Loading...
HomeMy WebLinkAbout5.372 Original ContractApril 3, 1995 Mitchell Johnson Design Manager Safeway Inc. P. 0. Box 85001 Bellevue, WA 98015 -8501 Attachment CITY OF PORT ANGELES 5, 3 7 c 321 EAST FIFTH ST., P O. BOX 1150 PORT ANGELES, WASHINGTON 98362 PHONE (206) 457 -0411 Re: Agreement Between Safeway and City of Port Angeles for Sharing Storm Drainage Improvement Costs Dear Mr. Johnson: Thank you for your letter of March 29, 1995, transmitting the above referenced agreement. The agreement was approved by the City Council at its meeting of March 21, 1995. Attached is a fully executed copy for your file. Please contact me if I can be of any further assistance. Sincerely yours, 6E(4 L ,tptc_(._ Becky J. Upton City Clerk SAFEWAY. PO Box 85001 Bellevue, WA 98015 -8501 (206) 455-6444 March 29, 1995 Ms. Beth Upton City Clerk City of Port Angeles 321 E 5th Street Port Angeles, WA 98362 Dear Ms. Upton: Enclosed please find two original copies of the storm drainage agreement that have been executed by Safeway. After completing the City's portion, please return a fully executed copy to us. Also enclosed is a check for $86,000.00 to pay for the cost of vacating 4th Street. Should you have any questions, please call. Sincerely i lL .°.....m.l."14.". Mitchell John t I Design Manager Enclosure cc: Sharman Braff John Keegan Bob Blair Dave Messner File T MAR 3 1 1996 CITY OF PORT ANGELES 3- 3 I 96 ,f2001a cu RECYCLED PAPER AGREEMENT FOR SHARING STORM DRAINAGE IMPROVEMENT COSTS THIS CONTRACT is entered into by and between the CITY OF PORT ANGELES and SAFEWAY INC., for the purpose of sharing the cost of storm drainage improvements on Lincoln Street between Fourth Street and the alley between First and Second Streets. WHEREAS, the construction of a new Safeway food center in the City of Port Angeles will cause a direct impact on surface water drainage in the Lincoln Street area, and WHEREAS, the City Engineer has determined that storm drainage improvements can be designed and constructed to efficiently address the needs of the Safeway project while also accommodating future growth in the area,. and WHEREAS, Safeway will be entitled to enter into a developer reimbursement agreement with the City pursuant to Ch 13.68 PAMC in order to recover a pro -rata share of the costs from subsequent users of the storm drainage improvements, and WHEREAS, Safeway is required by Ordinance 2845 to pay the City $126,000 as compensation for vacating a portion of Fourth Street at the site of the new store; and WHEREAS, the City Council has previously recognized the public policy benefits of applying street vacation proceeds to necessary improvements in the City rights -of -way, and WHEREAS, due to the factors mentioned above, the parties have determined that it is fair and appropriate for the City to offset the cost of the storm drainage improvements by $40,000 as a credit against the compensation owed by Safeway to the City for vacation of a City street with Safeway paying the remainder; NOW, THEREFORE, in consideration of the above representations and the agreement set forth herein, the parties hereby agree as follows 1. Safeway Inc. will install storm drainage improvements in accordance with the requirements of the City's Public Works Department and State and City regulations in the Lincoln Street area of the City of Port Angeles and will pay all costs thereof except as set forth in Paragraph 2 below. The agreed scope of work for such project is described in the letter to Mr. Mitchell Johnson from Bush, Roed and Hitchings, Inc., dated February 16, 1995 These improvements will be constructed under private contract by Safeway and, upon completion, dedicated to the City of Port Angeles. This is not a "public works" project 2. The City of Port Angeles will offset the cost of installing said storm drainage improvements by granting Safeway a $40,000 credit against the compensation owed by Safeway to the City for vacation of a portion of Fourth Street. 