Loading...
HomeMy WebLinkAbout223 E 4th St Technical Boiler Project - BuildingTECHNICAL Permit Oq- 9 Address a22-3 fr\ Project description C .c,,w, Coun+y (30 or f e�l" P umbi ti le0164qtca. Date the permit was finaled to Number of technical pages 70 Clallam County Public Works Department Parks, Fair Facilities Division -OLD COURTHOUSE BOILER REPLACEMENT- -PHASE II- BOILER REPLACEMENT- 223 East 4` Street, Suite 7 PORT ANGELES WA 98362 PROJECT NUMBER. 620601CH June 2009 BOARD OF CLALLAM COUNTY COMMISSIONERS HOWARD V DOHERTY, JR., CHAIR STEPHEN P THARINGER MICHAEL C CHAPMAN Documents Prepared By Meulink Engineering, Inc. 108 N Washington, Suite 505 Spokane WA 99201 PH 509 624 1050 FX. 509 624 2420 PROJECT MANUAL cla TABLE OF CONTENTS Title COVER SHEET TABLE OF CONTENTS BIDDING REQUIREME DIVISION ZERO Section 00100 Section 00200 Section 00300 Section 00400 Section 00500 Section 00600 DIVISION ONE Section 01001 General Requirements Section 01100 Special Project Procedures Section 01070 Substantial Completion Form PREVAILING WAGES Clallam County DRAWINGS 11 X 17' NTS END OF TABLE OF CONTENTS Notice of Call for Bids. Instructions to Bidders Bid Proposal Form Supplemental Bid Forms Form of Agreement Between Owner Contractor General Conditions Table of Contents No. of Pages 1 1 1 5 2 9 2 15 5 6 1 9 12 Old Courthouse Boiler Replacement -Phase II June 2009 DIVISION ZERO Section 00100 CLALLAM COUNTY PARKS, FAIR FACILITIES DIVISION NOTICE OF CALL FOR BIDS Notice of Call for Bids SEALED BIDS will be received by the Board of Clallam County Commissioners 223 East Fourth Street, Room 150 Port Angeles, Washington until 10 a.m. on Tuesday, May 2009 for 20 -Old Courthouse Boiler Replacement -PHASE II- Complete drawings and specifications may be obtained from Clallam County Parks, Fair and Facilities Division of Public Works in the Old Courthouse. Room 180 Monday through Friday from 8:30 a.m. to 4 30 p m. All bidding and related questions should be directed to Bill Meulink at Meulink Engineering, Inc., 509.624.1050. The sealed bids must be clearly marked on the outside of the envelope, 'BID PROPOSAL -Old Courthouse Boiler Replacement Project -PHASE II." Address bid proposal to Board of Clallam County Commissioners, 223 East 4 Street, Suite 4 Port Angeles, Washington 98362 or hand deliver to 223 East 4th Street, Room 150 Port Angeles, Washington. Bid documents delivered to other offices and received late by the Commissioners' Office will not be considered nor will bids received by facsimile or e-mail. Clallam County hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises as defined in Title VI of the Civil Rights Act of 1964 at 49 CFR Part 23 will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color national origin, or sex in consideration for an award. Clallam County will determine the lowest responsible bidder in accordance with the terms of Clallam County Code Section 3.12.070 and reserves the right to reject any or all bids and to waive informalities in the process or to accept the bid, which in its estimation best serves the interests of Clallam County Construction Timeframe. July 14 through September 19 2009 There will be a mandatory on -site walk- through conducted Thursday, May 14 at 2:00 pm. All interested bidders are to meet in the Parks, Fair Facilities office prior to the walk- through, Room 180 �f�'' APPROVED this 2-d day of OV/ 2009 BOARD OF CL Howarct'V,Dohe t, Jr Chair ATTEST r>n5k t-fv Ids, UNTY COMMISSIONERS Trish Holden CMC Clerk of the Board Publish. May 3 and May 10 2009 (PDN) END OF SECTION 00100 Old Courthouse Boiler Replacement -Phase II June 2009 DIVISION ZERO Section 00200 INSTRUCTIONS TO BIDDERS ARTICLE 1 DEFINITIONS Instructions to Bidders 1 1 Bidding Documents include the Bidding Requirements and the proposed Contract Documents. Bidding Requirements include Advertisement and Notice of Call for Bids, Instructions to Bidders, Bid Forms, Sample Contract Forms, and Supplementary Instructions. Contract documents consist of Agreement or Contract Form between Owner and Contractor Conditions of the Contract including General, Supplementary Drawings, Plans, Specifications and all Addenda issued prior to execution of the Contract. 1.2 Addenda are written or graphic instructions issued by the Owner or Owner's representative Engineer which modify or interpret the Bidding Documents by additions, deletions, clarifications or corrections. 1 3 A Bid is a properly completed and signed proposal to do the work for sums stipulated and submitted in accordance with the Bidding Documents. 1 4 The Base Bid is the sum stated in the Bid for which the Bidder offers to perform work described as the base to which work may be added or deleted for sums stated in Alternate Bids. 1 5 An Alternate Bid is an amount stated in the Bid to be added or deducted from the Base Bid if Alternate work is accepted. 1 6 A Unit Price is an amount stated in the Bid as a price per unit for materials, equipment, or service as described in Bidding Documents. 1 7 A Bidder is a person or entity who submits a Bid 1 8 A Sub bidder is a person or entity who submits a bid to a Bidder for materials, equipment or labor for a portion of work. ARTICLE 2 BIDDER'S REPRESENTATION 2.1 By making a Bid, the Bidder represents that the Bidder has visited the site and become familiar with local conditions under which the work is to be performed has read and understands all Bidding and Contract Documents, and correlated personal observations with the requirements of the proposed contract documents. Site visits shall be as stated on Notice of Call for Bids. 2.2 The Bid is based upon materials, equipment, labor and systems required by the Bidding Documents without exception. ARTICLE 3 BIDDING DOCUMENTS 3 1 1 Bidders may obtain complete sets of Bidding Documents from the office designated in the Advertisement or Notice of CaII for Bids in the number and for the deposit sum if any stated therein (limit of 2 sets per contractor) The deposit sum will be refunded to Bidders who submit a bonafide Bid and return Bidding Documents in good condition within ten days after receipt of Bids. A bidder receiving the Contract Award may retain Documents and deposit will be returned. 3 1.2 Bidders shall use complete sets of Bidding documents in preparing Bids; neither Owner nor Owner's representative Engineer assumes responsibility for errors or misrepresentations resulting from use of incomplete Bidding Documents. Old Courthouse Boiler Replacement -Phase II June 2009 DIVISION ZERO Section 00200 3.1 3 In making copies of the Bidding Documents available, the Owner and /or Owner's representative Engineer do so for the purpose of obtaining Bids and do not confer a license or grant permission for any other use of the Bidding Documents. 3.1 4 Copies of bidding documents and specs are available for review in Parks Office, Room 180 in the Old Courthouse. 3.2 Interpretation or correction of Bidding Documents Instructions to Bidders 3.2.1 The Bidder shall carefully examine the Bidding Documents, examine the site and local conditions, and compare them with other work being bid concurrently or presently under construction to the extent that it relates to work being Bid, and shall at once report to the Owner and /or Owner's representative Engineer errors, inconsistencies, or ambiguities discovered. 3.2.2 The Bidder and sub bidders requiring clarification or interpretation of the Bidding Documents shall make a written request to Owner and /or Owner's representative Engineer at least seven days prior to the date of receipt of Bids. 3.2.3 Changes in the Bidding Documents will be made by Addendum and changes made in any other manner will not be binding and Bidders shall not rely upon them. 3 3 Substitutions 3.3.1 The materials, equipment, products described in the Bidding Documents establish a standard of function, dimension, appearance and quality to be met by any substitution. 3.3.2 No substitution will be considered prior to receipt of Bids unless written request for approval has been received by Owner or Owner's representative Engineer at least ten days prior to the date for receipt of Bids. Such requests shall include the name of the materials or equipment for which it is to be substituted and a complete description of the proposed substitution including drawings, performance and test data, and other information necessary for an evaluation. A statement setting forth changes in other materials, equipment or other portions of the Work including changes in the work of other contractors that incorporation of the proposed substitution would require, shall be included The burden or proof of the merit of the proposed substitution is upon the proposer The Owner's decision of approval or disapproval of a proposed substitution shall be final. 3 3 3 If the Owner approves a proposed substitution prior to receipt of Bids, such approval will be set forth in an Addendum. Bidders shall not rely upon approvals made in any other manner 3.3 4 No substitutions will be considered after the Contract award unless specifically provided in the Contract Documents. 3 3 5 Should any proposed product substitution require any redesign work by the Owner and /or Engineer or his consultations to accommodate the substitute product, costs for such redesign work shall be included in the Bid amount and shall be paid to the Engineer or Owner at his usual rates for the time expended in the required redesign work. ARTICLE 4 BIDDING PROCEDURES 4 1 1 Bids shall be submitted on forms identical to ones included in the Bidding Documents, shall have all blanks filled out in ink (typed or manually)* with sums expressed in words and figures where indicated with words governing; and all alternates and unit prices bid. If alternates do not change Base Bid, enter no change' Old Courthouse Boiler Replacement -Phase II June 2009 DIVISION ZERO Section 00200 Instructions to Bidders 4 1.2 Interlineations, alterations and erasures must be initialed by signer of the Bid. 4 1 3 Bid shall include legal name of Bidder and a statement that the Bidder is a sole proprietor partnership corporation or other legal entity Each copy shall be signed by the person or persons legally authorized to bind the Bidder to a Contract. A Bid by a corporation shall give the state of incorporation or corporate seal affixed. A Bid submitted by an agent shall have a current power of attorney attached certifying the agent's authority to bind the Bidder 4.2 Bid security 4.2.1 If so stated in the Advertisement or Notice Call for Bids, or in Bidding Documents, each Bid shall be accompanied by a bid security in a.) cash b cashier's check/money order c.) certified check, or d.) Surety Bond in the amount of 5% of the total Bid amount. Bid security shall be in form required, pledging that the Bidder will enter a Contract with the Owner on the terms stated in the Bid and will furnish bonds covering the faithful performance of the Contract and payment of all obligations arising thereunder Bid security of the lowest three Bidders may be retained by Owner for a period not to exceed 30 days following opening of Bids. All other Bidders securities shall be returned within ten days of date of receipt of bids. Should Bidder fail to enter into a Contract or furnish bonds where required the amount of Bid Security shall be forfeited to the Owner as liquidated damages, not as a penalty 4.2.2 Surety Bond shall be written on required forms and the attorney -in -fact who executes the bond shall affix to the Bond a certified and current copy of the power -of- attorney 4 3 Submission of bids 4 3 1 Bids, Bid Security and other documents required to be submitted with the Bid shall be enclosed in a sealed opaque envelope marked with the notation `BID PROPOSAL with project name clearly marked on the outside of the envelope. The envelope shall be addressed to the party receiving the Bids as identified in the Advertisement or Notice Call for Bids and include the Bidder's name and address. If the Bid is sent by mail the sealed envelope shall be enclosed in a separate mailing envelope with notation BID PROPOSAL ENCLOSED' and the project name on the face thereof 4 3.2 Bids shall be deposited at the designated location prior to the time and date for receipt of Bids. Bids received after time and date will be returned unopened. The Bidders shall assume full responsibility for timely delivery at location designated for receipt of Bids. 4 3 3 Oral, telephone, telegraphic, or fax Bids are invalid and will not receive consideration. 4 4 Modification or withdrawal of Bid 4 4 1 A Bid may not be modified, withdrawn or canceled by the Bidder during the stipulated time period of thirty days following the time and date designated for the receipt of Bids, and each Bidder so agrees in submitting a Bid 4 4.2 Prior to the time and date designated for receipt of Bids, a Bid submitted may be modified or withdrawn by notice to the party receiving Bids at the place designated for receipt of Bids. Such notice shall be in writing over the signature of the Bidder or by telegram if by telegram written confirmation over the signature of the Bidder shall be mailed and postmarked on or before the date and time set for receipt of Bids. A change shall be so worded as not to reveal the amount of the original Bid. 4 4 3 Withdrawn Bids may be resubmitted up to the date and time designated for the receipt of Bids provided that they are then fully in conformance with these instructions to Bidders. 4 4 4 Bid Security if required, shall be in an amount sufficient for the Bid as modified or resubmitted. Old Courthouse Boiler Replacement -Phase II June 2009 DIVISION ZERO Section 00200 ARTICLE 5 CONSIDERATION OF BIDS 5 4 Bid award Instructions to Bidders 5 1 Bids received on time and properly identified will be opened and read aloud at the Board of Commissioners meeting held immediately after the time and date for receipt of Bids as advertised in Notice Call for Bids. 5.2 The Owner shall have the right to reject any or all Bids, reject a Bid not accompanied by a required Bid Security or by other data required by the Bidding Documents, or reject a Bid which is in any way incomplete or irregular 5 3 The Owner may determine that a Bidder is not responsible and reject his proposal for any of the reasons found in Clallam County Code Chapter 3 12. 5 4 1 It is the intent of the Owner to award a Contract to the lowest responsible Bidder provided the Bid has been submitted in accordance with the requirements of the Bidding Documents and does not exceed the funds available The Owner shall have the right to waive informalities or irregularities in a Bid received and to accept the Bid which, in the Owners judgment, is in the Owner's best interests. 5 4.2 The Owner shall have the right to accept Alternates in any order or combination, unless otherwise specifically provided in the Bidding Documents, and to determine the low Bidder on the basis of the sum of the Base Bid and Alternates accepted. ARTICLE 6 POST BID INFORMATION 6 1 Contractor's Qualification Statement Bidders to whom award of a Contract is under consideration shall submit to the Owner or Owner's representative Engineer upon request, a properly executed Contractor's Qualification Statement in the form requested by the Owner 6.2.1 Submittals The Bidder shall, within three days of notification of selection for the award of a Contract, furnish the Owner or Owner's representative Engineer in writing if not required to be included on the Bid Proposal Form. 1 Work to be performed by Bidders own forces 2. A complete list of sub bidders or sub contractors to be used to complete this project 3. Name of project superintendent or foreman to be used 4 Names of manufacturers, products, and supplies of principal items or systems proposed for the Work. 6.2.2 Prior to award of the Contract, the Owner or Owner's representative Engineer will notify Bidder if Owner has a reasonable objection to a person or entity proposed by Bidder If Owner has an objection, the Bidder may (1) withdraw the Bid, or (2) submit an acceptable substitute person or entity with an adjustment in the Base Bid or Alternate Bid to cover the difference in cost, if any occasioned by the substitution. The Owner may accept the adjusted bid price or disqualify the Bidder In the event of withdrawal or disqualification, the Bid Security will not be forfeited. 6.2.3 Persons and entities proposed by the Bidder and to whom the Owner has made no reasonable objection must be used on the work for which they were proposed and shall not be changed except with the written consent of the Owner 6.2.4 A copy of Contractor's UBI Certification shall be submitted with the signed agreement. Old Courthouse Boiler Replacement -Phase II June 2009 DIVISION ZERO Section 00200 ARTICLE 7 PERFORMANCE AND PAYMENT BOND 7 1 Bond requirements Instructions to Bidders 7 1 1 The Bidder shall furnish bonds covering faithful performance and payment of all obligations as described in the Bidding Documents and all bonds shall be paid for by the Bidder and costs shall be included in Bid. 7.2 Time of delivery and form of bonds 7.2.1 The Bidder shall deliver the required bonds to the Owner not later than three days following the date of execution of the Contract. If the Work is to be commenced prior thereto in response to a letter of intent, the Bidder shall, prior to commencement of the Work, submit evidence satisfactory to the Owner that such bonds will be furnished and delivered in accordance with this Subparagraph 7.2.1 7.2.2 Unless otherwise provided the bonds shall be written on forms provided by Owner Performance Bond and Payment Bond. Both bonds shall be written in the amount of the Contract Sum plus sales tax. 7.2.3 The bonds shall be dated on or after the date of the Contract. 