Loading...
HomeMy WebLinkAbout5.129 Original ContractAGREEMENT TO FUND CONVENTION CENTER SCHEMATIC DESIGN 7) This AGREEMENT is entered into on this ,4 7 ,:9Z- 4 -day of /,'_Cl) 1982, by and between CLALLAM COUNTY, a political subdivision of the State of Washington (hereinafter referred to as "COUNTY and the CITY OF PORT ANGELES, a municipal coporation of the State of Washington (hereinafter referred to as the "CITY IT IS MUTUALLY AGREED AND UNDERSTOOD BY THE COUNTY AND CITY THAT: 1. This AGREEMENT is entered into pursuant to the authority of Chapter 39.34 RCW, "Interlocal Cooperation Act." 2. The COUNTY and CITY are each accumulating funds under the provisions of Chapter 67.28 RCW, "Hotel-Motel Tax." 3. Pursuant to RCW 67.28.210, the "hotel -motel tax" funds are limited in their use to the acquisition, construction, or operation of stadiums, convention centers, and performing art centers, and /or promoting tourism. 4. The CITY has entered into an AGREEMENT with a consultant, Ellerbe and Associates, an engineer- architect firm, to prepare schematic design work on the Vern Burton Memorial Community Center in determining the feasibility in renovating and converting it into a county /city convention center. 5. Such design assessment will benefit the COUNTY in deter- mining the appropriate use of the funds which it holds as the scope of work of the consultant's contract extends to all of Clallam County. 6. The CITY has complied with all necessary legal procedures in the selection of •Ellerbe and Associates, for performance of this AGREEMENT. NOW, THEREFORE, in consideration of the above representations, and of the mutual agreements contained herein, it is agreed as follows: 1. Provided the scope of work of the consultant is as stated in Section 1 of an Agreement dated December 1, 1981, between the CITY and Ellerbe and Associates, a copy of which is attached and incorporated hereto as Exhibit "A the COUNTY agrees to reimburse the CITY fifty percent (50%), up to Five thousand dollars ($5,000) of the amount paid by the CITY to Ellerbe and Associates, pursuant to Section 2 of that Agreement. 2. The CITY will provide an invoice to the COUNTY at the time the CITY makes payment to Ellerbe and Associates, and the COUNTY shall reimburse the CITY based on the invoice paid by the CITY. 3. The CITY, as the administering agency of this interlocal agreement and the Consultant's contract, shall provide the COUNTY an opportunity to review and make recommendations at all appropriate stages of the Consultant's work, including, but not limited to, final acceptance, and shall consider and implement reasonable. input from the COUNTY. Page two Agreement To Fund Convention Center Schematic Design CITY OF PORT ANGELES OROthY Mbl\ICAN, MAYOR ATTEST: c5 /L„;u6 MARIAN PARRISH, CLERK DON FEELE BOARD OF CLALLAM COUNTY COMMISSIONERS HARRY L Y ARD, CHAIRMAN ‘.)1) 3 al C ERK OF THE BOkRD /0 —,0100 APPRO AS TO FORM: CRAIG D. KaUTSON DEPUTY PROSECUTING ATTORNEY, CLALLAM COUNTY cc: Auditor Prosecutor AGREEMENT This AGREEMENT is made this d.• day of A-Ge 1981, by and between the CITY OF PORT ANGELES, a municipal corporation of the state of Washington (hereafter "City and ELLERBE ARCHI- TECTS ENGINEERS, a Washington partnership (hereafter "Consultant In consideration of the mutual promises, covenants, terms and conditions of this Agreement, the parties agree as follows: PERFORMANCE BY CONSULTANT 1. The Consultant agrees to perform the following work: 1.1 Review existing drawings and reports on, and investigate, the Vern Burton Memorial Community Center building to determine expansion and remodeling potential. 1.2 Review the Port Angeles Convention /Community Center Study and Program (hereafter "Program prepared under contract to the City by Event and Facility Consultants, and work with that consultant in identifying those portions of the Program that can be accomodated by remodeling, and those portions which require new construction. 1.3 Prepare-preliminary designs for the remodeling, and for new construction, reflecting the recommended spacial relationships identified in the Program. As a part of this preliminary design, the Consultant will prepare sight development recommendations and exterior design solutions. 1.4 Consistent with the preliminary design, prepare recommen- dations for phasing of the remodeling, and construction; to meet the City's required, identify alternative methods and systems where applicable; and prepare estimates of probable construction costs for the project, including fixed equipment and site develop- ment. 1.5 Assist the_City in necessary public presentations of the project as described in the preliminary design prepared by the Consultant. PAYMENT TO CONSULTANT 2.1 For the work to be performed under the terms of this Agreement, the City shall pay a lump sum, not to exceed Twelve Thousand Nine Hundred Fifty Dollars ($12,950), which includes the items described in this paragraph. This fee shall include all work described in paragraph 1 of this Agreement including all travel expenses and other reimbursable charges necessary to fulfill the terms of this Agreement. 2.2 The basis of calculation of the fee shall be two and one -half times direct personnel expense, plus actual reimbursable charge s 2.3_ Direct personnel expense is defined, for the purposes of this paragraph, as the direct salaries of all consultant personnel engaged in the project and the cost of their mandatory and customary contributions and benefits related to that salary, such as employment taxes and other statutory employee benefits, insurance, sick leave, holidays, vacations, pensions, profit sharing, and similar contributions and benefits. 2.4 Reimbursable charges include the cost of travel and out- of-town living expenses, long distance communications, reproduction and mailing, data processing, photo reproduction techniques, and any state or local taxes imposed upon the work of the Consultant. 'TIME OF PERFORMANCE 3.1 The services to be performed under this Agreement shall be completed within four (4) months of the date of this Agreement. 3.2 If the services covered by this Agreement have not been capable of completion_. within the term of this Agreement, through no fault of the Consultant, the amount of compensation received by the Consultant pursuant to paragraph 2.1 shall be equitably adjusted, based upon direct personnel expenses and reimbursable charges incurred by the Consultant in performance of the work. EXTRA WORK 4.1 Any additional services beyond the scope of the terms of this contract will be performed upon written agreement thereto by the parties and will be compensated on the basis of two and one -half times direct personnel expense, plus reimbursable charges. METHOD OF PAYMENT 5.1 Consultant will be reimbursed monthly, beginning thirty (30) days after execution of this Agreement. Consultant shall submit an itemized invoice to the City for the work performed. Payment by the City shall be full compensation for the work performed and services rendered, and for all supervision, labor, profit, supplies, materials, equipment or use thereof, and for all. incidentals necessary to complete the work. 5.2 Payment by the City shall be made within thirty (30) days of the receipt of the billing from Consultant. FINAL DESIGN AND CONSTRUCTION 6.1 The time of completion and acceptance by the City of the preliminary designs prepared by Consultant, pursuant to paragraph 1 of this Agreement, the City will determine whether to proceed with final design and construction. At that time, the City will consider, prior to awarding a contract for such final design, the knowledge and information developed by Consultant in preparation of the preliminary design. Preparation of such final design shall be pursuant to a separate agreement between the City and the consultant selected for such final design. OWNERSHIP OF DOCUMENTS 7.1 All drawings, prints, plans, field notes, and other related documents prepared or obtained by the Consultant under the terms of this Agreement shall become the property of the City. FURNISHING OF DOCUMENTS TO CITY 8.1 The Consultant shall furnish to the City ten (10) copies of the preliminary design. ACCEPTANCE OF PRELIMINARY DESIGN 9.1 All materials to be delivered under the terms of this Agreement will be forwarded to the City Manager for inspection and acceptance. All materials shall be furnished in a good workmanlike manner, and in accordance with the best ti- customs and standards for such work. The decision of the City Manager based upon the conformance of the materials to the terms of this Agreement and the customs and standards for such work. The decision of the City Manager shall be final. No payment for any REVISION OF THE WORK whether to accept such material shall be such work forwarded shall be made by the City, until the work is accepted by the .City Manager. 10.1 Consultant shall make such revisions in the materials delivered to the City as are necessary to correct errors attribut- able to the Consultant and as required so to do by notification from the City. Revisions of the work requested by the City after acceptance of the work shall be paid for in accordance with paragraph 4, Extra Work. ASSIGNMENT 11.1 This Agreement may not be assigned without express written consent of the City. INDEPENDENT CONTRACTOR 12.1 The Consultant is an independent contractor, not an employee or agent of the City. TERMINATION OF AGREEMENT 13.1 The right is reserved by the City to terminate this Agreement at any time upon not less than ten (10) days' written notice to the Consulant. 13.2 In the event of the death of any member or partner of the consulting firm, the surviving members shall complete the work. 13.3 In the event that the partnership or corporation is dissolved, the signing principal shall complete the work. 13.4 In the event this Agreement is terminated prior to completion, the original copies of the Consultant's report, all drawings, prints, plans, and field notes prepared by the Consultant prior to said termination shall become the property of the City. 13.5 The right is reserved to the Consultant to terminate the Agreement at any time upon not less than ten (10).days' written notice to the City if the Consultant's work is suspended for more than two (2) months or abandoned in whole or in part. 13.6 In the event this Agreement is terminated under any of its terms prior to completion of the work, a final payment shall be made to the Consultant which, when added to any payments pre viozsly made, shall total the same percentage of the amount which would have been due if the work had been fully completed, as the work completed at the time of completion bears to the total work required under this Agreement. 13.7 If the total accumulated payments made to the Consultant prior to the notice of termination equal the total amount that would be due computed as set forth above, then no final payment sha:Ll be due and the Consultant shall immediately reimburse the Cite for any excess paid. EN T':CRE- AGREEMENT 14.1 This- Agreement shall constitute the entire agreement between the parties, and may only be modified by written document, signed by the parties. IN WITNESS THEREOF the parties hereto have executed this Agreement as of the day and year first above written. CITY OF PORT ANGELES ,l Mayor A LV-ee.;4e) gefieht Clerk ELLERBE ARCHITECTS ENGINEERS Partner y Board of Counts Commissioners DICK LOTZGESyL, District I DON FEELEY, District II HARRY LYDIARIL, District III FACILITY PLANNING CLALLAM COUNTY COMMISSIONERS' OFFICE TO: Board of Clallam County Commissioners FROM. Michael R. Wilson (.j I SUBJECT: Clallam /Port Angeles Convention Center DATE. November 30, 1982 COURT HOUSE 223 EAST FOURTH STREET PORT ANGELES. WASHINGTON 98362 -3098 (206) 452 -7831, Ext. 233 SCAN 575 -1234 The Economy of Clallam County is in a state of crisis and there is significant need for the county and municipalities within the county to participate in what- ever ways found acceptable to stipulate economic recovery. The tourism indust- ry is perhaps the single most unexploited area of industry within our county which coincidently lends itself to the greatest potential of economic enhancement to the community. In addition to both the private and public sectors working to provide a more cooperative and coordinated effort in promoting tourism in Clallam County, the Board of Commissioners should strongly consider developing and financially supporting a convention center in conjunction with the City of Port Angeles. Convnti ors business can be a big business in Port Angeles, just like it has been these past five years in Yakima, provided it is properly planned, financed, and managed. In order for a convention center in Clallam County to be successful, it iS imperative we do our homework before we break ground. This would include doing an exemplary job in market research to determine what type of activities, events and attractions would best suit the facility and our area. An adequate convention market research report was done by Event Facility Con- sultants (Mr. Don Jewell) and a fine schematic design. was prepared by Ellerbe Associates which provides for converting the Vern Burton Memorial Center into virtliially a new 24,000 square foot convention center facility. Although this initial effort has been conducted, it is imperative for the county and City to select a convention center board of directors to perform further study and planning. As soon as a decision is reached by the county and city to proceed with this project, the board should be appointed and be charged with the responsibility of pre -final design and pre- construction planning. Board of Clallam County Commissioners Page Two I wou d recommend that the Board operate independent of Clallam County or the City of Port Angeles governments, but provide them with fiscal accountability. The Board should consist of either five or seven members; including a representa- tive of Clallam County, a representative of the City of Port Angeles, and a representative from the tourism business community_of each of the three com- missioner districts in the county. Every convention has a unique kind of market and appeal. The Board should ac- tively proceed to assess the unique characteristics, geographic location, and other special attractions of Clallam County and Port Angeles and develop a plan based on those positive aspects. The Board should also be responsible for hiring a (Eonvention center manager, approving the convention center budget, and adoption of annual operation plans. FACIL::TY MANAGEMENT The convention center manager should be selected by the board of directors and be on bo at least three months in advance of the facility opening. The manager should primarily be responsible for overall administration of the facility, in- cluding operational event planning and coordination, marketing and selling, and budge .i ng. The convention center manager is a very important ingredient in the formula of success for tourism development. Therefore, it is essential the individual have a strong tourism industry and marketing background. Consideration should be given to having the manager responsible for tourism information and promotion within -the county. It is important in order to have an effective tourism indust- ry that we have a central location and individual responsible for coordinating touri activities'in the Clallam County area. Efforts also should be made to attract the Forks, Sequim, and Port Angeles Chambers of Commerce into the con ventin center facility through a cooperative arrangement. The center would serve as a satellite office for the three chambers and bring about better com- munication and coordination of efforts to promote tourism and chamber- related activ "ties. FACIL]TY FINANCING The County and City should expeditiously move toward entering into an interlocal cooperation agreement as to the financing and management of the Clallam /Port Angels Cenvention Center before final design is authorized. I have prepared a.tim table (see attached) which indicates a schedule when events should or could occur in the development of the convention center. In order to determine how much the facility would cost Clallam County and the City of Port Angeles, it was necessary to prepare an estimated 1984 revenue report (see Exhibit A), estimated budgets for 1983, 1984 and 1985 (see Exhibits B, C and D), and a financing statement (see Exhibit E). The primary funding sourcd for the construction of the facility would be the use of the hotel /motel taxes;of both the county and city, plus ongoing use of hotel /motel tax monies to pay for the capital indebtedness of the facility. Board of Clallam County Commissioners Page Three The initial operation of the facility will show a deficit, perhaps $33,000 or more in 1984; therefore, it would be necessary to use hotel /motel taxes or other financial resources of the county and city (e.g. sales tax) to pay for this anticipated operation deficit (see Exhibit E for financial detail). As the activities within the convention center increase, the more revenue will be raised to su port the facility and, of course, the more hotel /motel taxes will be gen- erate in addition to sales taxes, gas taxes, etc. If properly promoted and manag d, there should eventually be adequate funds between the county and city withi their respective hotel /motel tax funds to pay for the financing of the facility. In calculating the figures on Exhibit E, it was determined that the county would use 80% of its hotel /motel tax and city would use virtually all of its existing hotel /motel funds to finance the construction of the center. Thereaf- ter, county would use 80% of its ongoing hotel /motel tax accumulation to support the operating deficit and bond indebtedness, not to exceed perhaps $30,0)0. The amount of County hotel /motel tax for the county without a convention center is anticipated to be about $25,000 annually. With the recent Hood Canal Bridge openi g and with a convention center, I would hope we could double that amount. The m jor "initial" impact of a convention center on the community will be within the c nfines of Port Angeles, but the "spin -off" effect once conventioneers are attra ted to Port Angeles will positively impact the outlying areas and the rest of Cl llam County through aggressive promotion. The financial support and ownership of the convention center was determined on a. 80% 20% split: Port Angeles 80% and Clallam County 20 The ownership formula was based on joint ownership of the building and land improvements, but not the land itself. In financing the anticipated construction balance of $870,000, I would recommend the Bard pursue a Commissioners' Bond which could be obtained, if the market holds steady the next six months, at a rate of between 9% to 10 Because this project-is local and backed by the county and city hotel /motel tax, the rate we would be able to obtain should be as good as general obligation bond rates. I hav included two amortization schedules (see Exhibit F) received from the Seatt a law firm of Preston, Thorgrimson, Ellis Holman which reflects the current marke .rate. If the rates stabilize at this level, the Commissioners' Bond would seem #.o be the most attractive financing option. ANTIC:;PATED COUNTY REVENUE Although we can reasonably predict what the convention center construction costs and o erating expenses should be, it is most difficult to project the revenue the f cility will generate or the revenue the county may derive in the form of hotel /motel tax, gas tax, sales tax, or other sources. Since the county receives 15% of the first half cent of sales tax raised in the city, increased business activity in Port Angeles will certainly benefit Clall County's revenue picture. The primary benefit, however, will be the Boar' of Clallam County Commissioners Page Four stimulus of tourism activity throughout the County which will generate more spending, more jobs, and more revenue in the county. To emphasize once again, if the facility is properly planned and operated, it is easy to conclude that everyone should benefit. 