Subject: Electric Service to 4 Lots
Preliminary Cost Estimate
N GELES
The estimated cost of labor and materials to provide electrical service for the
4Lot Plat is $2 966 40
This estimate is good for 180 days and is subject to change as your company
provides additional information
The customer /developer will be responsible for the followina.
321 EAST FIFTH STREET P 0 BOX 1150 PORT ANGELES WA 98362 -0217
PHONE 360-417 4805 FAX 360 -417 4542 TTY 360 -417 4645
E MAIL publicworks @cityofpa us
1) Surveying and staking the property Clearing grading and bringing the
area to final grade before installation of the electrical facilities.
2) Easements as required via the Planning Department for placement of
the transformer vaults /pedestals guy wire /anchor and conduit routes
3) Providing a 24/7 all- season road for maintenance
4) Trenching backfilling and restoration of the entire job
The primary cable trench must be a minimum of forty -seven (47
inches deep trench twenty -four (24') inches wide The trench must
meet the requirements of
WAC Chapter 296 -155N "Excavation. Trenching and Shoring
The service cable trench(es) must be a minimum of thirty -three (33')
inches deep and eighteen (18 inches wide from the
transformer /secondary pedestal(s) to the meter location
All excavated material shall be placed no closer than two (2) feet from
the back edge of the excavation and any excavation over forty -seven
(47) inches in depth will need shoring
Backfill and compaction will be in accordance with Spec# UM 0 01 -S
3,5) Coordination with Qwest, Capacity Provisioning and WAVE Broadband
for installation of their equipment. They may share the trench with the
electrical facilities
6) Installation and future maintenance of the underground cable' in
conduit from the secondary pedestal(s) to the meter base(s).
7) All required permits (Trenching in the R/W, Electrical, etc.)
8) Payment of $2,966 40
The City will be responsible for the following.
1) Providing and installing the transformer vault(s), secondary pedestal(s)
and associated equipment.
2) Pulling in and terminating the primary cable(s) and street light wire
3) Providing and installing the electric meter(s).
If the actual cost of construction exceeds the estimated amount, there will be no
further billing If the cost is less than the estimate, the difference will be refunded
to you
Work will be scheduled in five (5) to six (6) weeks after the receipt of the payment
for $2,966 40 This allows for engineering design, scheduling the City Light crews
and the requisitioning of materials
If you have any questions or concerns, feel free to contact me.
Sincere)
J n G Hebner
Electrical Engineering Specialist
ihebner(a citvofoa.us
360.417 4706
Cc: James Harper Electrical Engineering Manager
AI Oman, Electrical Inspector
Roger Vess, Permit Tech
File
Attachments: 5