7.2.4 The Bidder shall require the attorney -in -fact who executes the required bonds on behalf of the surety to affix thereto a certified and current copy of the power of attorney ARTICLE 8 FORM OF AGREEMENT 8 1 Form to be used 8 1 1 The Agreement for the Work shall be the completed sample included in the Bidding Documents and shall be signed by the Bidder within ten days of notice by the Owner of award of Contract to the Bidder END OF SECTION 00200 Old Courthouse Boiler Replacement -Phase 11 June 2009 DIVISION ZERO Section 00300 BID PROPOSAL FORM Project Name Old Courthouse Boiler Replacement Project Number 620601CH To: CLALLAM COUNTY PARKS FAIR FACILITIES DIVISION Submission of this bid proposal certifies that the Undersigned has examined the project site and the conditions of work; and has carefully read and thoroughly understands the Bidding Documents governing the work embraced in this project, and the method by which payment will be made for said work. The Undersigned hereby proposes to undertake and complete the work embraced in this project in accordance with said Bidding Documents and agrees to accept as payment for said work the amounts indicated below under Bid Proposal. The base bid shall include all work except that indicated in the Alternates. The Undersigned acknowledges that payment will be based on the actual work performed, as measured or provided for in accordance with the said contract documents; Base Bid, Alternates and Unit Prices shall not include State of Washington Sales Tax. Contractor shall pay state sales tax and the County will pay appropriate sales tax to the contractor Appropriate sales tax is to be added to invoice amounts after award of bid BASE BID PROPOSAL BASE BID AMOUNT OF ALTERNATES. Circle one: ADD DEDUCT ALTERNATE #1 Provide insulation for all steam piping and replace existing with new dollars Circle one. ADD DEDUCT ALTERNATE #2 Direct Digital Control (DDC) System. UNIT PRICING. UNIT PRICE #1 Provide per cubic yard (cy) price for excavation dollars dollars dollars Bid Proposal Form Old Courthouse Boiler Replacement -Phase II June 2009 DIVISION ZERO Section 00300 Bid Pr000sal Form CONTRACTOR'S CERTIFICATION OF BIDDING CONTRACT DOCUMENTS By signing this form, the Contractor certifies that based on the Contractor's knowledge and review that the Contractor finds the Bidding Contract Documents sufficiently complete and in sufficient detail to perform the work required. NON COLLUSION STATEMENT By signing this proposal, the Contractor certifies that he /she has not participated in any collusion, or otherwise taken action in restraint of free competitive bidding in connection with this project for which this proposal is submitted. NON DISCRIMINATION The Contractor hereby agrees to not discriminate against any person on the basis of race, creed, political ideology color national origin, sex, marital status, sexual orientation, age or presence of any sensory mental or physical disability INDEPENDENT CONTRACTOR STATEMENT The Contractor certifies that services shall be furnished by the Contractor as an independent contractor and nothing herein contained shall be construed to create a relationship of employer /employee or master /servant, but all payments made hereunder and all services performed shall be made and performed pursuant to this Agreement by the Contractor ADDENDA Receipt of Addenda(s) numbered is hereby acknowledged and all costs of the Work therefore have been included in the Bid Proposal. BIDDER NAME AND SIGNATURE The name of the Bidder submitting this proposal, the address and phone number to which all communications concerned with this proposal shall be made, and the number which has been assigned indicating the Bidder is licensed to do business in the State of Washington are as follows. Firm Name Address: Telephone Contractor's License No Exp.Date The firm submitting this proposal is a: Sole Proprietorship Corporation Partnership The names and titles of the principal officers of the corporation submitting this proposal, or of the partnership or of all persons interested in this proposal as principals are as follows: SIGNATURE OF AUTHORIZED OFFICIAL(S) (PROPOSAL MUST BE SIGNED) END OF SECTION 00300 FIRM NAME (Seal) Old Courthouse Boiler Replacement -Phase II June 2009 DIVISION ZERO Section 00400 ARTICLE 1 STATEMENT OF BIDDER'S QUALIFICATIONS When requested by the Owner Contractor shall complete and submit the below information within three days of notification by Owner 1 Name of Bidder 2. Business Address: 3 How many years has said bidder been engaged in the contracting business under the present firm name? 4 Contracts now in hand (Gross Amount). 5 General character of work performed by said company 6 List of more important projects constructed by said company including approximate costs and dates: 7 List of company's major equipment: 8 Bank references: 9 Department of Labor and Industries Firm No 10 Department of Revenue Registration: Name of Bidder By Title Date Suoolemental Bid Forms Old Courthouse Boiler Replacement -Phase II June 2009 DIVISION ZERO Section 00400 ARTICLE 2 STATEMENT OF PROPOSED SUB CONTRACTORS AND MAJOR MATERIAL SUPPLIERS The Contractor shall submit a complete list of all major material suppliers and a sub contractor's list within three days of notification of Bid award or upon request by the Owner to provide it. SUB CONTRACTOR'S LIST NAME ADDRESS DESCRIPTION OF WORK/MATERIAL MATERIAL SUPPLIERS LIST Supplemental Bid Forms MATERIAL SUPPLIERS DESCRIPTION OF WORK/MATERIAL Old Courthouse Boiler Replacement -Phase II June 2009 1 1 DIVISION ZERO Section 00400 ARTICLE 3 RETAINAGE INVESTMENT OPTION DECLARATION CONTRACTOR. PROJECT NAME. Old Courthouse Boiler Replacement -Phase II DATE. Supplemental Bid Forms Pursuant to RCW 60.28.010 as amended you may choose how your Retainage under this contract will be held and invested. Please complete and sign this form indicating your preference. If you fail to do so the County will hold your Retainage as described in 'Current Expense" Option 1 below 1 Current Expense: The County will retain the money in its Current Expense Fund Account until thirty days following final acceptance of the improvement or work as completed. You will not receive interest earned on this money 2. Interest Bearing Account: The County will deposit Retainage checks in an interest bearing account in a bank, mutual savings bank, or savings and loan association, not subject to withdrawal until after the final acceptance of the improvement or work is completed or until agreed to by both parties. Interest on the account will be paid to you. 3 Escrow /Investments: The County will place the Retainage checks in escrow with a bank or trust company until thirty days following the final acceptance of the improvement or work as completed. When the moneys reserved are to be placed in escrow the County will issue a check representing the sum of the moneys reserved payable to the bank or trust company and you jointly This check will be converted into bonds and securities chosen by you and approved by the County and these bonds and securities will be held in escrow Interest on these bonds and securities will be paid to you as interest accrues. 4 The Contractor may at his /her option choose to not submit a performance bond and agrees to a 50% Retainage in lieu of a performance bond. Retainage to be released when Contract is complete and all paperwork submitted. (Pertains to projects under $25 000 00 only) Retainage is normally released 30 -40 days after final acceptance of work by the County or following receipt of Labor and Industries Department of Revenue clearance, whichever takes longer (Contractor's Signature) (Title) Old Courthouse Boiler Replacement -Phase II June 2009 DIVISION ZERO Section 00400 ARTICLE 4 PERFORMANCE AND PAYMENT BOND FORM PERFORMANCE BOND FOR Bond No. CLALLAM COUNTY. WASHINGTON Supplemental Bid Forms WE d /b /a (insert legal name of uontractor) (insert traae name or Contractor if any) (hereinafter 'Principal and (hereinafter 'Surety"), are held and firmly bound unto CLALLAM COUNTY, WASHINGTON (hereinafter 'County") as Obligee, in an amount (in lawful money of the United States of America) equal to the total compensation and expense reimbursement payable to Principal for satisfactory completion of Principal's work under Contract No between Principal and County which total is initially Dollars for the payment of which sum Principal and Surety bind themselves, their executors, administrators, legal representatives successors and assigns, jointly and severally firmly by these presents. Said contract (hereinafter referred to as the Contract is for and is made a part hereof by this reference. The Contract includes the original agreement as well as all documents attached thereto or made a part thereof and amendments, change orders, and any other document modifying adding to or deleting from said Contract any portion thereof This Bond is executed in accordance with the laws of the State of Washington, and is subject to all provisions thereof and the ordinances of County insofar as they are not in conflict therewith, and is entered into for the use and benefit of County and all laborers, mechanics, subcontractors, and materialmen, and all persons who supply such person or persons, or subcontractors, with provisions or supplies for the carrying on of the work covered by Contract No. between the below -named Contractor and County for a copy of which Contract, by this reference is made a part hereof and is hereinafter referred to as 'the Contract. (The Contract as defined herein includes the aforesaid agreement together with all of the Contract documents including addenda, exhibits, attachments, modifications, alterations, and additions thereto deletions therefrom amendments and any other document or provision attached to or incorporated into the Contract) THE CONDITION OF THIS OBLIGATION is such that if Contractor shall promptly and faithfully performs the Contract, then this obligation shall be null and void; otherwise it shall remain in full force and effect. THE PARTIES FURTHER ACKNOWLEDGE AGREE AS FOLLOWS (1) Surety hereby consents to, and waives notice of any alteration, change order or other modification of the Contract and any extension of time made by County except that any single or cumulative change order amounting to more than twenty-five percent (25%) of the penal sum of this bond shall require Surety's written consent. (2) Surety recognizes that the Contract includes provisions for additions, deletions, and modifications to the work or Contract Time and the amounts payable to Contractor Subject to the limitations contained in paragraph (1) above, no such change or any combination thereof shall void or impair Surety's obligation hereunder (3) Whenever County has declared Contractor to be in default and County has given Surety written notice of such declaration, Surety shall promptly (in no event more than thirty [30] days following receipt of such notice), specify in written notice to County which of the following actions Surety intends to take to remedy such default, and thereafter shall: (a) Remedy the default within fifteen (15) days after its notice to County as stated in such notice; or (b) Assume within fifteen (15) days following its notice to County full responsibility for the completion of the Contract in accordance with all of its provisions, as stated in such notice, and become entitled to payment of the balance of the Contract sum as provided in the Contract; or (c) Pay County upon completion of the Contract, in cash, the cost of completion together with all other reasonable costs and expenses incurred by County as a result of Contractor's default, including but not limited to those incurred by County to mitigate its losses, which may include but are not Old Courthouse Boiler Replacement -Phase II June 2009 DIVISION ZERO Section 00400 SuDolemental Bid Forms limited to attorneys' fees and the cost of efforts to complete the work prior to Surety's exercising any option available to it under this Bond; or (d) Obtain a bid or bids for completing the Contract in accordance with its terms and conditions, and upon a determination by County and Surety jointly of the lowest responsible bidder arrange for one or more agreements between such bidder and County and make available as work progresses (even though there is a default or a succession of defaults under such agreement(s) for completion arranged for under this paragraph) sufficient funds to pay the cost of completion less the balance of the Contract price, but not exceeding, including other costs and damages for which Surety may be liable hereunder the penal sum of this Bond. The term 'balance of the Contract price, as used in this paragraph, shall mean the total amount payable by County to Contractor under the Contract, less the amount properly paid by County to Contractor (4) If County commences suit and obtains judgment against Surety for recovery hereunder then Surety in addition to such judgment, shall pay all costs and attorneys' fees incurred by County in enforcement of County's rights hereunder The venue for any action arising out of or in connection with this bond shall be in Clallam County Washington (5) No right or action shall accrue on this Bond to or for the use of any person or corporation other than Clallam County and to the extent required under RCW Ch. 39 all laborers, mechanics, subcontractors, and materialmen, and all persons who supply such person or persons, or subcontractors, with provisions or supplies for the carrying on of the work covered by the Contract. (6) No rider amendment or other document modifies this Bond except as follows, which is hereby incorporated herein. (7) Surety shall give to Principal and to County not less than sixty (60) days prior written notice by certified mail, return receipt requested of the effective date of the expiration or cancellation of this bond. (8) Principal must provide County with a replacement bond, acceptable to County not Tess than thirty (30) days before the effective date of this bond's expiration or cancellation as specified in the Surety's notice provided pursuant to Condition (7) (9) If Principal fails to provide the replacement bond not less than thirty (30) days before the effective date of this bond's expiration or cancellation as specified in the Surety's notice provided pursuant to Condition (7) above, such failure shall constitute a default under this bond for which County may make a claim, and Surety shall be obligated to make immediate payment under this bond of all sums. SURETY'S QUALIFICATIONS Every Surety named on this bond must appear on the United States Treasury Department's most current list (Circular 570 as amended or superseded) and be authorized by the Washington State Insurance Commissioner to transact business as a surety in the State of Washington. In addition, the Surety must have a current rating of at least A- VII in A. M. Best's Key Ratina Guide. INSTRUCTIONS FOR SIGNATURES: This bond must be signed by the president or a vice president of a corporation; the managing general partner of a partnership' managing joint venturer of a joint venture; manager of a limited liability company or if no manager has been designated, a member of such LLC a general partner of a limited liability partnership; or the owner(s) of a sole proprietorship. If the bond is signed by any other representative, the Principal must attach currently- dated, written proof of that signer's authority to bind the Principal, identifying and quoting the provision in the corporate articles of incorporation, bylaws, Board resolution, partnership agreement, certificate of formation, or other document authorizing delegation of signature authority to such signer and confirmation acceptable to the County that such delegation was in effect on the date the bond was signed. A NOTARY PUBLIC MUST ACKNOWLEDGE EACH SIGNATURE BELOW Old Courthouse Boiler Replacement -Phase II June 2009 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 DIVISION ZERO Section 00400 FOR THE SURETY FOR THE PRINCIPAL. By By (signature of Attomey -in -ract) (t ype or punt name or Attorney -In -tact) (1 ype or pnm1 1 none number or orney- in-FEt) STATE OF ss: ACKNOWLEDGMENT FOR CONTRACTOR COUNTY OF (signature of Notary Public) Notary Public in and for the State of My commission expires STATE OF COUNTY OF (signature or Notary Public) Notary Public in and for the State of My commission expires ss: nn or type name of Notary Public) residing at ACKNOWLEDGMENT FOR SURETY nn or type name or Notary Public) residing at Supplemental Bid Forms (signature of aumonzea signer Tor contractor) (1 ype or pnnt name 01 signer ror contractor) (type or pant oue or signer ror contractor) On this day of before me a notary public in and for the State of duly commissioned and sworn, personally appeared the person described in and who executed the foregoing bond, and acknowledged to me that signed and sealed said bond as the free and voluntary act and deed of the Contractor so identified in the foregoing bond for the uses and purposes therein mentioned, and on oath stated that is authorized to execute said bond for the Contractor named therein. WITNESS my hand and official seal hereto affixed the day and year in this certificate first above written. SEAL 4 On this day of before me a notary public in and for the State of duly commissioned and sworn, personally appeared Attorney -in -Fact for the Surety that executed the foregoing bond, and acknowledged said bond to be the free and voluntary act and deed of the Surety for the uses and purposes therein mentioned, and on oath stated that is authorized to execute said bond on behalf of the Surety and that the seal affixed on said bond or the annexed Power of Attorney is the corporate seal of said Surety WITNESS my hand and official seal hereto affixed the day and year in this certificate first above written. SEAL4 Old Courthouse Boiler Replacement -Phase II June 2009 1 1 1 1 1 1 1 1 1 State of I County of 1 1 1 In witness whereof I have hereunto set my hand and affixed my official seal the day and year first above written. I (CORPORATE SEAL) (Contractor's Signature) (Title) 1 Notary Public in and for the State of Washington Residing at 1 1 1 1 DIVISION ZERO Section 00400 ARTICLE 5 INDUSTRIAL INSURANCE PREMIUMS AND CONFESSION OF JUDGMENT 1 The contractor shall pay and is responsible for payment of all industrial insurance premiums that become due and payable to the Washington State Department of Labor and Industries (Department) pursuant to Title 51 RCW whether such premiums are attributable to the contractor or its subcontractors. 