Loading...
HomeMy WebLinkAbout205 E 5th St - Technical Permit 1I -8 Lo Address 20 5 5 S Project description R ace roo -F-+ wox, -c-r Goarol V\1601 Date the permit was finaled v I?1 Number of technical pages 1 1 Clallam County Parks, Fair Facilities Department 1 HORIZON CENTER BUILDING- 223 East 4 th Street, Suite 7 1 PORT ANGELES, WA 98362 1 PROJECT NUMBERS: 621101 HB June 2011 CITY OF PORT ANGELES Construction Plano Documents Prepared By: The issuance of this permit based upon these plans, specifi- Lindberg Smith Architects 319 South Peabody St., Suite B cations and other data shall not prevent the building official from thereafter requiring the correction of errors in said plans, specifications and other data, or from preventing Port Angeles, WA 98362 building operations being carried on thereunder when in 1 violation of ail codes and ordinances of this jurisdiction. Phone: 360.452.6116 Approval Date t By 1 Fax 360.452.7064 \\/°12-14-- For the: 4 BOARD OF CLALLAM COUNTY COMMISSIONERS HOWARD V. DOHERTY, JR., CHAIR STEPHEN P. THARINGER MICHAEL C. CHAPMAN 1 1 1 PROJECT MANUAL 1 4Lf• Clallam County Parks, Fair Facilities Department HORIZON CENTER BUILDING Port Angeles, WA Project Number: 62110HB ADDENDUM NUMBER ONE This addendum is issued for the purposes of addition, clarification and /or revision to the Drawings and Specifications, and now becomes a part of the Contract Documents. Bidders shall notify all sub bidders of receipt of this Addendum. GENERAL ITEMS 1. Attached with this addendum is the sign -up sheet from the mandatory walk- through at the project site on Tuesday, August 2, 2011. SPECIFICATIONS 00600 GENERAL CONDITIONS OF THE CONTRACT ARTICLE 8 TIME AND LIQUIDATED DAMAGES Paragraph 8.1.6, at middle of paragraph states: "It is agreed between the parties that the amount of damages will be One Thousand Dollars and No Cents ($200.00) per calendar day from Final Completion date as designated for each individual project as stated on the Form of Agreement between Owner and Contractor." CHANGE this sentence to read: "It is agreed between the parties that the amount of damages will be Two Hundred Dollars and No Cents ($200.00) per calendar day from Final Completion date as designated for each individual project as stated on the Form of Agreement between Owner and Contractor." END OF ADDENDUM #1 Addendum Number One Aug 5, 2011 Horizon Center Building Page 1 CI O co 0 N °a 1 0 w W CO y Z v W t g C J Io Z i CI) d -0- J w m LL A V �J 1 I— J Z Q i m I I rZ II LJ.I LL 9 y fY 2 i -J w 1P O N a R 1, `i z W Q O 1i u 11 I IIIIIIIII 0 v U m 9 W J W cn J U z 8 •i O T oC o: Lindberg Smith Architects Horizon Building Clallam County June 2011 r TABLE OF CONTENTS DIVISION 00 BIDDING AND CONTRACT REQUIREMENTS 00100 00200 Notice of Call For Bids Instructions To Bidders 00300 Bid Proposal Form 00400 Supplemental Bid Forms 00500 Form of Agreement 00600 General Conditions of the Contract DIVISION 01 GENERAL REQUIREMENTS 01001 General Requirements 01070 Substantial Completion Form 01250 Contract Modification Procedures 01251 Request For Information Form 1 DIVISION 2 SITE CONSTRUCTION 02230 Site Work DIVISION 3 CONCRETE (NOT USED DIVISION 5 METALS (NOT USED) DIVISION 6 WOOD AND PLASTICS 06100 Rough Carpentry 06200 Finish Carpentry DIVISION 7 THERMAL MOISTURE PROTECTION 07210 07260 Building Insulation Vapor Retarders 07311 Asphalt Shingles 07620 Sheet Metal Flashing and Trim 07920 Joint Sealants DIVISION 8 DOORS WINDOWS (NOT USED) DIVISION 9 FINISHES 1 09260 Gypsum Board Assemblies 09912 Painting (Professional Line Products) 1 TABLE OF CONTENTS 00010 1 Lindberg Smith Architects Horizon Building Clallam County 1 June 2011 DIVISION 10 SPECIALITIES (NOT USED DIVISION 11 EQUIPMENT (NOT USED) 1 DIVISION 12 FURNISHINGS (NOT USED) 1 DIVISION 13 SPECIAL CONSTRUCTION (NOT USED) 1 DIVISION 14 CONVEYING SYSTEM (NOT USED) 1 1 1 1 1 1 1 1 1 1 1 1 1 TABLE OF CONTENTS 00010 2 1 DIVISION ZERO Notice of Call for Bids Section 00100 CLALLAM COUNTY PARKS, FAIR FACILITIES DEPARTMENT NOTICE OF CALL FOR BIDS SEALED BIDS will be received by the Board of Clallam County Commissioners 223 East Fourth Street, Room 150, Port Angeles, Washington until 10:00 a.m. on Tuesday, August 9, 2011 for: HORIZON CENTER BUILDING- Complete drawings and specifications may be obtained from Pen Print, Inc., Phone 360.457.3404. All bidding and related questions should be directed to Lindberg Smith Architects 360.452.6116. The sealed bids must be clearly marked on the outside of the envelope, "BID PROPOSAL Horizon Center Building Address bid proposal to: Board of Clallam County Commissioners, 223 East 4 Street, Suite 4, Port Angeles, Washington 98362 or hand deliver to 223 East 4 Street, Room 150, Port Angeles, Washington. Bid documents delivered to other offices and received late by the Commissioners' Office will not be considered nor will bids received by facsimile or e-mail. Note: All Bids shall include a 5% Bid Bond. 1 Clallam County hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises as defined in Title VI of the Civil Rights Act of 1964 at 49 CFR Part 23 will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin, or sex in consideration for an award. Clallam County will determine the lowest responsible bidder in accordance with the terms of Clallam County Code Section 3.12 and reserves the right to reject any or all bids and to waive informalities in the process or to accept the bid, which in its estimation best serves the interests of Clallam County. Construction Timeframe: August 17, 2011 through October 21, 2011 ri�1ES There will be a mandatory on -site walk- through conducted Monday; August Z2011 at 2:00 pm. All interested bidders are to meet at the site, located at 205 East 5 Street (corner of 5 and Lincoln Streets) in Port Angeles. This will be the only opportunity for bidders to review the as -built conditions. Bring any tools, equipment, etc., needed for personal documentation. Staff and the architect will be on site throughout the afternoon to answer questions and provide access for 1 bidders. APPROVED this day of 2011. BOARD OF CLALLAM COUNTY COMMISSIONERS: Howard V. Doherty, Jr., Chair ATTEST: 1 Trish Holden, CMC, Clerk of the Board Publish: July 24 31, 2011 (PDN) END OF SECTION 00100 1 HORIZON CENTER BUILDING Page 1 of 1 June 2011 DIVISION ZERO Instructions to Bidders Section 00200 INSTRUCTIONS TO BIDDERS ARTICLE 1 DEFINITIONS 1.1 Bidding Documents include the Bidding Requirements and the proposed Contract Documents. Bidding Requirements include Advertisement and Notice of CaII for Bids, Instructions to Bidders, Bid Forms, Sample Contract Forms, and Supplementary Instructions. Contract documents consist of Agreement or Contract Form between Owner and Contractor, Conditions of the Contract including General, Supplementary, Drawings, Plans, Specifications and all Addenda issued prior to execution of the Contract. 1 1.2 Addenda are written or graphic instructions issued by the Owner or Owner's representative Engineer, which modify or interpret the Bidding Documents by additions, deletions, clarifications or corrections. 1.3 A Bid is a properly completed and signed proposal to do the work for sums stipulated and submitted in accordance with the Bidding Documents. 1 1.4 The Base Bid is the sum stated in the Bid for which the Bidder offers to perform work described as the base to which work may be added or deleted for sums stated in Alternate Bids. 1.5 An Alternate Bid is an amount stated in the Bid to be added or deducted from the Base Bid if Alternate work is accepted. 1.6 A Unit Price is an amount stated in the Bid as a price per unit for materials, equipment, or service 1 as described in Bidding Documents. 1.7 A Bidder is a person or entity who submits a Bid. 1 1.8 A Sub bidder is a person or entity who submits a bid to a Bidder for materials, equipment or labor for a portion of work. 1 ARTICLE 2 BIDDER'S REPRESENTATION 2.1 By making a Bid, the Bidder represents that the Bidder has visited the site and become familiar with local conditions under which the work is to be performed, has read and understands all Bidding and Contract Documents, and correlated personal observations with the requirements of the proposed contract documents. Site visits shall be as stated on Notice of Call for Bids. 2.2 The Bid is based upon materials, equipment, labor and systems required by the Bidding Documents without exception. ARTICLE 3 BIDDING DOCUMENTS 1 3.1.1 Bidders may obtain complete sets of Bidding Documents from the location(s) designated in the Advertisement or Notice of Call for Bids in the number, and for the deposit sum, if any stated therein (limit of 2 sets per contractor). The deposit sum will be refunded to Bidders who submit a bonafide Bid and return Bidding Documents in good condition within ten days after receipt of Bids. A bidder receiving the Contract Award may retain Documents and deposit will be returned. 1 1 HORIZON CENTER BUILDING June 2011 DIVISION ZERO Instructions to Bidders Section 00200 3.1.2 Bidders shall use complete sets of Bidding documents in preparing Bids; neither Owner nor Owner's representative Engineer assumes responsibility for errors or misrepresentations resulting from use of incomplete Bidding Documents. 3.1.3 In making copies of the Bidding Documents available, the Owner and /or Owner's representative Engineer, do so for the purpose of obtaining Bids and do not confer a license or grant permission for any other use of the Bidding Documents. 3.1.4 Copies of bidding documents and specs are available for review in Parks Office, Room 180 in the Historic Courthouse. 3.2 Interpretation or correction of Bidding Documents 3.2.1 The Bidder shall carefully examine the Bidding Documents, examine the site and local conditions, and compare them with other work being bid concurrently or presently under construction to the extent that it relates to work being Bid, and shall at once report to the Owner and /or Owner's representative Engineer errors, inconsistencies, or ambiguities discovered. 3.2.2 The Bidder and sub bidders requiring clarification or interpretation of the Bidding Documents shall make a written request to Owner and /or Owner's representative Engineer at least seven days prior to the date of receipt of Bids. 3.2.3 Changes in the Bidding Documents will be made by Addendum and changes made in any other manner will not be binding and Bidders shall not rely upon them. 3.3 Substitutions 3.3.1 The materials, equipment, products described in the Bidding Documents establish a standard of function, dimension, appearance and quality to be met by any substitution. 3.3.2 No substitution will be considered prior to receipt of Bids unless written request for approval has been received by Owner or Owner's representative Engineer at least ten days prior to the date for receipt of Bids. Such requests shall include the name of the materials or equipment for which it is to be substituted and a complete description of the proposed substitution including drawings, performance and test data, and other information necessary for an evaluation. A statement setting forth changes in other materials, equipment or other portions of the Work including changes in the work of other contractors that incorporation of the proposed substitution would require, shall be included. The burden or proof of the merit of the proposed substitution is upon the proposer. The Owner's decision of approval or disapproval of a proposed substitution shall be final. 3.3.3 If the Owner approves a proposed substitution prior to receipt of Bids, such approval will be set forth in an Addendum. Bidders shall not rely upon approvals made in any other manner. 3.3.4 No substitutions will be considered after the Contract award unless specifically provided in the Contract Documents. 1 3.3.5 Should any proposed product substitution require any redesign work by the Owner and /or Engineer or his consultations to accommodate the substitute product, costs for such redesign work shall 1 be included in the Bid amount and shall be paid to the Engineer or Owner at his usual rates for the time expended in the required redesign work. ARTICLE 4 BIDDING PROCEDURES 4.1.1 Bids shall be submitted on forms identical to ones included in the Bidding Documents; shall have all blanks filled out in ink (typed or manually); with sums expressed in words and figures where indicated HORIZON CENTER BUILDING June 2011 DIVISION ZERO Instructions to Bidders Section 00200 with words governing; and all alternates and unit prices bid. If alternates do not change Base Bid, enter 1 "no change 4.1.2 Interlineations, alterations and erasures must be initialed by signer of the Bid. 1 4.1.3 Bid shall include legal name of Bidder and a statement that the Bidder is a sole proprietor, partnership, corporation or other legal entity. Each copy shall be signed by the person or persons legally authorized to bind the Bidder to a Contract. A Bid by a corporation shall give the state of incorporation or corporate seal affixed. A Bid submitted by an agent shall have a current power of attorney attached certifying the agent's authority to bind the Bidder. 4.2 Bid security 1 4.2.1 Each Bid shall be accompanied by a bid security in a.) cash, b.) cashier's check/money order, c.) certified check, or d.) Surety Bond in the amount of 5% of the total Bid amount. Bid security shall be in form required, pledging that the Bidder will enter a Contract with the Owner on the terms stated in the Bid, and will furnish bonds covering the faithful performance of the Contract and payment of all obligations arising there under. Bid security of the lowest three Bidders may be retained by Owner for a period not to exceed 30 days following opening of Bids. All other Bidders' securities shall be returned within ten days of date of receipt of bids. Should Bidder fail to enter into a Contract or furnish bonds where required, the amount of Bid Security shall be forfeited to the Owner as liquidated damages, not as a penalty. 4.2.2 Surety Bond shall be written on required forms and the attorney -in -fact who executes the bond shall affix to the Bond a certified and current copy of the power -of- attorney. 4.3 Submission of bids 1 4.3.1 Bids, Bid Security and other documents required to be submitted with the Bid shall be enclosed in a sealed, opaque envelope marked with the notation "BID PROPOSAL" with project name clearly marked on the outside of the envelope. The envelope shall be addressed to the party receiving the Bids as identified in the Advertisement or Notice Call for Bids and include the Bidder's name and address. If the Bid is sent by mail, the sealed envelope shall be enclosed in a separate mailing envelope with notation "BID PROPOSAL ENCLOSED" and the project name on the face thereof. 4.3.2 Bids shall be deposited at the designated location prior to the time and date for receipt of Bids. 1 Bids received after time and date will be returned unopened. The Bidders shall assume full responsibility for timely delivery at location designated for receipt of Bids. 4.3.3 Oral, telephone, telegraphic, or fax Bids are invalid and will not receive consideration. 1 4.4 Modification or withdrawal of Bid 4.4.1 A Bid may not be modified, withdrawn or canceled by the Bidder during the stipulated time period of thirty days following the time and date designated for the receipt of Bids, and each Bidder so agrees in submitting a Bid. 4.4.2 Prior to the time and date designated for receipt of Bids, a Bid submitted may be modified or 1 withdrawn by notice to the party receiving Bids at the place designated for receipt of Bids. Such notice shall be in writing over the signature of the Bidder or by telegram; if by telegram, written confirmation over the signature of the Bidder shall be mailed and postmarked on or before the date and time set for receipt of Bids. A change shall be so worded as not to reveal the amount of the original Bid. 4.4.3 Withdrawn Bids may be resubmitted up to the date and time designated for the receipt of Bids provided that they are then fully in conformance with these instructions to Bidders. 4.4.4 Bid Security shall be in an amount sufficient for the Bid as modified or resubmitted. HORIZON CENTER BUILDING June 2011 1 DIVISION ZERO Instructions to Bidders Section 00200 1 ARTICLE 5 CONSIDERATION OF BIDS 5.1 Bids received on time and properly identified will be opened and read aloud at the Board of Commissioners meeting held immediately after the time and date for receipt of Bids as advertised in Notice Call for Bids. 5.2 The Owner shall have the right to reject any or all Bids, reject a Bid not accompanied by a required Bid Security or by other data required by the Bidding Documents, or reject a Bid which is in any way incomplete or irregular. 1 5.3 The Owner may determine that a Bidder is not responsible and reject his proposal for any of the reasons found in Clallam County Code Chapter 3.12. 1 5.4 Bid award 5.4.1 It is the intent of the Owner to award a Contract to the lowest responsible Bidder provided the Bid has been submitted in accordance with the requirements of the Bidding Documents and does not exceed the funds available. The Owner shall have the right to waive informalities or irregularities in a Bid received and to accept the Bid which, in the Owners judgment, is in the Owner's best interests. 5.4.2 The Owner shall have the right to accept Alternates in any order or combination, unless otherwise specifically provided in the Bidding Documents, and to determine the low Bidder on the basis of the sum of the Base Bid and Alternates accepted. ARTICLE 6 POST BID INFORMATION 6.1 Contractor's Qualification Statement Bidders to whom award of a Contract is under consideration shall submit to the Owner or Owner's representative Engineer, upon request, a properly executed Contractor's Qualification Statement in the form requested by the Owner. 6.2.1 Submittals The Bidder shall, within three days of notification of selection for the award of a Contract, furnish the Owner or Owner's representative Engineer in writing if not required to be included on the Bid Proposal Form: 1 1. Work to be performed by Bidders own forces 2. A complete list of sub bidders or sub contractors to be used to complete this project 3. Name of project superintendent or foreman to be used 4. Names of manufacturers, products, and supplies of principal items or systems proposed for the Work. 6.2.2 Prior to award of the Contract, the Owner, or Owner's representative Engineer, will notify Bidder if Owner has a reasonable objection to a person or entity proposed by Bidder. If Owner has an objection, the Bidder may (1) withdraw the Bid, or (2) submit an acceptable substitute person or entity with an adjustment in the Base Bid or Alternate Bid to cover the difference in cost, if any, occasioned by the substitution. The Owner may accept the adjusted bid price or disqualify the Bidder. In the event of withdrawal or disqualification, the Bid Security will not be forfeited. 6.2.3 Persons and entities proposed by the Bidder and to whom the Owner has made no reasonable objection must be used on the work for which they were proposed and shall not be changed except with the written consent of the Owner. 1 6.2.4 A copy of Contractor's UBI Certification shall be submitted with the signed agreement. 1 HORIZON CENTER BUILDING June 2011 1 DIVISION ZERO Instructions to Bidders 1 Section 00200 ARTICLE 7 PERFORMANCE AND PAYMENT BOND 7.1 Bond requirements 7.1.1 The Bidder shall furnish bonds covering faithful performance and payment of all obligations as 1 described in the Bidding Documents and all bonds shall be paid for by the Bidder and costs shall be included in Bid. 7.2 Time of delivery and form of bonds 7.2.1 The Bidder shall deliver the required bonds to the Owner not later than three days following the date of execution of the Contract. If the Work is to be commenced prior thereto in response to a letter of intent, the Bidder shall, prior to commencement of the Work, submit evidence satisfactory to the Owner that such bonds will be furnished and delivered in accordance with this Subparagraph 7.2.1. 7.2.2 Unless otherwise provided, the bonds shall be written on forms provided by Owner, Performance Bond and Payment Bond. Both bonds shall be written in the amount of the Contract Sum plus sales tax. 7.2.3 The bonds shall be dated on or after the date of the Contract. 1 7.2.4 The Bidder shall require the attorney -in -fact who executes the required bonds on behalf of the 1 surety to affix thereto a certified and current copy of the power of attorney. ARTICLE 8 FORM OF AGREEMENT 1 8.1 Form to be used 8.1.1 The Agreement for the Work shall be the completed sample included in the Bidding Documents 1 and shall be signed by the Bidder within ten days of notice by the Owner of award of Contract to the Bidder. 1 1 1 1 1 1 1 END OF SECTION 00200 HORIZON CENTER BUILDING June 2011 1 DIVISION ZERO Bid Proposal Form Section 00300 BID PROPOSAL FORM Project Name: HORIZON CENTER BUILDING Project Number(s): 621101HB To: CLALLAM COUNTY PARKS, FAIR FACILITIES DEPARTMENT Submission of this bid proposal certifies that the Undersigned has examined the project site and the conditions of work; and has carefully read and thoroughly understands the Bidding Documents governing the work embraced in this project, and the method by which payment will be made for said work. The Undersigned hereby proposes to undertake and complete the work embraced in this project in accordance with said Bidding Documents and agrees to accept as payment for said work the amounts indicated below under Bid Proposal. The base bid shall include all work except that indicated in the Alternates. The Undersigned acknowledges that payment will be based on the actual work performed, as measured or provided for in accordance with the said contract documents; Base Bid, Alternates and Unit Prices shall not include State of Washington Sales Tax. Contractor shall pay state sales tax and the County will pay appropriate sales tax to the contractor. Appropriate sales tax is to be added to invoice amounts after 1 award of bid. BID PROPOSAL 1. BASE BID AMOUNT: dollars($ 2. ALTERNATE #1: Description if applicable. 1 dollars($ 3. UNIT PRICE #1: Description if applicable. dollars($ 1 4. TOTAL BID: Includes Base Bid, Alternate #1 and Unit Price #1: 1 dollars($ 1 1 HORIZON CENTER BUILDING Page 1 of 2 June 2011 DIVISION ZERO Bid Proposal Form Section 00300 CONTRACTOR'S CERTIFICATION OF BIDDING CONTRACT DOCUMENTS By signing this form, the Contractor certifies that based on the Contractor's knowledge and review, that the Contractor finds the Bidding Contract Documents sufficiently complete and in sufficient detail to perform the work required. NON COLLUSION STATEMENT By signing this proposal, the Contractor certifies that he /she has not participated in any collusion, or otherwise taken action in restraint of free competitive bidding in connection with this project for which this proposal is submitted. NON DISCRIMINATION The Contractor hereby agrees to not discriminate against any person on the basis of race, creed, political ideology, color, national origin, sex, marital status, sexual orientation, age or presence of any sensory, mental or physical disability. 1 INDEPENDENT CONTRACTOR STATEMENT The Contractor certifies that services shall be furnished by the Contractor as an independent contractor and nothing herein contained shall be construed to create a relationship of employer /employee or master /servant, but all payments made hereunder and all services performed shall be made and performed pursuant to this Agreement by the Contractor. ADDEN DA Receipt of Addenda(s) numbered is hereby acknowledged and all costs of the Work therefore have been included in the Bid Proposal. BIDDER NAME AND SIGNATURE The name of the Bidder submitting this proposal, the address and phone number to which all communications concerned with this proposal shall be made, and the number which has been assigned indicating the Bidder is licensed to do business in the State of Washington are as follows: Firm Name: 1 Address: Telephone Contractor's License No. Exp.Date The firm submitting this proposal is a: Sole Proprietorship Corporation Partnership The names and titles of the principal officers of the corporation submitting this proposal, or of the partnership, or of all persons interested in this proposal as principals are as follows: SIGNATURE OF AUTHORIZED OFFICIAL(S) (PROPOSAL MUST BE SIGNED) 1 (Seal) FIRM NAME END OF SECTION 00300 HORIZON CENTER BUILDING Page 2 of 2 June 2011 DIVISION ZERO Supplemental Bid Forms Section 00400 ARTICLE 1 STATEMENT OF BIDDER'S QUALIFICATIONS 1 Upon notification of intent to award bid, Contractor shall complete and submit the below information within three days of notification by Owner. 1. Name of Bidder: 2. Business Address: 3. How many years has said bidder been engaged in the contracting business under the present firm name? 4. Contracts now in hand (Gross Amount): 5. General character of work performed by said company: 6. List of more important projects constructed by said company, including approximate costs and dates: 7. List of company's major equipment: 1 1 8. Bank references: 1 9. Department of Labor and Industries Firm No.: 1 10. Department of Revenue Registration: 1 1 Name of Bidder Title By Date 1 1 HORIZON CENTER BUILDING June 2011 1 DIVISION ZERO Supplemental Bid Forms Section 00400 ARTICLE 2 STATEMENT OF PROPOSED SUB CONTRACTORS AND MAJOR MATERIAL 1 SUPPLIERS The Contractor shall submit a complete list of all major material suppliers and a sub contractor's list within three days of notification of Bid award or upon request by the Owner. NOTE: Per RCW39.30.060, projects expected to cost one million dollars or more are required, as part of the Bid or within one hour after the published Bid submittal time, to submit a subcontractor list. Failure to submit this information shall render the Bid Nonresponsive. (See RCW39.30.060 for full text) SUB CONTRACTOR'S LIST: NAME ADDRESS DESCRIPTION OF WORK/MATERIAL 1 1 1 1 1 1 MATERIAL SUPPLIERS LIST: 1 MATERIAL SUPPLIERS DESCRIPTION OF WORK/MATERIAL 1 1 1 1 HORIZON CENTER BUILDING June 2011 1 DIVISION ZERO Supplemental Bid Forms Section 00400 ARTICLE 3 RETAINAGE INVESTMENT OPTION DECLARATION CONTRACTOR: 1 PROJECT NAME: Horizon Center Building PROJECT NO.: Project 621101 HB DATE: Pursuant to RCW 60.28.010, as amended, you may choose how your Retainage under this contract will be held and invested. Please complete and sign this form indicating your preference. If you fail to do so, the County will hold your Retainage as described in "Current Expense" Option 1 below: 1. Current Expense: The County will retain the money in its Current Expense Fund Account until thirty days following final acceptance of the improvement or work as 1 completed. You will not receive interest earned on this money. 2. Interest Bearing Account: The County will deposit Retainage checks in an interest bearing account in a bank, mutual savings bank, or savings and loan association, not subject to withdrawal until after the final acceptance of the improvement or work is completed, or until agreed to by both parties. Interest on the account will be paid to you. 3. Escrow /Investments: The County will place the Retainage checks in escrow with a bank or trust company until thirty days following the final acceptance of the improvement or work as completed. When the moneys reserved are to be placed in escrow, the County will issue a check representing the sum of the moneys reserved payable to the bank or trust company and you jointly. This check will be converted into bonds and securities chosen by you and approved by the County and these bonds and securities will be held in escrow. Interest on these bonds and securities will be paid to you as interest accrues. 