Loading...
HomeMy WebLinkAbout5.338 Original ContractFiled at the Request of: City of Port Angeles City Clerk's Office P. O. Box 1150 Port Angeles, WA 98362 2005 1164640 City Clerk File No.: Purpose: rite,fri Dated: 33 Interlocal Agreement (UCe,e Ar Clallam County FILED FOR REwr,c 0 a ECOROEL L! t 2005 SEP 28 Agreement between the City of Port Angeles and C3 1 G( 4.4 C_a_s l 5,33$ t ELECTRICAL SERVICE AGREEMENT This AGREEMENT is made and entered into this z4- day of March, 1994, by and between the City of Port Angeles, Washington, hereinafter called the "City," and the Port of Port Angeles, Washington, hereinafter called the "Port." WITNESSETH that: WHEREAS, the Port has requested the City take over ownership of the primary electrical distribution system serving five (5) buildings located on the north one -half of the west one -half of suburban lot number 121; and WHEREAS, the Port paid the City to purchase and install the primary electrical distribution system and primary metering to serve the Rogerson Hiller Corporation; and WHEREAS, the Port owns the building on the site and wants to lease the buildings to individual tenants; and WHEREAS, the City does not allow the electric consumption at each building to be submetered; NOW, THEREFORE, IT IS AGREED between the parties hereto as follows: 1. Transfer of Ownership: The ownership of the primary electrical distribution system (underground primary cable, transformers and related appurtances) serving five (5) buildings located in the north one -half of the west one -half of Suburban Lot 121, Townsite of Port Angeles, as shown on Exhibit "A" attached hereto and made a part of this Agreement, shall be transferred from the Port to the City, pursuant to the provisions of the Port Angeles Municipal Code. The Port will continue to own and maintain the underground secondary cables between the transformers and the buildings. 2. Metering: The electric meter shall be changed from "primary" metering to "secondary" metering. The City will provide current transformers, electric meters and straight time City labor costs for the revision. The Port agrees to provide and install the meter base and the conduit between the current transformers and the meterbase. -1- 5.338 3. Easement: The Port agrees to provide the City with an easement for the location of the primary electrical distribution facilities. 4. Warranty: The City agrees to accept the specified electrical facilities as is with no warranty as to condition or suitability for use by the City. 5. Authority: Each party warrants that the undersigned representative has full and complete legal authority to sign for it and to commit it to the performance of the agreements set forth herein. IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be duly signed and executed in two counterparts as of the day and year first above written. AT ATTEST: A Becky J<J Up .'.n, C ty Clerk tbr•r,itl Oa y PORT OF PORT ANGELES 74,1)14, R J.( Titus, Director PORT ANGELES CITY LIGHT Ek if PARKING OFFICE 80/277 COMPOSITES s BLDG 10.40 1 0 0 9 1 F 4 3 0 480/277 44 P 9 OAVC LCN FABRICATION N.0. BLDG 10.30 WAREHOUSE BLDG 10.20 15 HP AIR BOTHER 1OPUMPS BLDG 10 10 HANGER 25000 t 250000 25000 4t Ti 3.3 S' /a Vc A9CM A 4/0 ALCU 4" PVC