2. In the event that Clallam County is required to make industrial insurance premiums to the Department due to the failure, neglect or refusal of the contractor to make payment as required herein the contractor authorizes Clallam County to take judgment against it, and the contractor hereby confesses judgment, in the amount which Clallam County is required to pay the Department pursuant to Title 51 RCW to satisfy contractor's liabilities hereunder The contractor confesses judgment in an amount equal to the entire industrial insurance premium liability due to the Department on behalf of the contractor and its subcontractors hereunder less any premium payments previously made to the Department by the contractor 3 The contractor expressly agrees that the amount confessed herein was expressly negotiated and that the amount due to Clallam County for satisfying contractor's obligations to the Department hereunder is due, justly due or to become due. 4 Until such time as Clallam County is actually reimbursed for industrial insurance premiums paid to the Department due to the failure, neglect or refusal of the contractor to meet its obligations hereunder the contractor shall be debarred from bidding on any projects for which Clallam County solicits bids. Corporate. ss 1 Suoolemental Bid Forms On this day of 20 before me personally appeared to me known to be the (president, vice president, secretary treasurer or other authorized officer or agent, as the case may be) of the corporation that executed the within and foregoing instrument, and acknowledged said instrument to be the free and voluntary act and deed of said corporation, for the uses and purposes therein mentioned, and on oath stated that he was authorized to execute said instrument and that the seal affixed is the corporate seal of said corporation. Old Courthouse Boiler Replacement -Phase 11 June 2009 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 DIVISION ZERO Section 00400 State of County of Individual: ss Suoolemental Bid Forms On this day personally appeared before me to me known to be the individual, or individuals described herein and who executed the within and foregoing instrument, and acknowledged that he (she or they) signed the same as his (her or their) free and voluntary act and deed, for the uses and purposes therein mentionec Given under my hand and official seal this day of 20 Notary Public in and for the State of Washington Residing at (Contractor's Signature) (Title) Old Courthouse Boiler Replacement -Phase II June 2009 DIVISION ZERO Section 00400 ARTICLE SIX INSURANCE CERTIFICATE FORM 05.07.08 PW -ROADS INSURED (Legal name and business address) CLALLAM COUNTY WASHINGTON PUBLIC WORKS DEPARTMENT COURTHOUSE 223 EAST FOURTH ST. STE. 7 PORT ANGELES, WA 98362 PROJECT DESCRIPTION LOCATIONS VEHICLES RESTRICTIONS SPECIAL ITEMS. This is to certify that policies of Insurance listed below have been issued to the Insured named above for the policy period indicated. CO TYPE OF INSURANCE POI.ICY NUMBER Date Policy Date Policy LTR Effective Expires (MM/DD/YY) (MM/DD/YY) GENERAL LIABILITY Commercial General Liability Claims Made Occurrence Owner s Contractors Protection Deductible S AUTOMOBILE LIABILITY Any Auto All Owned Autos Scheduled Autos hired Autos Non -Owned Autos Garage Liability Deductible S EXCESS LIABILITY Other Than Umbrella Form WORKERS COMPENSATION AND EMPLOYER'S LIABILITY OTHER (11) CLALLAM COUNTY, WA CERTIFICATE OF INSURANCE THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER TI IE COVERAGE AFFORDED BY THE POLICIES BELOW CERTIFICATE HOLDER. CONTRACT NUMBER ALL LIMITS IN THOUSANDS General Aggregate Products Comp/Ops Aggregate Personal Advertising Iniury Each Occurrence Fire Damage (Any One Fire) Medical Expense Any One Person) CSL S Bodily Injury (per person) Bodily Injury (per accident) Property Damage S Each Occurrence Supplemental Bid Forms DATE ISSl1ED: J I J S d S IS I s I5 I 5 Aggregate S S STATUTORY S (Each Accident) S (Disease Policy Limit) S (Disease -Each Employee) ADDITIONAL PROVISIONS CLALLAM COUNTY is included as additional insured as related to the above mentioned project. Should any of the above described policies be cancelled before the expiration date thereof, the issuing Company must deliver or mail not less than a 45 days written notice to the above Certificate !(older, per RCW 48.18.290 COMPANIES AFFORDING COVERAGE ISSUING COMPANY AGENT OR REPRESENTATIVE NOTE: Attach a separate sheet to this certificate giving all the company names and their percentage of coverage, if clarification is needed, A ADDRESS. B C D E END OF SECTION 00400 NAME: Authorized Signature Title Signature Date Signee Name Telephone No. Old Courthouse Boiler Replacement -Phase II June 2009 DIVISION ZERO Section 00500 FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR Form of Aareement Between Owner and Contractor Project Name OLD COURTHOUSE BOILER REPLACEMENT -PHASE II Project Number 620601CH This agreement is entered into between Clallam County a political subdivision of the State of Washington, hereafter called 'County' and of hereinafter called 'Contractor" The Owner and Contractor agree as set forth below• 1 This Agreement is comprised of the Bidding Documents, Contract Documents, the Agreement, Plans and Specifications as described in the Contract Documents, Addenda issued prior to execution of this Agreement and modifications issued after execution of this Agreement. 2. The Contractor shall execute the entire work described in the Bidding and Contract Documents. 3 The date of commencement is the date the Contractor receives a signed copy of this Agreement by the Board of Commissioners which shall be considered the notice to proceed. 4 The Contractor shall achieve Substantial Completion of the entire work no later than September 11. 2009 subject to adjustments provided for in the Contract Documents. All work shall be completed not later than September 18. 2009 5 The Owner shall pay the Contractor in current funds for Contractor's performance of the Contract the Contract Sum of dollars subject to additions and deductions as provided in the Contract Documents. 6 The Contract Sum is based upon the following alternates, if any which are described in the Contract Documents and hereby accepted by the Owner Alternates /Unit Pricina. Alternate #1 Provide insulation for all steam piping and replace existing with new Alternate #2: Direct Digital Control (DDC) System Unit Price #1 Provide per cubic yard price for excavation 7 Progress Payments a. The Owner shall make progress payments to the Contractor on account of the Contract Sum as provided for below and elsewhere in the Contract Documents. b The Contractor shall submit Application for Payment on AIA Document G702 forms not more than once per month or Contractor's own form with same information found on G702 Forms. c. The Contractor shall submit Application for Payment prior to the last day of each calendar month to the Owner or Owner's Representative Engineer d. The Owner shall make progress payments within 15 calendar days of receipt of Application for Payment and certification that work has progressed satisfactorily e. Each Application for Payment shall be based upon the schedule of values submitted by the Contractor in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work and be prepared in such form and supported by such data to substantiate its accuracy as the Owner or Owner's Engineer may require. This schedule, unless objected to by the Owner or Owner's Engineer shall be used as a basis for reviewing the Contractor's Applications for payment. Old Courthouse Boiler Replacement -Phase II June 2009 DIVISION ZERO Section 00500 f Applications for Payment shall indicate the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. g Subject to the provisions of the Contract Documents, the amount of each progress payment shall be computed as follows: Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share of the total Contract Sum allocated to that portion of the Work in the schedule of values, less Retainage of five percent. Pending final determination of cost to the Owner of changes in the Work, amounts not in the dispute may be included as provided in the General Conditions even though the Contract Sum has not yet been adjusted by Change Order Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction Tess Retainage of five percent. o Subtract the aggregate of previous payments made by the Owner and Subtract amounts, if any for which the Owner or Engineer has withheld or nullified a Certificate of Payment as provided in the General Conditions. 8 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when (1) the Contract has been fully performed by the Contractor except for the Contractor's responsibility to correct non conforming Work as provided in the General Conditions and to satisfy other requirements, if any which necessarily survive final payment; and (2) a Final Certificate for Payment has been issued by the Owner or Owner's Representative Engineer such final payment shall be made by the Owner not more than 30 days after the issuance of the Owner or Owner's Representative Engineer's final Certificate for Payment, punch list is completed and all close -out paperwork and documents have been submitted to the Owner including Department of Revenue clearance. 9 Other documents, if any forming part of the Contract Documents are as follows: A. UBI Certification (copy to be attached to Agreement) IN WITNESS WHEREOF the Parties have executed this Agreement on this day of 2009 CONTRACTOR. OWNER: Clallam County Commissioners (Name) (By) Howard V Doherty Jr Chair (Its) Date. 2009 Approved as to Form Attest: Deputy Prosecuting Attorney Trish Holden, CMC Clerk of the Board END OF SECTION 00500 Form of Agreement Between Owner and Contractor Old Courthouse Boiler Replacement -Phase II June 2009 1 GENERAL CONDITIONS OF THE CONTRACT 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 DIVISION ZERO Section 00600 ARTICLE 1 GENERAL PROVISIONS 11 Definitions 1.2 Execution, Correlation and Intent General Conditions of the Contract 1 1 1 Contract Documents consist of Agreement between Owner and Contractor General Conditions of the Contract, Supplemental Conditions, Bidding Documents, Bonds, Drawings and Specifications, Addenda, approved Alternates, and modifications issued after execution of the Agreement. 1 1.2 The term Work means the construction and services required by the Contract Documents and include all labor materials, equipment and services provided by the Contractor to fulfill the Contractor's obligations. 1 1 3 The Drawinas are the graphic and pictorial portions of the Contract Documents showing the design, location and dimensions of the Work. 1 1 4 The Specifications are that portion of the Contract Documents consisting of the written requirements for materials, equipment construction systems, standards and workmanship for the Work and performance of related services. 1 1 5 The Proiect Manual is the volume assembled for the work which includes the Bidding Documents including Call for Bids and Instructions to Bidders, and Contract Documents. 1.2 1 The Contract Documents shall be signed by the Owner and Contractor as provided in the Agreement. 1.2.2 Execution of the contract by the Contractor is a representation that the Contractor has visited the site become familiar with local conditions under which the Work is to be performed and correlated personal observations with requirements of the Contract Documents. 1.2.3 The intent of the Contract Documents is to include all items necessary for the proper execution and completion of the Work by the Contractor The Contract Documents are complementary and what is required by one shall be as binding as if required by all. 1.2.4 Organization of the Specifications into divisions, sections and articles and arrangement of Drawings shall not control the Contractor in dividing the Work among Subcontractors or in establishing the extent of Work to be performed by any trade. 1.2.5 Unless otherwise stated in the Contract Documents, words which have well -known technical or construction industry meanings are used in the Contract Documents in accordance with such recognized meanings. 1.2.6 The apparent silence of the specifications or plans as to any detail or the apparent omission from them of a detailed description concerning any point shall be regarded as meaning that only the best general practice is to prevail and that only material and workmanship of first quality are to be used. All interpretations of these specifications shall be made on the basis above stated Old Courthouse Boiler Replacement -Phase II June 2009 DIVISION ZERO Section 00600 1.3 Ownership of Documents General Conditions of the Contract 1 3 1 The Drawings, Specifications and other documents prepared by the Owner or Owner's Engineer are instruments of the Owner's service through which the Work to be executed by the Contractor is described. The Owner shall be deemed the author of them and will retain all common law statutory and other reserved rights, in addition to the copyright. ARTICLE 2 OWNER 2.1 1 The Owner is the person or entity identified as such in the Agreement and is referred to throughout the contract Documents as if singular in number The term 'Owner" means the Owner or the Owner's authorized representative. 2.1.2 The Owner shall furnish surveys, utility locations, or other records that the Owner has presently on file or presently knows of to the contractor upon request. The Owner will not provide additional surveys, layouts or locations unless specifically stated elsewhere in the Contract Documents. 2.1 3 The Owner shall be responsible for obtaining the septic permit as it relates to this project. 2.1 4 The Owner shall have additional responsibilities enumerated herein. 2.1 5 If the Contractor fails to correct Work or persistently fails to carry out Work in accordance with the Contract Documents, the Owner by written order signed personally or by an agent specifically so empowered by the Owner in writing, may order the Contractor to stop the work, or any portion thereof until the cause for such order has been eliminated. ARTICLE 3 CONTRACTOR 3 1 1 The Contractor is the person or entity identified as such in the Agreement and is referred to throughout the Contract Documents as if singular in number The term 'Contractor" means the Contractor or the Contractor's authorized representative. 3 1.2 The Contractor shall carefully study and compare the Contract Documents with each other and with information furnished by the Owner and shall at once report to the Owner errors, inconsistencies or omissions discovered The Contractor shall not be liable to the Owner for damage resulting from errors, inconsistencies or omissions in the Contract Documents unless the Contractor recognized (or should have recognized) such error inconsistency or omission and knowingly failed to report it to the Owner If the Contractor performs any construction activity knowing it involves a recognized error inconsistency or omission in the Contract Documents without such notice to the Owner the Contractor shall assume appropriate responsibility for such performance and shall bear an appropriate amount of the attributable costs for correction. 3.1 3 The Contractor shall take field measurements and verify field conditions and shall carefully compare such field measurements and conditions and other information known to the Contractor with the Contract Documents before commencing activities. Errors, inconsistencies or omissions discovered shall be reported to the Owner at once. 3 1 4 The Contractor shall supervise and direct the Work, using the Contractor's best skill and attention. The Contractor shall be solely responsible for and have control over construction means, methods, techniques, sequences and procedures and for coordinating all portions of the Work under the Contract, unless Contract Documents give other specific instructions concerning these matters. Old Courthouse Boiler Replacement -Phase II June 2009 DIVISION ZERO Section 00600 General Conditions of the Contract 3 1 5 The Contractor shall be responsible to the Owner for acts and omissions of the Contractor's employees, Subcontractors and their agents and employees, and other persons performing portions of the Work under a contract with the Contractor 3 1 6 Unless otherwise provided in the Contract Documents, the Contractor shall provide and pay for labor materials, equipment, tools, construction equipment and machinery water heat, utilities, transportation, and other facilities and services necessary for proper execution and completion of the Work, whether temporary or permanent and whether or not incorporated or to be incorporated in the Work. 3.1 7 The Contractor shall enforce strict discipline and good order among the Contractor's employees and other persons carrying out the Contract. The Contractor shall not permit employment of unfit persons or persons not skilled in tasks assigned to them. 3 1 8 The Contractor warrants to the Owner that materials and equipment furnished under the Contract will be of good quality and new that the Work will be free from defects not inherent in the quality required or permitted, and that the Work will conform to the requirements of the Contract Documents. Work not conforming to these requirements, including substitutions not properly approved and authorized may be considered defective. The Contractor's warranty excludes remedy for damage or defect caused by abuse, modifications not executed by the Contractor improper or insufficient maintenance, improper operation, or normal wear and tear under normal usage. If required by the Owner the Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment. 3 1 9 The Contractor shall pay sales, consumer use and similar taxes for the work or portions thereof provided by the Contractor which are legally enacted when bids are received or negotiations concluded whether or not yet effective or merely scheduled to go into effect. 