4. The Contractor may at his /her option choose to not submit a performance bond and agrees to a 50% Retainage in lieu of a performance bond. Retainage to be released when Contract is complete and all paperwork submitted. (Pertains to projects under $25,000.00 only) Retainage is normally released 30 -60 days after final acceptance of work by the County, or following receipt of Labor and Industries Department of Revenue clearance, whichever takes longer. (Contractor's Signature) (Title) HORIZON CENTER BUILDING June 2011 DIVISION ZERO Supplemental Bid Forms Section 00400 ARTICLE 4 PERFORMANCE AND PAYMENT BOND FORM 1 PERFORMANCE BOND FOR Bond No. 1 CLALLAM COUNTY, WASHINGTON WE, d /b /a (Insert legal name of Contractor) (Insert trade name of Contractor, it any) (hereinafter "Principal and (hereinafter "Surety are held and firmly bound unto CLALLAM COUNTY, WASHINGTON (hereinafter "County as Obligee, in an amount (in lawful money of the United States of America) equal to the total compensation and expense reimbursement payable to Principal for satisfactory completion of Principal's work under Contract No. between Principal and County, which total is initially Dollars for the payment of which sum Principal and Surety bind themselves, their executors, administrators, legal representatives, successors and assigns, jointly and severally, firmly by these presents.. Said contract (hereinafter referred to as "the Contract is for and is made a part hereof by this reference. The Contract includes the original agreement as well as all documents attached thereto or made a part thereof and amendments, change orders, and any other document modifying, adding to or deleting from said Contract any portion thereof. This Bond is executed in accordance with the laws of the State of Washington, and is subject to all provisions thereof and the ordinances of County insofar as they are not in conflict therewith, and is entered into for the use and benefit of County, and all laborers, mechanics, subcontractors, and materialmen, and all persons who supply such person or persons, or subcontractors, with provisions or supplies for the carrying on of the work covered by Contract No. between the below -named Contractor and County for a copy of which Contract, by this reference is made a part hereof and is hereinafter referred to as "the Contract." (The Contract as defined herein includes the aforesaid agreement together with all of the Contract documents including addenda, exhibits, attachments, modifications, alterations, and additions thereto, deletions therefrom, amendments and any other document or provision attached to or incorporated into the Contract) 1 THE CONDITION OF THIS OBLIGATION is such that if Contractor shall promptly and faithfully performs the Contract, then this obligation shall be null and void; otherwise it shall remain in full force and effect. THE PARTIES FURTHER ACKNOWLEDGE AGREE AS FOLLOWS: (1) Surety hereby consents to, and waives notice of, any alteration, change order, or other modification of the Contract and any extension of time made by County, except that any single or cumulative change order amounting to more than twenty -five percent (25 of the penal sum of this bond shall require Surety's written consent. (2) Surety recognizes that the Contract includes provisions for additions, deletions, and modifications to the work or Contract Time and the amounts payable to Contractor. Subject to the limitations contained in paragraph (1) above, no such change or any combination thereof, shall void or impair Surety's obligation hereunder. (3) Whenever County has declared Contractor to be in default and County has given Surety written notice of such declaration, Surety shall promptly (in no event more than thirty [30] days following receipt of such notice), specify, in written notice to County, which of the following actions Surety intends to take to remedy such default, and thereafter shall: (a) Remedy the default within fifteen (15) days after its notice to County, as stated in such notice; or (b) Assume within fifteen (15) days following its notice to County, full responsibility for the completion of the Contract in accordance with all of its provisions, as stated in such notice, and become entitled to payment of the balance of the Contract sum as provided in the Contract; or (c) Pay County upon completion of the Contract, in cash, the cost of completion together with all other reasonable costs and expenses incurred by County as a result of Contractor's default, HORIZON CENTER BUILDING June 2011 1 DIVISION ZERO Supplemental Bid Forms Section 00400 including but not limited to those incurred by County to mitigate its losses, which may include but are not limited to attorneys' fees and the cost of efforts to complete the work prior to Surety's exercising any option available to it under this Bond; or (d) Obtain a bid or bids for completing the Contract in accordance with its terms and conditions, and upon a determination by County and Surety jointly of the lowest responsible bidder, arrange for one or more agreements between such bidder and County, and make available as work progresses (even though there is a default or a succession of defaults under such agreement(s) for completion arranged for under this paragraph) sufficient funds to pay the cost of completion less the balance of the Contract price, but not exceeding, including other costs and damages for which Surety may be liable hereunder, the penal sum of this Bond. The term "balance of the Contract price," as used in this paragraph, shall mean the total amount payable by County to Contractor under the Contract, less the amount properly paid by County to Contractor. (4) If County commences suit and obtains judgment against Surety for recovery hereunder, then Surety, in addition to such judgment, shall pay all costs and attorneys' fees incurred by County in enforcement of County's rights hereunder. The venue for any action arising out of or in connection with this bond shall be in Clallam County, Washington. (5) No right or action shall accrue on this Bond to or for the use of any person or corporation other than Clallam County, and to the extent required under RCW Ch. 39, all laborers, mechanics, subcontractors, and materialmen, and all persons who supply such person or persons, or subcontractors, with provisions or supplies for the carrying on of the work covered by the Contract. (6) No rider, amendment or other document modifies this Bond except as follows, which is hereby incorporated herein. (7) Surety shall give to Principal and to County not less than sixty (60) days' prior written notice by certified mail, return receipt requested, of the effective date of the expiration or cancellation of this bond. (8) Principal must provide County with a replacement bond, acceptable to County, not less than thirty (30) days before the effective date of this bond's expiration or cancellation as specified in the Surety's notice provided pursuant to Condition (7). (9) If Principal fails to provide the replacement bond not less than thirty (30) days before the effective date of this bond's expiration or cancellation as specified in the Surety's notice provided pursuant to Condition (7) above, such failure shall constitute a default under this bond, for which County may make a claim, and Surety shall be obligated to make immediate payment under this bond of all sums. SURETY'S QUALIFICATIONS: Every Surety named on this bond must appear on the United States Treasury Department's most current list (Circular 570 as amended or superseded) and be authorized by the Washington State Insurance Commissioner to transact business as a surety in the State of Washington. In addition, the Surety must have a current rating of at least A -:VII in A. M. Best's Key Rating Guide. INSTRUCTIONS FOR SIGNATURES: This bond must be signed by the president or a vice president of a corporation; the managing general partner of a partnership; managing joint venturer of a joint venture; manager of a limited liability company or, if no manager has been designated, a member of such LLC; a general partner of a limited liability partnership; or the owner(s) of a sole proprietorship. If the bond is signed by any other representative, the Principal must attach currently- dated, written proof of that signer's authority to bind the Principal, identifying and quoting the provision in the corporate articles of incorporation, bylaws, Board resolution, partnership agreement, certificate of formation, or other document authorizing delegation of signature authority to such signer, and confirmation acceptable to the County that such delegation was in effect on the date the bond was signed. A NOTARY PUBLIC MUST ACKNOWLEDGE EACH SIGNATURE BELOW. 1 1 1 HORIZON CENTER BUILDING June 2011 DIVISION ZERO Supplemental Bid Forms Section 00400 1 FOR THE SURETY: FOR THE PRINCIPAL: By By: (Signature of Attomey -in -Fact) (Signature of authonzed signer for Contractor) (Type or pnnt name of Attorney -in -Fact) (Type or pnnt name of signer for Contractor) (Type or pnnt telephone number for Attomey -in -Fact) (Type or pnnt title of signer for Contractor) STATE OF ss: ACKNOWLEDGMENT FOR CONTRACTOR COUNTY OF On this day of before me a notary public in and for the State of duly commissioned and sworn, personally appeared the person described in and who executed the foregoing bond, and acknowledged to me that signed and sealed said bond as the free and voluntary act and deed of the Contractor so identified in the foregoing bond for the uses and purposes therein mentioned, and on oath stated that is authorized to execute said bond for the Contractor named therein. WITNESS my hand and official seal hereto affixed the day and year in this certificate first above written. (Signature of Notary Public) (Print or type name of Notary Public) Notary Public in and for the State of residing at My commission expires SEAL STATE OF ss: ACKNOWLEDGMENT FOR SURETY COUNTY OF On this day of before me a notary public in and for the State of duly commissioned and sworn, personally appeared Attorney -in -Fact for the Surety that executed the foregoing bond, and acknowledged said bond to be the free and voluntary act and deed of the Surety for the uses and purposes therein mentioned, and on oath stated that is authorized to execute said bond on behalf of the Surety, and that the seal affixed on said bond or the annexed Power of Attorney is the corporate seal of said Surety. WITNESS my hand and official seal hereto affixed the day and year in this certificate first above written. (Signature of Notary•Public) (Print or type name of Notary Public) Notary Public in and for the State of residing at My commission expires SEAL 1 1 1 1 1 HORIZON CENTER BUILDING June 2011 1 DIVISION ZERO Supplemental Bid Forms Section 00400 ARTICLE 5 INDUSTRIAL INSURANCE PREMIUMS AND CONFESSION OF JUDGMENT 1. The contractor shall pay, and is responsible for payment of, all industrial insurance premiums that become due and payable to the Washington State Department of Labor and Industries (Department) pursuant to Title 51, RCW, whether such premiums are attributable to the contractor or its subcontractors. 2. In the event that Clallam County is required to make industrial insurance premiums to the Department due to the failure, neglect or refusal of the contractor to make payment as required herein, the contractor authorizes Clallam County to take judgment against it, and the contractor hereby confesses judgment, in the amount which Clallam County is required to pay the Department pursuant to Title 51, RCW to satisfy contractor's liabilities hereunder. The contractor confesses judgment in an amount equal to the entire industrial insurance premium liability due to the Department on behalf of the contractor and its subcontractors hereunder, less any premium payments previously made to the Department by the 1 contractor. 3. The contractor expressly agrees that the amount confessed herein was expressly negotiated and that the amount due to Clallam County for satisfying contractor's obligations to the Department hereunder is due, justly due or to become due. 4. Until such time as Clallam County is actually reimbursed for industrial insurance premiums paid to the Department due to the failure, neglect or refusal of the contractor to meet its obligations hereunder, the contractor shall be debarred from bidding on any projects for which Clallam County solicits bids. Corporate: State of County of ss On this day of before me personally appeared to me known to be the (president, vice president, secretary, treasurer, or other authorized officer or agent, as the case may be) of the corporation that executed the within and foregoing instrument, and acknowledged said instrument to be the free and voluntary act and deed of said corporation, for the uses and purposes therein mentioned, and on oath stated that he was authorized to execute said instrument and that the seal affixed is the corporate seal of said corporation. In witness whereof I have hereunto set my hand and affixed my official seal the day and year first above written. 1 (CORPORATE SEAL) (Contractor's Signature) 1 (Title) 1 Notary Public in and for the State of Washington Residing at 1 1 HORIZON CENTER BUILDING June 2011 1 DIVISION ZERO Supplemental Bid Forms Section 00400 Individual: State of ss County of On this day personally appeared before me to me known to be 1 the individual, or individuals described herein and who executed the within and foregoing instrument, and acknowledged that he (she or they) signed the same as his (her or their) free and voluntary act and deed, for the uses and purposes therein mentioned. Given under my hand and official seal this day of ,20 Contractors Signature) (Title) Notary Public in and for the State of Washington 1 Residing at 1 1 1 1 1 1 1 1 1 HORIZON CENTER BUILDING June 2011 1 I DIVISION ZERO Supplemental Bid Forms Section 00400 I ARTICLE SIX INSURANCE CERTIFICATE I FORM CLALLAM COUNTY, WA e CERTIFICATE OF INSURANCE TIIIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY. 05.07.08 THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER TI IE 1'9.1-ROADS COVERAGE AFFORDED 13Y THE POLICIES BELOW. I INSURED (Legal name and business address) CERTIFICATE HOLDER: CONTRACT NUMBER CLALLAM COUNTY, WASHINGTON PUBLIC WORKS DEPARTMENT COURTHOUSE DATE ISSUED I 223 EAST FOURTH ST. sTE. 7 PORT ANGELES, WA 98362 PRO/ Err DESCRIPTION/LOCATIONS VEHICLES RESTRICTIONS SPECIAL ITEMS: 1 This is to certify that iolicies of Insumnce listed below have been issued to the Insured named above for the hey riod indicated, I 1 :'71:1 L ,::',-,-:-VL:::::Zqt7.I:7s2Z.::.:L1,:d;;7''Z'1,'SY:;...,' 7j'. 11,1 775:TIF7:::LW::"...'::377:'..' CO TYPE OF INSURANCE POLICY NUMBER Date Policy Date Policy ALL LIMITS IN THOUSANDS LTR Effective Expires (IMM/DD/YY) (MWDD/YY) I GENERAL LIABILITY Commercial General Liability Products Comp/Ops Agate-gate s 1 Claims Is4ade E3 Occurrence General Agerceate 5 Personal Advertising Injury owficcs Contractors Protection Each Occurrence fire Damage (Anv One Fire) S I Deductible S. Medical Expense (Any One Person) AUTOMOBILE LIABILITY My Auto CSI. 5 All Owned Autos Bodily Injury 1,.. I Scheduled Autos lifted Autos Bodily Injury Non•Ooned Autos per person) (p Kr accident) r f.„ Garage Liability. Properly fr:. Deductible Damage 5 1 EXCESS LIA1311.1TY 1 Each Occurrence Aggregate Other Than Umbrella Form 4 i S 5 WORKERS COMPLNSATION sTATIrroRY I AND EMPLOYER'S LIABILITY 5 ch 5 (Ea Accidenti (Di 5 sease Policy Limit) (Disease-Each Emplovee) OTI IER I ADDITIONAL PROVISIONS CLALLAM COUNTY is included as additional insured as related to the above-mentioned project. Should any of thc above described policies be cancelled before the expiration date thereof. thc issuing Company must deliver or mail not less than a 45 days written notice I to thc above Certificate I folder, per RCW 48.18.290 COMPANIES AFFORDING COVERAGE ISSUING COMPANY, AGENT OR REPRESENTATIVE NOTE: Attach a separate sheet to this certificate giving all the company names and their percentage of coverage, if NAME: clarification is needed, 1 A ADDRESS: 13 7./ I —1 C Fs a Authorized Signature Title r- I) Signature Date o L.) Signce Name 1 E Telephone No. I END OF SECTION 00400 HORIZON CENTER BUILDING June 2011 1 DIVISION ZERO Form of Agreement Between Owner and Contractor Section 00500 FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR 1 Project Name: Horizon Center Building Project Number(s): 621101HB This agreement is entered into between Clallam County, a political subdivision of the State of Washington, hereafter called "County" and hereinafter called "Contractor 111 The Owner and Contractor agree as set forth below: 1. This Agreement is comprised of the Bidding Documents, Contract Documents, the Agreement, Plans and Specifications as described in the Contract Documents, Addenda issued prior to execution of this Agreement and modifications issued after execution of this Agreement. 2. The Contractor shall execute the entire work described in the Bidding and Contract Documents. 1 3. The date of commencement is the date the Contractor receives a signed copy of this Agreement by the Board of Commissioners which shall be considered the notice to proceed. 4. The Contractor shall achieve Substantial Completion of the entire work no later than October 3, 2011 subject to adjustments provided for in the Contract Documents. All work shall be completed no later than October 14, 2011. 1 5. The Owner shall pay the Contractor in current funds for Contractor's performance of the Contract the Contract Sum of Dollars 1 subject to additions and deductions as provided in the Contract Documents. 6. The Contract Sum is based upon the following alternates, if any, which are described in the Contract Documents and hereby accepted by the Owner: Alternates /Unit Pricing: Alternate #1: Unit Price #1: 7. Progress Payments 1 a. The Owner shall make progress payments to the Contractor on account of the Contract Sum as provided for below and elsewhere in the Contract Documents. b. The Contractor shall submit Application for Payment on AIA Document G702 forms not more than once per month or Contractor's own form with same information found on G702 Forms. c. The Contractor shall submit Application for Payment prior to the last day of each calendar month to the Owner or Owner's Representative Engineer. d. The Owner shall make progress payments within 15 calendar days of receipt of Application for Payment and certification that work has progressed satisfactorily. e. Each Application for Payment shall be based upon the schedule of values submitted by the Contractor in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work and be prepared in such form and supported by such data to substantiate its accuracy as the Owner or Owner's Engineer may require. This schedule, unless objected to by the Owner or Owner's Engineer, shall be used as a basis for reviewing the Contractor's Applications for payment. f. Applications for Payment shall indicate the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. g. Subject to the provisions of the Contract Documents, the amount of each progress payment shall be computed as follows: Take that portion of the Contract Sum properly allocable to completed Work as determined 1 by multiplying the percentage completion of each portion of the Work by the share of the total HORIZON CENTER BUILDING Page 1 of 2 June 2011 DIVISION ZERO Form of Agreement Between Owner and Contractor Section 00500 Contract Sum allocated to that portion of the Work in the schedule of values, Tess Retainage of five percent. Pending final determination of cost to the Owner of changes in the Work, amounts not in the dispute may be included as provided in the General Conditions even though the Contract Sum has not yet been adjusted by Change Order. Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction less Retainage of five percent. Subtract the aggregate of previous payments made by the Owner; and Subtract amounts, if any, for which the Owner or Engineer has withheld or nullified a Certificate of Payment as provided in the General Conditions. 8. Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when (1) the Contract has been fully performed by the Contractor except for the Contractor's responsibility to correct non conforming Work as provided in the General Conditions and to satisfy other requirements, if any, which necessarily survive final payment; and (2) a Final Certificate for Payment has been issued by the Owner or Owner's Representative Engineer; such final payment shall be made by the Owner not more than 30 days after the issuance of the Owner or Owner's Representative Engineer's final Certificate for Payment, punch list is completed and all close -out paperwork and documents have been submitted to the Owner including Department of Revenue clearance. 1 9. Other documents, if any, forming part of the Contract Documents are as follows: A. UBI Certification (copy to be attached to Agreement) IN WITNESS WHEREOF, the Parties have executed this Agreement on this day of 1 2011. CONTRACTOR: OWNER: 1 Clailam County Commissioners (Name) 1 (By) Howard V. Doherty, Jr., Chair (Its) 1 Date: 2011 Approved as to Form Attest: Deputy Prosecuting Attorney Trish Holden, CMC, Clerk of the Board 1 END OF SECTION 00500 1 HORIZON CENTER BUILDING Page 2 of 2 June 2011 DIVISION ZERO General Conditions of the Contract Section 00600 GENERAL CONDITIONS OF THE CONTRACT ARTICLE 1 GENERAL PROVISIONS 1.1 Definitions 1.1.1 Contract Documents consist of Agreement between Owner and Contractor, General Conditions 1 of the Contract, Supplemental Conditions, Bidding Documents, Bonds, Drawings and Specifications, Addenda, approved Alternates, and modifications issued after execution of the Agreement. 1.1.2 The term Work means the construction and services required by the Contract Documents and include all labor, materials, equipment and services provided by the Contractor to fulfill the Contractor's obligations. 1 1.1.3 The Drawings are the graphic and pictorial portions of the Contract Documents showing the design, location and dimensions of the Work. 1.1.4 The Specifications are that portion of the Contract Documents consisting of the written requirements for materials, equipment construction systems, standards and workmanship for the Work and performance of related services. 1 1.1.5 The Project Manual is the volume assembled for the work which includes the Bidding Documents including Call for Bids and Instructions to Bidders, and Contract Documents. 1.2 Execution, Correlation and Intent 1.2.1 The Contract Documents shall be signed by the Owner and Contractor as provided in the Agreement. 1.2.2 Execution of the contract by the Contractor is a representation that the Contractor has visited the site, become familiar with local conditions under which the Work is to be performed, and correlated personal observations with requirements of the Contract Documents. 1.2.3 The intent of the Contract Documents is to include all items necessary for the proper execution and completion of the Work by the Contractor. The Contract Documents are complementary, and what is required by one shall be as binding as if required by all. 1.2.4 Organization of the Specifications into divisions, sections and articles, and arrangement of Drawings shall not control the Contractor in dividing the Work among Subcontractors or in establishing the extent of Work to be performed by any trade. 1.2.5 Unless otherwise stated in the Contract Documents, words which have well -known technical or construction industry meanings are used in the Contract Documents in accordance with such recognized meanings. 1.2.6 The apparent silence of the specifications or plans as to any detail or the apparent omission from them of a detailed description concerning any point shall be regarded as meaning that only the best general practice is to prevail and that only material and workmanship of first quality are to be used. All interpretations of these specifications shall be made on the basis above stated. 1 1 HORIZON CENTER BUILDING Page 1 of 16 June 2011 DIVISION ZERO General Conditions of the Contract Section 00600 1.3 Ownership of Documents 1.3.1 The Drawings, Specifications and other documents prepared by the Owner or Owner's Engineer are instruments of the Owner's service through which the Work to be executed by the Contractor is described. The Owner shall be deemed the author of them and will retain all common law, statutory and other reserved rights, in addition to the copyright. ARTICLE 2 OWNER 1 2.1.1 The Owner is the person or entity identified as such in the Agreement and is referred to throughout the contract Documents as if singular in number. The term "Owner" means the Owner or the Owner's authorized representative. 2.1.2 The Owner shall furnish surveys, utility locations, or other records that the Owner has presently on file or presently knows of to the contractor upon request. The Owner will not provide additional surveys, layouts or locations unless specifically stated elsewhere in the Contract Documents. 2.1.3 The Owner shall be responsible for obtaining the septic permit as it relates to this project. 1 2.1.4 The Owner shall have additional responsibilities enumerated herein. 2.1.5 If the Contractor fails to correct Work or persistently fails to carry out Work in accordance with the Contract Documents, the Owner, by written order signed personally or by an agent specifically so empowered by the Owner in writing, may order the Contractor to stop the work, or any portion thereof, until the cause for such order has been eliminated. ARTICLE 3 CONTRACTOR 3.1.1 The Contractor is the person or entity identified as such in the Agreement and is referred to throughout the Contract Documents as if singular in number. The term "Contractor" means the Contractor or the Contractor's authorized representative. 3.1.2 The Contractor shall carefully study and compare the Contract Documents with each other and with information furnished by the Owner and shall at once report to the Owner errors, inconsistencies or omissions discovered. The Contractor shall not be liable to the Owner for damage resulting from errors, inconsistencies or omissions in the Contract Documents unless the Contractor recognized (or should have recognized) such error, inconsistency or omission and knowingly failed to report it to the Owner. If the Contractor performs any construction activity knowing it involves a recognized error, inconsistency or omission in the Contract Documents without such notice to the Owner, the Contractor shall assume appropriate responsibility for such performance and shall bear an appropriate amount of the attributable costs for correction. 3.1.3 The Contractor shall take field measurements and verify field conditions and shall carefully compare such field measurements and conditions and other information known to the Contractor with the Contract Documents before commencing activities. Errors, inconsistencies or omissions discovered shall be reported to the Owner at once. 3.1.4 The Contractor shall supervise and direct the Work, using the Contractor's best skill and attention. The Contractor shall be solely responsible for and have control over construction means, methods, techniques, sequences and procedures and for coordinating all portions of the Work under the Contract, unless Contract Documents give other specific instructions concerning these matters. 1 HORIZON CENTER BUILDING Page 2 of 16 June 2011 DIVISION ZERO General Conditions of the Contract Section 00600 3.1.5 The Contractor shall be responsible to the Owner for acts and omissions of the Contractor's 1 employees, Subcontractors and their agents and employees, and other persons performing portions of the Work under a contract with the Contractor. 3.1.6 Unless otherwise provided in the Contract Documents, the Contractor shall provide and pay for labor, materials, equipment, tools, construction equipment and machinery, water, heat, utilities, transportation, and other facilities and services necessary for proper execution and completion of the Work, whether temporary or permanent and whether or not incorporated or to be incorporated in the Work. 3.1.7 The Contractor shall enforce strict discipline and good order among the Contractor's employees and other persons carrying out the Contract. The Contractor shall not permit employment of unfit persons or persons not skilled in tasks assigned to them. 3.1.8 The Contractor warrants to the Owner that materials and equipment furnished under the Contract will be of good quality and new, that the Work will be free from defects not inherent in the quality required or permitted, and that the Work will conform to the requirements of the Contract Documents. Work not conforming to these requirements, including substitutions not properly approved and authorized, may be considered defective. The Contractor's warranty excludes remedy for damage or defect caused by abuse, modifications not executed by the Contractor, improper or insufficient maintenance, improper operation, or normal wear and tear under normal usage. If required by the Owner, the Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment. 3.1.9 The Contractor shall pay sales, consumer, use and similar taxes for the work or portions thereof provided by the Contractor which are legally enacted when bids are received or negotiations concluded, whether or not yet effective or merely scheduled to go into effect. 3.1.10 The Contractor shall secure and pay for all permits and governmental fees, licenses and inspections necessary for proper execution and completion of the Work, with the exception of the septic permit that has already been obtained by the Owner. 3.1.11 The Contractor shall comply with and give notices required by laws, ordinances, rules, regulations and lawful orders of public authorities bearing on performance of the Work. 3.1.12 If the Contractor observes that portions of the Contract Documents are at variance with codes, the Contractor shall promptly notify the Owner in writing, and necessary changes shall be accomplished by appropriate modification. 3.1.13 If the Contractor performs Work knowing or should have known it to be contrary to laws, statutes, ordinances, building codes, and rules and regulations without such notice to the Owner, the Contractor shall assume full responsibility for such Work and shall bear the attributable costs. 3.1.14 The Contractor shall keep the premises and surrounding area free from accumulation of waste materials or rubbish caused by operations under the Contract. At completion of the work, the Contractor shall remove from and about the Project waste materials, rubbish, the Contractor's tools, construction equipment, machinery and surplus materials. 