HomeMy WebLinkAbout000272 Original ContractPSGP FY09 MEMORANDUM OF AGREEMENT (MOA) Between MARINE EXCHANGE OF PUGET SOUND And CITY OF PORT ANGELES This Agreement is made and entered into by and between Northwest Maritime Advisory Service, d/b /a Marine Exchange of Puget Sound "Marine Exchange a Washington corporation, and City of Port Angeles "Subgrantee WHEREAS, Marine Exchange has been appointed by the Federal Emergency Management Agency "FEMA to act as the Puget Sound Fiduciary Agent "the FA for the FY 2009 Port Security Grant Program "PSGP pursuant to 46 USC 70107 and the Maritime Transportation Security Act; and WHEREAS, a Cooperative Agreement between the FA and FEMA, incorporated into this MOA as Appendix A, makes the FA responsible for management and administration of PSGP grant award 2009- PU- T9 -K044 "the Award and designates the FA as the direct representative of FEMA and intermediary and funding pass-through agent between FEMA and Subgrantees; and WHEREAS, the FA's role includes but is not limited to the following tasks: Serve as funds pass through agent while maintaining fiscal integrity of the Award; Receive funds from FEMA and disburse funds to Subgrantees in accordance with FEMA guidelines and policies, Federal grant and procurement laws, and Subgrantee's approved Investment Justification(s) (U(s)) including corresponding budgets, which are incorporated in to this MOA as Appendix B; Ensure that procurement and payment documentation provided by Subgrantee is adequate to satisfy subsequent Federal agency audits; Monitor Subgrantee's financial and accounting policies and practices with regard to the Project(s) identified below to ensure that they properly address and comply with FEMA guidelines and policies and with Federal grant and procurement laws; Conduct all necessary interactions with FEMA on matters such as project scope and budget changes, environmental and historic preservation (EHP) requirements, timeline extensions, and other such matters; and Monitor Subgrantee's progress in carrying out work on the Project(s) identified below in a timely fashion in order to complete them within the FY09 grant period; and WHEREAS, Subgrantee has requested and been granted an allocation of fiords from grant award 2009 -PU- T9-K044 "the Subaward for the following Project(s): 2 o U9: U- T9 -K044' Fire Equipment and Training City of Port Angeles Record #000272 WHEREAS, Subgrantee will.plan, develop,,and execute that (those) Project(s) in accordance with and as .defined in the IJ(s) in Appendix B; and WHEREAS,',the pure* of this .MOA is to establish the conditions and circumstances under which the FA will manage and ariminister,the Subaward and will disburse funds to Subgrantee for approved costs incurred in carrying out'the Projects) identified above; THEREFORE, the parties agree as follows: 1. Pre= Project and Project Initiation Activities a. With.regard to each Project, when FEMA notifies the FA that all conditions imposed by FEMA for the Project have been satisfied, and after this MOA has been signed by bothparties, the FA shall notify Subgrantee that its Subaward for that Project is formally effective: Such notification shall be made by electronic or other written means; and the date of that,electronic or other written notice shall constitute the effective.date of the Subaward. b. Subgrantee shall comply with all applicable federal, State and local environmental and historic preservation,(EHP) requirements and shall provide anyinformation requested by, FEMA to ensure compliance with applicable laws. Subgrantee•is responsible for identifying and obtaining all other required federal, state, and local permits and/or approvals necessary to complete projects. The responsibilityto„ascertain'and comply with all, environmental and permittingrrequirements lies exclusively with Subgrantee. c. Subgrantee shall not begin any work on any Project, including any obligation of funds, until -informed by the FA that the Subaward for that Project is effective. d. Prior to beginning the Project(s), Subgrantee shall provide the following assurances to the FA: SBA Form 1623 Certification Regarding Debarment, Suspension, •and Other Responsibility Matters Certification Regarding Drug -Free Workplace Requirements U.S. Dept. of Commerce Form CD-511 Certification Regarding Lobbying Standard Form LLL Disclosure of Lobbying Activities (only if Subgrantee has engaged in lobbying) Standard Form 242B Assurances Non- Constrtion Programs (if project is not a construction project) Standard Form 242D Assurances Construction Programs (if project is a construction project) Accounting System and Financial Capability•Questionnaire.