Loading...
HomeMy WebLinkAbout1404 1/2 W 15th St - Technical TECHNICAL Permit# EN Address I40i /z vJ i 5 1/6 Project description r'lan fcw1 hovvei Date the permit was f+p exj■tre,A (4. D- Number of technical pages 0i z i• L' 2",44-2.4.&1..,, t 7, F NCSBCS /ANSI A225.1 1994 r .i �aL J S f q f', �1. 7 is Fe S y a i may' L^ y Pi:. b:� is �i C.o.'5V 1fJ i a .>I7 hi f 1 t v Manufactured Home _Z Installations of 4.f v' F d a m .i s 1 1 .L i CV s t r s U) s kfi 04), y m •1 V U M: :4C -i 1!. �r .r t r rF S Y .i l Vm_ 1.1 lIl AII 11111 11 I .k e' MO MI li 1 N. MNI• NEM y ,f. a =ital L I- Y. N v�� National Conference z <V:� x of States on M r ay Y� Building Codes r r a and Standards Inc 5 j i 4.,•, f S• NCSBCS /ANSI A225.1 -1994 Revision of ANSI A225.1 -1987 American National Standard MANUFACTURED HOME INSTALLATIONS 1110 Secretariat National Conference of States on Building Codes and Standards, Inc. Approved January 4, 1994 American National Standards Institute, Inc. American National Standard Approval of an American National Standard requires verification by ANSI that the requirements for due process, consensus, and other criteria for approval have been met by the standards developer. Consensus is established when, in the judgment of the ANSI Board of Standards Review, substantial agreement has been reached by directly and materially affected interests. Substantial agreement means much more than a simple majority, but not necessarily unanimity. Consensus requires that all views and objections be considered and that a concerted effort be made toward their resolution. The use of American National Standards is completely voluntary; the existence of the standards does not lfn any respect preclude anyone, whether he /she has approved the standards or not, from manufacturing, marketing, purchasing, or using products, processes, or procedures not conforming to the standards. The American National Standards Institute does not develop standards and will in no circumstances give an interpretation of any American National Standard. Moreover, no person shall have the right or authority to issue an interpretation of an American National Standard in the name of the American National Standards Institute. Requests for interpretations should be addressed to the secretariat or sponsor whose name appears on the title page of this standard. CAUTION NOTICE: This American National Standard may be revised or withdrawn at any time. The procedures of the American National Standards Institute require that action be taken .periodically to reaffirm, revise, or withdraw this standard. Purchasers to American National Standards may receive current information on all standards by calling or writing the American National Standards Institute. Published by National Conference of States on Building Codes and Standards, Inc. 505 Huntmar Park Drive, Suite 210, Herndon, Virginia 22070 Copyright 1994 by National Conference of States on Building Codes and Standards, Inc. All rights reserved. No part of this publication may be reproduced in any form, in an electronic retrieval system or otherwise, without prior written permission of the publisher. Printed in the United States of America CONTENTS 0 1 Introduction, applicability, and organization of standard 1 1.1 Scope 1 1.2 Intended usage of manufactured homes covered under this standard 1 1.3 Preinstallation considerations 2 1.4 Consumer information card 2 2 Definitions 2 3 Site preparation 5. 3.1 Location and layout 5 3.2 Soil conditions 5 3.3 Removal of organic material 5 3.4 Drainage 6 3.5 Ground moisture control 6 4 Foundations 6 4.1 Piers 6 4.2 Footings 8 4.3 Permanent foundations 8 4.4 Special considerations 9 4.5 Important reference documents 9 5 Installation procedures 9 41) 5.1 Moving manufactured home to location 9 5.2 Positioning home 9 5.3 Interconnection of multisection homes 9 5.4 Cross -over connections for multisection manufactured homes 10 5.5 Anchoring instructions 10 5.6 Installation of on -site structures 1 1 6 Installation of optional features 11 6.1 Hinged roofs and eaves 11 6.2 Garden and bay windows 12 6.3 Awnings and ramadas 12 6.4 Miscellaneous lights and fixtures 12 6.5 Ventilation options 12 6.6 Optional panels, siding, and moulding 12 6.7 Exterior coverings 1 2 6.8 Skirting 12 6.9 Telephone and cable TV 13 6.10 Joints and seams 13 7 Preparation of appliances 13 7.1 Clothes dryer vent 13 7.2 Comfort cooling systems 13 7.3 Fireplace and wood -stove chimneys and air inlets 13 7.4 Range, cook -top, and oven venting 14 8 Utility- system connection and testing 14 8.1 Proper procedures 14 8.2 Water supply 14 8.3 Drainage system 15 8.4 Gas supply 15 8.5 Heating oil systems 16 8.6 Electricity 16 Annex A Final Inspection Checklist 17 Annex B Barrier -free Design Aspects for the 20 Physically Handicapped (Exterior Only) Annex C Sample Checklist for Enforcement Officials 22 Annex D Suggested Acceptance Guidelines for "Pre- HUD Code" (pre MHCSS) Manufactured (mobile) Homes 24 Annex E Sample Schedule for Manufactured Home Installation Permits 27 Annex F Bibliography of Foundation Plans Available from Manufacturer 