1 3.1.15 If the Contractor fails to clean up as provided in the Contract Documents, the Owner may do so and the cost thereof shall be charged to the Contractor. 3.1.16 The Contractor shall provide the Owner access to the Work in preparation and progress wherever located. 3.1.17 To the fullest extent permitted by law, the Contractor shall defend, indemnify and hold harmless, 1 the Owner, Architect, Architect's consultants, and agents and employees of any of them from and against claims, damages, losses and expenses, including but not limited to attorney's fees, arising out of or HORIZON CENTER BUILDING Page 3 of 16 June 2011 DIVISION ZERO General Conditions of the Contract Section 00600 resulting from performance of the Work, provided that such claim, damage, loss or expense is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property (other than the work itself) including Toss of use resulting therefrom, but only to the extent caused in whole or in part by negligent acts or omissions of the Contractor, a Subcontractor, anyone directly or indirectly employed by them or anyone for whole acts they may be liable, regardless of whether or not such claim, damage, loss or expense is caused in part by a party indemnified hereunder. Such obligation shall not be construed to negate, abridge, or reduce other rights or obligations of indemnity which would otherwise exist as to a party or person described in this Paragraph. 3.1.18 With respect to performance of this agreement and as to claims against the county, its elected and appointed officers, agents and employees, the Contractor expressly waives its immunity under Title 51 RCW, the Industrial Insurance Act, as now and hereafter amended, for injuries to its employees and agrees that the obligations to indemnify, defend and hold harmless provided in this agreement extend to any claim brought by or on behalf of any employee of the Contractor. This waiver is mutually negotiated by the Owner and Contractor. ARTICLE 4 ADMINISTRATION OF THE CONTRACT 4.1 The Owner's project manager shall be the administrator of the contract unless the Owner has 1 agreement for Architectural services. 4.1.1 The Architect is the person lawfully licensed to practice Architecture or an entity lawfully practicing Architecture identified as such in the Agreement and is referred to throughout the Contract Documents as if singular in number. The term "Architect" means the Architect or the Architect's authorized representative. 4.1.2 Duties, responsibilities and limitations of authority of the Architect as set forth in the Contract Documents shall not be restricted, modified or extended without written consent of the Owner, Contractor and Engineer. Consent shall not be unreasonably withheld. 1 4.1.3 The Architect will provide administration of the Contract as described in the Contract documents, and will be the Owner's representative (1) during construction, (2) until final payment is due and (3) with the Owner's concurrence, from time to time during the correction period. The Architect will advise and consult with the Owner. The Engineer will have authority to act on behalf of the Owner only to the extent provided in the Contract Documents, unless otherwise modified by written instrument in accordance with other provisions of the Contract. 4.1.4 The Architect will visit the site at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the completed Work and to determine in general if the Work is being performed in a manner indicating that the Work, when completed, will be in accordance with the Contract Documents. However, the Architect will not be required to make exhaustive or continuous on -site inspections to check observations as an Architect, the Architect will keep the Owner informed of progress of the Work, and will endeavor to guard the Owner against defects and deficiencies in the Work. 4.1.5 Except as otherwise provided in the Contract Documents or when direct communications have been specially authorized, the Owner and Contractor shall endeavor to communicate through the Architect. Communications by and with the Architect's consultants shall be through the Architect. Communications by and with Subcontractors and material suppliers shall be through the Contractor. Communications by and with separate contractors shall be through the Owner. 4.1.6 Based on the Architect's observations and evaluations of the Contractor's Applications for Payment, the Architect will review and certify the amounts due the Contractor and will issue Certificates for Payment in such amounts to the Owner who has final approval and authority. 1 HORIZON CENTER BUILDING Page 4 of 16 June 2011 DIVISION ZERO General Conditions of the Contract Section 00600 4.1.7 The Architect, with Owner's approval, will have authority to reject Work which does not conform 1 to the Contract documents. Whenever the Architect, with Owner's approval, considers it necessary or advisable for implementation of the intent of the Contract Documents, the Architect, with Owner's approval, will have authority to require additional inspection or testing of the work. However, neither this authority of the Architect nor a decision made in good faith either to exercise or not to exercise such authority shall give rise to a duty or responsibility of the Architect to the Contractor, subcontractors, material and equipment suppliers, their agents or employees, or other persons performing portions of the Work. 4.1.8 The Architect will review and, with Owner's approval, approve or take other appropriate action upon the Contractor's submittals such as Shop Drawings, Product Data and Samples, but only for the limited purpose of checking for conformance with information given and the design concept expressed in the Contract Documents. 4.1.9 The Architect, with the Owner's approval, will prepare Change Orders and Construction Change 1 Directives, and may authorize minor changes in the work as provided in Paragraph 7.1.4. 4.1.10 The Architect will conduct inspections to determine the date or dates of Substantial Completion and the date of final completion, will receive and forward to the Owner for the Owner's review and records written warranties and related documents required by the Contract and assembled by the Contractor, and will issue a final Certificate for Payment upon compliance with the requirements of the Contract Documents. ARTICLE 5 SUBCONTRACTORS 1 5.1 Definitions 5.1.1 A Subcontractor is a person or entity who has a direct contract with the Contractor to perform a portion of the Work at the site. 5.1.2 Unless otherwise stated in the Contract Documents or the bidding requirements, the Contractor, as soon as practicable after award of the Contract, shall furnish in writing to the Owner the names of persons or entities (including those who are to furnish materials or equipment fabricated to a special design) proposed for each principal portion of the Work. The Owner will promptly reply to the Contractor in writing stating whether or not, after due investigation, the Owner has reasonable objection to any such proposed person or entity. Failure of the Owner to reply promptly shall constitute notice of no reasonable objection. 5.1.3 The Contractor shall not contract with a proposed person or entity to whom the Owner has made reasonable and timely objection. 5.1.4 If the Owner has reasonable objection to a person or entity proposed by the Contractor, the 1 Contractor shall propose another to whom the Owner has no reasonable objection. The Contract Sum shall be increased or decreased by the difference in cost occasioned by such change and an appropriate Change Order shall be issued. However, no increase in the Contract Sum shall be allowed for such change unless the Contractor has acted promptly and responsively in submitting names as required. 5.1.5 By appropriate agreement, written where legally required for validity, the Contractor shall require each Subcontractor, to the extent of the Work to be performed by the Subcontractor, to be bound to the Contractor by terms of the Contract Documents, and to assume toward the Contractor all the obligations and responsibilities which the Contractor, by these Documents, assumes toward the Owner and Architect. Each subcontract agreement shall preserve and protect the rights of the Owner and Architect under the Contract Documents with respect to the Work to be performed by the Subcontractor so that subcontracting thereof will not prejudice such rights, and shall allow to the Subcontractor, unless specifically provided otherwise in the subcontract agreement, the benefit of all rights, remedies and HORIZON CENTER BUILDING Page 5 of 16 June 2011 DIVISION ZERO General Conditions of the Contract Section 00600 redress against the Contractor that the Contractor, by the Contract Documents, has against the Owner. Where appropriate, the Contractor shall require each Subcontractor to enter into similar agreements with 1 Sub subcontractors. The Contractor shall make available to each proposed Subcontractor, prior to the execution of the subcontract agreement, copies of the Contract Documents to which the Subcontractor will be bound, and, upon written request of the Subcontractor, identify to the Subcontractor terms and conditions of the proposed subcontract agreement which may be at variance with the Contract Documents. Subcontractors shall similarly make copies of applicable portions of such documents available to their respective proposed Sub subcontractors. 1 ARTICLE 6 CONSTRUCTION BY OWNER 6.1.1 The Owner reserves the right to perform construction or operations related to the Project with the Owner's own forces, and to award separate contracts in connection with other portions of the Project or other construction or operations on the site under Conditions of the Contract identical or substantially similar to these including those portions related to insurance and waiver of subrogation. If the Contractor 1 claims that delay or additional cost is involved because of such action by the Owner, the Contractor shall make such Claim as provided elsewhere in the Contract Documents. 6.1.2 The Owner shall provide for coordination of the activities of the Owner's own forces. 1 6.1.3 If part of the Contractor's Work depends, for proper execution or results, upon construction or operations by the Owner or a separate contractor, the Contractor shall, prior to proceeding with that portion of the Work, promptly report to the Owner apparent discrepancies or defects in such other construction that would render it unsuitable for such proper execution and results. Failure of the Contractor to so report shall constitute an acknowledgment that the Owner's or separate contractors' completed or partially completed construction is fit and proper to receive the Contractor's Work, except as to defects not then reasonably discoverable. ARTICLE 7 CHANGES IN THE WORK 7.1.1 Changes in the work may be accomplished after execution of the Contract, and without invalidating the Contract, by Change Order. 1 7.1.2 A Change Order shall be based upon agreement among the Owner, Contractor and Architect/Engineer. 1 7.1.3 Changes in the Work shall be performed under applicable provisions of the Contract Documents, and the Contractor shall proceed promptly, unless otherwise provided in the Change Order. 7.1.4 A Change Order is a written instrument prepared by the Owner or Architect and signed by the Owner, Contractor and Architect stating their agreement upon all of the following: 1. a change in the Work, 2. the amount of the adjustment in the Contract Sum, if any, and 3. the extent of the adjustment in the Contract Time, if any. ARTICLE 8 TIME AND LIQUIDATED DAMAGES 8.1.1 Time limits stated in the Contract Documents are of the essence of the Contract. By executing the Agreement, the Contractor confirms that the Contract Time is a reasonable period for performing the Work. 1 HORIZON CENTER BUILDING Page 6 of 16 June 2011 DIVISION ZERO General Conditions of the Contract Section 00600 8.1.2 The Contractor shall not knowingly, except by agreement or instruction of the Owner in writing, 1 prematurely commence operations on the site or elsewhere prior to the effective date of insurance to be furnished by the Contractor. The date of commencement of the Work shall be not changed by the effective date of such insurance. Unless the date of commencement is established by a notice to proceed given by the Owner, the Contractor shall notify the Owner in writing not less than five days or other agreed period before commencing the work to permit the timely filing of mortgages, mechanic's liens and other security interests. 8.1.3 If the Contractor is delayed at any time in progress of the Work by an act or neglect of the Owner, or of an employee of either, or of a separate contractor employed by the Owner, or by changes ordered in the Work, or by labor disputes, fire, unavoidable casualties or other causes beyond the Contractor's control, or by delay authorized by the:Owner, then the Contract time shall be extended by Change Order. 8.1.4 Should the Contractor fail to complete the Work within the Contract Time, the Owner will sustain damage. 8.1.5 Therefore, the parties agree that the Contractor shall pay the Owner, as liquidated damages and not as penalty, an amount as follows,'iwhich shall be considered to be the amount of the damage sustained by the Owner on account of the condition specified and shall continue to be paid until the condition specified is met. 8.1.6 It is agreed by the parties that time is of essence in this agreement and, if the date of final 1 completion is delayed, the Owner will be damaged. The exact amount of the damage will be difficult to calculate, but will include such items as outside leases, loss of efficient function, and inconvenience to the public and to the Owner. It is agreed between the parties that the amount of damages will be One 1 Thousand Dollars and No Cents ($200.00) per calendar day from Final Completion date as designated for each individual project as stated on the Form of Agreement between Owner and Contractor. The Owner may deductithe sum of such liquidated damages from any moneys due or that may become due the Contractor; or if 'such moneys are insufficient, the Contractor or his Surety or Sureties shall pay the difference. ARTICLE 9 PAYMENTS AND COMPLETION 9.1.1 The Contract Sum is stated in the Agreement and, including authorized adjustments, is the total amount payable by the Owner to the Contractor for performance of the Work under the Contract Documents. 9.1.2 Before the first Application for;Payment, the Contractor shall submit to the Owner or Architect a schedule of values allocated to various portions of the work, prepared in such form and supported by such data to substantiate its accuracy;as the Owner or Architect may require. This schedule, unless objected to by the Owner or Architect, ,shall be used as a basis for reviewing the Contractor's Applications for Payment. 9.1.3 At least ten days before the date established for each progress payment, the Contractor shall submit to the Owner or Architect, if one is used, an itemized Application for Payment for operations 1 completed in accordance with the schedule of values. Such application shall be notarized, if required, and supported by such data substantiating the Contractor's right to payment as the Owner or Architect may require, such as copies or requisitions from Subcontractors and material suppliers, and reflecting Retainage if provided for elsewhere inithe Contract Documents. 9.1.4 Such applications may include requests for payment on account of changes in the work which have been properly authorized by Change Orders. 1 9.1.5 Such applications may not include requests for payment of amounts the Contractor does not intend to pay to a Subcontractor or material supplier because of a dispute or other reason. HORIZON CENTER BUILDING Page 7 of 16 June 2011 DIVISION ZERO General Conditions of the Contract Section 00600 1 9.1.6 Unless otherwise provided in the Contract Documents, payments shall be made on account of materials and equipment delivered and suitably stored at the site for subsequent incorporation in the Work. 9.1.7 The Contractor warrants that title to all Work covered by an Application for Payment will pass to the Owner no later than the time of payment. The Contractor further warrants that upon submittal of an Application for Payment, all Work for which Certificates for Payment have been previously issued and payments received from the Owner shall, to the best of the Contractor's knowledge, information and belief, be free and clear of liens, claims, security interests or encumbrances in favor of the Contractor, Subcontractors, material suppliers, or other persons or entities making a claim by reason of having provided labor, materials and equipment relating to the Work. 9.1.8 The Owner shall determine the payment amount to be made to the Contractor. 9.1.9 At the time each month stipulated in the Owner /Contractor Agreement, the Owner shall pay to the Contractor an amount equal to ninety -five percent (95 of the value of labor and material incorporated in the work, all as approved by the Architect in accordance with the provisions of the Contract Documents; such amount paid to the Contractor shall be less the total of all previous payments and deductions provided for in the Contract Documents. The five percent (5 withheld shall be Retainage, which shall be paid as provided hereinafter. The percentage of contract retained shall be five percent (5 pursuant to RCW Chapter 60.28, as amended. Thirty days after final acceptance of the completed work, the balance due will be paid, provided, a. The work be fully completed. b. Certification has been received by the Owner from the State Department of Labor and Industries, as to payment of prevailing wages, in conformance with laws. c. Certification has been received by the Owner from the State Department of Revenue that all taxes have been paid, no tax lien may exist, and d. The Contractor warrants to the Owner all claims by materialmen and workmen, if any, for unpaid charges against the work have been satisfied, and e. To hold the Owner harmless from all liens on the completed work. In the event these provisions are not met, the Owner may pay a percentage of the Retainage, holding back that quantity of money for materialmen and laborer's liens, tax liens, cost and attorney's fees to defray the cost of foreclosing all other liens, costs, and Engineer's fee to defray cost of additional Construction Administration services. After the award of a Contract for public improvement or work for which retained percentages are required to be reserved under the provisions of RCW 60.28.010., Owner shall require the Contractor to exercise in writing, one of the options listed in RCW 60.20.010. Retained amounts shall be paid into an escrow account, if requested, in a financial institution chosen by the Contractor and approved by the Owner, the interest earnings from which shall accrue to the benefit of the Contractor. 9.1.10 Final payment will not be made by the Owner until all contract conditions and requirements have been fulfilled and all forms and certificates are received in full. 9.1.11 Upon receipt of written notice that the Work is ready for final inspection and acceptance and upon receipt of a final Application for Payment, the Owner or Architect will promptly make such inspection, and when Owner and Architect finds the Work acceptable under the Contract Documents and the Contract fully performed, the Architect will promptly issue a final Certificate for Payment. 1 HORIZON CENTER BUILDING Page 8 of 16 June 2011 DIVISION ZERO General Conditions of the Contract Section 00600 ARTICLE 10 PROTECTION OF1PERSONS AND PROPERTY 10.1.1 The Contractor shall be responsible for initiating, maintaining and supervising all safety 1 precautions and programs in connection with the performance of the Contract. 10.1.2 In the event the Contractor encounters on the site material reasonably believed to be asbestos or polychlorinated biphenyl (PCB) which has not been rendered harmless, the Contractor shall immediately stop Work in the area affected and report the condition to the Owner and Architect in writing. The Work in the affected area shall not thereafter be resumed except by written agreement of the Owner and Contractor if, in fact, the material is asbestos or polychlorinated biphenyl (PCB) and has not been rendered harmless. The work in the affected area shall be resumed in the absence of asbestos or PCB, or when it has been rendered harmless by written agreement of the Owner and Contractor. 10.1.3 The Contractor shall take reasonable precautions for safety of, and shall provide reasonable protection to prevent damage, injury or Toss to: 1. employees on the Work and other persons who may be affected thereby; 2. the work and materials and equipment to be incorporated therein, whether in storage on or off the site, under care, custody or control of the Contractor or the Contractor's Subcontractors or Sub subcontractors, and 3. other property at the site or adjacent thereto, such as trees, shrubs, lawns, walks, pavements, roadways, structures and utilities not designated for removal, relocation or replacement in the course of construction. 10.1.4 The Contractor shall give notices and comply with applicable laws, ordinances, rules, regulations and lawful orders of public authorities bearing on safety of persons or property or their protection from damage; injury or loss. 1 10.1.5 The Contractor shall erect and maintain, as required by existing conditions and performance of the Contract, reasonable safeguards for safety and protection, including posting danger signs and other warnings against hazards, promulgating safety,regulations and notifying owners and users of adjacent sites and utilities. 10.1.6 When use or storage of explosive or other hazardous materials or equipment or unusual methods are necessary for execution of the Work, the Contractor shall exercise utmost care and carry on such activities under supervision of properly qualified personnel. 10.1.7 The Contractor shall promptly, remedy damage and Toss (other than damage or loss insured under property insurance required by the Contract Documents) to property caused in whole or in part by the Contractor, a Subcontractor, a Sub- subcontractor, or anyone directly or indirectly employed by any of them, or by anyone for whose acts they may be liable and for which the Contractor is responsible, except damage or loss attributable to acts or omissions of the Owner or Engineer or anyone directly or indirectly employed by either of them, or by anyone for whose acts either of them may be liable, and not attributable to the fault or negligence of the Contractor. The foregoing obligations of the Contractor are in addition to the Contractor's obligations. 1 10.1.8 The Contractor shall not load or permit any part of the construction or site to be loaded so as to endanger its safety. 10.1.9 In an emergency affecting safety of persons or property, the Contractor shall act, at the Contractor's discretion, to prevent threatened damage, injury or loss. 10.1.10 The Contractor agrees to comply with Chapter 49.18 RCW providing that no laborer, workman, or mechanic in the employ of the Contractor, Subcontractor, or other person doing or contracting to do the work or any part of the work contemplated by the Contract, shall be permitted or required to work HORIZON CENTER BUILDING Page 9 of 16 June 2011 DIVISION ZERO General Conditions of the Contract Section 00600 more than eight (8) hours in any one calendar day, provided that, in cases of extraordinary emergency, such as danger to life or property, the hours of work may be extended, but in such cases shall not be Tess than one and one -half times the rate allowed for this same amount of time during eight (8) hours' service. Any work necessary to be performed after regular working hours, or Sunday or legal holidays shall be performed without additional expense to the Owner. Contractor further agrees the said Contract is terminable in case the Contractor shall violate the provisions of such act. 1 ARTICLE 11 INSURANCE BONDS 11.1.1 The Contractor shall purchase from and maintain in a company or companies lawfully authorized to do business in the jurisdiction in which the Project is located such insurance as will protect the Contractor from claims set forth below which may arise out of or result from the Contractor's operations under the Contract and for which the Contractor may be legally liable, whether such operations be by the Contractor or by a Subcontractor or by anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable: 1 1. claims under workers or workmen's compensation, disability benefit and other similar employee benefit acts which are applicable to the Work to be performed; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of the Contractor's employees; 3. claims for damages because of bodily injury, sickness or disease, or death of any person other than the Contractor's employees; 4. claims for damages insured by usual personal injury liability coverage which are sustained (1) by a person as a result of an offense directly or indirectly related to employment of such person by the Contractor, or (2) by another person; 5. claims for damages, other than to the Work itself, because of injury to or destruction of tangible property, including Toss of use resulting therefrom; 6. claims for damages because of bodily injury, death of a person or property damage arising out of ownership, maintenance or use of a motor vehicle; and 7. claims involving contractual liability insurance applicable to the Contractor's obligations. 11.1.2 The Contractor shall name the Owner, the Engineer, their consultants, and their officers, agents, and employees, as additional insured on the insurance policies, except the workers' or workmen's compensation policy. The Contractor shall obtain from the Owner and Engineer the list of names to appear on the insurance policies. 11.1.3 The insurance required by Subparagraph 11.1.1 shall be written for not less than the following, or greater if required by law: 1. Workers' Compensation; a. State: Statutory b. Applicable Federal (e.g. Longshoremen, harbor Work, Work at or outside U.S. Boundaries): Statutory c. Employer's Liability: $1,000,000.00 d. Benefits Required by Union labor contracts: as applicable e. Include all- states endorsement 2. Comprehensive General Liability (Including Premises Operations; Independent Contractor's Protective, Products and Completed Operations; Broad Form Property Damage): a. Bodily Injury: $2,000,000.00 Single Limit Per Occurrence Full Contract Amount Aggregate, Products and Completed Operations b. Property Damage: Course of Construction Insurance HORIZON CENTER BUILDING Page 10 of 16 June 2011 DIVISION ZERO General Conditions of the Contract Section 00600 Full Contract Amount Each Occurrence 1 Full Contract Amount Aggregate c. Products and Completed Operations Insurance shall be maintained until 30 days after final completion d. Property Damage Liability Insurance shall include coverage for the following hazards: Vandalism, Fire, Explosion, Collapse, and Underground e. Contractual Liability; 1. Bodily Injury: $2,000,000 Each Occurrence 2. Property Damage: Full Contract Amount Each Occurrence Full Contract Amount Aggregate f. Personal Injury with Employment Exclusion Deleted: $2,000,000.00 Aggregate 3. Comprehensive Automobile Liability (Owned, Non owned, Hired): a. Bodily Injury: $1,000,000.00 Each Person $1,000,000.00 Each Occurrence b. Property Damage: $500,000.00 Each Occurrence 1 4. If possible, all of the above insurance coverage shall be carried with the same insurance company. 111 11.1.4 Certificates of Insurance acceptable to the Owner shall be filed with the Owner and the Architect prior to commencement of the work. These Certificates shall contain a provision that coverages afforded under the policies will not be canceled until at least thirty (30) days' prior written notice has been given to the Owner, the Architect, the Contractor, and the Owner's insurer. Certificates shall be furnished in duplicate and stipulate all coverage required, and the Contractor shall furnish to the Owner and the Architect copies of all endorsements that are subsequently issued amending coverage or limits. 11.1.5 The Contractor shall purchase and maintain, in a company or companies lawfully authorized to do business in the jurisdiction in which the Project is located, property insurance in the amount of the initial Contract sum as well as subsequent modifications thereto for the entire Work at the site on a replacement cost basis without voluntary deductibles. Such property insurance shall be maintained, unless otherwise provided in the Contract Documents or otherwise agreed in writing by all persons and entities who are beneficiaries of such insurance, until final payment has been made. 11.1.6 Property insurance shall be on an all -risk policy form and shall insure against the perils of fire and extended coverage and physical loss or damage including, without duplication of coverage, theft, vandalism, malicious mischief, collapse, false work; temporary buildings and debris removal including demolition occasioned by enforcement of any applicable legal requirements, and shall cover reasonable compensation for Architect's services and expenses required as a result of such insured loss. Coverage for other perils shall not be required unless otherwise provided in the Contract Documents. 11.1.7 The Contractor shall secure and pay for performance and payment bonds issued by a bonding company, licensed to transact business in the locality of the project, on a Bond Form executed in pursuance to Chapter 39.08 Revised Code of Washington. The Bond Form must comply with all requirements of the Owner's attorney.; The surety bond shall be in the following penal sums: Performance Bond 100 of agreement sum, including Washington State Sales Tax Labor and Material 100 of agreement sum, including Washington State 1 Sales Tax 1 HORIZON CENTER BUILDING Page 11 of 16 June 2011 DIVISION ZERO General Conditions of the Contract Section 00600 Four copies of Bond Certification required. 11.1.8 The Contract Bond or an equivalent Maintenance Bond shall continue in full force until final acceptance of the Work by the Owner. 11.1.9 The Contractor guarantees the excellence of both workmanship and material, and the payment of all obligations incurred until the Work is finally accepted and for (30) days thereafter, and until the provisions of the Contract Documents are fulfilled. 11.1.10 For the projects under $25,000.00, Contractor may agree to a 50% Retainage fund in lieu of providing a performance bond. The Retainage fund to be held by the County until work is complete, all paperwork is turned in and state releases signed and returned to County. ARTICLE 12 WARRANTY 12.1.1 The Contractor shall warranty all labor, materials and work performed for a period of 1 year from date of final completion. ARTICLE 13 LAW, SUCCESSORS, TESTS 13.1.1 The contract shall be governed by law of the place where project is located. 13.1.2 The Owner and Contractor respectively bind themselves, their partners, successors, assigns and legal representatives to the other party hereto and to partners, successors, assigns and legal representatives of such other party in respect to covenants, agreements and obligations contained in the Contract Documents. Neither party to the Contract shall assign the Contract as a whole without written consent of the other. If either party attempts to make such an assignment without such consent, that party shall nevertheless remain legally responsible for all obligations under the Contract. 1 13.1.3 Duties and obligations imposed by the Contract Documents and rights and remedies available thereunder shall be in addition to and not a limitation of duties, obligations, rights and remedies otherwise imposed or available by law. 1 13.1.4 No action or failure to act by the Owner, Architect or Contractor shall constitute a waiver of a right or duty afforded them under the Contract, nor shall such action or failure to act constitute approval of or acquiescence in a breach thereunder, except a may be specifically agreed in writing. 13.1.5 Tests, inspections and approvals of portions of the Work required by the Contract Documents or by laws, ordinances, rules, regulations or orders of public authorities having jurisdiction shall be made at an appropriate time. Unless otherwise provided, the Contractor shall make arrangements for such tests, inspections and approvals with an independent testing laboratory or entity acceptable to the Owner, or with the appropriate public authority and shall bear all related costs of tests, inspections and approvals. U The contractor shall give the Owner timely notice of when and where tests and inspections are to be made so the Owner may observe such procedures. The Owner shall bear costs of tests, inspections or approvals which do not become requirements until after bids are received or negotiations concluded. 13.1.6 If the Owner or public authorities having jurisdiction determine that portions of the Work require additional testing, inspection or approval, instruct the Contractor to make arrangements for such additional testing, inspection or approval by an entity acceptable to the Owner, and the Contractor shall 1 give timely notice of when and where tests and inspections are to be made so the Owner may observe such procedures. 1 HORIZON CENTER BUILDING Page 12 of 16 June 2011 DIVISION ZERO General Conditions of the Contract Section 00600 13.1.7 If such procedures for testing, inspection or approval reveal failure of the portions of the Work to comply with requirements established by the Contract Documents, the Contractor shall bear all costs made necessary by such failure including those of repeated procedures. 13.1.8 Required certificates of testing, inspection or approval shall, unless otherwise required by the 1 Contract Documents, be secured by the Contractor and promptly delivered to the Owner. ARTICLE 14 TERMINATION 14.1.1 The Owner may terminate the Contract if the Contractor: 1. refuses or fails to supply enough properly skilled workers or proper materials; 2. fails to make payment to Subcontractors for materials or labor in accordance with the respective agreements between the Contractor and the Subcontractors; 3. disregards laws, ordinances, or rules, regulations, or orders of a public authority having jurisdiction; or 4. otherwise is guilty of substantial breach of a provision of the Contract Documents. ARTICLE 15 PREVAILING WAGES 15.1.1 REQUIRED: CONTRACTOR TO FILE STATEMENT OF INTENT TO PAY PREVAILING 1 WAGES AND AFFIDAVIT OF WAGES PAID. The prevailing rate of wage to be paid to all workmen, laborers, or mechanics employed in the performance of any part of this Contract shall be in accordance with the provisions of Chapter 39.12 RCW, as amended, and the rules and regulations of the Department of Labor and Industries of the State of Washington. The prevailing wage rates for the locality or localities where this Contract will be performed shall be determined by the Industrial Statistician of the Department of Labor and Industries, and are, by reference, made a part of this contract as though fully set forth herein. Current prevailing wage data is furnished by the Industrial Statistician. 15.1.2 Statement of Intent to Pay Prevailing Wages: The Contractor, on or before the date of commencement of work, shall complete, file and pay for a statement under oath with the Owner and with the Director of Labor and Industries certifying the rate of hourly wage paid and to be paid each classification of laborers, workmen or mechanics employed upon the work by the Contractor or Subcontractor which shall be not less than the prevailing rate of wage. (State Form LI 700 -29), State of Washington, Department of Labor and Industries, "Statement of Intent to Pay Prevailing Wages on Public Contract" form. Such statement and any subsequent statements shall be filed in accordance with the practices and procedures required by the Department of Labor and Industries. Therefore, the Contractor shall familiarize himself with this form and all its requirements. The Owner will not distribute any payments until all required certified copies of such forms are received. 15.1.3 It is the responsibility of the Contractor to require all his Subcontractors to complete and pay for "Statement of Intent to Pay Prevailing Wages" forms, submit these documents to the Department of Labor and Industries for certification and forward certified copies to the Owner as proof that the prevailing wage requirements of RCW 39.12.040 have been satisfied. Additional forms may be obtained from the Department of Labor and Industries, Industrial Relations Division, General Administration Building, Olympia, Washington 98504, and from all 15 service locations of the Department of Labor and Industries. 15.1.4 Each voucher claim submitted by a Contractor for payment on a project estimate shall state that prevailing wages have been paid in accordance with the pre -filed statement or statements of intent on file with the Department of Labor and Industrial Statistician. 15.1.5 The Contractor and Subcontractors shall further certify that: 1 a. He has not employed or retained any company or person (other than a full -time bona fide employee working solely for the offer) to solicit or receive this Contract and HORIZON CENTER BUILDING Page 13 of 16 June 2011 DIVISION ZERO General Conditions of the Contract Section 00600 b. He has not paid or agreed to pay any company or person (other than a full -time bona fide employee working solely for the offer any fee, commission, percentage or brokerage fee c. contingent upon or resulting from the award of this Contract; and He has not been asked or otherwise coerced, either expressed or implied, into contributing funds, for any purpose as a condition to doing business with the Owner; and d. He agrees to furnish information relating to items 1, 2 and 3 as requested by the 1 contracting officer. 15.1.6 It is further agreed that in case any dispute arises as to what are the prevailing wages for the work of a similar nature and such dispute cannot be adjusted by the parties involved, the matter shall be referred for arbitration to the Director of the Department of Labor and Industries of the State, and his decision therein shall be final, binding and conclusive on all parties involved in the dispute. 15.1.7 Upon completion of a Public Works Project, the Contractor, for himself and on behalf of all Subcontractors, shall file "Affidavit of Wages Paid" forms. Forms properly executed by the Contractor and all Subcontractors shall be submitted with proper payment to: Department of Labor and Industries, Industrial Insurance Division, Underwriting Section, General Administration Building, Olympia, WA 98504. Each "Affidavit of Wages" must be certified by the Industrial Statistician of the Department of Labor and Industries before it is submitted to the Owner. Copies of all required statements must be on file with the Owner before the retained percentage is released. 15.1.8 Upon completion of a Public Works project, the Contractor shall file a "Release for the Protection of Property Owner and General Contractor" form (LI 206 -83 release 1 -67) with the Department of Labor and Industries. The Owner will not disburse final payment or the Retainage to the Contractor until a release has been issued by the Department of Labor and Industries. Contractor shall pay for all costs of obtaining and filing all Labor and Industries forms. 1 ARTICLE 16 OFFSHORE ITEMS 16.1.1 In compliance with RCW 39.25, the Contractor shall furnish the Owner a certified statement 1 setting forth the nature and source of Offshore items in excess of $2,500 which have been utilized under each prime contract in the performance of the work. "Offshore Items" are those items procured from sources beyond the territorial boundaries of the United States including Alaska and Hawaii. This certified statement is mandatory and shall be received before final payment is made on the contract. ARTICLE 17 PREVENTION OF ENVIRONMENTAL POLLUTION AND PRESERVATION OF PUBLIC NATURAL RESOURCES 17.1.1 Pursuant to Chapter 62, Laws of 1973, 1st Ex. Session, those provisions of federal, state and local statutes, ordinances, and regulations dealing with the prevention of environmental pollution and the preservation of public natural resources that affect, or are affected by, the herein described project are, to the extent they are reasonably obtainable, as follows: RCW 43.21.030; RCW 90.58.140; RCW 90.58.320; and RCW 70.94.152. Conform with the provisions thereof. ARTICLE 18 DISCRIMINATION 1 18.1.1 The Contractor, by entering this contract, agrees that Discrimination in all phases of employment is prohibited by Title VII of the Civil Rights Act of 1964, Presidential Executive Order 11375, the Washington State Law Against Discrimination, Chapter 49.60 RCW, and by Gubernatorial Executive Orders 66 -1 and 70 -01, among other laws and regulations. 18.1.2 During the performance of this Contract, the Contractor agrees as follows: HORIZON CENTER BUILDING Page 14 of 16 June 2011 DIVISION ZERO General Conditions of the Contract Section 00600 1. The Contractor will not discriminate against any employee or applicant for employment because of race, creed, color, national origin, sex, sexual orientation, age, marital status, or the presence of any physical, sensory or mental handicap, nor shall the Contractor commit any of the other unfair practices defined in RCW 79.60, the Washington State Law Against Discrimination. 2. The Contractor will, in all solicitations or for employees, state that all qualified applicants will be considered for employment, without regard to race, creed, color, national origin, sex, sexual orientation, age, marital status, or the presence of any physical, sensory, or mental disability. 1 3. The Contractor will send to each labor union, employment agency, or representative of workers with which the Contractor has a collective bargaining agreement or other contract or understanding, a notice advising the labor union, employment agency, or workers' representative of the Contractor's commitments under this contract and RCW 49.60, the Washington State Law Against Discrimination. 4. The Contractor will permit access to its books, records and accounts, and to its premises by 1 the Owner or the Washington State Human Rights Commission for the purpose of investigation to ascertain compliance with these specifications. 5. The Contractor will include the provisions of clauses 1. through 4. above in every Subcontract or purchase order, so that such provisions will be upon each Subcontractor or vendor. 1 ARTICLE 19 COUNTY /CONTRACTOR RELATIONSHIP 19.1.1 In the event that either the state or federal government determines that an employer employee relationship exists, rather than an independent contractor relationship, such that Clallam County is deemed responsible for federal withholding, social security contributions and the like, the Contractor agrees to reimburse Clallam County for any payments made or required to be made by Clallam County. Should any payments be due to the Contractor pursuant to this agreement, the Contractor agrees that reimbursement may be made by deducting from such future payments a pro rata share of the amount to be reimbursed based upon the following formula: Total amount to be reimbursed Deduction from payment Number of payments remaining Notwithstanding a determination by the state or federal government that an employer employee relationship exists, the Contractor, its officers, employees and agents, shall not be entitled to any benefits which Clallam County provides to its employees, including, but not limited to, vacation and medical 1 benefits. 19.1.2 The status of the Contractor hereunder is that of an independent contractor and the Contractor shall not be construed to be an employee of Clallam County. As an independent contractor, the Contractor is not entitled to any benefits available to employees of Clallam County and the Contractor is responsible for withholding any moneys required to be withheld from the Contractor's employees pursuant to local, state, or federal law including, but not limited to, worker's compensation, social security, and taxes. 1 1 HORIZON CENTER BUILDING Page 15 of 16 June 2011 1 DIVISION ZERO General Conditions of the Contract Section 00600 1 END OF SECTION 00600 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 HORIZON CENTER BUILDING Page 16 of 16 June 2011 DIVISION ONE GENERAL REQUIREMENTS General Requirements Section 01001 GENERAL REQUIREMENTS 1. SUMMARY OF WORK 1 A. Contract Description: The work of this contract includes repair work upgrades to the Horizon Center Building: These include the following: 1. Removal and roof in -fill at existing skylights. Removal of existing roofing; inspection and repair of existing roof sheathing; and addition of new sheathing over existing exposed rafters. Installation of new 30 -year composition shingle roofing and new rain gutters and downspouts. Demolition of walls where rot occurs (as noted on drawings) and replacement with new construction and finishes to match existing. Addition of new support for existing deck wall. Removal of existing asphalt curbs as noted on drawings and addition of new concrete wheel stops and re- striping of parking lot as indicated on drawings. 2. Other Work typically associated with a project of this type and as described in the Contract Drawings and these specifications. 1 B. The Contractor is responsible for verifying all systems, assemblies, and details of construction prepared by the Owner or Owner's consultant as being appropriate to and within the standard practices of the building trades involved. The Contractor and all of his subcontractors and sub subcontractors shall have reviewed all documents thoroughly and shall report all discrepancies, irregularities, and items that differ from standard practices during the bidding phase. The Contractor shall be responsible to ensure proper coordination between all trades and all the corresponding documentation directing those trades. The Contractor shall also be responsible for confirmation of all manufacturers' instructions and special requirements of the use and application of their products. 2. WORK NOT IN CONTRACT A. 'NIC' (Not in Contract) items are as follows: 1. See drawings. 3. CONTRACTOR USE OF PREMISES 1 A. The Contractor shall have access only to the areas where the new work is to be executed. The Contractor shall coordinate with the Owner for staging, power outages, construction, and parking during construction, which will be limited to the area of Work. Work times and dates shall be scheduled and approved by the Owner prior to start of work. B. Given the nature of the day -to -day operations of this facility, it is imperative that all scheduling of work be approved beforehand by Owner. 4. UNIT PRICING 1 A. See Bid Forms, Section 00300 B. Unit Prices: As approved on final Section 00500 Form of Agreement Between Owner and 1 Contractor. 5. ALTERNATES 1 A. Alternates quoted on Bid Forms, Section 00300, will be reviewed and accepted or rejected at the Owner's option. 1 HORIZON CENTER BUILDING Page 1 of 5 June 2011 DIVISION ONE GENERAL Requirements REQUIREMENTS General Re Q 4 Section 01001 B. Coordinate related Work as required for a proper installation of all the Work of this Contract. C. Alternates: As approved on final Section 00500 Form of Agreement Between Owner and Contractor. 6. COORDINATION A. Coordinate scheduling, submittals, and Work of the various sections of specification to ensure efficient and orderly sequence of installation of interdependent construction elements with a minimum of public service disruption. B. In finished areas, conceal pipes and wiring within the construction. 1 7. WORKING HOURS A. Working hours shall be from 8:00 am until 5:00 pm, Monday through Friday. B. Any work outside these established working hours will need prior authorization from the Owner. 8. EXAMINATION A. Verify that existing conditions and substrate surfaces are acceptable for subsequent Work. Beginning new Work means acceptance of existing conditions. 9. PREPARATION A. Clean substrate surfaces prior to applying next material or substance. B. Apply manufacturer required or recommended substrate primer, sealer, or conditioner prior to applying new material or substance in contact or bond. 10. SUBMITTAL PROCEDURES A. Submittal form to identify Project, Contractor, Subcontractor or supplier; and pertinent Contract Document references. B. Apply Contractor's stamp, signed or initialed, certifying that review, verification of Products required, field dimensions, adjacent construction Work, and coordination of information is in accordance with the requirements of the Work and Contract Documents, prior to submitting the submittal for review by the Owner or Owner's Representative Engineer. C. Identify variations from Contract Documents and Product or system limitations which may be detrimental to successful performance of the completed Work. D. Revise and submit submittals as required; identify all changes made since previous submittal. 11. QUALITY ASSURANCE CONTROL OF INSTALLATION A. Monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce Work of specified quality, or when no level of quality is specified, perform Work as would be standard for a "custom" installation. B. Comply with manufacturers' instructions. HORIZON CENTER BUILDING Page 2 of 5 June 2011 DIVISION ONE GENERAL REQUIREMENTS General Requirements 1 Section 01001 C. Comply with specified standards as minimum quality for the Work except when more stringent 1 tolerances, codes, or specified requirements indicate higher standards or more precise workmanship. 12. TOLERANCES 1 A. Monitor tolerance control of installed Products over suppliers, manufacturers, Products, site conditions, and workmanship, to produce acceptable Work. Do not permit tolerances to accumulate. B. Comply fully with manufacturers' tolerances. 1 13. REFERENCES A. Conform to reference standards applicable for each system, product, or assembly as 1 commonly applied to each trade or discipline for this type of work and level of quality specified or implied, by date of issue current as of date of Contract Documents. B. Should specified reference standard conflict with Contract Documents, request clarification 1 from Owner before proceeding. 14. ELECTRICITY 1 A. Contractor may use existing electrical power facilities as available at the Horizon Center Building and in proximity to the project. Any equipment modification required to accommodate the Contractor's needs shall be at the Contractor's cost. Modifications shall only be made with approval of the County and equipment shall be returned to its original condition or better at the conclusion of the work. 15. LIGHTING FOR CONSTRUCTION PURPOSES A. Contractor may use existing lighting. Any equipment modification required to accommodate the Contractor's needs shall be at the Contractor's cost. 16. WATER A. Contractor may use existing water facilities as available at Horizon Center Building and in proximity to the project. Any equipment modification required to accommodate the Contractor's needs shall be at the Contractor's cost. Modifications shall only be made with approval of the County and equipment shall be returned to its original condition or better at the conclusion of the work. 17. SANITARY FACILITIES 1 A. The Contractor is to provide his/her own facilities. Building restrooms and sanitary facilities may not be used by Contractor. 1 18. PROJECT SAFETY A. See drawings for specific barrier requirements. 1 B. At a minimum, the Contractor shall erect and maintain an orange construction fence around the entire area of work, and provide temporary closures for protection of adjacent existing conditions, and barriers and signage to protect the public from construction hazards, including any overhead work. Prior to leaving the site in the evening the Contractor shall inspect and 1 HORIZON CENTER BUILDING Page 3 of 5 June 2011 DIVISION ONE GENERAL REQUIREMENTS General Requirements Section 01001 1 insure all fencing and barriers adequately protect the public from the safety hazards created by the construction of this project. 19. PROTECTION OF INSTALLED WORK A. Protect installed Work and provide special protection where specified in individual specification 1 sections. 20. SECURITY A. Provide security and facilities to protect Work and Owner's operations from unauthorized entry, vandalism, or theft. 1 21. PROGRESS CLEANING AND WASTE REMOVAL A. Collect and maintain areas free of waste materials, debris, and rubbish. Maintain construction area in a clean and orderly condition. Contractor is responsible for all costs involved in waste 1 removal. 1 22. REMOVAL OF UTILITIES, FACILITIES, AND CONTROLS A. Remove temporary utilities, equipment, facilities, and materials prior to Final Completion I review. Clean and repair damage caused by installation or use of temporary work. C. Restore existing facilities used during construction to original condition. Restore permanent facilities used during construction to specified condition. 23. PRODUCTS A. Products: means new material, machinery, components, equipment, fixtures, and systems forming the Work, but does not include machinery and equipment used for preparation, fabrication, conveying and erection of the work. Products may also include existing materials or components specifically identified for reuse. B. Do not use materials and equipment removed from existing premises, except as specifically 1 identified or allowed by the Contract Documents. C. Provide interchangeable components of the same manufacturer for components being replaced 1 and /or added in addition to existing components, e.g. lighting, switches, receptacles, etc. 24. TRANSPORTATION, HANDLING, STORAGE AND PROTECTION 1 A. Transport, handle, store, and protect Products in accordance with manufacturer's instructions. 25. CONTRACT CLOSE -OUT PROCEDURES 1 A. Submit written certification that the Contract Documents have been reviewed, Work has been inspected, and that Work is complete in accordance with the General Conditions and the Contract Documents and ready for Owner inspection. B. Submit final Application for Payment identifying total adjusted Contract Sum /Price previous payments, and amount remaining due. 1 HORIZON CENTER BUILDING Page 4 of 5 June 2011 DIVISION ONE GENERAL REQUIREMENTS General Requirements Section 01001 C. Complete and submit all required documentation, covered in this Project Manual, and the 1 drawings. D. At completion of project the Contractor shall provide three (3) copies of Maintenance Operation (M &O) manuals which shall be divided by Section and include all major components used in detail, submittals and warranties. 26. FINAL CLEANING A. Execute final cleaning prior to final inspection. B. Thoroughly clean interior and exterior surfaces exposed to view. 1 C. Remove waste and surplus materials, rubbish, and construction facilities from the site. 27. TESTING AND ADJUSTING A. Perform any /all testing of installed as per Manufacturer's recommendations if applicable.. 1 28. WARRANTIES A. Provide triplicate notarized copies. 1 B. Execute and assemble transferable warranty documents from Subcontractors, suppliers, and manufacturers in 3 -ring binders with labels. This may be included with M &O manuals. 1 C. Submit prior to final application for payment 29. WA STATE L&I PREVAILING WAGE 1 A. This project is subject to WA State L &I Prevailing Wage Rates. Certified Payroll will be required. 1 B. All required Intents and Affidavits of wages paid must be submitted prior to Owner request from the State for retainage release. 1 1 1 1 END OF SECTION 01001 1 HORIZON CENTER BUILDING Page 5 of 5 June 2011 1 DIVISION ONE GENERAL REQUIREMENTS General Requirements Section 01070 1 PROJECT: Owner /Arch /Eng: I Project Number: TO: Contractor: 1 Contract for: Contract Date: 1 DATE OF ISSUANCE: PROJECT OR DESIGNATED PORTION SHALL INCLUDE: The work performed under this Contract has been reviewed and found to be substantially complete. The Date of Substantial Completion of the Project or portion thereof designated above is hereby establiShed,as e I 20 which is also the date of commencement of applicable warrantie required by the Co Documents, except as stated below.t I DEFINITION OF DATE OF SUBSTANTIAL COMPLETION: The Date of Substantial Completion of the Work or designated „p t hereof i th ce by the Owner /Architect/Engineer when construction is sufficiently complete, in accordance with, the Contract Documents, so the I Owner can occupy or utilize the Work or designated portion thereof for the use for which it is intended, as expressed in the Contract Documents. At k u ".v k., A list of items to be completed or corrected, prepared by the Contractor d verified and amended by the Owner Architect/Engineer is attached hereto. The failure to include an nclude any items such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. The date of commencement of warranties for items on the attached list .will be the date ofhfi payment unless otherwise agreed to in writing. 1 u ARCHITECT /ENGINEER B 1 Y DATE The Contractor will complete or correct the Work on thelist of items attached hereto within days from the above Date of Substantial Completion y afw` 1 CONTRACTOR, BY DATE I The Owner accepts: the Work or designated portion thereof, as substantially complete and will assume full possession thereof at p.m. on il 20 OWNER BY DATE 1 The responsibilities of the Owner and the Contractor for security, maintenance, heat, utilities, damage to the Work and insurance shall be as follows: 1 1 HORIZON CENTER BUILDING Page 1 of 1 June 2011 1 Lindberg Smith Architects Horizon Building Clallam County June 2011 SECTION 01250 CONTRACT MODIFICATION PROCEDURES PART 1 GENERAL 1.1 RELATED DOCUMENTS 1 A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY 1 A. This Section specifies administrative and procedural requirements for handling and processing Contract modifications. 