(if Subgrantee has not had an active Federal grant within the past three years) Subgrantee agrees to be bouncily and comply with these assurances throughout the MOA period and bind its contractors, consultants; and vendors to the same assurances.. e. If Subgrantee is a consortium, prior to beginning work on the Project(s), it shall provide to the FA an MOA or other document clearly setting out the identity of the consortium's coordinator or facilitator and how the consortium will operate and how distribution and use of the resources provided by the Subaward will be managed. MOA Page 2 of 16 f. If Subgrantee plans to provide an in -kind cost share, it shall provide documentation on all elements of the cost share to the FA prior to beginning the Praject(s). Such documentation shall include all information necessary to determine that the cost is an appropriate in -kind cost share under PSGP guidelines, including depreciated value and date of acquisition. Subgrantee shall begin each Project within sixty (60) days following the effective date of the Subaward for that Project, or this agreement may be subject to cancellation with regard to that Project. Evidence of beginning each Project shall be reported to the FA within sixty (60) days and may include, but is not limited to, project time line, written and/or electronic communications, development and issue of solicitation announcements, contracting documents, purchase orders, and/or similar compliance documents acceptable to the FA. h. Subgrantee understands and warrants that funds received under this MOA shall supplement, but not supplant or replace state or local funds or other resources that otherwise, in the absence of such funds, would have been made available for the Project(s) to be executed under this MOA, and that if such other funds or resources would otherwise have been made available, Subgrantee may be required to repay funds received. 2. Project Performance a. Subgrantee shall comply with all federal statutes, regulations and guidance applicable to administration of a PSGP Subaward, including but not limited to With regard to administrative requirements: o For state, local, and tribal governments: 44 CFR Part 13 (OMB Circular A -102) o For all other Subgrantees: 2 CFR Part 215 (OMB Circular A -110) With regard to cost principles: o For state, local, and tribal governments: 2 CFR Part 225 (OMB Circular A-87) o For colleges and universities: 2 CFR Part 220 (OMB Circular A -21) o For not for profits: 2 CFR Part 230 (OMB Circular A -122) o For for profits: 48 CFR Part 31 (FAR 312) With regard to audit requirements: o For all Subgrantees: OMB Circular A -133, which requires an annual organization -wide or program audit if Subgrantee expends $500,000 or more of federal funds during its fiscal year, unless a lower threshold is established by any applicable rule, regulation or standard. PSGP FY 09 Guidance The FA will provide technical assistance where possible, but Subgrantee shall be responsible for familiarity and compliance with relevant federal statutes, regulations, and PSGP guidance. Subgrantee shall also assure that where applicable, all recipients of grant funds also comply. Subgrantee's obligation to comply with these statutes, regulations, and guidance exist separate and apart from this MOA and shall survive expiration or earlier termination of the MOA. b. Subgrantee shall be additionally guided and governed by, and shall strictly adhere to, the requirements in "Marine Exchange of Puget Sound PSGP Procurement and Purchasing Policies and Procedures" which is hereby incorporated by reference and made a non severable part of this Agreement. Marine Exchange shall make changes in that document when required in order for Subgrantee to comply with federal laws, regulations, or policy, and shall inform Subgrantee by electronic or other written means within five (5) business days of such changes. g. MOA Page 3 of 16 c. The FA and Subgrantee agree to abide by all Special Conditions of the Cooperative Agreement in Appendix A. Subgrantee shall also comply with the ,following requirement specified by FEMA as a condition of Subaward approval: NA d. Subgrantee agrees to use all reasonable means to complete the Project(s) by March 31, 2012. If all reasonable means have been used and the Project(s) cannot be completed by that date, the FA will attempt to obtain one or more project performance period extensions from FEMA, but in no case will extensions for project completion, including filing of final reports, be granted beyond June 30, 2014. e. The FA is the primary contact with FEMA regarding projects under this MOA. If Subgrantee has any questions, problems, or issues regarding projects,'Subgrantee should make every possible attempt to resolve them with the FA rather than contacting FEMA. The FA will, in any event, be involved in any resolution handled in coordination with FEMA. f. Subgrantee must get FA approval for any major project changes, including but not limited to project intent or scope, including location or capability of equipment, equipment or services not included in the original IJ and budget, any other budget changes, and grant performance period. Subgrantee shall notify the FA electronically or by other written means of any such proposed major changes. The FA will submit the proposed changes to FEMA if necessary, and upon approval, the FA will