Loading...
HomeMy WebLinkAbout4.635 Original ContractSCOPE OF WORK PROJECT MANUAL 4 Street Stormwater Improvements - Phase 1 Emergency Overflow Project Project DR03 -2009 The purpose of this project is to reduce the pressure in the existing storm system on 4th Street and minimize a flooding problem. The work includes the following elements: Connect into the existing manhole at the intersection of 4 and H Streets with a single length of new 8" diameter corrugated polyethlene pipe (Maxi roll — flexible pipe). Construct approximately the first 58 linear feet of corrugated pipe in a trench at 4.0% to a daylight point. Daylight the pipe and continue the pipe run on the existing grade approximately 482 feet to a new rip rap energy dissipater. Do not remove vegetation for the overland pipe placement unless it is approved by the Engineer. Place a new catch basin. Construct approximately 41 linear feet of pipe at 2.7% grade to a Y pipe fitting. Construct a new ditch from the rip rap energy dissipater to an existing ditch approximately 70 feet to the east. Replace asphalt concrete paving to restore alley to the original condition. Place seed and compost over disturbed areas for erosion control. All work to complete the installation, including the furnishing of all labor, tools, equipment and material needed in the placing of all necessary pipe, structures, fittings and appurtenances, and restoration of pavement and other surfaces is included in the bid. All work shall meet the requirements of the attached Plans (titled 4 Street Stormwater Improvements — Phase 1 Emergency Overflow Project), the City of Port Angeles' Urban Services Standards and Guidelines and the 2008 edition of Washington State Department of Transportation's Standard Specifications for Road, Bridge and Municipal Construction and Standard Plans. WORK DESCRIPTION — METHODS AND MEANS A. Mobilization Per WSDOT 1 -09.7 B. Temporary Traffic Control Per WSDOT 1 -10. C. Connection to Existing Drainage Structure The Contractor shall verify invert elevations prior to construction. The opening cut through the wall of the drainage structure shall be grouted and watertight. Small Works Roster Project Manual — Project DR03 -2009 4th Street Stormwater Improvements - Phase 1 Emergency Overflow Project Page 1 of 13 Mortar shall conform to the requirements of WSDOT Section 9 -04.3. This work also includes the removal of the step on the north side of the existing manhole. The pipe connection to the manhole shall be accordance with WSDOT Section 7 -05.3. fOG 6 D. Corrugated Polyethlene Storm Sewer Pipe, ' Diameter - Installation in the Trench Place approximately 58 linear feet of flexible corrugated polyethylene storm sewer pipe to the daylight point. Place approximately 41 linear feet of pipe in a separate trench to a y connection point on the first pipe (see Plans). Pipe installation in the trench shall conform to WSDOT Section 7 -08 and Section 7- 04. This work includes structure excavation for the pipe, providing and placing gravel backfill for pipe zone bedding, providing and installing of the pipe and fittings, backfill of the trench, compaction of pipe bedding and trench backfill outside of paved areas, and providing and placing controlled density fill (cdf) inside of paved areas, pipe testing, topsoil and seeding of the trench line. Corrugated polyethylene pipe and fittings shall conform to WSDOT Section 9- 05.20. Pipe zone bedding shall conform to 9- 03.12(3). Seeding shall conform to 8- 01.3(2) Gil E. Corrugated Polyethlene Storm Sewer, p " Diameter - Installation on the Ground Pipe installation on the ground shall conform to WSDOT Section 7 -04, This work includes all costs for vegetation removal as necessary, providing and installing of approximately 470 linear feet of flexible pipe and fittings, and pipe testing. The intent in this project is to lay one length of flexible pipe from the manhole to the outfall. Joints in the pipe can be made with the Engineer's approval. If no joints are made in the pipe, pipe testing will be unnecessary. The pipe shall be laid along a straight line between the manhole and the outfall, unless the Engineer agrees in writing to a change in the alignment. Corrugated polyethlene pipe and fittings shall conform to WSDOT Section 9- 05.20, except that the pipe and fittings shall meet the requirements of ASTM F 667. The pipe slope shall match the existing ground surface and be constructed with the minimum number of joints possible. F. WSDOT Type 1 Catch Basin, Frame and Vaned Grate WSDOT Type 1 Catch Basin shall be per Standard Plan B -1 a. No adjustment sections or reducing sections will be necessary. Frame shall be per WSDOT Standard Plan B -2a. Vaned Grate shall be per WSDOT Standard Plan B -2b. This work shall include the materials for and placement of the catch basin, frame and vaned grate, as well as pipe collars, placement and grouting of the new pipe into the catch basin, sawcutting, structure excavation and Small Works Roster Project Manual — Project DR03 -2009 4th Street Stormwater Improvements - Phase 1 Emergency Overflow Project Page 2 of 13 replacement of existing asphalt pavement around the structure. G. Pipe Anchors Pipe anchors shall be Manta Ray MR -88, or equal. This work includes the pipe anchor, the pipe saddle and galvanized all thread rod to connect the anchors. Anchors shall be set 4' below existing grade. The contractor shall submit a detail to the Engineer for approval. Six pipe anchors will be placed. One approximately 20' from the bluff face and two anchors at the outfall location. The other three anchors will be placed on the face of the bluff at the direction of the Engineer. H. Asphalt Sawcutting Asphalt sawcutting is required for the pipe and catch basin installation in the street. Limits of the trench saw cutting shall be per Section E in the Plans. I. Asphalt Replacement Asphalt shall be replaced in the paved areas in accordance with WSDOT Section 5 -04. Asphalt depth shall match the existing section. Asphalt material shall be HMA CI.1 /2" PG 64 -22. Temporary asphalt patching or steel plates are required when traffic must cross CDF for more than 24 hours. This work includes temporary asphalt patching or steel plates, as necessary. J. Light Loose Rip Rap Light loose rip rap shall be placed in accordance with WSDOT Section 8 -15 and Detail B, Section C and Section F in the Plans. Rip Rap material shall be per WSDOT Section 9- 13.1(2). Rip rap placement shall be per WSDOT 9 -13.1. This work shall include the excavation for the outfall structure and soil separation geotextile. Geotextile shall be installed in accordance with WSDOT 2 -12. Geotextile material shall meet the requirements of WSDOT Section 9- 33.2(1) Table 3. This work shall also include clearing and grading necessary for the rip rap installation. K. Ditch Excavation Ditch excavation shall be in accordance with WSDOT 2 -10 and the detail shown in the plans. This work shall also include any clearing and grading necessary for the ditch installation, however tree removal shall be minimized. The ditch flow line shall be constructed from the outfall over to the existing ditch section, approximately 70 feet away. Small Works Roster Project Manual — Project DR03 -2009 4th Street Stormwater Improvements - Phase 1 Emergency Overflow Project Page 3 of 13 L. Temporary Erosion Control The following are the minimum standards for siltation control during construction on any site. Construction Access Control — Do not track soil onto the street. Sequence the construction to avoid moving soil out onto the street. Stabilization of Denuded Areas - a. All exposed and unworked soils shall be stabilized using suitable best management practices (sod, vegetation, plastic covering, mulching, etc). b. No land disturbing activity shall be undertaken until installation of sufficient erosion and sediment control devices to retain the sediment that may be generated by the activity is complete. c. Vegetation measures shall be used for erosion and sediment control wherever feasible, rather than structural measures such as pipes, structures, or other devices. Native plants shall be used in environmentally sensitive areas. 3. Protection of Adjacent Properties - Adjacent properties shall be protected from sediment deposition by appropriate use of vegetated buffer strips, sediment barriers or filters, dikes or mulching, or combinations of measures. All reasonable measures to protect all public and private property from damage shall be taken. Installation of erosion control devices shall conform to the City's Urban Services Standards. ADDITIONAL REQUIREMENTS 1. The bid shall be submitted on the attached Bid Form and mailed or delivered to the Director of Public Works & Utilities, City of Port Angeles, 321 East Fifth Street, P. O. Box 1150, Port Angeles, Washington 98362. Questions may be directed to Terri Partch, PE, Project Manager, at 360- 417 -4811. 2. The most recently issued Washington State Prevailing Wage Rates for Clallam County, a copy of which is attached to this Project Manual, shall apply to this Contract. 3. The bid may be awarded to the lowest responsible bidder from the group of Small Works Roster contractors asked to bid on this work. If the bid is awarded, the attached Contract will then be signed, requiring the Contractor to meet the requirements in the Contract as well as the entire Project Manual. No bidder will be permitted to withdraw its bid between the closing time for receipt of bids and the execution of a Contract, unless the award is delayed for a period exceeding sixty (60) calendar days. Small Works Roster Project Manual — Project DR03 -2009 4th Street Stormwater Improvements - Phase 1 Emergency Overflow Project Page 4 of 13 4 Bids shall be submitted no later than 3:00 PM, October 30th, 2009. 5. Because this Contract is for an amount less than $35,000, a bid bond, performance and payment bond, and retainage will not be required for this work. However, the City shall have the right of recovery against the Contractor for any payments made on the Contractor's behalf. 