Loading...
HomeMy WebLinkAbout1008 W 5th St - BuildingOwner Permit Additional desc Permit pin number Permit Fee Issue Date Expiration Date Permit Fee Total Plan Check Total Other Fee Total Grand Total T:FormsBuilding Division/Building Permit CITY OF PORT ANGELES DEPARTMENT OF COMMUNITY ECONOMIC DEVELOPMENT BUILDING DIVISION 321 EAST 5TH STREET PORT ANGELES WA 98362 Application Number Application pin number Property Address ASSESSOR PARCEL NUMBER Tenant nbr name Application type description Subdivision Name Property Use Property Zoning Application valuation Application desc TEAR OFF RE ROOF GARAGE CHAS MARIE BEAM TRUST MARIE TRUSTEE 1008 W 5TH ST PORT ANGELES (360) 457 7805 Structure Information 000 WA 98363 Qty Unit Charge Per 1 00 14 0000 THOU Other Fees Fee summary Charged 09 00000732 Date 883280 1008 W 5TH ST 06 30 00 0 1 0800 0000 CHAS /MARIE BEAM TRUST RE ROOF RS7 RESDNTL SINGLE FAMILY 2103 Contractor TOPNOTCH ROOFING GUTTER 1235 W 9TH PORT ANGELES (360) 457 0066 000 TEAR OFF RE ROOF GARAGE BUILDING PERMIT NO PR FEE TEAR OFF RE ROOF GARAGE 150540 109 75 Plan Check Fee 7/23/09 Valuation 1/19/10 109 75 00 4 50 114 25 BASE FEE BL -2001 25K (14 PER K) STATE SURCHARGE Paid Credited 109 75 00 4 50 114 25 00 00 00 00 Due 7/23/09 WA 98362 4 50 00 00 00 00 00 2103 Extension 95 75 14 00 LA-pi 7- 27- (d Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned fora period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the last inspection I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. inta_v, Ba,T PT> �J�_/ .4 Date Print Name Signature of Contractor or Authorized Agent Signature of Owner (if owner is builder) FOUNDATION Footings Stemwall Foundation Drainage Downspouts Piers Post Holes (Pole Bldgs.) PLUMBING Under Floor Slab Rough -In Water Line (Meter to Bldg) Gas Line Back Flow Water AIR SEAL. Walls Ceiling FRAMING Joists Girders Under Floor Shear Wall Hold Downs Walls Roof Ceiling Drywall (Interior Braced Panel Only) T -Bar INSULATION Slab Wall Floor Ceiling MECHANICAL. Heat Pump Furnace FAU Ducts Rough -In Gas Line Wood Stove Pellet Chimney Commercial Hood Ducts MANUFACTURED HOMES Footing Slab Blocking Hold Downs Skirting T Forms /Building Division /Building Permit BUILDING PERMIT INSPECTION RECORD PLEASE PROVIDE A MINIMUM 24 -HOUR NOTICE FOR INSPECTIONS Building Inspections 417 4815 Electrical Inspections 417 4735 Public Works Utilities 417 4831 Backflow Prevention Inspections 417 4886 IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED POST PERMIT IN CONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE. Inspection Type Date Accepted By Comments PLANNING DEPT Separate Permit #s SEPA. Parking Lighting I ESA. Landscaping I SHORELINE. Inspection Type Electrical 417 -4735 Construction R.W PW Engineering 417 -4831 Fire 417 -4653 Planning 417 -4750 Building 417 -4815 FINAL Date Accepted by FINAL Date Accepted by FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/ USE Date Accepted By Applicant /t'',t 71 L 2i 1y Property Owner rvi Property Owner's Address /p6 Contractor c G -rte e-r-) -r e Contractor's Ad ress /�3 /il Q_ License t o w R G eq y pp. e xpires P/ E -mail PROJECT ADDRESS Parcel Number Floor Areas BUILDING PERMIT APPLICATION Print in ink CITY OF PORT ANGELES Attn Building Permit Technician 321 E. Fifth St. Port Angeles, WA 98362 (360)417 -4815 fax (360) 417 -4711 Existing (sq. ft.) Proposed (sq. ft.) Date 7- _7 3-0gPrint Name a rl e. L, i c Signature T Forms /Building Division /Bldg Permit.doc Phone Phone For City Use Only Date Received '7- -Z.3 0$ Permit Oq -132. Date Approved 3 Phone U4,,) 4 D ,P J Lot Zoning Basement per sq ft. 1 Floor 2 Floor 3 Floor Garage Carport Covered Porch V Deck Shed Other jam" 4� TAL VALUATION a/G3 rj Total footprint of structures sq ft. T Lot size sq. ft. Lot coverage Site Coverage the amount of impervious surface on a parcel including structures paved driveways sidewalks and other impervious surfaces. (see PAMC 17 94 135 for exemptions) Site coverage t h., l krce nr� gijes� r p� ce Project Type Brief Description. Residential Multi family Commercial Industrial Check all that apply New Construction Addition Remodel Repair Demolition Re-roof House 'garage other ear off re -roof lay over one layer eat System Heat pu p wood burning stove gas fireplace pellet stove o other Other patios Max. height of proposed structures ft. Occupancy group of bedrooms Will a lawn sprinkler system be installed? Occupant load of full baths Will a fire sprinkler system be installed? Construction type of half baths I have read and completed this application and know it to be true and correct. I am authorized to apply for this permit and understand that it is my responsibility to determine what permits are required, and to obtain permits prior to working on projects. Q A-i:9 gSf_ -4 I $2103 57 176.69 $2280 26 Please call if you have any questions Thank you. Plus City of Port Angeles building permit required ESTIMATE AND BID PROPOSAL CONTRACT Two thousand two hundred eighty and 26/100 6/17/09 topnotchroofing @gwestoffice.net p r TOPNORG994 DA EXPIRATION DATE: 5/18/10 Company signature l /.(J .i. Date 7 (19 1 Bid prices are subject to reasonable increases due to any necessary alterations, additions, increases in material and /or labor to complete work. Homeowner will be notified of any necessary changes, which may affect cost. Property owners are responsible for obtaining any permits required for work and materials described herein. TOPNOTCH is happy to provide permit, but will add the cost to the final bill. Bid prices are applicable for 30 days* from date below, unless otherwise stated or agreed to. Please feel welcome to call if you have questions concerning this estimate /bid If bid is accepted, please sign one copy and return it to TOPNOTCH ROOFING GUTTER, at the address above Work is scheduled upon receipt of sinned bid. Verbal agreements will not Guarantee scheduled work. References are available! TO Marie Beam 1008 W 5" St Port Angeles, WA 98363 457 7805 FOR: Re -roof garage at same address Shingle roof with skip sheathing Tear off sheathing Installation, re -roof Tear off existing roofing Clean up and disposal included Install OSB sheathing Install 30 -year laminated architectural composition over 30# felt Install 50' Of drip edge starter course composition ridge cap Estimated cost of tear off sheathing installation, re -roof using the materials specified Labor to complete work as described, and sales tax Authorized party to accept bid Date q._ /P 9 MATERIAL WARRANTY BY MANUFACTURER, WORKMANSHIP GUARANTEED BY LICENSED, BONDED, INSURED CONTRACTOR W og kn.anshin warranty cities not cover a... rations, lack of maintenance, or imor mer maintenance, etc. PAYMENT TERMS: ONE HALF TO START WORK. BALANCE DUE IN FULL WHEN WORK IS COMPLETED ALTERNATIVE PAYMENT ARRANGEMENTS MUST BE DISCUSSED AND AGREED TO PRIOR TO THE START OF THE )OB