incorporate the changes into a revised Appendix B. Subgrantee shall not enter into any contract and/or purchase agreement for the amended scope or budget until the FA provides notice by electronic or other written means that the change is approved. g. Subgrantee shall not enter into contracts and/or purchase agreements for execution of the Project(s) for any items and services except those that are listed, specifically or as part of a group of items or services, in the approved budget for that Project in Appendix B, as revised in accordance with paragraph 2.f. of this MOA. h. All contracts for execution of any Project shall provide that Subgrantee, or the designated coordinator if Subgrantee is a consortium, shall retain ultimate control and responsibility for the proper execution of the Project and that contract and purchasing requirements as detailed herein, including those in Appendix A, will also apply and bind any contractor, consultant or vendor when so required by federal statute and regulations. i. In any case in which Subgrantee enters into a contract with third parties, the FA is not a party to such a contract and shall not be obligated or liable for any breach of contract or other action at law or in equity to any party other than Subgrantee. j. Subgrantee shall maintain effective safeguards, control, and accountability for all property acquired using funds under the Subaward and assure that it is used solely for authorized grant purposes as described in Subgrantee's U(s). Title to and disposal of property shall be handled in accordance with OMB Circulars A -102 and A -110. 3. Monitoring and Reporting a. Throughout the Project(s), Subgrantee agrees to facilitate the FA's monitoring responsibilities by providing reasonable response to requests from the FA, including but not limited to the following: Designation of a Project Manager with daily, hands -on involvement in the Project(s), who shall respond to routine inquiries about the Project(s). Initial Project Manager is: Name: Kerr Phone: 360 41l Lib 53 MOA Page 4 of 16 Email: KZ LAM. e C rt`( oP PP OS MOA Page 5 of 16 Designation of a specific financial person who is involved in or supervises invoicing and processing of reimbursements, and who shall respond to requests to monitor financial policies, processes, and records. Initial financial contact is: Name: F/ ila F..l F 1 Phone: 3A9 7- `./6�0 Email: -Pi nQ /j CP !,l J c T"" 2O O Provision of prompt notice to the FA, by electronic or other written means from the Project Manager or Subgrantee's signator to this MOA, if these personnel change Ensuring that reasonable access to required information about the Project(s) is granted to the FA and, when requested, to FEMA. Periodically allowing the FA to make an on -site physical inspection of the Project(s). Notifying the FA when key milestones have been reached in the Project(s). b. Subgrantee shall submit programmatic and financial reports on the Project(s) at such times and in such format as the FA prescribes. These reports shall include but not be limited to quarterly financial reports submitted not later than the 15th day of January, April, July and October; semi- annual progress reports by the 15th of January and July each year; and final reports required by FEMA to close out the Project(s). The final reports must be filed with the FA within thirty (30) days after completion of each Project, and in no event later than June 30, 2014. The FA will not paythe final cost invoice for any Project until it has received and approved the final close -out reports for that Project. c. Subgrantee shall notify FA of any program income generated by a Project within the month following the month when it is earned, and shall comply with provisions of OMB Circular A -110 with regard to handling of such income. 4. Funding and Payments a. In executing this MOA, the FA shall follow all of its normal accounting policies and practices including the issuance of an internal purchase order for the amount expected to be received from FEMA and disbursed to Subgrantee for each Project. b. In matters of invoices, payments, and reimbursements, Subgrantee and the FA shall comply with the provisions of "Marine Exchange of Puget Sound PSGP Procurement and Purchasing Policies and Procedures," which is further described in paragraph 2.b. of this MOA. The FA may make exceptions to the provisions of that document in a one-time case of extreme hardship or extenuating circumstances, at the sole discretion of the FA. c. Subgrantee understands and acknowledges that only certain costs are allowable under federal law and the PSGP guidelines, and that FEMA's approval of Subgrantee's Subaward neither guarantees that all items and amounts in the approved budget are allowable nor supercedes or waives PSGP provisions regarding allowable costs. d. In no event shall the FA be obligated to reimburse Subgrantee for any Project related expenditures in amounts not expressly included in the approved budget for that Project in Appendix B, as revised in