3 1 10 The Contractor shall secure and pay for all permits and governmental fees, licenses and inspections necessary for proper execution and completion of the Work, with the exception of the septic permit that has already been obtained by the Owner 3 1 11 The Contractor shall comply with and give notices required by laws, ordinances, rules, regulations and lawful orders of public authorities bearing on performance of the Work. 3 1 12 If the Contractor observes that portions of the Contract Documents are at variance with codes the Contractor shall promptly notify the Owner in writing, and necessary changes shall be accomplished by appropriate modification. 3 1 13 If the Contractor performs Work knowing or should have known it to be contrary to laws, statutes, ordinances, building codes, and rules and regulations without such notice to the Owner the Contractor shall assume full responsibility for such Work and shall bear the attributable costs. 3 1 14 The Contractor shall keep the premises and surrounding area free from accumulation of waste materials or rubbish caused by operations under the Contract. At completion of the work, the Contractor shall remove from and about the Project waste materials rubbish the Contractor's tools, construction equipment, machinery and surplus materials. 3 1 15 If the Contractor fails to clean up as provided in the Contract Documents, the Owner may do so and the cost thereof shall be charged to the Contractor 3 1 16 The Contractor shall provide the Owner access to the Work in preparation and progress wherever located. 3 1 17 To the fullest extent permitted by law the Contractor shall defend, indemnify and hold harmless, the Owner Engineer Engineer's consultants, and agents and employees of any of them from and against claims, damages, losses and expenses, including but not limited to attorney's fees, arising out of or Old Courthouse Boiler Replacement -Phase II June 2009 DIVISION ZERO Section 00600 General Conditions of the Contract resulting from performance of the Work, provided that such claim, damage, loss or expense is attributable to bodily injury sickness, disease or death, or to injury to or destruction of tangible property (other than the work itself) including Toss of use resulting therefrom, but only to the extent caused in whole or in part by negligent acts or omissions of the Contractor a Subcontractor anyone directly or indirectly employed by them or anyone for whole acts they may be liable, regardless of whether or not such claim, damage, loss or expense is caused in part by a party indemnified hereunder Such obligation shall not be construed to negate, abridge, or reduce other rights or obligations of indemnity which would otherwise exist as to a party or person described in this Paragraph. 3.1 18 With respect to performance of this agreement and as to claims against the county its elected and appointed officers, agents and employees, the Contractor expressly waives its immunity under Title 51 RCW the Industrial Insurance Act, as now and hereafter amended, for injuries to its employees and agrees that the obligations to indemnify defend and hold harmless provided in this agreement extend to any claim brought by or on behalf of any employee of the Contractor This waiver is mutually negotiated by the Owner and Contractor ARTICLE 4 ADMINISTRATION OF THE CONTRACT 4 1 The Owner's project manager shall be the administrator of the contract unless the Owner has agreement for engineering services. 4 1 1 The Engineer is the person lawfully licensed to practice engineering or an entity lawfully practicing engineering identified as such in the Agreement and is referred to throughout the Contract Documents as if singular in number The term 'Engineer" means the Engineer or the Engineer's authorized representative. 4 1.2 Duties, responsibilities and limitations of authority of the Engineer as set forth in the Contract Documents shall not be restricted modified or extended without written consent of the Owner Contractor and Engineer Consent shall not be unreasonably withheld. 4 1 3 The Engineer will provide administration of the Contract as described in the Contract documents and will be the Owner's representative (1) during construction, (2) until final payment is due and (3) with the Owner's concurrence, from time to time during the correction period. The Engineer will advise and consult with the Owner The Engineer will have authority to act on behalf of the Owner only to the extent provided in the Contract Documents, unless otherwise modified by written instrument in accordance with other provisions of the Contract. 4 1 4 The Engineer will visit the site at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the completed Work and to determine in general if the Work is being performed in a manner indicating that the Work, when completed, will be in accordance with the Contract Documents. However the Engineer will not be required to make exhaustive or continuous on -site inspections to check observations as an engineer the Engineer will keep the Owner informed of progress of the Work, and will endeavor to guard the Owner against defects and deficiencies in the Work. 4 1 5 Except as otherwise provided in the Contract Documents or when direct communications have been specially authorized, the Owner and Contractor shall endeavor to communicate through the Engineer Communications by and with the Engineer's consultants shall be through the Engineer Communications by and with Subcontractors and material suppliers shall be through the Contractor Communications by and with separate contractors shall be through the Owner 4 1.6 Based on the Engineer's observations and evaluations of the Contractor's Applications for Payment, the Engineer will review and certify the amounts due the Contractor and will issue Certificates for Payment in such amounts to the Owner who has final approval and authority Old Courthouse Boiler Replacement -Phase II June 2009 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 DIVISION ZERO Section 00600 General Conditions of the Contract 4 1 7 The Engineer with Owner's approval, will have authority to reject Work which does not conform to the Contract documents. Whenever the Engineer with Owner's approval, considers it necessary or advisable for implementation of the intent of the Contract Documents, the Engineer with Owner's approval, will have authority to require additional inspection or testing of the work. However neither this authority of the Engineer nor a decision made in good faith either to exercise or not to exercise such authority shall give rise to a duty or responsibility of the Engineer to the Contractor subcontractors, material and equipment suppliers, their agents or employees, or other persons performing portions of the Work. 4 1 8 The Engineer will review and, with Owner's approval, approve or take other appropriate action upon the Contractor's submittals such as Shop Drawings, Product Data and Samples, but only for the limited purpose of checking for conformance with information given and the design concept expressed in the Contract Documents. 4 1 9 The Engineer with the Owner's approval, will prepare Change Orders and Construction Change Directives, and may authorize minor changes in the work as provided in Paragraph 7 1 4 4 1 10 The Engineer will conduct inspections to determine the date or dates of Substantial Completion and the date of final completion, will receive and forward to the Owner for the Owner's review and records written warranties and related documents required by the Contract and assembled by the Contractor and will issue a final Certificate for Payment upon compliance with the requirements of the Contract Documents. ARTICLE 5 SUBCONTRACTORS 51 Definitions 5 1 1 A Subcontractor is a person or entity who has a direct contract with the Contractor to perform a portion of the Work at the site. 5 1.2 Unless otherwise stated in the Contract Documents or the bidding requirements, the Contractor as soon as practicable after award of the Contract, shall furnish in writing to the Owner the names of persons or entities (including those who are to furnish materials or equipment fabricated to a special design) proposed for each principal portion of the Work. The Owner will promptly reply to the Contractor in writing stating whether or not, after due investigation, the Owner has reasonable objection to any such proposed person or entity Failure of the Owner to reply promptly shall constitute notice of no reasonable objection. 5 1 3 The Contractor shall not contract with a proposed person or entity to whom the Owner has made reasonable and timely objection. 5 1 4 If the Owner has reasonable objection to a person or entity proposed by the Contractor the Contractor shall propose another to whom the Owner has no reasonable objection. The Contract Sum shall be increased or decreased by the difference in cost occasioned by such change and an appropriate Change Order shall be issued. However no increase in the Contract Sum shall be allowed for such change unless the Contractor has acted promptly and responsively in submitting names as required. 5 1 5 By appropriate agreement, written where legally required for validity the Contractor shall require each Subcontractor to the extent of the Work to be performed by the Subcontractor to be bound to the Contractor by terms of the Contract Documents, and to assume toward the Contractor all the obligations and responsibilities which the Contractor by these Documents, assumes toward the Owner and Engineer Each subcontract agreement shall preserve and protect the rights of the Owner and Engineer under the Contract Documents with respect to the Work to be performed by the Subcontractor so that subcontracting thereof will not prejudice such rights, and shall allow to the Subcontractor unless specifically provided otherwise in the subcontract agreement, the benefit of all rights, remedies and Old Courthouse Boiler Replacement -Phase 11 June 2009 DIVISION ZERO Section 00600 ARTICLE 6 CONSTRUCTION BY OWNER General Conditions of the Contract redress against the Contractor that the Contractor by the Contract Documents, has against the Owner Where appropriate, the Contractor shall require each Subcontractor to enter into similar agreements with Sub subcontractors. The Contractor shall make available to each proposed Subcontractor prior to the execution of the subcontract agreement, copies of the Contract Documents to which the Subcontractor will be bound, and, upon written request of the Subcontractor identify to the Subcontractor terms and conditions of the proposed subcontract agreement which may be at variance with the Contract Documents. Subcontractors shall similarly make copies of applicable portions of such documents available to their respective proposed Sub subcontractors. 6 1 1 The Owner reserves the right to perform Qonstruction or operations related to the Project with the Owner's own forces, and to award separate contracts in connection with other portions of the Project or other construction or operations on the site under Conditions of the Contract identical or substantially similar to these including those portions related to insurance and waiver of subrogation. If the Contractor claims that delay or additional cost is involved because of such action by the Owner the Contractor shall make such Claim as provided elsewhere in the Contract Documents. 6.1.2 The Owner shall provide for coordination of the activities of the Owner's own forces. 6 1 3 If part of the Contractor's Work depends, for proper execution or results, upon construction or operations by the Owner or a separate contractor the Contractor shall, prior to proceeding with that portion of the Work, promptly report to the Owner apparent discrepancies or defects in such other construction that would render it unsuitable for such proper execution and results. Failure of the Contractor to so report shall constitute an acknowledgment that the Owner's or separate contractors completed or partially completed construction is fit and proper to receive the Contractor's Work, except as to defects not then reasonably discoverable. ARTICLE 7 CHANGES IN THE WORK 7 1 1 Changes in the work may be accomplished after execution of the Contract, and without invalidating the Contract, by Change Order 7 1.2 A Change Order shall be based upon agreement among the Owner Contractor and Architect/Engineer 7 1 3 Changes in the Work shall be performed under applicable provisions of the Contract Documents, and the Contractor shall proceed promptly unless otherwise provided in the Change Order 7 1 4 A Change Order is a written instrument prepared by the Owner or Engineer and signed by the Owner Contractor and Engineer stating their agreement upon all of the following: 1 a change in the Work, 2. the amount of the adjustment in the Contract Sum, if any and 3 the extent of the adjustment in the Contract Time, if any ARTICLE 8 TIME AND LIQUIDATED DAMAGES 8.1 1 Time limits stated in the Contract Documents are of the essence of the Contract. By executing the Agreement, the Contractor confirms that the Contract Time is a reasonable period for performing the Work. 8.1.2 The Contractor shall not knowingly except by agreement or instruction of the Owner in writing, prematurely commence operations on the site or elsewhere prior to the effective date of insurance to be Old Courthouse Boiler Replacement -Phase II June 2009 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 DIVISION ZERO Section 00600 furnished by the Contractor The date of commencement of the Work shall be not changed by the effective date of such insurance. Unless the date of commencement is established by a notice to proceed given by the Owner the Contractor shall notify the Owner in writing not Tess than five days or other agreed period before commencing the work to permit the timely filing of mortgages, mechanic s liens and other security interests. 8.1 3 If the Contractor is delayed at any time in progress of the Work by an act or neglect of the Owner or of an employee of either or of a separate contractor employed by the Owner or by changes ordered in the Work, or by labor disputes, fire, unavoidable casualties or other causes beyond the Contractor's control, or by delay authorized by the Owner then the Contract time shall be extended by Change Order 8.1 4 Should the Contractor fail to complete the Work within the Contract Time, the Owner will sustain damage. 8.1 5 Therefore, the parties agree that the Contractor shall pay the Owner as liquidated damages and not as penalty an amount as follows, which shall be considered to be the amount of the damage sustained by the Owner on account of the condition specified and shall continue to be paid until the condition specified is met. 8 1 6 It is agreed by the parties that time is of essence in this aareement and if the date of final completion is delayed the Owner will be damaged The exact amount of the damage will be difficult to calculate, but will include such items as outside leases, loss of efficient function, and inconvenience to the public and to the Owner It is agreed between the parties that the amount of damages will be $100.00 per calendar day from Final Completion date as designated for each individual project as stated on the Form of Agreement between Owner and Contractor The Owner may deduct the sum of such liquidated damages from any moneys due or that may become due the Contractor or if such moneys are insufficient, the Contractor or his Surety or Sureties shall pay the difference ARTICLE 9 PAYMENTS AND COMPLETION General Conditions of the Contract 9 1 1 The Contract Sum is stated in the Agreement and including authorized adjustments, is the total amount payable by the Owner to the Contractor for performance of the Work under the Contract Documents. 9 1.2 Before the first Application for Payment, the Contractor shall submit to the Owner or Engineer a schedule of values allocated to various portions of the work, prepared in such form and supported by such data to substantiate its accuracy as the Owner or Engineer may require. This schedule, unless objected to by the Owner or Engineer shall be used as a basis for reviewing the Contractor's Applications for Payment. 9 1 3 At least ten days before the date established for each progress payment, the Contractor shall submit to the or Engineer if one is used an itemized Application for Payment for operations completed in accordance with the schedule of values. Such application shall be notarized, if required and supported by such data substantiating the Contractor's right to payment as the Owner or Engineer may require, such as copies or requisitions from Subcontractors and material suppliers, and reflecting Retainage if provided for elsewhere in the Contract Documents. 9 1 4 Such applications may include requests for payment on account of changes in the work which have been properly authorized by Change Orders. 