Loading...
HomeMy WebLinkAboutMcDougal St - BuildingDecember 6, 2004 Dear Mike RT W A S H I N G T O N U S A PUBLIC WORKS UTILITIES DEPARTMENT Mike Adamich C/o Adamich Construction 810 Church Ave Port Angeles, WA. 98362 Subject: Electric Service to 4 Lots Preliminary Cost Estimate N GELES The estimated cost of labor and materials to provide electrical service for the 4Lot Plat is $2 966 40 This estimate is good for 180 days and is subject to change as your company provides additional information The customer /developer will be responsible for the followina. 321 EAST FIFTH STREET P 0 BOX 1150 PORT ANGELES WA 98362 -0217 PHONE 360-417 4805 FAX 360 -417 4542 TTY 360 -417 4645 E MAIL publicworks @cityofpa us 1) Surveying and staking the property Clearing grading and bringing the area to final grade before installation of the electrical facilities. 2) Easements as required via the Planning Department for placement of the transformer vaults /pedestals guy wire /anchor and conduit routes 3) Providing a 24/7 all- season road for maintenance 4) Trenching backfilling and restoration of the entire job The primary cable trench must be a minimum of forty -seven (47 inches deep trench twenty -four (24') inches wide The trench must meet the requirements of WAC Chapter 296 -155N "Excavation. Trenching and Shoring The service cable trench(es) must be a minimum of thirty -three (33') inches deep and eighteen (18 inches wide from the transformer /secondary pedestal(s) to the meter location All excavated material shall be placed no closer than two (2) feet from the back edge of the excavation and any excavation over forty -seven (47) inches in depth will need shoring Backfill and compaction will be in accordance with Spec# UM 0 01 -S 3,5) Coordination with Qwest, Capacity Provisioning and WAVE Broadband for installation of their equipment. They may share the trench with the electrical facilities 6) Installation and future maintenance of the underground cable' in conduit from the secondary pedestal(s) to the meter base(s). 7) All required permits (Trenching in the R/W, Electrical, etc.) 8) Payment of $2,966 40 The City will be responsible for the following. 1) Providing and installing the transformer vault(s), secondary pedestal(s) and associated equipment. 2) Pulling in and terminating the primary cable(s) and street light wire 3) Providing and installing the electric meter(s). If the actual cost of construction exceeds the estimated amount, there will be no further billing If the cost is less than the estimate, the difference will be refunded to you Work will be scheduled in five (5) to six (6) weeks after the receipt of the payment for $2,966 40 This allows for engineering design, scheduling the City Light crews and the requisitioning of materials If you have any questions or concerns, feel free to contact me. Sincere) J n G Hebner Electrical Engineering Specialist ihebner(a citvofoa.us 360.417 4706 Cc: James Harper Electrical Engineering Manager AI Oman, Electrical Inspector Roger Vess, Permit Tech File Attachments: 5