accordance with paragraph 2.f. of this MOA. e. The FA may suspend payments to Subgrantee if Subgrantee fails to comply with: The terms and conditions of the Subaward, including the intent stated in Subgrantee's IJ; or Any provision of this MOA, including but not limited to the assurances in Section 1.d. or Appendix A of this MOA, or the document titled in "Marine Exchange of Puget Sound PSGP Procurement and Purchasing Policies and Procedures or PSGP FY09 Guidance or any federal, state, or local law related to a Project; Upon such finding, the FA shall notify the Subgrantee in writing to correct any deficiencies found. If said deficiencies are not corrected within fifteen (15) business days, after consultation with FEMA, the Fiduciary Agent may suspend or cancel this MOA and the Subaward upon furnishing electronic or other written notice of such action to Subgrantee. f. Subgrantee understands and acknowledges that any of the compliance failures cited in Section 4.e. may result in a requirement by FEMA that funding already received must be repaid. Subgrantee understands and acknowledges that the FA is a pass-through agent for FEMA funds, and that if any funds are required to be repaid to the federal government because of findings of an audit by a federal authority or for any other reason, the FA shall not be liable for such repayment. 5. Other Provisions a. This MOA shall be binding on all parties thereto. b. If Subgrantee is a consortium,, the coordinator or facilitator identified in accordance with paragraph 1.e. of this MOA shall be responsible for compliance by all members of the consortium with the provisions of this MOA and associated applicable statutes, regulations, and other requirements. c. Subgrantee shall not assign or transfer any interest in this MOA or the Subaward without prior written consent of the FA and FEMA. This specifically includes any assignment and/or transfer occurring as a matter of law or of Subgrantee ownership transfer. d. The failure of the FA to insist upon strict performance ofany provision of this agreement or to exercise any right based upon a breach thereof, or the acceptance of any performance during such a breach, shall not constitute a waiver of any rights assigned to the FA under this MOA. e. The FA encourages Subgrantee to obtain and maintain, for the duration of this MOA, the following insurance, with the FA named as an additional insured: Commercial General Liability insurance on ISO Form CG 00 01 10 01 (or equivalent) Professional Liability Insurance (Errors and Omissions) Employer's Crime Insurance (Fidelity Bond) If Subgrantee does not obtain and maintain the described insurance, Subgrantee shall indemnify, defend, and hold harmless the FA and its officers, directors, employees, contractors, and agents, from and against all liability, loss, cost or expense (including attomey's fees) by reason of liability imposed upon the FA that would have been covered by said insurance if Subgrantee had obtained and maintained it. g. g. f. Subgrantee shall indemnify, defend and hold harmless the FA, arising out of or related to Subgrantee's performance under this MOA and/or the Subgrantee's conduct of the Project(s), whether caused by or contributed to by the FA or any other party indemnified herein, including but not limited to any breach, misfeasance, malfeasance, negligent or intentional acts of Subgrantee, its officers, agents, or employees or its contractors or subcontractors or their officers, agents, or employees, unless such a loss is caused solely by the misfeasance, malfeasance, or negligence of the FA, its officers, directors, employees or agents. Such indemnity shall survive the expiration or earlier termination of this MOA. Notices shall be delivered to the addresses or e-mails shown in the signature blocks of this MOA unless one or both of the parties provide change of such contact information by electronic or other written means. MOA Page 6 of 16 h. If a dispute arises out of or relates to this MOA, or a breach thereof, and if the dispute cannot be settled through negotiation, the parties agree first to try in good faith to resolve the dispute by mediation before resorting to arbitration, litigation or other adversarial dispute resolution process. The mediation and any subsequent dispute resolution process, including litigation, are to be conducted in the English language in the city of Seattle, Washington. i. This MOA, along with the Appendices and other materials referred to in the MOA, constitute the entire agreement between the FA and the Subgrantee as to the Subaward and the Project(s). Any and all prior writings between those parties pertaining to those subjects shall have no legally binding effect, and except as otherwise expressly provided in the MOA or the documents to which it refers, neither shall any contemporaneous or subsequent changes to the Parties' agreement on these topics unless made in writing and signed by both Parties. This MOA shall take effect on the date of signing by both parties and shall