Loading...
HomeMy WebLinkAbout611 E 8th St Technical - BuildingTECHNICAL Permit 5 (A Address (Qs Fdo 1 5 (1q1 Project description Ca, co a ov) 5 �r� kr 6 \Y)Oik S r)`E-Pi: Date the permit was finaled N umber of technical pages 1-r-2 41 ?ARGENT ENGINEERS IN6. Project: Dr SRALT2y Subject: Consulting Engineers 320 West Bay Drive GO\ S �1E✓✓T OLYMPIA, WASHINGTON 98502 Phone 943 -3590 By NEA Date: 2 /11 1 5f+ EET 5013 CA LCUL. Otil S FOTz- Dr DA-w SH-PcLTR.'1 O rF IGE 8Y 1.1IC.oI.P6 AFEIC14 LIND5eRC f3RCH- /TECTS REQ uESTED 5/9-RENT ENGI NEEQS /MC TO Pe FOAM STkUCTUI, A-NALy5I5 A-Nb DES /C(AJ F02 THE ITEMS LI STE ON T7 AT TA-GW p COPY Of- LETTER DArTED l/a /'9l SEA sHeET tl OF T14 PFCXi%E A/060 E2 SAr2GEliT E//Je. 1IVeC�s LY E E3 TH wr- t 57/2.0C E FAR L 4T E2AL FORCES A PPr2TIGC. LAT -i L ,4i'U, C,7 /3 4J OL3 l'JoT /5c A P;' OPR -I TE D COVE. Si-FEET I LETrc R DESCRIg1Mcc SCOPP of \VOR 9 CHECL< f DESIG N OF C LU-- LA-M S AMS q- 13 LPTE12PPL A JD DesICa 14 -18 a14-5c,14_/ DesI N OF C.3LU L Nt 13E CaNNE 19 H 1OELL K EO U S C%�+ECtiL 1 N C� 21 -?:3 DETA�I LS 24 -Zb STRUCTURAL NDTEs Pr►3D SH UJPc LL SCN ED U L.� 27-Z9 C, E NI v L t1A a NG 1 ETf�-1 Ls /\T 5H wA -L1,, 3b 34 RETIE( CALLS 13Y MoNTE S stim+ FILE 4 '0 .N ,i 1 Sheet Z/13�91 0/ 4 LINDBERG A R C H I T E C T S 319 SOUTH PEABODY STREET SUITE B PORT ANGELES, WA 98362 452 -6116 January 29, 1991 Mr Monte Smith Sargent Engineers 320 West Bay Drive, Ste 101 Olympia, WA 98502 RE: A New Office For Dr Dana Shaltry Dear Monte Enclosed please find two sets of drawings for Dr Shaltry's New Office The Building Department has requested three items to be engineered, before we receive the building permit 1 Provide engineered design for shear panels, collector elements, and holdowns for the north wall 2 Provide engineered design, grade and beam sizes for all glulams 3 Provide details of glulam anchorage for both wind uplift loading and rotation resulting from eccentric loading (See roof framing for location of detail) As always we need this information as soon as possible Please call with any questions and a time line Thank you Sincerely, LINDBERG ARCHITECTS Charles D Smith, Associate CDS /jak Q ff1 Q 0 nr 18 I U SARGENT ENGINEERS INC.' ,I 3 u I t SARGENT ENGINEERS INC+; SARGENT ENGINEERS INC. Project: Dr SC- IALTIZ`1 tF l C.E k Consulting Engineers 320 West Bay Drive OLYMPIA, WASHINGTON 98502 Phone 943 -3590 C &&Etna.. b A., e-i 0 cL By P\1 EA Date: 2 4/191 F 1 71 4 8 N Cr) cO Y s Subject: T L c2, SARGENT ENGINEERS INC. I Project: DY' SHA1- 7 1 R'/ Su bject: Consulting Engineers o�Fl GE 320 West Bay Drive C� a�uw C- 1`.Q.4t. OLYMPIA, WASHINGTON 98502 Phone 943 -3590 By NEA Date: 2 //1 9 j 1-0A IJ CA 25 r (sue) Szo. kA s C ALA k. 5112 ��L► (3VS C nk,0-1,0 Cam- be.. r 1 1 3- 1 Y_ P c 2 246) t 1- IZ 2:15 7 n 31 7 a F/o .5 V x 9 11 oLX M. n&L.a.4, Wiwi CL 5 1-ta.x, TOT I, 0 8C0 u M 3 x Io' TOT 1,08(0 x 18"1.87301,5 0.(08" e/ 282 at. 0, to S x V 7 5) o 27" 0 4-1 _v 'r., te&ZAL eaA&k: -w 1)-uck_ OL S+daa, US E 3 118 x 10 (24 F -V4) CAAAA,1 1 /4 (3'/ w= x4O) 12 I I 41 Fon- At.cZ, A-e.0 a. USE 3 I/3 x 1 O (24 F- V4-) Ca.u>iA, 1/411 LOCATION 0 HO 1 nn i nu 00 4 Ou 5 00 6 00 nn U H uU 10 1111 11 00 12 lit is Ou 14 00 15 uO 16 UU GLU LAM BEAM F F,OGF,AM FROJECT DR SHALTRY OFFICE DATE Cu i11l -Ou TIME U0 !ICI 110 GLU LAM GRADE 24 F ALLOWABLE SHEAF. ETRES5 16° KSI) MODULUS OF ELASTICITY 1300 (KSI) BEAM LENGTH 16 FT) ROOF BEAM LEFT END MOMENT 0 (KIP-FT) RIGHT END MOMENT 1 24 (k I P -FT UNIFORM LOADS 'KIPS FT 7.75 CONCENTRATED LOAC S LOAD k I P S 7 LOCATION (FT) 0 0 REACTION 2 1 225 KIFS LEFT REACTION 2 2 k IFS RIGHT SHEAF, KIP= 2 1: 1 E•J 1 1 30 1 it 0_t "9 0 4 n -1_ I= -0 35 11 -n -'fi GLU LAM LIST FOR LOADS SPECIFIED BM I gM La kFT) Lb (FT) 0 16 MOMENT (KIF -FT U UU 1 7 5 13 7 18 E 12 16 9 4` 6 1 1 1' c J b 1 4 5 4 36 1 -2 00 U 90 2 20 -1 24 3 8 57._ 28 125 1 GLU LAM EE�,h�t 1 t. BEAM DEFLECTION AT MIDSPAN 1 06633 INCHES 5 125 9 GLU LAM BEAM I 311 344 S 71 4342 A 46 125 BEAM DEFLECTION AT MIDSP;N 662398 INCHES 7 5 Y 9 GLU LAM BEAM I 410 1163 S 94 0E48 A 60 75 BEAM DEFLECTION AT MIDSPAN 502932 INCHES SAgGENT ENGINEERS INC. Project: Dr_ S H-1\L -TZ`/ ,1 FILE Consulting Engineers 320 West Bay Drive OLYMPIA, WASHINGTON 98502 Phone 943 -3590 By NEA BM Wig x l'i2) O3= (la cod o�. bH P= 17Z (I(o+ 3) 194-0 2 (up) t-( ,.a.x. c (_1.14x 4_ 3 b 4 1 /zq, 3 t 6,d ktet. T O T (I,94) (8 x 12) X1800 x )1 D 0 a.e r +eA, Y 2x Co 47 K.