1 1.3 REQUEST FOR INFORMATION A. Request for Information (RFI) forms may be issued by the Contractor. The Contractor shall be 1 responsible for maintaining a sequential numbering record of all BFI's. B. Contractor Initiated Request for Information: The Contractor will issue a detailed description of information requested. If necessary, the description will include sketches, dimensions, photographs, or other materials to help clarify the request being made. 1. Request for information form (copy enclosed) is prepared by the Contractor, and transmitted to the Architect. The Architect will provide response, and Owner will accept or reject. The Architect will transmit RFI response to Contractor. The Contractor must either proceed upon receipt of response if no cost impact, or submit a statement of cost and schedule impact within five (5) days of response date. 2. RFIs and responses shall be numbered consecutively and sent to appropriate parties. 3. Responses shall be marked on record drawings and specifications. 1.4 MINOR CHANGES IN THE WORK A. Architect will issue supplemental instructions authorizing Minor Changes in the Work, not involving 1 adjustment to the Contract Sum or the Contract Time, on AIA Document G710, "Architect's Supplemental Instructions or other form approved by Architect/Owner. 1.5 PROPOSAL REQUESTS A. Owner- Initiated Proposal Requests: The Owner will provide a written request and the Architect will issue a detailed description of proposed changes in the Work that may require adjustment to the Contract Sum or the Contract Time. If necessary, the description will include supplemental or revised Drawings and Specifications. 1. Proposal Requests issued by the Architect are for information only. Do not consider them instructions either to stop work in progress or to execute the proposed change. 2. Within time specified in Proposal Request after receipt of Proposal Request, submit a quotation estimating cost adjustments to the Contract Sum and the Contract Time necessary to execute the change. 1 CONTRACT MODIFICATION PROCEDURES 01250 1 1 Lindberg Smith Architects Horizon Building Clallam County June 2011 a. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities. b. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts. c. Include an updated Contractor's Construction Schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time. d. On Owner's approval of proposal request work may proceed prior to issuance of change order. B. Contractor- Initiated Proposals: If latent or unforeseen conditions require modifications to the Contract, Contractor may propose changes by submitting a request for a change to the Architect. 1. Include a statement outlining reasons for the change and the effect of the change on the Work. Provide a complete description of the proposed change. Indicate the effect of the proposed change on the Contract Sum and the Contract Time. 2. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities. 3. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts. 4. Include an updated Contractor's Construction Schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time. C. Proposal Request Form: Submit contractor's form for approval. 1.6 CHANGE ORDER PROCEDURES A. Change Orders serve to formalize proposal request for invoicing. Several proposal requests may be combined for one change order. The Architect will issue a Change Order for signatures of Owner and Contractor on AIA Document G701, or other form approved by Architect/Owner. PART 2 PRODUCTS (Not Used) PART 3 EXECUTION (Not Used) Note: Copy of Request for Information form is enclosed for the Contractors' reference. END OF SECTION 01250 1 CONTRACT MODIFICATION PROCEDURES 01250 2 Lindberg Smith Architects Horizon Building Clallam County 1 REQUEST FOR INFORMATION FORM 1 Contractor: RFT No.: Address: Date: ITEM: Reference Drawing or Specification: 1 Description of request: 1 1 1 Prepared By: Date: Suggested Resolution: 1 1 IMPACT ON: Contract Sum (Y/N): Contract Time (Y/N): Response: t 1 1 Prepared By: Date: Owners Response: Rejected: Accepted: Other: This response in not an authorization to proceed with work involving additional costs and/or time. Notification must be given in accordance with the contract documents if any response results in a change to the contract sum or time. Copies to: Attachments: 1 1 1 REQUEST FOR INFORMATION FORM RFI -1 1 Lindberg Smith Architects Horizon Building Clallam County ty June 2011 1 SECTION 02230 SITE WORK PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1. Remove all damaged and broken extruded curb and curbing indicated on drawings to be removed. 2. Remove existing on -grade concrete slab and steel bollards as indicated on drawings. 3. Remove existing gravel fill and landscaping against building as indicated on drawings. 4. Re- stripe parking, add new ADA parking signage, add new concrete wheel stops. 1.3 MATERIALS OWNERSHIP A. Except for materials indicated to be stockpiled or to remain Owner's property, cleared materials shall become Contractor's property and shall be removed from the site. 1.4 PROJECT CONDITIONS A Traffic: Minimize interference with adjoining streets, walks, and other adjacent occupied or used facilities during site work operations. 1. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction. Coordinate all activities with the City of Port Angeles. 2. Provide traffic cones, barricades, and flaggers as required by the city when doing any work in the city right -of -way that would impact normal use of sidewalks or streets. PART 2 PRODUCTS A. Pavement Marking Paint: Latex, waterborne emulsion, lead and chromate free, ready mixed, complying with FS TT -P -1952, with drying time of less than 3 minutes. 1 1. Color: White for general stripping and marking. 2. Color: Yellow for curb marking. B. Wheel Stops: Precast, air entrained concrete, 2500 -psi minimum compressive strength, 4 -1/2 inches high by 9 inches wide by 72 inches long. Provide chamfered corners and drainage slots on underside and holes for anchoring to substrate. SITE CLEARING 02230 1 Lindberg Smith Architects Horizon Building Clallam County 1 June 2011 1. Dowels: Galvanized steel or concrete reinforcing steel, 3/4 -inch diameter, 10 -inch minimum length. 1 PART 3 EXECUTION 3.1 PREPARATION 1 A Protect existing site improvements to remain free from damage during construction. 1. Restore damaged improvements to their original condition, as acceptable to Owner. 1 3.2 DISPOSAL 1 A. All demolition materials and debris to be removed from site and legally disposed of by contractor. 1 1 END OF SECTION 02230 1 1 1 1 1 1 1 1 1 1 SITE CLEARING 02230 2 1 Lindberg Smith Architects Horizon Building Clallam County June 2011 1 SECTION 06100 ROUGH CARPENTRY PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1. Structural wall and roof framing. 2. Framing with engineered wood products. 3. Built -up structural beams and columns. 4. Wall, floor and roof sheathing. 5. Wood furring. 6. Wood blocking and nailers. 7. Preservative treatment of wood. B. Related Sections include the following: 1 1. Section 06200 "Finish Carpentry" for nonstructural carpentry items exposed to view and not specified in another Section. 1.3 DEFINITIONS A. Rough Carpentry: Carpentry work not specified in other Sections and not exposed, unless otherwise indicated. B. Lumber grading agencies, and the abbreviations used to reference them, include the following: 1. NLGA National Lumber Grades Authority. 2. WCLIB West Coast Lumber Inspection Bureau. 3. WWPA Western Wood Products Association. 1.4 QUALITY ASSURANCE A. Source Limitations for Engineered Wood Products: Obtain each type of engineered wood product through one source from a single manufacturer. 1.5 DELIVERY, STORAGE, AND HANDLING A. Stack lumber, plywood, and other panels; place spacers between each bundle to provide air circulation. Provide for air circulation around stacks and under coverings. ROUGH CARPENTRY 06100 1 Lindberg Smith Architects Horizon Building Clallam County June 2011 PART 2 PRODUCTS 2.1 WOOD PRODUCTS, GENERAL 1 A. Lumber: DOC PS 20 and applicable rules of lumber grading agencies certified by the American Lumber Standards Committee Board of Review. 1. Factory mark each piece of lumber with grade stamp of grading agency. 2. Where nominal sizes are indicated, provide actual sizes required by DOC PS 20 for moisture content specified. Where actual sizes are indicated, they are minimum dressed sizes for dry lumber. 3. Provide dressed lumber, S4S, unless otherwise indicated. 4. Provide dry lumber with 19 percent maximum moisture content at time of dressing for 2- inch nominal thickness or less, unless otherwise indicated. B. Engineered Wood Products: Provide engineered wood products acceptable to authorities 1 having jurisdiction and for which current model code research or evaluation reports exist that show compliance with building code in effect for Project. 1. Allowable Design Stresses: Provide engineered wood products with allowable design stresses, as published by manufacturer, that meet or exceed those indicated. Manufacturer's published values shall be determined from empirical data or by rational engineering analysis and demonstrated by comprehensive testing performed by a qualified independent testing agency. C. Wood Structural Panels: 1 1. Plywood: Either DOC PS 1 or DOC PS 2, unless otherwise indicated. 2. Oriented Strand Board: DOC PS 2. 3. Thickness: As needed to comply with requirements specified but not less than thickness indicated. 4. Comply with "Code Plus" provisions in APA Form No. E30K, "APA Design/Construction Guide: Residential Commercial." 5. Factory mark panels according to indicated standard. 1 2.2 WOOD PRESERVATIVE TREATED MATERIALS A. Preservative Treatment by Pressure Process: AWPA C2 (lumber) and AWPA C9 (plywood), 1 except that lumber that is not in contact with the ground and is continuously protected from liquid water may be treated according to AWPA C31 with inorganic boron (SBX). 1. Preservative Chemicals: a. Copper azole, Type A (CBA -A). B. Kiln -dry material after treatment to a maximum moisture content of 19 percent for lumber and 15 percent for plywood. Do not use material that is warped or does not comply with requirements for untreated material. 1 ROUGH CARPENTRY 06100 2 Lindberg Smith Architects Horizon Building Clallam County June 2011 C. Mark each treated item with the treatment quality mark of an inspection agency approved by the American Lumber Standards Committee Board of Review. D. Application: Treat items indicated on Drawings, and the following: 1. Wood cants, nailers, curbs, equipment support bases, blocking, stripping, and similar 1 members in connection with roofing, flashing, vapor barriers, and waterproofing. 2. Wood sills, sleepers, blocking, furring, stripping, and similar concealed members in contact with masonry or concrete. 3. Wood framing members less than 18 inches above grade. 4. Wood floor plates that are installed over concrete slabs directly in contact with earth. 1 2.3 DIMENSION LUMBER FOR CONCEALED APPLICATIONS A. General: Provide dimension lumber of grades indicated according to the American Lumber Standards Committee National Grading Rule provisions of the Western Wood Products Association (WWPA) Grading Agency. B. Sizes: Nominal size as indicated on drawings, S4S. C. Moisture Content: S -Dry or MC19. D. Non -load bearing interior partitions: Construction, Stud, or No. 2 grade. 1. Species: Hem Fir. E. Exterior and Load Bearing Walls: Refer to drawing details and notes for additional requirements. 1. Species: Hem Fir or Douglas Fir. 2. Grade: Hem Fir No. 1 or Douglas Fir No. 2. 1 3. fb- Single (minimum extreme fiber stress in bending): 850 psi. F. Small Beam Framing (2x6 through 4x16): 1. Species: Douglas Fir 2. Grade: No. 2 3. fb- single (minimum extreme fiber stress in bending): 1,000 psi. G. Joists (2x6 through 2x14): 1 1. Species: Hem Fir 2. Grade: No. 2 3. fb- single (minimum extreme fiber stress in bending): 975 psi. H. Beam and Stringers (6x and larger member): 1. Species: Douglas Fir 2. Grade: No. 1 3. fb- single (minimum extreme fiber stress in bending): 1,350 psi. ROUGH CARPENTRY 06100 3 Lindberg Smith Architects Horizon Building Clallam County June 2011 I. Posts and Timbers: 1. Species: Douglas Fir 2. Grade: No. 1 Appearance grade where noted 1 3. fc- single: (minimum extreme fiber stress in bending): 1,200 psi. J. lx Trim: 1 1. Species: Western cedars where stained or SPF- primed where painted. 2. Grade: Cedar, B or better (select tight knot). K. Miscellaneous Blocking, Furring, and Nailers: 1. Lumber: S4S, grade varies per location. 1 2. Boards: Standard or No. 3 2.4 ENGINEERED WOOD PRODUCTS A. Engineered Wood Joist: Engineered wood joist or rafters shall be wood I-joists manufactured in accordance with a nationally recognized code and installed in accordance with the manufacture's recommendations. 1. Structural Laminated Veneer Lumber (LVL) 2. Parallel Strand Lumber (PSL) 3. Laminate Strand Lumber (LSL) B. Rim Boards: Performance -rated product complying with ASTM D5456. 1 1. Material: all- veneer panels or structural composite lumber. 2. Thickness and Grade: 1 -1/2 -inch wide by depth of joist LSL rim board. 1 3. Trademark: Factory mark with APA trademark indicating thickness, grade, and compliance with APA standard. 1 2.5 WOOD PANEL PRODUCTS A. Plywood Wall Sheathing: Exposure 1 sheathing. 1 1. Span Rating: Not less than 48/24. 2. Thickness: Not less than 1/2 inch. B. Oriented- Strand -Board Wall Sheathing: Exposure 1 sheathing. 1. Span Rating: 16 inches. 2. Thickness: Not less than 15/32 inch. C. Plywood Roof and Floor Sheathing: Exposure 1 sheathing. 1. Span Rating: Not less than 48/24. 2. Thickness: Not less than 1/2 inch. D. Oriented- Strand -Board Roof and Floor Sheathing: Exposure 1 sheathing. ROUGH CARPENTRY 06100 4 Lindberg Smith Architects Horizon Building Clallam County June 2011 1 1. Span Rating: Not less than 40/20 2. Thickness: Not less than 19/32 inch. 2.6 FASTENERS 1 A. General: Provide fasteners of size and type indicated that comply with requirements specified in this Article for material and manufacture. 1. Where rough carpentry is exposed to weather, in ground contact, or in area of high relative humidity, provide fasteners with hot -dip zinc coating complying with ASTM A 153/A 153M. 1 B. Nails, Brads, and Staples: ASTM F 1667. C. Power Driven Fasteners: CABO NER -272. D. Wood Screws: ASME B18.6.1. E. Screws for Fastening to Cold- Formed Metal Framing: ASTM C 954, except with wafer heads and reamer wings, length as recommended by screw manufacturer for material being fastened. F. Lag Bolts: ASME B18.2.1.. G. Bolts: Steel bolts complying with ASTM A 307, Grade A; with ASTM A 563 hex nuts and, where indicated, flat washers. H. Expansion Anchors: Anchor bolt and sleeve assembly of material indicated below with capability to sustain, without failure, a load equal to 6 times the load imposed when installed in unit masonry assemblies and equal to 4 times the load imposed when installed in concrete as determined by testing per ASTM E 488 conducted by a qualified independent testing and inspecting agency. 1. Material: Carbon -steel components, zinc plated to comply with ASTM B 633, Class Fe /Zn 5. 1 2.7 MISCELLANEOUS MATERIALS 1 A. Building Paper: Asphalt saturated organic felt complying with ASTM D 226, Type I (No. 15 asphalt felt), unperforated. B. Building Wrap: Air retarder sheeting made from polyolefins; cross laminated films, woven strands, or spun bonded fibers; coated or uncoated; with or without perforations; and complying with ASTM E 1677, Type I. 1. Thickness: Not less than 3 mils. 2. Permeance: Not less than 10 perms. 3. Flame- Spread Index: 25 or less per ASTM E 84. 4. Allowable Exposure Time: Not more than three months. 1 ROUGH CARPENTRY 06100 5 Lindberg Smith Architects Horizon Building Clallam County 1 June 2011 C. Building Wrap Tape: Pressure sensitive plastic tape recommended by building wrap manufacturer for sealing joints and penetrations in building wrap. D. Sheathing Tape: Pressure sensitive plastic tape for sealing joints and penetrations in sheathing and recommended by sheathing manufacturer for use with type of sheathing required. E. Sill- Sealer Gaskets: Glass- fiber- resilient insulation, fabricated in strip form, for use as a sill sealer; 1 -inch nominal thickness, compressible to 1/32 inch; selected from manufacturer's standard widths to suit width of sill members indicated. F. Sill- Sealer Gaskets: Closed -cell neoprene foam, 1/4 inch thick, selected from manufacturer's standard widths to suit width of sill members indicated. PART 3 EXECUTION 3.1 INSTALLATION, GENERAL A. Set rough carpentry to required levels and lines, with members plumb, true to line, cut, and fitted. Fit rough carpentry to other construction; scribe and cope as needed for accurate fit. Locate furring, nailers, blocking, and similar supports to comply with requirements for attaching other construction. B. Do not use materials with defects that impair quality of rough carpentry or pieces that are too small to use with minimum number of joints or optimum joint arrangement. C. Apply field treatment complying with AWPA M4 to cut surfaces of preservative- treated lumber and plywood. D. Securely attach rough carpentry work to substrate by anchoring and fastening as indicated, complying with the following: 1. CABO NER -272 for power -driven fasteners. 2. Published requirements of metal framing anchor manufacturer. 3. Table 2306.1, "Fastening Schedule," in the Standard Building Code. E. Use common wire nails, unless otherwise indicated. Select fasteners of size that will not fully penetrate members where opposite side will be exposed to view or will receive finish materials. Make tight connections between members. Install fasteners without splitting wood; predrill as required. F. Use finishing nails for exposed work, unless otherwise indicated. Countersink nail heads and fill holes with wood filler. 3.2 WOOD SLEEPER, BLOCKING, AND NAILER INSTALLATION 1 A. Install where indicated and where required for screeding or attaching other work. Form to shapes indicated and cut as required for true line and level of attached work. Coordinate locations with other work involved. 1 ROUGH CARPENTRY 06100 6 1 Lindberg Smith Architects Horizon Building Clallam County June 2011 B. Attach items to substrates to support applied loading. Recess bolts and nuts flush with surfaces, unless otherwise indicated. Build anchor bolts into masonry during installation of masonry work. Where possible, secure anchor bolts to formwork before concrete placement. 3.3 WOOD FURRING INSTALLATION A. Install level and plumb with closure strips at edges and openings. Shim with wood as required for tolerance of finish work. 1. Fire block furred spaces of walls, at each floor level and at ceiling, with wood blocking or noncombustible materials accurately fitted to close furred spaces. B. Furring to Receive Gypsum Board: Install 2 -by -2 -inch nominal- size furring vertically at 16 inches o.c. 3.4 WOOD FRAMING INSTALLATION, GENERAL A. Framing Standard: Comply with AFPA's "Manual for Wood Frame Construction," unless otherwise indicated. B. Framing with Engineered Wood Products: Install engineered wood products to comply with manufacturer's written instructions. C. Do not splice structural members between supports. D. Where built -up beams or girders of 2 -inch nominal- dimension lumber on edge are required, fasten together with 2 rows of 20d nails spaced not less than 32 inches o.c. Locate one row near top edge and other near bottom edge. 1. For continuous members, locate end joints over supports. 3.5 WALL AND PARTITION FRAMING INSTALLATION A. General: Arrange studs so wide face of stud is perpendicular to direction of wall or partition and narrow face is parallel. Provide single bottom plate and double top plates using members of 2 -inch nominal thickness whose widths equal that of studs, except single top plate may be used for non -load- bearing partitions. Anchor or nail plates to supporting construction, unless otherwise indicated. B. Construct corners and intersections with three or more studs. Provide blocking and framing as indicated and as required to support facing materials, fixtures, specialty items, and trim. 1. Provide continuous horizontal blocking at mid height of partitions more than 96 inches high, using members of 2 -inch nominal thickness and of same width as wall or partitions. C. Fire block concealed spaces of wood -framed walls and partitions at each floor level and at ceiling line of top story. Where fire blocking is not inherent in framing system used, provide closely fitted wood blocks of 2 -inch nominal- thick lumber of same width as framing members. ROUGH CARPENTRY 06100 7 Lindberg Smith Architects Horizon Building Clallam County June 2011 D. Frame openings with multiple studs and headers. Provide nailed header members of thickness equal to width of studs. Set headers on edge and support on jamb studs. 1. For non -load- bearing partitions, provide double jamb studs with headers not less than 4- inch nominal depth for openings 48 inches and less in width, 6 -inch nominal depth for openings 48 to 72 inches in width, 8 -inch nominal depth for openings 72 to 120 inches in width, and not less than 10 -inch nominal depth for openings 10 to 12 feet in width. 2. For load- bearing walls, provide double jamb studs for openings 72 inches and less in width, and triple jamb studs for wider openings. Provide headers of depth indicated. 1 3.6 TIMBER FRAMING INSTALLATION A. Install timber with crown edge up and provide not less than 4 inches of bearing on supports. Provide continuous members, unless otherwise indicated; tie together over supports if not continuous. B. Where beams or girders are framed into pockets of exterior concrete or masonry walls, provide 1/2-inch air space at sides and ends of wood members. C. Install wood posts using metal anchors indicated. D. Treat ends of timber beams and posts exposed to weather by dipping in water repellent preservative for 15 minutes. 3.7 WOOD STRUCTURAL PANEL INSTALLATION 1 A. General: Comply with applicable recommendations contained in APA Form No. E30K, "APA Design/Construction Guide: Residential Commercial," for types of structural -use panels and applications indicated. 1. Comply with "Code Plus" provisions in above referenced guide. 3.8 BUILDING PAPER APPLICATION 11 with 2-inch overlap 6-inch A. Apply building paper horizontally c o e ap and 6 inch end lap; fasten to sheathing with galvanized staples or roofing nails. Cover upstanding flashing with 4 -inch overlap. 3.9 BUILDING WRAP APPLICATION A. Cover wall sheathing with building wrap as indicated. 1 1. Comply with manufacturer's written instructions. 2. Cover upstanding flashing with 4 -inch overlap. 3. Seal seams, edges, and penetrations with tape. 4. Extend into jambs of openings and seal corners with tape. END OF SECTION 06100 ROUGH CARPENTRY 06100 8 Lindberg Smith Architects Horizon Building Clallam County June 2011 1 SECTION 06200 FINISH CARPENTRY PART 1 GENERAL 1.1 RELATED DOCUMENTS 1 A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1 1. Exterior standing and running trim. 2. Exterior siding B. Related Sections include the following: 1 1. Section 06100 "Rough Carpentry" for framing, furring, blocking, and other carpentry work not exposed to view 2. Section 09912 "Painting" for priming and back priming of finish carpentry. 111 1.3 DEFINITIONS 1 A. Inspection agencies, and the abbreviations used to reference them, include the following: 1. WCLIB West Coast Lumber Inspection Bureau. 2. WWPA Western Wood Products Association. 1 1.4 DELIVERY, STORAGE, AND HANDLING 1 A. Protect materials against weather and contact with damp or wet surfaces. Stack lumber, plywood, and other panels. Provide for air circulation within and around stacks and under temporary coverings. B. Deliver interior finish carpentry only when environmental conditions meet requirements specified for 1 installation areas. If finish carpentry must be stored in other than installation areas, store only where environmental conditions meet requirements specified for installation areas. 1.5 PROJECT CONDITIONS A. Environmental Limitations: Do not deliver or install interior finish carpentry until building is enclosed 1 and weatherproof, wet work in space is completed and nominally dry, and HVAC system is operating and maintaining temperature and relative humidity at occupancy levels during the remainder of the construction period. 1 1 FINISH CARPENTRY 06200 1 Lindberg Smith Architects Horizon Building Clallam County June 2011 B. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions 1 permit work to be performed according to manufacturer's written instructions and warranty requirements and at least one coat of specified finish to be applied without exposure to rain, snow, or dampness. 1.6 WARRANTY A. Special Warranty for Siding: Manufacturer's standard form, signed by manufacturer, Installer, and Contractor, in which manufacturer agrees to repair or replace siding that fails in materials or workmanship within specified warranty period. Failures include, but are not limited to, deformation or deterioration beyond normal weathering. 1. Warranty Period for Siding (Excluding Finish): 25 years from date of Substantial Completion. 1 PART 2 PRODUCTS 2.1 MATERIALS, GENERAL A. Lumber: DOC PS 20 and applicable grading rules of inspection agencies certified by the American Lumber Standards' Committee Board of Review. 1. Factory mark each piece of lumber with grade stamp of inspection agency indicating grade, species, moisture content at time of surfacing, and mill. 2. For exposed lumber, mark grade stamp on end or back of each piece, or omit grade stamp and provide certificates of grade compliance issued by inspection agency 2.2 EXTERIOR STANDING AND RUNNING TRIM A. Trim for Painted Applications: Pre -Primed S.P.F. lumber with surfaced (smooth) face, sizes as indicated. B. 2x6 P.T. (pressure treated) horizontal trim board with beveled top edge. 2.3 EXTERIOR SIDING A. 1/2" Re -sawn face plywood. 2.4 MISCELLANEOUS MATERIALS A. Fasteners for Exterior Finish Carpentry: Provide nails or screws of the following materials, in sufficient length to penetrate minimum of 1 -1/2 inches into substrate, unless otherwise recommended by manufacturer: 1. Hot -dip galvanized steel. 1 1 FINISH 'CARPENTRY 06200 2 Lindberg Smith Architects Horizon Building Clallam County ty June 2011 2.5 FABRICATION A. Wood Moisture Content: Comply with requirements of specified inspection agencies and with manufacturer's written recommendations for moisture content of finish carpentry at relative humidity conditions existing during time of fabrication and in installation areas. B. Back out or kerf backs of the following members, except members with ends exposed in finished work: 1. Exterior standing and running trim wider than 5 inches. 2. Interior standing and running trim. C. Ease edges of lumber less than 1 inch in nominal thickness to 1/16 -inch radius and edges of lumber 1 inch or more in nominal thickness to 1/8 -inch radius. 1 PART 3 EXECUTION 3.1 EXAMINATION A. Examine substrates, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 PREPARATION A. Clean substrates of projections and substances detrimental to application. B. Before installing finish carpentry, condition materials to average prevailing humidity in installation areas for a minimum of 24 hours, unless longer conditioning is recommended by manufacturer. C. Prime lumber for exterior applications to be painted, including both faces and edges. Cut to required lengths and prime ends. Comply with requirements in Division 9 Section "Painting." 3.3 INSTALLATION, GENERAL 1 A. Do not use materials that are unsound, warped, improperly treated or finished, inadequately seasoned, or too small to fabricate with proper jointing arrangements. 1. Do not use manufactured units with defective surfaces, sizes, or patterns. B. Install finish carpentry level, plumb, true, and aligned with adjacent materials. Use concealed shims where necessary for alignment. 1. Scribe and cut finish carpentry to fit adjoining work. Refinish and seal cuts as recommended by manufacturer. 2. Countersink fasteners, fill surface flush, and sand where face fastening is unavoidable. 3. Install to tolerance of 1/8 inch in 96 inches for level and plumb. Install adjoining finish carpentry with 1/32 -inch maximum offset for flush installation and 1/16 -inch maximum offset for reveal 4. installation. Coordinate finish carpentry with materials and systems in or adjacent to it. Provide cutouts for mechanical and electrical items that penetrate finish carpentry. FINISH CARPENTRY 06200 3 Lindberg Smith Architects Horizon Building Clallam County June 2011 3.4 ADJUSTING 1 A. Replace finish carpentry that is damaged or does not comply with requirements. Finish carpentry may be repaired or refinished if work complies with requirements and shows no evidence of repair or refinishing. Adjust joinery for uniform appearance. 3.5 CLEANING 1 A. Clean finish carpentry on exposed and semi exposed surfaces. Touch up factory applied finishes to restore damaged or soiled areas. 1 END OF SECTION 06200 1 1 1 1 1 1 1 1 1 1 1 1 1 FINISH CARPENTRY 06200 4 1 1 Lindberg Smith Architects Horizon Building Clallam County 1 June 2011 SECTION 07210 BUILDING INSULATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1. Batt insulation at roofs and floors. 2. Batt insulation at exterior walls. 3. Vapor retarders. B. Related Sections include the following: 1. Section 09260 "Gypsum Drywall for framed wall, partition and ceiling assemblies. 1.3 SUBMITTALS A. Product Data: For each type of product indicated. 