Loading...
HomeMy WebLinkAbout536 W 4th St - BuildingPREPARED 8/21/09 8 26 35 INSPECTION TICKET PAGE 1 CITY OF PORT ANGELES INSPECTOR JAMES LIERLY DATE 8/21/09 ADDRESS 536 W 4TH ST SUBDIV TENANT NBR GORDON W KALAHAR CONTRACTOR HENDRICKS CONSTRUCTION INC PHONE (360) 461 4644 OWNER GORDON W KALAHAR PHONE (360) 296 0154 PARCEL 06 30 00 0 0 8435 0000 APPL NUMBER 09 00000826 RES REMODEL PERMIT PL 00 PLUMBING PERMIT REQUESTED INSP DESCRIPTION TYP /SQ COMPLETED RESULT RESULTS /COMMENTS PL2 01 8/21/09 LL PLUMBING ROUGH IN August 21 2009 8 25 42 AM 1pangrle t...' RON 461 4644 ROUGH IN PLUMBING COMMENTS AND NOTES Application Number 09 00000826 Application pin number 089658 Property Address 536 W 4TH ST ASSESSOR PARCEL NUMBER 06 30 00 0 0 8435 0000 Tenant nbr name GORDON W KALAHAR Application type description RES REMODEL Subdivision Name Property Use Property Zoning RS7 RESDNTL SINGLE FAMILY Application valuation 9600 Application desc REMODEL BATHROOMS CITY OF PORT ANGELES DEPARTMENT OF COMMUNITY ECONOMIC DEVELOPMENT BUILDING DIVISION 321 EAST 5TH STREET PORT ANGELES, WA 98362 Owner Contractor Date 8/17/09 GORDON W KALAHAR HENDRICKS CONSTRUCTION INC 536 W 4TH ST 1432 W 4TH ST PORT ANGELES WA 98362 PORT ANGELES WA 98363 (360) 296 0154 (360) 461 4644 Structure• Information 000 000 REMODEL BATHROOM Permit BUILDING PERMIT RESIDENTIAL Additional desc REMODEL BATHROOM Permit pin number 151795 Permit Fee 207 75 Plan Check Fee 135 04 Issue Date 8/17/09 Valuation 9600 Expiration Date 2/13/10 Qty Unit Charge Per Extension BASE FEE 95 75 8 00 14 0000 THOU BL 2001 25K (14 PER K) 112 00 Permit MECHANICAL PERMIT Additional desc Permit pin number 151811 Permit Fee 64 50 Plan Check Fee 00 Issue Date 8/17/09 Valuation 0 Expiration Date 2/13/10 Qty Unit Charge Per Extension BASE FEE 50 00 2 00 7 2500 EA ME VENT FAN (SINGLE DUCT) 14 50 Permit PLUMBING PERMIT Additional desc Permit pin number 151829 Permit Fee 93 00 Plan Check Fee 00 Issue Date 8/17/09 Valuation 0 Expiration Date 2/13/10 Qty Unit Charge Per Extension BASE FEE 50 00 3 00 7 0000 EA PL- PLUMBING TRAP 21 00 Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned fora period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the last inspection I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. B /,7/© GA/4 4 if rocietc, 2 T:Forms/Building Division/Building Permit D \2 Date Print Name Signature of Contractor or Authorized Agent Signature of Owner (if owner is builder) BUILDING PERMIT INSPECTION RECORD IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED POST PERMIT IN CONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE. Inspection Type FOUNDATION Footings Stemwall Foundation Drainage Downspouts Piers Post Holes (Pole Bldgs.) PLUMBING Under Floor Slab Rough -In Water Line (Meter to Bldg) Gas Line Back Flow Water AIR SEAL. Walls Ceiling FRAMING Joists Girders Under Floor Shear Wall Hold Downs Walls Roof Ceiling Drywall (Interior Braced Panel Only) T -Bar INSULATION: Slab Wall Floor Ceiling MECHANICAL. Heat Pump Furnace FAU Ducts Rough -In Gas Line Wood Stove Pellet Chimney Commercial Hood Ducts MANUFACTURED HOMES. Footing Slab Blocking Hold Downs Skirting PLEASE PROVIDE A MINIMUM 24 -HOUR NOTICE FOR INSPECTIONS Building Inspections 417 4815 Electrical Inspections 417 4735 Public Works Utilities 417 4831 Backflow Prevention Inspections 417 4886 Date Accepted By PLANNING DEPT Separate Permit #s SEPA. Parking Lighting 1 ESA. Landscaping 1 SHORELINE. FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/ USE Inspection Type Electrical 417 -4735 Construction R.W PW Engineering 417 -4831 Fire 417 -4653 Planning 417 -4750 Building 417 -4815 T:Forms /Building Division /Building Permit Comments FINAL Date Accepted by FINAL Date Accepted by Date Accepted By 4 T:FormsBuilding Division/Building Permit CITY OF PORT ANGELES DEPARTMENT OF COMMUNITY ECONOMIC DEVELOPMENT BUILDING DIVISION 321 EAST 5TH STREET PORT ANGELES, WA 98362 Application Number Application pin number 09 00000826 089658 Page 2 Date 8/17/09 Qty Unit Charge Per Extension 1 00 7 0000 EA PL -WATER LINE 7 00 1 00 15 0000 EA PL SEWER LINE 15 00 Other Fees STATE SURCHARGE 4 50 Fee summary Charged