- w.. 1 Cl I8 n l it it Date: A MI Qty 33 '/8 x V' 15 cD'lL- E u2 i 2,c Co AAA ¥c .d -I o zv\, b.Q.a&, CO �.5L- 7 Pf)M5, Co 7 (3' /Sx aAR, a ftejA -Q `L2.IAAA o Q,wc1 BM 10 Ni a iZ ex. .,-t. 0 to j /1.0-1,0 tY�' 10 c� Co 0 l C Pv t k. sp ST2ZIS 0 e,A..d o-d' BeaM,�. L.o O 1L Subject: 3� Ip '/z T v l i v 4' /$x 1D P l '1 (»94/2) D 97 4. 1.5 x 7 /0,125x1,15)x 2,45" a 40 iv+x 0 c.2A- 8 M 9 lae aAAA" �C.�z -ate Sheet 5 SARGENT ENGINEERS INC. Consulting Engineers 320 West Bay Drive OLYMPIA, WASHINGTON 98502 Phone 943 -3590 RvP't 5ikx 1z) ail (1025)(11 By K)EA 15.5 Y.- 1� (1.025) 5 Project: tr SHALT Su bject: OFFICE Date: 2 /1/1/ (52x4 -0) OX. 1) 15 1025 V' z- flo 15,5X12/123 1,51 k.gi 1 5X5 o4/,1 5 TOT 5(1 S/2)( 1 1x12) 7384- x1$XJX 73g 0,25 '7528 D T t_ D, Z S x 0, I" 3... -a0._ 3M 9 (3 D VZ w f 1"l lO (3 x 10 W 40 (60 +3.25) g 293 4A ,k_ckj 1y -Liu, ic, ,cum am' -1 TOT NLAAAAZJ t,0 AAA 54 +.7Q./ 11_ C.cic b 2a. w t S) (7 513) 8 3b€2, (D 302) 4z 2 42_ 6 V arc (0,302 x 8 (1.1) 1.33 k jd,_ax,c,c._ rr (0,253) 1 2 5.27 k-- 4 (0,293 x (1,1) /.93 k 0,2c1 Z)(I2x10/g4X1800x Po a 4 42 1°5x 1 0,0401 kh k 8i 1 2 6,2.7x11/47,4z 0 138 1-34 O 5OCa 1L 52 3' 1.10 k't fu-_ 1.sx1.g3/32,8_ o.o8B ks- Sheet 5 0 4 2 5 V 5 71.0 a,,.,c. co 614 CO. SARGENT ENGINEERS INC. Consulting Engineers 320 West Bay Drive OLYMPIA, WASHINGTON 98502 Phone 943 -3590 8M I O'T x1D hdao- t/3 -e; ciAlt W 40) t l 4- Co 14 4 2. PM /2 (3 /8 xg) 5M /3 (5 12) P. 3 C9 8 4 Project: D By /QE-ft Date: y M (0, ea l4) 8 Z 0'6014 x /z/z. 3• (n 8 K S //2)0 -x /800x 414 4 6 DL, D. 32 x 239/6,14- a a I36 4, vJ 0 I 11.054. 2 4.2 l 4-1 k. 44 x 3 Co8/53,8 f, wi 1 335 4' Subject: /2' 0, 31 e /450 G'a,<,( c, 11 3 p v I i2 1 L V V -&Qu± -{mow 1 ce, /PIA. tiM Ca Ca e 2 3 wag- 4-0 (Co -3) (5x10) 15 w 2 (2x4 -0) o) 4 1 4 1-2Z-fe,t, itt) Gc-tAA- PA/LI-D-EAL 240, S !L -0 2523 kh FL, j/524 2,7 Co 1 0 1 0 3 !c s-c f Sheet EIMPLE BEAM PROGRAM PROJECT DR SHALTRY OFFICE Time 00 00 00 Date 00 00 /00 BEAM LENGTH 18 5 FEET LEFT END MOMENT 0 RIF FT RIGHT END MOMENT 0 KIP FT UNIFORM LOADS CONCENTRATED LOADS REACTION REACTION LOCATION (FEET) 0 Oct A 9" 1 §5 4 S~ 34 6 82 79 S �6 10 '1 12 !6 12 62 14 61 15 58 16 55 i' 5: 13 Sn (KIPS /FT La (FT) Lb 'FT) 3C5 0 12 175 12 18 5 LOAD 1-IF3) LOCATION .FT? 3 613 12 4 20 ?02 KIPS LEFT) 4 62848 KIPS RIGHT SHEAR (RIPS) 4 21 3 23 2 §U Z 58 1 93 1 on 1 2' 0 ;5 0 62 E 2; -2 t1 2 @S -4 12 -4 ZR 4 43 4 63 BM 13 DEFLECTION AT MIDSFAN =1 50637E +0. E*I INCHES DEFLECTION IS IN TERMS OF E (KSI) AND I (IN 4) MOMENT (KIP FT O 00 3 ;4 10 S" 13 eS 14 52 16 3' 20 91 24 J2 25 10 :1 24 05 :0 46 16 7 O 12 7 7 S 68 4 42 -0 00 SARGENT ENGINEERS INC. I Project: 1:>-y Consulting Engineers 320 West Bay Drive OLYMPIA, WASHINGTON 98502 Phone 943 -3590 By /J EA /5x 4.(03 S A-�C�iw�u a.t2, broT (2l) 31 (I.SO6,57x /D /30 73S) 2 6 DC. 57gx /3 //z TA/ LATEI C. .rCJM VS/ S Pk c e,v.l t .A• !)J i "ft, C.t,�:,«✓U�o 41, CU. t o7 c, 2/4/' 'V C.tA -<1 e,o e, w a L!c -e-d cA7P.Aw DA UJtM.d S d 35 MPH w t/J‘.-aC .od. 7 a f,2.d tAlci -2oa L <h <2O Date: 2 /4/4 O. 1/3 k--5/ 1. 1 9 x 5g3/g2 0.‘“, y4.83 7 150(0$70 e/304 l 7 O i 4 e 0. 7 3 11 0,4 -Cox /osl) O -3Z L LL- 0,73x (73$//05/) 0.Sl USE 5 /8 x 3 //2 (24 -1 4-) Cam Yz" Subject: La t ,01 --fr,R..2,v (4.14-cl ce cj" 15 I p► 0.2)0.3)09)0.0)c 29,60 E hlo t✓,t2Askuzy kl e-4 d 2 1.19 1.,u; .d v c.a Oat f Sheet SARGENT ENGINEERS INC. Project: D St- fALT2`f aFFl GE Consulting Engineers 320 West Bay Drive OLYMPIA, WASHINGTON 98502 Phone 943 -3590 O O O p il r By' N EA 1 1 27 L o o e czq c `o. Date: /Ii9 I Subject: S I-fEA WA-LL LOCRTI D N 111 O r ciCi II l 2 Sheet r I TR.15UTAR,1'; Cf4" 11111 (0,5+ ri'i5) DIRE (4-4,) 1 CTIFN WALL LzKIG1 oF I I I I 1 _EXPOSURE 1° 42,3, 3,1-5t* 4 3.54511.-2 20 Co 7 74,2g,2.7 Rpi I i ta v,. W 9, 0 to,-FC; 1k,51. .0 Si 511 e g iot.i. 1 1 i 1) p 4 is )(ti+33‘ 2 1 I i i I 0 4 -0,21 82- I L )4 IQ .'1/ 26-16)0c-i-1;5_ I I c4 8 .5 15,I( 3l81! 5 f (ix 4- 7 T 1 1 -.-4... 115 841- 3G4 235 ..i, 1 1 1 i 1 1 1 1 1 101 61-t 4-760 1 920c2q1 165 X 2A,691., 198 2 cl. kpl s 2(P 44(P1' 27Z 3 084. 5.840) 1 0 Cn 1 13 co CI irrl !ic 0 'n o C m a, a) w (n „in A CO 'me" Z c 0 z tri -I 0 ID 0 m z e 73 w oo r.—. Pt Ifbr1C.E ic _213 CD ci 0 1 I j9 313 i x Z 926 25 x 254 74' 632 C/) 0 CD 0 rr 'fr tr•., _?38 I J WAvLL. T 'PE. 4 3 _x3 S J t3 xi I��S I 2 4q`? 24;39 I t 24 -97' 1 1 1 1 c 1 I tv 5 lo.s 1 732_ 'i c' 1 7 3 1 2 i 227x 8,7f J I 93� 1 0 0 7' t t; al a 1 VO CD O N T E R ACTT M U b. LI• I LLI) 1 1 i 56 x!2)(5)it i )p x ,0 )t Z. )7094 i5'03 I I 1 1, (52 x1 2)0) +(�D, 0))C i20o +42b= I(c Z(. Ili 1 I xi2)( ,x10 (1), (07- i il /4.2b oz)(.2 i t 0.5 x to; (Li Io50 t 3�$ 4i I x 1)(2) +614.f><io)(i 25 2i t 1 1 x 1 2)(24) /0,5x14) I 31; at )3b5 2 .05 xi2)6 (3' NA T f10t4 e N TYPE uPI,IFT CLb) /2Sl 7 9 i+62A, 27 rfp2A _‘7,7 b2a• \frpz9 0 N m m Z m N n -o co 0 4;. '4 .b _cb1-6-telo-r1 IH Wittu. _tHeh l z. 1 LL WAc 1 1.11,_ _EORC,E "PPE &VP') 3 3 IL 14— C.> (Il) a __311 3i1 9, 5 37/f_ 3 xI)'5= 4/9(4 I) PIA I 1 545 x (46,$) .51-5 5ja_5 32-K £32X 826 GoG)367 I C-90 1■IWACTI 1).1, I CL-10 I I (/21: /2) (3j P2.1 43-1- 40() a32_. /0.) 03,5.11) .0 3' 1 4 f 405 It (1 5 x 1 0 57c) I 3 7 (4 X /jZ)(14) (./D.5 )(JP:, 21 00 I 473; 1.473 z -1 ,1 041,1 FT c -475 in 2 44.-.5 A 6S 4._._5_• .1.1 Az It 1 73 G) w rn -0 0 rt rrl act r 'Wm C m m 6 GT< Z (I) p o wo-gm 0 2Z6 03 0 1 C/1 C Cr. CD rr SARGENT ENGINEERS INC. Consulting Engineers 320 West Bay Drive OLYMPIA, WASHINGTON 98502 Phone 943 -3590 Up,PAN. w (z) %3 "4' boo e M-2414 a Project: D r �Sy !7 By N EA Date: 2 /4//9 1 20-6-P e .2, (S- 44 4 1 Z) 1(o x 2. tog Subject: aeo.uti Gvx Ecc J c 4oeucA,f,A,d. 14-) tAA.d u.j ,c aA..Z& c a± olzo Cos_AA,o 69.4p.4 u (l.)(2,8 )(l9)(i3O Co3.8 p /1,t cistn a± e� 1�u L 01- e a'XA pu. (l.t)(3,0)(l9)(1,a) CAS 4 t y Rc z- U (A 2)Z2,0)0(7 )(ho) 45. Go I et/ 3M 3 U t,p (34I5)(Cp3.S) Z37 'D.L 10 (4 +3.25) f )2 2.(4) Nei Z 78 20g [coNbmaNf (1)3 Eco1\1D1T /i J (2) pU_ 1 ,2 (/./xc1s 18,5) (I )(1 b) 23,5 .08 2 7 3 4/, i7 2 V 5 E nn(Z__) 5 4 ste,Aa 4 �u ac7,k tt l -22. 0,14„, 2x6 I-1F sAkci eaL.),, ,de. gun_ (Z x 6 1729 SARGENT ENGINEERS INC. I Project: D H, s,0 Subject: Consulting Engineers ¥/t 320 West Bay Drive OLYMPIA, WASHINGTON 98502 Phone 943 -3590 By !V EA Date: 2/4,/191 b e 1 bit c (2 3) k 2.09 2300 bui- O ou. Dco (o (4) 5 /f II co b de/ d I 2F mAt 40.0d /0/ox4)x1,33= 5373 $t1 0 p (2 x 1, 5) (60 8 4) Z05 e o) 137 #/I (A) -116u4- DIL x /D) +12 .1 52_ 4 1 (1,$)(20s -s2) +(40 5Z) 7E2 u5E (z) s /s Cev, JALc 01A_ 14, Co' (3 +It5)(2D 52) 52) 1241 0-4- 1>w67 (4) 5 /s "ch f t b ole— C evw, vc mar- dtJ -x4e. A,..(z,uA., 4t ...c cZ L bl.tio /24/2 CO20 44i -cui D au- D C2 C .c,a[.z,. o-�:� o i aal s L a1� e3,0,0 Ct-14- stu2.0, fr 7 3 4 3 x /0 /D 34-3 eruM. 2L-- wp b aft IollG_-Q 23 CO (P20 2gZO (Z) 5/5 7 ,e�..Q�. !tee -e,-r LA, s .ea- J 7of (4) (2x ?)(1 33) Iog53 ck cit., 3 /Z`j 7x 4$ a 4 3 /8"r Sheet SARGENT ENGINEERS INC. I Project: Dr, a Subject: Consulting Engineers :C2- 320 West Bay Drive OLYMPIA, WASHINGTON 98502 Phone 943 -3590 By /'i SA Date: Z A-Pct 5M 4- -eaiv k C),,.,t k-2 d eA ,5t 1 ,&1 5, (o 7 3 ez- /2,�2Q 4# 5 fr._ .^.o^ 'I B 04 CI +(41.px0,1)]((3,8) 357 #/i a g 5 x 2.3.5 59 5 4 6-6 s-2e3 e s l D 1 S Z 75 t k 59 5 27 5 3 2D ,5".9 rat 1 9 10 cv o-tAi e. k FRI 10 u rz-fIr 32-0 x li/ 17600 �3 JS-E (2) /5" 0 7''u.vo,,V, orz. S ‘44,a v ST(1)15 [3 +(4- (oxO,I)] (603,3) 0 l (z 3) (23,$) /43 c A-S 2.(0) (p+ 3,2 a 8 80 e)- tki p ¢3 5 50 405 U, Q2 w r Lg. x 4-05 2430 C l (Ex 134.0) x 1, 33 35( 'it Dv_ 435 V/ F- US-e. S t ,1.2A vu., .446 (z) 5r (02/S ce :L1_ ehe 5 Q f 011-3) (485) 43Ca43C0.5 c.oWAA.C.14.0V. I De�-O,. e /�11 0•, ?