Loading...
HomeMy WebLinkAbout000104 Original ContractCI El El Project: WW -11 -036 City of Port Angeles Public Works Utilities Dept Operations Office 1703 South B Street Port Angeles WA 98362 Tel: 360 417 -4541 Fax: 360 452 -4972 LIMITED PUBLIC WORKS PROCESS Request for Quotation Contract Contract Title: Sanitary Sewer System Cleaning Videoinq Project Number: WW -11 -036 THIS CONTRACT is entered into the date last below written between the CITY OF PORT ANGELES, WASHINGTON "CITY AND Pacific Concrete Services "Contractor 1. WORK BY CONTRACTOR The Contractor shall perform the work as described in Attachment "A" (Attachment "A" may include Contractor's Proposal, Scope of Work, Statement of Work, Plans, Specifications, and any other related Contract Documents) which is attached hereto and by this reference is incorporated herein. 2. TERM OF CONTRACT All work under this Contract is to be completed as indicated (check one): All work under this Contract is to be completed by this date: All work under this Contract is to be completed within 30 days from the Notice to Proceed on each work phase issued under this contract. No work is to be performed prior to written Notice to Proceed by the City. The overall performance period for this contract is 6 months from the date of award. The performance period under this Contract commences calendar days after notice to proceed and ends (xx days thereafter or after contract award). 3. PAYMENT A. The City shall pay the Contractor for the work performed under this contract (check one): Force Account Time and material, not to exceed: Force Account Time and actual expenses incurred, not to exceed: Force Account Unit prices set forth in the Contractor's bid or quote, not to exceed: 35,000 Firm Fixed Price set forth in Contractor bid or quote in the amount of: The Contractor shall do all work and furnish all tools, materials, and equipment, in accordance with and as described in the Attachment "A The Contractor shall provide and bear the expense of all equipment, work and labor of any sort whatsoever that may be required for the transfer of materials and for constructing and completing the work provided for in this contract and every part thereof; except as are mentioned in the specifications to be furnished by the City of Port Angeles. B. The Contractor shall maintain time and expense records, which may be requested by the City. The contractor shall submit invoices to the City for payment for work performed. All invoices must reference the City's contract number. Invoices shall be in a format acceptable to the City. C. The City shall pay all invoices from the Contractor by mailing a City warrant within 30 days of receipt of a properly completed invoice. Page 1 Rev. 8/30/2011 f D. records and accounts pertaining to this Contract are to be kept available for inspections by representatives of the City for a period of three (3) years after final payment. Copies shall be made available to the City upon request. E. If during the course of the Contract, the work rendered does not meet the requirements set forth in the Contract, the Contractor shall correct or modify the required work to comply with the requirements of this Contract. The City shall have the right to withhold payment for such work until it meets the requirements of the Contract Documents. 4. RESPONSIBILITY OF CONTRACTOR A. Safety. Contractor shall take all necessary precautions for the safety of employees on the work site and shall comply with all applicable provisions of federal, state and local regulations, ordinances and codes. Contractor shall erect and properly maintain, at all times, as required by the conditions and progress of the work, all necessary safeguards for the protection of workers and the public and shall post danger signs warning against known or unusual hazards. B. Correction of Defects. Contractor shall be responsible for correcting all defects in workmanship and /or materials discovered within one year after acceptance of this work. When corrections of defects are made, Contractor shall be responsible for correcting all defects in workmanship and /or materials in the corrected work for one year after acceptance of the corrections by the City. The Contractor shall start work to remedy such defects within seven (7) days of mailing notice of discovery thereof by City and shall complete such work within a reasonable time. In emergencies where damage may result from delay or where loss of service may result, such corrections may be made by the City, in which case the cost shall be borne by the Contractor. In the event the Contractor does not accomplish corrections at the time specified, the work will be otherwise accomplished and the cost of same shall be paid by the Contractor. C. Warranty. Contractor shall be liable for any costs, losses, expenses or damages including consequential damages suffered by the City resulting from defects in the Contractors work including, but not limited to, cost of materials and labor expended by the City in making emergency repairs and cost of engineering, inspection and supervision by the City. The Contractor shall hold the City harmless from any and all claims which may be made against the City as a result of any defective work and the Contractor shall defend any such claims at its own expense. Where materials or procedures are not specified in the Contract Document, the City will rely on the professional judgment of the Contractor to make appropriate selections. D. Nondiscrimination /Affirmative Action. Contractor agrees not to discriminate against any employee or applicant for employment or any other persons in the performance of this Contract because of race, creed, color, national origin, marital status, sex, age or handicap, or other circumstances as may be defined by federal, state or local law or ordinance, except for a bona fide occupational qualification. Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided by Contractor setting forth the provisions of the nondiscrimination clause. E. Employment. Any and all employees of the Contractor, while engaged in the performance of any work or services required by the Contractor under this Contract, shall be considered employees of the Contractor only and not of the City. Any and all claims that may arise under the Workers Compensation Act on behalf of said employees, while so engaged, and all claims made by a third party as consequence of any negligent act or omission on the part of the Contractor's employees, while so engaged on any of the work or services provided or rendered herein, shall not be the obligation of the City. 5. COMPLIANCE WITH LAWS The Contractor shall comply with all federal, state and local laws and regulations applicable to the work done under this Contract. Any violation of the provisions of this paragraph shall be considered a violation of a material provision of this Contract and shall be grounds for cancellation, termination or suspension of the Contract by the City, in whole or in part, and may result in ineligibility for further work for the City. Project: WW -11 -036 Page 2 Rev 8/30/2011 6. TERMINATION OF CONTRACT A. This Contract shall terminate upon satisfactory completion of the work described in Attachment "A" and final payment by the City. B. The City may terminate the Contract and take possession of the premises and all materials thereon and finish the work by whatever methods it may deem expedient, by giving 10 days written notice to the Contractor, upon the occurrence of any one or more of the events hereafter specified. 1. The Contractor makes a general assignment for the benefit of its creditors. 2. A receiver is appointed as a result of the insolvency of the Contractor. 3. The Contractor persistently or repeatedly refuses or fails to complete the work required herein. 4. Contractor fails to make prompt payment to subcontractors for material or labor. 5. Contractor persistently disregards federal, state or local regulations and ordinances. 6. Contractor persistently disregards instructions of the Contract Administrator, or otherwise substantially violates the terms of this Contract. 7. The City determines that sufficient operating funds are not available to fund completion of the work contracted for. C. In the event this Contract is terminated by the City, Contractor shall not be entitled to receive any further amounts due under this Contract until the work specified in Attachment "A" is satisfactorily completed, as scheduled, up to the date of termination. At such time, if the unpaid balance of the amount to be paid under this Contract exceeds the expense incurred by the City in finishing the work, and all damages sustained by the City or which may be sustained by reason of such refusal, neglect, failure or discontinuance of employment, such excess shall be paid by the City to the Contractor. If the City's expense and damages exceed the unpaid balance, Contractor and his surety shall be jointly and severally liable therefore to the City and shall pay such difference to the City. Such expense and damages shall include all legal costs incurred by the City to protect the rights and interests of the City under the Contract, provided such legal costs shall be reasonable. 7. OWNERSHIP OF DOCUMENTS A. On payment to the Contractor by the City of all compensation due under this Contract, all finished or unfinished documents and material prepared by the Contractor with funds paid by the City under this Contract shall become the property of the City and shall be forwarded to the City upon its request. B. Any records, reports, information, data or other documents or materials given to or prepared or assembled by the Contractor under this Contract will be kept confidential and shall not be made available to any individual or organization by the Contractor without prior written approval of the City or by court order. 8. CLAIMS Any claim against the City for damages, expenses, costs or extras arising out of the performance of this Contract must be made in writing to the City within thirty days after the discovery of such damage, expense or Toss, and in no event later than the time of approval by the City for final payment. Contractor, upon making application for final payment, shall be deemed to have waived its right to claim for any other damages for which application has not been made, unless such claim for final payment includes notice of additional claim and fully describes such claim. 9. GENERAL ADMINISTRATION AND MANAGEMENT The Director of the Public Works and Utilities Department or his /her designee shall have primary responsibility for the City under this Contract and shall oversee and approve all work to be performed, coordinate communications, and review and approve all invoices, under this Contract. 10. HOLD HARMLESS A. The Contractor shall protect, defend, indemnify and save harmless the City, its officers, employees and agents from any and all costs, claims, judgments or awards of damages, arising out of or in any way resulting from the negligent acts or omissions of the Contractor. The Contractor agrees that its obligations under this subparagraph extend to any claim, demand, and /or cause of action brought by, or on behalf of, any of its employees or agents. Project: WW -11 -036 Page 3 Rev. 8/30/2011 For this purpose, the Contractor, by mutual negotiation, hereby waives, as respects the City only, any immunity that would otherwise be available against such claims under the industrial insurance provision of Title 51 RCW. In the event the City obtains any judgment or award, and /or incurs any cost arising therefrom including attorneys' fees to enforce the provisions of this article, all such fees, expenses, and costs shall be recoverable form the Contractor. B. The City shall protect, defend, indemnify and save harmless the Contractor, its officers, employees and agents from any and all costs, claims, judgments or awards of damages, arising out of or in any way resulting from the negligent acts or omissions of the City. The City agrees that its obligations under this subparagraph extend to any claim, demand, and /or cause of action brought by, or on behalf of, any of its employees or agents. For this purpose, the City, by mutual negotiation, hereby waives, as respects the Contractor only, any immunity that would otherwise be available against such claims under the industrial insurance provision of Title 51 RCW. In the event the Contractor obtains any judgment or award, and /or incurs any cost arising therefrom including attorneys' fees to enforce the provisions of this article, all such fees, expenses, and costs shall be recoverable from the City. 11. INSURANCE The Contractor shall maintain insurance as set forth in Attachment B. 12. PREVAILING WAGE This Contract is subject to the requirements of Chapter 39.12 RCW, and as it may be amended, relating to prevailing wages. On Public Works projects, funded in