Loading...
HomeMy WebLinkAbout1314 O St Technical - BuildingTECIINICAI, PLAT 112795G Suntel Home Design In return for payment of a one -time fee, euh Designs Engineering, Inc. grants you a limited license to use the Analysis to construct one single house a the address shown below Site Location Lot 3 Rolling Hills, Port Angelos, Washington Copyright 8851 (please refer to this number when requesting customer support) NOTICE- If the Building Department accepts the Analysis without an engineer's original "wet- stamp" seal signed with red ink or for different site location than shown above, then it is agreed that such Building Department accepts total liability out of or in connection with this Analysis. AND CAN NOT BE USED FOR. CALCULATIONS, SHEAR SHEET, L -SHEET VALID ONLY WITH ORIGINAL STAMP HERE AND DIGITAL STAMP ON PLANS 41die/i. DESIGNS ENGINEERING,. INC 12560 N W Welsh Dr Portland, OR 97229 (503) 533 -5100 AFTER DECEMBER 2006 Designs Engineering, Inc. LIABILITY LIMITATIONS INDEMNIFICATIONS BY BUILDING DEPARTMENT OWNERSHIP OF DOCUMENTS Project: Catalina -G File 112795G- 100D -D2 -WA Client: Suntel Home Design SEISMIC ANALYSIS FOR ZONE D2 By RF Sheet No Date 7/2005 Job No 1843 11 ANALYSIS ANALYZE BUILDING FOR ONLY WIND SEISMIC FORCES According to the 2003 INTERNATIONAL BUILDING CODE WIND ANALYSIS FOR EXPOSURE "D" 100 MPH (3 -sec Gust) Building Department agrees to defend, indemnify and hold harmless FDE from any loss, costs, damage, expense, including attorney fees upon trial or appeal, for liability arising out of or in connection with FDE's Analysis unless Analysis is used for specific site location shown on cover naae and contains an orminal enaineer's "wet- stamp" seal signed with red -ink (no photocopy allowed). I eF Designs Engineering, "FDE was retained in a limited capacity for this project. Design is based upon information provided by the Client, who is solely responsible for accuracy of same No responsibility and liability is assumed to FDE for items beyond that shown on these sheets. No construction observations nor soils investigations performed by FDE All documents produced by FDE shall remain the property of FDE and shall not be used unless accompanied by ar original engineer's wet -stamp issued from FDE w. Designs Engineering, Inc FLOOR LINE I II �li�li�l SC:AI F 1 /d' T-CY Project: Catalina -G File 112795G 100D -D2 -WA Client. Suntel Hoene Design Illillllllllllllll ",,,l IIIIIIIIIIIIIIIIIIIIII 11 SCALE 1/8' T-O' 111!IIIIII Illll p!!!!1 lili�il 111111 A A By RF Sheet No Date 7/2005 2 Job No 1843 1 T L_LV�TU" EXP 0.515. SIDING LVA Pinar Ie r ".".li""!!'!!!! l .IIIII11111! MU NEI 111111 attailatlY r 7 Designs .Engineering, Inc Project. Catahria =G File 112795G 100D -D2 -WA Client. Suntel Horne Design SCALE 1/4' T--0 SCALE 1/8' Y-0' By RF Sheet No Date 7/2005 3 Job No 1843 1 �C71 I L__CVA 1 >'I 6 SIC 6 10' FLC L11■1: egarliwd/ Designs Engincering, lnL 1 Project Catalina -G File 11279DG 100D -D2 WA Client Suntel Home Design 1 1 1 1 1 1 1 1 1 1 1 1 I I I I I 1 F 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 .1_L1J_[_.I c u By RF Date 7/2005 Job No 1843 6) 1 I •I L I II II -1- 11 N 1t 1 -1IP Q 1 1I A 9 ct II a i f '1 T"I' 1' 1 T T 7 r 'I 7 Ti 1 o 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I 1 11 1 1 1 _I_ 1 1 1 1 I 1 1 1� I I 1 1 1 1 1 1, 1 1 1 1 1 1 1 1 1 1 1 1 Shee No 4 4 I 1 Designs Engineering, Inc WIND ANALYSIS USING 2003 IBC SIMPLIFIED WIND METHOD Data. W Total Wind Force Y x Ix P x A Reference 2003 IBC Figure 1609 6 2.1 Zone A B C D SIDE WALLS Zone Y =15 I =10 FRONT REAR WALLS Project. Catalina -G File 11.27950- 100D -D2 -WA Client Suntel Home Design Horizontal Pressure Pa 17 8 psf Pb 12.2 psf Pc 14.2 psf Pd 9 8 psf By RF Date 7/2005 Job No 1843 Projected Area Aa 30 sq ft. Ab =15 sq ft. Ac 165 sq ft. Ad 220 sq ft. Ilonzontal. Pressure Projected Area A Pa 17 8 psf Aa 30 sq ft. B Pb 12.2 psf Ab 20 sq ft. C Pc 14.2 psf Ac 245 sq ft. D Pd 9 8 psf Ad 420 sq ft. Sheet No 11 W Y I (Pa Aa Pb•Ab Pc Ac Pd Ad) W 7 82 x 10 pounds I Distribute wind force to roof and second. -floor level FRw1 Y I (1 0 Pa Aa 1 0•Pb Ab 1 0 Pc Ac 1 0•Pd Ad) FRw1 7 82 x 10 lbs W Y I (Pa Aa Pb•Ab Pc Ac Pd Ad) W 1.26 x 10 pounds Distribute wind force to roof and second -floor level FRw2 Y I (1 0 Pa Aa 1 0•Pb Ab 1 0-Pc Ac 1 0 Pd Ad) FRw2 1.26 x 10 lbs Designs Engineering, Inc Weights Mass Calculations AlstFloor 2300 ft^2 p =2— 20 Seismic Design Force FRe E Project. Catalina -G File 112795G- 100D -D2 -WA Client: Suntel Horne Design SEISMIC ANALYSIS USING 2003 IBC SIMPLIFIED ANALYSIS .PROCEDURE Data. I =1 0 Sd 1.30 .R 6 5 r 0 45 (worst case) E Earthquake Base Shear 1 2 p Qe 1 4 1.2 p (Sd W/ 1 4R) Roof Dead Load 15 psf (Composite Roof Covering) Partitions 10 psf Exterior Walls Windows 10 psf (Average) Mroof 20•Aroof 10 Aroofwall By RF Sheet No Date 7/2005 Job No 1843 i I Aroof 2500 ft ^2 Aroofwall 900ft ^2 Al wall 0 ft ^2 hl• =10ft Mroof 5 9 x 10 pounds r V Al stFloor p if (p 1,1, p) p 1 07 E 1.2 p. 1 Sd 4 R Mroof E 1 09 x 10 pounds FRe 1 09 x 10 pounds Designs Engineering, Inc Project: Catalina -G File 112795G 100D -D2 -WA Client: Suntel. Horne Design By RF Date 7/2005 Job No 1843 INVESTIGATE SHEARWALLS USING PERFORATED SHEARWALL DESIGN APPROACH Analyze entire brace wall line as a series of perforated shearwall panels using worst -case "maximum opening height ratio Individual perforated shearwall panels extend between plan discontinuity Overturning for such panel is calculated by rational analysis. Reference Section 2305.3 7.2 2003IBC Unadjusted in-plane shear force for brace wall line, FRe 2950# Percent full height sheathing 8 ft. 16 ft 50% Maximum opening height ratio 4ft 8 ft 0 50 Shear resistance adjustment factor, Co 0 8 (Ref Shear resistance adjustment factor table) Amplified in-plane shear, V Unadiusted shear force for brace wall line Shear resistance adjustment factor x Total length of full- height walls FRe (Co x L) 2950# (0 8 x 8 ft) 460 plf Uplift at perforated shearwall ends calculated based on rational analysis (use only 50% of weight of first individual full height wall segment for dead load) 2/3 average weight of full height wall segments and portion of roof framing, Wd 110 plf 2/3 dead -load reaction at end of shearwall or corner restraint, RI 400# Uplift at end of perforated shearwalls, Pu Vf x hl Wd x (0 5 L1) R1 460 plf x 8 ft 110 plf x (0 5 x 4ft) R1 3100# Uplift between wall ends, t V- Wd 460 plf 110 plf 350 plf Wall bottom plate (1 1/2" thickness) to rrmjoist. Use 16d common nails (0 162 by 3 1/2 inches) Lateral resistance 1 33 x 141## 187# per nail Withdrawal resistance 1.33 x 40 ph x 2 5" 133# per nail Nails for shear transfer 460 plf 187# per nail 2 4 nails per foot Nails for uplift transfer (460 -110 plf) 133# per nail 2 6 nails per foot Net spacing for shear and uplift 2.4" o c. Sheet No 8/ Rim Borst to wall top plate Use 16d common nail (0 162 by 3 1/2 in.) toe nailed to provide shear transfer Lateral resistance 0 83 x 187# per nail x 1 5 nails per ft. 230 plf (150# per nail default maxrmur for seismic loads) plus Simpson "LTP5" framing clip capacity 630# Net spacing for shear using LTP5 clip and 16d toenails at 8" o c. 630# (460- 150 24" o c Transfer of uplift, t, from second floor in this example is accomplished through attachment of second floor wall to the continuous rim joist which has been designed to provide sufficient strength to resist the induced moments and shears. Continuity of load path is provided by holdowns at ends of the perforated shear wall Use Tyne "C" shearwall w/ HTT22 holdowns. 