9 1 5 Such applications may not include requests for payment of amounts the Contractor does not intend to pay to a Subcontractor or material supplier because of a dispute or other reason. Old Courthouse Boiler Replacement -Phase II June 2009 DIVISION ZERO Section 00600 General Conditions of the Contract 9 1 6 Unless otherwise provided in the Contract Documents, payments shall be made on account of materials and equipment delivered and suitably stored at the site for subsequent incorporation in the Work. 9 1 7 The Contractor warrants that title to all Work covered by an Application for Payment will pass to the Owner no later than the time of payment. The Contractor further warrants that upon submittal of an Application for Payment, all Work for which Certificates for Payment have been previously issued and payments received from the Owner shall, to the best of the Contractor's knowledge, information and belief be free and clear of liens, claims, security interests or encumbrances in favor of the Contractor Subcontractors, material suppliers, or other persons or entities making a claim by reason of having provided labor materials and equipment relating to the Work. 9 1 8 The Owner shall determine the payment amount to be made to the Contractor 9 1 9 At the time each month stipulated in the Owner /Contractor Agreement, the Owner shall pay to the Contractor an amount equal to ninety-five percent (95 of the value of labor and material incorporated in the work, all as approved by the Engineer in accordance with the provisions of the Contract Documents, such amount paid to the Contractor shall be less the total of all previous payments and deductions provided for in the Contract Documents. The five percent (5 withheld shall be Retainage, which shall be paid as provided hereinafter The percentage of contract retained shall be five percent (5 pursuant to RCW Chapter 60.28, as amended. Thirty days after final acceptance of the completed work, the balance due will be paid provided, a. The work be fully completed. b. Certification has been received by the Owner from the State Department of Labor and Industries, as to payment of prevailing wages, in conformance with laws. c. Certification has been received by the Owner from the State Department of Revenue that all taxes have been paid, no tax lien may exist, and d. The Contractor warrants to the Owner all claims by materialmen and workmen, if any for unpaid charges against the work have been satisfied and e. To hold the Owner harmless from all liens on the completed work. In the event these provisions are not met, the Owner may pay a percentage of the Retainage, holding back that quantity of money for materialmen and laborer's liens, tax liens, cost and attorneys fees to defray the cost of foreclosing all other liens, costs, and Engineer's fee to defray cost of additional Construction Administration services. After the award of a Contract for public improvement or work for which retained percentages are required to be reserved under the provisions of RCW 60.28 010 Owner shall require the Contractor to exercise in writing one of the options listed in RCW 60.20 010 Retained amounts shall be paid into an escrow account, if requested in a financial institution chosen by the Contractor and approved by the Owner the interest earnings from which shall accrue to the benefit of the Contractor 9 1 10 Final payment will not be made by the Owner until all contract conditions and requirements have been fulfilled and all forms and certificates are received in full. 9 1 11 Upon receipt of written notice that the Work is ready for final inspection and acceptance and upon receipt of a final Application for Payment, the Owner or Engineer will promptly make such inspection, and when Owner and Engineer finds the Work acceptable under the Contract Documents and the Contract fully performed, the Engineer will promptly issue a final Certificate for Payment. Old Courthouse Boiler Replacement -Phase II June 2009 DIVISION ZERO Section 00600 ARTICLE 10 PROTECTION OF PERSONS AND PROPERTY General Conditions of the Contract 10 1 1 The Contractor shall be responsible for initiating maintaining and supervising all safety precautions and programs in connection with the performance of the Contract. 10 1.2 In the event the Contractor encounters on the site material reasonably believed to be asbestos or polychlorinated biphenyl (PCB) which has not been rendered harmless, the Contractor shall immediately stop Work in the area affected and report the condition to the Owner and Engineer in writing. The Work in the affected area shall not thereafter be resumed except by written agreement of the Owner and Contractor if in fact, the material is asbestos or polychlorinated biphenyl (PCB) and has not been rendered harmless. The work in the affected area shall be resumed in the absence of asbestos or PCB or when it has been rendered harmless by written agreement of the Owner and Contractor 10 1 3 The Contractor shall take reasonable precautions for safety of and shall provide reasonable protection to prevent damage, injury or loss to 1 employees on the Work and other persons who may be affected thereby 2. the work and materials and equipment to be incorporated therein, whether in storage on or off the site, under care, custody or control of the Contractor or the Contractor's Subcontractors or Sub subcontractors, and 3 other property at the site or adjacent thereto, such as trees, shrubs, lawns, walks, pavements, roadways, structures and utilities not designated for removal, relocation or replacement in the course of construction. 10 1 4 The Contractor shall give notices and comply with applicable laws, ordinances, rules, regulations and lawful orders of public authorities bearing on safety of persons or property or their protection from damage, injury or loss. 10 1 5 The Contractor shall erect and maintain, as required by existing conditions and performance of the Contract, reasonable safeguards for safety and protection, including posting danger signs and other warnings against hazards, promulgating safety regulations and notifying owners and users of adjacent sites and utilities. 10 1 6 When use or storage of explosive or other hazardous materials or equipment or unusual methods are necessary for execution of the Work, the Contractor shall exercise utmost care and carry on such activities under supervision of properly qualified personnel. 10 1 7 The Contractor shall promptly remedy damage and Toss (other than damage or loss insured under property insurance required by the Contract Documents) to property caused in whole or in part by the Contractor a Subcontractor a Sub subcontractor or anyone directly or indirectly employed by any of them, or by anyone for whose acts they may be liable and for which the Contractor is responsible, except damage or Toss attributable to acts or omissions of the Owner or Engineer or anyone directly or indirectly employed by either of them, or by anyone for whose acts either of them may be liable, and not attributable to the fault or negligence of the Contractor The foregoing obligations of the Contractor are in addition to the Contractor's obligations. 10 1 8 The Contractor shall not load or permit any part of the construction or site to be loaded so as to endanger its safety 10 1 9 In an emergency affecting safety of persons or property the Contractor shall act, at the Contractor's discretion, to prevent threatened damage, injury or loss. 10 1 10 The Contractor agrees to comply with Chapter 49 18 RCW providing that no laborer workman, or mechanic in the employ of the Contractor Subcontractor or other person doing or contracting to do the work or any part of the work contemplated by the Contract, shall be permitted or required to work more than eight (8) hours in any one calendar day provided that, in cases of extraordinary emergency such as Old Courthouse Boiler Replacement -Phase II June 2009 DIVISION ZERO Section 00600 General Conditions of the Contract danger to life or property the hours of work may be extended but in such cases shall not be less than one and one -half times the rate allowed for this same amount of time during eight (8) hours' service. Any work necessary to be performed after regular working hours, or Sunday or legal holidays shall be performed without additional expense to the Owner Contractor further agrees the said Contract is terminable in case the Contractor shall violate the provisions of such act. ARTICLE 11 INSURANCE BONDS 11 1 1 The Contractor shall purchase from and maintain in a company or companies lawfully authorized to do business in the jurisdiction in which the Project is located such insurance as will protect the Contractor from claims set forth below which may arise out of or result from the Contractor's operations under the Contract and for which the Contractor may be legally liable, whether such operations be by the Contractor or by a Subcontractor or by anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable: 1 claims under workers or workmen s compensation, disability benefit and other similar employee benefit acts which are applicable to the Work to be performed, 2. claims for damages because of bodily injury occupational sickness or disease, or death of the Contractor's employees; 3. claims for damages because of bodily injury sickness or disease, or death of any person other than the Contractor's employees; 4 claims for damages insured by usual personal injury liability coverage which are sustained (1) by a person as a result of an offense directly or indirectly related to employment of such person by the Contractor or (2) by another person, 5 claims for damages, other than to the Work itself because of injury to or destruction of tangible property including loss of use resulting therefrom, 6. claims for damages because of bodily injury death of a person or property damage arising out of ownership maintenance or use of a motor vehicle, and 7 claims involving contractual liability insurance applicable to the Contractor's obligations. 11 1.2 The Contractor shall name the Owner the Engineer their consultants, and their officers, agents, and employees, as additional insured on the insurance policies, except the workers' or workmen s compensation policy The Contractor shall obtain from the Owner and Engineer the list of names to appear on the insurance policies. 11 1 3 The insurance required by Subparagraph 11 1 1 shall be written for not less than the following or greater if required by law 1 Workers Compensation, a. State: Statutory b. Applicable Federal (e.g. Longshoremen, harbor Work, Work at or outside U S. Boundaries): Statutory c. Employer's Liability $1 000 000 00 d. Benefits Required by Union labor contracts: as applicable e. Include all- states endorsement 2. Comprehensive General Liability (Including Premises Operations; Independent Contractor's Protective, Products and Completed Operations; Broad Form Property Damage). a. Bodily Injury $1 000 000 00 Single Limit Per Occurrence Full Contract Amount Aggregate, Products and Completed Operations b. Property Damage: Course of Construction Insurance Full Contract Amount Each Occurrence Full Contract Amount Aggregate Old Courthouse Boiler Replacement -Phase II June 2009 DIVISION ZERO Section 00600 c. Products and Completed Operations Insurance shall be maintained until 30 days after final completion d Property Damage Liability Insurance shall include coverage for the following hazards Vandalism Fire Explosion, Collapse, and Underground e. Contractual Liability 1 Bodily Injury $1 000 000 Each Occurrence 2. Property Damage: Full Contract Amount Each Occurrence Full Contract Amount Aggregate f Personal Injury with Employment Exclusion Deleted $1 000 000 00 Aggregate 3 Comprehensive Automobile Liability (Owned, Non -owned Hired) a. Bodily Injury $1 000 000 00 Each Person $1 000 000 00 Each Occurrence b. Property Damage. $500 000 00 Each Occurrence 4 If possible, all of the above insurance coverage shall be carried with the same insurance company 11 1 4 Certificates of Insurance acceptable to the Owner shall be filed with the Owner and the Engineer prior to commencement of the work. These Certificates shall contain a provision that coverages afforded under the policies will not be canceled until at least thirty (30) days prior written notice has been given to the Owner the Engineer the Contractor and the Owner's insurer Certificates shall be furnished in duplicate and stipulate all coverage required, and the Contractor shall furnish to the Owner and the Engineer copies of all endorsements that are subsequently issued amending coverage or limits. 11 1 5 The Contractor shall purchase and maintain in a company or companies lawfully authorized to do business in the jurisdiction in which the Project is located property insurance in the amount of the initial Contract sum as well as subsequent modifications thereto for the entire Work at the site on a replacement cost basis without voluntary deductibles. Such property insurance shall be maintained unless otherwise provided in the Contract Documents or otherwise agreed in writing by all persons and entities who are beneficiaries of such insurance, until final payment has been made. 11 1 6 Property insurance shall be on an all -risk policy form and shall insure against the perils of fire and extended coverage and physical loss or damage including without duplication of coverage, theft, vandalism malicious mischief collapse false work, temporary buildings and debris removal including demolition occasioned by enforcement of any applicable legal requirements, and shall cover reasonable compensation for Engineer's services and expenses required as a result of such insured loss. Coverage for other perils shall not be required unless otherwise provided in the Contract Documents. 11 1 7 The Contractor shall secure and pay for performance and payment bonds issued by a bonding company licensed to transact business in the locality of the project, on a Bond Form executed in pursuance to Chapter 39 08 Revised Code of Washington The Bond Form must comply with all requirements of the Owner's attorney The surety bond shall be in the following penal sums. Performance Bond 100% of agreement sum including Washington State Sales Tax Labor and Material 100% of agreement sum including Washington State Sales Tax Four copies of Bond Certification required. General Conditions of the Contract Old Courthouse Boiler Replacement -Phase II June 2009 DIVISION ZERO Section 00600 11 1 8 The Contract Bond or an equivalent Maintenance Bond shall continue in full force until final acceptance of the Work by the Owner 11 1 9 The Contractor guarantees the excellence of both workmanship and material, and the payment of all obligations incurred until the Work is finally accepted and for (30) days thereafter and until the provisions of the Contract Documents are fulfilled. 11 1 10 For the projects under $25,000 00 Contractor may agree to a 50% Retainage fund in lieu of providing a performance bond. The Retainage fund to be held by the County until work is complete, all paperwork is turned in and state releases signed and returned to County ARTICLE 12 WARRANTY 12.1 1 The Contractor shall warranty all labor materials and work performed for a period of 1 year from date of final completion. ARTICLE 13 LAW, SUCCESSORS, TESTS 13 1 1 The contract shall be governed by law of the place where project is located. General Conditions of the Contract 13 1.2 The Owner and Contractor respectively bind themselves, their partners, successors, assigns and legal representatives to the other party hereto and to partners, successors, assigns and legal representatives of such other party in respect to covenants, agreements and obligations contained in the Contract Documents. Neither party to the Contract shall assign the Contract as a whole without written consent of the other If either party attempts to make such an assignment without such consent, that party shall nevertheless remain legally responsible for all obligations under the Contract. 13 1 3 Duties and obligations imposed by the Contract Documents and rights and remedies available thereunder shall be in addition to and not a limitation of duties, obligations, rights and remedies otherwise imposed or available by law 13 1 4 No action or failure to act by the Owner Engineer or Contractor shall constitute a waiver of a right or duty afforded them under the Contract, nor shall such action or failure to act constitute approval of or acquiescence in a breach thereunder except a may be specifically agreed in writing 13.1 5 Tests, inspections and approvals of portions of the Work required by the Contract Documents or by laws, ordinances, rules, regulations or orders of public authorities having jurisdiction shall be made at an appropriate time. Unless otherwise provided, the Contractor shall make arrangements for such tests, inspections and approvals with an independent testing laboratory or entity acceptable to the Owner or with the appropriate public authority and shall bear all related costs of tests, inspections and approvals. The contractor shall give the Owner timely notice of when and where tests and inspections are to be made so the Owner may observe such procedures. The Owner shall bear costs of tests, inspections or approvals which do not become requirements until after bids are received or negotiations concluded. 13.1 6 If the Owner or public authorities having jurisdiction determine that portions of the Work require additional testing inspection or approval, instruct the Contractor to make arrangements for such additional testing inspection or approval by an entity acceptable to the Owner and the Contractor shall give timely notice of when and where tests and inspections are to be made so the Owner may observe such procedures. 