part or in whole with Federal funds, Federal wages laws and regulations shall also be applicable. NO WORKER, LABORER OR MECHANIC EMPLOYED IN THE PERFORMANCE OF ANY PART OF THIS CONTRACT SHALL BE PAID LESS THAN THE PREVAILING RATE OF WAGE as determined by the Industrial Statistician of the Department of Labor and Industries for the State of Washington. The schedule of prevailing wage rates for this Contract is made a part of this contract as though fully set forth herein. Prior to making any payment under this Contract, the City must receive an approved copy of the "Statement of Intent to Pay Prevailing Wages on Public Works Contracts" from the Department of Labor and Industries. It is the Contractor's responsibility to obtain and file the "Statement of Intent to pay Prevailing Wage The Contractor shall be responsible for all filing fees. Each invoice shall include a signed statement that prevailing wages have been paid by the Contractor and all subcontractors. Following the final acceptance of services rendered, Contractor shall submit an "Affidavit of Wages Paid For a contract award or an on -call contract work order under $2,500, and in accordance with RCW 39.12.040(2), the contractor or subcontractor is authorized to submit a combined Statement Of Intent To Pay Prevailing Wages Affidavit Of Wages directly to the City of Port Angeles at final invoicing. Submission shall be made on the form developed by the Washington State Department of Labor and Industries and available from the City of Port Angeles Public Works and Utilities Department. In case any dispute arises as to what are the prevailing rates of wages for a specific trade, craft or occupation and such dispute cannot be adjusted by the parties in interest, including labor and management representatives, the matter shall be referred for arbitration to the Director of the Department of Labor and Industries, and his decision shall be final, conclusive, and binding on all parties involved in the dispute. 13. INTERPRETATION AND VENUE This Contract shall be interpreted and construed in accordance with the laws of the State of Washington. The venue of any litigation between the parties regarding this Contract shall be Clallam County, Washington. 14. BRANDS OR EQUAL When a special "brand or equal" is named it shall be construed solely for the purpose of indicating the standards of quality, performance, or use desired. Brands of equal quality, performance, and use shall be considered, Project: WW -11 -036 Page 4 Rev 8/30/2011 provided Contractor specifies the brand and model and submits descriptive literature when available. Any bid containing a brand which is not of equal quality, performance, or use specified must be represented as an alternate and not as an equal, and failure to do so shall be sufficient reason to disregard the bid. 15. INSPECTION AND REJECTION All goods, services, work, or materials purchased herein are subject to inspection and to approval by the City. Any rejection of goods, services, work, or materials resulting because of nonconformity to the terms and specifications of this order, whether held by the City or returned, will be at Contractor's risk and expense. 16. SUBLETTING OR ASSIGNING OF CONTRACTS Neither the City nor the Contractor shall assign, transfer, or encumber any rights, duties or interest accruing from this Contract without the express prior written consent of the other. 17. INDEPENDENT CONTRACTOR The Contractor is and shall be at all times during the term of this Contract an independent contractor and not an employee of the City. 18. EXTENT OF CONTRACT /MODIFICATION This Contract, together with the attachments and /or addenda, represents the entire and integrated Contract between the parties hereto and supersedes all prior negotiations, representations, or agreements, either written or oral. This contract may be amended, modified or added to only by written instrument properly signed by both parties hereto. 19. SUBCONTRACTOR RESPONSIBILITY A. The Contractor shall include the language of this section in each of its first tier subcontracts, and shall require each of its subcontractors to include substantially the same language of this section in each of their subcontracts, adjusting only as necessary the terms used for the contracting parties. The requirements of this section apply to all subcontractors regardless of tier. B. At the time of subcontract execution, the Contractor shall verify that each of its first tier subcontractors meets the following bidder responsibility criteria: At the time of subcontract bid submittal, have a certificate of registration in compliance with chapter 18.27 RCW; Have a current state unified business identifier number; If applicable, have: Industrial insurance coverage for the subcontractor's employees working in Washington as required in Title 51 RCW; An employment security department number as required in Tile 50 RCW; and A state excise tax registration number as required in Tile 82 RCW; An electrical contractor license, if required by Chapter 19.28 RCW; An elevator contract license, if required by Chapter 70.87 RCW. Not be disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065(3). Project: WW -11 -036 Page 5 Rev. 8/30/2011 IN WITNESS WHEREOF, the parties have executed this Contract as of d i y 70�Z PACIFIC CONCRETE SERVICES By: Printed Name: let L S j4/,q-,et Title: 4 E/t' 4 L- MA-A111-66.4_ Address: 2-6 ZZ0 7 9 7- X V. S- CITY OF PORT ANGELES By: Printed Name: 1< Title: C City: KE/V r WA- y'e'a 3 2_ APPROVED AS TO FORM: Tax ID 9/- 7 -/22- Phone Number: ZS3 S,6 ZS L Project: WW 11 036 BY: CITY ORNEY ATTEST: BY: Purchase Order Page 6 Rev. 8/30/2011 City of Port Angeles Operations Office Public Works and Utilities Department 360 417 -4541 ATTACHMENT "A" WORK BY CONTRACTOR The contractor shall do all work and furnish all tools, materials, and equipment in order to accomplish the project described below. Unless otherwise provided for in the Statement of Work, the Contractor will be responsible for obtaining and paying for any and all permits required for this work. General Scope: The intent of this contract is for sewer line cleaning to remove foreign materials from the lines to facilitate the use and to perform sewer line video equipment for sewer line inspection, and to restore the sewer line to a minimum of 95% of the original carrying capacity. This contract is an indefinite quantity indefinite delivery contract with the expectation of executing