4o CLALLAM /PORT ANGELES CONVENTION CENTER TIMETABLE 1. Execution of Clallam County /Port Angeles Interlocal Cooperation Agreement December 15, 1982. 2. Select Convention Center Committee December 30, 1982. 3. Contract for Final Design January 15, 1982. 4. Final Design Completion March 31, 1982. P 5. Call for Bids for facility construction April 15, 1983. 6. Award construction contract May 31, 1983. 7. Committee prepare 1983 -1984 Budget July 1, 1983. 8. Committee hire convention center director November 1, 1983 9. Construction completed and facility opening February 1, 1984. r 1984 ESTIMATED OPERATING REVENUE CLALLAM /PORT ANGELES tONVENTION CENTER Rental Revenues Main Hall (1) Meeting Rooms (2) Office Space (3) Concessions (4) Catering /Coffee Service (5) Equipment Rental /Service Charges Total Exhibit A 40,000 5,000 3,300 12,500 22,500 5,000 88,300 Notes: 1) Assumes $400/10% rental fee; 100 uses 2) Assumes. $50 average rental fee; 100 uses No charge to conventions using main hall. 3) Assumes $10 per square foot for approximately 550 square feet of office space. 4) Assumes 25% of $50,000 gross receipts. 5) Assumes 15% of $150,000 gross receipts ao Grand Hall (14,500 square feet) 8 a.m. 12 p.m. 8 a.m. 6 p.m. 6 p.m. 12 p.m. Room A or B (1562 square feet) 8 a.m. 12 p.m. 8 a.m. 6 p.m. 6 p.m. 12 p.m. 8 a.m. 12 p.m. 8 a.m. 6 p.m. 6 p.m. 12 p.m. YAKIMA CONVENTION CENTER HALL RATES Charge With No Food 1,045 880 880 300 250 250 600 575 575 Exhibit A 3) Room C (5,591 square feet) or Room D (5,875 square feet) Charge With Food 1,045 880 880 500 385 385 Personal Services: Administrative Expense: General Manager (2 months) Benefits (25 1983 BUDGET CLALLAM /PORT ANGELES CONVENTION CENTER 4,157 1,042 Total 5,199 Office Supplies 250 Communications 300 Dues and Subscriptions 0 Travel, vehicle expense, 200 Advertising and Printing. 1,500 Insurance 0 Professional- Services 0 Total Exhibit B 2,250 7,449 Personal Services: General Manager Secretary /Bookkeeper (2 time) Building Superintendent (2 time) Part -Time Employees Benefits (22 Administrative Expense: Operation Maintenace Expense: Utilities Repairs Maintenace Maintenance Supplies Contract Services 1984 BUDGET CLALLAM /PORT ANGELES CONVENTION CENTER 25,000 8,000 12,500 5,000 11,110 Total 61,610 Office Supplies "1,000 Communications 1,800 Dues Subscriptions 100 Travel, vehicle expense 1,200 Advertising and Printing 3,500 Insurance 6,000 Professional. Services 2,500 Total 16,100 20,000 3,600 5,006 3,600 Exhibit C Total 32,200 Grand Total 109,910 Personal Services: Administrative Expense: Office. Supplies Communications 1985 BUDGET CLALLAM /PORT ANGELES CONVENTION CENTER General Manager 26,250 Secretary /Bookkeeper (xi time) 10,000 Building Superintendent (a time) 13,125 Part -Time Employees 7,500 Benefits (22 12,512 Dues &.Subscriptions Travel, vehicle expense Advertising and Printing Insurance Professional. Services Operation Maintenance Expense ,Total 1,200 2,000 100 1,100 4,000 7,000 3,000" Utilities 22,000 Repairs Maintenance 4,000 Maintenance Supplies 5,500 :Contract, Services 4,000 Exhibit 0 69,387 35,500 Grand Total 123,287 I. Construction Cost: BUILDING FINANCING CLALLAM /PORT ANGELES CONVENTION CENTER Proposed Building (including alternates) Kitchen Equipment Allowance Moveable Furnishings Allowance 7.5% Contingency Tax on Building 6.7Q Total Construction Cost Final Design Fee (complete 3/31/83) 60,000.00 II. Capitalization of Project: 80% of City County Combined Fund Balance 3/31/83 460,000 173,000 632,000 Final Design Cost 45,000 15,000 60,000 415,000 157,000 573,000 Add: Tax Interest Accumulation 10/1/83 50,000 13,000 63,000 Minus: Chamber of Commerce and Museum Commitments -6,000 0 -6,000 Fund Balance 7/1/83 Construction Cost Minus: Combined Fund Balance Balance left to be financed III. County /City Contribution Toward Financing: A. Bond Financing: 20 year $870,000 Commissioner Bond (10% interest) would be amortized at $87,000 for the first year (1984) and an average of $104,500.00 annual payments thereafter. (See ;Exhibit E). t- 1984 Bond Payment Annual Bond Payments Thereafter 1984 Ancicipated Deficit $33,025 (See Exhibits A C) 459,000 171,000 630,000 City (78.5 County (21.5 /1 Combined 68,295 82,074, 26,420 1,082,000.00 100,000.00 148,000.00 81,115.00 89,110.00 1,500,225.00 1,500,225.00 630,000.00 870,225.00 18,705 Exhibit E 87,000 22.479 $104,553 Operation Deficit Financing: City (80 County (20 Combined 6,605 33,025 Startup Costs Financini {County (80 Combined, City (80 %1 7,449 5,959 1,490 Assuming a bond issue of $870,000 and amortization over a fifteen -year period and an assumed would be as follows: Payment Date COMMISSIONER BOND ISSUE CLALLAM /PORT ANGELES CONVENTION CENTER 12/1/83 -0-' 12/1/84 30,000 12/1/85 35,000 12/1/86 40,000 12/1/87 45,000 12/1/88 45,000 12/1/89 50,000 12/1/90 55,000 12/1/91 60,000 12/1/92 65,000 12/1/93 75,000 12/1/94 80,000 12/1/95 90,000 12/1/96 95,000 12/1/97 105,000 $870,000 interest rate of 9.50 the amortization schedule Principal Interest Total 87,650 82,650 82,650 112,650 79,800 114,800 76,475 116,475 72,675 117,675 68,400 113,400 64,125 114,125 59,375 114,375 54,150 114,150 '48,450. 113,450 42,275 117,275 35,150 35,150 =r =115,150 27,550 TT 117,550 19,000 114,000 9,975. 114,975 $822,700 $1,692,700 Assuming the same bond issue, but payable over twenty years with -a 10% interest rate, the amortization schedule would be as follows: Payment Date Principal Interest Total _12/1/83 -0- 87,000 87,000 12/1/84 $15,000 87,000 107,000 12/1/85 20,000 85,500 105,500 12/1/86 20,000 83,500 103,500 12/1/87 20,000 81,500 101,500 12/1/88 25,000 79,500 104,500 12/1/89 25,000 77,000 102,000 12/1/90 30,000 74,500 104,500 35,000 71,500`_ 106,500 12/1/92 35,000 68,000 s 103,000 12/1/93 40,000 64,500 104,500 12/1/94 45,000, 60,500 105,500 12/1/95 50,000 56,000 106,000 12/1/96 55,000 51,000 106,000 12/1/97 60,000 45,500 105,500 12/1/98 65,000 39,500, 104,500 12/1/99 70,000 33,000 103,000 12/1/00 80,000 26,000 106,000 12/1/01 85,000 18,000 103,000 12/1/02 95,000 9,500 104,500 $870,000 $1,198,500 $2,073,500 The 80% 20% contribution formula was based on the following data: r .,Bond financing OWNERSHIP FORMULA CLALLAM /PORT ANGELES CONVENTION CENTER County Exhibit G City Combined Capital Investment 186,000 501,000 690,000 Property value (Building Only) 425,260 425,260 Total 186,000(16L7%1 929,260(83.3 $1,115,260 445,800 $1,627,700 78.5% $2,073,500 Grand Total 631,800 (19.8 $2,556,960(80.2 $3,188,760 Area Code 206 457.8575 Mr. Dave Flodstrom, City Manager City of Port Angeles 140 West Front Port Angeles, WA 98362 Dear Dave: WAS:cb cc: Don Sleeper Frank Thayer April 23, 1982 Sincerely, Port Angeles Public Schools SCHOOL DISTRICT NO. 121 Superintendent 1 57' 1 J I have been watching the progress the City has been making towards plans to convert the former Roosevelt gymnasium into a convention center. If the Roosevelt gym is converted into a convention center, I would assume that the bleachers in the gym would be removed. We are in need of bleachers at both middle schools Stevens and Roosevelt. We had planned to put bleachers in each middle school building during construction, but we were short of funds and have had to delay installing bleachers. The bleachers in the old Roosevelt gym would be ideal for our two middle schools, with one -half of the bleachers going to each middle school. I would appreciate it very much if the City of Port Angeles would consider donating the bleachers to the Port Angeles School District. If this approval is granted, the School District would promptly re- move the bleachers at your direction. Since our school facilities are now also serving the community by being used and scheduled by the City for city recreation programs, the citizens would continue to have use of the bleachers and also it would fulfill a real need for the School District. We do appreciate the fine cooperation we have with the City of Port Angeles. Wifliam A. Serrette Superintendent of Schools 5.129 216 East Fourth Street Port Angeles, Washington 98362 I AGREEMENT e.g d. /as e e 4. /q This Agreement is made the day of /I '7. 7. Sr do vivo., ferlacfab 1981 by and between the CITY OF PORT ANGELES, a municipal corporation of the state of Washington, (hereafter "City and CLALLAM COUNTY, a political subdivision of the state of Washington (hereafter "County REPRESENTATIONS: 1. This Agreement is made pursuant to the authority of Chapter 39.34, RCW, the Interlocal Cooperation Act. 2. County and City are each holding funds gathered under the provisions of RCW 67.28.180 through .210, commonly known as the "hotel -motel tax." 3. Pursuant to RCW 67.28.210, these funds are limited in their use to the acquisition, construction, or operation of stadiums, convention centers, and performing art centers. 4. The City has entered into an agreement with a consultant, Event and Facility Consultants, Inc., for a determination of need and potential utilitzation of a conference or convention center in Port Angeles. 5. Such study will be of benefit to the County in determining the appropriate use of the funds which it holds, as the scope of work of the consultant's contract extends to all of Clallam County. 6. City complied with all necessary legal procedures in the selection of Event and Facility Consultants, Inc., for performance of this agreement. AGREEMENTS: Now, therefore, in consideration of the above epresentations, and of the mutual covenants and promises contained herein, IT IS AGREED as follows: 1. Provided that the scope of work of the consultant is as stated in Section 1 of an Agreement dated June 4, 1981, between the City of Port Angeles and Event and Facility Consultants, Inc., a 'copy of which is attached hereto as Exhibit "A" and incorporated by this reference, County agrees to reimburse the City fifty (50%) percent, up to Two Thousand Five Hundred ($2,500.00) Dollars of the amounts paid by the City to Event and Facility Consultants, Inc., pursuant to Section 2 of that Agreement. 2. City will provide an invoice to County at the time that City makes payment to Consultants, and County shall reimburse City based on the invoice paid by City. CITY OF PORT ANGELES (i- PCB!cice fX Clerk BOARD OF LLAM •UNTY COMMIS Conu issione issioner 6ommis on 71) /(-A 2 -ev(if4 cc :Cus d P11 AGREEMENT FOR CONSULTING SERVICES BE IT KNOWN, that effective on -the day of 19 the City of Port Angeles, whose address is 140 West Front Street, Port Angeles, Washington, 98362 (herein sometimes referred to as "City and Event Facility Consultants, whose address is 4205 SW Downsview Court, Portland, Oregon, 97221 (hereinafter sometimes referred to as "Consultant do hereby enter into a professional services contract under the following terms and conditions: WITNESSETH: EXHIBIT A WHEREAS, the City requires the services of Consultant with respect to the determination of needs and potential utilization of a conference/ community center in Port Angeles; and WHEREAS, Consultant by reason of his experience and expertise is capable of rendering such consulting services; and WHEREAS, such services are professional and non competitive in nature. NOW, THEREFORE, the City and the Consultant for and in considera- tion of the covenants and agreements hereinafter set forth, mutually agree as follows: Section 1 Consultant hereby agrees to perform the following Scope of Work: Advise in the final refinement of the overall project objec- tive. Verify assumptions regarding the convention market in the State of Washington; identify potential competition; undertake sufficient market surveys to confirm attitudes and probable use by state associations of the Port Angeles or Clallam County area as a convention site. Draft the most appropriate program of proposed spaces to accomplish desired goals. Estimate probable operational costs and revenues. Recommend alternatives such as project phasing, development of a totally new center, or abandonment of the entire concept. Recommend a planned phasing process permitting City /County officials an opportunity to make go or no -go decisions at appropriate junctures. Identify benefits to the unincorporated areas of Clallam County should a convention /community facility be constructed and operated in the Port Angeles area. -1- AGREEMENT FOR CONSULTING SERVICES Section 2 In consideration of the services described above, the City hereby agrees to pay Consultant on the basis of monthly statements for time billed, including travel time, at the rate of Fifty -five Dollars ($55.00) per hour, plus out -of- pocket expenses, not to exceed Five Thousand Dollars ($5,000.00) without prior authority by the City or its duly appointed representative. Section 3 This contract may be terminated by either party upon thirty (30) days written notice. Section 4 The Consultant shall not assign any interest in this contract and shall not transfer any interest in same (whether by assignment or nova tion) without prior written consent of the City, provided, however, that claims for money due or to became due to the Consultant from the City may be assigned to a bank, trust company or other financial institution without such written consent. Notice of any such assignment or transfer shall be furnished promptly to the City. Section 5 Travel undertaken by Consultant and other out -of- pocket expenses will be reimbursed at cost upon submittal of a list of such expenditures with appropriate documentation. Section 6 The City shall make payments of monthly billings submitted by Consultant by approximately the 15th of a given month providing said billing is submitted to the City no later than the first of said given month. Section 7 All notices to the parties shall, unless otherwise requested in writing, be sent to the City and the Consultant at the addresses shown above. -2- AGREEMENT FOR CONSULTING SERVICES 9 IN WITNESS WHEREOF, the parties have caused this Agreement to be executed on the day and year first above written. WITNESS: Title: WITNESS: -3- AGREEMENT FOR CONSULTING SERVICES CITY OF PORT ANGELES By: 4';.m /fe.rt.4.1 Date: C, i EVENT FACILITY CONSULTANTS, INC. By: Don Jewell Title: PRESIDENT Date: July 2, 1981 MEMORANDUM TO: City Council /Manager FROM: City Attorney RE: Contract with Clallam County Reimbursement of Convention Center Consultant Study Attached is an Agreement between the City and the County, whereby the County agrees to contribute up to $2,500.00, or 50 of the cost of the study being performed b Event and Facility Consultants, Inc. This is to put into effect an agreement reached earlier this spring, which the Council directed the City Manager to pursue with the County. 