3. Pending completion of these storm drainage improvements, Safeway will be permitted to make temporary storm connections for its new store to the existing combined 1492sdd1 1 system. Safeway's installation of these improvements will eliminate the need for detention and biofiltration facilities for its proposed new store. 4. Safeway may enter into a developer reimbursement agreement with the City in order to recover a pro -rata share of the total cost of the improvements from subsequent users of the system, provided that no costs in addition to the $40,000 contributed by the City under this Agreement shall be recovered from the City pursuant to a developer reimbursement agreement. 5. The parties represent that the undersigned signatories have full and complete authority to execute this contract. CITY OF PORT ANGELES By7 X �xAA U Title A,Y Date: ATTEST: 0.A I 1 Date: 1492sdd1 2 SAFEWAY INC. a Delaware corporation By: Its Assistant Vicj„I4 By: Its Assistant Secretary 61214/YS— f n fl BUSH, ROED HITCHINGS, INC. BRH Civil Engineers and Land Surveyors February 16, 1995 Mr. Mitchell Johnson Safeway, Inc. 1000 124th Avenue Northeast Suite 201 Bellevue, WA 98005 Re: Safeway Store No. 1492, Port Angeles Lincoln Street Improvement Project BRH Job No. 94108.05 Dear Mitch: 2009 Minor Avenue East, Seattle, Washington 98102 Phone 206/323 -4144; Fax 206/323 -7135 This letter is to inform you of our understanding of the scope and design issues for the Lincoln Street storm drainage improvement project. This letter incorporates review comments by Mr. John Keegan. The proposed project will help to alleviate combined sewer overflows into the receiving creek during peak rain fall events. The criteria that generally controls the costs and layout of the storm drain line are the length of the line, size, depth, locations of inlets for collection of street drainage, and surface restoration requirements. Each of these items is discussed below. Also attached is an exhibit of the proposed Lincoln Street storm drainage project. Length: The Lincoln Street storm drain will be constructed between the alley north of 2nd Street to the south side of 4th Street. A stub will be provided at the final manhole in 4th Street for future extension to the south. Size: A basin analysis, which has yet to be approved by city personnel, has been developed. Sizing of the pipe follows the generally accepted method for modeling of storm water peak flow rates, the rational method. The design storm return frequency used for sizing of the pipes is the 25 -year storm. Based on these criteria a 24 -inch diameter pipe size has been selected. Concrete or high density polyethylene pipe with watertight connections will be used throughout the project. Depth: The depth of the storm drain line effects the ability of surrounding properties to connect their storm drains to the line. Throughout the length of the project we have selected an invert depth of 8 feet for two reasons. First, at 8 feet deep it will allow surrounding property owners to connect to the line from both sides of the street. Second, these connections will not conflict with the existing 24 -inch sewer below it which has an invert of 12 to 16 feet deep. Based on the City's preliminary review, the selected depth is acceptable. SAFEWAY, INC. Mr. Mitchell