�urG *(o C 5373 �B.4L 7 V DWG 'i& a kz y 10$53 #Sh Ca�c, t ems. tin 04 o Ica SARGENT ENGINEERS INC. Project: Dv Subject: Consulting Engineers 7 320 West Bay Drive WASHINGTON 98502 Phone 943 -3590 By NEA Date: 34/' 9 I au_ k., 8-1'1 1D ttaA-auft 2x 2x3 x1¢O 1c.080 Z,5x2,Sx /1S )</$Q ZSS2 N A Use. 3x 3 x 21 3x3x1.75x 150 232 1J-44J TpTA -L 404Z A�'.so cat, ccsw.c. w>�c� (i 2 9 w V I e /514 Up-e;f1 (1,.3)(4s5) 3395 st, 3x3x2' -Co 3x3x Z.S x150 3375` O (12x0.1) (2x (08.4-) I404- 1 /axo. I) (2 x 45. C0) /09 4-0 3x.3 oz x 23 3 357 Cs„A (3 /9 e.0 uti '9 L (2 x 10) /4 /CD 4 1' 357 -1(04 3 #4 ass /z.) x 173 2/3 U5E (2) %s "co t>ti.1,011 10,6 cioxielz Co vwx.-c o-\., 5 c,,,,4 o,k, Pap co coLad o,. oh 7 C 3 3 C CD Sheet 4 17 SARGENT ENGINEERS INC. Consulting Engineers 320 West Bay Drive OLYMPIA, WASHINGTON 98502 Phone 943 -3590 81.1 12 Project: r. By M &A Date: 2/5p91 Subject: S w��°e�' 13#"1 I 1 r&,x u.�.�zc, A/3 /1 S B x 5) 7 51 138 Z 4x3 usE (2) A. HC.0 (9sox2 000 cyfet.2A, USE EpC CoGo eu- (ox. Co Zrf P6ST �1 141(. 41 NCI STUD TO OW) D I56I Fr7g STA (-ITV SARGENT ENGINEERS INC. Project: br Consulting Engineers 320 West Bay Drive OLYMPIA, WASHINGTON 98502 Phone 943 -3590 By N E A Date: 2 /8//91 C Iut_ck w-S wad (13) (14) V t J Met- 4O5 (sue I 4-740 l= u 1 sti C c/0-i ete.ou ,owe F Low. aztx .A -e0a.d (Lt. I "7 1 k 10 f eze., c.n� -i-Q IJJ� r t (true.A S AAA- 7 0 a 1 D 1 L e^A- x l 0 1 t- 63.d Senn, (A)-0:(9. Cox 1 O z,F 2 sha,„ 9 0-ftc 1 2x 3)� (5)(l50) I(035 I(o35- t-(R80 4050 Z3I5 C- 3 n )e_ 3 x 1.2 ciso I (08 USE 3'x 3 1 -4 LL 50 C' Subject: 2315 1735 242 F w/ (3) 4 EA uJo wad. i 3 -20A1. w e I 2 x 6 1 Z 5 3 O VI I b D.'18 kuy► 0 079 1rv■ ao,n,k .i 7- 0, 15 e/720 cu- Be-ct- Co g. I 0 )f 4 2 I S 014 (14) 9 uae- d.e.Q-e,k. b o 10-6 4a 1 &e. �,t wail, (14) ann..d .e T k s coxl /87,'73: 0. 870 kyt 0.870 k5,1 SARGENT ENGINEERS INC. I Project: 8r. Consulting Engineers 320 West Bay Drive OLYMPIA, WASHINGTON 98502 Phone 943 -3590 By Nei\ Date: Zlg /Icjj Subject: (o153x 19 /2) /2g 1. ksf S 61, /1-Lts to oL e" LJ 4 (/0) #j/J c E4 U N e r2A2a gTaUr TuJ.!J Wits (I 5) To 4-al (o95Co c. A,u Coq /44 rs8 4V1 Pico) C0 q 5( x 50c-8 CatZiL 3 x. 6Q kf#2 A 2 0 W (Ca5O x 1.D x 1.33) /3,75) 12833# b1 USE 3K49 Dute StA ST Co23('0 40 w ad- (Hp) a.cA. cL a.J- vst_ ow_ ST (,2 3 Co L,.►a22 (is) 'o d g60°D,C, C to.,ct; a e-x,e. 5T402-340 33 x 14 7 5 32/2 Sheet SARGENT ENGINEERS INC. Project: By' N Consulting Engineers 320 West Bay Drive OLYMPIA, WASHINGTON 98502 Phone 943 -3590 Pizo\R DE A1\ cH-OSZ goLT c2 Co" AUA 1 FROM EA FACE OF ELcCVOOT 414 V \vALL kour IN \VALL FOf`- GOl-ij )SEAM -OVI DE. ELr PAPS eTw M co. AND PRESSURE TREATED PLATE UNDER BEA \1111° Date: 0 III [11 -11 Subject: d 1 E.:DCCE NAILIIJC� PE tHamz. \VAj }4AI L R-(\vciyP hII 4T H' t+� To DOUBLE S TUDS ENQS 6F \VALL PER. EbCaE NAILI NCI. STS N AILItJ PEA ‘71-FeAK \VAt.I, 'GH ED. rr AT PLAfl IZE. I FOR CA N G ,AND FOUNDATION 11JALL PER DET PL`I woo Q Zo F A I b E I` X41 L. I NTeR.I a f Z \VAL L I Ki T, s Sheet SARGENT ENGINEERS INC. Project: Dr 3k-_- Consulting Engineers 320 West Bay Drive OLYMPIA, WASHINGTON 98502 Phone 943 -3590 By NEA Date: ygliq I s A li cP MI 6 ti C5) IDci 3" j 3 ST 2215 E6?UALL N d LED TD kM A-N D 'I'QP PLATE —r YU)C STUD E.AcH SIDE OF 85Aci1 I GLULAM 13E141 S NOTE NAIL EXTERIOR PL`/LO OD SHEATH TD SOTI -F VC1■C -1 STUDS \V/ to d 4'I O.G s FULL 14E1 G OF WALL 1: TIN I L I 11_ v (2) CRIPPLES Subject: DETM LS MAIL. PL`1UJ@OD TD FAQ dF BEA v 3 l I D d Cam" D G sTAGGERE b 8" ,i 572215 E1 (2) STUDS DET,I L a )TLOO KJ N,'T lo d @12"a,C FULL, NI GHT Sheet SARGENT ENGINEERS INC. Project: r S Consulting Engineers 320 West Bay Drive OLYMPIA, WASHINGTON 98502 Phone 943 -3590 By NEA SI NP5Ot ST 2215 STUD OVA -LL ti .1 .I B u 12.ETA -1 C, 1= 1'J\ MML PL`1WOOD TO DRA-C/ STRUT w/ to a b "DgC Jo I NT I N D2�°rG, STRUT 1 (2)5IMPSON ST CoZ3Cv JONT JOINT sHAI.L BE AT LSAT 5 FEET AJM F1zDM END OF S1-1-EAR WALL 3x Co Date: z/$ /19 1 E I DETAIL