all work on either two or three separate work phase letters. The minimum ordering size for any individual work phase will be $10,000 or greater based on the unit priced line items bid in the contract. The City will provide map sheets for informational purposes with each work phase. Location: Port Angeles, Washington. Background: The wastewater collection system in Port Angeles includes various diameters of clay, CMP, concrete, HDPE, and PVC lines. The older areas are predominantly concrete and clay, much of it dating back to the 1920's era. The focus of this contract will be the concrete pipe; however, some of the other types may also be cleaned or inspected. The areas being cleaned and inspected are combined sewer systems, so periodically are flushed by inflow from stormwater sources. Consequently, accumulations of debris are often flushed out of the system. The primary focus of this contract will be the Francis Basin wastewater collection system; however, some selected work may be done in other areas. Project Manager: Jeff Young, Wastewater Superintendent at 360 417 -4845 or Mike Szatlocky, Civil Engineer at 360 417 -4808. Work Hours and Schedule: The contractor will be allowed to work from 7:00 AM to 5:00 PM, Monday through Friday. Work outside of these hours may be requested from and is at the discretion of the Site Point of Contact. Construction Schedule and Preconstruction Conference: The contractor shall arrange with the project manager for a preconstruction conference as soon as practical after being awarded the contract. All relevant supervisory personnel in charge of the operation of the contractor and subcontractors shall be made available to attend this meeting. The contractor is urged to submit a list of agenda items to discuss, along with the construction schedule prior to this meeting. Approval of this schedule by the city will be required prior to the beginning of construction. The contractor shall provide a traffic control plan for the safety of job sites in the right of -way to the project manager. Traffic Control: The Contractor shall provide traffic control necessary to complete these services. The Contractor shall follow all City of Port Angeles and the current Washington State Department of Transportation's Standard Specifications for Road, Bridge and Municipal Construction referred to herein as the Standard Specifications, as well as all conditions called out on the Right -of -Way Use Permit and by the Right -of -Way Use official. Confined Space Entry: The contractor shall comply with all requirements and have all necessary equipment for confined space entry. The contractor is referred to Title 296 -62 WAC and any other applicable laws. Payment for any equipment or labor to meet confined space entry codes will be considered incidental to the project and no separate payment will be made. The contractor shall provide documentation or proof of contractor ability to comply with confined space requirements outlined in the above WAC provisions prior to beginning work. Project: WW -11 -036 Page 7 Rev. 8/30/2011 Final Acceptance: Final acceptance of the sewer line cleaning shall be made upon the successful completion of the television inspection and shall be to the satisfaction of the project manager. Work Requirements: 1.0 CLEANING A. The Contractor shall select the cleaning equipment and method for cleaning based on the age, the material, and the probable condition of the sewer. More than one type of equipment or attachments may be required on a single reach or at a single location. The Contractor shall not damage the sewer or any manhole during cleaning. B. When requested by the Project Manager, the Contractor shall demonstrate the performance capabilities of the cleaning equipment and method proposed for use. If results obtained by the demonstration are not satisfactory, the Contractor shall select other methods or equipment that will clean the sewer line, and shall perform another demonstration. C. For water pressure deaning equipment, the Contractor shall install a gauge to monitor working pressure on the discharge of high pressure water pumps. D. The Contractor shall remove dirt, debris, roots, rags, solids, and grease from the entire dreumference of the sewer between manholes. E. All excessive sediments shall be removed by the Contractor from catch basins and manholes encountered during deaning. F. Acceptance of sewer cleaning work is contingent upon the successful completion of the video inspection. If video inspection shows debris, solids, sand, grease, or grit remaining in the line, the cleaning will be considered unsatisfactory, and the Contractor shall repeat cleaning and televising of the sewer line at no increased cost to the City until cleaning is acceptable to the Project Manager. G. The Contractor shall remove sludge, dirt, sand, rocks, grease, roots, and other solid or semisolid material resulting from the cleaning operation at the downstream manhole of the section being cleaned. A suitable sand trap, weir, dam, or suction in the next downstream manhole shall be installed so that solids and debris are trapped for removal. Passing debris from one sewer section to any other sewer section shall not be allowed. Debris from the manholes shall be loaded into a leak proof, enclosed container that is permitted by applicable regulations for liquid waste hauling. All solids or semi -solid wastes shall be removed from the Site at the end of each work day. Debris, liquid waste, or sludge shall not accumulate at the Site. H. The Contractor shall dispose of waste debris using a licensed waste transporter to a location licensed for the type of waste involved. Debris resulting from cleaning may be disposed of into one of the two 25 yard Flo -trend decant boxes located at the City of Port Angeles Transfer Station at 3501 W. 18 Port Angeles, WA. Contractor must first decant the majority of the fluid with their jet truck prior to transferring debris to the decant boxes. Liquids may be returned to the next manhole on site or at the oil water separator at the Transfer Station decant facility. These two decant boxes will be dedicated for the use of this project and disposal fees in those boxes by the City shall be waived. Note that these decant boxes require decant time and process cycle time. If boxes are filled to capacity and are unavailable, Contractor shall make other arrangements for disposal at Contractor cost. Arrangements for disposal shall be coordinated through the Project Manager. I. Water for cleaning operations is available from various City hydrants at no cost to the Contractor provided that Contractor maintains sanitary procedures and an inventory of water obtained, providing Project: WW -11 -036 Page 8 Rev. 8/30/2011 that figure (gallons used) to the Project Manager at the end of the work phase. All connections shall have a backflow safety device approved by the City's Water Utility. The Water Utility can be contacted at 360- 417 -4855 or coordinated through the Project Manager. 2.0 VIDEO INSPECTION A. Equipment operators must be certified in NASSCO Standards (or equivalent). B. Depth of flow shall not exceed twenty percent (20 of the inside pipe diameter as measured in the manhole when performing video inspection. In the event the depth of flow of the reach being televised exceeds twenty percent (20 of the inside pipe diameter, the Contractor shall provide the necessary flow control or reschedule the inspection for a time when such flow is reduced to permit proceeding with the work. If nighttime work is necessary, the Contractor shall obtain a "Noise Exception Permit" from the City if noise levels are expected to exceed permitted thresholds during quiet hours. C. Video equipment shall include a multi -angle television camera capable of spanning 360 degrees circumference and 270 degrees on horizontal axis to televise sewer lines 6 -inch diameter or larger; the purpose of the rotating head camera is to view all service connections, upstream and downstream manhole structures, and to locate all defects, as well as questionable problem areas; focal distance shall be adjustable through a range of one (1) inch to infinity. The television camera shall be color format and specifically designed and constructed for operation in connection with sewer inspection, and for operation in sewers under 100% humidity conditions. Lighting and camera quality shall produce a clear, in -focus picture of the entire periphery of the pipe for a minimum distance of six feet. Other required equipment are television monitor, cables, power sources, lights, and other equipment necessary to do the work. D. A full 360 degree pan of all manholes is required. This video footage shall occur at the beginning of each pipe segment survey inspection from the bottom of the manhole panning up the manhole shaft. The Contractor shall cover the manhole opening to prevent too much light from entering the structure and to ensure a clear and focused view of the manhole interior. In instances when the manhole is the terminating manhole, then the pan shall occur at the end of the pipe segment survey inspection. E. The camera shall be moved through the pipeline in either direction at a uniform rate, stopping when necessary to ensure proper documentation of the sewer's condition. In no case shall the television camera be pulled or propelled at a speed greater than thirty (30) feet per minute. The camera height shall be adjusted such that the camera lens is always centered in the pipe being inspected. The equipment shall have an accurate footage counter, which shall display on the monitor the exact distance of the camera from the centerline of the starting manhole. Unless otherwise approved by the Engineer, footage measurements shall begin at the centerline of the upstream manhole. F. If videotaping must be stopped due to a blockage in pipe that requires further cleaning, the end product provided to the City shall be video of the continuous run of the pipe after cleaning. Lines with blockages or defects that cannot be cleared shall be video inspected from each end of the pipe section. G. In the event the video operator observes significant conditions showing existing pipe failure or imminent failure, a photograph of the defect shall be taken and the Project Manager will be notified within 24 hours. H. The date, identification of sewer reach(es) by upstream and downstream manhole numbers, and manhole to manhole footage shall be displayed on the video data view at all times. Each recording shall be permanently labeled with the Contractor's name, date televised, project name, street name(s), identification of the sewer reach(es) inspected, and run number. If the recordings are of such poor quality that the Engineer is unable to evaluate the condition of the sewer, locate sewer service connections, or verify cleaning, the Contractor shall re- televise the sanitary sewer and provide a new recording of good quality at no cost to the City. No payment will be made for recordings that do not meet the requirements of these specifications. Project: WW -11 -036 Page 9 Rev. 8/30/2011 I. Video inspection Togs furnished by the Contractor shall be typed or printed as a computerized report. The Engineer will provide the log format, or a sample copy may be submitted for approval. Data of significance includes the locations of service connections, types of upstream and downstream manhole structures, and any pipe defects. 3.0 DOCUMENTATION OF VIDEO INSPECTION A. The Contractor shall provide the video results in a DVD (Windows Media Player) or USB drive compatible with City computer systems. The defects shall be listed by structure, grid number, include the distance away from the structure, a verbal description of said defect, and a severity rating. The structure grid number is obtained from inventory maps provided by the City upon award of contract. Include is videoing of each tap. The following images depict the quality and information display that would typically comply with the requirement described in this section of the contract for documentation purposes. Close -up of Defect 2007 10 01 13: 59 L3rrC35 _?r S tar' t;:1029 -4051, r`; 10?E 009 DIP :lifstream Of T 'MS 'Roots Me d r arm Sarre I 8 Ottr i 'Je-d tlav Perspective View (looking down the pipe at the defect) 200710 01 Start :1829-0 0 1r':IUpst're2m SOFT HV Lar!C35 t Errd:1820 -0049 8 i c *r S: z��tav 270.Stt Project: WW -11 -036 Page 10 Rev 8/30/2011 Image of each tap 20.07 10 '02 Start; 1028 -00S1 Oir:[Icwnstream 0 E1- SEMENT- 11.55 TEC TaG =ac tory r, appe j 8 Vitrified C IaV Larcasttr 7nd :1628 -GO4S 201.Sft Section Header Running Screen Text t aart Br2r8 Oir] 0�1 Y D 1 r D U lll 11rSr 1'.2`,3 m. Page 11 Pipe Rev 8/30/2011 The information shown in the images above is not from Port Angeles, but depicts the type of information and videoing expected to be captured. The Contractor's specific video documentation system