6 The performance period for this work is 10 working days. Contractor is to mobilize and start work within 10 working days of Notice to Proceed. Small Works Roster Project Manual — Project DR03 -2009 4th Street Stormwater Improvements - Phase 1 Emergency Overflow Project Page 5 of 13 BID FORM 4 Street Stormwater Improvements - Phase 1 Emergency Overflow Project Project DR03 -2009 Signed by Title Printed Name: The bidder hereby bids the following amounts for all work (including labor, equipment, time and materials) required to install all work and related appurtenances as required in the Scope of Work. Lump Sum $ / / 225 Sales Tax (8.4 %) $ I. / 9V. Id Total Bid $ Is V/ 9, 9d The bidder hereby acknowledges that it has received Addenda No(s). ( (Enter "N /A" if none were issuedl to this Project Manual. The name of the bidder submitting this bid and its business phone number and address, to which address all communications concerned with this bid and with the contract shall be sent, are listed below. By signing below, bidder represents it is not disqualified from bidding on this project. Bidder's firm name Complete address Registration Number J' �IDUs t dei; // ilea Rd (Street address) /3rf 4naeles (City) &v/ '9Z 0 State Excise Tax Registration Number 4/5 1g // /U (resd/pern7;7`) UBI Number 6 892 e23 Industrial Insurance Number EDEN k Gz /P7 Telephone No. (3/, 41 '/57 < U a r e e/t (3)44/- /27S Employment Security Number 05 OU/ /, r Kevi7 /7GG // luvl 1W/.4. W,33 (State) (Zip) Small Works Roster Project Manual — Project DR03 -2009 4th Street Stormwater Improvements - Phase 1 Emergency Overflow Project Page 6 of 13 WITNESSETH: 1. Scone of Work. PUBLIC WORKS CONTRACT This Contract is made and entered into in duplicate this 7 day of Dee ether 2009, by and between the City of Port Angeles, a non - charter code city of the State of Washington, hereinafter referred to as "the City ", and Eden 6(eu'a.1 Ln,Q a 114.5h /iv) fide- (_' Corporation, hereinafter referred to as ` Contractor ". Whereas, the City desires to have certain public work performed as hereinafter set forth, requiring specialized skills and other supportive capabilities; and Whereas, the Contractor represents that it is qualified and possesses sufficient skills and the necessary capabilities to perform the services set forth in this Contract. NOW, THEREFORE, in consideration of the terms, conditions, and agreements contained herein, the parties hereto agree as follows: The Contractor shall do all work and furnish all tools, materials, and equipment in order to accomplish the following project: 4th Street Stormwater Improvements - Phase 1 Emergency Overflow Project Project DR03 -2009 in accordance with and as described in this Contract and the Project Manual, which include the attached plans and scope of work, and shall perform any alterations in or additions to the work provided under this Contract and every part thereof. The Contractor shall provide and bear the expense of all equipment, work, and labor of any sort whatsoever that may be required for the transfer of materials and for constructing and completing the work provided for in this Contract, except as may otherwise be provided in the Project Manual. 2. Time for Performance and Liquidated Damages. a. Time is of the essence in the performance of this Contract and in adhering to the time frames specified herein. The Contractor shall commence work within 10 working days of Notice to Proceed, and said work shall be physically completed within 10 working days after commencing work, unless a different time frame is expressly provided in writing by the City. b. If said work is not completed within the time for physical completion, the Contractor may be required at the City's sole discretion to pay to the City liquidated damages calculated in accordance with the most recent version of the Small Works Roster Project Manual — Project DR03 -2009 4th Street Stormwater Improvements - Phase 1 Emergency Overflow Project Page 7 of 13 WSDOT Standard Specifications Section 1 -08.9 for each and every day said work remains uncompleted after the expiration of the specified time. 3. Compensation and Method of Payment. a. The City shall pay the Contractor for work performed under this Contract as detailed in the bid, at the completion of work and submission of a detailed invoice. b. Payments for any alterations in or additions to the work provided under this Contract shall be on a negotiated time and materials basis. 4. Independent Contractor Relationship. The relationship created by this Contract is that of independent contracting entities. No agent, employee, servant, or representative of the Contractor shall be deemed to be an employee, agent, servant, or representative of the City, and the employees of the Contractor are not entitled to any of the benefits the City provides for its employees. The Contractor shall be solely and entirely responsible for its acts and the acts of its agents, employees, servants, subcontractors, or representatives during the performance of this Contract. The Contractor shall assume full responsibility for payment of all wages and salaries and all federal, state, and local taxes or contributions imposed or required, including, but not limited to, unemployment insurance, workers compensation insurance, social security, and income tax withholding. 5. Prevailing_ Wa2e Reauirements. The Contractor shall comply with applicable prevailing wage requirements of the Washington State Department of Labor & Industries, as set forth in Chapter 39.12 RCW and Chapter 296 -127 WAC. The Contractor shall document compliance with said requirements and shall file with the City appropriate affidavits, certificates, and/or statements of compliance with the State prevailing wage requirements. The Washington State Prevailing Wage Rates For Public Works Contracts, Clallam County, incorporated in this Contract have been established by the Department of Labor & Industries and are included as an Attachment to this Contract. The Contractor shall also ensure that any subcontractors or agents of the Contractor_ shall comply with the prevailing wage and documentation requirements as set forth herein. 6. Indemnification and Hold Harmless. a. The Contractor shall defend, indemnify, and hold harmless the City, its officers, officials, employees, and volunteers against and from any and all claims, injuries, damages, losses, or suits, including attorney fees, arising out of or in connection with the performance of this Contract, except for injuries and damages caused by the sole negligence of the City. Small Works Roster Project Manual — Project DR03 -2009 4th Street Stormwater Improvements - Phase 1 Emergency Overflow Project Page 8 of 13 b. Should a court of competent jurisdiction determine that this Contract is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, and volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. It is further specifically and expressly understood that the indemnification provided herein constitutes the Contractor's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Contract. 7. Insurance. The Contractor shall procure and maintain for the duration of the Contract, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees or subcontractors. Failure by the Contractor to maintain the insurance as required shall constitute a material breach of contract upon which the City may, after giving five working days notice to the Contractor to correct the breach, immediately terminate the Contract or at its discretion, procure or renew such insurance and pay any and all premiums in connection therewith, with any sums so expended to be repaid to the City on demand, or at the sole discretion of the City, off set against funds due the Contractor from the City. a. Minimum Scope of Insurance The Contractor shall obtain insurance of the types described below: i. Automobile Liability insurance covering all owned, non - owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. ii. Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, stop gap liability, independent contractors, products - completed operations, personal injury and advertising injury, and liability assumed under an insured contract. The Commercial General Liability insurance shall be endorsed to provide the Aggregate Per Project Endorsement ISO form CG 25 03 11 85. There shall be no endorsement or modification of the Commercial General Liability insurance for liability arising from explosion, collapse or underground property damage. The City shall be named as an insured under the Contractor's Commercial General Liability Small Works Roster Project Manual — Project DR03 -2009 4th Street Stormwater Improvements - Phase 1 Emergency Overflow Project Page 9 of 13 insurance policy with respect to the work performed for the City using ISO Additional Insured endorsement CG 20 10 10 01 and Additional Insured - Completed Operations endorsement CG 20 37 10 01 or substitute endorsements providing equivalent coverage. in. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. iv. Builders Risk insurance covering interests of the City, the Contractor, Subcontractors, and Sub - contractors in the work. Builders Risk insurance shall be on a all -risk policy form and shall insure against the penis of fire and extended coverage and physical loss or damage including flood and earthquake, theft, vandalism, malicious mischief, collapse, temporary buildings and debris removal This Builders Risk insurance covering the work will have a deductible of $5,000 for each occurrence, which will be the responsibility of the Contractor. Higher deductibles for floor and earthquake perils may be accepted by the City upon written request by the Contractor and written acceptance by the City. Any increased deductibles accepted by the City will remain the responsibility of the Contractor. The Builders Risk insurance shall be maintained until final acceptance of the work by the City. b. Minimum Amounts of Insurance The Contractor shall maintain the following insurance limits: i. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident. ii. Commercial General Liability insurance shall be written with limits no less than $1,000,000 each occurrence, $1,000,000 general aggregate and a $1,000,000 products - completed operations aggregate limit. iii. Builders Risk insurance shall be written in the amount of the completed value of the project with no coinsurance provisions. c. Other Insurance Provisions The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile Liability and Commercial General Liability insurance. i. The Contractor's insurance coverage shall be primary insurance as respect to the City. Any insurance, self - insurance, or insurance pool coverage maintained by the City shall be in excess of the Contractor's insurance and shall not contribute with it. Small Works Roster Project Manual — Project DR03 -2009 4th Street Stormwater Improvements - Phase 1 Emergency Overflow Project Page 10 of 13 u The Contractor's insurance shall not be cancelled or reduced as to coverage by either party, except after forty -five (45) days prior written notice by certified mail, return receipt requested, has been given to the City. d. Acceptability of Insurers Insurance is to he placed with insurers with a current A.M. Best rating of not less than A.VII. e. Verification of Coverage The Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the Automobile Liability and Commercial General Liability insurance of the Contractor before commencement of the work. Before any exposure to loss may occur, the Contractor shall file with the City a copy of the Builders Risk insurance policy that includes all applicable conditions, exclusions, definitions, terms and endorsements related to this project. f. Contractor's Insurance For Other Losses The Contractor shall assume full responsibility for all loss or damage from any cause whatsoever to any tools, Contractor's employee owned tools, machinery, equipment, or motor vehicles owned or rented by the Contractor, or the Contractor's agents, suppliers or contractors as well as to any temporary structures, scaffolding and protective fences. g. Waiver of Subrogation The Contractor and the City waive all rights against each other, any of their Subcontractors, Subcontractors, agents and employees, each of the other, for damages caused by fire or other perils to the extent covered by Builders Risk insurance or other property insurance obtain pursuant to the Insurance Requirements Section of this Contract or other property insurance applicable to the work. The policies shall provide such waivers by endorsement or otherwise. 8. Compliance with Laws. a. The Contractor shall comply with all applicable federal, state, and local laws, including regulations for licensing, certification, and operation of facilities and programs, and accreditation and licensing of individuals, and any other standards or criteria as set forth in the Project Manual. b. The Contractor shall pay any applicable business and permit fees and taxes which may be required for the performance of the work. Small Works Roster Project Manual — Project DR03 -2009 4th Street Stormwater Improvements - Phase 1 Emergency Overflow Project Page 11 of 13 c. The Contractor shall comply with all legal and permitting requirements as set forth in the Project Manual. 9. Non - discrimination. The parties shall conduct their business in a manner which assures fair, equal and nondiscriminatory treatment of all persons, without respect to race, creed, color, sex, Vietnam era veteran status, disabled veteran condition, physical or mental handicap, or national origin, and, in particular: a. The parties will maintain open hiring and employment practices and will welcome applications for employment in all positions from qualified individuals who are members of the above - stated minorities. b. The parties will comply strictly with all requirements of applicable federal, state or local laws or regulations issued pursuant thereto, relating to the establishment of nondiscriminatory requirements in hiring and employment practices and assuring the service of all patrons and customers without discrimination with respect to the above - stated minority status. 10. Assi nment. a. The Contractor shall not assign this Contract or any interest herein, nor any money due to or to become due hereunder, without first obtaining the written consent of the City, nor shall the Contractor subcontract any part of the services to be performed hereunder without first obtaining the consent of the City. b. The Contractor hereby assigns to the City any and all claims for overcharges resulting from antitrust violations as to goods and materials purchased in connection with this Contract, except as to overcharges resulting from antitrust violations commencing after the date of the bid or other event establishing the price of this Contract. In addition, the Contractor warrants and represents that each of its suppliers and subcontractors shall assign any and all such claims for overcharges to the City in accordance with the terms of this provision. The Contractor further agrees to give the City immediate notice of the existence of any such claim. 11. Contract Administration. This Contract shall be administered by ge.r v /?o d iraji on behalf of the Contractor and by Tern Partch, PE, Project Manger on behalf of the City. Any written notices required by the terms of this Contract shall be served or mailed to the following addresses: Small Works Roster Project Manual — Project DR03 -2009 4th Street Stormwater Improvements - Phase 1 Emergency Overflow Project Page 12 of 13 Contractor: CA!e #'i Cy ea,v /,',t1 , . -rc 2 /d 6-C � /e n L' i / Pd . T'or E efe , 1 4- qrs 12. Interpretation and Venue. This Contract shall be interpreted and construed in accordance with the laws of the State of Washington. The venue of any litigation between the parties regarding this Contract shall be Clallam County, Washington. IN WITNESS WHEREOF, the parties hereto have caused this Contract to be executed the day and year first set forth above. CONTRACTOR: Name of Contractor By: ��lri- Title: "arfo,.�e City: City of Port Angeles P.O. Box 1150 321 East Fifth Street Port Angeles, WA 98362 -0217 CITY OF PORT ANGELES: By: Mayor v Appr ed as to Form ( ./� — City Attorney' Attest: afkiLZegalizgiAl /jity Clerk Small Works Roster Project Manual — Project DR03 -2009 4th Street Stormwater Improvements - Phase 1 Emergency Overflow Project Page 13 of 13 ADDENDUM NO. 'I TO THE PROJECT MANUAL FOR 4 STREET STORMWATER IMPROVEMENTS — PHASE 1 EMERGENCY OVERFLOW PROJECT, PROJECT NO. DR03 -2009 NOTICE TO PROSPECTIVE BIDDERS (October 29, 2009) The following changes, additions, and /or deletions are hereby made a part of the Project Manual for the construction of 4th Street Stormwater Improvements — Phase 1 Emergency Overflow Project as fully and completely as if the same were fully set forth therein. WORK DESCRIPTION — MEANS AND METHODS 1. Testing — Pipe testing is required in WSDOT 7 -04. A two year warranty on the pipe and pipe joints from the time of project acceptance may be substituted for pipe testing. 2. Replace Section G Pipe Anchors with: G. Pipe Anchor System - Six pipe anchor systems are required on the project. A pipe anchor system includes two Manta Ray MR -88 anchors, the pipe saddle, galvanized all thread rod to connect the two anchors. Pipe anchors shall be Manta Ray MR -88, or equal. Anchors shall be set 4' below existing grade. The contractor shall submit a detail to the engineer for approval. One pipe anchor system will be placed approximately 20' from the bluff face and two anchor systems will be placed at the outfall location. The other three anchor systems will be placed on the bluff face at the direction of the Engineer. 3. The pipe trench will be constructed in accordance will Section E, Sheet 3. Controlled density fill as shown in the detail is required. There are no other changes to the Project Manual. The deadline date and time for bmittal remain unchanged. Steven `per "r','i .E. Deputy Director Engineering /City Engineer This addendum must be acknowledged in the space provided on the Bid Form in the Project Manual when it is submitted to the City with your bid. Failure to do so may result in the bid being rejected as being non- responsive. END OF ADDENDUM Addendum No. 1 Page 1 of 1 BENEFIT CODE KEY - EFFECTIVE 09 -02 -2009 OVERTIME CODES OVERTIME CALCULATIONS ARE BASED ON THE HOURLY RATE ACTUALLY PAID TO THE WORKER. ON PUBLIC WORKS PROJECTS, THE HOURLY RATE MUST BE NOT LESS THAN THE PREVAILING RATE OF WAGE MINUS THE HOURLY RATE OF THE COST OF FRINGE BENEFITS ACTUALLY PROVIDED FOR THE WORKER. 1. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE -HALF TIMES THE HOURLY RATE OF WAGE A. ALL HOURS WORKED ON SATURDAYS, SUNDAYS AND HOLIDAYS SHALL ALSO BE PAID AT ONE AND ONE -HALF TIMES THE HOURLY RATE OF WAGE. B ALL HOURS WORKED ON SATURDAYS SHALL BE PAID AT ONE AND ONE -HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. C. THE FIRST TWO (2) HOURS AFTER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST TEN (10) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE -HALF TIMES THE HOURLY RATE OF WAGE. ALL OTHER OVERTIME HOURS AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. D. THE FIRST TWO (2) HOURS BEFORE OR AFTER A FIVE - EIGHT (8) HOUR WORKWEEK DAY OR A FOUR - TEN (10) HOUR WORKWEEK DAY AND THE FIRST EIGHT (8) HOURS WORKED THE NEXT DAY AFTER EITHER WORKWEEK SHALL BE PAID AT ONE AND ONE -HALF TIMES THE HOURLY RATE OF WAGE. ALL ADDITIONAL HOURS WORKED AND ALL WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. E. THE FIRST TWO (2) HOURS AFTER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST EIGHT (8) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE -HALF TIMES THE HOURLY RATE OF WAGE. ALL OTHER HOURS WORKED MONDAY THROUGH SATURDAY, AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. F. THE FIRST TWO (2) HOURS AFTER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST TEN (10) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE -HALF TIMES THE HOURLY RATE OF WAGE ALL OTHER OVERTIME HOURS WORKED, EXCEPT LABOR DAY, SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON LABOR DAY SHALL BE PAID AT THREE TIMES THE HOURLY RATE OF WAGE. G. THE FIRST TEN (10) HOURS WORKED ON SATURDAYS AND THE FIRST TEN (10) HOURS WORKED ON A FIFTH CALENDAR WEEKDAY IN A FOUR - TEN HOUR SCHEDULE, SHALL BE PAID AT ONE AND ONE -HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED IN EXCESS OF TEN (10) HOURS PER DAY MONDAY THROUGH SATURDAY AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. H. ALL HOURS WORKED ON SATURDAYS (EXCEPT MAKEUP DAYS IF WORK IS LOST DUE TO INCLEMENT WEATHER CONDITIONS OR EQUIPMENT BREAKDOWN) SHALL BE PAID AT ONE AND ONE -HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED MONDAY THROUGH SATURDAY OVER TWELVE (12) HOURS AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. J THE FIRST TWO (2) HOURS AFTER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST TEN (10) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE -HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED OVER TEN (10) HOURS MONDAY THROUGH SATURDAY, SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. K. ALL HOURS WORKED ON SATURDAYS AND SUNDAYS SHALL BE PAID AT ONE AND ONE -HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. L. ALL HOURS WORKED IN EXCESS OF TEN (10) HOURS PER DAY MONDAY THROUGH SATURDAY AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. M. ALL HOURS WORKED ON SATURDAYS (EXCEPT MAKEUP DAYS IF WORK IS LOST DUE TO INCLEMENT WEATHER CONDITIONS) SHALL BE PAID AT ONE AND ONE -HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. N. ALL HOURS WORKED ON SATURDAYS (EXCEPT MAKEUP DAYS) SHALL BE PAID AT ONE AND ONE -HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. O. THE FIRST TEN (10) HOURS WORKED ON SATURDAY SHALL BE PAID AT ONE AND ONE -HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS, HOLIDAYS AND AFTER TWELVE (12) HOURS, MONDAY THROUGH FRIDAY, AND AFTER TEN (10) HOURS ON SATURDAY SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. P. ALL HOURS WORKED ON SATURDAYS (EXCEPT MAKEUP DAYS IF CIRCUMSTANCES WARRANT) AND SUNDAYS SHALL BE PAID AT ONE AND ONE -HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. 1. Q. BENEFIT CODE KEY - EFFECTIVE 09 -02 -2009 -2- THE FIRST TWO (2) HOURS AFTER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDAY AND UP TO TEN (10) HOURS WORKED ON SATURDAYS SHALL BE PAID AT ONE AND ONE -HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED IN EXCESS OF TEN (10) HOURS PER DAY MONDAY THROUGH SATURDAY AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS (EXCEPT CHRISTMAS DAY) SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON CHRISTMAS DAY SHALL BE PAID AT TWO AND ONE -HALF TIMES THE HOURLY RATE OF WAGE. R. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. S. THE FIRST TWO (2) HOURS AFTER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST EIGHT (8) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE -HALF TIMES THE HOURLY RATE OF WAGE. ALL OTHER OVERTIME HOURS WORKED, EXCEPT LABOR DAY, SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON LABOR DAY SHALL BE PAID AT THREE TIMES THE HOURLY RATE OF WAGE. T. WORK PERFORMED IN EXCESS OF EIGHT (8) HOURS OF STRAIGHT TIME PER DAY, OR TEN (10) HOURS OF STRAIGHT TIME PER DAY WHEN FOUR TEN (10) HOUR SHIFTS ARE ESTABLISHED, OR FORTY (40) HOURS OF STRAIGHT TIME PER WEEK, MONDAY THROUGH FRIDAY, OR OUTSIDE THE NORMAL SHIFT, AND ALL WORK ON SATURDAYS SHALL BE PAID AT TIME AND ONE -HALF THE STRAIGHT TIME RATE. HOURS WORKED OVER TWELVE HOURS (12) IN A SINGLE SHIFT AND ALL WORK PERFORMED AFTER 6 00 PM SATURDAY TO 6:00 AM MONDAY AND HOLIDAYS SHALL BE PAID AT DOUBLE THE STRAIGHT TIME RATE OF PAY THE EMPLOYER SHALL HAVE THE SOLE DISCRETION TO ASSIGN OVERTIME WORK TO EMPLOYEES. PRIMARY CONSIDERATION FOR OVERTIME WORK SHALL BE GIVEN TO EMPLOYEES REGULARLY ASSIGNED TO THE WORK TO BE PERFORMED ON OVERTIME SITUATIONS. AFTER AN EMPLOYEE HAS WORKED EIGHT (8) HOURS AT AN APPLICABLE OVERTIME RATE, ALL ADDITIONAL HOURS SHALL BE AT THE APPLICABLE OVERTIME RATE UNTIL SUCH TIME AS THE EMPLOYEE HAS HAD A BREAK OF EIGHT (8) HOURS OR MORE. U. ALL HOURS WORKED ON SATURDAYS SHALL BE PAID AT ONE AND ONE -HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS (EXCEPT LABOR DAY) SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON LABOR DAY SHALL BE PAID AT THREE TIMES THE HOURLY RATE OF WAGE. V. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS (EXCEPT THANKSGIVING DAY AND CHRISTMAS DAY) SHALL BE PAID AT ONE AND ONE -HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON THANKSGIVING DAY AND CHRISTMAS DAY SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. W. ALL HOURS WORKED ON SATURDAYS AND SUNDAYS (EXCEPT MAKE -UP DAYS DUE TO CONDITIONS BEYOND THE CONTROL OF THE EMPLOYER)) SHALL BE PAID AT ONE AND ONE -HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. X THE FIRST FOUR (4) HOURS AFTER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST TWELVE (12) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE -HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED OVER TWELVE (12) HOURS MONDAY THROUGH SATURDAY, SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. WHEN HOLIDAY FALLS ON SATURDAY OR SUNDAY, THE DAY BEFORE SATURDAY, FRIDAY, AND THE DAY AFTER SUNDAY, MONDAY, SHALL BE CONSIDERED THE HOLIDAY AND ALL WORK PERFORMED SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. Y. ALL HOURS WORKED OUTSIDE THE HOURS OF 5:00 AM AND 5:00 PM (OR SUCH OTHER HOURS AS MAY BE AGREED UPON BY ANY EMPLOYER AND THE EMPLOYEE) AND ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY (10 HOURS PER DAY FOR A 4 X 10 WORKWEEK) AND ON SATURDAYS AND HOLIDAYS (EXCEPT LABOR DAY) SHALL BE PAID AT ONE AND ONE -HALF TIMES THE HOURLY RATE OF WAGE. (EXCEPT FOR EMPLOYEES WHO ARE ABSENT FROM WORK WITHOUT PRIOR APROVAL ON A SCHEDULED WORKDAY DURING THE WORKWEEK SHALL BE PAID AT THE STRAIGHT -TIME RATE UNTIL THEY HAVE WORKED 8 HOURS IN A DAY (10 IN A 4 X 10 WORKWEEK) OR 40 HOURS DURING THAT WORKWEEK.) ALL HOURS WORKED MONDAY THROUGH SATURDAY OVER TWELVE (12) HOURS AND ALL HOURS WORKED ON SUNDAYS AND LABOR DAY SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE Z ALL HOURS WORKED ON SATURDAYS AND SUNDAYS SHALL BE PAID AT ONE AND ONE -HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID THE STRAIGHT TIME RATE OF PAY IN ADDITION TO HOLIDAY PAY. 2. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE -HALF TIMES THE HOURLY RATE OF WAGE. A. THE FIRST SIX (6) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE -HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED IN EXCESS OF SIX (6) HOURS ON SATURDAY AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. B ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT ONE AND ONE -HALF TIMES THE HOURLY RATE OF WAGE. C. ALL HOURS WORKED ON SUNDAYS SHALL BE PAID AT ONE AND ONE -HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. BENEFIT CODE KEY - EFFECTIVE 09 -02 -2009 -3- D. ALL HOURS WORKED ON SATURDAYS AND SUNDAYS SHALL BE PAID AT ONE AND ONE -HALF TIMES THE HOURLY RATE OF WAGE. THE FIRST EIGHT (8) HOURS WORKED ON HOLIDAYS SHALL BE PAID AT STRAIGHT TIME IN ADDITION TO THE HOLIDAY PAY. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON HOLIDAYS SHALL BE PAID AT ONE AND ONE -HALF TIMES THE HOURLY RATE OF WAGE. E. ALL HOURS WORKED ON SATURDAYS OR HOLIDAYS (EXCEPT LABOR DAY) SHALL BE PAID AT ONE AND ONE -HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS OR ON LABOR DAY SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. F. THE FIRST EIGHT (8) HOURS WORKED ON HOLIDAYS SHALL BE PAID AT THE STRAIGHT HOURLY RATE OF WAGE IN ADDITION TO THE HOLIDAY PAY. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. G. ALL HOURS WORKED ON SUNDAY SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON PAID HOLIDAYS SHALL BE PAID AT TWO AND ONE -HALF TIMES THE HOURLY RATE OF WAGE INCLUDING HOLIDAY PAY. H. ALL HOURS WORKED ON SUNDAY SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT ONE AND ONE -HALF TIMES THE HOURLY RATE OF WAGE. 2. I. ALL HOURS WORKED ON SATURDAYS AND HOLIDAYS (EXCEPT LABOR DAY) SHALL BE PAID AT ONE AND ONE - HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND ON LABOR DAY SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. J. ALL HOURS WORKED ON SUNDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON PAID HOLIDAYS SHALL BE PAID AT TWO AND ONE -HALF TIMES THE HOURLY RATE OF WAGE, INCLUDING THE HOLIDAY PAY. ALL HOURS WORKED ON UNPAID HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. K. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE IN ADDITION TO THE HOLIDAY PAY L. ALL HOURS WORKED ON SATURDAYS (OR ON THE REGULAR DAY OFF DURING A WORKWEEK OTHER THAN MONDAY THROUGH FRIDAY) AND HOLIDAYS SHALL BE PAID AT ONE AND ONE -HALF TIMES THE HOURLY RATE OF WAGE, EXCEPT LABOR DAY WHICH SHALL BE PAID AT DOUBLE THE HOURLY RATE. ALL HOURS WORKED MONDAY THROUGH SATURDAY OVER TWELVE (12) HOURS AND ALL HOURS WORKED ON SUNDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. M. ALL HOURS WORKED ON SATURDAYS, SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. O. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT ONE AND ONE -HALF TIMES THE HOURLY RATE OF WAGE. P. THE FIRST EIGHT (8) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE -HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED IN EXCESS OF EIGHT 8) HOURS ON SATURDAY AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. Q. ALL HOURS WORKED ON LABOR DAY SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. R. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS AND ALL HOURS WORKED OVER SIXTY (60) IN ONE WEEK SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. S. ALL HOURS WORKED ON SATURDAYS SHALL BE PAID AT ONE AND ONE -HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE, EXCEPT THE DAY AFTER THANKSGIVING, THE DAY AFTER CHRISTMAS AND A FLOATING HOLIDAY, WHICH SHALL BE PAID AT THE STRAIGHT TIME RATE IF WORKED, IN ADDITION TO HOLIDAY PAY. T. ALL HOURS WORKED ON SUNDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT TWO AND ONE -HALF TIMES THE HOURLY RATE OF PAY, AND THIS RATE SHALL INCLUDE HOLIDAY PAY. U ALL HOURS WORKED ON SATURDAYS SHALL BE PAID AT ONE AND ONE -HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED OVER 12 HOURS IN A DAY, OR ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. V. ALL HOURS WORKED ON SATURDAYS AND ON MAKE -UP DAYS SHALL BE PAID AT ONE AND ONE -HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. BENEFIT CODE KEY - EFFECTIVE 09 -02 -2009 -4- W THE FIRST TWO (2) HOURS Al- 1ER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST EIGHT (8) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE -HALF TIMES THE HOURLY RATE OF WAGE. ALL OTHER HOURS WORKED MONDAY THROUGH SATURDAY, AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. ON A FOUR -DAY, TEN -HOUR WEEKLY SCHEDULE, EITHER MONDAY THRU THURSDAY OR TUESDAY THRU FRIDAY SCHEDULE, ALL HOURS WORKED AFTER TEN SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. THE FIRST EIGHT (8) HOURS WORKED ON THE FIFTH DAY SHALL BE PAID AT ONE AND ONE -HALF TIMES THE HOURLY RATE OF WAGE ALL OTHER HOURS WORKED ON THE FIFTH, SIXTH, AND SEVENTH DAYS AND ON HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. X. ALL HOURS WORKED MONDAY THROUGH FRIDAY BETWEEN THE HOURS OF 6 P.M. AND 6:00 A M. AND ALL HOURS ON SATURDAYS SHALL BE PAID AT ONE AND ONE -HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. 