remain in effect for the duration of the Award period, ending September 30, 2014, unless terminated earlier as provided herein. MARINE EXCHANGE OF PUG ET SOUND 100 West Harrison, Suite S -560, Seattle WA 98119 E -mail: psap ®marineexchangesea.com Dated: 1220 Sett Sign John CITY OF PORT ANGELES P.O. Box 1150 Port Angeles, WA 98362 E -mail: Dated: Z —2_0 2-0 (f MOA Page 7 of 16 vs tjer, Executive Directo Signed: Print Name Title Appendix A Cooperative Agreement Between the Federal Emergency Management Agency and Marine Exchange of Puget Sound for management and administration of PSGP grant award 2009 PU-T9-K044 Appendix B Investment Justification and Budget for PSGP grant award 2009- PU- T9 -K044 -Fire Equipment and Training Project MOA Page 8of16 APPENDICES TO PSGP FY09 MEMORANDUM OF AGREEMENT (MOA) Between MARINE EXCHANGE OF PUGET SOUND And CITY OF PORT ANGELES Department of Homeland Security FEMA Grant Programs Directorate 0 PAGE a G 044 Cooperative Agreement I OF 3 L RECIPIENT NAME AND ADDRESS (Including Zip Code) Northwest Maritime Advisory Services (DBA Marine Exchange) 100 W Hamsm St, Suite S -560 SeaWe, WA 98199 4 AWARD NUMBER 2009- PU- 19 -K044 5. PROJECT PERIOD: FROM 06/012009 TO 05/31/2012 BUDGET PERIOD: FROM 06/01/2009 TO 05/31/2612 6. AWARD DATE 08/072009 7. ACTION Initial lA GRANTEE IRS/VENDOR NO. VG0003394 8. SUPPLEMENT NUMBER 00 9. PREVIOUS AWARD AMOUNT 5 0 3. PROJECT TITLE FY 2009 Port Security Grant Program 10. AMOUNT OF THIS AWARD S 26.888,749 11. TOTAL AWARD S 26,888.749 12. SPECIAL CONDITIONS THE ABOVE GRANT PROJECT IS APPROVED SUBJECT TO SUCH CONDITIONS OR LIMITATIONS AS ARE SET FORTH ON THE ATTACHED PAGE(S). 13. STATUTORY AUTHORITY FOR GRANT This project is supported under Consolidated Security. Disaster Assistance; and Continuing Appropr 'nation Act, 2009. P.L. No. 110-329 15. METHOD OF PAYMENT PARS AGENCY APPROVAL 16. TYPED NAME AND TITLE OF APPROVING DHS OFFICIAL W. Ross Ashley, III Assistant Administrator, Gram Programs Directorate Stl:7-t:rt2*Ta!NyYV ;:4111 18. TYPED NAME AND TITLE OF AUTHORED GRANTEE OFFICIAL John E Wenger Executive Director 17. SIGNATURE OF APPROVING DHS OFFICIAL 07 i d 19. SIGNATURE OF AUTHORIZED RECIPIENT OFFICIAL 19A. DATE \Cd l Si \L1 20. ACCOUNTING CLASSIFICATION CODES 21. PU09V40110 FISCAL FUND BUD. DN. YEAR CODE ACT. OFC. REG. SUB. POMS AMOUNT 9 T PU 10 00 00 26888749 OJP FORM 40002 (REV. 5-87) PREVIOUS EDITIONS ARE OBSOLETE. OUP FORM 40002 (REV. 4.88) MOA Page 9 of 16 PROJECT NUMBER 2009- PU- T9 -K044 1. The grantee and any subgrantee shall comply with the most recent version of the Administrative Requirements, Cost Principles, and Audit Requirements. A non exclusive list of regulations commonly applicable to DHS grants are listed below: B. Cost Principles 2. Recipient understands and agrees that it cannot enactment, repeal, modification or adoption of express prior written approval of FEMA. 3. The recipient agrees that all allocations and use of funds under this grant will be in accordance with the FY 2009 Port Security Grant Program guidance and application kit. 4. The Department of Homeland Security (DHS) has elected to enter into cooperative agreements with FY 2009 Port Security Grant Program (PSGP) funding recipients for projects taking place within port areas identified as Group I or Group II ports within the FY 2009 PSGP Guidance and Application Kit. The nature of the Federal involvement in the execution of this program may include joint conduct of a Group I or Group II project Other examples of prospective substantial Federal involvement include the following: Collaboration, participation, and/or intervention in any Group 1 or Group II activity covered by the cooperative agreement; Approval from DHS prior to the selection of a of an approved Group I or Group II project Authority for DHS to halt a Group I or Group I1 activity if detailed performance specifications are not met Authority for DHS to direct or redirect the scope of work of a Group I or Group 11 project based on new circumstances, and, Authority for DHS to require Group 1 or Group II award recipients (including Sub recipients) to participate in a port wide risk management planning project. OR FORM 4000/2 (REV. 4-88) Department of Homeland Security FEMA Grant Programs Directorate A. Administrative Requirements SPECIAL 1. 44 CFR Part 13, Uniform Administrative Local Governments 2. 2 CFR Part 215, Uniform Administrative: Education, Hospitals, and Other Non -Profit Or 1. 2 CFR Part 225, Cost Principles for State, AWARD CONTINUATION SHEET Cooperative Agreement AWARD DATE 08/072009 CONDITIONS PAGE 2 OF 3 Requirements for Grants and Cooperative Agreements to State and Requirements for Grants and 'Agreements with Institutions of Higher izations (OMB Circular A -110) Local and Indian Tribal Governments (OMB Circular A -87) use any federal funds, either directly or indirectly, in support of the any law, regulation or policy, at any level of government, without the new Group I or Group II project or commencement of the next phase 2. 