Loading...
HomeMy WebLinkAbout228 W 11th St - BuildingpORTk gn Application Number Pin number Property Address ASSESSOR PARCEL NUMBER Application description Subdivision Name Property Use Property Zoning Application valuation Owner DURHAM THELMA/ 228 W 11TH ST PORT ANGELES (683) 3158 Permit BUILDING PERMIT NO PR FEE Additional desc Permit Fee 120 75 Plan Check Fee 00 Issue Date 11/29/04 Valuation 3200 Expiration Date 5/29/05 Qty Unit Charge Per Extension BASE FEE 92 75 2 00 14 0000 THOU BL -2001 25K (14 PER K) 28 00 Other Fees STATE SURCHARGE 4 50 Fee summary Charged Paid Credited Due Permit Fee Total 120 75 120 75 00 00 Plan Check Total 00 00 00 00 Other Fee Total 4 50 4 50 00 00 Grand Total 125 25 125 25 00 00 Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned for a period of 180 days after the work as commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give author' t T1t violate or cancel the provisions of any state or local law regulating construction or the performance of con s2 cti n. ture of Contractor o utho T•\PLANNING\FORMS \1102.15 [11/14/2003] CITY OF PORT ANGELES DEPARTMENT OF COMMUNITY DEVELOPMENT BUILDING DIVISION 321 EAST 5TH STREET PORT ANGELES, WA 98362 WA 98362 04 00001103 772741 228 W 11TH ST 06 30 00 0 3 4530 0000 RE ROOF zed Agent RS7 RESDNTL SINGLE FAMILY 3200 Contractor OWNER SEBRING /�2 /G V Date Date 11/29/04 FL kfitz°61 o 5 Z a s Signature of Owner (if owner is builder) Date ELECTRICAL LIGHT DEPT BUILDING PERMIT INSPECTION RECORD CALL 417 -4815 FOR BUILDING INSPECTIONS. CALL 417 -4735 FOR ELECTRICAL INSPECTIONS. PLEASE PROVIDE A MINIMUM 24 HOUR NOTICE. IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT IN A CONSPICUOUS LOCATION. KEEP PERMIT CARD AND APPROVED PLANS AT JOB SITE. INSPECTION TYPE DATE ACCEPTED COMMENTS YES I NO FOUNDATION: FOOTINGS I I I WALLS I I I FOUNDATION DRAINAGE/DOWN SPOUTS I I ELECTRICAL (LIGHT DEPT) SEPARATE PERMIT ROUGH -IN I I I PLUMBING UNDER FLOOR SLAB I I I ROUGH -IN I I I WATER LINE (METER TO BLDG) I I I GAS LINE I I I BACK FLOW WATER I I I AIR SEAL WALLS I I I CEILING I I I FRAMING JOISTS GIRDERS I I I SHEAR WALL/HOLD DOWNS I I I WALLS ROOF CEILING I I I DRYWALL (INTERIOR BRACED PANEL ONLY) I I I T -BAR I I I INSULATION SLAB I I I WALL FLOOR /,CEILING I I I MECHANICAL HEAT PUMP I I I GAS LINE I I I WOOD STOVE PELLET CHIMNEY I I I HOOD /DUCTS I I I PW UTILITIES SITE WORK (Engineering Division) SEPARATE PERMIT #'s: WATERLINE METER SEWER CONNECTION SANITARY STORM PLANNING DEPT SEPARATE PERMIT #'s PARKING/LIGHTING LANDSCAPING RESIDENTIAL I I I I I I I I I I I I SEPA. ESA. SHORELINE. FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE DATE YES NO COMMERCIAL DATE ACCEPTED YES I NO 417 -4735 ELECTRICAL LIGHT DEPT CONSTRUCTION KW PW/ CONSTRUCTION RW ENGINEERING 417 -4807 PW ENGINEERING FIRE 417 -4653 I I I I FIRE DEPT PLANNING DEPT 417 -4750 I I I I PLANNING DEPT I BUILDING 417 -4815 I I I I BUILDING T•\PLANNING\FORMS \1102.15 [11/14/2003] I I I I I I I I I Applicant or Agent: Owner. Address No. of Stories. Lot Size: PLANNING USE ONLY BUILDING PERMIT APPLICATION Fill out COMPLETELY and in INK. Your application and site plan MUST BE COMPLETE to be accepted for review If you have any questions, call PERMITS (360) 417 -4815 FAX(360)417 -4711 Existing Sq Ft. Total lot coverage T•\RV ES S\BLDG- forms- brochures\2003- Buildingpermit.wpd L.t LI "1 City. Zip Architect/Engineer. Phone Contractor P y State License Address. City PROJECT ADDRESS ,a_94?- (ter' 11 Tb LEGAL DESCRIPTION Lot: Block: CLALLAM COUNTY PARCEL NUMBER. ESA/Wetland(s) Yes No SEPA Checklist required? Yes No Other. Exp Subdivision. Proposed Sq. Ft. Phone Zip ZONING FOR OFFICIAL USE ONLY Date Rec. _/1 '1- i Permit Date Approved. Date Issued. -7-a Phone H 7 //t..c 6 ER- Phone !P S 3 -J( Credit Card Holder Name: Billing Address: City. Credit Card Type VISA MC Exp. Date: TYPE OF WORK. SIZE/VALUATION Residential New Constr X' Re -roof Stove SF /SF o Multi family Addition Move Garage SF /SF Commercial Remodel Demolition Deck SF /SF Repair Sign ❑Other TOTAL VALUATION -3 BRIEF DESCRIPTION OF THE PROJECT /r t c- 1 2Q.r lido -,S A. e- C .l C.0 /r), p COMMERCIAL/RESIDENTIAL. Occupancy Group. Occupant Load. Construction Type: TOTAL Sq Ft. APPROVALS. PLAN BLDG DPWU FIRE. OTHER. BUILDING PERMIT APPLICATION SUBMITTAL. The Building Division can provide you with information on the application and plan submittal requirements if you have questions. VALUATION OF CONSTRUCTION In all cases, a valuation amount must be entered by the applicant. This figure will be reviewed and may be revised by the Building Division to comply with current fee schedules. Contact the Permit Coordinator at 417 -4815 for assistance. PLAN CHECK FEE. IF a plan check fee is due it must be submitted at the time the building permit application and construction plans are submitted. All other.permit fees are_due at the time of.permit.issuance. EXPIRATION OF PLAN REVIEW If no permit is issued within 180 days of the date of application, the application will expire. The Building Official can extend the time for action by the applicant up to 180 days upon written request by the applicant (see Section R105.3.2 of the International Building/Residential Code, 2003) No application can be extended more than once. I hereby certify that I have read and examined this application and know the same to be true and correct. I am authorized to apply for this permit and understand that it is my responsibility to determine what permits are required ,not the City's, and tha I must obtaj ch permits prior to work. Applican �T Date. 1/2 rap