4A. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SATURDAYS, SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. HOLIDAY CODES 5. A. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (7). B. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY, THE DAY BEFORE CHRISTMAS, AND CHRISTMAS DAY (8). C. HOLIDAYS• NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8). D. HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AND SATURDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8). E. HOLIDAYS NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, PRESIDENTIAL ELECTION DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8). F. HOLIDAYS NEW YEAR'S DAY, MARTIN LUTHER KING JR. DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (11). G. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE LAST WORK DAY BEFORE CHRISTMAS DAY, AND CHRISTMAS DAY (7). H. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING DAY, AND CHRISTMAS (6). I. HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY (6). J. HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS EVE DAY, AND CHRISTMAS DAY (7). K. HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY, THE DAY BEFORE CHRISTMAS, AND CHRISTMAS DAY (9). L. HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING JR. DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8). M HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING JR. DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY, THE DAY BEFORE CHRISTMAS AND CHRISTMAS DAY (9). N. HOLIDAYS• NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (9). P. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY AND SATURDAY AFTER THANKSGIVING DAY, THE DAY BEFORE CHRISTMAS, AND CHRISTMAS DAY (9) IF A HOLIDAY FALLS ON SUNDAY, THE FOLLOWING MONDAY SHALL BE CONSIDERED AS A HOLIDAY. BENEFIT CODE KEY - EFFECTIVE 09 -02 -2009 -5- Q PAID HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY (6). R. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING DAY, ONE -HALF DAY BEFORE CHRISTMAS DAY, AND CHRISTMAS DAY. (7 1/2). 5. S. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY (7). T. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS DAY, AND THE DAY BEFORE OR AFTER CHRISTMAS (9). U. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING JR. DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY (8). V PAID HOLIDAYS: SIX (6) PAID HOLIDAYS. W. PAID HOLIDAYS: NINE (9) PAID HOLIDAYS. X. HOLIDAYS: AFTER 520 HOURS - NEW YEAR'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY AFTER 2080 HOURS - NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND A FLOATING HOLIDAY (8). Y HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, THANKSGIVING DAY, THE FRIDAY FOLLOWING THANKSGIVING DAY, AND CHRISTMAS DAY (8). Z. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8). 6. A. PAID HOLIDAYS NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8). B. PAID HOLIDAYS: NEW YEAR'S EVE DAY, NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS EVE'S DAY, AND CHRISTMAS DAY (9). C. HOLIDAYS NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING DAY, THE LAST WORK DAY BEFORE CHRISTMAS DAY, AND CHRISTMAS DAY (9). D. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS DAY, THE DAY BEFORE OR THE DAY AFTER CHRISTMAS DAY (9). E. PAID HOLIDAYS. NEW YEAR'S DAY, DAY BEFORE OR AFTER NEW YEAR'S DAY, PRESIDENTS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING DAY, CHRISTMAS DAY, AND A HALF -DAY ON CHRISTMAS EVE DAY (9 1/2). F. PAID HOLIDAYS. NEW YEAR'S DAY, MARTIN LUTHER KING JR. DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (11). G. PAID HOLIDAYS. NEW YEAR'S DAY, MARTIN LUTHER KING JR. DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS DAY, AND CHRISTMAS EVE DAY (11). H. PAID HOLIDAYS. NEW YEAR'S DAY, NEW YEAR'S EVE DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS DAY, THE DAY AFTER CHRISTMAS, AND A FLOATING HOLIDAY (10). I. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (7). J. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS DAY, THE DAY AFTER CHRISTMAS, AND A FLOATING HOLIDAY (9). L. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, THE LAST WORKING DAY BEFORE CHRISTMAS DAY, AND CHRISTMAS DAY. (8) Q. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY (8). UNPAID HOLIDAY: PRESIDENTS' DAY. BENEFIT CODE KEY - EFFECTIVE 09 -02 -2009 -6- T. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, THE LAST WORKING DAY BEFORE CHRISTMAS DAY, AND CHRISTMAS DAY (9). U. HOLIDAYS: NEW YEAR'S DAY, DAY BEFORE NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, THE DAY BEFORE CHRISTMAS DAY, CHRISTMAS DAY (9). V PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING DAY, CHRISTMAS EVE DAY, CHRISTMAS DAY, AND ONE DAY OF THE EMPLOYEE'S CHOICE (9). W. PAID HOLIDAYS: NEW YEAR'S DAY, DAY BEFORE NEW YEAR'S DAY, PRESIDENTS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING DAY, CHRISTMAS DAY, DAY BEFORE OR AFTER CHRISTMAS DAY (10) X. PAID HOLIDAYS: NEW YEAR'S DAY, DAY BEFORE OR AFTER NEW YEAR'S DAY, PRESIDENTS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING DAY, CHRISTMAS DAY, DAY BEFORE OR AFTER CHRISTMAS DAY, EMPLOYEE'S BIRTHDAY (11). Y. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS DAY, AND A FLOATING HOLIDAY (9). Z. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (7) IF A HOLIDAY FALLS ON SATURDAY, THE PRECEDING FRIDAY SHALL BE CONSIDERED AS THE HOLIDAY. IF A HOLIDAY FALLS ON SUNDAY, THE FOLLOWING MONDAY SHALL BE CONSIDERED AS THE HOLIDAY. NOTE CODES 8. A. IN ADDITION TO THE HOURLY WAGE AND FRINGE BENEFITS, THE FOLLOWING DEPTH PREMIUMS APPLY TO DEPTHS OF FIFTY FEET OR MORE: OVER 50' TO 100' - $2.00 PER FOOT FOR EACH FOOT OVER 50 FEET OVER 100' TO 150' - $3.00 PER FOOT FOR EACH FOOT OVER 100 FEET OVER 150' TO 220' - $4.00 PER FOOT FOR EACH FOOT OVER 150 FEET OVER 220' - $5.00 PER FOOT FOR EACH FOOT OVER 220 FEET C. IN ADDITION TO THE HOURLY WAGE AND FRINGE BENEFITS, THE FOLLOWING DEPTH PREMIUMS APPLY TO DEPTHS OF FIFTY FEET OR MORE: OVER 50' TO 100' - $1.00 PER FOOT FOR EACH FOOT OVER 50 FEET OVER 100' TO 150' - $1 50 PER FOOT FOR EACH FOOT OVER 100 FEET OVER 150' TO 200' - $2.00 PER FOOT FOR EACH FOOT OVER 150 FEET OVER 200' - DIVERS MAY NAME THEIR OWN PRICE D. WORKERS WORKING WITH SUPPLIED AIR ON HAZMAT PROJECTS RECEIVE AN ADDITIONAL $1 00 PER HOUR. L. WORKERS ON HAZMAT PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS FOLLOWS - LEVEL A. $0.75, LEVEL B $0 50, AND LEVEL C: $0.25 M. WORKERS ON HAZMAT PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS FOLLOWS: LEVELS A & B: $1.00, LEVELS C & D: $0.50. N. WORKERS ON HAZMAT PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS FOLLOWS - LEVEL A. $1 00, LEVEL B. $0.75, LEVEL C: $0.50, AND LEVEL D $0.25 P WORKERS ON HAZMAT PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS FOLLOWS - CLASS A SUIT: $2.00, CLASS B SUIT: $1.50, CLASS C SUIT: $1.00, AND CLASS D SUIT $0.50 Stage of Progression & Hour Range ASBESTOS ABATEMENT WORKERS JOURNEY LEVEL LABORERS 1 0000 -1000 HOURS 60.00% 2 1001 -2000 HOURS 70.00% 3 2001 -3000 HOURS 80.00% 4 3001 -4000 HOURS 90 00% BOILERMAKERS JOURNEY LEVEL 1 0000 -1000 HOURS 70 00% 2 1001 -2000 HOURS 75.00% 3 2001 -3000 HOURS 80.00% 4 3001 -4000 HOURS 85.00% 5 4001 -5000 HOURS 90.00% 6 5001 -6000 HOURS 95 00% BRICK AND MARBLE MASOyS JOURNEY LEVEL 1 0000 -0750 HOURS 50.00% 2 0750 -2250 HOURS 55 00% 3 2550 -3000 HOURS 60.00% 4 3000 -3750 HOURS 70.00% 5 3750 -4500 HOURS 80.00% 6 4500 -5250 HOURS 90 00% 7 5250 -6000 HOURS 95 00% CARPENTERS CARPENTER 1 0000 -1000 HOURS 60.00% 2 1001 -2000 HOURS 65.00% 3 2001 -3000 HOURS 70.00% 4 3001 -4000 HOURS 75.00% 5 4001 -5000 HOURS 80 00% 6 5001 -6000 HOURS 85.00% 7 6001 -7000 HOURS 90.00% 8 7001 -8000 HOURS 95.00% DRYWALL APPLICATOR DRYWALL, METAL STUD, AND CEILING APPLICATORS 1 0000 -1000 HOURS 50 00% 2 1001 -2000 HOURS 60.00% 3 2001 -3000 HOURS 68.00% 4 3001 -4000 HOURS 76.00% 5 4001 -5000 HOURS 84.00% 6 5001 -6000 HOURS 92.00% 4COUSTICAL WORKER PREVAILING WAGE RATES FOR CLALLAM COUNTY APPRENTICES EFFECTIVE DATE 9/2/2009 Page 1 Prevailing Overtime Holiday Note Wage Code Code Code $27.65 $30 74 $33 84 $36.93 $43.50 $45.19 $46.87 $48 56 $50.24 $51 93 $28.74 $29 49 $31.21 $34 64 $38.07 $41.50 $43.22 $28.81 $36.08 $37.85 $39 62 $41 39 $43 16 $44.93 $46.70 1H 1H 1H 1H 1C 1C 1C '1C 1C 1C 1M 1M 1M 1M 1M 1M 1M 1H 1H 1H 1H 1H 1H 1H 1H 5D 5D 5D 5D 5N 5N 5N 5N 5N 5N 5A 5A 5A 5A 5A 5A 5A 5D 5D 5D 5D 5D 5D 5D 5D $25.28 1H 5D $34.31 1H 5D $37.15 1H 5D $39.98 1H 5D $42.81 1H 5D $45.64 1H 5D 1 0000 -1000 HOURS 50 00% $25 36 1H 5D 1 0000 -1000 HOURS 50 00% 2 1001 -2000 HOURS 60.00% 3 2001 -3000 HOURS 70.00% 4 3001 -4000 HOURS 80 00% 5 4001 -5000 HOURS 90.00% 6 5001 -6000 HOURS 95.00% DRYWALL TAPERS JOURNEY LEVEL 1 0000 -1000 HOURS 50 00% 2 1001 -2000 HOURS 55.00% PREVAILING WAGE RATES FOR CLALLAM COUNTY APPRENTICES EFFECTIVE DATE 9/2/2009 Prevailing Overtime Holiday Note Stage of Progression & Hour Range Wage Code Code Code 2 1001 -2000 HOURS 60.00% $34 41 1H 5D 3 2001 -3000 HOURS 68 00% $37 25 1H 5D 4 3001 -4000 HOURS 76 00% $40 10 1H 5D 5 4001 -5000 HOURS 84.00% $42 94 1H 5D 6 5001 -6000 HOURS 92.00% $45.79 1H 5D MILLWRIGHT AND MACHINE ERECTORS 1 0000 -1000 HOURS 60.00% $29.41 1H 5D 2 1001 -2000 HOURS 65 00% $36 73 1H 5D 3 2001 -3000 HOURS 70.00% $38 55 1H 5D 4 3001 -4000 HOURS 75 00% $40.37 1H 5D 5 4001 -5000 HOURS 80.00% $42.19 1H 5D 6 5001 -6000 HOURS 85.00% $44 01 1H 5D 7 6001 -7000 HOURS 90.00% $45 83 1H 5D 8 7001 -8000 HOURS 95.00% $47 65 1H 5D PILEDRIVERS. DRIVING. PULLING. PLACING COLLARS AND WELDING 1 0000 -1000 HOURS 60.00% $28.93 1H 5D 2 1001 -2000 HOURS 65.00% $36 21 1H 5D 3 2001 -3000 HOURS 70 00% $37 99 1H 5D 4 3001 -4000 HOURS 75.00% $39 77 1H 5D 5 4001 -5000 HOURS 80.00% $41.55 1H 5D 6 5001 -6000 HOURS 85.00% $43.33 1H 5D 7 6001 -7000 HOURS 90.00% $45 11 1H 5D 8 7001 -8000 HOURS 95.00% $46 89 1H 5D BRIDGE. DOCK AND WARF CARPENTERS 1 0000 -1000 HOURS 60.00% $28 81 1H 5D 2 1001 -2000 HOURS 65.00% $36 08 1H 5D 3 2001 -3000 HOURS 70.00% $37.85 1H 5D 4 3001 -4000 HOURS 75.00% $39.62 1H 5D 5 4001 -5000 HOURS 80 00% $41.39 1H 5D 6 5001 -6000 HOURS 85 00% $43 16 1H 5D 7 6001 -7000 HOURS 90.00% $44.93 1H 5D 8 7001 -8000 HOURS 95.00% $46.70 1H 5D CEMENT MASO&1 JOURNEY LEVEL Page 2 $15.48 1H 5D $18.58 1H 5D $21 67 1H 5D $24.77 1H 5D $27.86 1H 5D $29 41 1H 5D $31.64 1E 5P $33.35 1E 5P PREVAILING WAGE RATES FOR CLALLAM COUNTY APPRENTICES EFFECTIVE DATE 9/2/2009 Prevailing Overtime Holiday Note Stage of Progression & Hour Range Wage Code Code Code 3 2001 -3000 HOURS 65.00% $36 78 1E 5P 4 3001 -4000 HOURS 75.00% $40.21 1E 5P 5 4001-5000 HOURS 85.00% $43.64 1E 5P 6 5001 -6000 HOURS 90 00% $45 36 1E 5P ELECTRICIANS - INSIDE lQURNEY LEVEL 1 0000 -1000 HOURS 45.00% $26.69 2W 5L 2 1001 -2000 HOURS 50 00% $28.80 2W 5L 3 2001 -3500 HOURS 55.00% $35.26 2W 5L 4 3501 -5000 HOURS 65 00% $40 26 2W 5L 5 5001 -6500 HOURS 75.00% $45 26 2W 5L 6 6501 -8000 HOURS 85 00% $50 28 2W 5L ELECTRICIANS - POWEeJ,(LE COIILTRUCT Q±j JOURNEY LEVEL LINEPERSON 1 0000 -1000 HOURS 60.00% $34.76 4A 5A 2 1001 -2000 HOURS 63.00% $36 01 4A 5A 3 2001 -3000 HOURS 67 00% $37.77 4A 5A 4 3001 -4000 HOURS 72.00% $39.94 4A 5A 5 4001 -5000 HOURS 78.00% $42 51 4A 5A 6 5001 -6000 HOURS 86.00% $45 97 4A 5A 7 6001 -7000 HOURS 90.00% $47.69 4A 5A POLE SPRAYER 1 0000 -1000 HOURS 85.70% $45 87 4A 5A 2 1001 -2000 HOURS 89.80% $47.60 4A 5A 3 2001 -3000 HOURS 92 80% $48 89 4A 5A ELEVA CONSTRUCTORS MECHANIC 1 0000 -1000 HOURS 50 00% $21.46 4A 6Q 2 1001 -1700 HOURS 55.00% $43.49 4A 6Q 3 1701 -3400 HOURS 65.00% $48.03 4A 6Q 4 3401 -5100 HOURS 70.00% $50 91 4A 60 5 5101 -6800 HOURS 80.00% $55 55 4A 6Q + ELECTRONIC TECHNICIANS ELECTRONIC TECHNICIANS JOURNEY LEVEL 1 0000 -1000 HOURS 55.00% $8 55 1 2 1001 -2000 HOURS 60 00% $8 55 1 3 2001 -3000 HOURS 65.00% $8.55 1 4 3001 -4000 HOURS 70 00% $8 55 1 5 4001 -5000 HOURS 75 00% $9.05 1 6 5001 -6000 HOURS 80 00% $9.66 1 7 6001 -7000 HOURS 85 00% $10.26 1 8 7001 -8000 HOURS 95.00% $11.47 1 _TELECOMMUNICATION TECHNICIANS Page 3 Stage of Progression & Hour Range TELECOMMUNICATION TECHNICIANS JOURNEY LEVEL PREVAILING WAGE RATES FOR CLALLAM COUNTY APPRENTICES EFFECTIVE DATE 9/2/2009 Prevailing Overtime Holiday Note Wage Code Code Code 1 0000 -0800 HOURS 60 00% $22.23 1E 5A 2 0801 -1500 HOURS 65 00% $23 71 1E 5A 3 1601 -2400 HOURS 70.00% $25.20 1E 5A 4 2401 -3200 HOURS 75.00% $26.68 1E 5A 5 3201 -4000 HOURS 80 00% $28 16 1E 5A 6 4001 -4800 HOURS 85 00% $29 64 1E 5A GLAZIERS JOURNEY LEVEL, 1 0000 -1000 HOURS 50.00% $27 01 1Y 5G 2 1001 -2000 HOURS 55.00% $29 17 1Y 5G 3 2001 -3000 HOURS 60 00% $31.33 1Y 5G 4 3001 -4000 HOURS 65.00% $33.49 1Y 5G 5 4001 -5000 HOURS 70 00% $35 65 1Y 5G 6 5001 -6000 HOURS 75.00% $37 81 1Y 5G 7 6001 -7000 HOURS 80.00% $39 97 1Y 5G 8 7001 -8000 HOURS 90 00% $44 29 1Y 5G //EA T &FROST INS LATORS AND ASBESTOS WORKERS MECHANIC 1 0000 -2000 HOURS 45.00% $28.92 1S 5J 2 2001 -4000 HOURS 55 00% $32.31 1S 5J 3 4001 -6000 HOURS 65.00% $35.70 1S 5J 4 6001 -8000 HOURS 75 00% $39 10 1S 5J 5 8001 -10000 HOURS 85.00% $42.49 1S 5J HOD CARRIERS & MASON TENDERS JOURNEY LEVEL 1 0000 -1000 HOURS 60.00% $27 65 1H 5D 2 1001 -2000 HOURS 70 00% $30 74 1H 5D 3 2001 -3000 HOURS 80.00% $33.84 1H 5D 4 3001 -4000 HOURS 90.00% $36 93 1H 5D INSULATION APPLICATORS JOURNEY LEVEL 1 0000 -1000 HOURS 50 00% $10.25 1 2 1001 -2000 HOURS 60.00% $12 30 1 3 2001 -3000 HOURS 75.00% $15.38 1 4 3001 -4000 HOURS 90.00% $18 45 1 IRONWORKERS JOURNEY LEVEL 1 0000 -0750 HOURS 65.00% $30 00 10 5A 2 0751 -1500 HOURS 70.00% $31 83 10 5A 3 1501 -2250 HOURS 75.00% $45 12 10 5A 4 2251 -3000 HOURS 80 00% $46 95 10 5A 5 3001 -3750 HOURS 90.00% $50 61 10 5A 6 3751 -4500 HOURS 90.00% $50 61 10 5A Page 4 PREVAILING WAGE RATES FOR CLALLAM COUNTY APPRENTICES EFFECTIVE DATE 9/2/2009 Prevailing Overtime Holiday Note Stage of Progression & Hour Range Wage Code Code Code 7 4501 -5250 HOURS 95.00% $52.44 10 5A 8 5251 -6000 HOURS 95.00% $52.44 10 5A LA BOR B. GENERAL LABORER 1 0000 -1000 HOURS 60 00% $27.65 1H 5D 2 1001 -2000 HOURS 70.00% $30 74 1H 5D 3 2001 -3000 HOURS 80.00% $33 84 1H 5D 4 3001 -4000 HOURS 90.00% $36.93 1H 5D LABORERS - UNDERGROUND SEWER & WATER GENERAL LABORER 1 0000 -1000 HOURS 60.00% $27.65 1H 5D 2 1001 -2000 HOURS 70 00% $30.74 1H 5D 3 2001 -3000 HOURS 80.00% $33.84 1H 5D 4 3001 -4000 HOURS 90 00% $36 93 1H 5D LATHERS JOURNEY LEVEL 1 0000 -0700 HOURS 50.00% $25.28 1H 5D 2 0701 -1400 HOURS 60.00% $34.31 1H 5D 3 1401 -2100 HOURS 68.00% $37 15 1H 5D 4 2101 -2800 HOURS 76.00% $39 98 1H 5D 5 2801 -3500 HOURS 84 00% $42.81 1H 5D 6 3501 -4200 HOURS 92 00% $45.64 1H 5D PAINTERS JOURNEY LEVEL 1 0000 -0750 HOURS 52 00% $21.06 2B 6Z 2 0751 -1500 HOURS 56 00% $22.21 2B 6Z 3 1501 -2250 HOURS 60 00% $23.36 28 6Z 4 2251 -3000 HOURS 64.00% $24.52 2B 6Z 5 3001 -3750 HOURS 68 00% $25.66 2B 6Z 6 3751 -4500 HOURS 72 00% $26.82 2B 6Z PLASTERERS JOURNEY LEVEL 1 0000 -0500 HOURS 40.00% 2 0501 -1000 HOURS 45 00% 3 1001 -1500 HOURS 45.00% 4 1501 -2000 HOURS 50.00% 5 2001 -2500 HOURS 55 00% 6 2501 -3000 HOURS 60.00% 7 3001 -3500 HOURS 65 00% 8 3501 -4000 HOURS 70.00% 9 4001 -4500 HOURS 75 00% 10 4501 -5000 HOURS 80 00% 11 5001 -5500 HOURS 85.00% 12 5501 -6000 HOURS 90.00% Page 5 $10.33 1 $11 62 1 $11.62 1 $12.92 1 $14 21 1 $15.50 1 $16.79 1 $18 08 1 $19.37 1 $20 66 1 $21 96 1 $23.25 1 PREVAILING WAGE RATES FOR CLALLAM COUNTY APPRENTICES EFFECTIVE DATE 9/2/2009 Prevailing Overtime Holiday Note Stage of Progression & Hour Range Wage Code Code Code 13 6001 -6500 HOURS 95 00% $24.54 1 14 6501 -7000 HOURS 95.00% $24.54 1 PLUMfERS & PIPEFITTERS JOURNEY LEVEL, 1 0000 -2000 HOURS 50 00% $35.34 1G 5A 2 2001 -4000 HOURS 62.50% $47.68 1G 5A 3 4001 -6000 HOURS 70.00% $51.12 1G 5A 4 6001 -8000 HOURS 75 00% $53 41 1G 5A 5 8001 -10000 HOURS 85 00% $57.99 1G 5A POWER EQUIPMENT OPERATORS GRADE ENGINEER ALL EQUIPMENT 1 0000 -1000 HOURS 65.00% $37.46 1T 5D 8P 2 1001 -2000 HOURS 70 00% $39.18 1T 5D 8P 3 2001 -3000 HOURS 75.00% $40 90 1T 5D 8P 4 3001 -4000 HOURS 80.00% $42.61 1T 5D 8P 5 4001 -5000 HOURS 90.00% $46 05 1T 5D 8P 6 5001 -6000 HOURS 95.00% $47 76 1T 5D 8P POWER EQUIPMENT OPERATORS- UNDERGROUND SEWR & WATEQ (SEE POWER EQUIPMENT OPERATORS) 1 0000 -1000 HOURS 65 00% $35 43 2 1001 -2000 HOURS 70.00% $37 09 3 2001 -3000 HOURS 75.00% $38.74 4 3001 -4000 HOURS 80.00% $40.39 5 4001 -5000 HOURS 90.00% $43 70 6 5001 -6000 HOURS 95.00% $45 35 POWER LINE CLEARANCE TREE TRIMMERS TREE TRIMMER 1 0000 -1000 HOURS 75.00% $27.85 4A 5A 2 1001 -2000 HOURS 80 00% $29 16 4A 5A 3 2001 -3000 HOURS 85.00% $30 46 4A 5A 4 3001 -4000 HOURS 90.00% $31.78 4A 5A REFRIGERA�N & AIR CONDITIO MECHA NICS MECHANIC 1 0000 -2000 HOURS 50 00% $13.84 1 2 2001 -4000 HOURS 55.00% $15 22 1 3 4001 -6000 HOURS 60.00% $16 61 1 4 6001 -8000 HOURS 70.00% $19.38 1 5 8001 -10000 HOURS 85.00% $23 53 1 RESIDENTIAL CARPENTERS JOURNEY LEVEL, 1 1st Penod 60 00% $10.71 1 2 2nd Penod 65.00% $11.60 1 3 3rd Period 70 00% $12 50 1 Page 6 PREVAILING WAGE RATES FOR CLALLAM COUNTY APPRENTICES EFFECTIVE DATE 9/2/2009 Prevailing Overtime Holiday Note Stage of Progression & Hour Range Wage Code Code Code 4 4th Period 75.00% $13.39 1 5 5th Penod 80.00% $14.28 1 6 6th Period 85 00% $15 17 1 7 7th Penod 90.00% $16.07 1 8 8th Penod 95.00% $16 96 1 RESIDENTIAL ELECTRICIANS JOURNEY LEVEL 1 0000 -0900 HOURS 50 00% $13.89 1 2 0901 -1800 HOURS 55.00% $15 28 1 3 1801 -2700 HOURS 75.00% $20.84 1 4 2701 -4000 HOURS 85.00% $23.61 1 RESIDENTIAL PLUMBERS & PIPEFITTERS JOURNEY LEVEL, 1 0000 -1000 HOURS 55 00% $8.55 1 2 1001 -2000 HOURS 65.00% $9.49 1 3 2001 -4000 HOURS 75.00% $10.95 1 4 4001 -6000 HOURS 85 00% $12.41 1 RESIDENTIAL SHEET METAL WORKERS JOURNEY LEVEL (FIELD OR SHOPI 1 0000 -0900 HOURS 55 00% $17.43 1R 6L 2 0901 -1800 HOURS 60.00% $18 43 1R 6L 3 1801 -2700 HOURS 65.00% $19.85 1R 6L 4 2701 -3600 HOURS 70.00% $20 86 1R 6L 5 3601 -4500 HOURS 75.00% $22.10 1R 6L 6 4501 -5400 HOURS 80 00% $23.10 1R 6L ROOFERS JOURNEY LEVEL 1 0000 -0820 HOURS 60 00% $26.30 1R 5A 2 0821 -1630 HOURS 67.00% $28.31 1R 5A 3 1631 -2450 HOURS 74.00% $30.31 1R 5A 4 2451 -3270 HOURS 81 00% $3461 1R 5A 5 3271 -4080 HOURS 88.00% $36.62 1R 5A 6 4081 -4899 HOURS 95 00% $38.62 1R 5A SHEET METAL WORKERS JOURNEY LEVEL (FIELD OR SHOP) 1 0000 -2000 HOURS 45.00% $25.48 1E 6L 2 2001 -3000 HOURS 50 00% $36.69 1E 6L 3 3001 -4000 HOURS 55.00% $38.78 1E 6L 4 4001 -5000 HOURS 60 00% $40 91 1E 6L 5 5001 -6000 HOURS 65.00% $43.04 1E 6L 6 6001 -7000 HOURS 70.00% $45.15 1E 6L 7 7001 -8000 HOURS 75.00% $47.28 1E 6L 8 8001 -9000 HOURS 80.00% $49 40 1E 6L 9 9001 -10000 HOURS 85.00% $51.53 1E 6L Page 7 Stage of Progression & Hour Range SOFT FLOOR LYERS JOURNEY LEVEL 1 0000 -1000 HOURS 50.00% 2 1001 -2000 HOURS 60.00% 3 2001 -3000 HOURS 70.00% 4 3001 -4000 HOURS 75.00% 5 4001 -5000 HOURS 80 00% 6 5001 -6000 HOURS 85.00% 7 6001 -7000 HOURS 90 00% 8 7001 -8000 HOURS 95.00% SPRINKLER FITTERS (FIRE PROTECTION) JOURNEY LEVEL, 1 2 3 4 1 2 3 4 1 2 3 4 5 6 1 2 3 4 5 6 GRADE 1 (INDENTURED AFTER APRIL 1, 2000) 0000 -1000 HOURS 45.00% 1001 -2000 HOURS 50.00% 2001 -3000 HOURS 55 00% 3001 -4000 HOURS 60.00% 0000 -1000 HOURS 40 00% 1001 -2000 HOURS 45.00% 2001 -3000 HOURS 50 00% 3001 -4000 HOURS 55.00% 0000 -1000 HOURS 65 00% 1001 -2000 HOURS 70 00% 2001 -3000 HOURS 75 00% 3001 -4000 HOURS 80.00% 4001 -5000 HOURS 85 00% 5001 -6000 HOURS 90.00% 0000 -1000 HOURS 60 00% 1001 -2000 HOURS 65 00% 2001 -3000 HOURS 70.00% 3001 -4000 HOURS 75.00% 4001 -5000 HOURS 80 00% 5001 -6000 HOURS 85.00% TILE. MARBLE & TERRAZZO FINISHERS FINISHER 1 0000 -1000 HOURS 50 00% 2 1001 -2500 HOURS 55.00% 3 2501 -3500 HOURS 60 00% 4 3501 -4500 HOURS 70.00% TERRAZZO WORKERS & TILE SETTERS JOURNEY LEVEL 1 0000 -1000 HOURS 50 00% 2 1001 -2500 HOURS 55 00% 3 2501 -3500 HOURS 60.00% 4 3501 -4500 HOURS 70 00% PREVAILING WAGE RATES FOR CLALLAM COUNTY APPRENTICES EFFECTIVE DATE 9/2/2009 Page 8 Prevailing Overtime Holiday Note Wage Code Code Code $19 49 2X $23 20 2X $29.22 2X $30.89 2X $32.55 2X $34 20 2X $35.86 2X $37.56 2X $8 85 1 $9.84 1 $10 82 1 $11.80 1 $8.55 1 $8.85 1 $9 84 1 $10.82 1 $12.79 1 $13 77 1 $14 75 1 $15.74 1 $16.72 1 $17 70 1 $11.80 1 $12 79 1 $13 77 1 $14.75 1 $15 74 1 $16.72 1 $26.23 1B $27 84 1B $29 42 1B $32.66 1B $26.86 1M $28 52 1M $30.19 1M $33.53 1M 5A 5A 5A 5A 5A 5A 5A 5A 5A 5A 5A 5A 5A 5A 5A 5A Stage of Progression 5 4501 -5500 HOURS 6 5501 -6250 HOURS 7 6251 -7000 HOURS TRAFFIC CONtROL JOURNEY LEVEL, 1 0000 -0500 HOURS 60.00% 2 0501 -1000 HOURS 60.00% 3 1001 -2333 HOURS 60.00% 4 2334 -4666 HOURS 73 00% 5 4667 -7000 HOURS 88.00% 'RUCK DRIVERS PUMP TRUCK ALL TRUCKS 1 0000 -0700 HOURS 70.00% 2 0701 -1400 HOURS 80.00% 3 1401 -2100 HOURS 90.00% & Hour Range 80.00% 90.00% 95.00% STRIPERS PREVAILING WAGE RATES FOR CLALLAM COUNTY APPRENTICES EFFECTIVE DATE 9/2/2009 Page 9 Prevailing Wage $36.87 $40 20 $41.87 $16.44 1K $21.86 1K $25 59 1K $29.91 1K $34 90 1K $14.16 $16.18 $18 21 Overtime Holiday Code Code 1M 5A 1M 5A 1M 5A 1 1 1 5A 5A 5A 5A 5A Note Code *************************************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Classification State of Washington DEPARTMENT OF LABOR AND INDUSTRIES Prevailing Wage Section - Telephone (360) 902 -5335 PO Box 44540, Olympia, WA 98504 -4540 Washington State Prevailing Wage Rates For Public Works Contracts The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, workers' wage and benefit rates must add to not less than this total. A bnef description of overtime calculation requirements is provided on the Benefit Code Key. CLALLAM COUNTY EFFECTIVE 09 -02 -2009 (See Benefit Code Key) Over PREVAILING Time Holiday Note WAGE Code Code Code ASBESTOS ABATEMENT WORKERS JOURNEY LEVEL $40.03 1H 5D BOILERMAKERS JOURNEY LEVEL $53.61 1C 5N BRICK AND MARBLE MASONS BRICK & BLOCK FINISHER $39.49 1M 5A JOURNEY LEVEL $46.35 1M 5A BUILDING SERVICE EMPLOYEES JANITOR $8.55 1 SHAMPOOER $8.97 1 WAXER $8.97 1 WINDOW CLEANER $13.22 1 CABINET MAKERS (IN SHOP) JOURNEY LEVEL $14.67 1 CARPENTERS ACOUSTICAL WORKER $48.63 1H 5D BRIDGE, DOCK AND WARF CARPENTERS $48.47 1H 5D CARPENTER $48.47 1H 5D CREOSOTED MATERIAL $48.57 1H 5D DRYWALL APPLICATOR $48.47 1H 5D FLOOR FINISHER $48.60 1H 5D FLOOR LAYER $48.60 1H 5D FLOOR SANDER $48.60 1H 5D MILLWRIGHT AND MACHINE ERECTORS $49.47 1H 5D PILEDRIVERS, DRIVING, PULLING, PLACING COLLARS AND WELDING $48.67 1H 5D SAWFILER $48.60 1H 5D SHINGLER $48.60 1H 5D STATIONARY POWER SAW OPERATOR $48.60 1H 5D STATIONARY WOODWORKING TOOLS $48.60 1H 5D CEMENT MASONS JOURNEY LEVEL $40.03 1H 5D DIVERS & TENDERS DIVER $100.28 1M 5D 8A DIVER ON STANDBY $56.68 1M 5D DIVER TENDER $52.23 1M 5D SURFACE RCV & ROV OPERATOR $52.23 1M 5D SURFACE RCV & ROV OPERATOR TENDER $50.72 I B 5A DREDGE WORKERS ASSISTANT ENGINEER $49.57 IT 5D 8L ASSISTANT MATE (DECKHAND) $49.06 1T 5D 8L BOATMEN $49 57 1T 5D 8L ENGINEER WELDER $49.62 1T 5D 8L Page 1 CLALLAM COUNTY EFFECTIVE 09 -02 -2009 *************************************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code LEVERMAN, HYDRAULIC $51.19 1T 5D 8L MAINTENANCE $49.06 1T 5D 8L MATES $49.57 IT 5D 8L OILER $49.19 1T 5D 8L DRYWALL TAPERS JOURNEY LEVEL $48.79 1E 5P ELECTRICAL FIXTURE MAINTENANCE WORKERS JOURNEY LEVEL $9.37 1 ELECTRICIANS - INSIDE CABLE SPLICER $61.95 2W 5L CABLE SPLICER (TUNNEL) $66.57 2W 5L CERTIFIED WELDER $59.85 2W 5L CERTIFIED WELDER (TUNNEL) $64.13 2W 5L CONSTRUCTION STOCK PERSON $31.83 2W 5L JOURNEY LEVEL $57.74 2W 5L JOURNEY LEVEL (TUNNEL) $61.95 2W 5L ELECTRICIANS - MOTOR SHOP CRAFTSMAN $15.37 2A 6C JOURNEY LEVEL $14.69 2A 6C ELECTRICIANS - POWERLINE CONSTRUCTION CABLE SPLICER $59.79 4A 5A CERTIFIED LINE WELDER $54.59 4A 5A GROUNDPERSON $39.07 4A 5A HEAD GROUNDPERSON $41.22 4A 5A HEAVY LINE EQUIPMENT OPERATOR $54.59 4A 5A JACKHAMMER OPERATOR $41.22 4A 5A JOURNEY LEVEL LINEPERSON $54.59 4A 5A LINE EQUIPMENT OPERATOR $46.33 4A 5A POLE SPRAYER $54.59 4A 5A POWDERPERSON $41.22 4A 5A ELECTRONIC TECHNICIANS ELECTRONIC TECHNICIANS JOURNEY LEVEL $12.07 1 ELEVATOR CONSTRUCTORS MECHANIC $64.81 4A 6Q MECHANIC IN CHARGE $70.60 4A 6Q FABRICATED PRECAST CONCRETE PRODUCTS ALL CLASSIFICATIONS $13.50 1 FENCE ERECTORS FENCE ERECTOR $13.80 1 FENCE LABORER $11.60 1 FLAGGERS JOURNEY LEVEL $33.93 1H 5D GLAZIERS JOURNEY LEVEL $48.61 1Y 5G HEAT & FROST INSULATORS AND ASBESTOS WORKERS MECHANIC $48 28 1S 5J HEATING EQUIPMENT MECHANICS MECHANIC $16.00 1 HOD CARRIERS & MASON TENDERS JOURNEY LEVEL $41.28 1H 5D INDUSTRIAL ENGINE AND MACHINE MECHANICS MECHANIC $15.65 1 Page 2 *************************************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Classification CLALLAM COUNTY EFFECTIVE 09 -02 -2009 INDUSTRIAL POWER VACUUM CLEANER JOURNEY LEVEL $9.24 1 INLAND BOATMEN CAPTAIN $59.22 1 COOK $34.81 1 DECKHAND $34.52 1 ENGINEER/DECKHAND $58.62 1 MATE, LAUNCH OPERATOR $50.20 1 INSPECTION /CLEANING /SEALING OF SEWER & WATER SYSTEMS BY REMOTE CONTROL CLEANER OPERATOR, FOAMER OPERATOR $9.73 1 GROUT TRUCK OPERATOR $11.48 1 HEAD OPERATOR $12.78 1 TECHNICIAN $8.55 1 TV TRUCK OPERATOR $10.53 1 INSULATION APPLICATORS JOURNEY LEVEL $20.50 1 IRONWORKERS JOURNEY LEVEL $54.27 10 5A LABORERS ASPHALT RAKER $41.28 1 H 5D BALLAST REGULATOR MACHINE $40.03 1H 5D BATCH WEIGHMAN $33.93 1H 5D BRUSH CUTTER $40.03 1H 5D BRUSH HOG FEEDER $40.03 1H 5D BURNERS $40.03 1H 5D CARPENTER TENDER $40.03 1H 5D CASSION WORKER $41.28 1H 5D CEMENT DUMPER/PAVING $40.77 1H 5D CEMENT FINISHER TENDER $40.03 1H 5D CHANGE -HOUSE MAN OR DRY SHACKMAN $40.03 1 H 5D CHIPPING GUN (OVER 30 LBS) $40.77 1H 5D CHIPPING GUN (UNDER 30 LBS) $40.03 1 H 5D CHOKER SETTER $40.03 1 H 5D CHUCK TENDER $40.03 1H 5D CLEAN -UP LABORER $40.03 1H 5D CONCRETE DUMPER/CHUTE OPERATOR $40.77 1H 5D CONCRETE FORM STRIPPER $40.03 1H 5D CONCRETE SAW OPERATOR $40.77 1H 5D CRUSHER FEEDER $33.93 1H 5D CURING LABORER $40.03 1H 513 DEMOLITION, WRECKING & MOVING (INCLUDING CHARRED MATERIALS) $40.03 1H 5D DITCH DIGGER $40.03 1H 5D DIVER $41.28 1 H 5D DRILL OPERATOR (HYDRAULIC, DIAMOND) $40.77 1H 5D DRILL OPERATOR, AIRTRAC $41.28 1H 5D DUMPMAN $40.03 1H 5D EPDXY TECHNICIAN $40.03 1H 5D EROSION CONTROL WORKER $40.03 1H 5D FALLER/BUCKER, CHAIN SAW $40.77 1H 5D FINAL DETAIL CLEANUP (i.e., dusting, vacuuming, window cleaning, NOT $30.84 1H 5D construction debris cleanup) Page 3 (See Benefit Code Key) Over PREVAILING Time Holiday Note WAGE Code Code Code CLALLAM COUNTY EFFECTIVE 09 -02 -2009 *************************************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code FINE GRADERS $40.03 1H 5D FIRE WATCH $33.93 1H 5D FORM SETTER $40.03 1H 5D GABION BASKET BUILDER $40.03 1H 5D GENERAL LABORER $40.03 1H 5D GRADE CHECKER & TRANSIT PERSON $41.28 1H 5D GRINDERS $40.03 1H 5D GROUT MACHINE TENDER $40.03 1H 5D GUARDRAIL ERECTOR $40.03 1H 5D HAZARDOUS WASTE WORKER LEVEL A $41.28 1H 5D HAZARDOUS WASTE WORKER LEVEL B $40.77 1H 5D HAZARDOUS WASTE WORKER LEVEL C $40.03 1H 5D HIGH SCALER $41.28 1H 5D HOD CARRIER/MORTARMAN $41.28 1H 5D JACKHAMMER $40.77 1H 5D LASER BEAM OPERATOR $40.77 1H 5D MANHOLE BUILDER - MUDMAN $40.77 1H 5D MATERIAL YARDMAN $40.03 1H 5D MINER $41.28 1H 5D NOZZLEMAN, CONCRETE PUMP, GREEN CUTTER WHEN USING HIGH $40.77 1H 5D PRESSURE AIR & WATER ON CONCRETE & ROCK, SANDBLAST, GUNITE, SHOTCRETE, WATER BLASTER PAVEMENT BREAKER $40.77 1H 5D PILOT CAR $33.93 1H 5D PIPE POT TENDER $40.77 1H 5D PIPE RELINER (NOT INSERT TYPE) $40.77 1H 5D PIPELAYER & CAULKER $40.77 1H 5D PIPELAYER & CAULKER (LEAD) $41.28 1H 5D PIPEWRAPPER $40.77 1H 5D POT TENDER $40.03 1H 5D POWDERMAN $41.28 1H 5D POWDERMAN HELPER $40.03 1H 5D POWERJACKS $40.77 1H 5D RAILROAD SPIKE PULLER (POWER) $40.77 1H 5D RE- TIMBERMAN $41.28 1H 5D RIPRAP MAN $40.03 1H 5D RODDER $40.77 1H 5D SCAFFOLD ERECTOR $40.03 1H 5D SCALE PERSON $40.03 1H 5D SIGNALMAN $40.03 1H 5D SLOPER (OVER 20 ") $40.77 1H 5D SLOPER SPRAYMAN $40.03 1H 5D SPREADER (CLARY POWER OR SIMILAR TYPES) $40.77 1H 5D SPREADER (CONCRETE) $40.77 1H 5D STAKE HOPPER $40.03 1H 5D STOCKPILER $40.03 1H 5D TAMPER & SIMILAR ELECTRIC, AIR & GAS $40.77 1H 5D TAMPER (MULTIPLE & SELF PROPELLED) $40.77 1H 5D TOOLROOM MAN (AT JOB SITE) $40.03 1H 5D TOPPER- TAILER $40.03 1H 5D TRACK LABORER $40.03 1H 5D TRACK LINER (POWER) $40.77 1H 5D Page 4 CLALLAM COUNTY EFFECTIVE 09 -02 -2009 *************************************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code TRUCK SPOTTER $40.03 1H 5D TUGGER OPERATOR $40.77 1H 5D VIBRATING SCREED (AIR, GAS, OR ELECTRIC) $40.03 1H 5D VIBRATOR $40.77 1H 5D VINYL SEAMER $40.03 1H 5D WELDER $40.03 1H 5D WELL -POINT LABORER $40.77 1H 5D LABORERS - UNDERGROUND SEWER & WATER GENERAL LABORER & TOPMAN $40.03 1H 5D PIPE LAYER $40.77 1H 5D LANDSCAPE CONSTRUCTION IRRIGATION OR LAWN SPRINKLER INSTALLERS $12.89 1 LANDSCAPE EQUIPMENT OPERATORS OR TRUCK DRIVERS $12.89 1 LANDSCAPING OR PLANTING LABORERS $12.89 1 LATHERS JOURNEY LEVEL $48.47 1H 5D METAL FABRICATION (IN SHOP) FITTER/WELDER $15.16 1 LABORER $11.13 1 MACHINE OPERATOR $10.66 1 PAINTER $11.41 1 PAINTERS JOURNEY LEVEL $34.87 2B 6Z PLASTERERS JOURNEY LEVEL $25.83 1 PLAYGROUND & PARK EQUIPMENT INSTALLERS JOURNEY LEVEL $8.55 1 PLUMBERS & PIPEFITTERS JOURNEY LEVEL $64.84 1G 5A POWER EQUIPMENT OPERATORS ASPHALT PLANT OPERATOR $50.39 1T 5D 8P ASSISTANT ENGINEERS $47.12 1T 5D 8P BACKHOE, EXCAVATOR SHOVEL, OVER 50 METRIC TONS TO 90 METRIC $50.94 1T 5D 8P TONS BACKHOE, EXCAVATOR SHOVEL, OVER 90 METRIC TONS $51.51 1T 5D 8P BACKHOE, EXCAVATOR, SHOVEL, OVER 30 METRIC TONS TO 50 $50.39 1T 5D 8P METRIC TONS BACKHOE, EXCAVATOR, SHOVEL, TRACTORS UNDER 15 METRIC TONS $49.48 IT 5D 8P BACKHOE, EXCAVATOR, SHOVEL, TRACTORS 15 TO 30 METRIC TONS $49.90 1T 5D 8P BARRIER MACHINE (ZIPPER) $49.90 1T 5D 8P BATCH PLANT OPERATOR, CONCRETE $49.90 1T 5D 8P BELT LOADERS (ELEVATING TYPE) $49.48 1T 5D 8P BOBCAT (SKID STEER) $47.12 1T 5D 8P BROKK- REMOTE DEMOLITION EQUIPMENT $47.12 IT 5D 8P BROOMS $47.12 1T 5D 8P BUMP CUTTER $49.90 IT 5D 8P CABLEWAYS $50.39 1T 5D 8P CHIPPER $49.90 IT 5D 8P COMPRESSORS $47.12 1T 5D 8P CONCRETE FINISH MACHINE - LASER SCREED $47.12 IT 5D 8P CONCRETE PUMPS $49.48 IT 5D 8P CONCRETE PUMP -TRUCK MOUNT WITH BOOM ATTACHMENT $49.90 1 T 5D 8P Page 5 CLALLAM COUNTY EFFECTIVE 09 -02 -2009 *************************************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code CONCRETE PUMP -TRUCK MOUNT WITH BOOM ATTACHMENT OVER 42 $50.39 1T 5D 8P METERS CONVEYORS $49.48 1T 5D 8P CRANE, FRICTION 100 TONS THROUGH 199 TONS $51.51 1T 5D 8P CRANE, FRICTION OVER 200 TONS $52.07 IT 5D 8P CRANES, THRU 19 TONS, WITH ATTACHMENTS $49.48 1T 5D 8P CRANES, 20 - 44 TONS, WITH ATTACHMENTS $49.90 1T 5D 8P CRANES, 45 TONS - 99 TONS, UNDER 150 FT OF BOOM (INCLUDING JIB $50.39 1T 5D 8P WITH ATACHMENTS) CRANES, 100 TONS - 199 TONS, OR 150 FT OF BOOM (INCLUDING JIB $50.94 1T 5D 8P WITH ATTACHMENTS) CRANES, 200 TONS TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB $51.51 1T 5D 8P WITH ATTACHMENTS) CRANES, A- FRAME, 10 TON AND UNDER $47.12 1T 5D 8P CRANES, A- FRAME, OVER 10 TON $49.48 1T 5D 8P CRANES, OVER 300 TONS, OR 300' OF BOOM INCLUDING JIB WITH $52.07 1T 5D 8P ATTACHMENTS CRANES, OVERHEAD, BRIDGE TYPE (20 - 44 TONS) $49.90 IT 5D 8P CRANES, OVERHEAD, BRIDGE TYPE (45 - 99 TONS) $50.39 1T 5D 8P CRANES, OVERHEAD, BRIDGE TYPE (100 TONS & OVER) $50.94 1T 5D 8P CRANES, TOWER CRANE UP TO 175' IN HEIGHT, BASE TO BOOM $50.94 IT 5D 8P CRANES, TOWER CRANE OVER 175' IN HEIGHT, BASE TO BOOM $51.51 1T 5D 8P CRUSHERS $49.90 1T 5D 8P DECK ENGINEER/DECK WINCHES (POWER) $49.90 1T 5D 8P DERRICK, BUILDING $50.39 IT 5D 8P DOZER, QUAD 9, D -10, AND HD -41 $50.39 1T 5D 8P DOZERS, D -9 & UNDER $49.48 1T 5D 8P DRILL OILERS - AUGER TYPE, TRUCK OR CRANE MOUNT $49.48 1T 5D 8P DRILLING MACHINE $49.90 1T 5D 8P ELEVATOR AND MANLIFT, PERMANENT AND SHAFT -TYPE $47.12 1T 5D 8P EQUIPMENT SERVICE ENGINEER (OILER) $49.48 1T 5D 8P FINISHING MACHINE /BIDWELL GAMACO AND SIMILAR EQUIP $49.90 1T 5D 8P FORK LIFTS, (3000 LBS AND OVER) $49.48 1T 5D 8P FORK LIFTS, (UNDER 3000 LBS) $47.12 1T 5D 8P GRADE ENGINEER $49.90 1T 5D 8P GRADECHECKER AND STAKEMAN $47.12 1T 5D 8P GUARDRAIL PUNCH $49.90 IT 5D 8P HOISTS, OUTSIDE (ELEVATORS AND MANLIFTS), AIR TUGGERS $49.48 1T 5D 8P HORIZONTAUDIRECTIONAL DRILL LOCATOR $49.48 1T 5D 8P HORIZONTAUDIRECTIONAL DRILL OPERATOR $49 90 IT 5D 8P HYDRALIFTS /BOOM TRUCKS (10 TON & UNDER) $47.12 1T 5D 8P HYDRALIFTS /BOOM TRUCKS (OVER 10 TON) $49.48 1T 5D 8P LOADERS, OVERHEAD (6 YD UP TO 8 YD) $50.39 1T 5D 8P LOADERS, OVERHEAD (8 YD & OVER) $50.94 1T 5D 8P LOADERS, OVERHEAD (UNDER 6 YD), PLANT FEED $49.90 IT 5D 8P LOCOMOTIVES, ALL $49.90 IT 5D 8P MECHANICS, ALL $50.94 1T 5D 8P MIXERS, ASPHALT PLANT $49.90 1T 5D 8P MOTOR PATROL GRADER (FINISHING) $50 39 1T 5D 8P MOTOR PATROL GRADER (NON- FINISHING) $49.48 1T 5D 8P MUCKING MACHINE, MOLE, TUNNEL DRILL AND /OR SHIELD $50.39 1T 5D 8P OIL DISTRIBUTORS, BLOWER DISTRIBUTION AND MULCH SEEDING $47.12 IT 5D 8P OPERATOR PAVEMENT BREAKER $47.12 1T 5D 8P Page 6 CLALLAM COUNTY EFFECTIVE 09 -02 -2009 *************************************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code PILEDRIVER (OTHER THAN CRANE MOUNT) $49.90 1T 5D 8P PLANT OILER (ASPHALT, CRUSHER) $49.48 1T 5D 8P POSTHOLE DIGGER, MECHANICAL $47.12 1T 5D 8P POWER PLANT $47.12 1T 5D 8P PUMPS, WATER $47.12 1T 5D 8P QUICK TOWER -NO CAB, UNDER 100 FEET IN HEIGHT BASED TO BOOM $47.12 1T 5D 8P REMOTE CONTROL OPERATOR ON RUBBER TIRED EARTH MOVING $50.39 1T 5D 8P EQUIP RIGGER AND BELLMAN $47.12 IT 5D 8P ROLLAGON $50.39 1T 5D 8P ROLLER, OTHER THAN PLANT ROAD MIX $47.12 IT 5D 8P ROLLERS, PLANTMIX OR MULTILIFT MATERIALS $49.48 1T 5D 8P ROTO -MILL, ROTO- GRINDER $49.90 1T 5D 8P SAWS, CONCRETE $49.48 1T 5D 8P SCRAPERS - SELF PROPELLED, HARD TAIL END DUMP, ARTICULATING $50.39 1T 5D 8P OFF -ROAD EQUIPMENT (45 YD AND OVER) SCRAPERS, CONCRETE AND CARRY ALL $49.48 1T 5D 8P SCRAPER -SELF PROPELLED, HARD -TAIL END DUMP, ARTICULATING $49.90 1T 50 8P OFF -ROAD EQUIPMENT (UNDER 45 YARDS) SHOTCRETE GUNITE $47.12 1T 5D 8P SLIPFORM PAVERS $50.39 1T 5D 8P SPREADER, TOPSIDER & SCREEDMAN $50.39 1T 50 8P SUBGRADE TRIMMER $49.90 1T 5D 8P TOWER BUCKET ELEVATORS $49.48 1T 5D 8P TRACTORS, (75 HP & UNDER) $49.48 1T 5D 8P TRACTORS, (OVER 75 HP) $49.90 1T 5D 8P TRANSFER MATERIAL SERVICE MACHINE $49.90 1T 5D 8P TRANSPORTERS, ALL TRACK OR TRUCK TYPE $50.39 IT 5D 8P TRENCHING MACHINES $49.48 1T 5D 8P TRUCK CRANE OILER/DRIVER ( UNDER 100 TON) $49.48 IT 5D 8P TRUCK CRANE OILER/DRIVER (100 TON & OVER) $49.90 1T 5D 8P TRUCK MOUNT PORTABLE CONVEYER $49.90 1T 5D 8P WELDER $50.39 IT 5D 8P WHEEL TRACTORS, FARMALL TYPE $47.12 1T 5D 8P YO YO PAY DOZER $49.90 1T 5D 8P POWER EQUIPMENT OPERATORS- UNDERGROUND SEWER & WATER (SEE POWER EQUIPMENT OPERATORS) POWER UNE CLEARANCE TREE TRIMMERS JOURNEY LEVEL IN CHARGE $39.33 4A 5A SPRAY PERSON $37.24 4A 5A TREE EQUIPMENT OPERATOR $37.85 4A 5A TREE TRIMMER $35.21 4A 5A TREE TRIMMER GROUNDPERSON $26.58 4A 5A REFRIGERATION & AIR CONDITIONING MECHANICS MECHANIC $27.68 1 RESIDENTIAL BRICK & MARBLE MASONS JOURNEY LEVEL $46.35 1M 5A RESIDENTIAL CARPENTERS JOURNEY LEVEL $17.85 1 RESIDENTIAL CEMENT MASONS JOURNEY LEVEL $25.63 1 RESIDENTIAL DRYWALL TAPERS JOURNEY LEVEL $18.00 1 Page 7 CLALLAM COUNTY EFFECTIVE 09 -02 -2009 *************************************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code RESIDENTIAL ELECTRICIANS JOURNEY LEVEL $27.78 1 RESIDENTIAL GLAZIERS JOURNEY LEVEL $21.36 1 RESIDENTIAL INSULATION APPLICATORS JOURNEY LEVEL $9 86 1 RESIDENTIAL LABORERS JOURNEY LEVEL $18.08 1 RESIDENTIAL PAINTERS JOURNEY LEVEL $15.97 1 RESIDENTIAL PLUMBERS & PIPEFITTERS JOURNEY LEVEL $14.60 1 RESIDENTIAL REFRIGERATION &AIR CONDITIONING MECHANICS JOURNEY LEVEL $60.56 1G 5A RESIDENTIAL SHEET METAL WORKERS JOURNEY LEVEL (FIELD OR SHOP) $35.25 1R 6L RESIDENTIAL SOFT FLOOR LAYERS JOURNEY LEVEL $10.88 1 RESIDENTIAL SPRINKLER FITTERS (FIRE PROTECTION) JOURNEY LEVEL $19.67 1 RESIDENTIAL TERRAZZO/TILE SETTERS JOURNEY LEVEL $8.55 1 ROOFERS JOURNEY LEVEL $40.05 1R 5A USING IRRITABLE BITUMINOUS MATERIALS $43.05 1R 5A SHEET METAL WORKERS JOURNEY LEVEL (FIELD OR SHOP) $59.32 1E 6L SHIPBUILDING & SHIP REPAIR BOILERMAKER $32.56 1H 6W HEAT & FROST INSULATOR $48.28 1S 5J LABORER $12.16 1 MACHINIST $17.16 1 SHIPFITTER $14.66 1 WELDER/BURNER $14.66 1 SIGN MAKERS & INSTALLERS (ELECTRICAL) JOURNEY LEVEL $19.29 1 SIGN MAKERS & INSTALLERS (NON- ELECTRICAL) JOURNEY LEVEL $12.15 1 SOFT FLOOR LAYERS JOURNEY LEVEL $39.19 2X 5A SOLAR CONTROLS FOR WINDOWS JOURNEY LEVEL $10.31 1B 50 SPRINKLER FITTERS (FIRE PROTECTION) JOURNEY LEVEL $19.67 1 STAGE RIGGING MECHANICS (NON STRUCTURAL) JOURNEY LEVEL $13.23 1 STREET AND PARKING LOT SWEEPER WORKERS JOURNEY LEVEL $16 00 1 SURVEYORS CHAIN PERSON $9.35 1 INSTRUMENT PERSON $11.40 1 PARTY CHIEF $13.40 1 Page 8 4 CLALLAM COUNTY EFFECTIVE 09 -02 -2009 (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code TELECOMMUNICATION TECHNICIANS TELECOMMUNICATION TECHNICIANS JOURNEY LEVEL $34.09 1E 5A TELEPHONE LINE CONSTRUCTION - OUTSIDE CABLE SPLICER $32.27 2B 5A HOLE DIGGER/GROUND PERSON $18.10 2B 5A INSTALLER (REPAIRER) $30.94 2B 5A JOURNEY LEVEL TELEPHONE LINEPERSON $30.02 2B 5A SPECIAL APPARATUS INSTALLER I $32.27 2B 5A SPECIAL APPARATUS INSTALLER II $31.62 2B 5A TELEPHONE EQUIPMENT OPERATOR (HEAVY) $32.27 2B 5A TELEPHONE EQUIPMENT OPERATOR (LIGHT) $30.02 2B 5A TELEVISION GROUND PERSON $17.18 2B 5A TELEVISION LINEPERSON /INSTALLER $22.73 2B 5A TELEVISION SYSTEM TECHNICIAN $27.09 2B 5A TELEVISION TECHNICIAN $24.35 2B 5A TREE TRIMMER $30.02 2B 5A TERRAZZO WORKERS & TILE SETTERS JOURNEY LEVEL $45.26 1M 5A TILE, MARBLE & TERRAZZO FINISHERS FINISHER $39.09 1B 5A TRAFFIC CONTROL STRIPERS JOURNEY LEVEL $38.90 1K 5A TRUCK DRIVERS ASPHALT MIX ( TO 16 YARDS) $45.63 1T 5D 8L ASPHALT MIX (OVER 16 YARDS) $46.47 1T 5D 8L DUMP TRUCK $20.23 1 DUMP TRUCK & TRAILER $20.23 1 OTHER TRUCKS $46.47 1T 5D 8L TRANSIT MIXER $23.73 1 WELL DRILLERS & IRRIGATION PUMP INSTALLERS IRRIGATION PUMP INSTALLER $11.60 1 OILER $9.45 1 WELL DRILLER $11.60 1 Page 9 PRODUCER M.M. Fryer & Sons In Inc. P.O. Box 1347 Port Angeles WA, 98362 Phone :360 -457 -1144 Pax:360- 457 -9440 INSURED COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED NOTWITHSTANDING ANY REQUIREMENT. TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THrs CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES, AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS, IN wva LTA INSR[ TYPE OF INSURANCE GENERAL LIABILITY A X 1 COMMERCIAL GENERAL LIABILITY C173.22614 OEN'L AGGREGATE LIMIT APPLIES PER, POLICY 71 s'E,F F 1 LOC AUTOMOBILE LIABILITY ANY AUTO ALL OWNED AUTOS X SCHEDULED AUTOS X HIRED AUTOS X NON -OWNED AUTOS A 12/08/2009 13:49 3604579440 ,CORD CERTIFICATE OF LIABILITY INSURANCE OTHER Eden EXCavatlng, Inc. 4065 Men Valley Rd. Port Angeles WA 98362 I I CLAIMS MADE X OCCUR GARAGE LIABILITY ANY AUTO EXCEBSIUMBRELLA LIABILITY _, OCCUR Li CLAIMS MADE DEDUCTIBLE I RETENTION $ WORKERS COMPENSATION AND EMPLOYERS' UABILITY ANY PROPRIETOR/PARTNER /EXECUTIVE OFFICER /MEMBER ExCLUOED7 If es describe under SPECIAL PROVISIONS below CERTIFICATE HOLDER City of Port Angeles Attn: Terri Partch Fax #417. -4709 PO Box 1150 Port Angeles WA 98362 017122614 POLICY NUMBER WA STOP GAP C17122614 CITYOFP MM FRYER SONS INSURA OP ID C DATE (MM/OD/YYYY) EDENE -1 12/08/09 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. INSURERS AFFORDING COVERAGE NAIC # ` INSURER A' Liberty Northwest Insurance � 2 38 9 2 I INSURER B. INSURER C INSURER D I INSURER E POLICY EFFECTIVE TPDLICY EXPIRATION DATE IMMIDD/YY) I DATE IMM/DD1YYI DESCRIPTION OF OPERATIONS / LOCATIONS! VEHICLES I EXCLUSIONS ADDED BY ENDORSEMENT I SPECIAL PROVISIONS Operations of the above insured. EACH OCCURRENCE 02/19/09 02/19/10 PREMISES (Et occurence) 02/19/09 02/19/10 AUTHHO ZED REPRES AT tj COMBINED SINGLE LIMIT (Ea eccldent) BODILY INJURY (Per person) BODILY INJURY (Per acerdmi) AUTO ONLY, EACH OCCURRENCE AGGREGATE LIMITS MED EXP (Any one. person) PERSONAL & ADV INJURY GENERAL AGGREGATE PRODUCTS • COMP/OP AGG PROPERTY DAMAGE (Par eccldenl) AUTO ONLY - EA ACCIDENT I $ OTHER THAN EA ACC I S AGO IS PAGE 01/01 S 15 • 51000000 s100000 $ 5000 $1000000 $2000000 52000000 $ 1000000 $ IS 1$ H IS 1$ I IT WCS1Alu- OIH- ORYLIMITS ( I ER 02/19/09 02/19/10 LE L EACHACCIDENT $ 1000000 F E L DISEASE • EA EMPLOYEE 3 10 0 0 0 0 0 E L DISEASE - POLICYLIMIT I S 1000000 CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL 10 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, OUT FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR REPRESENTATIVES ACORD 25 (2001106) Cr:'1ACORD CORPORATION 1988 12- 10- 09;16:07 ; 4174542 Project Number: DR 03 -2009 Subcontractor or Lower Tier Subcontractor To be signed by proposed subcontractor or lower tier subcontractor The contract documents for this subcontract include the minimum prevailing wage rates. l certify the above statement to be true and correct. Company Lait.A. By - vl'` - t L ra Date ! - 1 in/n9 Title Contractor Certification To be completed and signed by the contractor I- [ 'A written agreement has been executed between my firm and the above subcontractor. 2. 0 A written agreement has been executed between (the subcontractor) and the above lower tier subcontractor, The contract documents for (I) or (2) marked above include the minimum prevailing wage rates. I certify the above statements under Contractor Certification to be true and correct. Company Eden CXCi h2 f # By v Title Di rea PW — 0407_25 (New 07/051 �_uu v �n�.r+V M I lIVV 111%, # 2/ 2 P u,kam 174 Contractor and Subcontractor or Lower Tier Subcontractor Certification for City of Port Angeles Projects (Required tar eel S b000vaotor of Lower Tice subooaenaar as an projects) Project Name: 4 Street Stormwater Improvements – Phase 1 Emergency Overflow Project Date /2- /0 _O/