Johnson February 16, 1995 Page 2 Inlets: Sixteen inlets for storm drainage have been located as specified by Mr. Gary Kenworthy, with the city of Port Angeles. The inlets conform to the WSDOT standard type 1 catch basin with a modification such that water flows through a curb opening to enter the structure. However, in 2 locations, 48 -inch diameter manholes are required due to conflicts with other utilities. The locations of the inlets, as specified by Gary Kenworthy, are as follows: (2) alley between 2nd 1st Street (4) 2nd Street (2) alley between 2nd 3rd Street (5) 3rd Street (3) 4th Street (2 will be 48 inch manholes) Sizing of connecting pipes for the inlets is as follows: BUSH, ROED HITCHINGS, INC. 12 -inch diameter for pipes that cross a right -of -way centerline, 8 -inch for any other interconnecting pipes. Improvements to existing utilities other than storm drains water and sewer lines) which are discovered during construction will be the responsibility of the City.* Sidewalk: The installation of the inlets in the street will require a limited amount of sidewalk restoration associated with the through curb installation. The limits of sidewalk restoration are shown on the plan. Manholes: A total of five 54 -inch diameter manholes will be required for installation of the 24 -inch storm drain. The location of these manholes has been reviewed by Mr. Kenworthy. Traffic Control: It will be the responsibility of the contractor to maintain adequate traffic flow throughout the duration of the construction project. The contractor will meet with the City to develop an acceptable traffic control plan. Pavement Markings: Any pavement markings or paint striping which is impacted by the construction project will be restored to its original condition by the contractor. *It is the contractor's responsibility to relocate any existing utilities that are in the way of the new storm drain, but it is not the contractor's reseonsibility to ungrade or improve the onalmty of any such relocated utilities. SAFEWAY, INC. Mr. Mitchell Johnson February 16, 1995 Page 3 Pavement Restoration: The City requires that the storm drain trench be backfilled with control density fill (CDF). This is a cement slurry that sets hard and fast so traffic can use the surface soon thereafter. This will amount to a depth of about 5 feet of CDF for the length of the 24 -inch storm drain line and 3 feet for connecting pipes. In addition, pavement patching to match the existing pavement thickness is required for the final wearing surface. A pavement overlay of the entire street will not be required. Timing: Based on a conversation with Mr. Kenworthy, the city would prefer that construction of the storm dram be completed prior to October 1, 1995. In fact, the "temporary" connection to the existing 24 inch sanitary sewer is only approved until October 1, 1995. Therefore, the 24 inch storm drain will need to be completed prior to October 1, 1995, if the on -site storm drain is constructed and temporarily hooked up to the sanitary sewer. Permits: The only permit required for construction of the Lincoln Street storm drain is a Right -of -way Use Permit. Mr. Kenworthy pointed out that one of the conditions of the permit will be the development of a traffic control plan. As mentioned earlier, this plan will be provided by the contractor. Please do not hesitate to call if you have any questions regarding these requirements. Sincerely, BUSH, ROED HITCHINGS, INC. J ,(J.,,1„ Jay 'D. Decker, P.E. JDD /acj Enclosure cc: John Weed, PE, BRH Rick Utt, Mithun Partnership John Keegan, Davis Wright Tremaine BUSH, ROED HITCHINGS, INC. t c k 