1 1.4 QUALITY ASSURANCE 1 A. Source Limitations: Obtain each type of building insulation through one source. B. Fire Test Response Characteristics: Provide insulation and related materials with the fire test response characteristics indicated, as determined by testing identical products per test method indicated below by UL or another testing and inspecting agency acceptable to authorities having jurisdiction. Identify materials with appropriate markings of applicable testing and inspecting agency. 1. Surface Burning Characteristics: ASTM E 84. 2. Fire Resistance Ratings: ASTM E 119. 3. Combustion Characteristics: ASTM E 136. 1 1.5 DELIVERY, STORAGE, AND HANDLING 1 A. Protect insulation materials from physical damage and from deterioration by moisture, soiling, and other sources. Store inside and in a dry location. Comply with manufacturer's written instructions for handling, storing, and protecting during installation. 1 BUILDING INSULATION 07210 1 1 Lindberg Smith Architects Horizon Building Clallam County June 2011 PART 2 PRODUCTS 2.1 ACCEPTABLE MANUFACTURERS A. Manufacturers: Subject to compliance with requirements, provide products of one of the following: 1. Manufacturers of Insulation: 1 a. CertainTeed Corp. b. Owens- Corning Corp. c. Johns Manville Corp. 2.2 INSULATING MATERIALS A. General: Provide insulating materials that comply with requirements and with referenced standards. 1 1. Provide R- values or thicknesses as indicated in the Specifications or on Drawings (R -value shall govern over thickness shown). a. Mineral Fiber Blanket/Batts: R -21 Walls, R -38 Roof, R -30 Floor. B. Unfaced Mineral Fiber Blanket/Batt Insulation: Thermal insulation produced by combining mineral fibers of types described below with thermosetting resins to comply with ASTM C 665 for Type I (blankets without membrane facing): and as follows: 1. Mineral Fiber Type: Fibers manufactured from glass. 1 2. Combustion Characteristics: Passes ASTM E 136 test. 3. Surface Burning Characteristics: Maximum flame spread and smoke developed values of 25 and 50, respectively. 1 2.3 AUXILIARY INSULATING MATERIALS 1 A. Polyethelene Vapor Retarder: ASTM D 4397 6 mils with laboratory- tested vapor transmission rating of .03 perms. B. Mastic Sealer: Type recommended by insulation manufacturer for bonding edge joints between units and filling voids in work. PART 3 EXECUTION 1 3.1 INSTALLATION, GENERAL A. Comply with insulation manufacturer's written instructions applicable to products and application 1 indicated. 1 BUILDING INSULATION 07210 2 1 Lindberg Smith Architects Horizon Building Clallam County June 2011 B. Install insulation that is undamaged, dry, and unsoiled and that has not been left exposed at any time to ice and snow. C. Extend insulation in thickness indicated to envelop entire area to be insulated. Cut and fit tightly around obstructions and fill voids with insulation. Remove projections that interfere with placement. D. Water- Piping Coordination: If water piping is located on inside of insulated exterior walls, coordinate location of piping to ensure that it is placed on warm side of insulation and insulation encapsulates piping. 3.2 INSTALLATION OF GENERAL BUILDING INSULATION A. Apply insulation units to substrates by method indicated, complying with manufacturer's written instructions. If no specific method is indicated, bond units to substrate with adhesive or use mechanical anchorage to provide permanent placement and support of units. B. Set vapor retarder to warm side of construction, unless otherwise indicated. Do not obstruct ventilation spaces, except for firestopping. 1. Tape joints and ruptures in vapor retarder, and seal each continuous area of insulation to surrounding construction to ensure airtight installation. 3.3 INSTALLATION OF VAPOR RETARDERS A. General: Extend vapor retarder to extremities of areas to be protected from vapor transmission. Secure in place with adhesives or other anchorage system as indicated. Extend vapor retarder to cover miscellaneous voids in insulated substrates, including those filled with loose -fiber insulation. B. Seal vertical joints in vapor retarders over framing by lapping not less than two wall studs. Fasten vapor retarders to framing at top, end, and bottom edges; at perimeter of wall openings; and at lap joints. Space fasteners 16 inches o.c. B. Firmly attach vapor retarders to substrates with mechanical fasteners or adhesives as recommended by vapor- retarder manufacturer. C. Seal joints caused by pipes, conduits, electrical boxes, and similar items penetrating vapor retarders with vapor- retarder tape to create an airtight seal between penetrating objects and vapor retarder. D. Repair any tears or punctures in vapor retarders immediately before concealment by other work. Cover with vapor retarder tape or another layer of vapor retarder. 3.4 PROTECTION 1 A. Protect installed insulation and vapor retarders from damage due to harmful weather exposures, physical abuse, and other causes. Provide temporary coverings or enclosures where insulation is subject to abuse and cannot be concealed and protected by permanent construction immediately after installation. END OF SECTION 07210 BUILDING INSULATION 07210 3 Lindberg Smith Architects Horizon Building Clallam County June 2011 SECTION 07260 -VAPOR RETARDERS PART 1— GENERAL 1.01 SECTION INCLUDES 1 A. Vapor Retarders: Materials to make exterior walls, joints between exterior walls and roof, joints around frames of openings in exterior walls, and underneath concrete slab -on -grade water vapor resistant. B. Vapor Barriers: Materials to stop passage of vapor from ground into floor structure. 1.02 RELATED SECTIONS A. SECTION 07210, BUILDING INSULATION: Vapor retarder facing on batt insulation. 'B. SECTION 07920, JOINT SEALERS: Sealant materials and installation techniques. 1.03 REFERENCES A. ASTM E96 Standard Test Methods for Water Vapor Transmission of Materials; 2000. 1.04 QUALITY ASSURANCE 1 A. Vapor Permeability (Perm): Measure in accordance with ASTM E96 procedure E 1.05 ENVIRONMENTAL REQUIREMENTS A. Maintain temperature and humidity recommended by the materials manufactures before, during 1 and after installation. PART 2 PRODUCTS 2.01 SHEET SEAL MATERIALS A. Sheet Seal Type 1: Polyethylene sheeting, clear color. 1. Thickness: 6 mil. 2. Application: Interior side of exterior walls and where noted. B. Sheet Seal Type 2: Rubberized asphalt bonded to sheet polyethylene, self adhesive. 1 1. Thickness: 40 mil, nominal. 2. Maximum Vapor Permeability (Perm): 2.9 ng/S /m /pa. (0.05 Perm) 3. Product: Vycor Weather Barrier Strips manufactured by Grace Construction Products or Fortiflash by Fortifiber Building Products Systems or Henry Blueskin SA <0.08 perms) 4. Application: Windows, Doors, Sills, and as where noted. 1 VAPOR RETARDERS 07260 1 1 Lindberg Smith Architects Horizon Building Clallam County June 2011 I C. Sheet Seal (Under Slab Vapor Barrier) Type 3: Polyolefin film. 1. Thickness: 15 mil. 2. Maximum Vapor Permeability (Perm): <0.03 per ASTM F1249 and I ASTM E96 (Method B) 3. Product: Stegowrap manufactured by Stego. 1 4. Substitutions: Per SECTION 01600. 5. Application: Under interior slabs on grade. 1 D. Sheet Seal Type 4: Building Paper, Type 1, Style 2, Grade D asphalt saturated sheathing paper. 1. This product is to be used at all locations on the drawings calling for #15 1 building paper or "building paper," or "roofing felt" or "#15 roofing felt." etc. 2. Tensile Strength: MD 70 lb/inch, CD 601b /inch per ASTM D828. 1 3. Water Resistance: 60 minutes (minimum) per ASTM D779. 4. Moisture Vapor Transmission: 35 grams. Min (MVT) per ASTM F1249 I E96 Procedure A. 5. Product: 60 Minute Super Jumbo Tex manufactured by [Fortifiber]. I 6. Application: Exterior side of wall and roof sheathing and as noted and detailed. I E. Tape Type A: Bright aluminum self adhering type, mesh reinforced, 2 inches wide, compatible with sheet material. 1 F. Tape Type B: Polyethylene self adhering type, 6 inches wide, compatible with sheet material and as recommended by sheet manufacturer. G. Sheet Seal Type 2b: Butyl Rubber bonded to sheet polyethylene, self adhesive. I 1. Thickness: 30 mil, nominal. I 2. Maximum Vapor Permeability (Perm): 2.9 ng/S /m/pa. (0.05 Perms). 3. Product: Vycor Ultra manufactured by Grace Construction Products, or approved. I 4. Application: Windows, doors, sills, and as where noted. I H. Substitutions: See Section 01600, Product Requirements. 2.02 SEALANTS 1 A. Butyl Sealant: As specified in SECTION 07920 B. Silyl Terminated Polyether elastomeric Sealant: As specified in SECTION 07920. 1 I VAPOR RETARDERS 07260 2 L Smith Architects Horizon Building Clallam County g g tY June 2011 ,C. Polyurethane Sealant: As specified in SECTION 07920. 1 ID. Silicone Sealant: As specified in SECTION 07920. E. Sealant Backers: As specified in SECTION 07920. F. Primers, Cleaners, and Other Sealant Materials: As recommended by sealant manufactures, appropriate to application, and compatible with adjacent materials. 1 2.03 ADHESIVES A. Mastic Adhesive: Compatible with sheet seal and substrate, thick mastic of uniform knife grade 1 consistency. B. Non Curing Adhesive: Compatible with sheet seal and substrate, permanently non curing. 2.04' ACCESSORIES 1 A. Thinners and Cleaners: As recommended by material manufacture. B. Fasteners: Stainless steel staples, nails, or screws as required for the substrate. PART 3 EXECUTION 3.01 EXAMINATION A. Verify that surfaces and conditions are ready to accept the work of this section. 3.02 PREPERATION 1 A. Remove loose or foreign matter which might impair adhesion of materials. B. Clean and prime substrate surfaces to receive adhesives in accordance with manufacture's 1 instructions. 3.03 INSTALLATION A. Install materials in accordance with manufacture's instructions. B. Install air and vapor seal materials and assemblies in conjunction with materials described in other sections to provide continuous sealed barrier in the exterior enclosures of the building. C. In exterior stud -framed walls, attach sheet seal Type 1 to inside stud faces with adhesive. Lap edges over stud faces, seal laps with tape Type 1. Lap ends onto adjacent construction; seal ends with sealant Type 1. D. Tape seal tears or cuts in vapor retarder. 1 E. Extend vapor retarder tightly to full perimeter of adjacent window and door frames and other items interrupting the plane of the membrane. Tape seal in place. F. Over exterior surface of exterior sheathing install sheet seal Type 4 with stainless steel staples. Apply sheet seal horizontally. Lap upper sheet over lower 6 inches and/or per (building paper VAPOR RETARDERS 07260 3 Lindberg Smith Architects Horizon Building Clallam County June 2011 1 or exterior finish) manufactures instruction. Apply a second layer offset one —half sheet width above the first. G. At exterior side of exterior openings, fold sheet Type 4 back under itself. DO NOT fold onto sill, Jamb or Head of opening. Flashing from window or door shall lay OVER sheet seal Type 4. H. At junction of exterior wall and roof, lap wall, sheet seal back under itself and attach with stainless steel staples and sealant. Position lap seal over firm bearing. I. At window openings, install sheet seal Type 2 between frame and adjacent wall seal material. Sheet is self adhering. Laps will seal to each other. Position lap seal over firm bearing. Follow manufactures recommendations. Place sill first, jambs second, and head last. J. Apply sealants and adhesives within recommended application temperature ranges. Consult manufactures temperature is out of this range. END OF SECTION 07260 1 1 1 1 1 1 1 1 1 1 1 1 VAPOR RETARDERS 07260 4 Lindberg Smith Architects Horizon Building Clallam County 1 June 2011 SECTION 07311- ASPHALT SHINGLES PART 1 GENERAL 1 1.1 RELATED DOCUMENTS 1 A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY 1 A. This Section includes the following: 1. Laminated Asphalt shingles. 2. Felt underlayment. 3. Roof vents. B. Related Sections include the following: 1. Section 06100 "Rough Carpentry for roof deck wood structural panels. 2. Section 07620 "Sheet Metal Flashing and Trim" for metal roof penetration flashings and counterflashings not part of this Section. 1.3 DEFINITIONS A. Roofing Terminology: Refer to ASTM D 1079 and glossary of NRCA's "The NRCA Roofing and Waterproofing Manual" for definitions of terms related to roofing work in this Section. 1.4 SUBMITTALS A. Product Data: For each type of product indicated. B. Samples for Initial Selection: For each type of asphalt shingle. 1 1. Include similar Samples of trim and accessories involving color selection. C. Qualification Data: For Installer, including certificate signed by asphalt shingle manufacturer stating that Installer is approved, authorized, or licensed to install roofing system indicated. D. Product Test Reports: Based: on evaluation of comprehensive tests performed by a qualified testing 1 agency or by manufacturer and witnessed by a qualified testing agency, for asphalt shingles. E. Warranties: Special warranties specified in this Section. 1 1 1 ASPHALT SHINGLES 07311 1 1 Lindberg Smith Architects Horizon Building Clallam County ty June 2011 I 1.5 QUALITY ASSURANCE A. Installer Qualifications: A firm or individual that is approved, authorized, or licensed by asphalt shingle 1 roofing system manufacturer to install roofing system indicated. B. Source Limitations: Obtain ridge and hip cap shingles through one source from a single asphalt shingle I manufacturer. C. Fire Test Response Characteristics: Provide asphalt shingle and related roofing materials with the fire- test response characteristics indicated, as determined by testing identical products per test method below by UL or another testing and inspecting agency acceptable to authorities having jurisdiction. Identify materials with appropriate markings of applicable testing and inspecting agency. I 1. Exterior Fire -Test Exposure: Class A; ASTM E 108 or UL 790, for application and roof slopes indicated. 1 1.6 DELIVERY, STORAGE, AND HANDLING A. Store roofing materials in a dry, well- ventilated, weathertight location according to asphalt shingle I manufacturer's written instructions. Store underlayment rolls on end on pallets or other raised surfaces. Do not double -stack rolls. 1 1. Handle, store, and place roofing materials in a manner to avoid significant or permanent damage to roof deck or structural supporting members. B. Protect unused underlayment from weather, sunlight, and moisture when left overnight or when roofing 1 work is not in progress. I 1.7 PROJECT CONDITIONS A. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit asphalt shingle roofing to be performed according to manufacturer's written instructions and I warranty requirements. I 1.8 WARRANTY A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace asphalt shingles that fail in materials within specified warranty period. Material failures include 1 manufacturing defects and failure of asphalt shingles to self -seal after a reasonable time. 1. Material Warranty Period: 30 years from date of Substantial Completion, prorated, with first 5 I 2. years non prorated. Wind -Speed Warranty Period: Asphalt shingles will resist blow -off or damage caused by wind speeds up to 70 mph for 10 years from date of Substantial Completion. 3. Algae- Discoloration Warranty Period: Asphalt shingles will not discolor 10 years from date of I 4. Substantial Completion. Workmanship Warranty Period: 10 years from date of Substantial Completion. I B. Special Project Warranty: Roofing Installer's warranty, on warranty form at end of this Section, signed by roofing Installer, covering Work of this Section, in which roofing Installer agrees to repair or replace components of asphalt shingle roofing that fail in materials or workmanship within the following warranty period: 1 I ASPHALT SHINGLES 07311 2 Lindberg Smith Architects Horizon Building Clallam County 1 June 2011 1. Warranty Period: Five years from date of Substantial Completion. 1 PART 2 PRODUCTS 1 2.1 GLASS FIBER REINFORCED ASPHALT SHINGLES A. Laminated fiberglass strip Asphalt Shingles: ASTM D 3462, laminated, multi -ply overlay construction, glass -fiber reinforced, mineral granule surfaced, and self sealing; complying with UL 2218, Class IV. 1. Strip Size: Manufacturer's standard. 2. Algae Resistance: Granules treated to resist algae discoloration. 3. Color and Blends: As selected by Architect from manufacturer's full range. B. Hip and Ridge Shingles: Manufacturer's standard units to match asphalt shingles. Trim each side of lapped portion of unit to taper approximately 1 inch. C. MANUFACTURERS: Subject to compliance with requirements, provide products by one of the following: 1. Malarkey. 2. PABCO roofing products. 3. Elk Premium Building Products, Inc. 4. Owens Corning. 5. Or approved equal approved by architect prior to bidding. 2.2 UNDERLAYMENT MATERIALS A. Felts: ASTM D 226 or ASTM D 4869, Type I asphalt saturated organic felts, non perforated. 1 2.3 ACCESSORIES A. Asphalt Roofing Cement: ASTM D 4586, Type II, asbestos free. 1 B. Static Roof Vents: Slant -back or square, high- impact plastic vents with minimum 50 sq. inches net free vent area. C. Roofing Nails: ASTM F 1667;: aluminum, stainless steel, copper, or hot -dip galvanized steel wire shingle nails, minimum 0.120 -inch- diameter, barbed shank, sharp- pointed, with a minimum 3/8 -inch- diameter flat head and of sufficient length to penetrate 3/4 inch into solid wood decking or extend at least 1/8 inch through OSB or plywood sheathing. 1. Where nails are in contact with metal flashing, use nails made from same metal as flashing. 1 ASPHALT SHINGLES 07311 3 1 Lindberg Smith Architects Horizon Building Clallam County June 2011 2.4 METAL FLASHING AND TRIM D. Sheet Metal Flashing and Trim: Comply with requirements in Division 7 Section "Sheet Metal Flashing 1 and Trim." E. Fabricate sheet metal flashing and trim to comply with recommendations in SMACNA's "Architectural Sheet Metal Manual" that apply to design, dimensions, metal, and other characteristics of item. PART 3 EXECUTION 3.1 EXAMINATION 1 A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of work. 1 1. Examine roof sheathing to verify that sheathing joints are supported by framing and blocking or metal clips and that installation is within flatness tolerances. 2. Verify that substrate is sound, dry, smooth, clean, sloped for drainage, and completely anchored; 1 and that provision has been made for flashings and penetrations through asphalt shingles. B. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 UNDERLAYMENT INSTALLATION A. Single -Layer Felt Underlayment: Install single layer of felt underlayment on roof deck perpendicular to roof slope in parallel courses. Lap sides a minimum of 2 inches over underlying course. Lap ends a minimum of 4 inches. Stagger end laps between succeeding courses at least 72 inches. Fasten with felt underlayment nails. B. Metal Flashed Open Valley Underlayment: Install two layers of 36 -inch- wide felt underlayment centered in valley. Stagger end laps between layers at least 72 inches. Lap ends of each layer at least 12 inches in direction to shed water, and seal with asphalt roofing cement. Fasten each layer to roof deck with felt underlayment nails. 1. Lap roof deck felt underlayment over first layer of valley felt underlayment at least 6 inches. 3.3 METAL FLASHING INSTALLATION 1 A. General: Install metal flashings and other sheet metal to comply with requirements in Division 7 Section "Sheet Metal Flashing and Trim." 1. Install metal flashings according to recommendations in ARMA's "Residential Asphalt Roofing Manual" and asphalt shingle recommendations in NRCA's "The NRCA Roofing and Waterproofing Manual." 1 1 ASPHALT SHINGLES 07311 4 Lindberg Smith Architects Horizon Building Clallam County 1 June 2011 3.4 ASPHALT SHINGLE INSTALLATION A. Install asphalt shingles according to manufacturer's written instructions, recommendations in ARMA's "Residential Asphalt Roofing Manual," and asphalt shingle recommendations in NRCA's "The NRCA Roofing and Waterproofing Manual." B. Install starter strip along lowest roof edge, consisting of an asphalt shingle strip with tabs removed at least 7 inches wide with self sealing strip face up at roof edge. 1 1. Extend asphalt shingles 3/4 inch over fascia at eaves and rakes. 2. Install starter strip along rake edge. C. Install first and remaining courses of asphalt shingles stair stepping diagonally across roof deck with manufacturer's recommended offset pattern at succeeding courses, maintaining uniform exposure. D. Install asphalt shingles by single -strip column or racking method, maintaining uniform exposure. Install full length first course followed by cut second course, repeating alternating pattern in succeeding courses. E. Fasten asphalt shingle strips with a minimum of six roofing nails located according to manufacturer's written instructions. 1. Where roof slope is less than 4:12, seal asphalt shingles with asphalt roofing cement spots. 2. When ambient temperature during installation is below 50 deg F, seal asphalt shingles with asphalt roofing cement spots. F. Open Valleys: Cut and fit asphalt shingles at open valleys, trimming upper concealed corners of shingle strips. Maintain uniform width of exposed open valley from highest to lowest point. 1. Set valley edge of asphalt shingles in a 3 -inch- wide bed of asphalt roofing cement. G. Ridge Cap Shingles: Maintain same exposure of cap shingles as roofing shingle exposure. Lap cap shingles at ridges to shed water away from direction of prevailing winds. Fasten with roofing nails of sufficient length to penetrate sheathing. 3.5 ROOFING INSTALLER'S WARRANTY A. WHEREAS of herein called the "Roofing Installer," has performed roofing and associated work "work on the following project: 1. Owner: 2. Address: 3. Area of Work: Asphalt Shingle Roof Installation 4. Acceptance Date: 5. Warranty Period: 6. Expiration Date: B. AND WHEREAS Roofing Installer has contracted (either directly with Owner or indirectly as a 1 subcontractor) to warrant said work against leaks and faulty or defective materials and workmanship for designated Warranty Period, C. NOW THEREFORE Roofing Installer hereby warrants, subject to terms and conditions herein set forth, that during Warranty Period he will, at his own cost and expense, make or cause to be made such repairs 1 ASPHALT SHINGLES 07311 5 1 Lindberg Smith Architects Horizon Building Clallam County June 2011 1 to or replacements of said work as are necessary to correct faulty and defective work and as are necessary to maintain said work in a watertight condition. D. This Warranty is made subject to the following terms and conditions: 1. Specifically excluded from this Warranty are damages to work and other parts of the building, and to building contents, caused by: a. lightning; b. peak gust wind speed exceeding 100 mph; c. fire; d. failure of roofing system substrate, including cracking, settlement, excessive deflection, deterioration, and decomposition; e. faulty construction of parapet walls, copings, chimneys, skylights, vents, equipment supports, and other edge conditions and penetrations of the work; f. vapor condensation on bottom of roofing; and g. activity on roofing by others, including construction contractors, maintenance personnel, other persons, and animals, whether authorized or unauthorized by Owner. 2. When work has been damaged by any of foregoing causes, Warranty shall be null and void until 1 such damage has been repaired by Roofing Installer and until cost and expense thereof have been paid by Owner or by another responsible party so designated. 3. Roofing Installer is responsible for damage to work covered by this Warranty but is not liable for consequential damages to building or building contents resulting from leaks or faults or defects of work. 4. During Warranty Period, if Owner allows alteration of work by anyone other than Roofing Installer, including cutting, patching, and maintenance in connection with penetrations, attachment of other work, and positioning of anything on roof, this Warranty shall become null and void on date of said alterations, but only to the extent said alterations affect work covered by this Warranty. If Owner engages Roofing Installer to perform said alterations, Warranty shall not become null and void unless Roofing Installer, before starting said work, shall have notified Owner in writing, showing reasonable cause for claim, that said alterations would likely damage or deteriorate work, thereby reasonably justifying a limitation or termination of this Warranty. 5. During Warranty Period, if original use of roof is changed, this Warranty shall become null and void on date of said change, but only to the extent said change affects work covered by this Warranty. 6. Owner shall promptly notify Roofing Installer of observed, known, or suspected leaks, defects, or deterioration and shall afford reasonable opportunity for Roofing Installer to inspect work and to examine evidence of such leaks, defects, or deterioration. 7. This Warranty is recognized to be the only warranty of Roofing Installer on said work and shall not operate to restrict or cut off Owner from other remedies and resources lawfully available to Owner in cases of roofing failure. Specifically, this Warranty shall not operate to relieve Roofing Installer of responsibility for performance of original work according to requirements of the Contract Documents, regardless of whether Contract was a contract directly with Owner or a subcontract with Owner's General Contractor. E. IN WITNESS THEREOF, this instrument has been duly executed this day of 1. Authorized Signature: 2. Name: 3. Title: END OF SECTION 07311 1 ASPHALT SHINGLES 07311 6 Lindberg Smith Architects Horizon Building Clallam County 1 June 2011 SECTION 07620 SHEET METAL FLASHING AND TRIM PART 1 GENERAL 1.1 RELATED DOCUMENTS 1 1 A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1 1.2 SUMMARY 1 A. This Section includes the following sheet metal flashing and trim: 1. Manufactured flashings. 2. Formed roof drainage system. B. Related Sections include the following: 1. Section 06100 "Rough Carpentry for wood nailers, curbs, and blocking. 2. Section 07920 "Joint Sealants" for field- applied sheet metal flashing and trim sealants. E REQUIREMENTS 1.3 PERFORMANC REQUIRE S A. General: Install sheet metal flashing and trim to withstand wind loads, structural movement, thermally induced movement, and exposure to weather without failing, rattling, leaking, and fastener disengagement. B. Thermal Movements: Provide sheet metal flashing and trim that allow for thermal movements resulting 1 from the following maximum change (range) in ambient and surface temperatures by preventing buckling, opening of joints, hole elongation, overstressing of components, failure of joint sealants, failure of connections, and other detrimental effects. Provide clips that resist rotation and avoid shear stress as a result of sheet metal and trim thermal movements. Base engineering calculation on surface temperatures of materials due to both solar heat gain and nighttime -sky heat loss. 1. Temperature Change (Range): 120 deg F, ambient; 180 deg F, material surfaces. 1 C. Water Infiltration: Provide sheet metal flashing and trim that will not allow water infiltration to building interior. I 1.4 QUALITY ASSURANCE A. Sheet Metal Flashing and Trim Standard: Comply with SMACNA's "Architectural Sheet Metal Manual." Conform to dimensions and profiles shown unless more stringent requirements are indicated. 111 1.5 DELIVERY, STORAGE, AND HANDLING A. Deliver sheet metal flashing materials and fabrications undamaged. Protect sheet metal flashing and trim 1 materials and fabrications during transportation and handling. 1 SHEET METAL FLASHING AND TRIM 07620 1 1 Lindberg Smith Architects Horizon Building Clallam County June 2011 B. Unload, store, and install sheet metal flashing materials and fabrications in a manner to prevent bending, warping, twisting, and surface damage. C. Stack materials on platforms or pallets, covered with suitable weathertight and ventilated covering. Do not store sheet metal flashing and trim materials in contact with other materials that might cause staining, denting, or other surface damage. 1 1.6 COORDINATION 1 A. Coordinate installation of sheet metal flashing and trim with interfacing and adjoining construction to provide a leak proof, secure, and non corrosive installation. PART 2 PRODUCTS 1 2.1 SHEET METALS A. Zinc Coated (Galvanized) Steel Sheet: ASTM A 653/A 653M, G90 coating designation; structural quality. B. Prepainted, Metallic- Coated Steel Sheet: Steel sheet metallic coated by the hot -dip process and prepainted by the coil- coating process to comply with ASTM A 755/A 755M. 1. Zinc Coated (Galvanized) Steel Sheet: ASTM A 653/A 653M, G90 coating designation; structural quality. 2. Aluminum -Zinc Alloy- Coated Steel Sheet: ASTM A 792/A 792M, Class AZ50 coating designation, Grade 40; structural quality. 3. Exposed Finishes: Apply the following coil coating: 1 a. High Performance Organic Finish: Prepare, pretreat, and apply coating to exposed metal surfaces to comply with coating and resin manufacturers' written instructions. 