AT DRAG STR...UT I N,TS Subject: 1>e TA-1 L. 5 L. P,Ekti PEi PLA-L1 AT SIM RP 6E BEAM AND PKOVIDE 5IMP50N TS 15 EACH -sIDE DF 15EAM IN LIEU of ST 2215 SI N FSO N ST (o 2I 5 E4-+ SIDE Of b -6 NOTE NA L Dla PLft OO D NCa TD bT4 Ciz.l P P L ES Pty. EE Of Si-fe A-R- �1�L,L5 PT CJiUNE CD 5T(- UCTU f2.E NMI. To ToP OF 3X Co g.I DGE PLUCtoD RDoF NAl LE 1 Td TO -P RATE OF SFEA2 OA LL PER EDGE NAILING L 3 )c (o gf'Cz ALL Sheet 23 STRUCTURAL NOTES DESIGN Structural design is in accordance with the structural provisions of the Uniform Building Code, 1988 edition DESIGN LIVE LOADS Roof 25 PSF Seismic Zone 3 Z =0 3 I =1 0 Rw =8 C =2 75 Wind Load 85 MPH wind speed, Exposure C, Method 2 GLUE LAMINATED BEAMS U B C combination 24F -V4 for simple spans, ICBO report 2519 Lumber shall be Douglas Fir (2,400 P S I) Camber for dead load as shown on drawings Waterproof glue all beams WOOD FRAMING. LUMBER GRADING Allowable stress required shall be in accordance with standard grading rules of West Coast Lumber no 16 Moisture content shall be 19% maximum Load bearing and exterior studs and plates shall be of grade hem -fir #2 or better, unless noted otherwise Joists and headers shall be of grade Douglas Fir #2 or better, unless noted otherwise Plywood sheathing shall be APA grade trademark plywood nominal thickness as shown on drawings Roof and wall sheathing shall be C -D (unless noted otherwise), interior with exterior glue and shall be nailed with l0d at 6" o c along edges and at 10" o c along intermediate framing members, unless noted otherwise Boundary nailing to be 10d 6" o c Roof sheathing nailing shear walls to be same as shear wall nailing SHEAR WALLS SECTIONS AND DETAILS DR DANA SHALTRY OFFICE Shear wall construction shall conform with that specified in shear wall schedules as a minimum Sections and details showing bolts, framing members, and connections are intended to illustrate specific details No attempt has been made to show all elements passing through a specific section or detail 24/ REFERENCES Refer to Architectural drawings for all dimensions not shown, for size and position of openings, breaks in structural members due to architectural treatment GENERAL NOTES Use 24" x 24" #4 elbow bars at all 90 degree bends in horizontal steel Dowel all interior continuous footing steel into perimeter footings with elbow bars SHEAR WALL SCHEDULE A PLYWOOD SHEAR WALLS 1 MAXIMUM SHEAR 250 P.L.F. 3 MAXIMUM SHEAR 435 P.L.F. Denotes shear wall location and type, refer to the shear wall schedule Denotes Simpson holdown anchored into the foundation Holdowns shall be attached to double studs Holdown bolt, embedment and configuration shall be per recommendation in Simpson Catalog C -91H -1 Use 1/2" CDX plywood sheathing- one side of wall Nail all edges with 10d nails at 6" o/c For framing use HF #2 Provide 1/2" diameter anchor bolts at 32" o/c maximum spacing at the foundation See plans for locations and sizes of holdowns Use 1/2" CDX plywood sheathing one side of wall Nail all edges with 10d nails at 3 1/2" o/c For framing use HF #2 Provide 5/8" diameter anchor bolts at 32" o/c maximum spacing at the foundation See plans for locations and sizes of holdowns 6 MAXIMUM SHEAR 770 P.L.F. (3 x FRAMING) Use 1/2" CDX plywood sheathing one side of wall Nail all edges with 10d nails at 2" o/c staggered For framing at vertical and horizontal edges use 3" nominal or wider DF #2 Provide 5/8" diameter anchor bolts at 18" o/c maximum spacing at the foundation See plans for locations and sizes of holdowns 25/ GENERAL REOIIIREMENTS All sheathing edges shall be backed with framing sizes according to shear wall schedule or 2" nominal blocking Connections between roof sheathing and wall sheathing shall be such that required edge nailing per schedule is continuous through blocking and wall plates All shear walls running parallel to roof framing shall be continuous to the roof sheathing and shall be connected to the sheathing in accordance with the edge nailing