28 Annex G Tables 29 Annex H Illustrations 34 II ii This standard was processed and approved for submittal to ANSI by the Accredited Standards Committee on Manufactured Home Installations (Manufactured Home Sites, Set -ups, Utilities), A225.1. Committee approval of the standard does not necessarily imply that all committee members voted for its approval. At the time it approved this standard, the A225.1 Committee had the following members: Delmont C. Thurber, P.E., Chairman, State of Montana Eric Leatherby, Secretary, National Conference of States on Building Codes and Standards, Inc. (NCSBCS) Organizational Member Representative American Forest and Paper Association David Collins American Hardboard Association Louis Wagner City of Boyton Beach, Florida Don Johnson City of West Melbourne, Florida James Phelps Commonwealth of Kentucky Charles Wiley Construction Code Consulting, Inc J. Bruce Scales Economy Mobile /Modular Homes, Inc Roy Grabanski Fleetwood Enterprises Ed Salsbury International Association of Plumbing and Mechanical Officials Shabbir Rawalpindiwala Manufactured Housing Institute Frank Walter Masonite Corporation John Sims Mobile Housing, Inc John Lawlor National Foundation of Manufactured Home Owners Len Wehrman State of Arkansas Mary Beth Bowman State of Maine David Preble State of Maryland James Hanna State of Minnesota Randy Vogt State of Missouri James Phillips State of Montana Del Thurber State of North Carolina David Goins State of South Carolina John Jones State of Washington Patricia McLachlan Thomas, Dean and Hoskins, Inc Wayne Dean T. R. Arnold and Associates, Inc. Tom Arnold Treasure Valley Homes Dwayne Ward U.S. Department of Housing and Urban Development Sam Hacopian Vinyl Improvement Products Company Bruce Dusko iii AMERICAN NATIONAL STANDARD NCSBCS /ANSI A225.1 American National Standard Manufactured Home Installations 1 Introduction, applicability, and manufacture. organization of standard NOTE The Federal standards, regulations, and 1.1 Scope requirements for manufactured housing, as authorized by 42.U.S.C.5401 et seq., are as follows: This standard covers the installation of *Part 3280 MHCSS manufactured homes, wherever located, *Part 3282 Manufactured Home Procedural and whenever the manufacturer's installation Enforcement Regulations instructions are not available. Included are *Part 3283 Manufactured Home Consumer requirements for manufactured home sites and Manual Requirements set -ups. Hereafter, throughout sections three through 1.2 Intended usage of manufactured homes eight of this document, "manufactured home" covered under this standard will be used interchangeably with "home." The provisions of this standard are intended to 1.2.2 Applicability apply to manufactured homes (single- section, multisection, or expandable types) for use as This standard is designed to be adopted by single family dwellings. authorities having jurisdiction over and responsible for the safety and health of NOTE 1 The Federal Manufactured Home manufactured home users. It is intended to S Construction and Safety Standards (MHCSS) cover apply to all home installations, whether at new one family occupancies only. This standard makes or existing manufactured home sites. no provisions for other residential occupancies. While this standard provides useful technical NOTE 2 This standard does not apply to data for improvements to existing sites falling manufactured homes used for other than dwelling within its scope, and such use is encouraged, it purposes. is not intended to be applied retroactively to existing sites except where the authority having NOTE 3 The provisions of this standard shall not jur considers such application essential apply to recreational vehicles as defined in the for the safety and health of the occupants or National Fire Protection Association (NFPA) 501C, users of the sites. This standard shall not be Standard for Recreational Vehicles, or to park trailers as defined in the ANSI A119.5, Standards construed as relieving the installer of a for Park Trailers. manufactured home of the responsibility for compliance with the codes and regulations 1.2.1 Types of manufactured homes covered established by the authorities having jurisdiction. The manufactured homes covered under this 1.2.3 Organization of standard standard are manufactured homes complying with the U.S. Department of Housing and Urban This standard consists of eight sections, Development (HUD)'s MHCSS Program, as set generally divided by the kinds of work involved in forth in 24 C.F.R., Parts 3280, 3282, and 3283, properly setting up a home. as mandated in the United States of America and manufactured homes built prior to June 15, 1.2.4 Use of this standard 1976, including those complying with the This standard contains instructions, including Standard for Mobile Homes, NFPA 501B /ANSI specifications and procedures, for installation A119.1 edition, in effect at the time of 1 NCSBCS /ANSI A225.1 and hook -up of a manufactured home. It has 1.3.3 Support been written in an objective and eas -to- understand manner so that it can be Manufactured homes weigh several tons. understood by those who lack extensive Installers should use enough temporary blocking technical training. It discusses the installation of to support the home during installation. No one the home from preparation of the site through should be allowed under the home unless it is final inspection. It includes many tables and securely in place, even if it is not moving. figures giving important data for proper installation. 