Paid Credited Due Permit Fee Total 365 25 365 25 00 00 Plan Check Total 135 04 135 04 00 00 Other Fee Total 4 50 4 50 00 00 Grand Total 504 79 504 79 00 00 Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the last inspection I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. Date Print Name Signature of Contractor or Authorized Agent Signature of Owner (if owner is builder) BUILDING PERMIT INSPECTION RECORD o .s> PLEASE PROVIDE A MINIMUM 24 -HOUR NOTICE FOR INSPECTIONS Building Inspections 417 4815 Electrical Inspections 417 4735 OQ Public Works Utilities 417 4831 Backflow Prevention Inspections 417 4886 IT UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED POST PERMIT IN CONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE. Inspection Type Date Accepted By Comments FOUNDATION Footings Stemwall Foundation Drainage Downspouts Piers Post Holes (Pole Bldgs PLUMBING Under Floor Slab Rough -In Water Line (Meter to Bldg) Gas Line Back Flow Water AIR SEAL. Walls Ceiling FRAMING Joists Girders Under Floor Shear Wall Hold Downs Walls Roof Ceiling Drywall (Interior Braced Panel Only) T -Bar INSULATION. Slab Wall Floor Ceiling MECHANICAL. Heat Pump Furnace FAU Ducts Rough -in Gas Line Wood Stove Pellet Chimney Commercial Hood Ducts MANUFACTURED HOMES. Footing Slab Blocking Hold Downs Skirting T:Forms /Building Division /Building Permit Inspection Type Electrical 417 -4735 Construction R.W PW Engineering 417 -4831 Fire 417 -4653 Planning 417 -4750 Building 417 -4815 PLANNING DEPT Separate Perrnit #s SEPA. Parking Lighting 1 ESA. Landscaping 1 SHORELINE. FINAL Date Accepted by FINAL Date FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/ USE Accepted by Date Accepted By )1 Yet 12 +22.— lU w S BUILDING PERMIT APPLICATION Print in ink CITY OF PORT ANGELES For City Use O IBC, Attn Building Permit Technician Date Received 321 E. Fifth St. Port Angeles WA 98362 Permit d9 $2( (360) 417 -4815 fax (360) 417 -4711 Date Approved -1.■$' 1f9 Applicant Pore.lcl t Ord Phone 360 `f Property Owner r�u l( bic 44/ Phone�co•- 1- a(.54. Property Owner's Address 536 t C' 7' ijr Por r Awile5 wed M2g1_ Contractor !ie t CK5 Co L'5 Y Phone Contractor's Address h' 14 Pao-- rlfs bv 3‘_ License C -1 4f Cr) Expiresf ,3o --`'../0 E -mail PROJECT ADDRESS 534, (w ems' 1` 11P for A- 4 r'5 Lj A '93 Proiect Tvoe &.Brief Des Check all that apply New Construction ❑Addition Remodel Repair Demolition Re -roof Heat System Other Floor Areas Parcel Number Basement 1 Floor 2 Floor 3rd Floor Garage Carport Covered Porch Deck Shed Other cription. :C /u57R f/ 4 j STJ ti t° House garage other tear off re -roof lay over one layer Heat pump wood burning stove gas fireplace pellet stove other Existing (sq. ft.) Posed (sq. ft.) tr (Ai d F Total footprint of structures sq ft. T Lot size Site Coverage= the amount of impervious surface on a parcel including, structures paved'driveways sidewalks and other impervious surfaces. (see PAMC 17 94 135 for exemptions) Site coverage Max. height of proposed structures ft. Occupancy group Will a lawn sprinkler system be installed? Occupant load Will a fire sprinkler system be installed? Construction type Lot Zoning X Residential Multi family b Commercial d Industrial per sq ft. TOTAL VALUATION of bedrooms of full baths of half baths I, (co sq ft-. Lot coverage patios 3 I have read and completed this application and know it 'to be true and. correct. t am authorized to apply for this permit and understand that it is my responsibility to determine whatpermits are required, and to obtain permits prior to wo 'ng o prof Date8 /a /O 6 1 Print Name eo if-44 ci Ct €')dr' C45 Signature T Forms /Building Division /Bide Permit.doc i I i hpprovai uate q Cts 7 C i, I z e n 7 e TT c■ cC7C3_ g sJ FItE 0 f3v-- J CITY OF PORT ANGELES Construction Plena he4ssuence -of -this- permit based upon- these- plans,•speCi cations and other data shall not prevent the building official from thereafter requiring the correction of errors in said plans, specifications and other data, or rrom preventing building operations being carried on thereunder when in viotation of°atl- codes and- ordinanees -of- this- }urisdiction. -12 F