requirements of the shear wall schedule Shear walls perpendicular to or at an angle to roof framing shall be blocked between top of wall and roof sheathing Blocking shall be connected to the sheathing in accordance with the edge nailing requirements of the shear wall schedule Provide roof and floor diaphragm nailing of 10d nails at 6" o c at panel edges and at 6" o c at diaphragm boundaries unless noted otherwise Provide diaphragm boundary nailing between roof and floor diaphragms and top of shear walls Space 10d nails 12" o c along intermediate framing members on roof and walls Space 10d nails at 10" o c along intermediate framing members on floors Lumber grades listed above are minimums All floors, roof, and shear walls require 4' x 8' plywood sheets At edges of diaphragm where plywood sheets might be smaller than 24 plywood sheets shall be fully blocked around entire piece with 10d nails at 6" o/c unless noted otherwise For bolting treated plate to continuous running footing, provide ASTM A307 anchor bolts of size and spacing indicated in the shear wall schedule and 1/2" diameter anchor bolt at 4' o c outside shear walls Provide a minimum embedment in concrete of 4" for 1/2" and 5/8" diameter bolts and 5" for 3/4" diameter bolts There shall be a minimum of two bolts per section of plate and a bolt shall be located within 12 inches of each end of the plate All bolts require nuts and washers Minimum supporting concrete wall thickness shall be 6" Blockouts in concrete wall shall be located outside the shear wall and at least 2 feet away from the location of a holdown The hook of the J -bolt of the HD6 holdown shall be embedded into the footing of the stem wall Refer to attached "GENERAL NAILING DETAILS AT SHEAR WALLS" for shear walls construction 2j GENERAL NAILING DETAILS AT SHEAR WALLS INDEX TO CALLOUTS O NAIL PER EDGE NAILING REQUIREMENT OF SHEAR WALL TYPE. Q2 NAIL PER EDGE NAILING REQUIREMENT OF UPPER SHEAR WALL TYPE. Q3 NAIL PER EDGE NAILING REQUIREMENT OF LOWER SHEAR WALL TYPE. 0 NAIL ALL EDGES OF WALL SHEATHING PER CORRESPONDING SHEAR WALL TYPE. QS BLOCKING VENT HOLES MAY BE PROVIDED WHERE REQUIRED Q PLYWOOD PER PLAN 0 70d NAILS 0 6" 0 C. QQ SIMPSON A35 ENGINEERTO DETERMINE SPACING. QQ JOINT IN WALL SHEATHING. 10 WALL SHEATHING CONTINUOUS AT IRIS LOCATION 27� z ROOF RAFTER FLAT OR SLOPED OR CANTILEVERED FLOOR JOIST A35 Ifb,C PcT Si4Efvg, WAU, Tf P E A35 5+ItAR WALL- T'I P E A RAFTER /JOIST FRAMING INTO SHEAR WALL OPTION 1 (WALL SHEATHING CONT TO BLOCKING) _r\ri RAFTER /JOIST FRAMING INTO SHEAR WALL OPTION 2 (WALL SHEATHING STOPPING TOP PLATE) 28/ EDGE NAILING BOTTOM PLATE FOUNDATION 1 2x FLAT HORIZONTAL EDGE W /STAGGERED EDGE NAILING RECOMMENDED CLEARANCE TO BOTTOM PLATE PER MANUFACTURER r SHEAR WALL IN THIS AREA 1 I ANCHOR BOLT PER SHEAR WALL TYPE AT END EDGE OF SHEAR WALL, NAIL SHEATHING TO VERTICAL STUDS PER EDGE NAILING WHETHER IT IS EDGE OR FIELD STAGGER JOINTS IN WALL SHEATHING HORIZONTAL JOINT IN WALL SHEATHING 1 i E J- HOLDOWN ATTACHED I TO DOUBLE KING STUDS, U N 0 HOLDOWN /SHEAR WALL NAILING REQUIREMENTS Z HOLDOWN ANCHOR BOLT, SIZE AND EMBEDMENT PER MNFR RECOMMENDATIONS 1 2q/ i SARGENT ENGINEERS INC. Consulting Engineers 320 West Bay Drive OLYMPIA, WASHINGTON 98502 Phone 943 -3590 ,Ori f L a a cf /4 ZS i 3 evrJ tapered By 1.4,1 s GA3SOG a 7 25� p P4, V 3 246 is.7 59 Z 0,5 5 z 0, 906 s06) z 4-002) -71- /Q, z5(3.2 z /2 C mss x A2_'p Project: Subject: D 5 h« l -''a i Off' c-i c l Date: w /Ii g/-1 P� 2 7,8 Ps D 24` z 7 6) -j- 9= /S", 7 or -11) e /1 czdvac /4 E *062).4 /4, 25 (s, Zs) 64, zs (3.1v3b 25,s 296,3 (l we 4,1+-) a Yz (J 15 x3.63 )7�, 2 S'-f- (3, 63) 7S 7 f Sheet *of 30 1 SARGENT ENGINEERS INC. I Project: Consulting Engineers S k' 1 'r1 320 West Bay Drive OLYMPIA, WASHINGTON 98502 0 i Phone 943 -3590 V D 25 By MJs Date: Z L. 4 o 0 4 1 (03 x Zo o DS x, 20 445 -19 Sax -1 x 6,326 .8/ 7 3 C oy,i i �y5 �o /S /5 (5 7, 3 )Z 2bC,r -lL 296, 3 (/S)� /S- V 536/ 4 12 b a Subject: /4,25 3 L J M e, 2SS 9 ((0 32 4-0 32 o� z 3 ,6 3 0,3 -5,/2 z 3 SARGENT ENGINEERS INC. Project: 1. Subject: Consulting Engineers 320 West Bay Drive OLYMPIA, WASHINGTON 98502 Phone 943 -3590 By Date: B M l 2 Uh Stk x- 4 5 l )s, s Da 4. 