2 CFR Part 220, Cost Principles for Educational Institutions (OMB Circular A -21) 3. 2 CFR Part 230, Cost Principles for Non -Profit Organizations (OMB Circular A -122) 4. Federal Acquisition Regulations (FAR), Part 31.2 Contract Cost Principles and Procedures, Contracts with Commercial Organizations C. Audit Requirements MOA Page 10 of 16 1. OMB Circular A -133, Audits of States, Local Governments, and Non -Profit Organizations Department of Homeland Security FEMA Grant Programs Directorate AWARD CONTINUATION SHEET Cooperative Agreement PAGE 3 OF 3 PROJECT NUMBER 21109 -PtJ T9 -K044 AWARD DATE 08/07/2009 SPECIAL CONDITIONS 5. The grantee is prohibited from obligating, expending or drawing down funds provided through this award until a Budget Review is completed and approved by the Grants Management Division (GMD) and an official notice has been issued removing this special condition. 6. The grantee is prohibited from obligating, expending or drawing down funds provided through this award until all applicable programmatic documents are provided to and approved by the program office and an official notice has been issued removing this special condition. 7. The grantee is prohibited from obligating, expending or drawing down funds provided through this award until all applicable programmatic documents ire 'Provided for and approved by a DHS/FEMA Environmental and Historic Preservation review and an official notice ties been issued removing this special condition. 8. Radiological detection equipment must be compliant with applicable national guidelines adopted by the U.S. Department of Homeland Security, including ANSI N323B =2003, ANSI N42.32 -2003, ANSI N42.33 -2003, and ANSI N42.35 -2004. OW FORM 4000/2 (REV. 4-88) MOA Page 11of1 Memorandum To: Official Grant File Subject: MOA Page 12 of 16 Department of Homeland Security, FEMA Grant Programs Directorate From: Jeffrey Hall, GPD NEPA Liaison Washington, D.C. 20531 Incorporates NEPA Compliance in Further Developmental Stages for Northwest Maritime Advisory Services. (DBA Marine Exchange) The recipient shall comply with all applicable Federal, State, and local environmental and historic preservation (EHP) requirements and shall provide any information requested by FEMA to ensure compliance with applicable laws including: National Environmental Policy Act, National Historic Preservation Act, Endangered Species Act, and Executive Orders on Floodplains (11988), Wetlands (11990) and Environmental Justice (12898). Failure of the recipient to meet Federal, State, and local EHP requirements and obtain applicable permits may jeopardize Federal funding. Recipient shall not undertake any project having the potential to impact EHP resources without the prior approval of FEMA, including but not limited to communications towers, physical security enhancements, new construction, and modifications to buildings that are 50 years old or greater. Recipient must comply with all conditions placed on the project as the result of the EHP review. Any change to the approved project scope of work will require re- evaluation for compliance with these EHP requirements. If ground disturbing activities occur during project implementation, the recipient must ensure monitoring of ground disturbance and if any potential archeological resources are discovered, the recipient will immediately cease construction in that area and notify FEMA and the appropriate State Historic Preservation Office. Any construction activities that have been initiated prior to the full environmental and historic preservation review will result in a non compliance finding. 1. Background MOA Page 13 of 16 FY09 PSGP Investment Justification Template Puget Sound Investment Heading 'Port Area State �"Atppficaiit_ zafioli *vestment ent Nan* L Port An eles Washin ton Clallam Count Sheriffs Office on Behalf of Port An eles Fire De artment Fire Equipment and Training $84,228 I. Provide an overview of the port system in which this Investment will take place Max. 1 page Area of Operations: o COTP Zone Puget Sound o Eligible Port area: Port Angeles o Project Site is at the Port of Port Angeles o Port of Port Angeles Point(s) of contact for organization (include contact information): Authorizing Official: Howard V. Doherty, Jr., Chair Clallam County Board of Commissioners 223 E. 4th Street, Port Angeles, WA 98362 360 -417 -2233 mdohertv Project Manager: Patti Morris and POC for the Project 223 E. 4th Street, Suite 12 Port Angeles, WA 98362 360 -461 -9008 pmorris aAwavecable.com Ownership or Operation: This IJ is a consortium request for the Port of Port Angeles, Port Angeles Fire Department, Port Angeles Police Department, Fire Districts #2 and #3, and Clallam County Sheriffs Office, City of Port Angeles, Port of Port Angeles, Port Angeles Fire Department, Port Angeles Police Department, Clallam County Fire District #2 and #3, all of which are agencies that would respond to the Port of Port Angeles in the event of an incident. Port Angeles has the direct responsibility to respond to fire