1.4 Consumer information card Careful adherence to this standard by the home The distributor or dealer of the manufactured owner and installation crew, and consultation home shall fill out the consumer information with a registered engineer in those unusual card and return it to the home's manufacturer, circumstances it does not cover, will help ensure so that the consumer may be notified of revised the home owner of a well- built, safe, and instructions or new products. affordable home for many years to come. 1.3. Preinstallation considerations 2 Definitions Prior to locating or relocating a manufactured accessory building or structure, home, the authority having jurisdiction shall be manufactured home: A building or structure contacted for installation procedures. that is an addition to or supplements the facilities provided by a manufactured home. Some jurisdictions require licensed or registered- Examples are: awnings, garages, storage installers. Many jurisdictions require permits to structures, carports, fences, windbreaks, or be obtained prior to the installation of such ..,porches. items as blocking, anchoring, and electrical and sewer or water connections or both. Inspections anchoring .equipment: Straps, cables, will be required in conjunction with permits to turnbuckles, and chains, including tensioning help ensure a. correct and safe installation of the devices, that are used with ties to secure a manufactured home, with notification to the manufactured home to ground anchors. jurisdiction at different times during the installation. anchoring system: A combination of ties, anchoring equipment, and ground anchors that For private property, installation zoning or will, when properly designed and-installed, resist development covenants may apply and should the overturning of the home or sideways also be taken into consideration. movement caused by wind. 1.3.1 Alterations approved: Acceptable to the authority having jurisdiction. Prior to altering a home, i.e., modifying the electrical, plumbing, or heating or cooling NOTE NCSBCS and ANSI do not approve, systems; adding a room, carport, or garage; or inspect, or certify any installations, procedures, making major repairs such as replacing a roof, equipment, or material, nor do they approve or be sure to contact the authority having evaluate testing laboratories. In determining the jurisdiction. A plan approval and permit may be acceptability of installations or procedures, required. equipment, or materials, the authority having jurisdiction may base acceptance on compliance 1.3.2. Safety with NCSBCS /ANSI or other appropriate standards. In the absence of such standards, said authority may require evidence of proper Only trained crews should install the home: installation, procedure, or use. The authority Installers should follow the safety instructions having jurisdiction may also refer to the listing or provided in this standard. labeling practices of an organization concerned 2 NCSBCS /ANSI A225.1 with product evaluations that is in a position to is: determine compliance with appropriate standards Capable of transferring design dead Toads for current production of listed items. and lateral and vertical live loads, as required by the Manufactured Home Procedural and authority having jurisdiction: The organization, Enforcement Regulations, and other design office, or individual responsible for approving loads unique to local home sites that result plans, equipment, an installation, or an from wind, seismic, and water conditions, or alteration procedure. that are imposed by or upon the structure, into the underlying soil or bedrock without awning: A shade structure supported by posts failure; or columns and entirely or partially supported by a manufactured home installed, erected, or Placed at an adequate depth, or otherwise used on a manufactured home site. adequately designed, to prevent frost damage in areas that are susceptible to frost; baling: A method of "wrapping" a cross section (roof, walls, and floor) and the main frame Constructed of materials acceptable to the (chassis) of a manufactured home with straps. authority having jurisdiction. cabana: A room enclosure erected or garage: A freestanding structure located on a constructed adjacent to a manufactured home manufactured home site and designed for the for residential use by the occupant of the storage of motor vehicles. manufactured home. gas supply connector, manufactured home: A carport:. An awning or shade structure for a listed connector designed for connecting the vehicle(s) °:-that is freestanding and not attached manufactured home to the gas supply