15 1 -eel C5 6 3s•7 /i. 9� 3, /2,52 6(( /4 �YY/ Z 4- 22 21 /¢Z /6 /4-z. 5 4. 24-UO[1— 22 2-1 7 2 43ps„ 6 8 (ts s� Z 6 ZO- Fr- b zo C af74 Sheet 1 1 .SARGENT ENGINEERS INC. Project: Consulting Engineers 320 West Bay Drive OLYMPIA, WASHINGTON 98502 Phone 943 -3590 By Date: 3M /3 A ,t /t 0 ms` 62) 4L 47 It S /Z� 0. 33S62_ j /g, S 5,./2/ 14. -r 44m. I Subject: 3,2.s p,175" (6,,r3 S 444 6 4 c SD /6 4, 41-4 637i 4 4/4k-A- /41'J- C D /7S 6z 29, s 29,S 9 (I2) 153 (1, 2 312 t= s L c? g- E,i2I J Dr 1G SG v dK �z Ciz4 2 (�s�) 4 X�Y 3 lD d 4 -4 12. &,s s")) (/72Z 27 (i oo)(/v si) 3 (lo) 24 (/d0O )('IOS/ )(ie 5 J i l 2 65 iz-Y- z /o (2 (16 .5) -12.) rz (10Y o J75 ((i& (4- (0,5)(16 s z S Z S 2 (1800)0051)06 s) D4 +0 -0d1p7 0 83'z /z&ro s add., (172 170 Sheet SARGENT ENGINEERS INC. 5 Project: Sub Consulting Engineers D ir 5110 +A 320 West Bay Drive OLYMPIA, WASHINGTON 98502 Phone 943 -3590 By Date: ()..)Q /7 c- i2x7 /z(84 is 6( Z,.(0 X �T Z 4 z 7 upo/I 12 14- 47_1 2- L (Z. L z. S 5 /6 3 S Z 9 s z z- z 7 s 3,s /0 zs.s Z z Z 4,07 /r 4c5 4ds Sheet 1 STRUCTURAL NOTES DESIGN Structural design is in accordance with the structural provisions of the Uniform Building Code, 1988 edition DESIGN LIVE LOADS Roof 25 PSF Seismic Zone 3 Z =0 3 I =1 0 Rw =8 C =2 75 Wind Load 85 MPH wind speed, Exposure C, Method 2 GLUE LAMINATED BEAMS U B C combination 24F -V4 for simple spans, ICBO report 2519 Lumber shall be Douglas Fir (2,400 P S I) Camber for dead load as shown on drawings Waterproof glue all beams WOOD FRAMING. LUMBER GRADING Allowable stress required shall be in accordance with standard grading rules of West Coast Lumber no 16 Moisture content shall be 19% maximum Load bearing and exterior studs and plates shall be of grade hem -fir #2 or better, unless noted otherwise Joists and headers shall be of grade Douglas Fir #2 or better, unless noted otherwise Plywood sheathing shall be APA grade trademark plywood nominal thickness as shown on drawings Roof and wall sheathing shall be C -D (unless noted otherwise), interior with exterior glue and shall be nailed with 10d at 6" o c along edges and at 10" o c along intermediate framing members, unless noted otherwise Boundary nailing to be 10d 6" o c Roof sheathing nailing shear walls to be same as shear wall nailing SHEAR WALLS Shear wall construction shall conform with that specified in shear wall schedules as a minimum SECTIONS AND DETAILS DR DANA SHALTRY OFFICE Sections and details showing bolts, framing members, and connections are intended to illustrate specific details No attempt has been made to show all elements passing through a specific section or detail 24/ REFERENCES Refer to Architectural drawings for all dimensions not shown, for size and position of openings, breaks in structural members due to architectural treatment GENERAL NOTES Use 24" x 24" #4 elbow bars at all 90 degree bends in horizontal steel Dowel all interior continuous footing steel into perimeter footings with elbow bars Denotes shear wall location and type, refer to the shear wall schedule Denotes Simpson holdown anchored into the foundation Holdowns shall be attached to double studs Holdown bolt, embedment and configuration shall be per recommendation in Simpson Catalog C -91H -1 SHEAR WALL SCHEDULE A PLYWOOD SHEAR WALLS 1 MAXIMUM SHEAR 250 P.L.F. Use 1/2" CDX plywood sheathing- one side of wall Nail all edges with 10d nails at 6" o/c For framing use HF #2 Provide 1/2" diameter anchor bolts at 32" o/c maximum spacing at the foundation See plans for locations and sizes of holdowns 3 MAXIMUM SHEAR 435 P.L.F. Use 1/2" CDX plywood sheathing one side of wall Nail all edges with 10d nails at 3 1/2" o/c For framing use HF #2 Provide 5/8" diameter anchor bolts at 32" o/c maximum spacing at the foundation See plans for locations and