incidents at the Port of Port Angeles. The Clallam County Sheriffs Office has the resources to manage this grant. Role in providing layered protection of regulated entities: Clallam County Sheriffs office and Port Angeles Police Dept. are the local agencies responsible for homeland security functions in Clallam County In the event of an incident, they would be first on the scene, along with Port Angeles Fire Department. Clallam County Fire District #2 and Clallam County Fire District #3 would provide mutual aid in the event of a large incident at or near the Port of Port Angeles. These local agencies often provide mutual aid to state and federal agencies and the Coho Blackball Ferry. Important features: PRMP Section 6.5.1 States: "Port Angeles has several sources of strategic risk to the passenger transportation strategic function with the highest level coming from a vessel being used as a weapon, followed by an attack by a terrorist assault team and by vessel or vehicle -borne IEDs. The following facilities have been identified as primary contributors to the strategic risk and are listed in order of level of risk, highest to lowest: COHO Ferry Terminal, COHO Ferry Vessels" PRMP states that the facility determined to be the highest risk facility in the Puget Sound region -area, based on information provided by MSRAM (the Maritime Safety Risk Assessment Model) is the COHO Black Ball Ferry Terminal. Regulated facilities in the AOR or the Port Angeles Fire Department and Clallam County Sheriffs Office AOR include Port of Port Angeles, Coho Ferry Terminal, Blackball Ferry Vessel, and the Victona Express Passenger Ferry. The Port Angeles area is the gateway to Puget Sound. There is an average of 30,000 commercial vessel trips through the Strait each year. All commercial vessels have to pick up a marine pilot, from Puget Sound Inland Pilots Assn at Port Angeles to continue their voyage east into Puget Sound. Any of these vessels could be a possible terrorist target, or be used to transport terrorist or materials for attacks on U.S.citizens, or critical facilities located in the Port Angeles area. All of the consortium members are NIMS compliant and provide reporting to Washington State EMD on that status in order to be eligible for grants. Other sources of funding being leveraged for security enhancements: Clallam County Sheriffs Office continually seeks out all available funding sources to support our Marine Unit. Currently the unit does not receive any grant funds to operate. We received a DHS (FEMA) interoperability grant in 2003 for $5.8 million, a DHS /NTIA interoperability grant in 2007 for $7.8 million, and grants for a vessel, training, and exercise in PSGP FY10. II. Strategic and Program Priorities II.A. Provide a brief abstract of the Investment Max. 1 page Fire Response Equipment and Training. The following equipment and training are requested for use in fighting ship fires at the Port of Port Angeles: 1. Two Blitzfire XXCV -32 portable monitors with MaxForce nozzles. 2. Thirteen new generation attack nozzles. 3. Pre positioning of 300 gallons foam concentrate 4. Three used shipping containers with foam and eductors 5. Forty Stat -X Fire Responder handheld units with pull actuators. 6. Five Mobile Data Terminals for five fire vehicles. 7. A five day, 45 hour intensive shipboard firefighting class (FEMA approved) for five people, including lodging and meals. AEL #s 19MH -00 -CONT (Shipping containers) 04HW -01 -MOBL (Mobile data terminals and accessories) Could not locate AEL #s for firefighting monitors or nozzles, foam, foam educators or foam nozzles, fire hose, or firefighting handheld pull- actuator units II.B. Describe how the Investment will i ddress one or more of the PSGP priorities and how it corresponds with the PRMP Max. 1 page PSGP priorities: Enhance IED /CBRNE Prevention, Protection, Response Recovery and Port Wide Collaboration: This investment will continue to enhance local capability to respond to terrorist attacks employing IEDs, CBRNE, and other non conventional weapons. Enhance Maritime Domain Awareness: The interoperable Mobile Data Terminals will allow the Port Angeles Fire Department to maintain contact with other agencies while working in the field, thereby keeping the other agencies informed as to evolving situations on the Port Angeles waterfront. PRMP Priorities: This investment is in keeping with the overall PRMP priority of effectively responding to terrorist and other human caused incidents in the maritime environment The PRMP points out that some of the highest risk targets in Puget Sound are in the Port Angeles area, specifically the COHO Black Ball FerryTerminal. The Mobile Data Terminals support collaborative interagency efforts in support of responses at the waterfront. This investment supports the response procedures set forth in the AMSP III. Impact III.A. Describe how the project offers the highest risk reduction potential at the least cost Max 1/2 age The Port Angeles Fire Department needs the capability to aggressively