source. to a manufactured home. ground anchor: A device placed at the construction alteration: The replacement, addition, modification, or removal of an manufactured home stand designed to transfer y home anchoring loads to the ground. equipment or installation that may affect the originally :approved design of construction, habitable room: A room or enclosed floor plumbing, heating, cooling, fuel- burning, or space arranged for living, eating, food electrical systems. preparation, or sleeping purposes, not including bathrooms, toilet compartments, laundries, diagonal tie: A tie intended to resist horizontal pantries, foyers, hallways, and other accessory or shear forces and to resist vertical, uplift, and spaces. overturning forces. installation: Assembly, at the site of dwelling unit: One or more habitable rooms occupancy, of all portions of the manufactured that are designed to be occupied by one family, home, connection of the home to existing utility with facilities for living, sleeping, cooking, eating, connections, and installation of support or and sanitation. anchoring systems. frame, main: That part of the structural system installation alteration: The replacement, that is normally used to transmit accumulative addition, modification, or removal of any design loads to the support system. components of the required ground support or ground anchoring systems. footing: That part of the support system that sits directly on the ground at, below, or partly installation instructions: Instructions provided below grade to support the piers. by the manufacturer, which accompany each manufactured home and detail the foundation, manufactured home: A site -built or manufacturer's requirements for ground support, site assembled system of stabilizing devices that anchoring systems, and other work completed 111111 3 NCSBCS /ANSI A225.1 on site. specified herein. labeled: Equipment or materials to which has noncompliance: Failure of a manufactured been attached a label, symbol, or other home to comply with the MHCSS that does not identifying mark of an organization that is constitute a defect, serious defect, or imminent acceptable to the authority having jurisdiction; safety hazard. that is concerned with product evaluation; that maintains periodic inspection of production of pier: That portion of the support system labeled equipment or materials; and that between the footing and the manufactured provides labels, the use of which indicates a home, exclusive of shims. Types of piers manufacturer's compliance with appropriate include, but are not limited to, the following: standards or performance in a specified mariner. manufactured steel stands; pressure- treated wood; listed: Equipment or materials included in a list manufactured concrete stands; that is published by an organization acceptable concrete blocks. to the authority having jurisdiction; that is concerned with product evaluation; that porch: An outside walking area with a floor that maintains periodic inspection of production of is elevated more than 8 inches above grade. listeid equipment or materials; and that produces listings that state either that the equipment or ramada: Any freestanding roof or shade materials meet appropriate standards or have structure installed or erected above a been tested and found suitable for use in a manufactured home or any portion thereof. specified manner. shall: Indicates a mandatory requirement. NOTE The means for identifying listed equipment may vary among organizations that are should: Indicates a recommendation or that concerned with product evaluation, some of which which is advised but not required. do not recognize equipment as listed unless it is also labeled. The authority having jurisdiction site, manufactured home: A designated parcel should use the system employed by the listing of land designed for the accommodation of one organization to identify a listed product. manufactured home, its accessory buildings or manufactured home: A structure, transportable structures, and accessory equipment, for the in one or more sections that, in its traveling exclusive use of the occupants of the home. mode, is 8 body feet or more in width or 40 skirting: A weather resistant material used to body feet or more in length, or, when erected enclose the space from the bottom of the on site, is 320 or more square feet; that is built manufactured home to grade. on a permanent chassis; that is designed to be used as a dwelling; that may or may not have a stabilizing devices: All components of the permanent foundation; that is connected to the anchoring and support systems, as required utilities; and that contains the g pp ort Y stems piers, plumbing, heating, air conditioning, and footings, ties, anchoring equipment, ground anchors, or any other materials and methods of electrical systems; except that such term shall construction that support and secure the include any structure that meets the size manufactured home to the ground. requirements and for which the manufacturer has voluntarily filed a certification required by the stand, manufactured