1/ Dear Mr. Jewell: Mr. Don Jewell, President Event and Facility Consultants 4205 S. W. Downsview Court Portland, Oregon 97221 DF/jh cc: Councilmembers Clallam Co. Commissioners Don Frizzell, Dir. of Parks Rec. Rob Orton, Dir. of Admin. Serv. •42e, yOrErv-/- i9 S. TOURIST MECCA OF THE NORTHWEST 140 WEST FRONT STREET PORT ANGELES, WASHINGTON 98362 June 5, 1981 The City Council, at its June 2nd meeting, reviewed your May 18th letter and the attached contract. Upon completing that review, the Council approved the scope of work for_Phase II of the. Convention/Community Center study and approved the signing of the contract; however, the contract has been amended from the one which you initially sent me. The amendment comes in Section 6, the last sentence of that section. I have removed from the signed copy of the contract the reference to a 15% penalty for late payment. This item was removed simply because it is a deviation from the standard agreement which the City has used in the past and feels is appropri- ate for contracting of professional services. With the exception of that one minor change, the Council is comfortable with the contract and eager to proceed with the second phase of the work. As suggested in your letter of May 18th, I would also propose that we immediately begin with the market verification activity and at the time you have determined that we have sufficient response to indicate the marketability of Port Angeles as a conven- tion site, that we would then meet with all interested parties to discuss the findings and hopefully, to discuss the next step in the process. Don Frizzell has indicated to me that he has talked with you about the material to be mailed out about the market verification analysis. If there is need for add- itional contact, I encourage you to continue to work through Don. If he is unavailable for whatever the reason, please feel free to contact me. Again, I look forward to the opportunity of working with you and have been very encouraged by the progress made in the first phase of this study. See you soon. Sincerely, y J. -A ter Dave Flodstrom, P.E. City Manager AGREEMENT FOR CONSULTING SERVICES BE IT KNOWN, that effective on the l t' day of 19 the City of Port Angeles, whose address is 140 West Front Street, Port Angeles, Washington, 98362 (herein sometimes referred to as "City and Event Facility Consultants, whose address is 4205 SW Downsview Court, Portland, Oregon, 97221 (hereinafter sometimes referred to as "Consultant do hereby enter into a professional services contract under the following terms and conditions: WITNESSETH: WHEREAS, the City requires the services of Consultant with respect to the determination of needs and potential utilization of a conference/ community center in Port Angeles; and WHEREAS, Consultant by reason of his experience and expertise is capable of rendering such consulting services; and WHEREAS, such services are professional and non competitive in nature. NOW, THEREFORE, the City and the Consultant for and in considera- tion of the covenants and agreements hereinafter set forth, mutually agree as follows: Section 1 Consultant hereby agrees to perform the following Scope of Work: Advise in the final refinement of the overall project objec- tive. Verify assumptions regarding the convention market in the State of Washington; identify potential competition; undertake sufficient market surveys to confirm attitudes and probable use by state associations of the Port Angeles or Clallam County area as a convention site. Draft the most appropriate program of proposed spaces to accomplish desired goals. Estimate probable operational costs and revenues. Recommend alternatives such as project phasing, development of a totally new center, or abandonment of the entire concept. Recommend a planned phasing process permitting City /County officials an opportunity to make go or no -go decisions at appropriate junctures. Identify benefits to the unincorporated areas of Clallam County should a convention /community facility be constructed and operated in the Port Angeles area. -1- AGREEMENT FOR CONSULTING SERVICES Section 2 In consideration of the services described above, the City hereby agrees to pay Consultant on the basis of monthly statements for time billed, including travel time, at the rate of Fifty -five Dollars ($55.00) pr hour, plus out -of- pocket expenses, not to exceed Five Thousand Dollars ($5,000.00) without prior authority by the City or its duly appointed representative. Section 3 This contract may be terminated by either party upon thirty (30) days written notice. Section 4 The Consultant shall not assign any interest in this contract and shall not transfer any interest in same (whether by assignment or nova tion) without prior written consent of the City, provided, however, that claims for money due or to become due to the Consultant from the City may be assigned to a bank, trust company or other financial institution without such written consent. Notice of any such assignment or transfer shall be furnished promptly to the City. Section 5 Travel undertaken by Consultant and other out -of- pocket expenses will be reimbursed at cost upon submittal of a list of such expenditures with appropriate documentation. Section 6 The City shall make payments of monthly billings submitted by Consultant by approximately the 15th of a given month providing said billing is submitted to the City no later than the first of said given month. Section 7 All notices to the parties shall, unless otherwise requested in writing, be sent to the City and the Consultant at the addresses shown above. -2- AGREEMENT FOR CONSULTING SERVICES IN WITNESS WHEREOF, the parties have caused this Agreement to be executed on the day and year first above written. WITNESS: By: �z a'a Y Title: WITNESS: Date: -3- AGREEMENT FOR CONSULTING SERVICES CITY OF PORT ANGELES EVENT FACILITY CONSULTANTS, INC. By: Don Jewell Title: PRESIDENT Date: ;�:.ri1_+.CIr 1. X11 agC r City •1 of Port Angeles 140 "L Front St1 eet P W i,uge es, WA 93362 Dear Mr. Flodst -o m: +f r •ai 1 s mss 4 C q• iR tie are in receipt of your letter dated 12 May 1981 and are pleased to learn tha t the City of Port Angeles and Cl al l am County are prepared to prc Ted with further study pertaining to a proposed conference /community center. In reviewing the Scope of Work as outlined, ned, hl e there z a 1 oiv..ti L r tfrer_ arm_ c�rta i n items on which we need clarification. Perhaps we should also outline for your approval our assumed plan for accomplishment of the tasks involved. Market Verificatilon We will prepare a survey form that can be repradoced in your ofrice. We will then provide a list OF appropriate state /regional organizations to which this questionnaire should be mailed, along with a staelped, self-addressed return envelope. Replies will be received by your orrice but forwarded to us for tabulating and evaluation. Functional Prot ?ram We will prepare a verbal program of the necessary, and desired areas for the proposed facility. Any illustrative sketches or schematic plans requested will be billed as an extra cost. Financial Estimates We will be responsible for estimating probable opera'ing costs and revenues. Remodeling and /or new construction costs most be the responsibility of an architectural firm of your choice. Tine Frame 142 are prepared to begin work on this project wi thin two weeks following receipt of your approval to proceed. It appears to inc that the market verification should be our first undertaking. As soon as we have sufficient response to indicate the iliarketability of Port Angeles as a convention site (or lack of it) we will then develop our reconnendations for an architectural program. At this point, it would seem we would have achieved sufficient direction to warrant a meeting of all concerned parties for an interig report and review of progress. This will also give Council (Members and -'ir:•' i to El ods tr•cin V`38l 71'J 11 l "ii, l to rl' \'v .�r l i' V \J' i, h it _i' "r. sugge; i, Li ,1 ic: fl C .S O s to 1y 1 lien- J.,'.+?t upon the res: \l is o th i initill I "1?c ?ng we would o a ..ic' procding with the ba ance of t;i: report, ,:_Csi sting in develo�en i T.. pro able construction costs and finally, e r i41 perhaps one rival meeting to present our findings and conclusions. There may also be the need to meet in Port Angeles with the architect, and /or perhaps the need to schedule one additional review session in Port Angeles. However, judging from the tone of your letter, you are suggesting that travel costs he kept to a minimum. Assuming this plan will meet with your approval, we are enclosing herewith a draft agreement for your consideration. Should some addi- tional form be more desirable, please feel free to make any changes necessary. We have included $5,000 as a not-to-exceed figure, but understand that we will be expected to complete the work in the most economical fash- ion possible. Please feel free to call or write if you have any questions or sug,es- ti ohs Sincerely, EViiLNT FACILITY CONSULTANTS Don Jewell, CFE President DJ /ba (IPC W01/0) Enclosures r 'EN ENT FOR CO, aTING ERVICES e. rective on the day or 1 40 L Front SCreet. cnr 08362 (herein s r`_t:,:es rafe ryr=A to as "City"), 1 isultants, Ar-sai address is 4205 SW Co nsv je, .17221 .sometimes ?fer1'oa to as enter into a ;r_ ssio:,ol services contract ,:;3 t2r;i!-s and conditio,is: WITNESSET WE =AS, the City requires the services of Consultant with respect to th e determination of needs and potential utilization of a conference/ community center in Port Angeles; and WHEREAS, Consultant by reason of his experience and expertise is capable of rendering such consulting services; and WHEREAS, such services are professional and non competitive in nature. NOW, THEREFORE, the City and the Consultant for and in considera- tion of the covenants and agreements hereinafter set forth, mutually agree as follows: Section 1 Consultant hereby.agrees to- perform the following Scope of Work: Advise in the final refinement of the overall project objec- tive. Verify assumptions regarding the convention market in the State of Washington; identify potential competition; undertake sufficient market surveys to confirm attitudes and probable use by state associations of the Port Angeles or Clallam County area as a convention site. Draft the most appropriate program of proposed spaces to accomplish desired goals. Estimate probable operational costs and revenues. Recommend alternatives such as project phasing, development of a totally new center, or abandonment of the entire concept. Recommend a planned phasing process permitting City /County officials an opportunity to make go or no -go decisions at appropriate junctures. Identify benefits to the unincorporated areas of Clallam County should a convention /community facility be constructed and operated in the Port Angeles area. -1- AGREEMENT FOR CONSULTING SERVICES Section 2 In ct nsideration of the r2rvi^'; describe] ..11't:V the City hereby agrees to pay Consultant cn the td i s of monthly ra th ll nn �s for time billed including travel t im_',, at the rate oF Dollars (:i;55.0Q) per hour, plus out -o: -pv'=,.._ t expenses, `1.;;: to exceed Five Thousar' i Dollars ($5,000.00) wi t(,ou nor authority �y Ln, City or its duly %ipo;n`.ed representot: Section 3 This contract may be terminated by either party t:pon thirty (30) days written notice. Section 4 The Consultant shall not assign any interest in this contract and shall not transfer any interest in same (whether by assignment or nova tion) without prior written consent of the City, provided, however, that claims for money due or to become due to the Consultant from the City may be assigned to a bank, trust company or other financial institution without such written consent. Notice of any such assignment or transfer shall be furnished promptly to the City. Section 5 Travel undertaken by Consultant and other out -of- pocket expenses will be reimbursed at cost upon submittal of a list of such expenditures with appropriate documentation. Section 6 The City shall make payments of monthly billings submitted by Consultant by approximately the 15th of a given month providing said billing is submitted to the City no later than the first of said given month. A late payment fee of 15% on any balances in excess of 30 days may be charged by the Consultant. Section 7 All notices to the parties shall, unless otherwise requested in writing, be sent to the City and the Consultant at the addresses shown above. -2- AGREEMENT FOR CONSULTING SERVICES IN WITNESS 1 .-;JE;:E07 ttil pr .s have caused nis Agreent to be ,,;,2c.u?:.2.1•1 cm th. :!ay ar c aove wrinei WITNESS: -3- AGREEMENT FOR CONSULTING SERVICES CITY OF PORT ANGELES Title: Date: EVENT FACILITY CONSULTA:ITS, INC. By: Don Jewell Title: PRESIDENT Date: 501,;: OF Cot.:{-i1 Y S5i( ;;ER., St-'t- Ms. Susan Moore President Forks Chamber of Commerce Box 1249 Forks, Washington 98331 Dear Ms. Moore: May 19, 1981 Re: Convention Center Funds We are in receipt of your letter of May 6, in which the Forks Chamber suggested that convention center funds ...should not all be used for one project in Pt. Angeles." We concur with the Forks Chamber position, at least in part. We do not believe that all the convention center funds should be spent in a Port Angeles facility. We have authorized the spending of $2500 for a consultant, Don Jewell, to perform an analysis of the potential costs/ benefits accruing from construction of a facility either in Port Angeles, or elsewhere in the County. Included in the contract retaining Mr. Jewell are explicit provisions for him to carefully analyze the benefits possible to the unincorporated County areas by construction of a facility. Upon receiving the facts available from his research, we will proceed to take further action on this matter. Mr. Jewell has been asked to work with the Forks and Sequim Chambers and Councils as part of his research. Susan Moore Forks Chamber of Commerce Page Two May 19, 1981 We hope this appr.oach will enable all concerned to look at this matter from a factual viewpoint. If the Forks Cha„'Ci.,. r has further ideas on this matter, we would be glad to discuss them with you. BCC /BGS /slc cc: Forks Town Council Sequim Chamber of Commerce Sequim City Council C C, Yours sincerely, BOARD OF 9T4LAM COUNTY 01 SSIQNERS Chairrnan, Dqn Feeley Dick/ ?otzceserl' HarTy Lydiard P Amei [i'y Mr. Don Jewell, President Event and Facility Consultants 4205 S. W. Downsview Court Portland, Oregon 97221 Dear Mr. Jewell: TOURIST MECCA OF THE NOR IIIµESI May 12, 1981 -1 140 WEST FRONT STREET PORT ANGELES, WASHINGTON 98362 At a special council meeting April 28, 1981, the City Council, Port Angeles Park and Beautification Board and the Clallam County Commissioners reviewed your letter of conclusions and impressions dated April 13, 1981. In summary, the Council formulated the overall project objective which reads "a project to broaden and diversify the economic base of the com- munity, developed as the focal point of the county and the Olympic Peninsula and enable the center to serve a broader segment of community interests As you will note, they objectively and selectively eliminated any further consideration of active sports events in the facility. With the establish- ment of their objectives, the Council is now ready to proceed with the next planning development phase. Therefore, the City Council and the County Commissioners have defined the second phase scope of work to be: 1.) The final refinement of the overall project objective. This to be done working with the City Council, the Clallam County Commissioners, Forks and Sequim City Council representatives and members of other interested groups; 2.) Verify the assumptions regarding the convention market in the state of Washington; identify potential competition; undertake sufficient market surveys to confirm the attitudes and probable use by state associations of the Port Angeles or Clallam County area as a conven- tion site; 3.) Draft the most appropriate architectural program, including special relationships to accomplish desired goals. 4.) Develop an estimated financial program for construction and an esti- mated operation cost of the facility. 5.) Examine and make recommendations on all alternatives, such as phasing the project, development of a totally new center, or abandonment of the entire concept; :SEAL Mr. Don Jewell May 12, 1981 Page two 6.) Develop a planning process that is phased in such a manner as to permit City and County officials an opportunity to make "go" or no go" decisions at appropriate junctions as further factual data becomes available. 7.) Identify benefits to the unincorporated areas of Clallam County should a convention /community facility be constructed and operated in the Port Angeles area. It would be the City's intention to enter into the second phase with your firm, based on the above outlined scope of work, at the earliest possible time, at a cost of between $2,500 and $5,000. The City of Port Angeles and Clallam County will be jointly participating in the funding of the second phase. We are anticipating performing as many functions which you feel appropriate in order to maintain the cost at as low a level as possible and still accomplish the tasks necessary to make decisions which must be made. In closing, I would like to say the City Council and members of the community you met with on your first visit here, were impressed with a your knowledge of the convention industry and truly appreciate your ability and willingness to discuss the uniqueness of Port Angeles and Clallam County as a convention community. We look forward to your response and also to working with you on the next phase of this most exciting project. DF/ jh cc: City Council members Clallam County Commissioners Don Frizzell, Dir. of Parks Rec. James Dinan, Mayor of Sequim Warren Paul, Mayor of Forks Sincerely, Dave Flodstrom City Manager 4 a-ea-g-° �.41c4L MEMO: MAY 5, 1981 TO: MAYOR, CITY COUNCIL AND CITY MANAGER FROM: DON FRIZZELL, DIRECTOR OF PARKS AND RECREATION I% SUBJECT: CONSIDERATION OF PHASE II FOR THE CONVENTION /CIVIC CENTER Attached hereto, please find the draft letter to Mr. Don Jewell, Event and Facility Consultants, which reflects a summary of the special meet- ing held by._the Council to consider further direction of the project. Should the Council agree with the content of the letter, staff will react accordingly. DDF /jh 5. 5, P/ Mr. Don Jewell, President Event and Facility Consultants 4205 Southwest_Downsview Court Portland, Oregon 97221 Dear Mr. Jewell: P iii e es TOURIST MECCA OF THE NORTHWEST 140 WEST FRONT STREET PORT ANGELES, WASHINGTON 98362 At a special Council meeting, April 28, 1981, the City Council and Park Commission reviewed your letter of conclusions and impressions, dated April 13, 1981. In summary, the Council formulated the overall project objective which reads "a project to broaden and diversify the economic base of the community, developed as the focal point of the county and the Olympic Peninsula and enable the center to serve a broader segment of community interests As you will note, they objectively, selectively eliminated any further considerations to encompass sport events in the project. With the establishment of their objectives, the Council is now ready to proceed with the next planning development phase. Therefore, the City has defined the next Scope of Work to be undertaken. 1.) To further refine the'overall project objective. 2.) Verify the assumptions as presented in the April 13, 1981 report by the Event and Facility Consultants. 3.) Draft the most appropriate architectural program, including special relationships to accomplish desired objectives. 4.) Recommend features necessary for efficient and economic operations of the facility. 5.) In conjunction with the five objectives and with the archi- tectural firm, selected by the City, determine probable costs of remodeling and /or new construction. Estimate probable equipment costs. 6.) Based on the architectural and engineering comparison findings, draft a facility program that can be reasonably accomplished through a.) remodeling or b.) new construction. Page two Mr. Don Jewell May 1, 1981 DDF /jh 7.) Examine alternatives such as phasing the project, a total new center, abandonment of the entire concept. 