1 1 c `i i; t' i �4 p i1��l i�.t lip 1 1 i ,L n �i 1 I, IMx Ot l',,, t 1 A 11‘;' 0 t:}11l, 1� j iil11it }It\ M: 1 I�j1 1 11i ,11, it alit t„ t P 1 Al it i 1 1 i .t, 4! g a t'ys Ss 11 itVS' 1 iil�'il t l i+ lii1 �'v Fp Y 1 Si -Y'� \111 S t 1 1 g r 1 1 t13,. is l a ST3' illll�'� t s t i 11 t ;i� 1 1i {11l :t P y i t 1 i \\11, 5” s Y c, �+g i t, 1 li t 1 °i''t�1 1111 iit� t i t t p 1 It ,tlt' 1 :i '‘A'‘, 1 %},i H T. 1t,ii ii t t it iii' t t l S i c. k° i1 ji1 tii4, v ssai 11 l i'1�111st' 1, 1,111 t, i• ;1. �l. ;W i l l +121 t fi t: rk 0000ee L-1-4 4. l''' -.4 9 11„,„:0,0,„,,‘.,,, 1 _Y\V: gS 1 k \'‘VA1 0,■i 1 1\T O S yY °A t i t h t 1 l,il,t 1 1 �r g 74 i A ...s,Fnj i fi sA 1 r`'; t t 1'ti'` i 1, 3 c r c s ,1► i' F 1 11i„ `i3.' 1i ;11,1 ',1! 1 sti.11 t ,1,� 'I ,Ij1t 1 -t Gi�i l e t,, 1 it il�t ii�'�i;l, ��L) ;tzd W it' fµ '��2 a- s ,i f 1 f i8 111;, j F 1 r ll 1 ilia 4- it 114'1'; l t it,+ y,��t" 1 D -`i—, l, t•. �,rn` �t., �'rY l 1 i l i ilt tl 1 i t 11, „-,.1 11 y �w TREE 1MPROVEV iS s PORT ANGELES SAYE\ti _cwt"( INC o3..4 4.1 r I :_iii to s., gt15131 ROEfl b, i t 0 giFt"`` i S q \1L EJoGiNffgs fT5 ■W (y II� I I j II (n (h N n (1 O p (hhh T I 1. 11 1'11 O ,1 •!1 I J[ II'1 7 p i I 1 ''1 1 1 1111 I 1 'ill,;; .1, i; ,,I I1,;i rr 11', aulp„cr trw'1 l i l'I r -^*i' I 'I '1. ;I'� 'j ,1 i' 1. Q '1, 1'11 i I ;1�" i' 1, 1i I 1 1 1;1' !i' II II i 1 r i ,i til I II 1, I 1 7 1 '1 1'1!,' 1 t 1i r f '''1'I' 1 1111' 1 ll �1 .t 1 '1 '1'1! 1 'lii1 1, 1 i1 it i ii 1 ;!1 1 1 1: 1 X 1 !i 1 11 !1, 1 1 '1;11 1 1 lii 1; 1'1 ,j Pi 111 y I i !1111 Ei 1111,,1,. i ��1,1 1 1 1 1 i ll I 1 i '1 11!1 1 I 1 14 4 :}.�..i 1 1 ,11 4 ,,...,,i 111 1 i i 1 1 i 1 r oo i '1 I i 1 l I '1111,' 1 „111; i I 11 1i i 1 I1 !1 l 'i 11 111' 1 +1i, .>.I ,i 1;1!! N� 1,!I 1 1' I1 i i i ,1 I i;. 1 Uri l 1 t 111 1;1 1 ,1 11 1 '01 1 O' 1 1 1, 1 }yI�' ;I j 1'1'11 1 1 1;, II 1 1 ti,! '11: !i! i l ag ,i '1'11 l ;fii 11 1 1 111 s i i I [.m' 1 111, 111 11 4 11iTT ..'i,11j1`l r 1 i 1, 1 1 11 1 2 11 SD 1 11 1 ''Id 11111'; 6t=. l, o 111 N `I H p 1 1 ,i I!i I I 1 11 1"il I1 1C A11 1111, ,I 0111 I11','1 11 X1 i t 11i l fr"'M 11 11rl (13 I '1 !,1','1;11 1 1 'l,i!; O 1111 j' ,'11'11'11 CD l ilt 1 j I il,1f 11 I. 'i1, hi: 11 11 111111,' 1 11 1; 'I 'III 1 ,I I 111 „I II Hi 11 ;1j11 I: 1 1 1; 1,11 1 y: sc... l E, 1[1; tr i +.+1.1 k +H O jU' 4rilsti ,,,.411. Hy:, ;11 ',u.e 4• i �c 114•h M s /I ,m Ik Y∎ ;a'f, p 41 I I *111'1 11, 11 I A AO 1( 1 =:11:1111;'' 1' 111 1 11111' 1 Jil 1„ 1 1 11!'1!1 .,t 71 ;1 !L t .111 y/ j ,Ci 1 1 [9u. e k j' 1 i= e 211 ,11 i!' 1 1 I I 1 9 I,, 1 1 i 1 1 m M) C wca� si p m i 1 .I 1 1 L 5714 yt.y yF NiY. -b f.F {1 1 11 1 rt, .9 1I[ _I R CG ^dJl t 6.3. -fi 1, -1, O O O 1 AT A': IT a 111110 d:1 -9 i t Z �m41 1 E4 lc )6'r .-..s 'V o w g g q- F m .t .:1 GVc.",.•, 4- 2 4 a n F1,,,, LBtSFdn1 0777 •IS 4,' s *t <4 P 1 i..4 'Y 19.-..5x1 wg g b r2F 'BC J� y7 j II I' I J '1 i 11 11 11 1 I „1 1, I j 11 1 d I '1 sAi f,P,I. r ''11!1 1, i, 1 iii It X11111 •l' 1,1,' 1 1 11 '1 7:1,177, 711,7- I 111 1'IbA 1 I's 111111 ''11 I III,'1 iii,1 1, 7,' Iy 1 r 1 I1:11 11 i PI 1 11111!!'1 '1111 '''1 t ,i+ 1 i;, 1 ,'!1 ",ii„ 1, 1111'1 '1 In tl i' ,i,' 1 !11'1 1,; ;FZSi_fs», .li'1j11 J'(" W d rss.� -rte RNOTNt. ft' Li STA rz rY 5•Col ,1t1....pp 1145 J i LINCOLN STREET IMPROVEMENTS SAFEWAY PORT ANGELES co o SAFEWAY, INC c) 11 i 11.: 1' 1 i1 11111; I ''l1!! i 11 1,1 1 11 111 „1 1 111 111' 1 ill, 1 I. me ,,1111 tip, 0 B 1 =b7�� M I° CFIN- 11 c S xi G• H R .'P 5 9 5, 1, ee 5„ a 1.' Ls LG., •,,1 .7F NYM1S t5.4 N.S; u tx BUSH, ROED HITCHINGS, INC. ow_ ENGINEERS 44 INTO SUR■•£YORS -fi r :h� 1.1',1.,1. 1"- :91f 1 174 T 1+ ti b4f� RGVt L' et., ^-Y'1 tlL■ :s r N 49 1, S: