Loading...
HomeMy WebLinkAbout902 E 6th St - Building0 Concept Review. 0 Preliminary Review 0 Final Review COMMENT NO PROJECT NAME. V 1104_04 [12/93) SENT FOR DEPARTMENT REVIEW ON C -2 3 '?'9 REVIEWING DEPARTMENTBuilding 1 PW Engineering DEPARTMENT COMMENTS RETURNED NOTE TO PLAN SUBMITTER: AB plan commenas require vain= response and/or correction for permit issuance. Return response with plan resubminal. Approval of ALL, reviewing depausatents required prior to permit issuance 0 Revision DRAWING OR SPEC REF other 0 Reviewed by (Ill 1= Z*,) eh. Oe 31 1- _z-z.).6-1072 /:_er Rws I //fist,- 4,b,e77-//47e,e0a) OA/ ,767 IR/514). 511 c/ge,AJT" 00.0)4? 7 Ain.Vt5 Dae7e- `'"e36 2 71:, pA7z1.r/A) zhtteod D .4r77e is (7.,J 546ai zo der--", es. 0 Not approved. Comments returned to subminer for response and or correction. REVIEWING DEPARTMENT FINAL APPROVAL. by Daze LOCATION. 97) c2 E VtA PLAN REVIEW COMMENTS 1 Wastewater Water [1 Street Solid Waste [1 Light Fire COMMENTS TO SUBMITTER: SUBMITTER RESPONSE DATE. COMMENTS DK) Rust /174zifes- ist-"J STATUS CODES. A COMMENT ACCEPTED C CORRECTION MADE N NO RESPONSE REQ'D PERMIT BACK CHECK BY/DATE. /1/ 00 S T A T U S