1) Fluoropolymer 2 -Coat System: Manufacturer's standard 2 -coat, thermocured system consisting of specially formulated inhibitive primer and fluoropolymer color topcoat containing not less than 70 percent polyvinylidene fluoride resin by weight; complying with physical properties and coating performance requirements of AAMA 2605, except as modified below: a) Humidity Resistance: 2000 hours. b) Salt -Spray Resistance: 2000 hours. 2) Color: As selected by Architect from manufacturer's full range.' 2.2 UNDERLAYMENT MATERIALS A. Polyethylene Sheet: 6 -mil- thick polyethylene sheet complying with ASTM D 4397. B. Felts: ASTM D 226, Type II asphalt saturated organic felt, non perforated. 1 C. Slip Sheet: Resin -sized paper, minimum 3 lb /100 sq. ft.. 1 SHEET METAL FLASHING AND TRIM 07620 2 Lindber g Smith Architects 'Horizon Building Clallam County June 2011 2.3 MISCELLANEOUS MATERIALS A. General: Provide materials and types of fasteners, solder, welding rods, protective coatings, separators, sealants, and other miscellaneous items as required for complete sheet metal flashing and trim installation. B. Fasteners: Wood screws, annular threaded nails, self tapping screws, self locking rivets and bolts, and other suitable fasteners designed to withstand design loads. 1. Exposed Fasteners: Heads matching color of sheet metal by means of plastic caps or factory- applied coating. 2. Fasteners for Flashing and Trim: Blind fasteners or self drilling screws, gasketed, with hex washer head. 3. Blind Fasteners: High strength aluminum or stainless -steel rivets. 4. Spikes and Ferrules: Same material as gutter; with spike with ferrule matching internal gutter width. C. Sealing Tape: Pressure- sensitive, 100 percent solids, polyisobutylene compound sealing tape with release -paper backing. Provide permanently elastic, nonsag, nontoxic, non staining tape. D. Elastomeric Sealant: ASTM C 920, elastomeric polymer sealant; of type, grade, class, and use classifications required to seal joints in sheet metal flashing and trim and remain watertight. E. Epoxy Seam Sealer: Two -part, non corrosive, aluminum seam cementing compound, recommended by aluminum manufacturer for exterior nonmoving joints, including riveted joints. F. Bituminous Coating: Cold- applied asphalt mastic, SSPC -Paint 12, compounded for 15 -mil dry film thickness per coat. Provide inert-type non corrosive compound free of asbestos fibers, sulfur components, and other deleterious impurities. G. Asphalt Roofing Cement: ASTM D 4586, asbestos free, of consistency required for application. 2.4 MANUFACTURED SHEET METAL FLASHING AND TRIM A. Reglets: Units of type, material, and profile indicated, formed to provide secure interlocking of separate reglet and counterflashing pieces, and compatible with flashing indicated. 1. Material: Galvanized steel, 0.0217 inch thick. 2. Flexible Flashing Retainer: Provide resilient plastic or rubber accessory to secure flexible flashing in reglet where clearance does not permit use of standard metal counterflashing or where Drawings show reglet without metal counterflashing. 3. Counterflashing Wind Restraint Clips: Provide clips to be installed before counterflashing to prevent wind uplift of counterflashing lower edge. GENERAL 2.5 FABRICATION, GE RAL A. General: Custom fabricate sheet metal flashing and trim to comply with recommendations in SMACNA's "Architectural Sheet Metal Manual" that apply to design, dimensions, metal, and other characteristics of item indicated. Shop fabricate items where practicable. Obtain field measurements for accurate fit before shop fabrication. B. Fabricate sheet metal flashing and trim in thickness or weight needed to comply with performance requirements, but not less than that specified for each application and metal. 1 SHEET METAL FLASHING AND TRIM 07620 3 1 I Lindberg Smith Architects Horizon Building Clallam County June 2011 I C. Fabricate sheet metal flashing and trim without excessive oil canning, buckling, and tool marks and true to line and levels indicated, with exposed edges folded back to form hems. I 1. Seams for Other Than Aluminum: Fabricate nonmoving seams in accessories with flat -lock seams. Tin edges to be seamed, form seams, and solder. I D. Sealed Joints: Form nonexpansion but movable joints in metal to accommodate elastomeric sealant to comply with SMACNA recommendations. I E. Expansion Provisions: Where lapped or bayonet -type expansion provisions in the Work cannot be used, form expansion joints of intermeshing hooked flanges, not less than 1 inch deep, filled with butyl sealant concealed within joints. I F. Conceal fasteners and expansion provisions where possible on exposed -to -view sheet metal flashing and trim, unless otherwise indicated. I G. Fabricate cleats and attachment devices from same material as accessory being anchored or from compatible, non corrosive metal. 1. Thickness: As recommended by SMACNA's "Architectural Sheet Metal Manual" for application 1 but not less than thickness of metal being secured. I 2.6 ROOF DRAINAGE SHEET METAL FABRICATIONS A. Hanging Gutters: Fabricate to cross section indicated, complete with end pieces, outlet tubes, and other accessories as required. Fabricate in minimum 96 -inch- long sections. Furnish flat -stock gutter spacers I and gutter brackets fabricated from same metal as gutters, of size recommended by SMACNA but not less than twice the gutter thickness. Fabricate expansion joints, expansion joint covers, gutter bead reinforcing bars, and gutter accessories from same metal as gutters. r 1. Gutter Style: D. 2. Expansion Joints: Built in. 3. Accessories: Wire ball downspout strainer. 1 4. Fabricate from the following: a. 27 Gauge, pre- finished aluminum. Color selected by architect. I B. Downspouts: Fabricate downspouts complete with mitered elbows. Furnish with metal hangers, from same material as downspouts, and anchors. 1. Fabricate downspouts from the following material: I a. 3 "x4" rectangular and corrugated, 27 gauge aluminum, pre finished to match gutters. Color selected by architect. I 2.7 FINISHES I A. Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for recommendations for applying and designating finishes. I B. Protect mechanical and painted finishes on exposed surfaces from damage by applying a strippable, temporary protective covering before shipping. 1 I SHEET METAL FLASHING AND TRIM 07620 4 i Lindberg Smith Architects Horizon Building Clallam County June 2011 C. Appearance of Finished Work: Variations in appearance of abutting or adjacent pieces are acceptable if 1 they are within one -half of the range of approved Samples. Noticeable variations in the same piece are not acceptable. Variations in appearance of other components are acceptable if they are within the range of approved Samples and are assembled or installed to minimize contrast. 1 PART 3 EXECUTION 3.1 EXAMINATION A. Examine substrates, areas, and conditions, with Installer present, to verify actual locations, dimensions and other conditions affecting performance of work. 1. Verify that substrate is sound, dry, smooth, clean, sloped for drainage, and securely anchored. 2. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 INSTALLATION, GENERAL A. General: Anchor sheet metal flashing and trim and other components of the Work securely in place, with provisions for thermal and structural movement. Use fasteners, solder, welding rods, protective coatings, separators, sealants, and other miscellaneous items as required to complete sheet metal flashing and trim system. 1. Torch cutting of sheet metal flashing and trim is not permitted. B. Metal Protection: Where dissimilar metals will contact each other or corrosive substrates, protect against galvanic action by painting contact surfaces with bituminous coating or by other permanent separation as recommended by fabricator or manufacturers of dissimilar metals. 1. Underlayment: Where installing metal flashing directly on cementitious or wood substrates, install a course of felt underlayment and cover with a slip sheet or install a course of polyethylene underlayment. 2. Bed flanges in thick coat of asphalt roofing cement where required for waterproof performance. 1 C. Install exposed sheet metal flashing and trim without excessive oil canning, buckling, and tool marks. D. Install sheet metal flashing and trim true to line and levels indicated. Provide uniform, neat seams with minimum exposure of solder, welds, and butyl sealant. E. Install sheet metal flashing and trim to fit substrates and to result in watertight performance. Verify shapes and dimensions of surfaces to be covered before fabricating sheet metal. 1. Space cleats not more than 12 inches apart. Anchor each cleat with two fasteners. Bend tabs over fasteners. F. Expansion Provisions: Provide for thermal expansion of exposed flashing and trim. Space movement joints at a maximum of 10 feet with no joints allowed within 24 inches of corner or intersection. Where lapped or bayonet -type expansion provisions cannot be used or would not be sufficiently watertight, form expansion joints of intermeshing hooked flanges, not less than 1 inch deep, filled with butyl sealant concealed within joints. G. Fasteners: Use fasteners of sizes that will penetrate substrate not less than 1 -1/4 inches for nails and not less than 3/4 inch for wood screws. 1 SHEET METAL FLASHING AND TRIM 07620 5 1 Lindberg Smith Architects Horizon Building Clallam County June 2011 1 1. Galvanized or Prepainted, Metallic- Coated Steel: Use stainless -steel fasteners. H. Seal joints with butyl sealant as required for watertight construction. 1. Where sealant filled joints are used, embed hooked flanges of joint members not less than 1 inch into sealant. Form joints to completely conceal sealant. When ambient temperature at time of installation is moderate, between 40 and 70 deg F, set joint members for 50 percent movement either way. Adjust setting proportionately for installation at higher ambient temperatures. Do not install sealant -type joints at temperatures below 40 deg F. 2. Prepare joints and apply sealants to comply with requirements in Division 7 Section "Joint 1 Sealants." I. Soldered Joints: Clean surfaces to be soldered, removing oils and foreign matter. Pretin edges of sheets to be soldered to a width of 1 -1/2 inches except where pretinned surface would show in finished Work. 1. Do not solder prepainted, metallic- coated steel sheet. 2. Do not use open -flame torches for soldering. Heat surfaces to receive solder and flow solder into joints. Fill joints completely. Completely remove flux and spatter from exposed surfaces. 1 3.3 ROOF DRAINAGE SYSTEM INSTALLATION A. General: Install sheet metal roof drainage items to produce complete roof drainage system according to SMACNA recommendations and as indicated. Coordinate installation of roof perimeter flashing with installation of roof drainage system. B. Hanging Gutters: Join sections with riveted and soldered joints or with lapped joints sealed with butyl sealant. Provide for thermal expansion. Attach gutters at eave or fascia to firmly anchored gutter brackets spaced not more than 36 inches apart. Provide end closures and seal watertight with sealant. Slope to downspouts. 1 1. Fasten gutter spacers to front and back of gutter. 2. Loosely lock straps to front gutter bead and anchor to roof deck. 3. Anchor and loosely lock back edge of gutter to continuous eave or apron flashing. 4. Anchor back of gutter that extends onto roof deck with cleats spaced not more than 24 inches apart. 5. Anchor gutter with spikes and ferrules spaced not more than 24 inches apart. 6. Install gutter with expansion joints at locations indicated but not exceeding 50 feet apart. Install expansion joint caps. C. Downspouts: Join sections with 1 -1/2 -inch telescoping joints. Provide fasteners designed to hold downspouts securely 1 inch away from walls; locate fasteners at top and bottom and at approximately 60 inches o.c. in between. 3.4 WALL FLASHING INSTALLATION A. General: Install sheet metal wall flashing to intercept and exclude penetrating moisture according to SMACNA recommendations and as indicated. Coordinate installation of wall flashing with installation of wall- opening components such as windows, doors, and louvers. 1 B. Reglets: Installation of reglets is specified in Division 4 Section "Unit Masonry Assemblies." 1 1 SHEET METAL FLASHING AND TRIM 07620 6 Lindberg Smith Architects Horizon Building Clallam County June 2011 3.5 CLEANING AND PROTECTION A. Clean and neutralize flux materials. Clean off excess solder and sealants. B. I Remove temporary protective coverings and strippable films as sheet metal flashing and trim are installed. On completion of installation, clean finished surfaces, including removing unused fasteners, metal filings, pop rivet stems, and pieces of flashing. Maintain in a clean condition during construction. C. Replace sheet metal flashing and trim that have been damaged or that have deteriorated beyond successful repair by finish touchup or similar minor repair procedures. END OF SECTION 07620 1 1 1 1 1 1 1 1 1 1 1 1 SHEET METAL FLASHING AND TRIM 07620 7 Lindberg Smith Architects Horizon Building Clallam County June 2011 1 SECTION 07920 JOINT SEALANTS 1 PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes sealants for the following applications: 1 1. Exterior joints in the following vertical surfaces and non traffic horizontal surfaces: 1 a. Perimeter joints between siding materials and frames of doors and windows. b. Joints between siding materials and trims. c. Other joints as indicated. 2. Interior joints in the following vertical surfaces and horizontal non traffic surfaces: a. Perimeter joints of exterior openings where indicated. 1 b. Other joints as indicated. B. Related Sections include the following: 1. Section 09260 "Gypsum Board Assemblies" for sealing perimeter joints of gypsum board partitions to reduce sound transmission. 1.3 PERFORMANCE REQUIREMENTS A. Provide elastomeric joint sealants that establish and maintain watertight and airtight continuous joint seals without staining or deteriorating joint substrates. B. Provide joint sealants for interior applications that establish and maintain airtight and water resistant continuous joint seals without staining or deteriorating joint substrates. 1 1.4 DELIVERY, STORAGE, AND HANDLING A. Deliver materials to Project site in original unopened containers or bundles with labels indicating manufacturer, product name and designation, color, expiration date, pot life, curing time, and mixing instructions for multi- component materials. B. Store and handle materials in compliance with manufacturer's written instructions to prevent their deterioration or damage due to moisture, high or low temperatures, contaminants, or other causes. 1 1 JOINT SEALANTS 07920 1 Lindbeig Smith Architects Horizon Building Clallam County June 2011 1.5 PROJECT CONDITIONS A. Environmental Limitations: Do not proceed with installation of joint sealants under the following conditions: 1 1. When ambient and substrate temperature conditions are outside limits permitted by joint sealant manufacturer. 2. When ambient and substrate temperature conditions are outside limits permitted by joint sealant manufacturer or are below 40 deg F. 3. When joint substrates are wet. B. Joint -Width Conditions: Do not proceed with installation of joint sealants where joint widths are less than those allowed by joint sealant manufacturer for applications indicated. C. Joint Substrate Conditions: Do not proceed with installation of joint sealants until contaminants capable of interfering with adhesion are removed from joint substrates. PART 2 PRODUCTS 2.1 PRODUCTS AND MANUFACTURERS 1 A. j Products: Subject to compliance with requirements, provide products indicated for each type of application from one of the following manufactures: 1 1. Sonneborn, Sonolastic 150. 2. Dow Corning Corp. 1 3. Chemrex, Inc. Building Products. 4. Pecora Corporation. 5. Emseal Joint Systems Ltd. 1 6. Dayton Superior Chemical Division.. 2.2 MATERIALS, GENERAL A. Compatibility: Provide joint sealants, backings, and other related materials that are compatible with one another and with joint substrates under conditions of service and application, as demonstrated by sealant manufacturer based on testing and field experience. B. Colors of Exposed Joint Sealants: As selected by Architect from manufacturer's full range for this characteristic. 2.3 ELASTOMERIC JOINT SEALANTS A. Elastomeric Sealant Standard: Comply with ASTM C 920 and other requirements indicated for each liquid- applied chemically curing sealant in the Elastomeric Joint Sealant Schedule at the end of Part 3, including those referencing ASTM C 920 classifications for type, grade, class, and uses. 1 JOINT SEALANTS 07920 2 Lindberg Smith Architects Horizon Building Clallam County June 2011 B. Additional Movement Capability: Where additional movement capability is specified in the Elastomeric Joint Sealant Schedule, provide products with the capability, when tested for adhesion and cohesion under maximum cyclic movement per ASTM C 719, to withstand the specified percentage change in the joint width existing at the time of installation and remain in compliance with other requirements of ASTM C 920 for uses indicated. 2.4 JOINT- SEALANT BACKING A. General: Provide sealant backings of material and type that are non staining; are compatible with joint substrates, sealants, primers, and other joint fillers; and are approved for applications indicated by sealant manufacturer based on field experience and laboratory testing. B. Cylindrical Sealant Backings: ASTM C 1330, of type indicated below and of size and density to control sealant depth and otherwise contribute to producing optimum sealant performance: 1. Type C: Closed -cell material with a surface skin. 2.5 MISCELLANEOUS MATERIALS 1 A. Primer: Material recommended by joint sealant manufacturer where required for adhesion of sealant to joint substrates indicated, as determined from preconstruction joint sealant substrate tests and field tests. B. Cleaners for Nonporous Surfaces: Chemical cleaners acceptable to manufacturers of sealants and sealant backing materials, free of oily residues or other substances capable of staining or harming joint substrates and adjacent nonporous surfaces in any way, and formulated to promote optimum adhesion of sealants with joint substrates. C. Masking Tape: Non staining, nonabsorbent material compatible with joint sealants and surfaces adjacent to joints. PART 3 EXECUTION 1 3.1 EXAMINATION A. Examine joints indicated to receive joint sealants, with Installer present, for compliance with requirements for joint configuration, installation tolerances, and other conditions affecting joint sealant performance. B. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 PREPARATION A. Surface Cleaning of Joints: Clean out joints immediately before installing joint sealants to comply with joint sealant manufacturer's written instructions and the following requirements: 1. Remove all foreign material from joint substrates that could interfere with adhesion of joint sealant, including dust, paints (except for permanent, protective coatings tested and approved for sealant adhesion and compatibility by sealant manufacturer), old joint sealants, oil, grease, waterproofing, water repellents, water, surface dirt, and frost. 1 JOINT SEALANTS 07920 3 Lindberg Smith Architects Horizon Building Clallam County June 2011 2. Clean porous joint substrate surfaces by brushing, grinding, blast cleaning, mechanical abrading, or a combination of these methods to produce a clean, sound substrate capable of developing optimum bond with joint sealants. Remove loose particles remaining from above cleaning operations by vacuuming or blowing out joints with oil -free compressed air. Porous joint surfaces include the following: a. Concrete. 3. Remove laitance and form- release agents from concrete. 4. Clean nonporous surfaces with chemical cleaners or other means that do not stain, harm substrates, or leave residues capable of interfering with adhesion of joint sealants. 1 a. Metal. b. Glass. c. Porcelain enamel. 1 B. Joint Priming: Prime joint substrates where recommended in writing by joint sealant manufacturer, based on preconstruction joint sealant- substrate tests or prior experience. Apply primer to comply with joint sealant manufacturer's written instructions. Confine primers to areas of joint- sealant bond; do not allow spillage or migration onto adjoining surfaces. C. Masking Tape: Use masking tape where required to prevent contact of sealant with adjoining surfaces 1 that otherwise would be permanently stained or damaged by such contact or by cleaning methods required to remove sealant smears. Remove tape immediately after tooling without disturbing joint seal. 3.3 INSTALLATION OF JOINT SEALANTS A. General: Comply with joint sealant manufacturer's written installation instructions for products and 111 applications indicated, unless more stringent requirements apply. B. Sealant Installation Standard: Comply with recommendations of ASTM C 1193 for use of joint sealants as applicable to materials, applications, and conditions indicated. C. Install sealant backings of type indicated to support sealants during application and at position required to produce cross sectional shapes and depths of installed sealants relative to joint widths that allow optimum sealant movement capability. 1. Do not leave gaps between ends of sealant backings. 2. Do not stretch, twist, puncture, or tear sealant backings. 3. Remove absorbent sealant backings that have become wet before sealant application and replace them with dry materials. D. Install sealants by proven techniques to comply with the following and at the same time backings are installed: 1. Place sealants so they directly contact and fully wet joint substrates. 2. Completely fill recesses provided for each joint configuration. 3. Produce uniform, cross sectional shapes and depths relative to joint widths that allow optimum sealant movement capability. E. Tooling of Nonsag Sealants: Immediately after sealant application and before skinning or curing begins, tool sealants according to requirements specified below to form smooth, uniform beads of configuration indicated; to eliminate air pockets; and to ensure contact and adhesion of sealant with sides of joint. 1 JOINT SEALANTS 07920 4 Lindberg Smith Architects Horizon Building Clallam County June 2011 1. Remove excess sealants from surfaces adjacent to joint. 2. Use tooling agents that are approved in writing by sealant manufacturer and that do not discolor I sealants or adjacent surfaces. Provide concave joint configuration per Figure 5A in ASTM C 1193, unless otherwise indicated. Provide flush joint configuration, per Figure 5B in ASTM C 1193, where indicated. 5. Provide recessed joint configuration, per Figure 5C in ASTM C 1193, of recess depth and at locations indicated. a. Use masking tape to protect adjacent surfaces of recessed tooled joints. 3.4 CLEANING A. Clean off excess sealants or sealant smears adjacent to joints as the Work progresses by methods and with cleaning materials approved in writing by manufacturers of joint sealants and of products in which joints occur. 3.5 PROTECTION B. Protect joint sealants during and after curing period from contact with contaminating substances and from damage resulting from construction operations or other causes so sealants are without deterioration or damage at time of Substantial Completion. If, despite such protection, damage or deterioration occurs, cut out and remove damaged or deteriorated joint sealants immediately so installations with repaired areas are indistinguishable from the original work. END OF SECTION 07920 1 1 1 1 1 1 1 1 111 JOINT SEALANTS 07920 5 Lindberg Smith Architects Horizon Building Clallam County June 2011 SECTION 09260 GYPSUM BOARD ASSEMBLIES PART !1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1 1.2 SUMMARY i 1 A. This Section includes the following: 1. Interior gypsum wallboard. 1 2. Joint treatment and accessories. B. Related Sections include the following: 1. Section 06100 Rough Carpentry for wood framing and furring 1 2. Section 07212 "Building Insulation for insulation and vapor retarders installed in gypsum board assemblies. 3. Section 09912 "Painting" for painting of GWB walls and exterior finishes. 1 1.3 DEFINITIONS A. Gypsum Board Terminology: Refer to ASTM C 11 for definitions of terms for gypsum board assemblies not defined in this Section or in other referenced standards. 1.4 DELIVERY, STORAGE, AND HANDLING 1 A. Deliver materials in original packages, containers, or bundles bearing brand name and identification of manufacturer or supplier. B. Store materials inside under cover and keep them dry and protected against damage from weather, direct sunlight, surface contamination, corrosion, construction traffic, and other causes. Stack gypsum panels flat to prevent sagging. 1.5 PROJECT CONDITIONS A. Environmental Limitations: Comply with ASTM C 840 requirements or gypsum board manufacturer's 1 written recommendations, whichever are more stringent. 1 GYPSUM BOARD ASSEMBLIES 09260 1 Lindberg Smith Architects Horizon Building Clallam County June 2011 PART 2 PRODUCTS 2.1 GYPSUM BOARD MATERIALS A. Panel Size: Provide in maximum lengths and widths available that will minimize joints in each area and correspond with support system indicated. B. Manufactures: 1. National Gypsum Company. 2. USG Corporation. C. Gypsum Wallboard: ASTM C36, ends square. 1. Regular type: In thickness indicated with long edges tapered. 2.2 TRIM ACCESSORIES A. Interior Trim: ASTM C 1047. 1. Material: Galvanized or rolled zinc. 2. Shapes: a. Cornerbead: Use at outside corners, unless otherwise indicated. b. L -Bead: L- shaped; exposed long leg receives joint compound; use where indicated. c. Expansion (Control) Joint: Use where indicated. 2.3 JOINT TREATMENT MATERIALS A. General: Comply with ASTM C 475. B. Joint Tape: 1. Interior Gypsum Wallboard: Paper. C. Joint Compound for Interior Gypsum Wallboard: For each coat use formulation that is compatible with other compounds applied on previous or for successive coats. 1. Prefilling: At open joints, rounded or beveled panel edges, and damaged surface areas, use setting -type taping compound. 2. Embedding and First Coat: For embedding tape and first coat on joints, fasteners, and trim flanges, use setting -type taping compound. 3. Fill Coat: For second coat, use setting -type, sandable topping compound. 4. Finish Coat: For third coat, use setting -type, sandable topping compound. 2.4 TEXTURE FINISHES 1 A. Products: Subject to compliance with requirements, products that may be incorporated into the work include, but are not limited to the following: 1. G.P. Gypsum Corp., GypRoc Ceiling Texture/Polystyrene GYPSUM BOARD ASSEMBLIES 09260 2 Lindberg Smith Architects Horizon Building Clallam County 1 June 2011 2. National Gypsum Company; Gold Bond Perfect Spray 1 3. United States Gypsum Co.; Sheetrock ceiling spray texture, QT Polystyrene 4. United States Gypsum Co.; Sheetrock wall and ceiling spray texture (aggregated). B. Primer: As recommended by textured finish manufacturer. C. Aggregate Finish: Level 4 finish, Water- based, job- mixed, aggregated, drying -type texture finish. 1. Light orange peel (light splatter) at all new construction. 2. Match existing when working with existing construction. 2.5 ACOUSTICAL SEALANT A. Acoustical Sealant for Exposed and Concealed Joints: Nonsag, paintable, nonstaining, latex sealant complying with ASTM C 834 that effectively reduces airborne sound transmission through perimeter joints and openings in building construction as demonstrated by testing representative assemblies according to ASTM E 90. 1 2.6 AUXILIARY MATERIALS A. General: Provide auxiliary materials that comply with referenced installation standards and manufacturer's written recommendations. B. Steel Drill Screws: ASTM C 1002, unless otherwise indicated. 1. Use screws complying with ASTM C 954 for fastening panels to steel members from 0.033 to 0.112 inch thick. C. Thermal Insulation: As specified in Division 7 Section "Building Insulation." D. Polyethylene Vapor Retarder: As specified in Division 7 Section "Building Insulation." 1 PART 3 EXECUTION 3.1 l EXAMINATION 1 A. Examine areas and substrates, with Installer present, and including welded hollow -metal frames, cast -in anchors, and structural framing, for compliance with requirements and other conditions affecting performance. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 APPLYING AND FINISHING PANELS, GENERAL 1 A. Gypsum Board Application and Finishing Standards: ASTM C 840 and GA -216. B. Install ceiling board panels across framing to minimize the number of abutting end joints and to avoid abutting end joints in the central area of each ceiling. Stagger abutting end joints of adjacent panels not less than one framing member. C. Install gypsum panels with face side out. Butt panels together for a light contact at edges and ends with not more than 1/16 inch of open space between panels. Do not force into place. GYPSUM BOARD ASSEMBLIES 09260 3 Lindberg Smith Architects Horizon Building Clallam County tY June 2011 D. Locate edge and end joints over supports, except in ceiling applications where intermediate supports or gypsum board back blocking is provided behind end joints. Do not place tapered edges against cut edges or ends. Stagger vertical joints on opposite sides of partitions. Do not make joints other than control joints at corners of framed openings. E. Attach gypsum panels to studs so leading edge or end of each panel is attached to open (unsupported) edges of stud first. F. Attach gypsum panels to framing provided at openings and cutouts. 1 G. Do not attach gypsum panels across the flat grain of wide dimension lumber, including floor joists and headers. Float gypsum panels over these members using resilient channels, or provide control joints to counteract wood shrinkage. H. Form control and expansion joints with space between edges of adjoining gypsum panels. I. Cover both faces of partition framing with gypsum panels in concealed spaces (above ceilings, etc.), except in chases braced internally. 1. Unless concealed application is indicated or required for sound, fire, air, or smoke ratings, 2. coverage may be accomplished with scraps of not less than 8 sq. ft. in area. Fit gypsum panels around ducts, pipes, and conduits. 3. Where partitions intersect structural members projecting below underside of floor /roof slabs and decks, cut gypsum panels to fit profile formed by coffers, joists, and other structural members; allow 1/4- to 3/8 -inch- wide joints to install sealant. J. Isolate perimeter of non -load- bearing gypsum board partitions at structural abutments, except floors. Provide 1/4- to 1/2 -inch- wide spaces at these locations, and trim edges with U -bead edge trim where edges of gypsum panels are exposed. Seal joints between edges and abutting structural surfaces with acoustical sealant. K. Floating Construction: Where feasible, including where recommended in writing by manufacturer, install gypsum panels over wood framing, with floating internal corner construction. L. STC -Rated Assemblies: Seal construction at perimeters, behind control and expansion joints, and at openings and penetrations with a continuous bead of acoustical sealant. Install acoustical sealant at both faces of partitions at perimeters and through penetrations. Comply with ASTM C 919 and manufacturer's 1 written recommendations for locating edge trim and closing off sound flanking paths around or through gypsum board assemblies, including sealing partitions above acoustical ceilings. M. Space fasteners in gypsum panels according to referenced gypsum board application and finishing standard and manufacturer's written recommendations. 1. Space screws a maximum of 12 inches o.c. for vertical applications. 111 3.3 PANEL APPLICATION METHODS A. Application: 2. On ceilings, apply gypsum panels before wall/partition board application to the greatest extent U possible and at right angles to framing, unless otherwise indicated. On partitions /walls, apply gypsum panels as indicated or required by fire- resistance -rated assembly, and minimize end joints. 1 GYPSUM BOARD ASSEMBLIES 09260 4 Lindberg Smith Architects Horizon Building Clallam County June 2011 a. Stagger abutting end joints not less than one framing member in alternate courses of board. 1 b. At stairwells and other high walls, install panels horizontally, unless otherwise indicated or required by fire resistance -rated assembly. c. Stagger joints at least 16" in double -layer assemblies, unless otherwise indicated or required by code. B. Fastening Methods: Apply gypsum panels to supports with steel drill screws. 3.4 INSTALLING TRIM ACCESSORIES A. General: For trim with back flanges intended for fasteners, attach to framing with same fasteners used for panels. Otherwise, attach trim according to manufacturer's written instructions. B Control Joints: Install control joints at locations indicated on Drawings. 1 3.5 FINISHING GYPSUM BOARD ASSEMBLIES 1 A. General: Treat gypsum board joints, interior angles, edge trim, control joints, penetrations, fastener heads, surface defects, and elsewhere as required to prepare gypsum board surfaces for decoration. Promptly remove residual joint compound from adjacent surfaces. B. Prefill open joints, rounded or beveled edges, and damaged surface areas. C. Apply joint tape over gypsum board joints, except those with trim having flanges not intended for tape. D Gypsum Board Finish Levels: Finish panels to levels indicated below, according to ASTM C 840, for locations indicated: 1. Embed tape and apply separate first, fill, and finish coats of joint compound to tape, fasteners, and 1 trim flanges. 2. Provide Level 4 finish at all new construction. Match finishes where working with existing construction. END OF SECTION 09260 1 1 1 I 1 1 GYPSUM BOARD ASSEMBLIES 09260 5 I Lindberg Smith Architects Horizon Building Clallam County June 2011 1 SECTION 09912 PAINTING PROFESSIONAL LINE PRODUCTS I PART 1 GENERAL I 1.1 RELATED DOCUMENTS I A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes surface preparation and field painting of exposed exterior and interior items and 1 surfaces. 1. Surface preparation, priming, and finish coats specified in this Section are in addition to shop I priming and surface treatment specified in other Sections. ant exposed surfaces, except where these Specifications indicate that the surface or material is not to be painted or is to remain natural. If an item or a surface is not specifically mentioned, paint the item or I surface the same as similar adjacent materials or surfaces. If a color of finish is not indicated, Architect will select from standard colors and finishes available. I C. Do not paint prefinished items, concealed surfaces, fmished metal surfaces, operating parts, and labels. 1. Prefinished items include the following factory- finished components: I a. Architectural woodwork. b. Finished mechanical and electrical equipment. c. Light fixtures. 1 2. Concealed surfaces include walls or ceilings in the following generally inaccessible spaces: a. Furred areas. b. Ceiling plenums. I c. Utility tunnels. d. Pipe spaces. e. Duct shafts. 1 3. Finished metal surfaces include the following: a. Anodized aluminum. I b. c. Bronze and brass. Stainless Steel d. Chromium Plate. 1 4. Operating parts include moving parts of operating equipment and the following: a. Valve and damper operators. I b. c. Linkages. Sensing devices. d. Motor and fan shafts. 1 I PAINTING (PROFESSIONAL LINE PRODUCTS) 09912 1 Lindberg Smith Architects Horizon Building Clallam County June 2011 5. Labels: Do not paint over UL, FMG, or other code required labels or equipment name, 1 identification, performance rating, or nomenclature plates. D. Related Sections include the following: 1 1. Section 09260 "Gypsum Board Assemblies" for surface preparation of gypsum board. 1.3 DEFINITIONS A. General: Standard coating terms defined in ASTM D 16 apply to this Section. 1 1. Flat refers to a lusterless or matte finish with a gloss range below 15 when measured at an 85- degree meter. 1 2. Eggshell refers to low sheen finish with a gloss range between 20 and 35 when measured at a 60- degree meter. 3. Semigloss refers to medium -sheen finish with a gloss range between 35 and 70 when measured at a 60- degree meter. 1.4 DELIVERY, STORAGE, AND HANDLING 1 A. Deliver materials to Project site in manufacturer's original, unopened packages and containers bearing manufacturer's name and label and the following information: 1. Product name or title of material. 2. Product description (generic classification or binder type). 3. Manufacturer's stock number and date of manufacture. 4. Contents by volume, for pigment and vehicle constituents. 5. Thinning instructions. 6. Application instructions. 7. Color name and number. 8. VOC content. B. Store materials not in use in tightly covered containers in a well ventilated area at a minimum ambient 1 temperature of 45 deg F. Maintain storage containers in a clean condition, free of foreign materials and residue. 1. Protect from freezing. Keep storage area neat and orderly. Remove oily rags and waste daily. 1.5 PROJECT CONDITIONS A. Apply waterborne paints only when temperatures of surfaces to be painted and surrounding air are between 50 and 90 deg F. B. Apply solvent thinned paints only when temperatures of surfaces to be painted and surrounding air are between 45 and 95 deg F. C. j Do not apply paint in snow, rain, fog, or mist; or when relative humidity exceeds 85 percent; or at temperatures less than 5 deg F above the dew point; or to damp or wet surfaces. 1 PAINTING (PROFESSIONAL LINE PRODUCTS) 09912 2 Lindberg Smith Architects Horizon Building Clallam County June 2011 1 1. Painting may continue during inclement weather if surfaces and areas to be painted are enclosed and heated within temperature limits specified by manufacturer during application and drying periods. 1.6 EXTRA MATERIALS 1 A. Furnish extra paint materials from the same production run as the materials applied and in the quantities described below. Package with protective covering for storage and identify with labels describing contents. Deliver extra materials to Owner. 1. Quantity: Furnish Owner with extra paint materials in quantities indicated below: a. b. Exterior, Flat Acrylic Paint: 1 gal. of each color applied. Exterior, Semigloss Acrylic Enamel: 1 gal. of each color applied. c. Interior, Eggshell Acrylic Enamel: 1 gal. of each color applied. d. Interior, Semigloss Acrylic Enamel: 1 gal. of each color applied. PART 2 PRODUCTS 2.1 MANUFACTURERS A. Available Products: Subject to compliance with requirements, products that may be incorporated into the 1 Work include products from the following manufactures: 1. Pittsburgh Paints, PPG Industries, Inc. 1 2. Benjamin Moore Co. 3. Parker Paint. 4. Rhodda Paints 2.2 PAINT MATERIALS, GENERAL 1 A. Material Quality: Provide manufacturer's best quality paint material of the various coating types specified that are factory formulated and recommended by manufacturer for application indicated. Paint material containers not displaying manufacturer's product identification will not be acceptable. 1. Proprietary Names: Use of manufacturer's proprietary product names to designate colors or materials is not intended to imply that products named are required to be used to the exclusion of equivalent products of other manufacturers. Furnish manufacturer's material data and certificates of performance for proposed substitutions. B. Colors: As selected by Architect/Owner. 1. Exterior: Match all existing exterior colors. 2. Interior: Match all existing interior colors 1 PAINTING (PROFESSIONAL LINE PRODUCTS) 09912 3 Lindberg Smith Architects Horizon Building Clallam County 1 June 2011 2.3 EXTERIOR PRIMERS 1 A. Exterior wood primer for acrylic enamels: Factory- formulated alkyd or latex wood primer for exterior application. 1. Pittsburgh Paints; 6 -609 Speedhide exterior house and trim wood primer 100 percent acrylic latex: applied at a dry film thickness of not less than 1.6 mils. 2. Benjamin Moore; Moorcraft super spec alkyd exterior primer No. 176: Applied at a dry film thickness of not less than 1.8 mils. 3. Kelly -Moore 255 stain -lock II stain resistant acrylic primer: Applied at a dry film thickness of not less than 2.0 mils. 2.4 INTERIOR PRIMERS A. Interior Gypsum Board Primer: Factory- formulated latex -based primer for interior application. 1 1. Pittsburgh Paints; 6 -2 Speedhide Interior Quick -Drying Latex Sealer. Applied at a dry film thickness of not less than 1.0 mil. 2. Benjamin Moore; Moorcraft Super Spec Latex Enamel Undercoater Primer Sealer No. 253: Applied at a dry film thickness of not less than 1.2 mils. 3. Kelly- Moore; 971 Acry-Prime Interior Latex Primer Sealer: Applied at a dry film thickness of not less than 1.6 mils. B. Interior Wood Primer for Acrylic Enamel and Semigloss Alkyd- Enamel Finishes: Factory- formulated alkyd- or acrylic latex -based interior wood primer. 1. Pittsburgh Paints; 6 -855 Speedhide Latex Enamel Undercoater: Applied at a dry film thickness of not less than 1.0 mil. 2. Benjamin Moore; Moorcraft Super Spec Alkyd Enamel Underbody and Primer Sealer No. 245: Applied at a dry film thickness of not less than 1.5 mils. 3. Kelly- Moore; 975 Acry Plex Interior Latex Enamel Undercoat: Applied at a dry film thickness of not less than 1.6 mils. 2.5 EXTERIOR FINISH COATS A. Exterior Flat Acrylic Paint: Factory- formulated flat acrylic emulsion latex paint for exterior application. 1. Pittsburgh Paints; 6 -600 Series SpeedHide Exterior House Paint Flat Latex: Applied at a dry film thickness of not less than 1.3 mils.. 2. Benjamin Moore; Moorcraft Super Spec Flat Latex House Paint No. 171: Applied at a dry film thickness of not less than 1.2 mils. 3. Kelly- Moore; 1205 Color Shield Exterior Flat Acrylic House Paint: Applied at a dry film thickness of not less than 1.9 mils. 1 PAINTING (PROFESSIONAL LINE PRODUCTS) 09912 4 Lindberg Smith Architects Horizon Building Clallam County June 2011 1 B. Exterior Full -Gloss Acrylic Enamel for Ferrous and Other Metals: Factory- formulated full -gloss waterborne acrylic -latex enamel for exterior application. 1. Pittsburgh Paints; 90- 300Series Pitt-Tech One Pack Interior/Exterior High Performance Waterborne High Gloss DTM Acrylic Gloss Enamel: Applied at a dry film thickness of not less than 3.0 mils. 2. Benjamin Moore; Moore's IMC Acrylic Gloss Enamel M28: Applied at a dry film thickness of not less than 2.0 mils. 3. Kelly- Moore; 5780 DTM Acrylic Gloss Enamel: Applied at a dry film thickness of not less thn 1.7 mils. 1 2.6 INTERIOR FINISH COATS A. Degree of glass to be confirmed with Owner's representative prior to paint acquisition. 1. Ferrous Metal: "Semi Gloss" gloss 35 -70 units. 2. Gypsum board in kitchen and toilet rooms: "Satin" gloss 25 -30 units. 3. Gypsum board at walls and ceilings: "Eggshell gloss 10 -25 units. 4. Wood with transparent finish: "Satin 1 B. Interior Eggshell Acrylic Paint: Factory- formulated eggshell acrylic emulsion latex paint for interior application. 1. Pittsburgh Paints; 6 -70 Line SpeedHide Interior Wall Flat -Latex Paint: Applied at a dry film 2. thickness of not less than 1.0 mil. Benjamin Moore; Moorecraft Super Spec Latex Flat No. 275: Applied at a dry film thickness of not less than 1.2 mils. 3. Kelly- Moore; 450 Pro -Wall Interior Flat Latex Wall Paint: Applied at a dry film thickness of not 1 less than 1.8 mils. C. Interior Satin Acrylic Enamel: Factory- formulated satin acrylic -latex enamel for interior application. 1 1. Pittsburg Paints; 6 -500 Series SpeedHide Interior Satin Latex: Applied at a dry film thickness of not less than 1.0 mil. 1 2. Benjamin Moore; Moorecraft Super Spec Latex Satin Enamel No. 276: Applied at a dry film thickness of not less than 1.2 mils. 3 Kelly- Moore; 1649 Acrylic -Latex Satin Enamel: Applied at a dry film thickness of not less than 1.7 mils. 4 Kelly- Moore; 1685 Dura -Poxy Satin Acrylic Enamel: Applied at a dry film thickness of not less than 1.5 mils. 111 2.7 INTERIOR WOOD STAINS AND VARNISHES A. Open Grain Wood Filler: Factory- formulated paste wood filler applied at spreading rate recommended by manufactures. 1. Pittsburg Paints; none required. 2. Benjamin Moore; Benwood Paste Wood Filler No. 238. 1 3. Kelly- Moore; none required. B. Clear Sanding Sealer: Factory- formulated fast drying alkyd -based clear wood sealer applied at spreading rate recommended by manufactures. PAINTING (PROFESSIONAL LINE PRODUCTS) 09912 5 Lindberg Smith Architects Horizon Building Clallam County June 2011 Paint 6-10 Speed Hide Quick-Dry Sanding 1. Pittsburgh s, 6 p Q ry g Sealer No. 413. 2. Benjamin Moore; Moore's Interior Wood Finishes Quick -Dry Sanding Sealer No. 413. 3. Kelly- Moore; 2164 E Z Sand Alkyd Q. D. Sealer. 1 C. Interior Alkyd- or Polyurethane -Based Clear Satin Varnish: Factory- formulated alkyd- or polyurethane -based clear varnish. 1. Pittsburgh Paints; 77 -7 Rez Varnish, Interior Satin Oil Clear. 2. Benjamin Moore; Benwood Interior Wood Finishes Polyurethane Finishes Low Lustre No. 435. 3. Kelly- Moore; 2050 Kel -Aqua Stain Base. 1 PART 3 EXECUTION 3.1 EXAMINATION A. Examine substrates, areas, and conditions, with Applicator present, for compliance with requirements for paint application. Comply with procedures specified in PDCA P4. 1. Proceed with paint application only after unsatisfactory conditions have been corrected and 1 surfaces receiving paint are thoroughly dry. 2. Start of painting will be construed as Applicator's acceptance of surfaces and conditions within a particular area. 1 13. Coordination of Work: Review other Sections in which primers are provided to ensure compatibility of the total system for various substrates. On request, furnish information on characteristics of finish materials to ensure use of compatible primers. 1. Notify Architect about anticipated problems when using the materials specified over substrates 1 primed by others. 3.2 PREPARATION A. General: Remove hardware and hardware accessories, plates, machined surfaces, lighting fixtures, and similar items already installed that are not to be painted. If removal is impractical or impossible because of size or weight of the item, provide surface- applied protection before surface preparation and painting. 1. After completing painting operations in each space or area, reinstall items removed using workers skilled in the trades involved. B. Cleaning: Before applying paint or other surface treatments, clean substrates of substances that could impair bond of the various coatings. Remove oil and grease before cleaning. 1. Schedule cleaning and painting so dust and other contaminants from the cleaning process will not fall on wet, newly painted surfaces. C. Surface Preparation: Clean and prepare surfaces to be painted according to manufacturer's written 1 instructions for each particular substrate condition and as specified. 1. Provide barrier coats over incompatible primers or remove and reprime. 1 2. Cementitious Materials: Prepare mineral -fiber- reinforced cement panel surfaces to be painted. Remove efflorescence, chalk, dust, dirt, grease, oils, and release agents. Roughen as required to 1 PAINTING (PROFESSIONAL LINE PRODUCTS) 09912 6 1 Lindberg Smith Architects Horizon Building Clallam County June 2011 remove glaze. If hardeners or sealers have been used to improve curing, use mechanical methods of surface preparation. a. Determine alkalinity and moisture content of surfaces by performing appropriate tests. If surfaces are sufficiently alkaline to cause the finish paint to blister and burn, correct this condition before application. Do not paint surfaces if moisture content exceeds that permitted in manufacturer's written instructions. 3. Galvanized Surfaces: Clean galvanized surfaces with nonpetroleum -based solvents so surface is free of oil and surface contaminants. Remove pretreatment from galvanized sheet metal fabricated from coil stock by mechanical methods. D. Material Preparation: Mix and prepare paint materials according to manufacturer's written instructions. 1 1. Maintain containers used in mixing and applying paint in a clean condition, free of foreign materials and residue. 2. Stir material before application to produce a mixture of uniform density. Stir as required during application. Do not stir surface film into material. If necessary, remove surface film and strain material before using. 3. Use only thinners approved by paint manufacturer and only within recommended limits. 1 E. Tinting: Tint each undercoat a lighter shade to simplify identification of each coat when multiple coats of same material are applied. Tint undercoats to match the color of the finish coat, but provide sufficient differences in shade of undercoats to distinguish each separate coat. 3.3 APPLICATION A. General: Apply paint according to manufacturer's written instructions. Use applicators and techniques best suited for substrate and type of material being applied. 1. Do not paint over dirt, rust, scale, grease, moisture, scuffed surfaces, or conditions detrimental to formation of a durable paint film. 2. 3. Provide finish coats that are compatible with primers used. The term "exposed surfaces" includes areas visible when permanent or built -in fixtures, grilles, convector covers, covers for finned -tube radiation, and similar components are in place. Extend 1 4. coatings in these areas, as required, to maintain system integrity and provide desired protection. Paint surfaces behind movable equipment and furniture the same as similar exposed surfaces. Before final installation of equipment, paint surfaces behind permanently fixed equipment or furniture with prime coat only. 1 B. Scheduling Painting: Apply first coat to surfaces that have been cleaned, pretreated, or otherwise 1 prepared for painting as soon as practicable after preparation and before subsequent surface deterioration. 1. The number of coats and film thickness required are the same regardless of application method. Do not apply succeeding coats until previous coat has cured as recommended by manufacturer. If sanding is required to produce a smooth, even surface according to manufacturer's written instructions, sand between applications. 2. Omit primer over metal surfaces that have been shop primed and touchup painted. 3. If undercoats, stains, or other conditions show through final coat of paint, apply additional coats until paint film is of uniform finish, color, and appearance. Give special attention to ensure that edges, corners, crevices, welds, and exposed fasteners receive a dry film thickness equivalent to that of flat surfaces. 1 1 PAINTING (PROFESSIONAL LINE PRODUCTS) 09912 7 Lindberg Smith Architects Horizon Building Clallam County 1 June 2011 4. Allow sufficient time between successive coats to permit proper drying. Do not recoat surfaces until paint has dried to where it feels firm, and does not deform or feel sticky under moderate thumb pressure, and until application of another coat of paint does not cause undercoat to lift or lose adhesion. 1 C. Application Procedures: Apply paints and coatings by brush, roller, spray, or other applicators according to manufacturer's written instructions. 1. Brushes: Use brushes best suited for type of material applied. Use brush of appropriate size for surface or item being painted. 2. Rollers: Use rollers of carpet, velvet -back, or high -pile sheep's wool as recommended by manufacturer for material and texture required. 3. Spray Equipment: Use airless spray equipment with orifice size as recommended by manufacturer for material and texture required. D. i Minimum Coating Thickness: Apply paint materials no thinner than manufacturer's recommended spreading rate to achieve dry film thickness indicated. Provide total dry film thickness of the entire system as recommended by manufacturer. 1 E. I Prime Coats: Before applying finish coats, apply a prime coat, as recommended by manufacturer, to material that is required to be painted or finished and that has not been prime coated by others. Recoat primed and sealed surfaces where evidence of suction spots or unsealed areas in first coat appears, to ensure a finish coat with no burn- through or other defects due to insufficient sealing. F. Pigmented (Opaque) Finishes: Completely cover surfaces as necessary to provide a smooth, opaque surface of uniform finish, color, appearance, and coverage. Cloudiness, spotting, holidays, laps, brush marks, runs, sags, ropiness, or other surface imperfections will not be acceptable. G. Completed Work: Match approved samples for color, texture, and coverage. Remove, refinish, or repaint work not complying with requirements. 3.4 CLEANING 1 A. Cleanup: At the end of each workday, remove empty cans, rags, rubbish, and other discarded paint materials from Project site. 1. After completing painting, clean glass and paint- spattered surfaces. Remove spattered paint by washing and scraping without scratching or damaging adjacent finished surfaces. 3.5 PROTECTION 1 A. Protect work of other trades, whether being painted or not, against damage from painting. Correct damage by cleaning, repairing or replacing, and repainting, as approved by Architect. B. Provide "Wet Paint" signs to protect newly painted finishes. After completing painting operations, remove temporary protective wrappings provided by others to protect their work. 1. After work of other trades is complete, touch up and restore damaged or defaced painted surfaces. Comply with procedures specified in PDCA P1. END OF SECTION 09912 1 PAINTING (PROFESSIONAL LINE PRODUCTS) 09912 8 1 MN r MN r®_ 11111 M M_ MI I o f a IL 20' -0' z c a I. 1 1 d i -3 Ei;lio2 0 e_____. 0 i iillili i 4i:: i 11 1 11 11 I). 1 i g A ':P`,r V 41 Q li liii A A iii !?iii A I 'z z ii 0) n rn II ig 2 p 1 a 32 4 g ot 4 Z ilz P!!! :-u PP1 ij A LLEY P N N RTY 100A0 i, F3' §ii 9191 m uf w E. T giRi R 1 T NZ y r r O °O ~~g n EXTG CONC WALK f EX C DECK I11 �i 1 •I I �i A N i II m g 1 '.1��� 'tl i a �1,1„1..� r N 1l1l111�1� I Z m j IIMI� 1 4 41411411 II y trt PI JJ 11111111111 N A O b 11�i,. I LI 0 1 I; 1 1 01 r R 11111 la N 33 JC '1'1'1'1'1 i-I 1 Y 1> g 5 4 11111 r N L= 1 li��� 3Z Il 1 i i i Z 0,10,10 D I 0 In 4A to N 1 ,1 1 1, �111 EK I X 1> N 144114' li I Q I t X1 11 N E N r g 1;1;1;1,1; O m X z Ili ii k.it 0/ K i h1 1 1 i l l L r 0— ;i m r z a Il�� Ion m -9 6 iii F I r p X v rn z 1v t r r�a����o� D ty A CO C O 0 CO I r r gg sg tog x 2 i Rw u 0 a i 6 al (11 ili 2 t 1 6 4 N 0 R. 111110401* k 4.. n9 8( i 6 1 li iP- 4 A g D,8 P I i OX 4 F �OZ 1 Ui if; a4 Y flii f ro 1. g (11p d gi- 1 j b A Q X 21i 1> 7 D p PROPERTY LIPS 100.000' fIi N -1 D Q1 EXiG CONC. SIDEWALK M 0 5 pfR .--J 4 N 241 -0" tt t tp� EXISTING F�F 1 N S I REET 0 318 South Peabody St imp" a imams FOR CC PROJ 6211011-1f3 I TER 1 �1 Port Angeles, WA 98382 HORIZON CENTER BUILDING A R C H I T E C T S Phone: (380) 52 -7084 205 E 5TH STREET, PORT ANGELES, WA MI MO NMI M MS a ME MN MB i i g F. F g 3' d� ppom O a r i l ?i P 1 b 7 EXTG CONC. II WALK -,,„,-r, 7 tik i 00X z vi rl c N W YjI I 0 IF. 1 1 II' r I I 1 m 1 I g gk I a m r 1 _N r qg dog Ii 1. I I I N w ,�1- I I Z N P 4 F r 4 i Imr #10 t p .11 v r 1 V I ii 1 ,t m E I F i x EXTG II X I II I II X 4h)13/ 2 r. 19'4' J N n g8€ A r 4 r o A A 7 1m lir (3 6 go y 319 South Peabody St M. 3% suite H �1 d GC PROJ 66211011-1B IV ft ILIENDI:M M Port Angeles, WA 98382 HORIZON CENTER BUILDING ARCHITECTS P Fas (380) 452-7064 US W M MEET, PORT ANINILE11, WA OM MI i M 1111111 r OM r r M■ M MINI O- X 1 o vR m I 1 a am 7 C_ 1 r Lr 7 1 u E w I MI 1 1 4 =OX cp J C�—1 CO 0 11 2 1 1 m 0 AiDOm I I 0 m N Li 0 11 PW u r 1 4X g Cr- 9 o 0 7 1 1 1 7 f— N 1 v' A• J n N L I J1 L_ O J mA 1=1 X l0 4 El I r- 1 1 El L 1- H1 1 r I I1 I I II I, n 1 I I I I El Z d Hh I I -JL -J 1 t 1 1 L-- J EXISTING GUTTER (REMOVE) N tom-' CC I II di i 0 319 South Peabody St. op d wags Fon CC PROJ 6211011-15 s e I.>1L1 suite B P ort Angeles, WA 98382 HORIZON CENTER BUILDING A R C H I T E C T S Phone: (380) 452 -8118 Fax (380) 452 -7084 205 E 5TH STREET, PORT ANGELES, WA J L g'.O" 41 9'-0' Q 5 TIT m r� EXIST EXISTNG N I I t zm I�f M E 1 it c N N .r z z V 6: 111 I 0 7 A z c o I, o 1 g z z I goo 1 y� H A 11 1 7 N -r" y 1 111 1 i 1 1 i V 1 N J 1 i El FT- N Am 4i 1 4111E ihil ti _I-- 1 Liii ti w. I-1 1 3 a E i g cl 1 Pg o i N X� EXISTING I I A I i �E6 1 x I I- 't brn i I iii I rn 11 o f o II A 'o o II g PI L ^y I� I, 01 l r y 0. EXISTING 4. 1 I J g il IIII 15 01 0, g m E (p t 70 D l c t�t A A y t gg C�3 ZI�1 N X u, il 5. i 1 ii g e 41 e 6. 4 -4 i cl E r N u 319 South Peabody St s �me RN CC PROJ 0 621101145 Su f. mil" R P ot, e° WA 98362 HORIZON CENTER BUILDING 4 4 A R C H E T E C T S Phone:(980) 462 -8118 F'as(980) 452-7064 205 E 5TH STREET, PORT ANGELES, WA T MO MI M 1111111 E MB IIIIII I IIIIII NM gm emi um me EN mu or zp? /1__, 1 1 z EXISTING ID 910" mo I lei g t. m iti g I). rn r41 EXISTING A I N N o o R v v rn a nx r n r S',. 9. i c i L 1 o iiiiiiil O w F 7 1 y� j l;z3 o o Z 0 0 r loi M 5 I Ili 1 h 2V MI ON A tie i o Vi" n E r IIN Oil Ela f, A M 1 [1] F gi-Pi6; �f 1 D v c wt i o k, 1\ P 1 g N Li Si iiiiiiii Mil Pit 3 i■ 0 Or CO k\ CID I I 2—W E 12 A g y g `IN S NF i i i EXISTI 4 xac; n K.:.:4, E`O' T 't.: N i III §k t 6. ri o i y !il T st,,.j —i .i A III X -1 9 r JJ in N t J� a z o JI p 1 m roo m Z 2 RAW 4 N W I�j 1 rt m yr N L T I 8 W A W G N n I A 9 -O rr� �t �1 D M 2:''r 41 44 lrr m E D D EXISTING -11.',:. r— n r p E t5 ftt r 3.?s H m g -1 m Dan OE= m� E 1, m orn N m N 6 ;v mc 3 i i A -pJ�..e N 1 N g -m m Ii Q m A M 31 9 South Peabody St M i :1 EAR y d ��S CG PROJ 621101N8 a I: EAR I 4 Suite B P ort Angeles, WA 98362 HORIZON CENTER BUILDING C,I A R C H I T E C T S Phone: (380) 462 -8118 Fax (380) 462 -7084 205 E 5TH STREET, PORT ANGELES, WA I MN MINI MB MI I M r I z�rt I 71m�p X N I -2E A =A 0E i&N x, r m N CIO j' mm m �mN"' .Q MIMI I r- h 41 m; 6 5 CP 111 A g 1 F E 1) CD O W I A I -1 O D 2 EE X E 0 0 rn M D M I r l A car m A rr- A D O f X E O N A F r A O m �A N N� E E E E 3 0 Q r f E D rn E 31 as w Z k31 "2” 4 g t p U a u 6 o I I pll 1p I J k X pT 34 QQl Dm -.O -Qm e TDcigAr A Wm 4r. M 6 me E r O A§ Zef6 Pg, o 2r -Om c mG a e m V nu, mr N N-4 N <DO�C m ll r v 6 ��m2 n N 3 d t r- m-ad W O \c3 N m O N -I Z N rr' m I DII el/ 3 rt, A II II C�� re o i L o J J II MM u 0 D E E m -Om ��X Em r O �0 —4--- �X�m N -nit1 ND0 6. Tr p p dm O�E Z n 0 A Z� A mli I, C1 E a A o D m e O M 1 0 r r N po AO� 6 C Mu -D r /V m FR N N 0 X rn r 4 Z g N r� O n E 1.1 p a� 6- g cn E a' 111 N gV 2 i it l 319 South Peabody St CC PROD 6211011-15 I �1j�� Suite B Port Angeles, WA 98982 HORIZON CENTER BUILDING (C II ARCHITECTS Phone: (380) 462 -8118 Fax 462 -7064 205 E 5TH STREET, PORT ANGELES, WA