may vary from this, but must substantially be able to provide this information on screen. B. The software for condition assessment must be compatible to Microsoft Windows XP operating system and approved by the City prior to being allowed to commence work. C. Digital Format The contractor shall have the digital capabilities using a MPEG format (or equivalent). All MPEG files shall also have a reference number shown on written reports for easy retrieval of defects. D. Audio The audio portion of the composite signal shall be sufficiently free from electrical interference and background noise to provide complete intelligibility of the oral report. Audio reports shall be recorded on video by the operating technician as they are being produced and shall include the location of the pipeline, numbers or the manholes or catchbasins involved direction of travel, pipe dimension, materials, and description of the pipelines as they are encountered. E. A title page will be shown on the video screen at the beginning of each run of pipe. The title page shall include the location of the pipeline, numbers of the manholes or catch basins involved direction of travel, pipe dimensions, and pipe material. F. Reports A written report shall be prepared for each separate pipe run (structure to structure) and shall include a title page and the location or each defect recorded in free from starting structure. Video inspection data shall be logged. The observations from television inspections shall be considered defects and shall be consistently noted in clear and consistent language and event codes. The event code system to be used shall be submitted to the Project Manager for approval. The listing should include a list of the specific codes to be used and the definitional meaning (such as PACP Codes). G. The following examples from jurisdictions outside of Port Angeles are shown as illustrations that depict the type of informational reports required for this contract. The actual reports may vary, but should substantially comply: Summary Table. Project: WW -11 -036 ge. Page 12 Rev. 8/30/2011 Date Start MH Stop MH Total Pipe Length Tot Length Quick maint rate Quick struct rate Section No 1 06 /17/2005 0+00 3 +15 315 314 01 0000 1100 1 2 06/17/2005 3 +15 6 +40 325 322 02 2211 3100 2 3 06/17/2005 6+40 9 +40 300 301.01 0000 0000 3 4 06/17/2005 9+40 12 +00 320 320 99 1300 1300 4 I 1 I 1 I 1 1 I The information shown in the images above is not from Port Angeles, but depicts the type of information and videoing expected to be captured. The Contractor's specific video documentation system may vary from this, but must substantially be able to provide this information on screen. B. The software for condition assessment must be compatible to Microsoft Windows XP operating system and approved by the City prior to being allowed to commence work. C. Digital Format The contractor shall have the digital capabilities using a MPEG format (or equivalent). All MPEG files shall also have a reference number shown on written reports for easy retrieval of defects. D. Audio The audio portion of the composite signal shall be sufficiently free from electrical interference and background noise to provide complete intelligibility of the oral report. Audio reports shall be recorded on video by the operating technician as they are being produced and shall include the location of the pipeline, numbers or the manholes or catchbasins involved direction of travel, pipe dimension, materials, and description of the pipelines as they are encountered. E. A title page will be shown on the video screen at the beginning of each run of pipe. The title page shall include the location of the pipeline, numbers of the manholes or catch basins involved direction of travel, pipe dimensions, and pipe material. F. Reports A written report shall be prepared for each separate pipe run (structure to structure) and shall include a title page and the location or each defect recorded in free from starting structure. Video inspection data shall be logged. The observations from television inspections shall be considered defects and shall be consistently noted in clear and consistent language and event codes. The event code system to be used shall be submitted to the Project Manager for approval. The listing should include a list of the specific codes to be used and the definitional meaning (such as PACP Codes). G. The following examples from jurisdictions outside of Port Angeles are shown as illustrations that depict the type of informational reports required for this contract. The actual reports may vary, but should substantially comply: Summary Table. Project: WW -11 -036 ge. Page 12 Rev. 8/30/2011 Observation Table. Page 1 Other information shall be provided as necessary to clearly associated the infrastructure to the reports. The reports shall be submitted to the City as a Microsoft Excel 2007 spreadsheet. H. All deliverables, either video, audio, electronic files, or documentation shall become the sole property of the City. 4.0 ADDITIONAL RESPONSIBILITIES OF THE CONTRACTOR A. In the event of any Contractor related overflow or interruption /backup of customer service, the Contractor shall immediately notify the Project Manager during normal working hours, or the Wastewater Utility On -Call number 360 461 -0111 or 360 461 -1044, and shall contain and eliminate the overflow. B. The Contractor shall be responsible for any fines levied by others, reimbursement of any agency incurred costs, damage, cleanup, restoration of flow, and any disruption of service costs to customers as a result of the Contractor's work. This is in addition to any and all costs incurred by the customer. C. The Contractor shall respect the rights of property owners, and not enter upon private property without obtaining permission from the owner of the property. D. For manholes located in easements of private property, the Contractor shall provide the resident with 24 -hour advanced notice for easement access prior to entering the property, unless the resident provides immediate permission. Such manholes will be identified in the work phase letter. 