8.) Develop a financial program for construction and operation of the facility. It would be the Council's intention to enter into the Second Phase with your firm, based on the above outlined Scope of Work, at the earliest possible date, at a cost of between $2,500 and $5,000. The City,_as performed through the First Phase, would be willing to accomplish as much of the necessary work items in advance for you, which may result in reducing City cost. It would appear those items the City could accomplish would have to be identified by you prior to starting. We look forward to your response and working with you in the next phase of this most exciting project. Sincerely, DF /jh 3 MEMO: FEBRUARY 27, 1981 TO: MAYOR, COUNCIL AND CITY MANAGER FROM: DON FRIZZELL, DIRECTOR OF PARKS AND RECREATION SUBJECT: CONSULTANT SELECTION FOR VERN BURTON MEMORIAL COMMUNITY CENTER As a result of the last countil meeting, staff has submitted a letter to the three finalists asking them to reappear before the council to further address the following unanswered questions: 1. Is it possible for the City to have a convention and recreation multi purpose center jointly? If so, what types of activities are compatible and what types of activities should be placed in other more appropriate facilities? 2. What is a market analysis? Why do we need the analysis or is it even necessary? What will it tell us and would it aid in final determintation to design scope? 3. Specifically why should the City hire your firm? What and how would your firm approach this project resulting in the best possible end product meeting the City's needs within its capa- bilities? 4. Could your firm and would your firm approach the project through a two contract arrangement; 1.) conduct the market analysis and determine a general design scope and; 2.) final design and construction development? If so, could you break down each contract by elements and cost? If the council agrees with this direction and sets the next interview date, staff will schedule the firms to appear. II NOTICE OF MEETING The Port Angeles City Council and Park Board will hold a special meeting on Tuesday, April 28, 1981 in the Council Chambers at 134 West Front Street. The purpose of the meeting is to discuss objectives and alternatives associated with the convention /community center. The Park Board meeting will convene at 6:30 P.M., to be followed by a joint City Council /Park Board meeting at 7:00 P.M. Distribution: Mayor Council Park Board City Manager Department Heads The Daily News News Editor The Chronicle News Editor KONP Radio Station KAPY Radio Station 4/27/81 Marian C. Parrish City Clerk I 1ll Event t Facility Consultants 8 21, 4205 SW DOWNSVIEW COURT PORTLAND. OREGON 97221 503/ 292 8910 April 13, 1981 Mr. Dave Flodstrom, City Manager City of Port Angeles Post Office Box 1150 Port Angeles, WA 98362 Dear Dave: In accordance with your request, we are pleased to summarize some of the comments presented at the special meeting of the Port Angeles City Council on April 8, 1981. The conclusions and impressions discussed at that meeting were based primarily on existing market data, interviews conducted in Port Angeles on April 6, 7 and 8, 1981 and our own exper- ience in similar projects. No priority is intended in listing the following items: A firm decision is needed by the City Council regarding the community's long -range objectives before the highest and best use for Vern Burton Memorial Com- munity Center can be determined. Possible objectives in development of plans for the Center could include: A A project to broaden and diversify the economic base of the community. B A project which will enable the Center to serve a broader segment of community interests. C A project to help Port Angeles develop as the focal point of the County and the Olympic Peninsula. D A project to improve the Center as a community sports facility. It is our opinion that Port Angeles could attract a number of state and regional conventions annually if the Center were developed to provide adequate meeting accommodations. A strong committment and support from the private sector, particularly members of the hospitality industry, will be needed to insure the proper marketing of the Center, if remodeled. Page Two April 13, 1981 Mr. Dave Flodstrom It is our judgement, at this point, that the highest and best use of the Center would be its conversion and expansion into a conference /community center with recreational activities limited to those of a passive nature. The attraction of ten conventions annually to the City of Port Angeles could have an economic impact of $1,890,0,00. Minimum spatial requirements for a conference /community center call for a large central room of 10,000 to 15,000 square feet,; 3,500 to 5,000 s.f. of meeting rooms plus a lobby or pre-function space, kitchen, storage space and other necessary support features. Any attempt to combine active sports such as basketball, volleyball or badminton with meetings and /or social activities can be expected to substantially increase both capital improvement and operational costs. State and regional conventions /conferences are not expected to occupy the Center more than 30 to 45 days annually during the first few years of operation. Substantial' utilization of the facility by local citizens for cultural, civic and social events can be anticipated. Use of the Center as a site for events designed to attract visitors to Port Angeles should be a part of overall planning. Further involvement of Event Facility Consultants in moving forward on the community center project could include the following: 1. Assist in determination of the most appropriate objectives for the Center. 2. Verify assumptions regarding the convention market in the State of Washington; identify potential competition; undertake sufficient market surveys to confirm the attitudes and probable use by state associations of Port Angeles as a convention site. 3. Draft the most appropriate architectural program, including spatial relationships, to accomplish desired goals. 4. In conjunction with an architectural firm selected by the City, determine probable costs of remodeling and new construc- tion. Estimate probable equipment costs. Page Three April 13, 1981 Mr. Dave Flodstrom 5. Examine totally new 6. Develop operational alternatives such as phasing the project, a center, abandonment of the entire concept. a financial program for construction and costs of the facility. 7. Finally, it is our recommendation that the planning process, as outlined, be phased in such a manner as to permit City officials go or no -go decisions at appropriate junctures as further factual data becomes available. Until such time as the Scope of Work to be undertaken can be developed it is impossible to give you a cost estimate for the next phase of study. However, from our earlier correspondence dated March 10, 1981, I believe you have a general idea of our broad estimates. If it appears the Council is desirous of moving ahead with the Community Center project, we will be pleased to assist in any manner which may be appropriate and look forward to hearing from you at your convenience. It was a pleasure working with you, Don Frizzel, the Mayor and others. I want to thank you for your cooperation and express my best wishes for the ultimate success of the project. Sincerely, EVENT FACILITY CONSULTANTS Don Jewell, CFE President DJ /ew BOARD OF COUNTY COMMISSIONERS C a am County State of Washington PORT ANGELES 98362 Phone 452.7831 Mayor Sam Haguewood City of Port Angeles P. O. Box 1150 Port Angeles, Washington 98362 Dear Sam: April 16, 1981 Re: Convention Center Funding We enjoyed having the opportunity to meet with Mr. Jewell recently, as he was able to provide us with inter- esting information in a number of areas that were of concern to us regarding the proposed convention center. We look forward to receiving additional information as to the benefits accruing to all County citizens through construction of the convention facility. We continue to be interested in supplying some portion of the County's convention center funding toward the proposed facility. BCC /BGS /slc Yours sincerely, BOARD OF C ALLAM COUNTY C ISSIONRS Chairman Disk Don Feeley Harry L. Lydiard gesell I CALL TO ORDER II ROLL CALL Members Present: Members Absent: Staff Present: CITY COUNCIL MEETING Port Angeles, Washington April 8, 1981 III V Suspended. VI LEGISLATION 1. MARKETING ANALYSIS FOR CONVENTION CENTER: D. JEWELL R 5,129 The special meeting was called to order by Mayor Haguewood at 5:00 P.M. The purpose of this meeting is to discuss a marketing analysis for a potential convention center in Port Angeles. Mayor Haguewood, Councilmen Hordyk, Polhamus, Quest. Councilmen Boardman, Buck, Duncan. Manager Flodstrom, Deputy Clerk Headrick. D. Frizzell, R. Orton. Parks Director Don Frizzell introduced Mr. Don Jewell to the Council and audience. Mr. Jewell, President of Event and Facility Consultants, has been in Port Angeles for the past several days in an attempt to identify and profile the potential convention /meeting market for the City. He has viewed the Vern Burton Memorial Community Center to determine its feasibility as a convention center, and met with several groups which may have an interest in a convention /sports /community center. Mr. Jewell then addressed the Council to give a brief presentation on his impressions over the past several days, based on previous findings and studies. The City, Mr. Jewell pointed out, has several alternatives for development of the Vern Burton Memorial Community Center property. But regardless of which alternative the City chooses, the Center must have a strong commitment from the City, County and private sectors (i.e the Chamber of Commerce). Mr. Jewell reviewed several charts which contained "conservative" statistics on the total convention center market for Washing- ton State, and the range and amount of convention "draw" that Port Angeles may expect. He also outlined the economic advantages of a convention center X in Port Angeles (which could amount approximately $2,000,000 per year); alternative uses for a community center when it is not being used for con- ventions; how the main exhibition space and outlying support space can best be utilized in a convention center; the role of the Chamber of Commerce in marketing a convention center; and steps the City should take in planning and developing a convention center. There were several questions from the Council, staff, and audience in regard to whether the 4th Street location and isolation of Port Angeles would be a disadvantage to the success of a convention /recreation /community center; the staff which would be needed for a "Meeting Planner possible problems which could arise from a wooden floor, as in the Vern Burton Memorial Corn- y._ munNyt Center; the County -wide benefits of a convention center; the feasibility of a self- supporting facility (beyond the hotel /motel tax); regional and national trends in convention going; the incompatibility of a combined sports /convention facility; funding for renovation of the Vern Burton Memorial Community Center and whether it would be better to borrow funds and build a total facility, renovate on a phase -to -phase basis, or tear down the existing building and a completely new facility; expanded planning for the entire area surrounding a convention center; and the different types of equipment, lighting, etc. which would be needed for a multi purpose facility. 6 CITY COUNCIL MEETING April 8, 1981 Page -2- VI LEGISLATION 2. PAYMENT TO EVENT AND FACILITY CONSULTANTS VII ADJOURNMENT Councilman Polhamus moved the Council authorize payment of $2,500 to Event and Facility Consultants for services performed by Mr. Don Jewell. The motion was seconded by Councilman Quast and carried. The meeting adjourned at 6:20 P.M. 1 .w... a,v..r w�a,ryr dWi.`__ *tAG 4 r. R"�'d°h`t&`S= 9F4x3Yi'P•2u26sf .x11 1 4/6/81 NOTICE OF MEETING The City Council of Port Angeles will hold a special meeting on Wednesday, April 8, 1981 from 5:00 P.M. to 7:00 P.M. in the City Council Chambers at 134 West Front Street. The topic of discussion is the Marketing Analysis for renovation of the Vern Burton Memorial Community Center. Distribution: Mayor and Council Clallam County Commissioners City Manager County Administrative Coordinator Department Heads The Daily News News Editor The Chronicle News Editor KONP Radio Station KAPY Radio Station Marian C. Parrish City Clerk I. CALL TO ORDER II. ROLL CALL III V. SUSPENDED VI. LEGISLATION: AGENDA Port Angeles, Washington Special Meeting April 7, 1981 5:00 P. M. 1. Presentation by Mr. Don Jewell on Convention Center potential in Port Angeles. 2. Payment of $2,500 to Event Facility Consultants for services regarding proposed convention facility (Mr. Don Jewell) VII. ADJOURNMENT MEMO: APRIL 8, 1981 TO: MAYOR, COUNCIL AND CITY MANAGER FROM: DON FRIZZELL, DIRECTOR OF PARKS RECREATION SUBJECT: PAYMENT TO MR. DON JEWELL FOR SERVICES RE: CONVENTION/ COMMUNITY CENTER Attached hereto please find for your consideration and approval a payment, in the amount of $2,500., for the performed services by Mr. Don Jewell as agreed by the City Council. Thank you for your time and consideration. DF /jh To City of Port Angeles: Post Office Box 1150; Port Angeles, Washington 98362 Attn: Don Frizzel Farm ML 5 N72 the Draw■ng Board Inc Bo, 505, Data, re,os EVENT FACILITY CONSULTANTS 4205 S.W. DOWNSVIEW COURT PORTLAND, OREGON 97221 (503) 292 -8910 DATE STATEMENT: Professional services per agreement regarding proposed convention /community facility for the City of Port Angeles, including travel to Port Angeles and return, April 5 9, 1981. 1 April 1981 SUBJECT Convention Hall Study $2,500.00 -rr r4. 4.7.Pr Sp yi /8 /t 19 8/ fi y I have attached Mr. Jewell's meeting schedule for April 6, 7, and 8. Several times are available for the Council to meet with Mr. Jewell besides the night of the 8th. As we discussed at the last Council meeting, a special meeting of the City Council has been set for Wednesday, April 8th at 5:00 PM. The 5:00 PM time was chosen to eliminate any conflict with the Planning Commission meeting at 7:00 PM and to accomodate Mr. Jewell's needs. Mr. Jewell will be conducting the activities which he identified as Phase I activities in his letter of March 10th. (also attached). MEMO: APRIL 3, 1981 Mr�a�C�t A,u 4Lys,S -*02,013,5 TO: MAYOR AND CITY COUNCIL 3£)E V4 c r l/ 47 r0Ai SoLT_ FROM: DAVE FLODSTROM 44U -}S. SUBJECT: MR. DON JEWELL'S VISIT TO PORT ANGELES DON JEWELL INTERVIEW SCHEDULE Monday, April 6, 198T 8:30 9:30 Meet with City staff 9:30 11:30 Community introduction :1:30 2,30 Hotel /Motel Managers 2:45 3:45 Restaurant Owners /Managers and Catering services 4:00 5:00 Recreational Agencies -YMCA, County Parks, City Parks, Badminton, Boy Girl Scouts, Campfire Girls, Derby Days, Senior Center and Golden Agers. Tuesday, April 7, 1981 7:30 8:30 Chamber of Commerce Tourist and Convention Promotion 9:15 10:15 Civic Clubs All Granges, Toastmasters Toastmistresses, Service clubs, and dance clubs. 10:30 1130 Governmental units -City, Downtown Merchants, League of Women Voters, School District, County and Peninsula College 1:30 2:30 Cultural /Performing Arts Community Players, Children's Theatre, Library and Clallam Art League 2:45 3:45 Business Interest Insurance Assoc., Bar Assoc., Peninsula Rental Assoc., and Clallam Car Assoc. Wednesday, April 8, 1981 9:00 12:00 Prepare to Council 2:00 3:00 Community Action 3:00 4:00 County Government 5:00 7:00 Council Presentation Event St Facility Consultants -i_ 4205 SW DOWP4SVIEW COURT PORTLANQ. OREGON 97221 503/292 flat) March 10, 1981 Mr. Dave Flodstrom, City Manager City of Port Angeles Post Office Box 1150 Port Angeles, WA 98352 Dear Mr. Flodstrom: We appreciate the opportunity to provide additional information regarding professional services offered by Event Facility Consultants. Incorporated in 1968, our attention is devoted exclusively to affairs of the public assembly facility industry. Over the years it has been our privilege to provide planning and management services for many of the outstanding facilities throughout the United States, Canada and Mexico. Some of our current projects include San Diego Convention Center, Moscone Convention Center in San Francisco, New Orleans Exhibition Hall and Peoria Civic Center. Expansion studies are underway in several other cities. From our extensive experience in the northwest, we believe we can bring unique expertise to the study of appropriate facilities for the City of Port Angeles. Some of our convention /community center studies in the State of Washington have been conducted in Bellevue, Spokane, Vancouver and Bellingham. Similar projects have been conducted in Juneau, Alaska; Gillette, Wyoming; and Fitchburg, Massachusetts. It has been our experience that the interests of our clients are best served when we are permitted early involvement in the project to advise on such matters as marketability, architectural programming, and oper- ating expenses and revenues. Proper analysis of the potential market or utilization of a facility, we believe, is most important to its long -range success. Following extensive conversations with you and Don Frizzel, it is our opinion that a substantial volume of work should be undertaken prior to selection of a project architect but that such selection will ultimately, at an appropriate time, be necessary in order for us to complete our assignment and for you to have all options placed clearly before you. Prior to discussions with you and other concerned individuals, it is somewhat difficult to determine the entire Scope of Work to be undertaken. However, some of the areas with we would anticipate investigating include the following: Mr. Dave Flodstrom, City Manager March 10, 1981 2 Possible Phase One Possible Phase: Two Identify and profile the potential convention /meetings market for the City of Port Angeles. Identify existing or possible local public assembly facility (or _community center) needs. -Determine passible commercial or entertainment _utilization of- a_publ is assembly facility. Indentify the most- appropriate public assembly facility for the perceived market. Determine the compatibility of recommended uses. Inventory local and area support businesses and facilities. Identify and evaluate competitive facilities for the perceived market. Evaluate site as it may relate to the proposed new utilization- Recommend