Loading...
HomeMy WebLinkAbout900 Milwaukee Dr - BuildingRaces Application Number Application pin number Property Address ASSESSOR PARCEL NUMBER Tenant nbr name Application type description Subdivision Name Property Use Property Zoning Application valuation Owner CITY OF PORT ANGELES PO BOX 1150 PORT ANGELES Permit Additional desc Permit pin number Permit Fee Issue Date Expiration Date Fee summary Permit Fee Total Plan Check Total Grand Total T•\Policies \1102.15R [1/051 WA 983620217 RIGHT OF WAY 4 POWER CROSSINGS 83048 00 7/21/06 1/17/07 CITY OF PORT ANGELES PUBLIC WORKS UTIL1'1ThS DIVISION 321 EAST 3TH STREET PORT ANGELES, WA 98362 06 00000797 587091 900 8 MILWAUKEE DR R6 30 00 0 0-0000 0000 LIGHT DIVISION PUBLIC WORKS UTILITES UNKNOWN 0 Contractor OWNER Plan Check Fee Valuation Charged Paid Credited 00 00 00 00 00 00 00 00 00 Date 7/21/06 Due 00 00 00 00 0 Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned for a period of 180 days after the work as commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances goveming this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. Signature of Contractor or Authorized Agent Date Signature of Owner (if owner is-builder) Date CALL 417 -4807 FOR UTILITY INSPECTIONS. PLEASE PROVIDE A MINIMUM 24 HOUR NOTICE. IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT IN A CONSPICUOUS LOCATION. PW UTILITIES (Engineering Division) WATERLINE METER SEWER CONNECTION SANITARY STORM SITE DRAINAGE SITE EROSION CONTROL PARKING SIDEWALK CURB GUTTER DRIVEWAY APPROACH BACK -FLOW DEVICE CONSTRUCTION RW PW/ 417 -4807 ENGINEERING FIRE 417 -4653 PLANNING DEPT. 417 -4750 BUILDING 417.4815 T•\Policies \1102.15R (1/05] RESIDENTIAL PERMIT INSPECTION RECORD KEEP PERMIT CARD AND APPROVED PLANS AT JOB SITE INSPECTION TYPE DATE ACCEPTED YES 1 NO 1 1 1 1 1 1 1 1 1 1 .1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE DATE YES NO COMMERCIAL DATE ACCEPTED YES 1 NO 1 1 1 1 1 1 1 1 CONSTRUCTION RW PW ENGINEERING 1 FIRE DEPT 1 PLANNING DEPT BUILDING COMMENTS 1 1 1 1 1 1 1 1