home: That area of a Secretary of HUD; and that complies with the MHCSS. manufactured home site that has been reserved for the placement of a manufactured home. NOTE This definition should not be interpreted structure: That which is built or constructed, an to include any types of recreational vehicles (including so- called "park models" or travel trailers) edifice or building of any kind, or any piece of that may equal or exceed the body length or width work artificially built up or composed of parts 4 NCSBCS /ANSI A225.1 joined together in some definite manner. information. support system: A combination of footings, 3.1.5 Issuance of permits piers, and shims that will, when properly installed, support the manufactured home. Ensure that all necessary local permits have been obtained and fees paid. tie: See anchoring equipment. 3.2 Soil conditions utility connections: The connection of the manufactured home to existing utilities that 3.2.1 Requirements include, but are not limited to, electricity, water, sewer, gas, or fuel oil. To help prevent settling or sagging, site the home on firm, undisturbed soil or fill compacted vertical tie: A tie intended to resist uplifting and to at least 90 percent of its maximum relative overturning forces. density. Installation on loose, uncompacted fill may invalidate the home's limited warranty. 3 Site preparation 3.2.2 Bearing capacity 3.1 Location and layout Test the bearing capacity of the soil in accordance with 3.2.3 before designing the 3.1.1 Use of zone maps foundation. If the soil cannot be tested, but its type can be identified, use the foundation A home is designed for certain weather bearing pressures shown in table 3 -1 as a conditions and roof loads [see zone maps near guide. If you cannot identify the soil, use a main electrical panel and in figures 3 -1(a), (b), bearing capacity of 1,000 pounds per square and (c)]. Do not site or relocate a home in a foot. Under unusual conditions, or if the soil zone requiring greater wind, roof load, or appears to be composed of peat or heating or cooling capabilities than those for uncompacted fill, consult a local geologist, which it was designed. engineer, or architect. 3.1.2 Access for transporter 3.2.3 Soil- bearing testing methods and equipment Before attempting to move a home, ensure that the transportation equipment and home can be Use a pocket penetrometer or other methods routed to the installation site. Special acceptable to the local jurisdiction having transportation permits may be required from authority. state, county, or city officials. 3.3 Removal of organic material 3.1.3 Encroachments and setback distances Removal of all decayable material, such as Local laws regarding encroachments in streets, grass, roots, twigs, and wood scraps, from yards, and courts shall be obeyed, and beneath the home is required in areas where permissible setback distances from property footings are to be placed, to minimize settling of lines and public roads shall be met. footings and insect damage. Remove shrubs and overhanging branches from the immediate 3.1.4 Fire separation distance vicinity of the home site to prevent windstorm damage. The distance a home must be sited from other structures depends on its fire resistance rating and on local requirements. Contact the home's manufacturer or the inspection agency identified on the data plate for fire- resistance rating III 5 NCSBCS /ANSI A225.1 3.4 Drainage Installation procedures and methods for secu in C g the home to its foundations are discussed in 5. 3.4.1 Purpose 4.1 Piers Proper drainage prevents water build -up under the home, which may cause shifting or settling 4.1.1 Importance of the foundation, dampness in the home, damage to siding and bottom board, buckling of Proper pier installation is the most important part walls and floors, and problems with the of home installation. Incorrect size, location, or operation of doors and windows. spacing of piers may cause serious structural damage to the home. It is important to install 3.4.2 Elimination of depressions piers around the perimeter as required. Failure to do so may lead to sagging floors, walls, and Grade the home site to permit water to drain roofs (see 4.1.5.3). from under the home (see figure 3 -2). 4.1.2 Acceptable types 3.4.3 Drainage structures Piers may be concrete blocks, pressure- treated Depending on the local landscape, ditches and wood having 0.60 retention in accordance with culverts may be needed to drain surface runoff. American Wood Preservers Association (AWPA) If so consult a registered engineer. C22 Standard, or adjustable metal or concrete piers (see figure 4 -1). Manufactured piers shall 3.4.4 Gutters and downspouts be listed or labeled for the required load -capacity. When gutters and downspouts are installed, direct the run off away from the home. 4.1.3 Design requirements 3.5 Ground moisture control 4.1.3.1 Load bearing. capacity 3.5.1 Vapor retarder The load that each pier must carry depends on such factors as the dimensions of the home, the If the space under the home is to be enclosed roof live load, the spacing of the piers, and the with skirting or other material, a vapor retarder way the piers are used to support the home. that keeps ground moisture out of the home Center beam /marriage wall blocking is required shall be installed for multisection homes. 3.5.2 Acceptable types of ground cover See tables 4 -1 and 4 -2 for pier capacities. These tables shall be used when the Use a minimum of six -mil polyethylene sheeting manufacturer's installation instructions are not or its equivalent. available. Manufactured piers must be rated at least to these capacities, and locally constructed 3.5.3 Proper installation piers must be designed to transmit these loads safely (see 4.1.3.2). Cover the entire area under the home with the sheeting and overlap it at least 12 inches at all 4.1.3.2 Configuration joints. Where soil and frost conditions permit placement of footings at grade level, place the Figure 4 -1 shows the recommended sheeting directly beneath the footings. arrangement of concrete block piers constructed on site. Load bearing (not decorative) concrete blocks should have dimensions of at least 8 4 Foundations inches x 8 inches x 16 inches. They must be stacked with their hollow cells aligned vertically. NOTE This section only covers foundations. When piers are constructed of blocks stacked 6 NCSBCS /ANSI A225.1 side by side, each layer should be at right should be listed and labeled. angles to the previous one (see figure 4 -1). 4.1.4.2 Piers 36 inches to 80 inches high and Cap hollow block piers as shown in figure 4 -1 to corner piers distribute the structural load evenly across them. Caps may be of solid masonry of at least 4 Construct all piers between 36 inches and 80 inches nominal thickness or hardwood at least 2 inches high and all corner piers over three inches nominal thickness, or of steel (see figure blocks high out of double, interlocked concrete 4 -1). All caps shall be of the same length and blocks (see figure 4 -1). Mortar will not normally width as the piers upon which they rest. Avoid be required. using plywood, as it may lead to unwanted settling. 4.1.4.3 Piers over 80 inches high Use 4 -inch x 6 -inch hardwood shims to level the Where permitted by local codes, lay blocks in home and fill any gaps between the base of the concrete mortar with steel reinforcing bars I -beam and the top of the pier cap. Always use inserted in the block cells and fill the cells with shims in pairs (see figure 4 -1). Drive them in concrete. Where such construction is not tightly so that they do not occupy more than 1 permitted by local codes, piers over 80 inches inch of vertical space. Use hardwood plates no high shall be designed by a registered engineer. thicker than 2 inches to fill in any remaining vertical gaps. 4.1.4.4 Elevated homes Select manufactured pier heights so that the When more than one fourth of the area of a adjustable risers do not extend more than 3 home is installed so that the bottom of the inches when finally positioned. main -frame members are more than 3 feet above ground level, the home stabilizing All piers must rest on footings (see 4.2) that devices shall be designed by a qualified extend below the frost line (see 4.2.2 for engineer and be approved prior to installation by exceptions to placement) and are placed on the authority having jurisdiction. either undisturbed soil or compacted fill. 4.1.5 Location and spacing 4.1.3.3 "'Clearance under homes A minimum clearance of 12 inches shall be The location and spacing of piers depend upon maintained beneath the lowest member of the the dimensions and weight of the home, the main frame (I -beam or channel beam) in the roof load zone, the type of construction (single area of utility connections. No more than 25 or multisection), and such other factors as the percent of the lowest member of the main frame location of doors or other openings. In general, of the home shall be less than 12 inches above locate piers no more than 2 feet from either end grade. and not more than 8 feet center -to center under the main rails. 4.1.4 Design procedures 4.1.5.1 Single- section homes 4.1.4.1 Piers Tess than 36 inches high Figure 4 -2 shows the recommended location Piers less than 36 inches high may be and spacing of piers for a single- section home constructed of single, open, or closed -cell when the manufacturer's installation instructions concrete blocks, 8 inches x 8 inches x 16 are not available. inches. Install them so that the long sides are at right angles to the supported I -beam (see 4.1.5.2 Multisection homes figure 4 -1). Position open cells at right angles to the footers. Horizontal offsets should not Figure 4 -3 shows the recommended location exceed 1/2 inch top to bottom. Mortar will not and spacing of piers for a multisection home normally be required. Manufactured piers when the manufacturer's installation instructions III 7 NCSBCS /ANSI A225.1 are not available. 