necessary spatial relationships and support areas needed to develop maximum utilization. Recommend necessary for efficient and economical operation of the facility. In conjunction with architect selected by City, determine capabilities of the existing structure to accommodate needed and recommended features. On the basis of architectural and engineering findings, draft the facilities program that can reasonably be accomplished by remodeling the existing structure. Possible Phase Three Estimate potential event days or utilization of the recommended facility if constructed. Estimate probable operating costs and revenues. rTh Mr. Dave Flodstrom, City Manager March 10, 1981 3 CJ Estimate costs of necessary equipment for efficient operation of facility. Identify administrative alternatives and recommend the most appropriate for the City of Port Angeles. Assist -in evaluation of schematic plans for remodeling as developed by selected architects. Identify_ possible options or phasing in development of plans. Outline both Tong -range and short -term marketing and /or facility promotion requirements. On the basis of similar projects, it would be our estimate that the total Scope of Work as outlined herein could be accomplished for approximately $15,000. However, it is our suggestion that the study be divided into three primary segments of $5,000 each with the City retaining the option to conclude the work following either completion of Phase I or Phase II. Following review of work in progress, it is believed Event Facility Consultants will begin a position to begin work on this project within 30 days from notice to proceed. We would anticipate completion of Phase i within 120 to 150 days from start of work. All field work will be considered my personal responsiblity; billings will be submitted monthly; an appropriate contract or agreement will be provided for your approval and signature. A copy of our credentials is attached as a part of this proposal as are current references_ Please feel free to request any additional information you may require. We look forward to the opportunity to be of service Sincerely, EVENT FACILITY CONSULTANTS Don Jewell, CFE President Enclosures cc: Don Frizzel DJ /cys (meDic) W01 /F n BOARD OF COUNTY COMMISSIONERS Clal la m County State of i4ashungton PORT ANC: EL. E$ 98362 Phor.; ?52 :8:21 Dear Sam: Mayor Sam Haguewood City of Port Angeles City Hall Port Angeles, Washington 98362 March 3, 1981 Re: Convention Center We are in receipt of a recent letter from Dave Flodstrom to Ben Stone regarding a proposal to include County Convention Center funds in the remodeling of the Vern Burton Gym. s, t2.9 The proposal would seem to be one that would bene- fit both City and County residents, and could be a welcome boost to the area's economic and tourism base. We would like to discuss this matter with the Council in the near future, and would like to suggest a joint meet- ing of the Council and the Board at the Council meeting of March 17, 1981. Prior to that, we would hope that City and County staff could meet to discuss the merits of the plan in some detail, and present us with recommendations to consider at the March 17th meeting. In this regard, we would like to have Bob Clark and Ben Stone meet with those City staff members deemed to be appropriate to work on this matter. Sam Haguewood At this point, we are interested in the proposal, and appreciate _the City's invitation to the County to work to- gether on this matter. BCC /BGS /slc cc: Bob Clark Yours sincerely, BOARD OF CLALLAM COUNTY COMMISSI RS „7,077„.„ Chairman, Dia]ctzgesell 1 77 Feeley Hayy/L Lydiard March 3, 1981 r i vciit Facility Consultants 4205 SW DOINNSVIEW COURT PORTtANQ OREGON 97221 503/292 8970 March 10, 1981 Mr. Dave Flodstrom, City Manager City of Port Angeles Post Office Box 1150 Port Angeles, WA 98362 Dear Mr. Flodstrom: We appreciate the opportunity to provide additional information regarding professional services offered by Event Facility Consultants. Incorporated in 1968, our attention is devoted exclusively to affairs of the public assembly facility industry. Over the years it has been our privilege to provide planning and management services for many of the outstanding facilities throughout the United States, Canada and Mexico. Some of our current projects include San Diego Convention Center, Moscone Convention Center in San Francisco, New Orleans Exhibition Hall and Peoria Civic Center. Expansion studies are underway in several other cities. From our extensive experience in the northwest, we believe we can bring unique expertise to the study of appropriate facilities for the City of Port Angeles. Some -of our convention /community center studies in the State of Washington have been conducted in Bellevue, Spokane, Vancouver and Bellingham. Similar projects have been conducted in Juneau, Alaska; Gillette, Wyoming; and Fitchburg, Massachusetts. It has been our experience that the interests of our clients are best served when we- are permitted early involvement in the project to advise on such matters as marketability, architectural programming, and oper- ating expenses and revenues. Proper analysis of the potential market or utilization of a facility, we believe, is most important to its long -range success. Following extensive conversations with you and Don Frizzel, it is our opinion that a substantial volume of work should be undertaken prior to selection of a project architect but that such selection will ultimately, at an appropriate time, be necessary in order for us to complete our assignment and for you to have all options placed clearly before you. Prior to discussions with you and other concerned individuals, it is somewhat difficult to determine the entire Scope of Work to be undertaken. However, some of the areas with we would anticipate investigating include the following: 3, /'2. VI 5, 119 Mr. Dave Flodstrom, City Manager March 10, 1981 2 Possible Phase One Identify and profile the potential convention /meetings market for I the City of Port Angeles. Identify existing or possible local public assembly facility (or community center) needs. Determine possible commercial or entertainment utilization =of a_public assembly facility. Indentify the most appropriate public assembly facility for the perceived market. Determine the compatibility of recommended uses. Inventory local and area support businesses and facilities.' acil i ties.' Identify and evaluate competitive facilities for the perceived. market. Evaluate site as it may relate to the proposed new utilization. Possible Phase Two= Recommend necessary spatial relationships and support areas needed to develop maximum utilization. Recommend features necessary for efficient and economical operation of the facility. In conjunction with architect selected by City, determine capabilities of the existing structure to accommodate needed and recommended features. On the basis of architectural and engineering findings, draft the facilities program that can reasonably be accomplished by remodeling the existing structure. Possible Phase Three Estimate potential event days or utilization of the recommended facility if constructed. Estimate probable operating costs and revenues. Mr. Dave Flodstrom, City Manager March 10, 1981 3 Estimate costs of necessary equipment for efficient operation of facility. Identify administrative alternatives and recommend the most appropriate for the City of Port Angeles. Assist in evaluation of schematic plans for remodeling as developed by selected architects. Identify possible options or phasing in development of plans. Outline both long -range and short -term marketing and /or facility promotion requirements. On the basis of similar projects, it would be our estimate that the total Scope of Work as outlined herein could be accomplished for approximately $15,000. However, it is our suggestion that the study be divided into three primary segments of $5,000 each with the City retaining the option to conclude the work following either completion of Phase I or Phase II. Following review of work in progress, it is believed Event Facility Consultants will be in a position to begin work on this project within 30 days from notice to proceed. We would anticipate completion of Phase I within 120. to 150 days from start of work. All field work will be considered my personal responsiblity; billings will be submitted monthly; an appropriate contract or agreement will be provided for your approval and signature. A copy of our credentials is attached as a part of this proposal as are current references. Please feel free to request any additional information you may require. We look forward to the opportunity to be of service. Sincerely, EVENT FACILITY CONSULTANTS C7'1-Zt. Don Jewell, CFE President Enclosures cc: Don Frizzel DJ /cys (meDic) WO1 /F n February 18, 1981 RE: Hotel /Motel Tax Dear Ben: Mr. Ben Stone, Administrative Coordinator Board of Commissioners Clallam County Courthouse Port Angeles, WA 98362 A ii:ees TOURIST MECCA OF THE NORTHWEST 140 WEST FRONT STREET PORT ANGELES, WASHINGTON 98362 As you know, the City has been studying the possibility of using hotel /motel tax revenue to renovate the Roosevelt School Gymnasium into convention center or multi- purpose facility with both convention and recreation capabilities. One funding option is to combine $300,000 in existing funds with proceeds of a $450,000 bond issue (serviced by annual motel tax revenue), to renovate the gymnasium. The project design fee, along with a potential expenditure for a market analysis, will not leave us with a very large construction budget. It occurs to me that the County also levies the 2% motel tax, and this letter is in inquiry as to whether or not the County might be interested in combining these fund sources with the City to construct a county -wide center. Rob Orton has advised me that the County may have obligated all or a portion of these funds to the City of Sequim and Town of Forks. If so, this may be a moot issue. Nontheless, I would hope that you might consider this proposal in a favorable light as the use of these funds is somewhat limited by you. The City Council believes that such a facility could diversify City /County tax bases, potentially produce income to both governments, and contribute, in no small way, to economic development badly needed in our area. 5.12? February 18, 1981 Mr. Ben Stone Page -2- If you need additional information, I would be pleased to before the Board to further explain our tentative plans for this project. Thank you. Very truly yours, Dave Flodstrom City Manager DF:ml cc: Don Frizzell, City Director of Parks and Recreation Jack Pittis, City Director of Public Works NOTICE OF MEETING 44 II 2/3/81 NOTICE OF MEETING The City Council of Port Angeles will hold a soecial meeting on Wednesday, February 4, 1981 at 7:00 P.M. in the Council Chambers at 134 West Front Street for the purpose of conducting consultant interviews re proposals for design of the Vern Burton Memorial Community Center renovation work. Distribution: Mayor Council City Manager Department Heads The Daily News News Editor The Chronicle News Editor KONP Radio Station KAPY Radio Station Marian C. Parrish City Clerk C AGENDA Special Meeting Port Angeles, Washington February 4, 1981 7:00 P.M. I CALL TO ORDER II ROLL CALL III IV SUSPENDED VI CONSULTANT INTERVIEWS (for design of the Vern Burton Memorial Community Center renovation work) 7:00 PM Firm of Bennett, Johnson, Slenes, and Smith (BJSS) Frank Densmore 7:30 PM Firm of ORB Organization (ORB) Mr. Bob Bignold 8:00 PM Firm of Makers Eric Anderson VII X SUSPENDED XI ADJOURNMENT MEMORANDUM TO: Mayor, City Council and City Manager FROM: Don Frizzell, Parks and Recreation Department a I- V DATE: January 12, 1981 SUBJECT: Interview selection of consultant firms to finalize the Vern Burton Community Development Plans. In accordance with the previous outlined Gym Development approach we have received, reviewed and rated six proposals. Attached are the brief proposal summaries. Each summary represents the responses from each firm relative to similar project involvement, the project manager, the Firm's approach and methodology, staff experience, time schedule and the method of establishing a fee. Additionally you will find the Consultant's selection matrix which provides a number value for each response area and a total point value for each respondent. It is Staff's recommendation the following 3 firms provide personal interview and presentation to the Council for final selection by the Council. 1. O.R.B., Renton, Washington 2. Maker, Seattle r 3. B.J.S.S., Port Angeles I offer for your consideration the following time schedule suggestion: 1. February 3 Council Meeting 3 Firm's persent Presentation 2. February 17 Council Meeting Council select a firm and determine Financing of Development. 3. February 25 Firm Contract Agreement 4. February 26 Plan Design Start. Should any Councilman desire I will make available any or all complete proposals for your review. Thank you for your time and consideration. I I I La,. I I 63 .4.5. -c to94 te-, _A_g_i/4_ At.ortgy.s_i li 0_„7 kelds4/ Rokit,..s 1 :I I r lilt 5; p Apkito.Tect 5. I ti.s I 1,Eor I fTs} i 467 1 i i t. L 1 171 1 1 ?a I 0 __IS it C$ 0" 3 4 il 5 1 i 1 I I eart feDgeS/4 IS I r 1 5 6' 1 i 1 I 1 1 I 1 I I LI i I 1 i 1 6 t 7 _1 ±.5- il 1 4 9 _f_P._____ II 1 L6, 11 1 I—I 1 i 12 I ffr af.h. 8 I I 10 )kt.,A7 II 13! 1 32. Ia.' L7_..:A4.9_Sc.4.ge1,44g 131 14,1 1 151 i 16 1 cl 7 '1 .8 1! 19.! 20 21 1 22 1 23 1 24 1 25 1 1 1 261; 271 I 1 P Sef 11 I 0 WILSON JONES En r,J.kre c i 6 t gEE I :14 I r I t 7; dp {5: 'Cl 1 i 7 15 I I I t 1 I t 1 i I I- I &hiltrO-i-:: I I I: 7 1 1 t i 1 1_iiii_____ 71._ 31__!:_i__ to.a,_ 13 L. II 1 I t— 1 1 1 1 T "—T— ,hi" I I it 'll i Tr- 1 j 1 fil T J 1 i. 1. 29 1 1 II 31 l' t 1 I 12 33 i 1 I i-__I 1 34 ;1 ti 1, 35 t- ii 36;1 1 I! i 11 38 il I 1 1 I 39 40 EIE 21 1,1 '22 23 24 tt '26 27 L I 1 -r- -t-- ---t-- :29 r----7 1 *1 -T- li I '30 1 1 r i t _,31 _I. ___i_ _1_1_ ,32 1 _L_ 4 1 _-__F_ _r_l_t • 33 I I I 1 I 34 —r- I ir i it 1 -r— -1 33 1 I ',I 1 1 t 1' 1 1 iLl 38 1 -1- -1.--- 1_ _1 I 1, 1 40 I i i r I 1 1 t r e, 1 t i 1 i i O.R.B. Firm Location: Renton, Washington I. Similar Projects: A. Mountlake Terrace Community Center Renovation and Addition Mount Lake Terrace, Washington B. Lynnwood Recreation Center Addition Lynnwood, Washington C. Hillsboro Community Center Hillsboro, Oregon D. Community Activity Building Auburn, Washington E. Carco Theater Renton, Washington F. Lewis County Senior Citizen Center Chehalis, Washington G. Centennial Hall Convention Center Hayward, California H. Anaheim Convention Center Anaheim, California I. Oakland Convention Center Oakland, California J. Winnipeg Convention Center Winnipeg, Canada K. Event and Facility Consultants to O.R.B. 1. Muscone Convention Center San Francisco 2. San Diego Convention Center San Diego, Calif. 3. New Orleans Convention Center New Orleans, Lo. 4. Hayward Centennial Hall Hayward, California 5. Tacoma Bicentennial Pavilion Tacoma, Washington II. Project Manager: Bob Bignold III. Project Proposal: Above average IV. Project Approach and Methodology A. Mostly all in house O.R.B. has Convention Facility Planner, Recreation Planner, Mechanical Engineer, Civil Engineer and El- ectrical Engineer on Staff. B. Would review convention market to include indoor recreation, hotel and motel facilities etc. C. Analysis and recommend appropriate activities and facilities, of useage and probable M and 0. cost. D. Determine total program by interaction with City Council. E. Develop schematic design with consideration of future phases. O.R.B. Project Approach and Methodoloty Cont'd Page 2, F. Develop design and probable construction cost. G. Develop construction documents, aid in bidding of project. H. Provide administration of project if desired by City. V. Backup Staff All in house VI. Time Schedule Overall 7 to 10 months to include construction A. Planning 1. Needs program 6 weeks 2. Program determination 2 weeks 3. Schematic design 4 weeks 4. Design development 6 weeks 5. Contract documents 8 weeks 6. Bidding and negotiation 4 weeks VII. Method of establishing fee overall fee could be between 8 and 10.6 A. Step 1 Needs and program development Negotiated as a lump sum contract. B. Schematic Design Between 1.4 and 1.2%. C. Design Development Phase 1 Between 1.9 and 1.6% D. Contract Documents Phase 1 Between 3.8 and 3.2% E. Bidding and Negotiation Phase 1 Between .5 and .4% F. Construction Phase If desired by City Between 3 and 1..6 VIII. Principal in Charge Bob Bignold ITEM 1. Specific Project Design Experience 2. Project Manager 3. Project Proposal Evaluation 4. Project Approach and Methodolgy 5. Baclz-up Staff ro. Time Schedule 7. Method of Establishing Fee S. Principal In Charge CONSULTANTSELECTION MATRIX RATING 1 2 3 4 5 0000 0 0 o O 00 o a) O o o cx5 o O 000 ko O 0 0 0 O 0 0 0 0 O. .8 (E'IR11) tie rov 44,11/1 orin L C-ei_o_A4e4m'iy CAJfI. (PROJKCT) MATRIX FACTOR 5 5 5 5 4 4 3 O 000 3 2 GRAND TOTAL (DATE) TOTAL 13 r3a. mae.um,..••��, i r I( 1>> jc i col '000J 2. 1>( 1(.:(.:L 11,11) >(10 r L C I I'l C> j(.col Al >p r(� (1110 V ,r. MCI )1(( 1I(jy BdC), -1U1> 5t. (if f f loll oci c>( 1,.4l,Il>1 i ,)iiil(1 1 t'(' nc iir,ll 1» Clint re J 0 0 0 0 C O C C 0 0 0 cNI C 0 C C C 0 0 C 0. C) 0 M C) 0 C) 0 0 0 C) C C SC C'!.C 1z i` l orb (1'.1!i C'ON!,tit,'I':\N'1' ;4I'•1 I I ON llr \'I'Itl Y. 1'1'1;11 1 2 3 4 1•7\C:'I'OR 5 J 5 4 O 0 0 4 IZ 3 3 2 (;1(1■l) '1'O')'/1L, 1 fct. '!5 20 c>) B.J.S.S. Firm Location Port Angeles, Washington I. Similar Projects: A. City Gym Conditions Assessment Port Angeles, Washington, B. Queen of Angels Church Social Hall Port Angeles, Washington C. Jefferson County Multi-Use Center Port Townsend, Washington D. Centralia College Gym Remodel Centralia, Washington E. Multi- Service Building Olympia School District Olympia, Washington F. Multi- Service Building Tumwater School District Tumwater, Wa. G. Cape Flattery School District Multi- Service Building Cape Flattery, Washington II. Project Manager Frank Densmore and /or Tim Haley III. Project Proposal: Average IV. Project Approach and Methodology A. The main approach would be mostly in house with the use of an,outside Firm for structural and mechanical /engineering. B. B.J.S.S. would be involved with all public meeting presentations and work sessions. C. Methodology 1. Establish the final scope of the project set input meetings, set final budget and present outcome to Council. 2. Develop a final program need plan interview user groups complete need program then adjust needs to budget present to Council. 3. Schematic Design and project estimate Final program needs complete a construction estimate using professinal estimator. 4. Design development and project estimate development of design documents 2nd professional cost estimation on construction budget. 5. Construction Documents Finalize construction documents advert:;.se for bids. 6. Bidding and contract negotiations prepare advertisement for bids will answer questions regarding construction documents will aid in reviewing bids and prepare documents for start of construction. B.J.S.S: Project Approach and Methodology ContTd. Page 2 7. Construction Control would cost extra. 8. One -Year Warranty Inspection Would complete a punch list to correct or repair if necessary this would occur if B.J.S.S. provides construction control. V. Backup Staff: A. Harold V. Sargent Structual Engineer Mr. Byron Perkins B. Blunt and Hamm Engineers VI. Time Schedule: A. Overall 8 months up to construction 1. 4 month 2. 3/4 month 3. 1 month 4. 1 3/4 month 5. 1 3/4 month 6. 1 4 month 7. 1 4 month Contract and Establish Scope Develop Program Need Schematic Designs Design Development Construction Documents Bidding and Negotiations Construction Control VII. Method of Establishing Fee: 2 possible approaches 1. of Construction Cost as _set by-Public Instruction less Credit or work already "per -.formed. 2. Hourly rates not to exceed a negotiated maximum. VIII. Principal in Charge Frank Densmore 3 ITEM 1. Specific Project Design Experience 2. Project Manager 3. Project Proposal Evaluation Project Approach and Methodolgy 5 i E _:k -up Staff 6. Time Schedule 1. Method of Establishing Fee 3. Principal In Charge v �Crtaly (SIG: LURE OP RLTIEwi;R) (PROJECT) 0 0 0 0 O 0 0 0 0 O 0 .0 0 0 O 0 O•0 0 O 0 =o o O 0 0 o O 0 ®0 0 O 0 0 o O 0 0 0 0 to Y s s (r IRm) Cc 4tow/11,/ 5/r/frk CON SULTANT SELECTTON MATRIX RATING MATRIX 1 2 3 4 5 FACTOR 5 5 5 5 4 4 3 3 2 GRAND TOTAL (D4T.. i TOTAL lie 1� CON:;l11,TAk"I' 1:11;l IIATk 1 2 3 4 1 I 1 PI 1) i( c 1)v I (111 unc:(2 r, .1 4 uv-1 V) ietn LiY),\ 1D 3. Pro jcc Propc.)!-..,t i 1 1 i o 1. 1'1 .j'o't Appc(),Ich clod ..1„ l3tIC3, tip 3, t ,t1 I 1 1, r‘ fliP :;c1 (11 1 'w (1 1(K1 ir 1:: ,L(11) I Cc(' I I I 111 (11t1 I I M 0 0 0 0 0 O 0 0 (>6 0 0 0 0 00 0 0 0 0 0 0 0 O 0 0 0 C) 0 O 0 0 o 11ATIt p t 5 5 5 4 4 3 2 ()T lz I Q SUERDRUP AND PARCAL AND ASSOCIATES CALVIN JORDAN AND ASSOCIATES FIRM LOCATION Joint Team Effort Bellevue, Wa. and Redmond, Wa. I. Similar Projects: A. Buckley Multi Service Center, City of Buckley, Washington B. Albuquerque Inn Convention Center Improvements Albuquerque, N. M. C. Library Senior Center, Town of Milton, Washington D. University of Missouri Multi Purpose Complex, Columbia, Missouri. E. University -Civic Amphitheater Multi- purpose Area, Terre Haute, In. F. Gymnasium Addition West Point, New York. G. Pacific Center City of Pacific, Washington H. Physical Education Complex Fairmont, West Virginia. II. Project Manager R. J. Allen III. Project Proposal: Average IV. Project Approach and Methodology A. Building Survey Provide a more detailed review based upon prepared condition report. B. Program Development Outline building's problems and opportunities consolidate gym potential with City's needs. C. Schematic Design City's need, building potential and design parameters graphically prepare preliminary cost estimates. D. Design Development Fix and describe size and character of the project Provide life cycle cost analysis refinement of pre- liminary cost estimates. E. Development Schedule Establish a schedule of phased development. F. Construction Documents Prepare drawings, specification and bid date A construction cost estimate will be prepared. G. Bidding Will aid in putting project to bid, analyze and aid in selection of contractor. H. Construction Act as City's representative in administration of construction contract would provide construction administration up to and including full construction management if City desired for additional fee. Suerdrup and Parcal Asso. Page 2 V. Backup Staff None required All in house. VI. Time Schedule A. Overall 7 3/4 1. 1 month 2. k month 3. 3/4 month 4. 14 months 5. 4 month 6. 4 months 7. 1 month months up to construction Building Survey Program Survey Schematic Design Design Development Development Schedule Construction Documents Bidding VII. Method of Establishing Fee 3 Possible Approaches Fees set by professional societies. 1. Salary cost times overhead and profit plus out -of- pocket expenses. 2. Cost -plus fixed fee. 3. A lump sum fee. VIII. Principal in Charge R. J. Allen ITEM 1. Specific Project Design Experience 2. Project Manager 3. Project Proposal Evaluation 4. Project Approach and He thodolgy 5. Back -up Staff 6. Time Schedule ;i. Principa] In Charge 9. Y �o r 1 PPG-Pi-es J 5-kw $y r'7 j .21 41 y C fivIsv l--- (PROJMP) 7. Method of Establishing Fee U I:i• ;;'1RWE CONSULTANT SELECTION MATRIX RATING MATRIX 1 2 3 4 5 FACTOR 0 0 O 00 o O 0 o 0 O o® oo 0 0 O 0 0 4 O 0 0 0 O 0 0 0 O 0 0 0 0 5 5 5 5 4 0 4 3 3 2 GRAND TOTAL TOTAL I l'1*() t 1)0;, .1)(`l t'll('W r 9c, Project_ '1:_ti Pro )ec, 1 I J('L t I 9(1H) 0,, 0:1( c\c'e,1,).: Illn '.L y t. f -.VI 'A(1‘ (I 1 1 I )i(' I i■ I p (11, 1(C Sc-vu-ta oP 44 Pke cez. A Assoc (v/1,0 -c-:-.L.00\Ac—i\T 0 (cIYA'All0/31" 6 11, X 1 2 O 0 0 0 Q 000 0 0 0 0 0 0 0 0 (Y) 0 0 CD 0 0 0 O 0 00 0 0 0 0 0 0 0 0 0 0 MATIZ I X 1 .PC PAL FACTOR 5 5 I 5 15 4 4 3 3 2 (:1(1,1 TOTAL 1 z iz (.0 LEA CMB FIRM LOCATION: Mount Vernon and Seattle, Washington Joint Venture I. Similar Projects: A. Community Center Northwest Parks and Recreation District. B. Activity and Recreation Center Cedar Hills Treatment Center Maple Valley, Washington C. Gymnasium and Community Center Holy Family Parish, Kirkland, Wa. II. Project Manager: Charles B. Chisom CMB Larry Erickson LEA III. Project Proposal: Average IV. Project Approach and Methodology A. The firm explains how it will accomplish the project but does spell out clearly what will be done. B. They state they will use the "Critical Path Method 1. Stage I. Site visit, site familiarization, investigation of utilities, zoning and codes, execution of agreement and program analysis, cost target and meet with City. 2. Stage 2. Schematic plans and specifications, cost target 2 and submission to City for review. 3. Stage 3. Design development plans and specification, detailed soil investigation, cost target 3 and submission to City for review. 4. Stage 4. Final plans and specification and cost target 4. 5. Stage 5. Prepare bidding documents, submission for City review, take bids and evaluation of bids. Cost target 5. 6. Stage 6. Cost target 6 and recommend contract award. 7. Stage 7. Certification of payment, colors and finishes, admini- stration of construction contracts and check out mechanical systems. 8. Stage 8. Cost target 7 and equipment installation. V. Backup Staff Consultants A. Structural 1. H. K. Kim Engineers, Bellevue 2. Structural Design Associates, Lynnwood 3. Skilling, Helle, Christiansen, Robertson, Seattle, Wa. LEX /CMB Backup Staff Page 2 B. .Electrical 1. Alexander H. Hargis, Seattle, Wa. 2. Valentine, Fisher and Tomlinson, Seattle, Wa. C. Geotechnical /Soil 1. Earth Consultants, Bellevue, Wa. 2. Dames and Moore, Seattle, Wa. D. Acoustical 1. Towne, Richards and Chaudieve, Seattle. Wa. E. Cost Estimates 1. Surveys, Incorporated, Seattle, Wa. VI. Time Schedule No detailed schedule was provided. VII. Methof of Establishing Fee Not stated. VIII. Principal in Charge Charles B. Chisum and Larry Erickson ITEM 1. Spoci f i c ProjecL Design Ex ierfence 2. ProjecL Manager 3. Project Proposa3 Evaluation 4. Project Approach and Net_hodolgy 5 13ack -up Staff_ 6. Time Schedule 7. Method of Establishing Fee 3. Principal In Charge lF,¢fe44h. (FIRM) l> r J340- t aA) ME 41i27.h Cd r f y C�ir -h5 4 WC.": .1 7;:.. OP RPV1;:'0! (PROJECT) CONSULTANT SELECTION MATRIX. RATING MATRIX 1 2 3 '4 5 FACTOR 0 o 0 0 O 0 o 0 o OD o 0 0 O 0 o 0 o o =goo O 0 0 0 0 O 0 0 0 0 n n o 0 O 0 o n n 5 5 5 5 4 4 3 3 2 GRAND TOTAL MITE) TOTAL 0ST is a 0 7 L Dev E-t.oPIV1C-• rOT Ceivrmui\ii CENvr (1)11'0,1PC7') CONSULTANT SE kECTTON MATR I X RAT1 NC, ITEM 1 2 3 4 5 1. Speci tti c Project:. Design i -ispe rd.c.mcc NI o CovIvey..Y b.ct tin cow 2. P oject. Manager 46' ¶t 3. Project Proposal Evaluation Project Appr (71c:11 and ry\vc. v Met bodolg y t.) 13ack ;;Lal 1 6 T ime Sch edule 0/Jr;; 1. Method Pee Pr nr) pal in Charge 4 9 Pc; o 000 o o o O 00 o O 00 00 o o o O 000 0 O 0 A)C) 0 O 000 0 0 0 0 0 LA /cm3 RN) I4ATRIX FACTOR 5 5 /0 5 5 4 3 3 2 GRAND TOTAL I f t (b/1 TOTAL /0 4 e, S C) JOHNSTON HUNT ROLINE FIRM LOCATION: Port Angeles, Washington Joint Venture I. Similar Projects: A. City Center Gym Assumption School District Bellingham, Wa. B. Jefferson County Community Center Jefferson County C. Crescent School District 313 Building Addition and Multi Purpose Building Crescent School District. II. Project Manager: David Johnston III. Project Proposal: Less than Average IV. Project Approach and Methodology A. Would provide one Principal 100% time on the project. B. Would use outside consultants. C. Will provide warranty check services. D. Listed a list of services that would be available to the City. E. Did not state what they would do rather the City should select those services they desired to include: pre- design, site analysis, si ematic design, design development, construction documents, bidding or negotiations, construction contract administration, post -con- struction and supplemental services. V. Backup Staff Consultants A. Local 1. Clark and Associates 2. Craig Rowen, P.E. 3. J. I. Paussett, P.E. B. Structural Engineering Smith, Swenson, Inc., Seattle; MacDonald McLaren Hammond, Seattle. C. Mechanical Engineering Richard Stern Consulting Engineers, Seattle; CMH /Baum, Seattle; Ben J. Sivotkin and Associates, Seattle; Alexander Hargis, Seattle. D. Electrical Engineering Sparling and Associates, Seattle; Beverly Travis and Associates; Engineered Electrical Systems, Bellevue; Valentine Fisher and Tomlinson, Seattle; Johnson and Tapley, Seattle. Johnston, Hunt, Roline Backup Staff Cont'd. Page 2 E. Construction Management and Cost Analysis Constructioneering Northwest, Bellevue. F. Landscape Architecture Jongejan /Gerrard /McNeal, Bellevue, R.C.A., Seattle; William G. Teufel Associates, Seattle. G. Land Surveying Jack A Glaubert and Associates, Port Angeles VI. Time Schedule Because of the Firm's approach for the City to select the item of service it desires no time schedule was provided. VII. Method of Establishing Fee Again because of the Firm's approach no set fee establishment was offered. Rather by first setting the service level and the time required the fee amount could be established. VIII. Principal in Charge David A. Johnston 1. Specific Project Design Experience 9 3. Project Proposal Evaluation 4. Project Approach and Nethodolgy 5. Back-up Staff 5. Time Schedule 3. Principal In Charge Project Manager 13 i• 74dAl A141 a 7 1- 1.- 7. Method of Establishing Fee (PROJECT) (;z 1 J OF lia7 CONSULTANT SELECTION MATRIX RATING MATRIX 1 23 4 5 FACTOR 035 0 0 0 0 O 0 0 0 OD 000 0 000 0 C)0 0 0 O 0 0 0 0 O 0 0 0 0 O 00 0 O 0 0 0 0 074,1.,9e em/hicinthob i fr (FIRMI 5 5 5 5 4 4 3 3 2 GRAND TOTAL TOTAL 1 P (r1 1 1 k i A k C 1 C. Pro J(:(•1 3 P ro j 00 P: 1:kid I no i 1 0 `1 1 ApP I;t't Ilt v, It. V 0 1 t 11 f 0 ,c'l tot), n 1 '1( :I). I I n I t I 11( 0 1 1 01)1 cTh cRik) \01/4) EvE-to2tA F-rar ea) vv) r\)( OTGra, 11 P,TP, I 1 1 2 :i o o (x) n C) 0 0 o o o n 0 u o o o C) 0 0 o o o O 0 0 0 0 0 v■ C_ CA ON)\-\ 1) I 14ATIt I PAC."1'01■ 5 5 5 4 4 3 2 "e0(1;fie_ IS 1 0 10 I0 1 1 Firm Location: Seattle, Washington I. Similar Projects: A. Maple Valley Community Center, City of Maple Valley B. Connolly Hall /Gymnasium Seattle University, Seattle C. Seattle University Student Union Building, Seattle D. Bundy and Associates Wenatchee Convention Center, Washington State Univesity Convention Center, Maple Valley Community Center, East Side Community Center and Puyallup Community Center. MAKER Project Manager Gerold Hansmire Project Proposal Above average Project Approach and Methodology A. Would use 3 specialist consultants: 1. Les McNary Facility Programing Management and 2. Bob Fossatti Building Structural Review and Renovations. Makers Development. 3. Building Renovation and Reuse Makers. B. Schematic Design Review preliminary feasibility study, develop report of spatial, architectural and administrative relationships, develop a program of basic layout and concept design and cost estimate by Surveys, Inc. C. Design Development Two steps; Fast track development. Step 1. Accomplish site work, exterior renovation, additions, structural framework mechanical and electrical required to pro- vide a sound exterior shell. Step 2. One to two months after first phase interior systems work would be completed. D. Fast track phasing approach would allow work quicker than unphased construction as construction can start while final design work is completed. E. The Firm would work with citizen groups, staff etc. during schematic and design development steps. F. The Firm would have a temporary field office in P.A. during schematic and design development. G. Bidding and construction would be part of Phase I and II. Makers Backup Staff Page 2 V. Backup Staff A. Hargis Engineers Associates, Structural Engineering B. George Bundy and Associates, Kitchen Design Consultants C. Sarvey, Inc., Cost Estimating D. Towne Richards and Chaudiere; Acoustical Engineering VI. Time Schedule Overall 102 months A. Stage 1 Would include program development, schematic design and preliminary cost estimates. 1. Program Development 3/4 month 2. Schematic Design 11 month 3. Preliminary cost estimate 2 month B. Phase 1 Site work, exterior renovations, addition, structural framework and mechanical and electrical construction. 2 3/4 months. C. Phase 2 Interior systems and other inside systems construction 5 months. VII. Method of Establishing Fee__ A. Hourly basis to a maximum based upon a percentage of total construction cost. Hourly rate of $30.00 per hour. B. Subconsultant Fees billed as direct expense with no prime consultant overhead. VIII. Principal in Charge Gerald Hansmire 1. Spcifie Project De5ign Experience 2. Project Manager 3. Project Proposal Evaltion 1. Project Approach and I:0 ZhOr:Olgy 7. j. ITEM Back-up Staf f Tima Schedule Eetho6 of EstabliFhing Fee 3. Principal. In Che-ae tig A../ &Jr top AI )-14 c.P.A4 if/friv-v (PROJPCT) I CONSULTANT SELCTION MATRIX 1 2 3 4 5 0 0 0 0 00 00 0000 0000 000 0 O 000 (g) O 0 0 o O 00 O 0 04-1 (FIRM) MATRIX FACTOR 5 5 5 5 4 4 3 3 2 TOTAL .26 1S .P GRAND TOTAL 21(i) 1 (1":'!)1:) 0 0 M 0 0 S J )!0!:)v, 0 0 0 0 0 O 0 0 0 O 0 0 0 o o o C) 00 o 0 0 v I X I '(1.1',V11 !)i'' I X rei,I.V11 NO I I W; ,i,NV,W111:;1\10.) TIINN;F(TAPJ oh it?tt;) Yd U V (31t I lc; VIP 1`,. -If) 1)01110 -V211.- 0 0 0 04 1)110 n :.7■111, 1 1 1;0 I :loll l?' oa it 3 1,70e0) 041'110 Mt) I IJ(L 0.1)1';‘ t .)I 1:),)■ 7. PROPOSAL EVALUATION QUESTIONS I. Similar Projects: A. How large is the Firm? B. Are the completed projects similar to what the City is proposing? C. Did the Firm work on the listed projects as the principal or as a sub- consultant? D. What is their experience on projects similar to ours, what location and how many? II. Project Manager A. Is the project manager a principal in the firm? B. Is the project manager a member of a consultant firm with the principal firm? C. Has the manager been a manager on other projects similar to ours? III. Proposal Presentation and Display A. Did the proposal address the questions in the R.F.P.? B. Did the proposal lay out the information and answering the R.F.P. questions in a meaningfull way? C. Did the proposal provide enough information to base a determination? IV. Project Approach and Methodology A. Is the firm doing the work in house? B. Is the firm using consultants Are they specialists? C. If the firm is using consultants Who are they? D. Has the firm provided a different approach to the project? E. How much will the firm be involved in the planning will they work directly with involved groups? F. Would the firm, if from out of town, provide an intown office to do the planning work? G. How far is the firm prepared to go with the project? V. Use of Consultant A. Who are the consultants the firm plans to use what areas will they be involved? B. Have the consultants had other experience similar to our project? Proposal Evaluation Questions Page 2 VI. Time Schedule A. What is the overall time frame? B. Have they divided it into sections and explained each section? C. Have they offered any new approaches to shorten the time? VII. Establishing Fee A. Did they provide a method? B. Did they provide the standard approach or offer a new approach? C. Did they provide a means for the City to select any or all individual sections if the City desires? VIII. Principal in Charge A. Is the principal in charge the same person as the project manager? B. Is the principal a member of the firm or a member of a consultant firm? C. Is the principal in charge one c= the firm's owners? JANUARY 30, 1981 MEMO: TO: DAVE, '.:YO HAGUEWOOD AND COUNCILMEMBERS FROM: ROB SUBJECT: CONVENTION CENTER FINANCING During the January 20th meeting, we discussed a number of options for financing the Convention Center. Most attention seemed to focus on Dave's Alternative No. 3, presented on January 16th. This recommendation suggested a _combination of. accumulated hotel/ motel tax revenues and a bond issue serviced by the annual hotel /motel tax receipts. This is the same suggestion that we advanced in July 1980. I've attached my analysis prepared at that time. T suggested a financial package as follows: Annual tax revenues: $55,000 less, allowance for Center maintenance: (15,000) Balance to service debt: 40,000 Construction Capital: Bond Tssue: plus, Funds on Hand: Total for Construction $390,000 (8%,20 Yrs. 40,000 install. 