sizes of holdowns 6 MAXIMUM SHEAR 770 P.L.F. (3 x FRAMING) Use 1/2" CDX plywood sheathing one side of wall Nail all edges with 10d nails at 2" o/c staggered For framing at vertical and horizontal edges use 3" nominal or wider DF #2 Provide 5/8" diameter anchor bolts at 18" o/c maximum spacing at the foundation See plans for locations and sizes of holdowns GENERAL REOUIREMENTS All sheathing edges shall be backed with framing sizes according to shear wall schedule or 2" nominal blocking Connections between roof sheathing and wall sheathing shall be such that required edge nailing per schedule is continuous through blocking and wall plates All shear walls running parallel to roof framing shall be continuous to the roof sheathing and shall be connected to the sheathing in accordance with the edge nailing requirements of the shear wall schedule Shear walls perpendicular to or at an angle to roof framing shall be blocked between top of wall and roof sheathing Blocking shall be connected to the sheathing in accordance with the edge nailing requirements of the shear wall schedule Provide roof and floor diaphragm nailing of 10d nails at 6" o c at panel edges and at 6" o c at diaphragm boundaries unless noted otherwise Provide diaphragm boundary nailing between roof and floor diaphragms and top of shear walls Space 10d nails 12" o c along intermediate framing members on roof and walls Space 10d nails at 10" o c along intermediate framing members on floors Lumber grades listed above are minimums All floors, roof, and shear walls require 4' x 8' plywood sheets At edges of diaphragm where plywood sheets might be smaller than 24 plywood sheets shall be fully blocked around entire piece with 10d nails at 6" o/c unless noted otherwise For bolting treated plate to continuous running footing, provide ASTM A307 anchor bolts of size and spacing indicated in the shear wall schedule and 1/2" diameter anchor bolt at 4' o c outside shear walls Provide a minimum embedment in concrete of 4" for 1/2" and 5/8" diameter bolts and 5" for 3/4" diameter bolts There shall be a minimum of two bolts per section of plate and a bolt shall be located within 12 inches of each end of the plate All bolts require nuts and washers Minimum supporting concrete wall thickness shall be 6" Blockouts in concrete wall shall be located outside the shear wall and at least 2 feet away from the location of a holdown The hook of the J -bolt of the HD6 holdown shall be embedded into the footing of the stem wall Refer to attached "GENERAL NAILING DETAILS AT SHEAR WALLS" for shear walls construction GENERAL NAILING DETAILS AT SHEAR WALLS INDEX TO CALLOUTS 10 NAIL PER EDGE NAILING REQUIREMENT OF SHEAR WALL TYPE. QZ NAIL PER EDGE NAILING REQUIREMENT OF UPPER SHEAR WALL TYPE. Q NAIL PER EDGE NAILING REQUIREMENT OF LOWER SHEAR WALL TYPE. Q4 NAIL ALL EDGES OF WALL SHEATHING PER CORRESPONDING SHEAR WALL TYPE. 05 BLOCKING VENT HOLES MAY BE PROVIDED WHERE REQUIRED Q PLYWOOD PER PLAN Q7 tOd NAILS 6" 0 C. Q SIMPSON A35 ENGINEERTO DETERMINE SPACING. Q JOINT IN WALL SHEATHING. 70 WALL SHEATHING CONTINUOUS AT THIS LOCATION 27/ z ROOF RAFTER FLAT OR SLOPED OR _,1\4 CANTILEVERED (E FLOOR JOIST RAPIER /JOIST FRAMING INTO A' 5 ia hT 5H *Iz, uJ ALL T`{ P E AS (o "O,c. AT 544thR. u— Ty P c> SHEAR WALL SHEAR WALL OPTION 1 (WALL SHEATHING CONT TO BLOCKING) RAFTER /JOIST FRAMING INTO SHEAR WALL OPTION 2 (WALL SHEATHING STOPPING TOP PLATE) 2 8/ EDGE NAILING BOTTOM PLATE FOUNDATION •r 1 2x FLAT HORIZONTAL EDGE W /STAGGERED EDGE NAILING RECOMMENDED CLEARANCE TO BOTTOM PLATE PER MANUFACTURER SHEAR WALL I IN THIS AREA I of 1 I„ 1 f 1 1 1 f li- HOLDOWN ATTACHED TO DOUBLE KING STUDS, U N 0 ANCHOR BOLT PER SHEAR WALL TYPE HORIZONTAL JOINT IN WALL SHEATHING HOLDOWN /SHEAR WALL NAILING REQUIREMENTS Z HOLDOWN ANCHOR BOLT, SIZE AND EMBEDMENT PER MNFR RECOMMENDATIONS AT END EDGE OF SHEAR WALL, NAIL SHEATHING TO VERTICAL STUDS PER EDGE NAILING WHETHER IT IS EDGE OR FIELD STAGGER JOINTS IN WALL SHEATHING 261/