4.2.2 Placement in freezin g climates 4.1.53 Perimeter blocking 4.2.2.1 Conventional footings Place piers on both sides of side wall exterior In areas subject to ground frost heave, place doors and any other side wall openings greater footings below the frost Tine. Consult local than 4 feet (such as entry and sliding glass authorities to determine the depth of the frost doors); under porch posts, fireplaces, and wood line. In the absence of a local code, use the stoves; and under the locations .where heavy frost penetration map provided in figure 4 -4 as pieces of furniture, such as pianos, organs, a guide. waterbeds, etc., are expected to be placed. 4.2.2.2 Floating slab systems 4.2 Footings When properly designed by a registered Footings shall be placed a minimum of 4 inches professional engineer, a "floating slab system" below grade in undisturbed soil. Support every may be used above the frost line. The design pier with a properly designed footing (see shall accommodate the anchorage 4.2.1. requirements identified in 5. 4.2.1 Acceptable types of footings 4.2.2.3 Insulated foundations 4.2.1.1 Concrete Footings may also be placed above the frost line when the .home_ is provided with a perimeter Footings may consist of precast or foundation' or skirting having insulation poured -in -place concrete, pads, slabs, or properties sufficient to prevent freezing of the ribbons at least 3.1/2- inches thick, with a 28 -day soil under or adjacent to every load- bearing compressive strength of at least 3,000 pounds component of the foundation and acceptable per square inch. for this purpose to the authority having jurisdiction. Useful design guidelines may be 4.2.1.2 Pressure- treated permanent wood found in the references found in Annex F. Insulation systems should be compatible with Two layers of nominal 2 -inch thick the requirement to cross-ventilate the entire pressure- treated wood having 0.60 retention in space under the home. accordance with AWPA C22 Standard, with the long dimensions of the second layer placed 4.2.3 Proper sizing of footings perpendicular to that of the first, may also be used. Proper sizing of footings depends upon the load- carrying capacity of both the piers and the 4.2.1.3 Other materials soil. See table 4 -3 for recommended footing sizes. Other materials approved for footings may be used when approved by local authorities if they 4.3 Permanent foundations provide equal load- bearing capacity and resistance to decay. Examples include: Check local building codes and regulations and consult a registered engineer when the home is 1/2 inch maximum crushed stone; to be sited on a permanent foundation (such as 3/8 inch or 3/4 inch graduated gravel; a full basement, crawl space, or load- bearing coarse sand, with grains no smaller than perimeter foundation). To obtain a permanent 1/16 inch, placed so it provides a soil bearing foundation design that meets most local codes, capacity of at least 3,000 pounds per square write to the manufacturer of the home. Useful foot. ideas and design guidelines can also be found in reference publications, such as those listed in Annex F. 8 411 NCSBCS /ANSI A225.1 4.4 Special considerations home is completed. Also see 5.5.3. Utilities are available. 4.4.1 Areas prone to flooding Any trenching, for crossover drain lines or for wheels that will be left in place, is Special elevations and anchoring techniques complete. are required when locating a home in an area prone to flooding. Consult an engineer and the Items that could be difficult to install after local building official to make sure that home the home is sited (such as anchors and design and construction conform to applicable ground moisture retarders), are in their proper federal, state, and local codes and regulations. locations. The Federal Emergency Management Agency (FEMA) publication listed in Annex F contains CAUTION: The home weighs several tons. Use design and construction recommendations for adequate temporary support blocking to elevated foundations as well as for connections safeguard workers. and anchoring systems that will allow the foundation system to resist flood forces. 5.2 Positioning home 4.4.2 Severe wind areas The home shall be installed and leveled by qualified installation personnel who are Special foundation and anchoring techniques acceptable to the authority having jurisdiction. are required .when locating a home in a severe wind area Consult a registered 5.3 Interconnection of multisection homes engineer. The HUD foundations design guide listed in Annex F contains recommendations for The following items shall be completed during designing foundations and anchoring systems. the interconnection of multisection homes when O Do not place the home in a more severe wind the manufacturer's installation instructions are zone than .the one indicated on the data plate not available. posted in the home. Provide an air infiltration barrier on the 4.4.3 Special snow load conditions mating edges of the floor, end walls, and ceilings. Homes designed for and located in heavy snowfall areas or that are subjected to other Fasten the roof at the ridge with #10 x 4- extreme loading conditions may require special inch wood screws, at a minimum, at 12 -inch, piers or footings. Check with the local authority on- center, staggered intervals. Secure end having jurisdiction. walls with #10 x 4 -inch wood screws, at a minimum, at 6 -inch, on- center, staggered 4.5 Important reference documents intervals. Fasten floors together at the mating line with #10 x 4 -inch wood screws, at See Annex F. a minimum, at 12 -inch, on- center, staggered intervals. 