fight fires within the tight confines of the port environment in a more effective manner than is possible with its existing earlier generation equipment The busy, congested nature of the port area dictates the need for a potent, compact firefighting system that can be deployed quickly with a minimum of manpower. Currently we are only able to pre position very limited amounts of foam at the port, and this is a risk to the security of the port and vessels. The information below is numbered to correspond with the equipment list in Section II.A 1 -2. With a portable monitor, a single firefighter would be able to deploy a stand -alone device that is capable of delivering 2 -3 times the volume of water that we can currently deliver in less time. Attack nozzles deliver higher volumes of water than the nozzles that we currently use These new nozzles would allow us to deliver MOA Page 14 of 16 more water with fewer personnel providing us with a significant advantage when fighting a potentially large fire in the marine environment 3-4: Currently getting a supply of foam to the Port of Tacoma when needed for a major fire would be time consuming, possibly allowing a dangerous fire to get out of control Prepositioning a significant amount of foam at the Port in shipping containers would address that issue at a modest cost. 5: Hand -held fire suppression systems such as the Stat -X First Responder are designed to be tossed into closed areas with active fires to provide immediate fire suppression. They buy time for hose set -up, stops flashover, and can provide an emergency egress route through a wall of flames. Used by police first on the scene, such a device can slow a fire long enough to allow fire departments to arrive. We would equip every police and fire vehicle with the devices. 6: As identified in a recent "Operation Alligator" exercise, the Port Angeles Fire Department has very poor interoperable communications capability. All agencies that provide response to the port are installing Mobile Data Terminals (MDTs) for the purpose of interoperable communications. Providing MDTs for Port Angeles fire vehicles would go a long way toward closing the identified gap in that area. 7: The Port Angeles Fire Department is not adequately trained to respond the Petroleum tanker fire, cruise ships fires, ferry fires, and other large vessels in the Port of Port Angeles. Funding to train five firefighters in marine firefighting techniques is very important to the department's ability to respond effectively to fires on vessels in the port. (Applicant will provide information on DHS- approved course prior to submssion to FEMA.) III.B. Describe current capabilities similar to this Investment Max. 1 /2 page There is no fire responder in the Port Angeles area with the requested equipment IV. Funding Implementation Plan V.A. Funding Plan Maritime= D IE�pr WMD Pre ention' Protec�tld» i•Response,::an, d Ree= ov'ery- C�apabil ties- Training Exercises TINIC Implernen,ation FY 2009 PSGP Request Total 82,174 2,054 84,228 Match (Cash or In -Kind) 27,391 685 28,076 Grand Total 109,565 2,739 112,304 IV.B. Provide a high -level timeline, milestones and dates, for the implementation of this Investment such as stakeholder engagement, planning, major acquisitions or purchases, training, exercises, and process /policy updates. Up to 10 milestones may be provided. Max. 1 page Upon award, will procure equipment and schedule the training class within the 1 12 months of grant. All work will be completed by March 1st, 2012 We will prepare and execute an exercise utilizing all equipment obtained with the grant, funded by consortium agencies prior to March 1, 2012. Pro'ect Close Out March 15, 2012. MOA Page 15 of 16 Budget Category Total Project Cost Federal Funding Request Match Amount Total M &A A. Personnel 2,054 685 2,739 B Fringe Benefits C Travel 7,995 5,996 1,999 D Equipment 96,368 72,276 24,092 E Supplies 5,203 3,902 1,301 F Consultants /Contractors G Other H. Indirect FY09 BUDGET DETAIL WORKSHEET CLALLAM COUNTY FIRE EQUIPMENT TRAINING Entered by Applicant 2,739 4,000 1,000 2,000 7,000 4,800 2,739 3,875 3,500 8,000 13,000 6,000 900 26,000 35,000 4,800 Patti Morris Pro ect M r Grant Coord ersonnel °Totals D5 Stat/X Fire Responder handheld units D6 Mobile Data Terminals Foam Concentrate 300 gallons 672 1,092 504 76 2,184 2,940 3,794 8,672 14,092 6,504 976 28,184 37,940 gNinfial 5,203 2,054 685 2,739 3,150 1,050 2,846 949 559967 1',!399 6,504 2,168 10,569 3,523 4,878 1,626 732 244 21,138 7,046 28,455 9,485 72 276 24 092 3,902 3,9U2 1,301 8,2 In3M1 Total M &A Line Item B1 B2 D1 D2 D3 D4 El Budget Category Item P FnngeBenefits u Shipboard Firefighting Training Meals Lodging irauelTotalsJ Blitzfire XXCV -32 portable monitors New Generation Attack Nozzles Used Shipping Containers Foam educators ral uu p es 4csi CruggigoM Amount to go in "Investment Heading" on IJ BUDGET SUMMARY MOA Page 16 of 16 Est. Cost Each Est. Cost Sales Tax Calculated Total Project Cost Federal Funding Request 84,228 Match Amount