13.1 7 If such procedures for testing, inspection or approval reveal failure of the portions of the Work to comply with requirements established by the Contract Documents, the Contractor shall bear all costs made necessary by such failure including those of repeated procedures. Old Courthouse Boiler Replacement -Phase II June 2009 DIVISION ZERO Section 00600 13 1 8 Required certificates of testing inspection or approval shall, unless otherwise required by the Contract Documents, be secured by the Contractor and promptly delivered to the Owner ARTICLE 14 TERMINATION 14 1 1 The Owner may terminate the Contract if the Contractor 1 refuses or fails to supply enough properly skilled workers or proper materials, 2. fails to make payment to Subcontractors for materials or labor in accordance with the respective agreements between the Contractor and the Subcontractors; 3 disregards laws, ordinances, or rules, regulations, or orders of a public authority having jurisdiction, or 4 otherwise is guilty of substantial breach of a provision of the Contract Documents. ARTICLE 15 PREVAILING WAGES General Conditions of the Contract 15 1 1 REQUIRED CONTRACTOR TO FILE STATEMENT OF INTENT TO PAY PREVAILING WAGES AND AFFIDAVIT OF WAGES PAID The prevailing rate of wage to be paid to all workmen, laborers, or mechanics employed in the performance of any part of this Contract shall be in accordance with the provisions of Chapter 39 12 RCW as amended, and the rules and regulations of the Department of Labor and Industries of the State of Washington. The prevailing wage rates for the locality or localities where this Contract will be performed shall be determined by the Industrial Statistician of the Department of Labor and Industries, and are, by reference, made a part of this contract as though fully set forth herein Current prevailing wage data is furnished by the Industrial Statistician 15 1.2 Statement of Intent to Pay Prevailing Wages: The Contractor on or before the date of commencement of work, shall complete, file and pay for a statement under oath with the Owner and with the Director of Labor and Industries certifying the rate of hourly wage paid and to be paid each classification of laborers, workmen or mechanics employed upon the work by the Contractor or Subcontractor which shall be not less than the prevailing rate of wage. (State Form LI 700 -29) State of Washington Department of Labor and Industries, Statement of Intent to Pay Prevailing Wages on Public Contract' form. Such statement and any subsequent statements shall be filed in accordance with the practices and procedures required by the Department of Labor and Industries. Therefore, the Contractor shall familiarize himself with this form and all its requirements. The Owner will not distribute any payments until all required certified copies of such forms are received. 15 1 3 It is the responsibility of the Contractor to require all his Subcontractors to complete and pay for 'Statement of Intent to Pay Prevailing Wages' forms, submit these documents to the Department of Labor and Industries for certification and forward certified copies to the Owner as proof that the prevailing wage requirements of RCW 39 12.040 have been satisfied Additional forms may be obtained from the Department of Labor and Industries, Industrial Relations Division General Administration Building Olympia, Washington 98504 and from all 15 service locations of the Department of Labor and Industries. 15 1 4 Each voucher claim submitted by a Contractor for payment on a project estimate shall state that prevailing wages have been paid in accordance with the pre -filed statement or statements of intent on file with the Department of Labor and Industrial Statistician 15 1 5 The Contractor and Subcontractors shall further certify that: a. He has not employed or retained any company or person (other than a full -time bona fide employee working solely for the offer) to solicit or receive this Contract and b He has not paid or agreed to pay any company or person (other than a full -time bona fide employee working solely for the offer) any fee, commission percentage or brokerage fee contingent upon or resulting from the award of this Contract; and c. He has not been asked or otherwise coerced, either expressed or implied into contributing funds, for any purpose as a condition to doing business with the Owner and Old Courthouse Boiler Replacement -Phase II June 2009 DIVISION ZERO General Conditions of the Contract Section 00600 d. He agrees to furnish information relating to items 1 2 and 3 as requested by the contracting officer 15 1 6 It is further agreed that in case any dispute arises as to what are the prevailing wages for the work of a similar nature and such dispute cannot be adjusted by the parties involved, the matter shall be referred for arbitration to the Director of the Department of Labor and Industries of the State, and his decision therein shall be final, binding and conclusive on all parties involved in the dispute. 15 1 7 Upon completion of a Public Works Project, the Contractor for himself and on behalf of all Subcontractors, shall file Affidavit of Wages Paid' forms. Forms properly executed by the Contractor and all Subcontractors shall be submitted with proper payment to: Department of Labor and Industries, Industrial Insurance Division, Underwriting Section, General Administration Building, Olympia, WA 98504 Each Affidavit of Wages must be certified by the .Industrial Statistician of the Department of Labor and Industries before it is submitted to the Owner Copies of all required statements must be on file with the Owner before the retained percentage is released. 15 1 8 Upon completion of a Public Works project, the Contractor shall file a 'Release for the Protection of Property Owner and General Contractor" form (LI 206 -83 release 1 -67) with the Department of Labor and Industries. The Owner will not disburse final payment or the Retainage to the Contractor until a release has been issued by the Department of Labor and Industries. Contractor shall pay for all costs of obtaining and filing all Labor and Industries forms. ARTICLE 16 OFFSHORE ITEMS 16 1 1 In compliance with RCW 39.25 the Contractor shall furnish the Owner a certified statement setting forth the nature and source of Offshore items in excess of $2,500 which have been utilized under each prime contract in the performance of the work. 'Offshore Items are those items procured from sources beyond the territorial boundaries of the United States including Alaska and Hawaii. This certified statement is mandatory and shall be received before final payment is made on the contract. ARTICLE 17 PREVENTION OF ENVIRONMENTAL POLLUTION AND PRESERVATION OF PUBLIC NATURAL RESOURCES 17 1 1 Pursuant to Chapter 62, Laws of 1973, 1st Ex. Session, those provisions of federal, state and local statutes, ordinances, and regulations dealing with the prevention of environmental pollution and the preservation of public natural resources that affect, or are affected by the herein described project are, to the extent they are reasonably obtainable, as follows: RCW 43.21 030 RCW 90 58 140 RCW 90 58 320 and RCW 70 94 152. Conform with the provisions thereof ARTICLE 18 DISCRIMINATION 18.1 1 The Contractor by entering this contract, agrees that Discrimination in all phases of employment is prohibited by Title VII of the Civil Rights Act of 1964 Presidential Executive Order 11375 the Washington State Law Against Discrimination, Chapter 49 60 RCW and by Gubernatorial Executive Orders 66 -1 and 70 -01 among other laws and regulations. 18.1.2 During the performance of this Contract, the Contractor agrees as follows: 1 The Contractor will not discriminate against any employee or applicant for employment because of race, creed, color national origin, sex, sexual orientation, age, marital status, or the presence of any physical, sensory or mental handicap, nor shall the Contractor commit any of the other unfair practices defined in RCW 79 60 the Washington State Law Against Discrimination. Old Courthouse Boiler Replacement -Phase II June 2009 DIVISION ZERO Section 00600 ARTICLE 19 COUNTY /CONTRACTOR RELATIONSHIP END OF SECTION 00600 General Conditions of the Contract 2. The Contractor will, in all solicitations or advertisements for employees, state that all qualified applicants will be considered for employment, without regard to race, creed, color national origin, sex, sexual orientation age, marital status, or the presence of any physical, sensory or mental disability 3 The Contractor will send to each labor union, employment agency or representative of workers with which the Contractor has a collective bargaining agreement or other contract or understanding, a notice advising the labor union, employment agency or workers representative of the Contractor's commitments under this contract and RCW 49 60 the Washington State Law Against Discrimination. 4 The Contractor will permit access to its books, records and accounts, and to its premises by the Owner or the Washington State Human Rights Commission for the purpose of investigation to ascertain compliance with these specifications. 5 The Contractor will include the provisions of clauses 1 through 4 above in every Subcontract or purchase order so that such provisions will be upon each Subcontractor or vendor 19 1 1 In the event that either the state or federal government determines that an employer employee relationship exists, rather than an independent contractor relationship such that Clallam County is deemed responsible for federal withholding social security contributions and the like, the Contractor agrees to reimburse Clallam County for any payments made or required to be made by Clallam County Should any payments be due to the Contractor pursuant to this agreement, the Contractor agrees that reimbursement may be made by deducting from such future payments a pro rata share of the amount to be reimbursed based upon the following formula. Total amount to be reimbursed Deduction from payment Number of payments remaining Notwithstanding a determination by the state or federal government that an employer employee relationship exists, the Contractor its officers, employees and agents, shall not be entitled to any benefits which Clallam County provides to its employees, including but not limited to vacation and medical benefits. 19 1.2 The status of the Contractor hereunder is that of an independent contractor and the Contractor shall not be construed to be an employee of Clallam County As an independent contractor the Contractor is not entitled to any benefits available to employees of Clallam County and the Contractor is responsible for withholding any moneys required to be withheld from the Contractor's employees pursuant to local state, or federal law including but not limited to worker's compensation social security and taxes Old Courthouse Boiler Replacement -Phase II June 2009 DIVISION ONE GENERAL REQUIREMENTS General Reauirements Section 01001 GENERAL REQUIREMENTS 1 SUMMARY OF WORK A. Contract Description. 1 Removal of existing masonry and fuel burning boilers and fuel tank. 2. Installation of new electric steam boiler and associated systems. 3 Work typically associated with a project of this type and as described in the Contract Drawings and these specifications. B The Contractor is responsible for verifying all systems, assemblies, and details of construction prepared by the Owner as being appropriate to and within the standard practices of the building trades involved. The Contractor and all of his subcontractors and sub subcontractors shall have reviewed all documents thoroughly and shall report all discrepancies, irregularities, and items that differ from standard practices during the bidding phase. The Contractor shall be responsible to ensure proper coordination between all trades and all the corresponding documentation directing those trades. The Contractor shall also be responsible for confirmation of all manufacturers instructions and special requirements of the use and application of their products. 2. WORK NOT IN CONTRACT A. 'NIC' (Not in Contract) items are as follows: 1 See drawings. 3. CONTRACTOR USE OF PREMISES A. The Contractor shall have access only to the areas where the new work is to be executed The Contractor shall coordinate with the Owner for staging power outages, construction, and parking during construction, which will be limited to the area of Work. Work times and dates shall be scheduled and approved by the Owner prior to start of work. 4 UNIT PRICING A. See Bid Forms, Section 00300 B Unit Prices. As approved on final Section 00500 Form of Agreement Between Owner and Contractor 5. ALTERNATES A. Alternates quoted on Bid Forms, Section 00300 will be reviewed and accepted or rejected at the Owner's option. B Coordinate related Work as required for a proper installation of all the Work of this Contract. C Alternates: As approved on final Section 00500 Form of Agreement Between Owner and Contractor Old Courthouse Boiler Replacement -Phase II June 2009 DIVISION ONE GENERAL REQUIREMENTS General Reauirements Section 01001 6. COORDINATION A. Coordinate scheduling submittals and Work of the various sections of specification to ensure efficient and orderly sequence of installation of interdependent construction elements with a minimum of public service disruption. B Verify utility requirement characteristics of operating equipment are compatible with building utilities. C In finished areas, conceal pipes and wiring within the construction 7 WORKING HOURS A. Working hours shall be from 8 am until 5 pm, Monday through Friday C Any work outside these established working hours will need prior authorization from the owner 8. EXAMINATION A. Verify that existing conditions and substrate surfaces are acceptable for subsequent Work. Beginning new Work means acceptance of existing conditions. 9 PREPARATION A. Clean substrate surfaces prior to applying next material or substance. B Apply manufacturer required or recommended substrate primer sealer or conditioner prior to applying new material or substance in contact or bond. 10. SUBMITTAL PROCEDURES A. Submittal form to identify Project, Contractor Subcontractor or supplier and pertinent Contract Document references. B Apply Contractor's stamp signed or initialed certifying that review verification of Products required field dimensions, adjacent construction Work, and coordination of information is in accordance with the requirements of the Work and Contract Documents, prior to submitting the submittal for review by the Owner or Owner's Representative Engineer C Identify variations from Contract Documents and Product or system limitations which may be detrimental to successful performance of the completed Work. B Revise and submit submittals as required; identify all changes made since previous submittal. 11 QUALITY ASSURANCE CONTROL OF INSTALLATION A. Monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship to produce Work of specified quality or when no level of quality is specified, perform Work as would be standard for a custom installation B Comply with manufacturers instructions. C Comply with specified standards as minimum quality for the Work except when more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship Old Courthouse Boiler Replacement -Phase II June 2009 DIVISION ONE GENERAL REQUIREMENTS General Requirements Section 01001 12. TOLERANCES A. Monitor tolerance control of installed Products over suppliers, manufacturers, Products, site conditions, and workmanship, to produce acceptable Work. Do not permit tolerances to accumulate. B Comply fully with manufacturers tolerances. 13. REFERENCES A. Conform to reference standards applicable for each system, product, or assembly as commonly applied to each trade or discipline for this type of work and level of quality specified or implied by date of issue current as of date of Contract Documents. B Should specified reference standard conflict with Contract Documents, request clarification from Owner before proceeding. 14. ELECTRICITY A. Contractor may use existing electrical power facilities as available at the courthouse and in proximity to the project. Any equipment modification required to accommodate the Contractor's needs shall be at the Contractor's cost. Modifications shall only be made with approval of the County and equipment shall be returned to its original condition or better at the conclusion of the work. 15. LIGHTING FOR CONSTRUCTION PURPOSES A. Contractor may use existing lighting. Any equipment modification required to accommodate the Contractor's needs shall be at the Contractor's cost. 16. WATER A. Contractor may use existing water facilities as available at Courthouse and in proximity to the project. Any equipment modification required to accommodate the Contractor's needs shall be at the Contractor's cost. Modifications shall only be made with approval of the County and equipment shall be returned to its original condition or better at the conclusion of the work. 17 SANITARY FACILITIES A. The Contractor may use the restroom facilities at the courthouse for the duration of the project. However it is expected that they will be kept clean and orderly 18. PROJECT SAFETY A. The Contractor shall erect and maintain an orange construction fence around the entire area of work, and provide temporary closures for protection of adjacent existing conditions, and barriers to protect the public from construction hazards. Prior to leaving the site in the evening the Contractor shall inspect and insure all fencing and barriers adequately protect the public from the safety hazards created by the construction of this project. 19 PROTECTION OF INSTALLED WORK A. Protect installed Work and provide special protection where specified in individual specification sections. Old Courthouse Boiler Replacement -Phase II June 2009 1 20. SECURITY 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 DIVISION ONE GENERAL REQUIREMENTS General Reauirements Section 01001 A. Provide security and facilities to protect Work and Owner's operations from unauthorized entry vandalism, or theft. 21 PROGRESS CLEANING AND WASTE REMOVAL A. Collect and maintain areas free of waste materials, debris, and rubbish. Maintain construction area in a clean and orderly condition Contractor is responsible for all costs involved in waste removal. 22. REMOVAL OF UTILITIES, FACILITIES, AND CONTROLS A. Remove temporary utilities, equipment, facilities, and materials prior to Final Completion review B Clean and repair damage caused by installation or use of temporary work. C Restore existing facilities used during construction to original condition Restore permanent facilities used during construction to specified condition. 