16d at 2 1/2" o.c. sole olate nailing and LTP5 clips at 24" o.c Designs Engineering, Inc RI 400 FRe 2950" HOL.POUJN Pu 3100" 4 -0' 4 -0' Segment P.S.UJ. Segment WALL HEIGHT 8' -0' Percent Full Height Sheathing 10% 20% 30% 40% 50% 60`e 10% 00% SNE�1� FRES1ST4 Project: Rockwall File #12801- 100B -D1 -OR Client. Suntel Home Design P errorated Shear Wall By RF Date 7/2005 Job No 1589 ELEVATION OF PEIRFOIRATED SNE4RW4LL MAXIMUM OPENING HEIGHT RATIO AND HEIGHT H/3 H/2 I 2H/3 2H/8 N 2' -8' 41 -0' I 5 -4 6 -8' 8'-0' Shear Resistance Adjustment Factor 1.0 0.69 0.53 043 0 1.0 011 o.56 045 0.38 1.0 014 0.59 049 042 1.0 011 063 053 0.45 1.0 0.80 0.61 0.51 0.50 1.0 0133 011 0.63 0.56 1.0 0,81 011 069 0.63 1.0 0.91 0.83 011 011 ce \ICE ADJUSTMENT FACTOR Sheet No '1 I I I Designs Engineering, Inc INVESTIGATE MAIN FLOOR SHEARWALLS.. Rear Walls Line A Front Walls Line B Project: Catalina -G File 112795G- 100D -D2 -WA Client: Suntel Home Design Summation of full height walls lengths Total length of brace wall line full- height sheathing S TL 100 Diaghragm stress v 0 5 TL Seismic Shearwall v 1 75 (0 5 FRe) stress w/ wall aspect L ratio penalty FR Perforated v 0 5 0 8 L Shearwall stress Uplift for shearwall length L1 2 ft. (worst case) Pu =v9– 5 WdLI –R1 Summation of full height walls lengths Total length of brace wall line full height sheathing S TL 100 Diaghragm stress v 0 5 F Seismic Shearwall v 1 75 (0 5 FRe) stress w/ wall aspect L ratio penalty By RF Date 7/2005 Job No 1843 L 18 ft. TL =58 ft. S 31 03 percent v 93 58 plf v 527 69 plf v 376 92 pif Weight Wd 110 plf Rl 400 Pu 2.88 x 10 pounds L•= 17 ft. TL 50 ft. S 34 percent v 108 55 pif v 558 73 pif Shearwall stress v 0 5 FR v 319.28 pif L Sheet No i0/ 11 Use Type "C" Shearwall w/ Type "D" at narrow walls w/ HTT22 holdowns. Weight Wd 110 pif Uplift for shearwall length L1 2 ft. Rl 400 (worst case) Pu v 9 5 Wd L1 R1 Pu 2 36 x 10 pounds 1 Use Type "C" Shearwall w/ Type "1)" at narrow walls w/ HT'T22 holdowns De.signs Engineering, Inc Line 1 Walls Project. Catalina. -G File 112795G- 100D -D2 -WA Client. Suntel Horne Design Shearwall stress v 0 5 FR 08L Uplift for shearwall length L1 2 ft. (worst case) Pu =v9— 5 WdLI —R1 Use Tyne "B" Shearwall w/ HTT22 holdowns Line 2 Walls Summation of full- height walls lengths Total length of brace wall line FR Shearwall stress v 0 5 0 88 L Uplift for shearwall length L1 2 ft. (worst case) Pu• =v9— 5 WdLI —R1 Use Type "B" Shearwall w/ HTT22 holdowns By RF Date 7/2005 Job No 1843 Summation of full- height walls lengths L 31 ft. Total len.gth. of brace wall line TL 4,0 ft. full- height sheathmg S 100 S 77 5 percent TL Diaghragm stress v 0 5 FR v 156 99 plf TL v 253.22 pif Weight Wd 110 plf R1 400 Pu 1 77 x 10 pounds L =30 ft. TL 32 ft. full- height sheathing S T 100 S 93 75 percent Diaghragm stress v 0 5 FR v 196.24 plf TL v 237 87 pif Weight Wd 110 plf R1 400 Pu 1 63 x 10 pounds Sheet No I 1 11 LEN CJ DESIGNATES GRID LINE 1 DESIGNATES DETAIL MARK DESIGNATES SI- IEARWALL TYPE DESIGNATES HOLDOWN TYPE (SEE SHEAR SCHEDULE) DESIGNATES DRAWING NOTE DESIGNATES HD LOCATION (APPROXIMATE) Designs Engineering, Inc. SNE4RUJ4LL SCHEDULE MARKILUALL COVER FASTENERS PANEL EDGES 6d WALLED A 5/8" G.UJ.B. NAIL OR 11/4' 'W" "6 SCREW /g\ 1/16" A.P.A. 16GA STAPLE 3" O.C. RATED SHT'G�0.131 X 2 4" O.C. 0.148 "4 x 2 6" 0.C. 1/16" A.P.A,- 0.131 x 2 3" O.C. RATED SHT'G 0.148" x 2!/4" 4,11 O.C. F RH. P -NAIL 1/16" A.P.A. 0.148 "4' x 21/4" RATED SHT'G FULL ROUND- 4" O.C. EACH SIDE HEAD P NAIL, 1/16" A.P.A. 0.148 "4' x 21/4" 2" O.C. RATED SI -IT'G FULL ROUND- STAGRD EACH SIDE HEAD P NAIL, I- 4OLDOUJN 5CNEDULE NOTES "X" DESIGNATES SIMPSON PRODUCT MARK HOLDOWN I FASTENERS x 2! 3" O.C. H RATED SHVG FU EAD P -LL RO NAIL D- ST 1/16" A.P.A. 0.148" NO HOLDOWN REQUIRED "MS7C40" (18) I6d SINKER NAILS AT EACH END "M5TC52" (24) 1601 SINKER NAILS AT EACH END "MSTC66" (34) I6d SINKER \3/ NAILS AT EACH END "CMSTI2" (43) 16d SINKER \4j 9' -0 "LONG NAILS AT EACH END STHD14 (38) 16d SINKER NAILS 'I -17T22 \6/ -OR- SIMPSON "SST1924" "HDU 5" 10 "PHD6" SIMPSON "SST1928" "1DU -8" -OR SIMPSON "SSTB28 "1DQ -8" (15)(16) SIMPSON "SSTB28" "HD U -II" or W/ 9/64" CUT WASHER "I- 11- IDQII" 4 HEAVY HEX NUT (15)(16) 1" DIA. (A36) GALV 11440QI4" ROD EMBED 8" INTO 12" THK. x 21" WIDE 10 -0" LONG FTC. DESIGNATES SHEAR PANEL AND HOLDOWN TYPE. DESIGNATES APPROXIMATE HOLDOWN LOCATION 4 O.C. Project. SHEARWALL SCHEDULE By FDE Location Pacific Northwest Date 3/2006 Client FDE Job No 0000 1 1 1/2" LONG x 1/16" WIDE STAPLES W/ CROWNS PARALLEL W/ FRAM'G. DBL. STUDSBLKG. AT (5) ADJOINING PANEL EDGES 1.0 /16dAT4 O.C. DBL. STUDSBLKG. AT (5) ADJOINING PANEL EDGES WI I6d AT 4" O.C. DBL. STUDSBLKG. (8)(11) ADJOIN'G PANEL EDGES W/ I6d AT 4" 4 3X MUDSILL 3X. MUDSILL AND (8)(ll) STUDS /BLKG. AT ADJOINING PANEL EDGES PER NEW CODE, ALL ANCHOR BOLTS MUST HAVE 2" SQUARE X 3/I6" HOG PLATE WASHERS 1. ALL FASTENERS USED AT THE COAST AND IN CONTACT WITH PRESSURE TREATED MATERIAL MUST BE HOT DIPPED GALVANIZED (I -IDG) 2. 'F RH. P- NAIL" DESIGNATES A FULL ROUND HEAD PNEUMATIC- DRIVEN NAIL (10d GALV BOX NAILS MAY SUBSTITUTE FOR 0.1484 P- NAILS). 3. SIMPSON "RBC" BOUNDARY CLIPS TO SUBSTITUTE FOR "LTP5" AT ROOF 4 SHEATHING ON 51- IEARWALLS MUST EXTEND DOWN To SOLE 4 MUDSILL PLATES AND SHALL NOT BE INTERRUPTED BY ANY WALL BUTTING INTO THE SHEARWALL. 5 PROVIDE DOUBLE STUDS /BLKG. W/ I6d A7 4" O.C. AT ADJOINING PANEL EDGES TO AVOID SPLITTING, NAIL EACH PANEL EDGE TO ONLY ONE 2X. 6 "SIMPSON" PRODUCTS SHALL BE INSTALLED AS PER MFG. SPECS 1. HOLDOUINS OCCUR AT ENDS OF SHEAR -WALLS AND SHALL FASTEN TO A MINIMUM OF (2) STUDS (MIN.) LAMINATED TOGETHER W/ I6d AT 6 "o. c. 8. USE LONGER FDN. BOLTS WITH 3X MUDSILL AND SET BOLTS HIGHER. DO NOT INSTALL FDN. VENT WITHIN 12 CLR. OF A HOLDOWN ANCHOR BOLT 9. FASTENERS SPACING APPLIES ONLY AT FULL-HEIGHT WALL SEGEMENTS, OTHERWISE USE MINIMUM CONSTRUCTION STANDARDS. 10 USE SIMPSON "STHDI4RJ" INSTEAD OF '5T1 -ID14" WITH JOIST FLOOR SYSTEM. II. WALLS WITH PLYWOOD ON EACH SIDE SHALL OFFSET PLYWOOD EDGE JOINTS ON ONE SIDE OF THE SI- IEARWALL FROM THOSE ON THE OTHER EXTEND PLYWOOD THROUGH CORNER AS SHOWN IN DETAIL 14 TO ACHIEVE MINIMUM SHEARWALL WIDTH SHOWN ON PLANS 12 SHEARWALLS WITH OVERDRIVEN NAILS PENETRATING SURFACE BY MORE THAN 1/8" WILL BE REQUIRED TO BE RENAILED USE A RUBBER GROMMET IN HEAD OF NAIL -GUN AND ADJUST AIR PRESSURE SO NAIL HEADS ARE FLUSH WITH OR SLIGHTLY RECESSED INTO 81-IEATHING. 13 ALL STUD WALLS MUST HAVE DOUBLE TOP PLATES W/ 1601 AT 8" O.G. AND STUDS 16" o.c. PLATES SHALL LAP A MINIMUM 4 -0" AT SPLICES WITH AT LEAST EIGHT I6d NAILS EACH SIDE OF SPLICE 14 HOLDOWN TYPES W/ GREATER NUMERICAL DESIGNATION MAY SUBSTITUTE FOR HOLDOWNS WITH LESSER SEE CHART TO THE LEFT 15 USE 3000 P8I CONCRETE IN STEMWALL. PROVIDE (2) 4) 4 CONT T 4 B IN STEMWALLS WITH THESE I-IOLDOWNS. EXTEND 10' -0" PAST HOLDOWNS. 16 FASTEN TO (3) 2x6 FULL -I-IGT STUDS. FASTEN EACH STUD TOGETHER W/ (2) ROWS 16d AT 6" O.C. STAGGERED EDGE NAIL WALL PLY TO EA. STUD INTERM. STUDS 4" O.C. 16de 8 "oc SOLE (9) BLOCKING/ (9) 'a"4 x 1" REMARKS PLATE RIM J0157 Et-e. ABa 6" O.C _II6de 3!/2 "oc 12" O.C. STAGRD 12" O.C. 16de 2!/2 "oc STAGRD 12" O.C. 16de 3!/2 "oc STAGRD 12" O.C. 16de 2k2 "oc STAGRD 12" O.C. 16de 1 "oc STAGRD 16d TOENAILS AT 8" O.C. (3) "LTP5 "e 48" oc (3) 48" O.C. 48" O.G. 16" O.C. 10" O.C. (3) "LTPS "e 10" oc 18" O.C. 12" O.C. 'LTPS "e 24" oc (3) "LTPS "e 16" oc (3) "LTP5 "e 6 oc Sheet No ALL PANEL EDGES MUST BE BLOCKED IN SHADED AREAS FASTEN SHTHG. AT 4" O.C. AT BOUNDARIES OF SHADED AREA AND PANEL EDGES. BLOCK PANEL EDGES W/ 2" NOMINAL FLAT BLOCKING. USE ad COMMON NAILS FOR ROOF /CLGS. AND 10d AT FLOORS. USE 1/16" OSB OR PLY SHTHG. AT CEILINGS. REFERENCES TO SEE NOTES ABOVE 3 -21 -06 Designs Engineering, Inc. 1 APA -RATED ROOF SHEATHING BOUNDARY NAIL (BN.) 2 X SOLID FRIEZE D. 2 X STUD WALL 1 ROOF PERIMETE THIS DETAIL ALWAYS APPLIES. SIMPSON 'LTP4' SEE SCHEDULE FOR SPACING SI-IEARWALL O EMEND WALL SHTHG DOUN TO TOP WALL PLATE EN. EDGE NAIL (EN) PLY. SPLICE PT. EDGE NAILING SIMPSON "LTP4' areolleit. I 30 I 51751-- IE4RUJ4LL CLG. JST 10d w 4' O.C. 7 SOLE PLATE NAILING SEE SCHDE FOR INFO (4) I0d EA. BLK. 0 PARALLEL JOISTS THIS DETAIL ALWAYS APPLIES. Project: Structural Details Location. Pacific Northwest Client: FDE 1 b rJt NOTE: SIMP "N25" MAY r�r5� SUBSTITUTE FOR 4-11' AS LONG AS "RBC" CLIPS AT 48" o.c. ARE USED TO CONNECT THE FRIEZE 5D TO TOP WALL PLATE. SIMPSON 'HP TIE AT EACH RAFTER ALONG ENTIRE PERIMETER NOTE: 'W10 -2' MAY SUBSTITUTE FOR "Ht" 1, 2 APA -RATED SHEATHING PLYWOOD DECK SHEATHING SIMPSON "LS50' MAY SUBSTITUTE FOR 'LTP4' I/ APA -RATED SHEATHING FLOOR JOISTS 2 X BLOCKING AT 6 -0' O.CW /(3)10d TOENAILS TO PLATE 2X STUD WALL APA -RATED SHEATHING 1, 2 APA -RATED ROOF SHEATHING 8d ®4 O.C. 2 X 6 FLAT BLK'G W/ I6de4 O.C. INTO WALL E STRUCTURAL CE IL INCA 1 SHEARWALL WALL PLYWOOD SHEATHING I0d 4' O.C. SIMPSON "LTP4" SEE SCHEDULE FOR SPACING By RF Date. 3/2006 Job No 0000 END OP 2x4 4 DRAG STRUT L x I0d a 6" O.C. AT FLOOR AT DSCR, PROVIDE 2x4 x 5' -0' LONG NAILED TO BOTTOM CHORD W/ 16d AT 4" O.C. STAGGERRED PREDRILL HOLES FOR CONNECTOR SCREWS DRACs STRUT Sheet No 2 X SOLID BLOCKING W/ SIMPSON 'LS50' STRUCTURAL CEILING IN CROSS HATCH AREA —SEE SI- !'WALL SCHEDULE FOR ADDITIONAL INFO. 2 X STUD EXT WALL JOIST 16d 2 X BLOCK'G SOLID BLKYs. EA. SIDE 48' JOIST TYPE 'C' SHEARUALL SOLID BLK'G. SIMPSON "L850' MAY SUBSTITUTE FOR 'LTP4' SHEAR.UALL FULL HEIGHT 11" APA -RATED SHEATHING 4 JOIST /5I-4 A UJALL et (C{{ re■rflf IrCLZ etszccf mete. ,ter SOLID BLKG EA. SIDE 5' -0' AWAY FROM END OF DRAG STRUT CONNECTOR SEE PLAN FOR SIZE. INSTALL W/ EQUAL LENGTH TO DRAG STRUT AND WALL. Designs Engineering, Inc F'. >N WALE.. E POND J�OF REINF CONC. STEM WALL EDGE NAIL BIDE WALL EHTH'G TO 4x6 STUD L 4 -0' SIMPSON 'MSTC28' EA. BIDE (4- TOTAL) (12) 16d-- H IX tp SOLE PLATE NAILING SEE SCHEDULE PLYWOOD SHEATHING n= FLOOR FRAMING rl. 0 4 CONT HORIZ. AT TOP 4 BOTTOM rl�, t NOR1"I,4L JOISTS THIS DETAIL ALWAYS APPLIES. 1 MIN. PLY WIDTH I EA. SIDE I' 10' APA RATED SHEATHING FASTENED TO MUDSILL PLATE EDGE NAIL (EN) SIMPSON 'LS50' ANCHOR (NOT REQ'D IF SHTH'G EXTENDS CONT TO MUDSILL W /OUT ANY JOINTS) EDGE NAIL (EN) x 10' AB'e W/ 2 X2 X3 /I6 PLATE WASHERS OR SIMP '13PS /8 -2' 04 DOWELS m 48' O.C. L NAIL SHEATHING TO HEADER W/ 0.148'0 x 2 F RH. P -NAILS 3 O.C. BOTH WAYS 4x6 STUD EA. END W/ ADD'L 2X NAILER CORNER WI I6d e C ARAC 1 '2 APA -RATED SHTH'G FROM A SINGLE 81-4EET BOTH SIDES W/ 0.148'0 F RH. P -NAILS INTO 4x6 W/ (2) ROWS AT 2' oc. EXTEND PLYWD THRU CORNER SEE PET 14 /I 6x SOLID BLOCKING '1 .1.-.-1 AT SHEATHING SPLICE it 4x6 PLATES W/ (2) 8/8'0X12' J -80LTS AT 6' o.c. W/ F SIMP 'BP�eS' WASHERS (2) ROWS OF NAILS AT 11/2' STAGGERED TO MUDSILL SIMPSON 'PHD6 I-4 1 i. I�I 1 it .4x 1 1 23 r 1I I I HAIRPIN BAR i I F, �.I •I ,-t-, ka 8' CONCRETE WALL WI I I ii (2) 4 DOWELS EA. END r{ I HA UNDER SHEARWALL �4 'I I 12' PEEP x 8' 04 X I -6 5 00 C T 4 B 1: 1 4 v 24 x 48' X 12' FTC. GARAGE -FRAME DETA ILBE L Ow 04 BARED CENTE STEMWALL Project: Structural Details Location. Pacific Northwest Client. FDE NOTE EXTEND GARAGE POOR HEADER OVER ENDWALL. HEADER WIDTH TO MATCH WALL WIDTH (4) IOd 0 3' O.C.— PLYWOOD DECK SHEATHING IF FLOOR JOIST SYSTEM, PROVIDE 2 X BLOCKING 12' O.C. W/ (3) 10d TOENAILS TO PLATE CONC. STEM WALL- PARALLEL JOISTS THIS DETAIL ALWAYS APPLIES. PONYWALLS 4 -0' AND TALLER MUST SE APPROVE BY ENGINEER OTHERWISE OK _1. II IPRNYW i `L TO'.h Ti i k sHEA ,I I 01.11 11ENT.S J I By RF Date 2/2006 Job No 0000 11111/11111 MI11111111 111111111111 Y, III '1 VE ALL N.) i I: I :I 0 l,I I -r APA RATED SHEATHING. 0 4 CONT HORIZ T 4 B x 10' AR's W/ 2 X 2 X 3 /I6 PLATE WASHERS OR IMP '3P5/8 -2' 0 4. DOWELB 0 48' O.C. 'I CONCRETE FOUNDATION Sheet No SOLE PLATE NAILING EDGE NAIL (EN) SIMPSON 'LS60' AT SAME SPACING AS 'LTP4 EDGE NAIL (EN) MIN. (2) 2X6 STUDS AT HOLC'OWNS EDGE NAIL PLY TO STUDS SIMPSON HOLDOUdJ 436 "HREADED ROD WITH SAME PIAM -TER AS ANCI -OR BOLT SIMPSON 'CNW' COUPLET 11- '$It''IRSON 'STAB' BOLT +I' jl. i III I�. —!4 CONT T 4.8 0 4 DOWELS o48' I- IOLDOUJN FON- t'UJALL Designs Engineering, Inc RATED— WALL BHEATHI�Ka J EDGE NAIL-- 6HEAT-1ING PLY TO HOLDOUN EDGE NAIL STUDS (2) -2 X 6 2)-2 X 6 RIM JOIST JOIST SIMPSON "LTP4 1 SEE SCHEDULE FOR SPACING 2 X STUD WALL Vi RATED WALL SHEATHING 1 PLATE NAILING BOUNDARY NAIL SOLID BLK'G. CANT! LEVER JST LAM. STUDS TOGETHER W/ I6d AT 6 O.C. 8EE PLAN IF PLYWOOD CEILING IS REQUIRED. FASTEN RAFTER TO WALL PLATE W/ SIMPSON "HI" SEE ['ET I FOR ADD'L INFO. SIMPSON "L550" MAY -SUBSTITUTE FOR "LTP4" HOLDOUN 1 ROOF LEDGER DETAIL 15 Project DETAILS Location Pacific Northwest Client FDE GRADE A36 THREADED ROD SEE SIMPSON CATOLCG FOR DIAMETER y� I I 1 N '(A D 36) THREADE• RbC9 11 IN p 11 W/. SIMPSON. ''BET" ADHESIVE. 1 I out. 'HDIOA" E c 'L 'USE .1(p" EMBEDMENT •DEPTH pa Rgo 15' 11 T (CF,PT 1•IDIOA (SP(=CIAL, EMBEDMENT 'I INSRECTIQN'16•.RE.QUIRED) DEPTH 11 CONCRETE FOUNDATION y I I ®MISSING 1- IOLDOWN ANCNoR BOUND. NAIL ROOF PLYWD. TO 2 X 10 LEDGER W/ BEVELED TOP TO MATCH ROOF SLOPE. NAIL LEDGER W/ (2) -16d EA WALL STUD 4 EA. 2 X 6 BLK'G. FOR THIS SECTION OP ROOF, BLOCK PANEL EDGES W/ 2 X 4 FLAT, NAIL 8d 4" 0 .C. EDGES AND BOUNDARIES, 12' 04. N FIELD. 81HEARWALL PLYWD. MUST EMEND DOU.N TO BOTTOM WALL PLATE (TYP BA. RATED WALL 6HEATHRJG (2) -2x OR--/ 4x (REF.TO PLANS) By RF Date 1/2005 Job No 0000 SOLE PLATE NAIL ING BOUNDARY NAIL r SOLID BLK'G. CONT RIM 4 2X BLKG. OR DB RIM JST HOLDOUN STRAP UJRAP AROUND DBL. J01876 UPSIDE DOWN SIMPSON "T1-IAC222 2' FASTEN TO DBL JOISTS 4x6 OR (2) 2X STUDS IF TH18 IS A SH IUALL W/ A HOLDOUN, THEN EXTEND 81 -IT1-1'G THRU 1 EDGE NAIL NOTE, THIS DETAIL IS REQ'D ONLY WHEN TU)O _L 61-IEARWALLS SHARE ONE H0LD0U.N. 8d AT 6 o.a. .AT ALL FRAMING MEMBERS WITHIN 5' -0' OF EDGE GABLE END TRUSS 2 NAILS BAKED --1 ON 6HEARWALL REOMTB. BELOW EITHER NO JOINT IN PLYWOOD OR FASTEN SH'WALL TO ENDWALL TRUSS W/ BLOCKING/RIM FASTENERS 6.10U.N IN 81-1'WALL SCND'L. 8HWALL SEE S1-'WALL SCHEDULE FOR NAIL'G REQMTS. PI SIMPSON "L850" MAY SUBSTITUTE J015T FOR "LTP4" L DBL. JOIST AT EACH END OF WALL OVER DBL. STUDS FASTEN TO RIM JOIST W/ SIMPSON 1.90" ®I4OLDOWN TO RIM JST 16d AT 6" O.C. (2) 16d EA. TRU88 2x4 x 8' -0" LATERAL BRACE AT 6'r0' o c. (6) 16d NAIL IF "N" EXCEEDS 6 -0" THEN INSTALL 2x4 ON EDGE BEHIND 2x4 FLAT IN END -WALL TRUSS. IP "IN" EXCEEDS 12' -0' USE 2x6 ON EDGE. 8EE ABOVE. 2x6 PLATE WI 16d AT 12" oz. TO WALL GABLED ENDWALL Sheet No HOLDOUN 16d AT 6" Off. INTO EA. STUD EDGE NAIL PRAMINC-c AT CORNER 2x4 FLAT AT 24" O.C. IN END -WALL TRUSS BHTHG. 2X VERTICAL BRACE (2) led AT 8 0.C. 2x4 BLKG, .4T 6' -0" O.C. W/ ed AT 3' O.C. TRUSS BOTTOM CHORD OR CEILING JOISTS DBL.2xSOLID BLOCK W/ (2) 61MP "L850" TO WALL PLATE GYPSUM BOARD DIAPHRAGM WITH 8d COOLER NAILS AT 1" O.C. AT FIRST (4) CEILING MEMBERS AND 2x6 PLATE I Designs Engineering, Inc. 000 f 29Q' Joof NI1 011271.1 SHEARWALL2 CUT 1 4 x4" ROOF TRUSS 90 r i T n4;:k F OP R pPI INTERFLOOR 11OLDOLLN (2) -2x OR 4x (REF TO PLANS) r HOLDOWN STRAP 2x SOLE IL-■ 1 (INSTALL STRAP W/ SEE SCHDL I EQUAL LENGTH TO FOR NFO I BEAM 4 STUDS. I f SLOT IN 61-ITHG. 1•• DBL. JOIST OR BEAM �2x SOLID BLK'G EACH SIDE NEXT TO STRAP l— IOLDOUJN DETAIL Bd AT 3" O.C. INTO 2x4 BLKG. 2x4 AROUND BLKG. TEL NEL PERIMETER Project DETAILS Location Pacific Northwest Client. FDE SNEARUJALL EXTENSION FOR TRUSS-FRAMED ROOFS 2 X STUD WALL 2x4 FLAT EDGE FRAMING NAILED TO TRUSS VERTICAL W/ 16d AT 6" O.C. 1/2" PLY SHTH'G. W/ 10d AT 4" O.C. EDGES WALL TOP PLATES 16d AT 8" O.C. FROM BLKG. PANEL TO WALL PLATES 2X SOLE IE SEE SCHEDULE FOR INFO APA -RATED ROOF SHEATHING BOUNDARY NAIL (BN.) 2 X SOLID FRIEZE BD. (2) -2x OR 4x (SEE PLAN) f By RF Date 1/2005 Job No 0000 HOLDOII.N STRAP (INSTALL WITH EQUAL LENGTH TO BEAM AND STUDS. BN. NOLDOUJN DETAIL DBL. JST. OR BEAM L. 2 X SOLID BLKG BELOW ENTIRE LENGTH OF SHEARWALL. SNEARWALL NAILING SAME AS BELOW SOLID BLKG. 81MPSON 'LS50" MAY SUBSTITUTE FOR "LTP4" CLG. JST ty APA -RATED SHEATHING 51— IEARUJALL EXTENSION FOR STICK FRAMED ROOFS (2) 16d INTO TRUSS T &B CHORDS NAIL 8d AT 3" OC. INTO EACH SHEAR TRUS S\ EITHER SHEAR TRANSFER SYSTEM MAY BE USED. SHEAR TRUSSES EACH DESIGNED FOR DIAPHRAGM SHEAR LOAD SHOWN ON PLANS TRUSS TO TRANSFER SHEAR FROM TOP TO BOTTOM CHORD) (4) 18d NAILS 2x8 AT 16" O.C. W/ (3) 16d EA. END FASTEN TRUSS TO WALL W/ "LS50" CLIPS SEE SCHEDULE CLIP SPACING. Sheet No SHEARWALL SHEAR TRUSS MAY BE ELIMINATED IF SHEARWALL EXTENDS UP TO ROOF SHEATHING NAIL ROOF TO SHEARWALL W/ 6d AT 3" O.C. SNEARUJALL EXTENSION I 2 Po� Designs Engineering, Inc T I SIMP..TISTC40" EA. END OP HEADER FASTEN TO DBL. STUDS I•• II NOLDOUJN ABOVE BEAM THIS DETAIL ALWAYS APPLIES. BOLT DECK LEDGER TO RIM JOIST W/ 5 i e ,"4' AT 16 O.C. AND (2) ROWS 16cl AT8 O.C. (USE 2 -5/8' BOLTS IF JOIST SPAN GREATER THAN 10' -0 SEE SCHEDULE FOR NUMBER OF NAILS EA. SIDE BEAM FLOOR JOIST- 2X STUD WALL SEE SCHEDULE FOR NUMBER OF NAILS EA. SIDE STRAP SEE FLOOR PLAN 4 X 8 POST SH 18d 0 8' O.C. MULTIPULE HOLDOWN STUDS SEE SCHEDULE CUT 1" X 4• SLOT IN PLY. FLOOR SHOW FOR STRAP I_ Project Structural Details Location Pacific Northwest Client. FDE HOLDOLLN W/ A36 GRADE THREADED ROD TREADED ROD 81FIPwCN T1STC" WRAP STRAP ARAuND HEADER IF NECESSARY FILL CAVITY LLV SOLID WOOD AT 14OLDILNB I•' -DRILL HOLE V8" GREATER IN DIA IN CENTER OP BEAM FOR BOLT I I 5" 8Q X 3/8" BRG PLATE PEEN THREADS AFTER TIGHTENED J) e -SIMPSON "H2.5 `j EA. SIDE --4 X 12 BEAM `NOTCH 4X8 FOR 3' BEAM BEARING SIMPSON "PHD2" W/ 5/8" X 8" EXP BOLT II I CONCRETE FTC. It 61EARWALL- POST CONN. 2X BLKG. AT STRAP EXTERIOR WALL 2X LEDGER 1/I111111 =MI 2D DECK LEDGER HANDRAIL CONN. T1-116 DETAIL ALWAYS ArrLI SIMPSCN ABU" POST BASE OR ELEVATED EPB IP SLAB 2X SPACED CEDAR DOUBLE 2X JOIST 2X6 DIA. BRACE W/ (2) 16c1 EA. JOIST BEAM ST6224 STRAP WRAP AROUND BACK OF LEDGER 4 NAIL TO DIAG. BRACE. PORCH /DECK POST CONN. THIS DETAIL ALWAYS APPLIES. DBL. 2X MEMBER OR 4X MEMBER RIM JOIST 1 4 "X X6 "X0' 9" STEEL ANGLE �I n II PERPENDICULAR WALL (6) 16d 1 NAILS AT THE TOP MIDDLE, 4 BOTTOM CONNECT WALLS TOGETHER BY FIRS NAILING END 2x4 TO CHANNEL W/ (5)16d THEN INSTALL ADDITIONAL 2x4 AGAINST IT AND NAIL W/ (6) 16d PLYWOOD SHEATHING OVER WALL STUDS EDGE NAIL (EN) TO END 2x4 By RF Date 2/2005 Job No 0000 (2) 16D— TOENAIL (6) I6d BEAM I 1 F —CONC. FIG. LJ UNLESS NOTED OTHERWISE, U6E1 "BIMPSON" PC' POST CAP (USE 'Mac' AT ENDS CP BEAM) PRESSURE TREATED WOOD POST CONCRETE BLAB 4 1 4" 5/8 "4' THROUGH BOLTS W/ NUTS AND I DIA. X 3/16 WASHERS. EA. SIDE. 4X6 CEDAR NEWELL TO RIM JOIST —1— 0 SI- IEARWALL- WALL CONN. Sheet No EDGE NAIL CI a s_11 As al 1 ID Cs r (11 -r ID al 3 iti 1 -1- 3 ct ri Li ri al ID 3 ...s. -IA t-A• I '-3 i- 3 ID 17. t Cr 1- -1 ID n 3 3 01 _:1 C 1 I ;I 1' 0 (0 i•-, c 3 -I, I'. z i t I 1 111 1.--i Li 1 LII i....1 C ITI n 1 C Al 1_11 .7i 3> U -7 I- L 1 ID ....r.'.ii..1 A, -1 ITt Lit tli DI 3 3: 1::t to tu 11 a 1-4 -I- -1- rti p- 411 tii 1_11 Lit )--A- 3> -t. .I, D Eli .1. ili 111 1 1 111 1] ID ID al -r r ID 0) 1' 3 n fit ct Au ts) 3 t ill u u a n (.1 i 11 f,. I. 1" i- tp 1, ,I 1' 1 1•1 i r1 t-,1 rf 111 s-- 1 1 Cri Lj t 1.I1 CI) 1 .1 W LI 01 ID 3 .3 0 I 1 .7.g. a> I 4 1 :4, 1 1: d` 0 1 1 01 i'i I 1 d B B l u 4 cT 21 cI- kJ (1 tri 0.1 -1 '`Z. I i 1 (0 I- Ds 0.1 ii 0 t3. 3 0., !la i n IA 0 1 411 Cl. :3 3 411 I" III 11.1 1...1 1 I- s I-I i f: -1 1_ •ti :l r a s 1 ii i. ni 3: 1- I 1 jj 11 1 -1 111 4.."-.. •1 111 (ft 11 1 0 a- 0 1 L r d- ai a t •1 ID ID t 1.11 u cr 41 DI I 1 1 A-A: 1 11 -1 -1. F 1i1 rs ...i..; 1(I 3 1 '1 0 0 11 [3 a. ui 3 2: Ail Al I% .4 IJ ft f) 4 rt. f 1 :1: 9-4 n t, t 'G f •tt r•I 111 (1'1 r. J 1 4 1-1 1 •1 to 111 r-a r 111 I 4 if1 1. 1;9 i1 .1. x f -1 131 rr 1 -1 ri I!J I 1) I- '1- Ili 3 r-4 -4 W VI pi t .0 .a ul i1 2 1^t •-•1 1 r- 4-4 I.0 0. 111 .-9 131 1.3 1_ 1 Ir f 1 r1 II ft. -4 1 Of I t 1 11 II fr. 1 1 :t ill 46 .1 l! I?` '1:1 _I. I. 41 r1' -I (I) 0 I 4 -4 111 1'11 III 3 r= r -:1 rn •rt 5_ to 3 0Il.1 '11 111 I '31 1 1) [r- i 11-1 I'i Ili 1-- '--4 RI 1 i C 117 931 _r) -1 1..1 1.11 -P C I IL r 1 C 11; F.: 1 .5- I1.1 -I 5- 5 u 1 1 0 .fi f, {jI `1 r). 4- 43 '1- 1 -I E (1 •43 1 '1-- `r T- 1I ri r c u, W r) J =i q al I1 10 '.1) t• 10 Pte. '-1 (T1 1�j 1 1 .1 j IIl 1 .-1 :1-, 1Ii f _1 .1 I y. :.1_ (7 r •r_1 ill; I I -1 9 1 1-+ Ili 4- 11! 1 E tit r' C -t Ul E 1.1 C 1J) f1! .1• •I- t- 111 QI U1 IJ W 1 q) n.1 -r 1.9 m i T 1 30 'A 13.1 'a 117 rri 1 :61 1 ,1 1 .1. f: .f l'a E l! LI_ 11 IY 11 T- rn 4.0 C In al 117 ITI I`r E 117h� I. a L1 W J r-"! 111 u !-"r) r r 1i) 111 rI 1 "I 1-1 E 7 -1 f 't C F 1 Q► E E Q ..-4' 1 C 1n C_ E 1 u! F, .1, •.-1 414 E f' 1 •.l 1-- F W 4- C at fl 4 it R 1 E E �.1 1 ti_ C G fl E 1 11 al .'f 1 al E 'I- a -L 1�1 I]) 1-.I r 41 111 r-nrq dF_ ct