300,000 $690,000 This proposal did not consider some S60,000 in Revenue Sharing which was once budgeted to the Convention Fund. The volatility in the bond market has changed this picture considerably. We could now expect to sell the bonds at an interest cost of 92% to 11 There are some other concerns in the market that will work against us as well. David first asked me to calculate the maximum bond issue which all of the annual tax receipts could support. Using the average of $55,000 (which is still indicated on the basis of the past five years experience and an interest range of 9.49% to 10.41 we could support an issue of from $485,000 (9.49 down to $455,000 (10.41 The interest rates are the low and high tax exempt quotes for recent weeks. The tax exempt market has been'on a downtrend since December but has not moved off 91/2 -9 3/4% since. Most of my market contacts are very cautious. Page two Dave, Mayor Council Convention Center Financing January 30, 1981 A bond issue of $455,000, coupled with existing funds of $312,000, would provide construction funds or $767,000. I would require a budget of $8,500 to print and market the official state- ment and bonds; for the legal opinion,(ordinances), and to obtain a preliminary credit rating for the issue. There seemed to be concern on the Council about whether hotel /motel tax funds should be used to construct the facility. I checked with Yakima, Spokane and Wenatchee for information on how these cities financed and operate their facilities. Yakima issued a $600,000 limited tax bond serviced by the hotel /motel tax. A small residual of the tax (about $2,500 annually) is deposited to a "Capital Reserve Fund" for replacement equipment, etc. The Yakima center is staffed with three (3) full -time and one (1) part time employees. The 1981 budget is $150,000 against revenues of $105,000. The budget deficit is being resolved (apparently) by using capital reserves for operation. Ninety percent of the center revenues come from space rental and food service. Spokane issued $2,000,000 in non -voted bonds to remodel the "EXPO" World's Fair pavilion into a combination opera house and convention center. The hotel /motel tax is used both to service bonds issued to improve an athletic stadium and to support center operations. The center's manager is a city employee, but a "Convention Center Advisory Board made up of the local tourist bureau, Chamber of Commerce, etc., apparently have some say in operation. Like Yakima, the center is not self supporting and in 1981, will receive $400,000 in City General Funds for operations. The Spokane board has recently appealed to the Council to allocate proceeds from the city's admission tax to the center (Incidently, Port Angeles had an admissions tax once but it was repealed). Wenatchee's center opened December 6, 1980. It was built with a $1,800,000 EDA grant, Revenue Sharing, and donated funds from a private citizen. The city contracts with Vance Hotels, Inc. for operation of the center. Adminis- tration is through a local doctor who, with Vance is attempting to build a hotel on surplus property near the site. The city earns $70,000 annually in hotel /motel tax funds but does not expect to commit all of that for center operations. Page three Dave, Mayor Council Convention Center Funding January 30, 1981 Only Yakima actually uses the tax to pay off bonds. Their annual tax revenue is similar to ours, but they entered the bond market in 1975 and obtained a rate of 5.8 Their money goes much farther than ours. In my opinion, if we forego use the the motel tax funds to service a bond issue, we lose a unique opportunity to raise some capital without in- creasing tax liability of the local citizenery. On the other hand, it is quite clear that other resources will have to be found to initially capitalize the center for operations, promotion etc. In 1981, $34,000 is budgeted for repairs, maintenance, and custodial work for the center. If we issue bonds on April 1st, and use our current funds to start con- struction, we could probalby earn another $25,000 interest by investing the bond proceeds. Also, we will earn interest on the monthly hotel tax receipts themselves. This will provide about $3,000 annually. Funds available for construction would be: Funds on Hand $312,000 less working capital (28,000) Balance for construction $284,000 Add Bond proceeds 455,000 Add interest on bond investments 25,000 Sub -total $764,000 Less bond market costs (8,500) Balance available for design and construction: $755,500 1981 funds for maintenance, operation and promotion: Current 1981 Budget: $34,600 Working capital held out of 25,000 current funds Interest on tax receipts 3,000 Total: $62,600 Obviously, revenues from center operations are not included in this work. It is reasonable to assume that demand for the facility will not occur until the center is built and promoted. A market analysis could forecast potential sales for such operations. I hope this information is of assistance. cc: Pat Rodman January 16, 1981 MEMORANDUM To: Mayor and City Council From: David Flodstrom Subject: Funding the Renovation of the Vern Burton Community Center Earlier this year the Council discussed the renovation of the Vern Burton Community Center. A preliminary structural review of the facility was done by BJSS and we have now completed the first round of a consultant selection process for the design portion of the project. However, before we proceed much further we need to consider which mechanism will be used to finance the renovation work. There are several options which might be explored: 1. Fund the renovation work from existing cash on hand and phase the work over several years as general fund revenues materialize. 2. Fund the total cost of renovation through the issuing of a limited General Obligation Bond issue, using a combination of general tax dollars, revenue sharing and Hotel -Motel tax annual revenues to service the debt. 3. Fund the renovation of the Gym through a combination of accumulated Hotel Motel tax revenues (1981 Budget calls this fund the Stadium and Convention fund current balance is $301,829.00) and a bond issue. The bond issue would be serviced by the annual revenue from the Hotel -Motel tax. Rob will be providing some additional information for the meeting Tuesday evening. DF:jl MEMO: AUGUST 29, 1980 TO: MAYOR AND CITY COUNCIL FROM: DAVE FLODSTROM, CITY MANAGER SUBJECT: CALLING FOR DESIGN PROPOSALS FOR VERN BURTON MEMORIAL COMMUNITY CENTER A preliminary project scope was developed for the renovation of the Vern Burton Memorial Community Center. This project scope was provided to the City Council at its August 19th meeting. Hopefully, all members of the Council have had an opportunity to review this preliminary scope. If the Council feels that this preliminary scope identifies the needed improvements for the reriuvation project, then the staff will proceed to call for design proposals. The process for selecting a design firm will include: a.) Request for proposals from specific firms having done similar work and through general advertisement of the project. b.) Staff and Manager review of firms submitting proposals. c.) Selection of three to five finalist firms. d.) Final selection through interviews. (If the City Council wishes, these interviews can be conducted by the Staff or the Council jointly.) DT F/ j h 5T 7, x•8.6 /7 Gmona0 L 1 Y June 17, 1980 Mr. David Flodstrom P.O. Box 1150 Port Angeles, WA 98362 Dear Mr. Flodstrom: 1036 EAST FIRST STREET PORT ANGELES, WASHINGTON 98362 (206) 452 -3844 We have enclosed herewith the second segment of our written commentary assessing existing conditions. Please allow us to stress the point that the written commentary enclosed is not the final report. The final re- port will be presented July 1, 1980. The following summarizes the items of economic value in up- dating the project to current standards and thus making the facility usable and functional. Estimated Costs 1. Sub -Task 1.) Structural Conditions: ib. Add vapor barrier and additional crawl space ventilation. lc. Add new vents to attic space. Install new vents in moisture producing areas. Install new plywood sheathing over the existing gymnasium decking. ld. Reinforce or remove chimney at boiler room. J 2. Sub -Task 2.) Mechanical Systems Review: 2a. Replace existing oil fired steam boiler with an electric heating unit that provides ventilation as an integral part of the unit $75,000.00 3. Sub -Task 3.) Electrical Systems Review: 3a. Replace existing, gymnasium lighting with new metal halide fixtures. Replace existing locker room lighting with new fluorescent fixtures $11,100.00 12 3b. Increase power service to accomlodate electric heat. Replace existing receptacles with new grounded receptacles. Renovate power distribution for new uses 8,500.00 3c. Install new sound system 3,000.00 STEPHEN D JOHNSON G. STACEY BENNETT ROBERT C SLENES FRANK L SMITH FRANKLIN J DENSMORE AKIRA SATO OLYMPIA OFFICE 320 WEST BAY DRIVE, SUITE 212 OLYMPIA, WASHINGTON 98502 PHONE 206 943 -4650 Mr. David Flodstrom June 17, 1980 Page 2 Estimated Costs' 3d. Replace existing fire alarm system with new system 5,500.00 3e. Replace existing exterior light fixtures with vandal resistant fixtures 1,500.00 3f. Emergency and new exit lighting 3,500.00 4. Sub -Task 4.) General Architectural Review: 4a. Re -roof the facility $30,000.00 5. Sub -Task S.) Plumbing Systems Review: 5d. Rearrangement of fixtures, supply lines and drainage lines. Replacement of existing showers, toilets and sinks $52,000.00 Option -If all the locker rooms on the west side were not renovated, leaving renovation only to the east locker room and public rest room, the anticipated cost would be reduced by approximately one half $26,000.00 5e, Replace existing hot water system 4,000.00 Add contents of first report June 3, 1980. Masonry walls (east and west) reinforcement $15,000.00 Glue laminated arch reinforcement $18,000.00 The expanded commentary attached is much more thorough in its explanation of the above mentioned tasks. BJSS would suggest a complete review by you and all council persons. We welcome any comments you might have to add to the report. Respectfully, BJSS/ 'rchi'ects Planners /AIA im Maley TH:pld cc: Frank Densmore CITY OF PORT ANGELES PUBLIC GYMNASIUM "The Vern Burton Memorial Community Center" Study of Existing Conditions June 17, 1980 The following written commentary is presented in an effort to up -date those concerned with the on -going study of existing conditions at the above men- tioned facility. For convenience, the facility shall be referred to in this report as "The City Gym The following report is organized for purposes of convenient cross referencing in the manner outlined in the "Request for Proposal to Study the City of Port Angeles Public Gym" issued by the City of Port Angeles, dated March 11, 1980. Sub -Task 1.) Structural Conditions Estimated Cost a. Foundation Conditions: Examination of the existing facility re- vealed few cracks or other signs of settle met <t at structurally significant areas (significant in terms of safe occupancy of the building). This indicates the existing foundation is adequate for the continued use of the facility, barring any dramatic change in the 'type of use of the facility. (i.e. a use with unusual loading conditions) Improvements recommended: -None b. Floor System Conditions: The floor system at the main gymnasium area is a wood floor system over a crawl space. The timber floor joists, floor beams and posts were visually examined by physically entering the building's crawl space. These timber ele- ments were found to be in remarkably good shape. Rot was not encountered in the wood members. The existing floor system is ade- quate for the continued use of the facility, barring any dramatic change in the type of use of the facility. However, the crawl space is poorly ventilated. Current standards re- quire additional crawl space ventilation re- gardless of type of use (Uniform Building Code Section 2517(c)6.). New mechanical ventilation 1.1 l.7 L Ui L !LL18G L D UM. 1A... U�'11LL 1C.LJ.LLUU Study of Existing Conditions Page 2 should be provided to serve the crawl space and a vapor barrier should be laid on the dirt floor of the crawl space as preventative measures to control sub surface moisture, dampness and humidity which could contribute to future deterioration of the timber members in the crawl space. All areas other than the main gymnasium area itself are concrete slabs on grade. The eastern most portion of the existing girls' locker room (east side of building) was a later addition to the facility. This area (circa 1969) is not in need of improvement unless the area is remodeled for a use other than the one it was designed for. The existing exercise room to the southeast of the main gymnasium arena area has a wood surface covering a concrete slab floor below. The wood covering is in poor condition and of no further value. The concrete slab floor below the wood covering can be expected,to be in a comparable condition to that encountered at the existing entry and at the original locker rooms. At the original locker rooms and existing entry, th ,concrete slab surface in general is pitted and chipped. The locker room floors contain floor drains of the "trench drain" type and therefore, the floor is sloped toward these drains. Concrete ledges are provided at the perimeter walls to form a raised base for the lockers. The shower room areas have gutters for drainage formed in the concrete floor slab. The concrete floor slabs have been painted and the paint has come off in numerous spots. The conditions stated above give the concrete floors a rather run -down appearance. However, the floor slabs do not have excessive cracks with abrupt varia- tions in floor level creating a hazardous situ- ation resulting from uneven settlement. It is reasonable to expect a few cracks. Although the appearance of the floor is unpleasant, no struc- tural modifications are required. The floor slope, floor gutters, raised concrete locker bases, and general unappealing appearance of the floor slabs would in all likelihood, require surface improvement if these areas should ever be converted to a use other than the use they were designed for but not for reasons of struc- tural significance (significance in terms of safe occupancy of the building). City of Port Angeles Public Gymnasium Study of Existing Conditions Page 3 Improvements recommended: -A vapor barrier and additional crawl space ventilation should be provided 2,500.00 c. Column /Beam Conditions: In the crawl space, the connection of the timber posts to their foundation pads and to the timber floor beams above were found to be in good condition with little or no separ- ation (air space) noticed. The timber posts supporting the floor system are adequate for the continued use of the facility, barring any dramatic change in type of use of the facility. The base connection of the glu -lam arch roof beams with their foundations was investigated by removing the enclosure around one base connection. The condition of the connection was visually examined and the wood was probed where the beam and foundation are bolted together with a steel base plate connector. The connection was found to be sound and adequate for the continued use of the facility. The glued laminated wood arch beams are a matter of serious concern as described in the first segment of this study, dated June 3, 1980. The beams should be strengthened as per the recommendations made in the June 3, 1980 report. The connection of the sawn timber columns to the roof girder (4- 2x12's) carrying the flat roof over the main entry to the facility (the north portion of building), were visually ex- amined also. This was accomplished by enter- ing the attic space over the entry where the connection is exposed. These connection con- ditions were found to be in good condition and adequate for the continued use of the facility. The condition of the roof joists, ceiling joists, and roof sheathing at the flat roofed portion of the facility over the main entry were visually examined from within the attic space at this location. No structurally significant deterior- ation was encountered. Some localized dampness was noted where roof leakage was occuring. It was possible to see where water was coming through City of Port Angeles Public Gymnasium Study of Existing Conditions Page 4 the roof, dripping onto the sheetrock ceiling below, running to a low spot in the ceiling causing damage noticeable from the entry interior below. In spite of the presence of moisture from roof leakage, rot within the wood members was not en- countered, and the wood members appear to be structurally sound and adequate for continued use of the facility. The attic space did not appear to be vented. The UBC requires ventilation of such attic spaces and the addition of new venti- lation is recommended (even if the roof leakage is corrected.) in order to comply,with the pro- visions of the UBC and as a preventative measure to control deterioration of the wood members. The connection of the flat roofs over the existing locker rooms, located at the east and west perimeter of the main gymnasium arena area, is entirely en- closely by existing wall, ceiling and roof surfaces. Due to a lack of cracks on these surfaces or ex- cessive staining from roof leakage, it was deemed that destructive removal of existing wall, ceiling and roof surfaces was not warranted. Such removal of surface materials at random locations would be necessary to visually inspect the actual conditions of this connection. It is reasonable to conclude that the condition of the existing connection has not deteriorated substantially and is adequate for continued use of the facility. The roof and ceiling joists and roof sheathing over the flat roofed areas over the locker rooms at the east and west perimeter of the main gym- nasium are entirely enclosed by existing ceiling and roof surfaces. No attic space exists. The existing ceiling was removed from two selected locations to reveal the roof /ceiling structure. Again, no rot or other structurally significant deterioration was encountered. The wood members appear to be structurally sound and adequate for continued use of the facility. This roof space does not appear to be vented. Again, the UBC would require the roof joist cavities to be vented to the outside in today's new construction. Due to the nature of the construction of this roof/ ceiling system providing new venting of this area although desirable would be difficult if not im- possible. We contend that to provide new venti- lation would be