23. PRODUCTS A. Products. means new material, machinery components, equipment, fixtures, and systems forming the Work, but does not include machinery and equipment used for preparation fabrication, conveying and erection of the work. Products may also include existing materials or components specifically identified for reuse. B Do not use materials and equipment removed from existing premises, except as specifically identified or allowed by the Contract Documents. C Provide interchangeable components of the same manufacturer for components being replaced and /or added in addition to existing components, e.g. lighting, switches, receptacles, etc. 24. TRANSPORTATION, HANDLING, STORAGE AND PROTECTION A. Transport, handle, store, and protect Products in accordance with manufacturer's instructions 25. CONTRACT CLOSE -OUT PROCEDURES A. Submit written certification that the Contract Documents have been reviewed, Work has been inspected, and that Work is complete in accordance with the General Conditions and the Contract Documents and ready for Owner inspection. B. Submit final Application for Payment identifying total adjusted Contract Sum /Price previous payments, and amount remaining due C Complete and submit all required documentation, covered in this Project Manual, and the drawings. 26. FINAL CLEANING A. Execute final cleaning prior to final inspection. B Thoroughly clean interior and exterior surfaces exposed to view C Remove waste and surplus materials, rubbish, and construction facilities from the site. Old Courthouse Boiler Replacement -Phase II June 2009 DIVISION ONE GENERAL REQUIREMENTS General Reauirements Section 01001 27 ADJUSTING A. Perform test of water treatment system to assure that all equipment is operating correctly including filters, pump, controls, valves, and alarm systems. 28. WARRANTIES A. Provide duplicate notarized copies. B Execute and assemble transferable warranty documents from Subcontractors, suppliers, and manufacturers. C Submit prior to final application for payment END OF SECTION 01001 Old Courthouse Boiler Replacement -Phase II June 2009 49AM men 1n Fn% irunme:ntal C uwnlixncc C'oni Firm Report Date November 9 2007 Clallam County Attn Joe Winborn 223 East 4 Street, Suite 7 Port Angeles, Washington NOW Env nin nta P rV 639 Executive Summary RE. Asbestos Survey Report Boiler 223 East 4`" located In Port Angeles WA NOW Project Number 07 -0497 Dear Mr Winborn On October 26 2007 under an agreement with your organization, we performed a limited asbestos survey on the old boiler located at 223 East 4` in Port Angeles, Washington. At your request, the purpose of this survey was to ascertain the existence of asbestos containing materials associated with the old boiler as well as providing characterization and quantities. The boiler has a foot print of approximately 240 square feet. This survey was performed in conformance with procedures and methods outlined in applicable federal, state, and local regulations This survey was performed by an accredited AHERA Building Inspector Ronald Coleman (ABIR- NES -08 -010• Expiration Date June 26 2008) Investigating Protocol and Findings All samples were homogenized collected, processed, and analyzed for content by Polarized Light Microscopy AHERA protocol provides guidance for the number of samples of each material to be collected depending on its category and amount of material present. The goal of AHERA is to ensure statistically reliable data and it accomplishes this by requiring or suggesting a minimum number of samples to be collected, and in some cases, by using random sampling techniques to determine sampling locations Building materials that contain asbestos fibers in the amounts greater than 1 percent (1 is regulated by the Occupational Safety and Health Administration (OSHA) and Puget Sound Clean Air Agency Material(s) meeting this criterion are noted in the table below Upon completion of the field investigation, review of the field notes and review of the laboratory data, all materials (as outlined in the suspect material table) were found to be non detect for asbestos. 34004 9`" Avenue South Building A, Suite 12 Federal Way Washington 98003 Telephone (253) 927 -5233 Facsimile (253) 924 -0323 A 1 10 49AM NOW Env nmPn Pry viro n Ma SI Environmental Compliance Consulting Firm Suspect materials processed and found non detect or containing 1% ffr containing asbestos are listed in the table below Suspect Material Table M4.t omogenization Miscellaneous 1 (Misc. 1) Boiler Blower Seal Miscellaneous 2 (Misc. 2) Fire Brick Miscellaneous 3 (Misc. 3) Fire Brick Mortar Miscellaneous 4 (Misc. 4) Boiler Exterior Brick Miss ellaneous 5 (Misc. 5) Exterior Bride Mortar Miscellaneous 6 (Misc. 6) Outer Top Shelf Boiler N 6391 Negative for ACM Table Please note that should additional materials (not referenced in this repott) be discovered as a result of remodeling or demolition they are to be presumed asbestos containing unless subsequent sampling by an accredited inspector proves otherwise Inaccessible Locations NOW Environmental Services cannot make statements as to the potential presence or absence of asbestos containing materials in inaccessible areas or areas not considered Disclaimer NOW Environmental Services has conducted a survey for asbestos containing materials of the old boiler located at 223 East 4 Street in Port Angeles Washington in conformance with the requirements established by the United States Environmental Protection Agency and the Occupational Safety and Health Administration prior to the engagement of renovation or demolition of the building The sampling strategy and analytical method employed conform to existing and enforceable standards and methods. This Executive Summary of the investigation performed at the subjedt site is Intended to describe asbestos containing materials with the potential of being impacted. We represent that our services were performed within the limits prescribed by applicable regulations and in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances. No other representation is made to the client, expressed or implied and no warranty or guarantee is included or Intende NOW Environmental Report #07 -0497 November 9 2007 223 East •1' Street in Port Ancrles WA Faye of s 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2u(i7 AM NOM Env 1 r m nt,• I ry An Environment9il Compliance Consulting Firm Professionally Yours NOW Environmental Services, Inc Building Inspector Ronald Coleman AHERA Building Inspector NOW Environmental Services Inc. Reviewer rz,) X 639 Other than the Client, other agencies of the U S Federal Govemment, and the Owner reports submitted with respect to services performed under this contract may not be extended to third parties without prior written consent. Questions concerning this Executive Summary may be addressed the undersigned. Thank you for the opportunity to serve you. I hope we can be of assistance to you on future projects. If there is anything additional I can do to expedite your operation, please do not hesitate to let me know Donna McNeal AHERA Building Inspector CEO NOW Environmental Services, Inc NOW Environmental Report 407 -0497 November 9. 2007 223 East 4 Street in Port Angeles. WA Page 3 of 3 G 1 14 0 Q R u v w 4 7 8 NOW Environmental Services Inc. 34004 9 Avenue South, Suite 12 Federal Way, WA 98003 Phone: (253) 927 FAX. (253) 924 www.nowenvironmental.com 1.0 11 12 13 14 15 16 1.7 18 19 20 21. 22 23 24 2.5 26 28 29 30 31 32 33 14 077049/ 60:1410 7 ,thrtH Clailam Lounty Boiler Room 0 223 East 4' Street, Suite 7 att': Port Angeles WA tfoweil 98362 m 0 INO NM NM INN MI OM Ell MI MI NM MN •IIII 111111 1 1 1 01 1 '04 ‚os 1 1 1 1 1 1 Client NOW Environmental Services. Inc 34004 9 Avenue South, Suite 12 Federal Wa'v WA 98003 1 Client Name /Number Project Name I Client N amber I O RIO)V Environmental Services Aualyzed By 71027 74 uAM NOW Env nmPnta Vu Environmental C otupliance C unsulting Firm enuis Rauschenberg Laboratory Analyst Polanzed Light Microscopy Test Relbort EPA Method 600/R- 98/116 Calallam County Boiler 07 -0497 Old Boiler Orion Number Stereo Scone Exam 71027 -69 Boiler Blower Seal Homogeneous 71027 10 Fire Erick Homogeneous 71027 71 f ire Brick Mortar Homogeneous 71027 72 Boiler Extenor Bnck Homogeneous 71027 -73 Extenor Brick Mortar Homogeneous Top Shelf (Outer) Bdiler Homogeneous 4 Reviewed By Date Page Invoice Date Recei ved Sample Asbestos Treatuient Percent Type Crushed ND Crushed ND Crushed ND Crushed ND Crushed ND C rushed ND Duly Laboratory QA/QC Duplicate M, Mastic [(a), (b), (c), etc.] Sample layers numbered from front to back. C onunents. For layered samples, each component has been analyzed separately ND Means non detect for asbestos fibers by EPA Method 6001R- 981116.Disclaimers. PLM has been known to nss asbestos in a small percentage of samples that contain asbestos. Thus, these laboratory results represent di e diligence however negative or <1 %o PLM results can not be guaranteed. Per EPA guidelines samples will he archived for 30 days then will be dis d of This report may only be reproduced in frill with written appro gal ofORION bnvironmenta ices Donna McNeal Laboratory Director, CEO Leading En.vimnmentat Compfance Consulting Into the 21 Century N 639 6 November 07, 2007 Page 1 of 1 076029 October 27 2007 Other Fibers Cellulose Cellulose 34004 9 to. enue South Suite S Fcderal Vb ay Washington 9603 Tacoma. (253) 952 6 1 1 7 Seattle (253) 874-8118 facsinnle (253) 927.4 Email InfAOrionES.net 1FIF W21+9219763 Ar u: f:•sciiic 1nt_ 1 W ti4 Ns 1 us Lfjt$ is to fatal) that Ronald A. Coleman, Jr. tans satisfactoril,j' cotnpletc S hours of refresher training as an Asbestos Supervisor to t.omph) tottlt the tt mmHg requtrelttent of T QE.t Tale Mti it 29 EPA A 192 1 101 (Intl 11 -G qi: 996 Dare. 51 1 1 r:uniug \nnu:,1 Peiceshrr Required 1 CERTIFICATE OF 1 SUBSTANTIAL COMPLETION 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 DATE OF ISSUANCE. ARCHITECT /ENGINEER OWNER Distribution to Owner Arch /Eng Contractor PROJECT Owner /Arch /Eng Project Number TO Contractor Contract for Contract Date: DEFINITION OF DATE OF SUBSTANTIAL COMPLETION The Date of Substantial Completion of the Work or designated portion thereof is the Date certified by the Owner /Architect/Engineer when construction is sufficiently complete, in accordance with the Contract Documents, so the Owner can occupy or utilize the Work or designated portion thereof for the use for which it is intended as expressed in the Contract Documents. PROJECT OR DESIGNATED PORTION SHALL INCLUDE. The work performed under this Contract has been reviewed and found to be substantially complete. The Date of Substantial Completion of the Project or portion thereof designated above is hereby established as 20 which is also the date of commencement of applicable warranties required by the Contract Documents, except as stated below A list of items to be completed or corrected, prepared by the Contractor and verified and amended by the Owner /Architect/Engineer is attached hereto. The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. The date of commencement of warranties for items on the attached list will be the date of final payment unless otherwise agreed to in writing BY DATE The Contractor will complete or correct the Work on the list of items attached hereto within days from the above Date of Substantial Completion CONTRACTOR BY DATE The Owner accepts the Work, or designated portion thereof as substantially complete and will assume full possession thereof at p m. on 20 BY DATE The responsibilities of the Owner and the Contractor for security maintenance, heat, utilities, damage to the Work and insurance shall be as follows: Old Courthouse Boiler Replacement -Phase II June 2009 1 1 State of Washington DEPARTMENT OF LABOR AND INDUSTRIES Prevailing Wage Section Telephone (360) 902 5335 PO Box 44540, Olympia, WA 98504 -4540 Washington State Prevailing Wage Rates For Public Works Contracts The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, workers' wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements is provided on the Benefit Code Key CLALLAM COUNTY EFFECTIVE 03 -04 -2009 (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code ASBESTOS ABATEMENT WORKERS JOURNEY LEVEL $38.12 1H 5D BOILERMAKERS JOURNEY LEVEL $53.37 1C 5N BRICK AND MARBLE MASONS JOURNEY LEVEL $45.05 1M 5A CABINET MAKERS (IN SHOP) JOURNEY LEVEL $14 67 1 CARPENTERS ACOUSTICAL WORKER $46.32 1M 5D BRIDGE, DOCK AND WARF CARPENTERS $46.16 1M 5D CARPENTER $46.16 1M 5D CREOSOTED MATERIAL $46.26 1M 5D DRYWALL APPLICATOR $46.42 1M 5D FLOOR FINISHER $46.16 1M 5D FLOOR LAYER $46.16 1M 5D FLOOR SANDER $46.16 1M 5D MILLWRIGHT AND MACHINE ERECTORS $47 16 1M 5D PILEDRIVERS, DRIVING, PULLING, PLACING COLLARS AND WELDING $46.36 1M 5D SAWFILER $46.16 1M 5D SHINGLER $46.16 1M 5D STATIONARY POWER SAW OPERATOR $46.16 1M 5D STATIONARY WOODWORKING TOOLS $46.16 1M 5D CEMENT MASONS JOURNEY LEVEL $38.12 1H 5D DIVERS TENDERS DIVER $96.81 1M 5D 8A DIVER ON STANDBY $54 19 1M 5D DIVER TENDER $49.84 1M 5D DREDGE WORKERS ASSISTANT ENGINEER $47 09 1T 5D 8L ASSISTANT MATE (DECKHAND) $46.58 1T 5D 8L BOATMEN $47 09 1T 5D 8L ENGINEER WELDER $47 14 1T 5D 8L LEVERMAN, HYDRAULIC $48.71 1T 5D 8L MAINTENANCE $46.58 1T 5D 8L MATES $47.09 1T 5D 8L OILER $46.71 IT 513 8L DRYWALL TAPERS JOURNEY LEVEL $46.34 1E 5P ELECTRICAL FIXTURE MAINTENANCE WORKERS JOURNEY LEVEL $9.37 1 Page 1 CLALLAM COUNTY EFFECTIVE 03 -04 -2009 (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code ELECTRICIANS INSIDE CABLE SPLICER $58.34 1E 5A CABLE SPLICER (TUNNEL) $62.86 1E 5A CERTIFIED WELDER $56.29 1 E 5A CERTIFIED WELDER (TUNNEL) $60.60 1E 5A CONSTRUCTION STOCK PERSON $28.83 1E 5A JOURNEY LEVEL $54.25 1E 5A JOURNEY LEVEL (TUNNEL) $58.34 1E 5A ELECTRICIANS MOTOR SHOP CRAFTSMAN $15.37 2A 6C JOURNEY LEVEL $14.69 2A 6C ELECTRICIANS POWERLINE CONSTRUCTION CABLE SPLICER $58.36 4A 5A CERTIFIED LINE WELDER $53.30 4A 5A GROUNDPERSON $38.14 4A 5A HEAD GROUNDPERSON $40.25 4A 5A HEAVY LINE EQUIPMENT OPERATOR $53.30 4A 5A JACKHAMMER OPERATOR $40.25 4A 5A JOURNEY LEVEL LINEPERSON $53.30 4A 5A LINE EQUIPMENT OPERATOR $45.14 4A 5A POLE SPRAYER $53.30 4A 5A POWDERPERSON $40.25 4A 5A ELECTRONIC TECHNICIANS ELECTRONIC TECHNICIANS JOURNEY LEVEL $12.07 1 ELEVATOR CONSTRUCTORS MECHANIC $64.81 4A 6Q MECHANIC IN CHARGE $70.60 4A 6Q FABRICATED PRECAST CONCRETE PRODUCTS ALL CLASSIFICATIONS $13.50 1 FENCE ERECTORS FENCE ERECTOR $13.80 1 FENCE LABORER $1160 1 FLAGGERS JOURNEY LEVEL $32.47 1H 5D GLAZIERS JOURNEY LEVEL $45.25 1Y 5G HEAT FROST INSULATORS AND ASBESTOS WORKERS MECHANIC $48.28 1S 5J HEATING EQUIPMENT MECHANICS MECHANIC $16.00 1 HOD CARRIERS MASON TENDERS JOURNEY LEVEL $39.31 1H 5D INDUSTRIAL ENGINE AND MACHINE MECHANICS MECHANIC $15.65 1 INDUSTRIAL POWER VACUUM CLEANER JOURNEY LEVEL $9.24 1 INLAND BOATMEN CAPTAIN $59.22 1 COOK $34.81 1 DECKHAND $34.52 1 ENGINEER/DECKHAND $58.62 1 MATE, LAUNCH OPERATOR $50.20 1 Page 2 CLALLAM COUNTY EFFECTIVE 03 -04 -2009 (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code INSPECTION /CLEANING /SEALING OF SEWER WATER SYSTEMS BY REMOTE CONTROL CLEANER OPERATOR, FOAMER OPERATOR $9 73 1 GROUT TRUCK OPERATOR $11 48 1 HEAD OPERATOR $12.78 1 TECHNICIAN $8.55 1 TV TRUCK OPERATOR $10.53 1 INSULATION APPLICATORS JOURNEY LEVEL $20.50 1 IRONWORKERS JOURNEY LEVEL $51 01 10 5A LABORERS ASPHALT RAKER $39.31 1H 5D BALLAST REGULATOR MACHINE $38.12 1H 5D BATCH WEIGHMAN $32.47 1H 5D BRUSH CUTTER $38.12 1H 5D BRUSH HOG FEEDER $38.12 1H 5D BURNERS $38.12 1H 5D CARPENTER TENDER $38.12 1H 5D CASSION WORKER $39.31 1H 5D CEMENT DUMPER/PAVING $38.83 1H 5D CEMENT FINISHER TENDER $38.12 1H 5D CHANGE -HOUSE MAN OR DRY SHACKMAN $38.12 1H 5D CHIPPING GUN (OVER 30 LBS) $38.83 1H 5D CHIPPING GUN (UNDER 30 LBS) $38.12 11-1 5D CHOKER SETTER $38.12 1H 50 CHUCK TENDER $38.12 1H 5D CLEAN -UP LABORER $38.12 1H 5D CONCRETE DUMPER/CHUTE OPERATOR $38.83 1H 5D CONCRETE FORM STRIPPER $38.12 1H 5D CONCRETE SAW OPERATOR $38.83 1H 5D CRUSHER FEEDER $32.47 1H 5D CURING LABORER $38.12 1H 5D DEMOLITION, WRECKING MOVING (INCLUDING CHARRED MATERIALS) $38.12 1H 5D DITCH DIGGER $38.12 1H 5D DIVER $39.31 1H 5D DRILL OPERATOR (HYDRAULIC, DIAMOND) $38.83 1H 5D DRILL OPERATOR, AIRTRAC $39.31 1H 5D DUMPMAN $38.12 1H 5D EPDXY TECHNICIAN $38.12 1H 5D EROSION CONTROL WORKER $38.12 1H 5D FALLER/BUCKER, CHAIN SAW $38.83 1H 5D FINAL DETAIL CLEANUP (i.e. dusting, vacuuming, window cleaning; NOT $29 65 1H 5D construction debris cleanup) FINE GRADERS $38.12 1H 5D FIRE WATCH $32.47 1H 50 FORM SETTER $38.12 1H 5D GABION BASKET BUILDER $38.12 1H 5D GENERAL LABORER $38.12 1H 5D GRADE CHECKER TRANSIT PERSON $39.31 1H 5D GRINDERS $38.12 1H 5D GROUT MACHINE TENDER $38.12 1H 5D Page 3 CLALLAM COUNTY EFFECTIVE 03 -04 -2009 (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code GUARDRAIL ERECTOR $38.12 1H 5D HAZARDOUS WASTE WORKER LEVEL A $39.31 1H 5D HAZARDOUS WASTE WORKER LEVEL B $38.83 1H 5D HAZARDOUS WASTE WORKER LEVEL C $38.12 1H 5D HIGH SCALER $39.31 1H 5D HOD CARRIER/MORTARMAN $39.31 1H 5D JACKHAMMER $38.83 1H 5D LASER BEAM OPERATOR $38.83 1H 5D MANHOLE BUILDER MUDMAN $38.83 11-1 5D MATERIAL YARDMAN $38.12 11-1 5D MINER $39.31 1H 5D NOZZLEMAN, CONCRETE PUMP GREEN CUTTER WHEN USING HIGH $38.83 1H 5D PRESSURE AIR WATER ON CONCRETE ROCK, SANDBLAST GUNITE, SHOTCRETE, WATER BLASTER PAVEMENT BREAKER $38.83 1H 5D PLOT CAR $32.47 1H 5D PIPE POT TENDER $38.83 1H 5D PIPE RELINER (NOT INSERT TYPE) $38.83 1H 5D PIPELAYER CAULKER $38.83 1H 5D PIPELAYER CAULKER (LEAD) $39.31 1H 5D PIPEWRAPPER $38.83 1H 5D POT TENDER $38.12 1H 5D POWDERMAN $39.31 1H 5D POWDERMAN HELPER $38.12 1H 5D POWERJACKS $38.83 1H 5D RAILROAD SPIKE PULLER (POWER) $38.83 11-1 5D RE TIMBERMAN $39.31 1H 5D RIPRAP MAN $38.12 1H 5D RODDER $38.83 1H 5D SCAFFOLD ERECTOR $38.12 1H 5D SCALE PERSON $38.12 1H 50 SIGNALMAN $38.12 1H 5D SLOPER (OVER 20 $38.83 1H 5D SLOPER SPRAYMAN $38.12 11-I 5D SPREADER (CLARY POWER OR SIMILAR TYPES) $38.83 1H 5D SPREADER (CONCRETE) $38.83 1H 5D STAKE HOPPER $38.12 1H 5D STOCKPILER $38.12 1H 5D TAMPER SIMILAR ELECTRIC, AIR GAS $38.83 111 5D TAMPER (MULTIPLE SELF PROPELLED) $38.83 1H 5D TOOLROOM MAN (AT JOB SITE) $38.12 1H 5D TOPPER TAILER $38.12 1H 5D TRACK LABORER $38.12 1H 5D TRACK LINER (POWER) $38.83 1H 5D TRUCK SPOTTER $38.12 1H 5D TUGGER OPERATOR $38.83 1H 5D VIBRATING SCREED (AIR, GAS, OR ELECTRIC) $38.12 1H 5D VIBRATOR $38.83 1H 5D VINYL SEAMER $38.12 1H 5D WELDER $38.12 1H 5D WELL -POINT LABORER $38.83 1H 5D Page 4 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 CLALLAM COUNTY EFFECTIVE 03 -04 -2009 (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code