHANICS JOURNEY LEVEL $60 56 1G 5A RESIDENTIAL SHEET METAL WORKERS JOURNEY LEVEL (FIELD OR SHOP) $3414 11 6L RESIDENTIAL SOFT FLOOR LAYERS JOURNEY LEVEL $1088 RESIDENTIAL SPRINKLER FITTERS (FIRE PROTECTION) JOURNEY LEVEL $1967 ROOFERS JOURNEY LEVEL $38 28 1R 5A USING IRRITABLE BITUMINOUS MATERIALS $4128 1R 5A SHEET METAL WORKERS JOURNEY LEVEL (FIELD OR SHOP) $55 27 1E 6L SHIPBUILDING & SHIP REPAIR BOILERMAKER $32 56 1H 6W HEAT & FROST INSULATOR $48 28 1S 5J LABORER $1216 1 MACHINIST $1716 1 SHIPFITTER $1466 1 WELDER/BURNER $1466 1 SIGN MAKERS & INSTALLERS (ELECTRICAL) JOURNEY LEVEL $1929 SIGN MAKERS & INSTALLERS (NON-ELECTRICAL) JOURNEY LEVEL $1215 SOFT FLOOR LAYERS JOURNEY LEVEL $3818 1B 5A SOLAR CONTROLS FOR WINDOWS JOURNEY LEVEL $1031 1B 50 SPRINKLER FITTERS (FIRE PROTECTION) JOURNEY LEVEL $1967 STAGE RIGGING MECHANICS (NON STRUCTURAL) JOURNEY LEVEL $1323 SURVEYORS CHAIN PERSON $935 1 INSTRUMENT PERSON $1140 1 PARTY CHIEF $1340 1 TELECOMMUNICATION TECHNICIANS TELECOMMUNICATION TECHNICIANS JOURNEY LEVEL $32 34 1E 5A TELEPHONE LINE CONSTRUCTION. OUTSIDE CABLE SPLICER $3146 2B 5A HOLE DIGGER/GROUND PERSON $1758 2B 5A INSTALLER (REPAIRER) $3017 2B 5A JOURNEY LEVEL TELEPHONE L1NEPERSON $29 26 2B 5A SPECIAL APPARATUS INSTALLER I $3146 2B 5A SPECIAL APPARATUS INSTALLER II $30 82 2B 5A TELEPHONE EQUIPMENT OPERATOR (HEAVY) $3146 2B 5A TELEPHONE EQUIPMENT OPERATOR (LIGHT) $29 26 2B 5A TELEVISION GROUND PERSON $1667 2B 5A TELEVISION L1NEPERSON/INSTALLER $2219 2B 5A TELEVISION SYSTEM TECHNICIAN $26 42 2B 5A Page 8 .. . CLALLAM COUNTY EFFECTIVE 03-04-2009 ********************************************************************************************************** (See Benefit Code Key) Over PREVAILING Time Holiday Note ClaSSification WAGE Code Code Code TELEVISION TECHNICIAN $23 76 2B 5A TREE TRIMMER $29 26 2B 5A TERRAZZO WORKERS & TILE SETTERS JOURNEY LEVEL $4361 1M 5A TILE, MARBLE & TERRAZZO FINISHERS FINISHER $37 44 1B 5A TRAFFIC CONTROL STRIPERS JOURNEY LEVEL $37 90 1K 5A TRUCK DRIVERS ASPHALT MIX (TO 16 YARDS) $43 45 1T 50 8L ASPHALT MIX (OVER 16 YARDS) $44 25 1T 50 8L DUMP TRUCK $20 23 1 DUMP TRUCK & TRAILER $20 23 1 OTHER TRUCKS $44 25 1T 50 8L TRANSIT MIXER $23 73 1 WELL DRILLERS & IRRIGATION PUMP INSTALLERS IRRIGATION PUMP INSTALLER $1160 OILER $945 WELL DRILLER $1160 Page 9 " . .. PREVAILING WAGE RATES FOR CLALLAM COUNTY APPRENTICES EFFECTIVE DATE 3/4/2009 Prevailing Overtime Holiday Note Stage of Progression & Hour Range Wage Code Code Code ASBESTOS ABA TEMENT WORKERS JOURNEY LEVEL ENVIRONMENTAL CONTROL PAINTERS 1 0000-1000 HOURS 50 00% $20 29 lH 50 2 1001-2000 HOURS 60 00% $23 26 1H 50 3 2001-3000 HOURS 75 00% $29 96 1H 50 4 3001-4000 HOURS 90 00% $34 85 1H 50 1 0000-1000 HOURS 60 00% $26 26 lH 50 2 1001-2000 HOURS 70 00% $29 22 1H 50 3 2001-3000 HOURS 8000% $3219 1H 50 4 3001-4000 HOURS 90 00% $3515 1H 50 BOILERMAKERS JOURNEY LEVEL 1 0000-1000 HOURS 70 00% $43 26 1C 5N 2 1001-2000 HOURS 75 00% $44 95 lC 5N 3 2001-3000 HOURS 8000% $46 63 lC 5N 4 3001-4000 HOURS 8500% $48 32 lC 5N 5 4001-5000 HOURS 90 00% $50 00 lC 5N 6 5001-6000 HOURS 95 00% $5169 lC 5N BRICK AND MARBLE MASONS JOURNEY LEVEL 1 0000-0750 HOURS 50 00% $2712 1M 5A 2 0750-2250 HOURS 55 00% $28 78 1M 5A 3 2550-3000 HOURS 60 00% $30 44 1M 5A 4 3000-3750 HOURS 70 00% $33 75 1M 5A 5 3750-4500 HOURS 80 00% $37 07 1M 5A 6 4500-5250 HOURS 90 00% $40 38 1M 5A 7 5250-6000 HOURS 95 00% $42 04 1M 5A CARPENTERS CARPENTER 1 0000-1000 HOURS 60 00% $28 07 1M 50 2 1001-2000 HOURS 65 00% $34 05 1M 50 3 2001-3000 HOURS 70 00% $35 78 1M 50 4 3001-4000 HOURS 75 00% $3751 1M 50 5 4001-5000 HOURS 80 00% $39 24 1M 50 6 5001-6000 HOURS 85 00% $40 97 1M 50 7 6001-7000 HOURS 90 00% $42 70 1M 50 8 7001-8000 HOURS 95 00% $44 43 1M 50 DRYWALL APPLICATOR ORYWALL, METAL STUO, ANO CEILING APPLICATORS 1 0000-0700 HOURS 50 00% $24 75 1M 50 2 0701-1400 HOURS 60 00% $32 48 1M 50 3 1401-2100 HOURS 68 00% $35 27 1M 50 4 2101-2800 HOURS 76 00% $38 06 1M 50 5 2801-3500 HOURS 84 00% $40 84 1M 50 Page 1 Slage of Progression & Hour Range 6 3501-4200 HOURS 92 00% ACOUSTICAL WORKER 1 0000-1000 HOURS 50 00% 2 0701-1400 HOURS 60 00% 3 1401-2100 HOURS 68 00% 4 2101-2800 HOURS 76 00% 5 2801-3500 HOURS 84 00% 6 3501-4200 HOURS 92 00% MILLWRIGHT AND MACHINE ERECTORS PREVAILING WAGE RATES FOR CLALLAM COUNTY APPRENTICES EFFECTIVE DATE 3/4/2009 1 15t Penod 60 00% 2 2nd Penod 65 00% 3 3rd Penod 70 00% 44th Penod 75 00% 55th Penod 80 00% 66th Penod 85 00% 77th Penod 90 00% 88th Penod 95 00% PILEDRIVERS, DRIVING, PULLING, PLACING COLLARS AND WELDING 1 1 st Penod 60 00% 2 2nd Penod 65 00% 3 3rd Penod 70 00% 44th Penod 75 00% 55th Penod 80 00% 66th Penod 85 00% 77th Penod 90 00% 88th Penod 95 00% BRIDGE, DOCK AND WARF CARPENTERS 1 15t Penod 60 00% 2 2nd Penod 65 00% 3 3rd Penod 70 00% 44th Penod 75 00% 55th Penod 80 00% 66th Penod 85 00% 77th Penod 90 00% 88th Penod 95 00% CEMENT MASONS JOURNEY LEVEL 1 0000-1000 HOURS 50 00% 2 1001-2000 HOURS 60 00% 3 2001-3000 HOURS 70 00% 4 3001-4000 HOURS 80 00% 5 4001-5000 HOURS 90 00% 6 5001-6000 HOURS 95 00% DRYWALL TAPERS Page 2 PrevaIling Wage $43 63 Overtime Code 1M Holiday Code 50 $24 70 1M 50 $32 42 1M 50 $35 20 1M 50 $37 98 1M 50 $40 76 1M 50 $43 54 1M 50 $28 67 1M 50 $34 70 1M 50 $36 48 1M 50 $38 26 1M 50 $40 04 1M 50 $4182 1M 50 $43 60 1M 50 $45 38 1M 50 $2819 1M 50 $3418 1M 50 $35 92 1M 50 $37 66 1M 50 $39 40 1M 50 $4114 1M 50 $42 88 1M 50 $44 62 1M 50 $28 07 1M 50 $34 05 1M 50 $35 78 1M 50 $3751 1M 50 $39 24 1M 50 $40 97 1M 50 $42 70 1M 50 $44 43 1M 50 $1483 $17 80 $20 76 $23 73 $26 69 $2818 lH lH lH lH lH lH 50 50 50 50 50 50 . . ." Note Code . .. PREVAILING WAGE RATES FOR CLALLAM COUNTY APPRENTICES EFFECTIVE DATE 3/4/2009 PrevaIling OvertIme Holiday Note Stage of ProgressIon & Hour Range Wage Code Code Code JOURNEY LEVEL 1 0000-1000 HOURS 50 00% $1389 lE 5P 2 1001-2000 HOURS 55 00% $3167 lE 5P 3 2001-3000 HOURS 65 00% $34 93 lE 5P 4 3001-4000 HOURS 75 00% $3819 lE 5P 5 4001-5000 HOURS 85 00% $4145 lE 5P 6 5001-6000 HOURS 90 00% $43 08 lE 5P ELECTRICIANS - INSIDE JOURNEY LEVEL 1 0000-1000 HOURS 45 00% $25 75 lE 5A 2 1001-2000 HOURS 50 00% $27 80 lE 5A 3 2001-3500 HOURS 55 00% $3311 1E 5A 4 3501-5000 HOURS 65 00% $3781 1E 5A 5 5001-6500 HOURS 75 00% $4251 1E 5A 6 6501-8000 HOURS 85 00% $47 20 lE 5A ELECTRICIANS - POWERLINE CONSTRUCTION JOURNEY LEVEL LlNEPERSON 1 0000-1000 HOURS 60 00% $3391 4A 5A 2 1001-2000 HOURS 63 00% $3518 4A 5A 3 2001-3000 HOURS 67 00% $36 88 4A 5A 4 3001-4000 HOURS 72 00% $38 98 4A 5A 5 4001-5000 HOURS 78 00% $4151 4A 5A 6 5001-6000 HOURS 86 00% $44 89 4A 5A 7 6001-7000 HOURS 90 00% $46 59 4A 5A POLE SPRA YER 1 0000-1000 HOURS 85 70% $4476 4A 5A 2 1001-2000 HOURS 89 80% $46 49 4A 5A 3 2001-3000 HOURS 92 80% $4776 4A 5A ELEVA TOR CONSTRUCTORS MECHANIC 1 0000-1000 HOURS 50 00% $2146 4A 60 2 1001-1700 HOURS 55 00% $43 49 4A 60 3 1701-3400 HOURS 65 00% $48 03 4A 60 4 3401-5100 HOURS 70 00% $5091 4A 60 5 5101-6800 HOURS 80 00% $55 55 4A 60 ELECTRONIC TECHNICIANS ELECTRONIC TECHNICIANS JOURNEY LEVEL 1 0000-1000 HOURS 55 00% $855 2 1001-2000 HOURS 60 00% $855 3 2001-3000 HOURS 65 00% $855 4 3001-4000 HOURS 70 00% $855 5 4001-5000 HOURS 75 00% $905 6 5001-6000 HOURS 80 00% $966 7 6001-7000 HOURS 85 00% $1026 Page 3 ~ . ~ PREVAILING WAGE RATES FOR CLALLAM COUNTY APPRENTICES EFFECTIVE DATE 3/4/2009 PrevaIling OvertIme Holiday Note Stage of ProgressIon & Hour Range Wage Code Code Code 8 7001-8000 HOURS 95 00% $1147 TELECOMMUNICA TION TECHNICIANS TELECOMMUNICA TION TECHNICIANS JOURNEY LEVEL 1 0000-0800 HOURS 60 00% $2118 lE 5A 2 0801-1500 HOURS 65 00% $22 58 lE 5A 3 1601-2400 HOURS 70 00% $23 97 lE 5A 4 2401-3200 HOURS 75 00% $25 37 lE 5A 5 3201-4000 HOURS 80 00% $26 76 lE 5A 6 4001-4800 HOURS 85 00% $2816 lE 5A GLAZIERS JOURNEY LEVEL 1 0000-1000 HOURS 50 00% $2515 lY 5G 2 1001-2000 HOURS 55 00% $2716 lY 5G 3 2001-3000 HOURS 60 00% $2917 lY 5G 4 3001-4000 HOURS 65 00% $3118 lY 5G 5 4001-5000 HOURS 70 00% $3319 lY 5G 6 5001-6000 HOURS 75 00% $35 20 lY 5G 7 6001-7000 HOURS 80 00% $3721 lY 5G 8 7001-8000 HOURS 90 00% $4123 lY 5G HEA T & FROST INSULA TORS AND ASBESTOS WORKERS MECHANIC 1 0000-2000 HOURS 45 00% $28 92 lS 5J 2 2001-4000 HOURS 55 00% $3231 lS 5J 3 4001-6000 HOURS 65 00% $35 70 lS 5J 4 6001-8000 HOURS 75 00% $3910 1S 5J 5 8001-10000 HOURS 85 00% $42 49 1S 5J HOD CARRIERS & MASON TENDERS JOURNEY LEVEL 1 0000-1000 HOURS 60 00% $26 26 1H 50 2 1001-2000 HOURS 70 00% $29 22 1H 50 3 2001-3000 HOURS 80 00% $3219 1H 50 4 3001-4000 HOURS 90 00% $3515 1H 50 INSULA T/ON APPLICA TORS JOURNEY LEVEL 1 0000-1000 HOURS 50 00% $1025 2 1001-2000 HOURS 60 00% $1230 3 2001-3000 HOURS 75 00% $1538 4 3001-4000 HOURS 90 00% $1845 IRONWORKERS JOURNEY LEVEL 1 0000-0750 HOURS 65 00% $855 10 5A 2 0751-1500 HOURS 70 00% $30 24 10 5A 3 1501-2250 HOURS 75 00% $4241 10 5A 4 2251-3000 HOURS 80 00% $4413 10 5A Page 4 . .. ., PREVAILING WAGE RATES FOR CLALLAM COUNTY APPRENTICES EFFECTIVE DATE 3/4/2009 PrevaIling OvertIme Holiday Note Stage of ProgressIon & Hour Range Wage Code Code Code 5 3001-3750 HOURS 90 00% $4757 10 5A 6 3751-4500 HOURS 90 00% $4757 10 5A 7 4501-5250 HOURS 95 00% $49 29 10 5A 8 5251-6000 HOURS 95 00% $49 29 10 5A LABORERS GENERAL LABORER 1 0000-1000 HOURS 60 00% $26 26 1H 50 2 1001-2000 HOURS 70 00% $29 22 1H 50 3 2001-3000 HOURS 80 00% $3219 1H 50 4 3001-4000 HOURS 90 00% $3515 1H 50 LABORERS - UNDERGROUND SEWER & WA TER GENERAL LABORER 1 0000-1000 HOURS 60 00% $26 26 1H 50 2 1001-2000 HOURS 70 00% $29 22 1H 50 3 2001-3000 HOURS 80 00% $3219 1H 50 4 3001-4000 HOURS 90 00% $3515 1H 50 LATHERS JOURNEY LEVEL 1 0000-0700 HOURS 5000% $24 75 1M 50 2 0701-1400 HOURS 60 00% $32 48 1M 50 3 1401-2100 HOURS 68 00% $35 27 1M 50 4 2101-2800 HOURS 76 00% $38 06 1M 50 5 2801-3500 HOURS 84 00% $40 84 1M 50 6 3501-4200 HOURS 92 00% $43 63 1M 50 PAINTERS JOURNEY LEVEL 1 0000-0750 HOURS 52 00% $20 35 26 5A 2 0751-1500 HOURS 56 00% $2144 26 5A 3 1501-2250 HOURS 60 00% $22 54 26 5A 4 2251-3000 HOURS 64 00% $24 52 26 5A 5 3001-3750 HOURS 68 00% $25 66 26 5A 6 3751-4500 HOURS 72 00% $26 82 26 5A PLASTERERS JOURNEY LEVEL 1 0000-0500 HOURS 40 00% $1033 2 0501-1000 HOURS 45 00% $1162 3 1001-1500 HOURS 45 00% $1162 4 1501-2000 HOURS 50 00% $1292 5 2001-2500 HOURS 55 00% $1421 6 2501-3000 HOURS 60 00% $1550 7 3001 -3500 HOURS 65 00% $1679 8 3501 -4000 HOURS 70 00% $1808 9 4001-4500 HOURS 7500% $1937 10 4501-5000 HOURS 80 00% $20 66 Page 5 PREVAILING WAGE RATES FOR CLALLAM COUNTY APPRENTICES EFFECTIVE DATE 3/4/2009 Stage of Progression & Hour Range 11 5001-5500 HOURS 85 00% 12 5501-6000 HOURS 90 00% 13 6001-6500 HOURS 95 00% 14 6501-7000 HOURS 95 00% PLUMBERS & PIPEFITTERS JOURNEY LEVEL 1 0000-2000 HOURS 50 00% 2 2001-4000 HOURS 62 50% 3 4001-6000 HOURS 70 00% 4 6001-8000 HOURS 75 00% 5 8001-10000 HOURS 85 00% POWER EQUIPMENT OPERA TORS BACKHOES, /75 HP & UNDER) ALL EQUIPMENT 1 0000-1000 HOURS 65 00% 2 1001-2000 HOURS 70 00% 3 2001-3000 HOURS 75 00% 4 3001-4000 HOURS 80 00% 5 4001-5000 HOURS 90 00% 6 5001-6000 HOURS 95 00% POWER EQUIPMENT OPERA TORS- UNDERGROUND SEWER & WA TER (SEE POWER EQUIPMENT OPERA TORS) 1 0000-1000 HOURS 65 00% 2 1001-2000 HOURS 70 00% 3 2001-3000 HOURS 75 00% 4 3001-4000 HOURS 80 00% 5 4001-5000 HOURS 90 00% 6 5001-6000 HOURS 95 00% POWER LINE CLEARANCE TREE TRIMMERS TREE TRIMMER 1 0000-1000 HOURS 75 00% 2 1001-2000 HOURS 80 00% 3 2001-3000 HOURS 8500% 4 3001-4000 HOURS 90 00% REFRIGERA TlON & AIR CONDITIONING MECHANICS MECHANIC 1 0000-2000 HOURS 50 00% 2 2001-4000 HOURS 55 00% 3 4001-6000 HOURS 60 00% 4 6001-8000 HOURS 70 00% 5 8001-10000 HOURS 85 00% RESIDENTIAL CARPENTERS JOURNEY LEVEL 1 1 st Penod 60 00% Page 6 Prevailing Wage $21 96 $23 25 $24 54 $24 54 $34 48 $45 95 $49 20 $5137 $55 70 .. . ~ Overtime Holiday Code Code Nole Code 1G 1G 1G 1G 1G 5A 5A 5A 5A 5A $35 43 11 50 8P $37 09 11 50 8P $3874 11 50 8P $40 39 11 50 8P $43 70 11 50 8P $45 35 11 50 8P $35 43 $37 09 $3874 $40 39 $43 70 $45 35 $27 82 $2914 $30 44 $31 50 $1384 $1522 $1661 $1938 $23 53 $1071 4A 4A 4A 4A 5A 5A 5A 5A . .. '" PREVAILING WAGE RATES FOR CLALLAM COUNTY APPRENTICES EFFECTIVE DATE 3/4/2009 Prevailing Overtime Holiday Note Stage of ProgressIon & Hour Range Wage Code Code Code 2 2nd Penod 65 00% $1160 3 3rd Penod 70 00% $1250 44th Penod 75 00% $1339 55th Penod 80 00% $1428 66th Penod 85 00% $1517 77th Penod 90 00% $1607 88th Penod 95 00% $1696 RESIDENTIAL ELECTRICIANS JOURNEY LEVEL 1 0000-0900 HOURS 50 00% $1389 2 0901-1800 HOURS 55 00% $1528 3 1801-2700 HOURS 75 00% $20 84 4 2701-4000 HOURS 85 00% $2361 RESIDENTIAL PLUMBERS & PIPEFITTERS JOURNEY LEVEL 1 0000-1000 HOURS 55 00% $855 2 1001-2000 HOURS 65 00% $949 3 2001-4000 HOURS 75 00% $1095 4 4001-6000 HOURS 85 00% $1241 RESIDENTIAL SHEET METAL WORKERS JOURNEY LEVEL (FIELD OR SHOP) 1 0000-0900 HOURS 55 00% $1744 11 6L 2 0901-1800 HOURS 60 00% $1836 11 6L 3 1801-2700 HOURS 65 00% $1970 11 6L 4 2701-3600 HOURS 70 00% $20 63 11 6L 5 3601-4500 HOURS 75 00% $2180 11 6L 6 4501-5400 HOURS 80 00% $22 72 11 6L ROOFERS JOURNEY LEVEL 1 0000-0820 HOURS 60 00% $24 93 1R 5A 2 0821-1630 HOURS 67 00% $26 87 1R 5A 3 1631-2450 HOURS 74 00% $28 80 1R 5A 4 2451-3270 HOURS 8100% $33 03 lR 5A 5 3271-4080 HOURS 88 00% $34 97 1R 5A 6 4081-4899 HOURS 95 00% $36 90 1R 5A SHEET METAL WORKERS JOURNEY LEVEL (FIELD OR SHOP) 1 0000-2000 HOURS 45 00% $23 63 lE 6L 2 2001-3000 HOURS 50 00% $34 27 1E 6L 3 3001-4000 HOURS 55 00% $36 24 1E 5L 4 4001-5000 HOURS 60 00% $38 22 lE 6L 5 5001-6000 HOURS 55 00% $40 20 1E 6L 6 6001-7000 HOURS 70 00% $4216 1E 6L 7 7001-8000 HOURS 75 00% $4414 1E 6L Page 7 .. . .. PREVAILING WAGE RATES FOR CLALLAM COUNTY APPRENTICES EFFECTIVE DATE 3/4/2009 PrevaIling OvertIme