justifiably impractical and should not be attempted. However, those spaces under these roofs should be provided with mechanical Study of Existing Conditions Page 5 ventilation, particularly where moisture and humidity are generated such as in shower areas, to control moisture from passing through the ceiling material to the wood members of these roofs. The main body of the roof is constructed of timber tongue and groove decking spanning over the arch beams. The decking has suffered very noticeable shrinkage since it was installed (it was undoubtedly lumber with a high moisture con- tent (green) when installed which has dried out over the years, and thus, contracted in actual physical size). This shrinkage has created a gap between the edges of each member and the adjacent member. When the shrinkage occured originally, it had the effect of pulling and possibly tearing of the roofing felt laid over the top of the decking. The shrinkage by now has probably stabilized, but gaps between pieces of decking are at places as much as 1 The shrinkage and separation may have weakened the tongue and groove joints and the original nail- ing. It is recoiwuended that a layer of 3/8" plywood be installed over the top of the roof decking (exterior face of decking). Such an action will increase the strength of roof and bea great help in preventing roof leaks in the future. The plywood will provide a more con tinously smooth surface upon which roofing material can be installed. More comment will be made on this condition in the roofing portion of the general architectural review section of this report. Improvements recommended: Strengthen the glued laminated wood arch beams over the main gymnasium arena area Install new vents in attic space over main entry Install new vents in moisture generating areas (shower areas) under enclosed roof spaces where it is impractical to install new vents serving the enclosed roof spaces themselves Install new plywood sheathing over existing roof decking at main gymnasium arena area d. Seismic Conformance: The masonry walls (brick) in the building are the primary concern in this category as stated in the first segment of this study, dated June 3, 1980. The walls should be reinforced as per the recommen- dations made in the June 3, 1980 report. $18,000.00 1,000.00 4,000.00 3,000.00 City of Port Angeles Public Gymnasium Study of Existing Conditions Page 6 The chimney at the boiler is in good condition with the exception of the uppermost two feet of the stack. At the very least, the uppermost portion of the chimney needs to be surrounded with a metal band to act as a belt around itself. The uppermost portion could also be rebuilt. However, the chimney, even though in good con- dition with the exception noted above, is not up to current structural codes. In light of the code deficiency, we recommend the chimney be re- inforced or removed. Improvements recommended: Reinforce masonry walls (brick) $15,000.00 Reinforce or remove chimney at boiler room 2,000.00 e. Compliance with Uniform Building Code Requirements: Items of concern in this category have been noted under the other categories where they occur and are listed again below. It should be noted that compliance with the UBC has up to this point only been investigated with respect to how the code can be applied to the facility, regardless of they type of use housed within the facility. It is pot our desire to appear to be vague on this matter of concern, but we must reserve the oppor- tunity to modify the written commentary presented at this time. When we receive a "program statement" from the City of Port Angeles, (which is currently being compiled) which more definitely and more specifically states the type of anticipated future uses, we will be able to evaluate code compliance more thoroughly. The size, frequency and other characteristics of those uses have direct bearing upon the requirements of the Uniform Building Code. We are scheduled as per our agreement with the City, to receive the "program statement" very soon and will be able to conclude the investigation regarding compliance with the requirements of the Uniform Building Code to be included in the final portion of our review. Items of concern that are indicated at this time are as follows: Additional crawl space ventilation should be provided. -The roof beams over the main gymnasium arena should be strengthened. -The masonry walls (brick) at the east and west ends of the main gymnasium arena area should be reinforced. Install new attic ventilation. City of Port Angeles Public Gymnasium Study of Existing Conditions Page 7 Install new vents in moisture generating areas under existing enclosed roof spaces. Install new plywood sheathing over existing roof decking at main gymnasium arena area f. Other Conditions: The non bearing partition walls particularly in the locker rooms at the west side of the facility have received a great deal of destructive treat- ment and are of questionable value as far as any continued use of the facility from a functional point of view. However, since the walls are non- bearing partitions, their condition is structurally speaking, insignificant. No improvements to these partitions are necessary in structural terms re- garding the safe occupation of the facility. Improvements recommended: -None City of Port Angeles Public Gymnasium Study of Existing Conditions page 8 Sub -Task 2.) Mechanical Systems Review Estimated Cost a. Heating Plant Review, b. Distribution, c. Controls, d. Safety Devices: The gym is presently heated with an oil fired steam boiler. Fuel is No. 5 heavy oil. Heat is transferred to the main gym space via three large heating units with steam coils suspended at the ceiling. Locker rooms are heated with unit heaters suspended near the ceiling. Most components of the heating system are functional and are probably capable of oper- ation. The general overall appearance of the system indicates neglect and age. Continuous operation would probably require considerable maintenance and expense. The condition of the inside of the boiler is unknown. It is very likely that retubing would be required. It is also likely that the steam and condensate piping may be badly deteri- orated from the inside. The Life Cycle Cost analysis which is not com- plete at this time, will determine the best solution for heating the facility. Replacement of oil fuel with electrical will probably be desirable. Improvements recommended: Replace existing oil fired steam boiler with an electrical heating unit that provides venti- lation as an integral part of the unit $75,000.00 e. Mechanical Exhaust System: The gym heating units do not have ventilation capability. Ventilation is accomplished by opening windows and doors. The original locker rooms are ventilated by exhaust fans. Most ex- haust fans appear to be either removed or in- operable. The locker room addition on the east end of the building has a heating and ventilating unit which supplies preheat ventilating air.. Improvements recommended: -The new electrical heating units would have ventilation capability within the units. Some additional exhaust fans may be required. The cost of ventilation and exhaust equipment is included in the $75,000.00 stated above. City of Port Angeles Public Gymnasium Study of Existing Conditions Page 9 f. Compliance with Uniform Mechanical Code: The present system does not satisfy existing UBC requirements for ventilation. The three heating units in the gym would have to be re- placed with units which are capable of supplying outside air. The original locker rooms would require new exhaust fans and make -up air units. The locker room addition (at east end of the building) meets codes. Improvements recommended: -As stated above, replacement of the existing oil fired steam boiler with an electrical unit that provides both heat and ventilation. The cost of compliance with codes is included in the $75,000.00 stated above. City of Port Angeles Public Gymnasium Study of Existing Conditions Page 10 Sub -Task 3.) Electrical System Review Estimated Cost a. General Lighting: The present lighting system consists of incandescent lights. The lighting level in the main gym is about 30 footcandles. There are no codes governing the lighting level, however, present practice recommends a level of footcandles. It is recommended that ex- isting fixtures in the gym be replaced with metal halide fixtures and locker room in- candescent fixtures be replaced with fluores- cent fixtures. Improvements recommended: Replace existing incandescent fixtures in main gymnasium arena area with new metal halide fixtures. Replace existing incandescent fixtures in the locker rooms with new fluorescent fix- tures $11,100.00 b. Power Service: A 240V, three phase open delta, 150 kw service has recently been installed. The 150 kw ser- vice is adequate for considerable expansion except for electric heat. A new service would be required if heating energy is changed from oil to electricity. Regarding the power distribution sub system, the existing receptacles do not meet code• re- quirements because they are not grounded. Therefore, the existing receptacles should be replaced. It is reasonable to contend that changes in the use of the facility will require further renovation of the power distribution system. Improvements recommended: Increase service capacity for electric heat 2,500.00 Replace existing receptacles with new grounded receptacles 2,000.00 Further renovation of the power distribution system due to new use of the facility (rough estimate only) 4,000.00± 8,500.00 c. Intercom: Since the present gym doesn't have a sound system for the different multi -use functions that are anticipated, it would be highly desirable to install one. V1 Vy V1 IWIL.rutgeie ruulic uymnasium Study of Existing Conditions Page 11 Improvements recommended: Install new sound system 3,000.00 d. Fire Alarm: The existing fire alarm is not adequate to meet present standards for this type of facility. Therefore, it will be necessary to provide a new fire alarm system in the building. Improvements recommended: Replace existing fire alarm system with new system 5,500.00 e. Security Lighting: Most of the existing exterior light fixtures have been destroyed by vandalism. New vandal resistant light fixtures should be installed. Existing circuits may be reused. Improvements recommended: Replace existing exterior light fixtures with new vandal resistant fixtures 1,500.00 f. Exit Lighting: The present system consists of exit lights at the major exit doors. These, however, do not have an alternate energy source in case of a power outage. Therefore, a new exit lighting system should be installed along with emergency lights through principal corridors for safe egress from the building in an event of a power outage 3,500.00 g. Equipment Loads: See b. (Power Service) h. Emergency Generator System: Emergency power is not anticipated to be required for any use other than exit lights and lighting in principal corridors. Therefore, it is recommended that lights with rechargeable cells, wired directly to the power distribution system, be installed. With these lights, the cells are kept charged while the power is on and the lights will run off the storage cell in the event of a power outage. The expense of an emergency generator system is thus avoided. The cost of the emergency lights are in- cluded in the cost estimate above for "f. Existing Lighting city of Fort Angeles Public Gymnasium Study of Existing Conditions Page 12 Improvements recommended: -None i. Compliance with National Electric Code: Code compliance concerns have been described within each of the sub categories a through h listed above and are reiterated below: Existing receptacles are not grounded and should be replaced. Existing fire alarm system does not meet present standards and should be replaced. Existing exit lighting system does not have an alternate energy source in case of a power outage and should be replaced with a new system equipped with an alternate energy source. City of Port Angeles Public Gymnasium Study of Existing Conditions Page 13 Sub -Task 4.) General Architectural Review Estimated Cost a. Roof: The existing roof leaks and needs to be replaced. From within the attic space over the entry area, wetness and dripping water was noted at several locations at the underside of the roof sheathing. Water was also noted on the floor of the gymnasium area. As mentioned in Sub -Task 1., the main body of the roof is timber tongue and groove decking spanning over the arch beams. The decking has suffered very noticeable shrinkage. This shrinkage has created a gap between the edges of the respective members. When the shrinkage occurred originally, it shed the effect of pulling and possibly tearing the roofing felt laid over the top of the decking. At places, a gap of as much as Z" exists. At these points, the roofing felt has to span between decking members without any surface to adhere to. In addition to this, decking laid on a curved arch is inherently not a continuous surface, but rather a series of flat surfaces at a very slight angle with respect to each other. The surface of the roofing felts at the main body of the roof (the arched portion) were in much better condition on the north side than at the south where bubbles were everywhere and edges of the layers of roofing felt were exposed. At the main body of the roof (the arched portion) installation of a 3/8" thickness of plywood over the existing roof prior to re- roofing will pro- vide a smoother and more continuous surface for the roofing felts to adhere to which should greatly reduce bubbling of the roofing. The flat roof portions of the original building exhibited "alligatoring" of the surface where roofing tar had been applied excessively. This condition is well documented as a leading cause of failure of built -up roofing systems. Some of the flat roof areas were also suffering from lack of positive drainage (ponding) and some roof drains were choked with debris. This con- dition could be corrected by creating positive slope with an application of tapered rigid insul- ation or light weight insulating concrete prior to re- roofing combined with a program of routine maintenance to periodically clean the roof drains of debris. City of Port Angeles Public Gymnasium Study of Existing Conditions Page 14 The flat roof over the addition to the original building at the east was in good condition but has a severe drainage problem. Water pending was evident over nearly the entire surface of the roof as the roof drain was located at one of the highest points on the roof. The roof over the boiler room was in better shape than most of the rest of the building, due to the gravel covering at this location. The rest of the roof does not have a gravel covering, but rather a coating of tar with a reflective surface. The sheet metal flashing and coping around the perimeter of the roof has been ravaged by ex- pansion and contraction (due to temperature changes). Many once soldered connections are now separated. Improvements recommended: -Re -roof existing flat roofs with new tapered insulation or light weight insulation concrete installed to create better drainage. Re -roof the existing arched roof portion of the facility after installing a new layer of 3/8" plywood sheathing. Install new sheet flashings and copings $30,000.00 City of Port Angeles Public Gymnasium Study of Existing Conditions Page 15 Sub -Task 5.) Plumbing System Review Estimated Cost a. Sewerage Disposal b. System Drainage: The existing systems are functional. Some signs of neglect were noticed, but could be corrected with regular use and routine maintenance. Improvements recommended: Routine maintenance Negligible c. Toilet Facilities d. Piping: The toilets in the original portion of the building are functional, but many seals are worn and leak when flushed. They have received rough treatment during the life of the building and should be replaced if their use in the future is anticipated. The showers in the orig- inal portion of the building are functional, but many faucets leak. The existing showers should be renovated. The toilets and showers at the locker room addition (Girls', circa 1969) at the east end of the building are in good condition and no modification to this area is necessary. The existing piping is functional but shows signs of neglect. It has not been in regular use for some time and this lack of use is not beneficial for the system. For the most part, the existing system could be put into regular use again. However, the need for considerable maintenance should be anticipated if the ex- isting system is put into regular use again. Improvements recommended: -It is reasonable to assume that some re- arrangement of fixtures, supply lines and drainage lines will be desirable. -The existing toilets and showers (at the original portion of the buildings) should be replaced if their use in the future is anticipated. -No modifications to the locker room addition (Girls', circa 1969) at the east end of the building $52,000.00 Alternative No. 1: If all the locker rooms on the west end were deleted and only the original east locker room and public rest City of Port Angeles Public Gymnasium Study of Existing Conditions Page 16 room were renovated, the estimated cost would be reduced by approximately one -half $26,000.00 e. Support Equipment: Hot water is presently heated with the oil fired boiler. A new water heating system will be required if the oil boiler is replaced. Improvements recommended: Replace existing hot water system with new electric hot water system 4,000.00 f. Compliance with Uniform Plumbing Code: No serious deficiencies have been discovered so far. Improvements recommended: -None (Due to code requirements.) -417151W T Hlio o.tqexi L.1 al Ya ,i41 1— .1 LI,, Ii I I I _r-r .1 i. I 0 I 1A 3135r. 11 ems.. iri 14031 ar;-9 L 1- 14 t i er 11 A, f c.c:rinA ITe El 3?4 -1Z1V; 1 CM giVitilli\ i 1 -5,-ni\-ze -603 1 1 t 4-o 1 cCocN I Nat:4 r Ti Th 1 1' 41 114 r 4 1.1.u=i4=t 4 4 :1 gbaA Cava? f7 strge.de cv?-- fccitA n-us PT "txIsta-16- -0rAl-eg ViCCIA G-cer.7Lca.,1101-1 Fog. --1 Nt5P-t55 rfi /1 HC?R sc.ALG 1/16.1= LOCATION 2. f2Aati-lovricttiervizit*r-actit GArg1 A-eeA uP Acc.Ess tr0 1 "a IV ii 11 U 11 ,I t L 14:14111-4 s(1 Vtnnu2uaod Nv�1 411 -i-Wm 413= I 4 4.a S! 1-4011_ I NS `)}t1 t 1 00Q-9 9k .4 Z r ...7 i 1 1 N