LABORERS UNDERGROUND SEWER WATER GENERAL LABORER $38.12 1H 5D PIPE LAYER $38.83 1H 5D LANDSCAPE CONSTRUCTION IRRIGATION OR LAWN SPRINKLER INSTALLERS $12.89 1 LANDSCAPE EQUIPMENT OPERATORS OR TRUCK DRIVERS $12.89 1 LANDSCAPING OR PLANTING LABORERS $12.89 1 LATHERS JOURNEY LEVEL $46.42 1M 5D METAL FABRICATION (IN SHOP) FITTER/WELDER $15.16 1 LABORER $11 13 1 MACHINE OPERATOR $10 66 1 PAINTER $11 41 1 PAINTERS JOURNEY LEVEL $34.87 2B 6Z PLASTERERS JOURNEY LEVEL $25.83 1 PLAYGROUND PARK EQUIPMENT INSTALLERS JOURNEY LEVEL $8.55 1 PLUMBERS PIPEFITTERS JOURNEY LEVEL $62.19 1G 5A POWER EQUIPMENT OPERATORS ASSISTANT ENGINEERS $44 64 1T 5D 8P BACKHOE, EXCAVATOR SHOVEL, OVER 50 METRIC TONS TO 90 METRIC $48.46 1T 50 8P TONS BACKHOE, EXCAVATOR SHOVEL, OVER 90 METRIC TONS $49.03 1T 5D 8P BACKHOE, EXCAVATOR, SHOVEL, OVER 30 METRIC TONS TO 50 $47.91 1T 5D 8P METRIC TONS BACKHOE, EXCAVATOR, SHOVEL, TRACTORS UNDER 15 METRIC TONS $47 00 1T 5D 8P BACKHOE, EXCAVATOR, SHOVEL, TRACTORS: 15 TO 30 METRIC TONS $47 42 1T 5D 8P BARRIER MACHINE (ZIPPER) $47 42 1T 5D 8P BATCH PLANT OPERATOR, CONCRETE $47 42 1T 5D 8P BELT LOADERS (ELEVATING TYPE) $47.00 IT 5D 8P BOBCAT (SKID STEER) $44.64 1T 5D 8P BROKK- REMOTE DEMOLITION EQUIPMENT $44 64 1T 513 8P BROOMS $44 64 1T 5D 8P BUMP CUTTER $47 42 1T 5D 8P CABLEWAYS $47.91 1T 5D 8P CHIPPER $47 42 1T 5D 8P COMPRESSORS $44 64 1T 50 8P CONCRETE FINISH MACHINE LASER SCREED $44.64 1T 5D 8P CONCRETE PUMPS $47 00 1T 5D 8P CONCRETE PUMP -TRUCK MOUNT WITH BOOM ATTACHMENT $47 42 IT 5D 8P CONVEYORS $47.00 1T 5D 8P CRANE, FRICTION 100 TONS THROUGH 199 TONS $49.03 1T 5D 8P CRANE, FRICTION OVER 200 TONS $49.59 1T 5D 8P CRANES, THRU 19 TONS, WITH ATTACHMENTS $47 00 1T 5D 8P CRANES, 20 44 TONS, WITH ATTACHMENTS $47 42 1T 5D 8P CRANES, 45 TONS 99 TONS, UNDER 150 FT OF BOOM (INCLUDING JIB $47.91 1T 5D 8P WITH ATACHMENTS) CRANES, 100 TONS 199 TONS, OR 150 FT OF BOOM (INCLUDING JIB $48.46 1T 5D 8P WITH ATTACHMENTS) Page 5 CLALLAM COUNTY EFFECTIVE 03 -04 -2009 (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code CRANES, 200 TONS TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB $49.03 1T 5D 8P WITH ATTACHMENTS) CRANES, A- FRAME, 10 TON AND UNDER $44.64 1T 5D 8P CRANES, A- FRAME, OVER 10 TON $47.00 1T 5D 8P CRANES, OVER 300 TONS, OR 300' OF BOOM INCLUDING JIB WITH $49.59 1T 5D BP ATTACHMENTS CRANES, OVERHEAD BRIDGE TYPE 20 44 TONS) $47 42 1T 50 8P CRANES, OVERHEAD BRIDGE TYPE (45 99 TONS) $47.91 1T 5D 8P CRANES, OVERHEAD BRIDGE TYPE (100 TONS OVER) $48.46 1T 5D 8P CRANES, TOWER CRANE UP TO 175' IN HEIGHT BASE TO BOOM $48.46 IT 5D 8P CRANES, TOWER CRANE OVER 175' IN HEIGHT BASE TO BOOM $49.03 1T 5D 8P CRUSHERS $47 42 1T 5D 8P DECK ENGINEER/DECK WINCHES (POWER) $47 42 1T 50 8P DERRICK, BUILDING $47.91 1T 5D 8P DOZERS, 0 -9 UNDER $47.00 1T 5D 8P DRILL OILERS AUGER TYPE, TRUCK OR CRANE MOUNT $47.00 1T 5D 8P DRILLING MACHINE $47 42 1T 5D 8P ELEVATOR AND MANLIFT PERMANENT AND SHAFT TYPE $44.64 1T 5D 8P EQUIPMENT SERVICE ENGINEER (OILER) $47.00 1T 5D 8P FINISHING MACHINE /BIDWELL GAMACO AND SIMILAR EQUIP $47 42 1T 5D 8P FORK LIFTS (3000 LBS AND OVER) $47.00 1T 5D 8P FORK LIFTS (UNDER 3000 LBS) $44.64 1T 5D 8P GRADE ENGINEER $47 00 1T 5D 8P GRADECHECKER AND STAKEMAN $44 64 1T 5D 8P GUARDRAIL PUNCH $47 42 1T 5D 8P HOISTS, OUTSIDE (ELEVATORS AND MANLIFTS), AIR TUGGERS $47 00 1T 5D 8P HORIZONTAUDIRECTIONAL DRILL LOCATOR $47.00 IT 5D 8P HORIZONTAUDIRECTIONAL DRILL OPERATOR $47 42 1T 5D 8P HYDRALIFTS /BOOM TRUCKS (10 TON UNDER) $44.64 1T 5D 8P HYDRALIFTS /BOOM TRUCKS (OVER 10 TON) $47.00 1T 5D 8P LOADERS, OVERHEAD (6 YD UP TO 8 YD) $47.91 IT 5D 8P LOADERS, OVERHEAD (8 YD OVER) $48.46 1T 5D 8P LOADERS, OVERHEAD (UNDER 6 YD), PLANT FEED $47 42 1T 5D 8P LOCOMOTIVES ALL $47 42 1T 50 8P MECHANICS, ALL $48.46 IT 5D 8P MIXERS, ASPHALT PLANT $47 42 1T 5D 8P MOTOR PATROL GRADER (FINISHING) $47.91 1T 5D 8P MOTOR PATROL GRADER (NON FINISHING) $47.00 1T 5D 8P MUCKING MACHINE, MOLE, TUNNEL DRILL AND /OR SHIELD $47.91 1T 5D 8P OIL DISTRIBUTORS, BLOWER DISTRIBUTION AND MULCH SEEDING $44.64 1T 5D 8P OPERATOR PAVEMENT BREAKER $44.64 IT 5D 8P PILEDRIVER (OTHER THAN CRANE MOUNT) $47 42 IT 5D 8P PLANT OILER (ASPHALT CRUSHER) $47.00 1T 5D 8P POSTHOLE DIGGER, MECHANICAL $44.64 1T 5D 8P POWER PLANT $44.64 1T 5D 8P PUMPS, WATER $44 64 IT 5D 8P QUAD 9, D -10, AND HD-41 $47.91 1T 5D 8P QUICK TOWER -NO CAB, UNDER 100 FEET IN HEIGHT BASED TO BOOM $44.64 1T 5D 8P REMOTE CONTROL OPERATOR ON RUBBER TIRED EARTH MOVING $47.91 1T 5D 8P EQUIP RIGGER AND BELLMAN $44 64 1T 5D 8P ROLLAGON $47.91 IT 5D 8P Page 6 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 CLALLAM COUNTY EFFECTIVE 03 -04 -2009 (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code ROLLER, OTHER THAN PLANT ROAD MIX $44 64 1T 5D 8P ROLLERS, PLANTMIX OR MULTILIFT MATERIALS $47.00 1T 513 8P ROTO -MILL, ROTO- GRINDER $47 42 1T 5D 8P SAWS, CONCRETE $47.00 1T 5D 8P SCRAPERS SELF PROPELLED HARD TAIL END DUMP ARTICULATING $47.91 1T 5D 8P OFF -ROAD EQUIPMENT (45 YD AND OVER) SCRAPERS CONCRETE AND CARRY ALL $47 00 1T 5D 8P SCREED MAN $47 42 1T 5D 8P SHOTCRETE GUNITE $44 64 1T 50 8P SLIPFORM PAVERS $47.91 1T 5D 8P SPREADER, TOPSIDER SCREEDMAN $47.91 1T 5D 8P SUBGRADE TRIMMER $47 42 1T 5D 8P TOWER BUCKET ELEVATORS $47.00 1T 5D 8P TRACTORS, (75 HP UNDER) $47 00 1T 5D 8P TRACTORS, (OVER 75 HP) $47 42 IT 5D 8P TRANSFER MATERIAL SERVICE MACHINE $47 42 1T 5D 8P TRANSPORTERS, ALL TRACK OR TRUCK TYPE $47.91 IT 5D 8P TRENCHING MACHINES $47.00 1T 5D 8P TRUCK CRANE OILER/DRIVER UNDER 100 TON) $47 00 IT 5D 8P TRUCK CRANE OILER/DRIVER (100 TON OVER) $47 42 1T 5D 8P TRUCK MOUNT PORTABLE CONVEYER $47 42 1T 5D 8P WHEEL TRACTORS FARMALL TYPE $44 64 IT 5D 8P YO YO PAY DOZER $47 42 1T 51) 8P POWER EQUIPMENT OPERATORS UNDERGROUND SEWER WATER (SEE POWER EQUIPMENT OPERATORS) POWER LINE CLEARANCE TREE TRIMMERS JOURNEY LEVEL IN CHARGE $39.29 4A 5A SPRAY PERSON $37.21 4A 5A TREE EQUIPMENT OPERATOR $37.81 4A 5A TREE TRIMMER $35.18 4A 5A TREE TRIMMER GROUNDPERSON $26.55 4A 5A REFRIGERATION AIR CONDITIONING MECHANICS MECHANIC $27.68 1 RESIDENTIAL BRICK MARBLE MASONS JOURNEY LEVEL $45.05 1M 5A RESIDENTIAL CARPENTERS JOURNEY LEVEL $17.85 1 RESIDENTIAL CEMENT MASONS JOURNEY LEVEL $25.63 1 RESIDENTIAL DRYWALL TAPERS JOURNEY LEVEL $18.00 1 RESIDENTIAL ELECTRICIANS JOURNEY LEVEL $27 78 1 RESIDENTIAL GLAZIERS JOURNEY LEVEL $21.36 1 RESIDENTIAL INSULATION APPLICATORS JOURNEY LEVEL $9.86 1 RESIDENTIAL LABORERS JOURNEY LEVEL $18.08 1 RESIDENTIAL PAINTERS JOURNEY LEVEL $15.97 1 Page 7 CLALLAM COUNTY EFFECTIVE 03 -04 -2009 (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code RESIDENTIAL PLUMBERS PIPEFITTERS JOURNEY LEVEL $14 60 1 RESIDENTIAL REFRIGERATION AIR CONDITIONING MECHANICS JOURNEY LEVEL $60.56 1G 5A RESIDENTIAL SHEET METAL WORKERS JOURNEY LEVEL (FIELD OR SHOP) $34 14 11 6L RESIDENTIAL SOFT FLOOR LAYERS JOURNEY LEVEL $10.88 1 RESIDENTIAL SPRINKLER FITTERS (FIRE PROTECTION) JOURNEY LEVEL $19.67 1 ROOFERS JOURNEY LEVEL $38.28 1R 5A USING IRRITABLE BITUMINOUS MATERIALS $41.28 1R 5A SHEET METAL WORKERS JOURNEY LEVEL (FIELD OR SHOP) $55.27 1E 6L SHIPBUILDING SHIP REPAIR BOILERMAKER $32.56 1H 6W HEAT FROST INSULATOR $48.28 1S 5J LABORER $12.16 1 MACHINIST $17 16 1 SHIPFITTER $14.66 1 WELDER/BURNER $14.66 1 SIGN MAKERS INSTALLERS (ELECTRICAL) JOURNEY LEVEL $19.29 1 SIGN MAKERS INSTALLERS (NON- ELECTRICAL) JOURNEY LEVEL $12.15 1 SOFT FLOOR LAYERS JOURNEY LEVEL $38.18 1B 5A SOLAR CONTROLS FOR WINDOWS JOURNEY LEVEL $10.31 1B 50 SPRINKLER FITTERS (FIRE PROTECTION) JOURNEY LEVEL $19.67 1 STAGE RIGGING MECHANICS (NON STRUCTURAL) JOURNEY LEVEL $13.23 1 SURVEYORS CHAIN PERSON $9.35 1 INSTRUMENT PERSON $11 40 1 PARTY CHIEF $13.40 1 TELECOMMUNICATION TECHNICIANS TELECOMMUNICATION TECHNICIANS JOURNEY LEVEL $32.34 1E 5A TELEPHONE LINE CONSTRUCTION OUTSIDE CABLE SPLICER $31 46 2B 5A HOLE DIGGER/GROUND PERSON $17.58 2B 5A INSTALLER (REPAIRER) $30.17 2B 5A JOURNEY LEVEL TELEPHONE LINEPERSON $29.26 2B 5A SPECIAL APPARATUS INSTALLER I $31 46 2B 5A SPECIAL APPARATUS INSTALLER II $30.82 2B 5A TELEPHONE EQUIPMENT OPERATOR (HEAVY) $31 46 2B 5A TELEPHONE EQUIPMENT OPERATOR (LIGHT) $29.26 2B 5A TELEVISION GROUND PERSON $16.67 2B 5A TELEVISION LINEPERSON /INSTALLER $22.19 2B 5A TELEVISION SYSTEM TECHNICIAN $26.42 2B 5A Page 8 CLALLAM COUNTY EFFECTIVE 03 -04 -2009 (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code TELEVISION TECHNICIAN $23.76 2B 5A TREE TRIMMER $29.26 2B 5A TERRAZZO WORKERS TILE SETTERS JOURNEY LEVEL $43.61 1M 5A TILE, MARBLE TERRAZZO FINISHERS FINISHER $37 44 16 5A TRAFFIC CONTROL STRIPERS JOURNEY LEVEL $37.90 1K 5A TRUCK DRIVERS ASPHALT MIX TO 16 YARDS) $43.45 1T 5D 8L ASPHALT MIX (OVER 16 YARDS) $44.25 1T 5D 8L DUMP TRUCK $20.23 1 DUMP TRUCK TRAILER $20.23 1 OTHER TRUCKS $44.25 1T 5D 8L TRANSIT MIXER $23.73 1 WELL DRILLERS IRRIGATION PUMP INSTALLERS IRRIGATION PUMP INSTALLER $11 60 1 OILER $9.45 1 WELL DRILLER $11 60 1 Page 9 EN I• I• I= I• 0 I'm mil 11 ilriqiii111114;11 II I 1' 11110 .zo.a §v *+•1116 +rtt0 o O z ti 1111111 ii A 1 5 yi"i 2gz r iiii1001119" U"iir 11044 laP1H I H SNEET STLE PROJECT 1111E p N g A 8 1 PP 1g b p N A 8 LEGENDS, ABBREVIATIONS, SCHEDULES PIPING DIAGRAM PROTECT 620601CH aALLAM COUNTY COURTHOUSE 223 EAST 4TH STREET PORT ANGELES, WASHINGTON G g 1 e r g El a 03 1 8 4 43 Y o g 5 1A0 gRilii i g g; I Wi ;i1 a 1 MEUUNK ff: IRS W. FPS AW... IUTE•201 SPOKANE, WA 1@01 Aux a Jp410/0 Par OCM (2421ID 1 CONSULTANTS g P 0 c 5 >4 a 0 0 1 tt woe on ao so ow ani, ao w wow I SI /1. V 1 9 to o $yam as 7 p Zy C Y Q g l l s a Nvo, t L j q �y� 1 Ili g w c' 011 �Y� isAt; 5b :2 412 a'�QQ 4 o �Iq *A A ll itIt i eg 4 hili 0 ea In 1- t LP 1 4 4 V Ail t X125 to tl 51 014 re It 1 1 0 Q 9 T s�,A 01 1 u ni t" 1 6 I WO PIM ielt ..j l l* ta III i i All 0 V i i 41 1;7 1 1U Ot I I t q a i 161‘ 0 i 'i; i c1 i 1142 If 4 r 4 n 11 11 1 0 t 10 ei t till A 0 P tit ihtl 0 Du 114 W$74- n vit 08 I i y dit qvi h, Iv 1 0 4 1255 0 va M I t s 4 g 11 g 1 i r 1 1 1,1 11 a$ V 1 ill g a 1 Mg 2 ofig IR i 9 l tt r W 1 %1 010 1 00 4 1 1 i :t t L `d U 2 �i y� Y Y f 7.!' g 9 L ZN f. 1 u. �j N 1 19 Y Q °r S Q pQ f 'l7� R 1 i a, At 11 A 8 al It 1,., t t u �s 0 41 g �Q A. s ot a3 al 1 1 10 ilVt ig tt t 4 A CIL a N to t r 4 4 $q*�. 4II119^° 1 IVp� Ill �'�`a s i nk s?m� F gl le i 01% +4 tit t I 9 ,0 1 4f# 41 4 1P 1 1 fi q 1 pi g V ti i i t 1 il 0 i tt 1 i si 1 t °4 PIA iisi ,0 a s g4 1 g I tl qs it i .1 T•A 1. 0 A V.'A 0 t 1% i e 4 I 5 i l 4t 0 I lli; 4 s $1 ih II i t 1 I ti IA 0 ii t i tit l z ;04 Vs li A lit 1 0 -:1 41 i q4 U 1 i 1 1111 i l 1 1 11 1 1 1 I li Vi li Ps t til p 1,1 t A I% VI c i l tis 0 ii a g 0 P m 00 1 A i 1 1 l st P n i P 1 .9 MA 1 1 %ill 11 VI 1 11 t i 4 r P r. r nil 0.: Va 4 11 WI W en 1 T. P P s' l l i s% an 11 DV It i PI 9 4 1. o i P I 'ig III V 5 1 1 1 i i If nti iltrii 1 11 %IP< I. i 4 7 :1 4 l' 2 fI r 6 1 .1°4 1 111 t i l i l t a el ext9, 4 t 18 51 1 1 1 1, IT W: WI 1 A 1 1 11 t 1/ ti w ti, A4 ti 41 p io lowi Ti 1 I- 'ott 'i i I' V 11:5 otl, i 1 1 A 1.4 fo isilivi 13 1,14 II IA tliglim ,ci,,,,, A 1 41 W tl 1 I V A; 1 Wi i I 0 1 t Ail Vi h t tilt III 5 6 Ill ilti 1 4 1 3 t g t 4 11 OA 5 1 1 10 4 i! i 4i wg t -4 1i 11 Y 1 11 6 614 i' A 1014 144 g 1 Vt t i l I i g P r 4 in 1- s I !LF t. 010 11 8 A tt 11; "1 PS4 1 lit W VIPM 4 a l' n 1 0 0 r 11 i t ii 3,' 1 P 1 1 1 11 1 7 14 1W 1 P 11 i IR 1 1 1! 1 1V1 1 0 a in ri tA fig &YAW t 0 4 N lA r -lc's 1 inlqx I ii 4 P /1 6 t 1 OS 1 1 P 01 1 t i mi 4 41 pitephit ti r 4 k 1 4 q le e, .vc -1 5' ti i i tt 5 g 11 WI i i I sti l liiii il 11 14 4 0 L St f. i i A S i U i t% A 1; t il 5 A 1 1 k tiii i att l i0 4 2 g At ,,A 11 MI $1 n 11 ;1 1; g i 1 0 4 114 PI4A *V xi A A 1 4 4 il il 1 Ye a ti 13- 4 1 3 4 l i t i W% 1 :00 1 fl A 1 4 131 A 31 tg 919 4 ls p, 1 0 s p 0 0, U it A ti Pi AO i A 11A, Ill 1 1 11 11 1 4 Av 0 1 1 i4 q ,lolgtt g t,, -I HAN I t 1 i d 4 ii tg A I i a 1 t 3 10A D h t II A hi 43 1, c?4 1,40s 1 I it+ A 1 4 il It% 1- %Alla 1 v 0 i i $i t 1 s id ti i hoe. i g t; g 1 1 Ill i ig 1 it tP I i f 1 r„..tto 11 I; 11; 1 ni; il 41 lIt il 1 I 1 1 lit o lig IA 541 lq 1 l le a g t.1Gtt4EE� NG m E SPEGFlACIIONS son US 3 8 4 r 70 n� �r6Z 1 �y l� 3t 9A a f fM� �w{ 4 (S TREET i'y' j CUO �r �.W��. HING c PORT ANGELES, WAS i MOM M EM MN MN _I —t In o P A P f P P o' A i P P N 4w i Ai g g v is ti r iq J "i 1 1 a 1 it s� m 4: 2�2. S* SC yi Y a t X 2 1 x It €i g g 4 „a 1 1 g g00 11 4 it jgp 1 1 i i ;APIA §:A A p it i g 0 P" p s °g 0 s i m 2 Ns� PROJECT tmt PROJECT 620601 CH CLALLAM COUNTY COURTHOUSE 223 EAST 4TH STREET PORT ANGELES, WASHINGTON w r N n m SHEET not caskruas: SPECIFICATIONS ENG I_I EE ENGINEERING INC. 1375 W. Fist AYE, 211E na MAC, WA amt Ram (SA R41030 Pa Pss/sE4a1m MINI MO M r NM MI N. NW MN I Pliiiri Algll A° s F 2. Q WPM 028Aar24 i ppPlio liqiil: I Illii4 I; AA m OOP r I SHEET 1111E PROJECT 1711E FUEL OIL DEMOLITION PLAN PROJECT 62060101 CIALLAM COUNTY COURTHOUSE 223 EAST 4TH STREET PORT ANGELES, WASHINGTON r MEULINK ENGINEERING INC. 1325'1.PRIT AVE. 5111E KU *TIME WA IOW Plmc aUn @*1050 PC PI) d Q L 2 COKSULTWIS. MV FUEL 011. SUPPL AND RETURN PIPING I REMOVE EXISTING PIPING 4• STEAM SHUT OFF VALVE 10 1 REMOVE AND DISPOSE OF ROAN. PROVIDE WELDED CAP I EXISTING WATER HEATER ON PIPRHG rW J J YON TO TRAP 11104 TO CONDENSATE TANK r r I I I I tel re I I I I I 2N" 10 L J 2l 1 SALVAGE BONER COORS TO OWNER El1S11NG WASHING MACHINE TO BE RELOCATED 1 J REMOVE EXISTING FLUE TO CHIMNEY BOILER ROOM DEMCUTIC NM/AC wr.Mr COSTING BACCFLOW PREVENT%) AND CONDENSATE TO REMAIN PI SERVICE UNTIL NEW BOILER IS T "—COSTING CLOTHES DRYER V. TO BE RELOCATED ,-2Vi REMOVE AND ...New, OF COSTING WATER HEATER e p u 18 LRQIOVE CW HW BRANCH PIING BACK TO MAIN AND CAP i 3C 3C 3C 3C 3C 3C 3C 3C 3 BOILER ROOM DEMOAUTICNPLUAIB/NO way wr.R 0 TN Tr AND PLYWOOD FRAME. COORDINATE WITH NEW WORI(. UP 'SR UP —2'S UP —SR OFF BOTTOM OF .E Ll FEMOVE EXISTING BOILER AND REFACTORY, DOWN TO .........c.c FLOOR ,-PUU_ FLUE DEBRIS FROM CHNNEY CLEAN-WT BEFORE SEARING CLOSED 114 NEW WORK. EXISTING ao1HES DRIER TO BE RELOCATED REMOVE SINK AND PIPING. CAP AT MANS OPEN ENDED DUCT WH114 MIRE MESH SCREEN 2 J 1_, e\ 0 4J F O 2l L Yf BOILER ROOM PLAN STEAM/INAC roite INTERCEPT COSTING ORAN UNOFRFLOOR AND 11E N NEW FLOOR DRAIN. PATCH FLOOR TO MATCH ENDING 1i COORDINATE PIPING 1.11)1 I 1; INSTALLATION 1)1146 1W1H I I COSTING BELOW I I' GRADE VAULT _J_ _1 ROU1E 1 MAKE UP l J WATER TO CONDENSATE PUMP CO140N1A1E ELECTRICAL CONNEC110N 270-1 /NEEDED CAPS ON EXISTING BOILER FLUE ATTACH STEEL PLATE TO CHIMNEY TO COVER HOLE CREATED BY FLUE PROVE =ANUIT 1 NEW LAUNOR SINK COIF •1 8 6 COIF 2 cWWA5*4(RR COSTING 4 It[ DE 1 1/2 VENT PITO EWSNG VENT SYSTEM TIE WASHER DRAIN STAND PIPE TO FLOOR VS DRAB W HW ON PROVIDE 3/4 H8 -1 ATJ FLOOR LEVEL DIRECTLY ABOVE FD-1 FOR WANG BLOW DOWN OF BONER 11E Y VENT 14 1P' DOSING VENT SYSTEM BOILER ROOM PLAN NEW PLUMBING 4 B'WLC 1Fr•tT 'CW WNW DTI J 1 I UONNECT 4• DRYER %E11T TO DRYER DRYER VENT CAP REPLACE EXISTING LOUVER AND PLYLV000 WITH N P1EX00LA55. INSTALL DRYER DISCHARGE N LOWER PORTION OF PLCOGLASS. LOCATE LOUVER IN UPPER PORTION OF MCl/GLASS. 11E N PIPING BOILER FEED PUMP PR0NOE 4 CONCRETE HOUSOCEEPING PAD UNDER BOILER AND UNDER CONDENSATE PUMP CAP TOP OF CHIMNEY AND SEAL WATER 11C4T GENERAL NOTES. I. REPLACE EXISTING AUDIBLE BOILER ALARM WITH NEW r AUDIBLE MAW PRONGED BY �f BOILER MANUFACTURER 2. MARK ALL GAUGES LW111 NORMAL GPERATNG RANGES. 3. CONTRACTOR SHALL COORDWATE INSPECTION BY STATE BONER INSPECTOR BEFORE PROJECT IS CCHSDERED COMPLETE --RELOCATED COSTING WASHER AND DRYER COORDINATE PIPING INSTALLATION 041H EI510/G BELOW GRADE VAULT f Y� V EIFY COSTING DRAIN L LOCATION USING CANOVA. SAWCUT COSMIC FLOOR AND INTERCEPT WA51E PIPING 011010 TO NEW %RAN. 0X%411146 CW COTE I `2 FD -1 I 'r lJ GENERA! NQTFa 1. CONTRACTOR SHALL ATE x SEAT OF WATER HEATER STATE Mar ONSID BEFORE E PROJECT I5 CONSIDERED CDMPLEIE. 8 DOE DRANK PROJECT WADER WRAC W. a ZW� Z U gy m? S§ kg OSZ008 ADH ■RI 0728 d3.0 8f as we no MI r —s IMIlJ a JJJ w ..L SHEET >RE PROJECT Rill L FIRST FLOOR MECHANICAL PLAN PROJECT 620601 CH CW.LAM COUNTY COURTHOUSE 223 EAST 4TH STREET PORT ANGELES, WASHINGTON :R X 9 L N N L J. MEUUNK ENG INC. INEERING 1275 W. MST AVE 201E n0/ SPOKANE WA 26201 Row 6241050 he 6242421 CONSULTANTS: A A9 EIA HOY prceso g4( micro 'am MOIR )0 NMq 31Y0 1 PN IW Iw IW .M) V U V .MI J d0.0 Y (03IYlnsM).Mk 10)10.4rr ❑Q dO.Z/ Ml :3Y 13 S33 Meld 2100b 1.330 l 1.338 3513,6 :Ml d0.•A O 1N3NI d30 S tied 1N3A NIV LLY1SOYN3H1 311YA .M c 3O .X833 dA.41 I7 O N3LLd3J3tl 3A1i0 N36N3IX 3318315 1 I 031YY)SNr ,Ml O MOON A81N3 _MI .MIJ 'M3N Him NOLLYYKN ONUSO(3 ANY 33Y3d31 ONldld HY3IS TY NO! NOUYYLSIA 307.10Nd 3171 413111. MI O O MB M r NM OW 1 0 yq SHEET ,111E PROJECT TIE 01 01 THIRD FLOOR MECHANICAL PLAN g PROJECT 620601 CH CLALLAM COUNTY COURTHOUSE 223 EAST 4TH STREET PORT ANGELES, WASHINGTON 0 o 01 MEUUNK E INC. NGINEERING ,lD W. P AVE., EJTE# 4 VOEN( WA NM Thus pco) aHOao Poe cm, 0244,03 0 r 0i i l. C --1=== r- c g t ti 1u 1,\ 0 i qy Pr ON9.LTA/CS: MI MI MI NM I r r MI w 1 Elt >TU PROJECT TITLE o O A 0 PROJECT 620601 CH QALLAM COUNTY COURTHOUSE 223 EAST 4TH Ftt PORT ANGELES, WASHINGTON FOURTH FLOOR MECHANICAL PLAN 0i I I❑ 1) M zg MEUUNK joh, INC ENGINEERING 1225 W. MSTAW.. #1104 SPOKANE. WA 2220f P• (505) 0241060 he ROM 021.2120 0 01 lr 04 I 0341.4.1Nrt5: 1 9 MIN O111 MO w MI w- r ■N MI I M NM NM O- PROJECT IRE 0 0 J FOURTH FLOOR MECHANICAL PLAN PROJECT 620601G1 1 CLALLAM COUNTY COURTHOUSE 223 EAST 4T11 STREET PORT ANGELES, WASHINGTON Q oA A y MEULINK ENGINEERING INC. ISM NV. MIT MS, WE 7ro24 SPEAMEru 77201 Rine (507)1114-1060 r« (504 1014120 01 COHSULTMITS: 5, IIIIII 11111 11.111 all NM IMO Mill NMI NMI MIMI MI IMF MN 0 0-1 g 6 z a 0 L SHEET 11111 PROJECT TITLE .11 BUILDING RISER DIAGRAM 4 PROJECT 620601CH CLALLAM COUNTY COURTHOUSE 223 EAST 4TH STREET PORT ANGELES, WASHINGTON 5. MEUUNK ENGINEERING Isis W. MT AVE. SUITE 0:04 SPCWAAIE WA ORM Mo. 614-1050 Pc PA) C244420 COT A n 1 it I 0 1 1 ma 1 DETAILS, CONTROLS SCHEDULES 62 06 0 a 411I SIREET met mil PROIECT 223 PORT A n it (,s1 w r m s 3. tlt r3 1 i i 0 ION it g sa 1 I g N la 1 3 i p MN il 1 t; Cill j t lA 5 m a y ft 1 4 11 r 9 z tl Pt 111111 g F X t I N it Fsc 6244422 MEUUNK /I: 1 ,7 RING INC. 132SW. 00,024402 J CD �Z 1 1