5.0 WORK PHASES A. This contract is an indefinite quantity indefinite delivery contract with the expectation of executing all work on either two or three separate phases. The minimum order size for any individual phase will be $10,000 or greater based on the unit priced line items bid in the contract. The performance period for each work phase shall be 30 days. Commencement of each work phase shall be initiated by a notice -to- proceed from the City. B. Work phases will be initiated by a letter to the Contractor from the City Engineer, fully describing the locations of the work to be performed with proper identification of the sewer lines, lengths as determined Project: WW -11 -036 Page 13 Rev. 8/30/2011 Section No Position OC Observation Struct Gr 0 +M Grade 1 4 0 AMH Upstream Manhole, Survey Begins 2 4 0 M WL Water Level, 15 of cross sectional area, from 05 to 07 o'clock 3 4 22 24 TFA Tap Factory Made Active, at 10 o'clock, 6 within 8 inch NO 4 4 38 47 CM Crack Multiple, from 10 to 04 o'clock within 8 inch YES 3 5 4 71 32 TFA Tap Factory Made Active, at 03 o'clock, 6 within 8 inch. NO 6 4 114 58 TFA Tap Factory Made Active, at 03 o'clock, 6 wrthin 8 inch NO 7 4 137 54 TFA Tap Factory Made Active, at 03 o'clock, 6", within 8 Inch NO 8 4 245 94 AMH Downstream Manhole, Survey Ends 9 5 0 AMH Upstream Manhole Survey Begins 10 5 0 MWL Water Level, 15 of cross sectional area, from 05 to 07 o'clock 11 5 10.01 TFA Tap Factory Made Active, at 03 o'clock, 8', within 8 Inch' NO 12 5 51.02 MWM Water Mark 10 of cross sectional area 2 13 5 100.7 TFA Tap Factory Made Active, at 03 o'clock, 6 within 8 inch NO 14 5 115.94 AMH Downstream Manhole, Survey Ends Observation Table. Page 1 Other information shall be provided as necessary to clearly associated the infrastructure to the reports. The reports shall be submitted to the City as a Microsoft Excel 2007 spreadsheet. H. All deliverables, either video, audio, electronic files, or documentation shall become the sole property of the City. 4.0 ADDITIONAL RESPONSIBILITIES OF THE CONTRACTOR A. In the event of any Contractor related overflow or interruption /backup of customer service, the Contractor shall immediately notify the Project Manager during normal working hours, or the Wastewater Utility On -Call number 360 461 -0111 or 360 461 -1044, and shall contain and eliminate the overflow. B. The Contractor shall be responsible for any fines levied by others, reimbursement of any agency incurred costs, damage, cleanup, restoration of flow, and any disruption of service costs to customers as a result of the Contractor's work. This is in addition to any and all costs incurred by the customer. C. The Contractor shall respect the rights of property owners, and not enter upon private property without obtaining permission from the owner of the property. D. For manholes located in easements of private property, the Contractor shall provide the resident with 24 -hour advanced notice for easement access prior to entering the property, unless the resident provides immediate permission. Such manholes will be identified in the work phase letter. 5.0 WORK PHASES A. This contract is an indefinite quantity indefinite delivery contract with the expectation of executing all work on either two or three separate phases. The minimum order size for any individual phase will be $10,000 or greater based on the unit priced line items bid in the contract. The performance period for each work phase shall be 30 days. Commencement of each work phase shall be initiated by a notice -to- proceed from the City. B. Work phases will be initiated by a letter to the Contractor from the City Engineer, fully describing the locations of the work to be performed with proper identification of the sewer lines, lengths as determined Project: WW -11 -036 Page 13 Rev. 8/30/2011 by GIS, diameters, and manholes involved, and GIS map showing the locations. Included will be the unit pricing as bid, extended, and taxes. Upon receipt of the work phase letter, the Contractor shall sign and return one copy acknowledging its receipt. C. The quantities of cleaning needed prior to video inspection and the quantities of inspection may be reduced or increased depending on circumstances determined in the field by the Contractor and the Project Manager; however, all adjustments will be made using the bid unit prices and with no increase to the total maximum value of the work phase. Invoicing on the work phase will be for the actual quantities of work performed. 6.0 SUBMITTALS All submittals are considered incidental to the work performed and shall be included in the unit pricing of the work. Prior to the commencement of work for the first phase, the Contract shall submit the following submittals to the Project Manager for approval. Project: WW 11 036 Sample video of a typical manhole to manhole inspection of a line section with defects and including informational display. Sample reports Actual Event Code listing to be used for this project. Video operator NASSCO certifications Documentation or proof Confined Space Entry requirements. Page 14 Rev. 8/30/2011 City of Port Angeles Operations Office Public Works and Utilities Department 360 -417 -4541 INSURANCE INDEMNITY REQUIREMENTS FOR CONSTRUCTION AND SERVICE CONTRACTS Includes construction and remodeling, janitorial service, tree maintenance, road maintenance, painting, electrical work, plumbing, movers, and on site maintenance agreements. Indemnification Hold Harmless The Contractor shall defend, indemnify and hold the City, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with the performance of this Agreement, except for injuries and damages caused by the sole negligence of the City. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, and volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. It is further specifically and expressly understood that the indemnification provided herein constitutes the Contractor's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement. Insurance ATTACHMENT "B" INSURANCE The Contractor shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees or subcontractors. No Limitation Contractor's maintenance of insurance, its scope of coverage and limits as required herein shall not be construed to limit the liability of the Contractor to the coverage provided by such insurance, or otherwise limit the City's recourse to any remedy available at law or in equity. Minimum Scope of Insurance Contractor shall obtain insurance of the types described below: 1. Automobile Liability insurance covering all owned, non owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. 2. Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, independent contractors, products completed operations, stop gap liability, personal injury and advertising injury, and liability assumed under an insured contract. The Commercial General Liability insurance shall be Project: WW -11 -036 Page 15 Rev. 8/30/2011 endorsed to provide the Aggregate Per Project Endorsement ISO form CG 25 03 11 85 or an equivalent endorsement. There shall be no endorsement or modification of the Commercial General Liability Insurance for liability arising from explosion, collapse or underground property damage. The City shall be named as an insured under the Contractor's Commercial General Liability insurance policy with respect to the work performed for the City using ISO Additional Insured endorsement CG 20 10 10 01 and Additional Insured Completed Operations endorsement CG 20 37 10 01 or substitute endorsements providing equivalent coverage. 3. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. Minimum Amounts of Insurance Contractor shall maintain the following insurance limits: 1. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident. 2. Commercial General Liability insurance shall be written with limits no less than $1,000,000 each occurrence, $2,000,000 general aggregate and $2,000,000 products completed operations aggregate limit. Other Insurance Provision The Contractor's Automobile Liability and Commercial General Liability insurance policies are to contain, or be endorsed to contain that they shall be primary insurance as respect the City. Any insurance, self insurance, or insurance pool coverage maintained by the City shall be excess of the Contractor's insurance and shall not contribute with it. Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best rating of not less than A: VII. E. Verification of Coverage Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the insurance requirements of the Contractor before commencement of the work. F. Subcontractors The Contractor shall have sole responsibility for determining the insurance coverage and limits required, if any, to be obtained by subcontractors, which determination shall be made in accordance with reasonable and prudent business practices. G. Notice of Cancellation The Contractor shall provide the City and all Additional Insureds for this work with written notice of any policy cancellation, within two business days of their receipt of such notice. Project: WW -11 -036 Page 16 Rev. 8/30/2011 H. Failure to Maintain Insurance Failure on the part of the Contractor to maintain the insurance as required shall constitute a material breach of contract, upon which the City may, after giving five business days notice to the Contractor to correct the breach, immediately terminate the contract or, at its discretion, procure or renew such insurance and pay any and all premiums in connection therewith, with any sums so expended to be repaid to the City on demand, or at the sole discretion of the City, offset against funds due the Contractor from the City. Project: WW -11 -036 Page 17 Rev 8/30/2011 Cify of Port Angeles Operations Office Public Works and Utilities Department 360- 417 -4541 See attached listing: ATTACH M ENT "C" PREVAILING WAGE RATES 1. Washington State Prevailing Wage Rates For Public Works Contracts Journey Level and Apprentices, Clallam County, effective December 5, 2011. 2. To access applicable prevailing rate(s) of wages rates for the describe work by trade, use the following Labor and Industries website link: http: /www.lni.wa.gov/ TradesLicensing !PrevWage /WageRates /default.asp 3. A copy of the applicable prevailing wage rates can be obtain by contacting Lucy Hanley at 360 417 -4541 or by email, lhanley @cityofpa.us. A hard copy is available for viewing in person at 1703 South B Street, Port Angeles, WA. 98363. Project: WW -11 -036 Page 18 Rev. 8/30/2011 Eify of Port Angeles Operations Office Public Works and Utilities Department 360 -417 -4541 See attached quote: Project: WW -11 -036 ATTACHMENT "D" QUOTE Page 19 Rev. 8/30/2011 Line Item Description Unit Estimated Quantity Unit Price Extended Price 1 6" Pipe Cleaning LF 1,000 0, 6 0 6 op. 00 2 8" Pipe Cleaning LF 2,000 0.. 6 0 2 0 o, o o 3 10" Pipe Cleaning LF 2,500 0 6 0 re 0.029 4 12" Pipe Cleaning LF 3,250 0 b 0 00 5 15" Pipe Cleaning LF 2,525 0 6 d /3757 0 0 6 18" Pipe Cleaning LF 1,145 D 62 D 68 00 7 21" Pipe Cleaning LF 1,835 0. 6 0 //0/. 0 4 8 24" Pipe Cleaning LF 1,655 h 0 993. 00 9 30" Pipe Cleaning LF 1,337 0. 6 D 50a 20 10 36" Pipe Cleaning' LF 0 0 7 S 6 0 0 11 6" Pipe Videoing_ LF 2,000 D ..5 1 0 0 12 8 "Pibe Videoin• LF 4000 0- S ZZo 0• °O 13 10" Pipe Videoing LF 5,000 0 5- f 2 -75 0 00 14 12" Pi.e Videoin LF 6 500 0 ..r-S 3575: 15 15" Pipe Videoinq LF 5,050 0 Ss" Z777.3 16 18" Pipe Videoing LF 2,290 0 .5"5 1.2-5 17 21" Pipe Videoing LF 3,670 0 .-r 2 d 19,.5'0 18 24" Pipe Videoing LF 3,310 0 MZ0. 6 19 30" Pipe Videoing LF 2,674 p r-s /¢70.70 20 36" Pipe Videoing* LF 0 0 G 5 0. 0 0 12/08/2011 101:18. 25385,95087 JAC PCS QUOTATION FORM SANITARY SEWER SYSTEM CLEANING VIDEOING WW -11 -036 Bidders shall bid on all Bid Items below for a bid to be valid. The bidder hereby bids the following amounts for all work (including labor, equipment, time and materials) required to perform the work in the Statement of Work and this package. Project: WW-11-036 For pricing purposes only) 1. Total Price: Z 317.9V 2 Sales Tax (8.4 Z4 2 87 3. Total Bid: 311,9_2 Page 3 Rev 8/30f2O11 PAGE 04/05 .12/18/2011 19:18 2538595087 4. The bidder hereby acknowledges that it has received Addenda No(s). (Enter "N/ itnone weLe issued) to this Request for Quotation package 5. The name of the bidder submitting this bid and its business phone number and address, to which address all communications concerned with this bid and with the contract shall be sent, are listed below. Any written notices required by the terms of an awarded contract shall be served or mailed to the following address: CQf KAlflfQrmatiO 1. Company Name: P,1t Zdr"ZC. eoNeee __,41eVr t r 2. Address: 7. G 2 Z (I 9 U• S 3. City, State, Zip Code: >kCNT 144 9,4.? Z 4. Phone Number: z fi g Jr6 2,4 2 5. Contractor Registration Number: �f C..,c S 29/ �Q 6.UBINumber:� /L6 7. WA State Industrial Insurance Account Number: 0 /1 00 7 4 8_ WA State Employment Security Dept Number: f 3 A 0 0 9. State Excise Tax Registration Number: Z l 2 Z 99.0 The bidder represents that it is qualified and possesses sufficient skills and the necessary capabilities to perform the services set forth in this Contract. Signed by Title Printed Name: Date rolect: 11-036 ‘6114F-0-11 /w,yNr JAC PCS PAGE 05/05 Page 4 Rev 8/30/2011