Holiday Note Stage of Progression & Hour Range Wage Code Code Code 8 8001-9000 HOURS 80 00% $4611 1E 6L 9 9001-10000 HOURS 85 00% $47 99 1E 6L SOFT FLOOR LA YERS JOURNEY LEVEL 1 0000-1000 HOURS 50 00% $1900 1B 5A 2 1001-2000 HOURS 60 00% $25 25 1B SA 3 2001-3000 HOURS 70 00% $2848 1B 5A 4 3001-4000 HOURS 75 00% $3010 1B 5A 5 4001-5000 HOURS 80 00% $3171 1B 5A 6 5001-6000 HOURS 85 00% $33 33 1B 5A 7 6001-7000 HOURS 90 00% $34 95 1B 5A 8 7001-8000 HOURS 95 00% $855 1B 5A SPRINKLER FITTERS (FIRE PROTECTION) JOURNEY LEVEL GRADE 1 (INDENTURED AFTER APRIL 1, 2000) 1 0000-1000 HOURS 45 00% $885 1 2 1001-2000 HOURS 50 00% $984 1 3 2001-3000 HOURS 55 00% $1082 1 4 3001-4000 HOURS 60 00% $1180 1 1 0000-1000 HOURS 40 00% $855 1 2 1001-2000 HOURS 45 00% $885 1 3 2001-3000 HOURS 50 00% $984 1 4 3001-4000 HOURS 55 00% $1082 1 1 0000-1000 HOURS 65 00% $1279 1 2 1001-2000 HOURS 70 00% $1377 1 3 2001-3000 HOURS 75 00% $1475 1 4 3001-4000 HOURS 80 00% $1574 1 5 4001-5000 HOURS 85 00% $1672 1 6 5001-6000 HOURS 90 00% $1770 1 1 0000-1000 HOURS 60 00% $1180 1 2 1001-2000 HOURS 65 00% $1279 1 3 2001-3000 HOURS 70 00% $1377 1 4 3001-4000 HOURS 75 00% $1475 1 5 4001-5000 HOURS 80 00% $1574 1 6 5001-6000 HOURS 85 00% $1672 1 TILE, MARBLE & TERRAZZO FINISHERS FINISHER 1 0000-1000 HOURS 50 00% $25 38 1B 5A 2 1001-2500 HOURS 55 00% $2691 1B 5A 3 2501-3500 HOURS 60 00% $28 42 1B 5A 4 3501-4500 HOURS 70 00% $3150 1B 5A TERRAZZO WORKERS & TILE SETTERS JOURNEY LEVEL 1 0000-1000 HOURS 50 00% $26 03 1M 5A 2 1001-2500 HOURS 55 00% $27 62 1M 5A Page 8 . ..... "" " PREVAILING WAGE RATES FOR CLALLAM COUNTY APPRENTICES EFFECTIVE DATE 3/4/2009 Stage of ProgressIon & Hour Range 3 2501-3500 HOURS 60 00% 4 3501-4500 HOURS 70 00% 5 4501-5500 HOURS 80 00% 6 5501-6250 HOURS 90 00% 7 6251-7000 HOURS 95 00% TRAFFIC CONTROL STRIPERS JOURNEY LEVEL 1 0000-0500 HOURS 60 00% 2 0501-1000 HOURS 60 00% 3 1001-2333 HOURS 60 00% 4 2334-4666 HOURS 73 00% 5 4667-7000 HOURS 88 00% TRUCK DRIVERS DUMP TRUCK ALL TRUCKS 1 0000-0700 HOURS 70 00% 2 0701-1400 HOURS 80 00% 3 1401-2100 HOURS 90 00% PrevaIling OvertIme Holiday Wage Code Code $2921 1M 5A $32 40 1M 5A $35 59 1M 5A $38 77 1M 5A $40 37 1M 5A $1590 $2122 $24 95 $2916 $3401 1K 1K 1K 1K 1K 5A 5A 5A 5A 5A $1416 $1618 $1821 Page 9 Note Code