5 Installation procedures Mating walls shall be firestopped in accordance with the MHCSS. 5.1 Moving manufactured home to location The following items shall be completed or verified before placing the manufactured home: The site is properly prepared (see 3). All footing work necessary for setting the 11111 9 NCSBCS /ANSI A225.1 Table 5 -1 Normal Home Installations 5.5 Anchorin g instructions 1110 (Single- Or Multisection Homes) After blocking and leveling, the installer should Types Of Foundation Systems secure the manufactured home against the Main Components wind, unless the jurisdiction permits otherwise. The type of installation is the determining factor Piers— Ground anchors: in deciding how this should be done, as is The manufactured home rests on piers of described in the following sections. concrete block; formed -in -place concrete; pe wood; or steel pedestals on 5.5.1 Normal installations permanent wood, crushed stone, or concrete footers. The ground anchors in the soil are Table 5 -1 summarizes and defines the types of angled to the resist straps or embedded in normal installations. The pier- and ground- dead -men in the soil. Straps are tied to the anchor system, as provided in this standard, is frame, with or without over the -top straps. most common. When using another type of installation, consult a registered engineer. Concrete slab or continuous footings: The manufactured home rests on a concrete NOTE The anchoring or foundation system shall slab or ribbons of concrete. The straps are be capable of meeting the Toads required by the tied between the frame and the perimeter MHCSS. footers or concrete slab. 5.5.1.1 Number and location of anchors Pile /post system: The manufactured home rests on piles or Select -the number and location of straps and posts placed sufficiently deep in the ground anchors from the chart and diagram in figure to resist all wind, snow, and earthquake 5 -2.. Use either the single- or the double -strap forces. Straps fasten the home to the piles or method. Use only approved ground anchors posts or to caps placed thereon. capable of resisting at least the minimum loads given in the chart for the method selected. Concrete, concrete block, or wood foundation, load bearing, perimeter walls: 5.5.1.2 Installation of anchors The manufactured home rests on exterior load- bearing walls that sit on concrete or The following is one example: Install the gravel footings. Straps fasten the home to anchors at the locations selected from figure 5 -2 the walls to resist all external forces. when the home manufacturer's installation instructions are not available. Follow the anchor manufacturer's instructions. Use single- headed 5.4 Cross-over connections for multisection anchors at all "frame- tie only" locations when manufactured homes using the single -strap method, and double- headed anchors when employing the 5.4.1 Utility cross -overs double -strap method. Install single- or double- headed anchors at all over the roof -tie Connect water, drainage, gas, electricity, and locations. When using a single strap, line up telephone utility cross overs. The correct the shaft of each anchor with its strap (see procedures are outlined in 8. figure 5 -3). When connecting more than one strap to a single anchor, line the shaft of the 5.4.2 Duct -work cross overs. Clamp the anchor with the results achieved by calculating flexible air conditioning or heating ducts or both the combined forces (see figures 5.4). The to. the sleeves projecting through the bottom ground anchors must be sized for the direction covering, seal the ducts' adjustable collars with of the load and the type of soil. (See figures 5.3 several wrappings of duct tape, and and 5.4 for additional information on the suspend /support them above the ground (see installation of anchors and tiedowns.) figure 5 -1). 10 NCSBCS /ANSI A225.1 5.5.2 Over the -roof straps 5.6.2 Garages and carports If over the -roof straps are provided with the A garage or carport must be installed according home, they must be reinstalled. to the rnanufacturer's instructions and to all applicable local codes. The garage or carport 5.5.3 Severe climatic conditions must be supported independently of the factory -built portion of the manufactured home. 5.5.3.1 Freezing climates Electrical circuits in a garage shall be provided with ground -fault circuit protection. Be sure anchor augers are installed below the frost line. During periods of frost heave, be 5.6.3 Porches prepared to lessen tension on the straps. Site- constructed porches must be constructed 5.5.3.2 Severe wind zones and inspected according to applicable building codes. Before a home is installed in a severe wind zone or is located within 1,500 feet of a coastline in 5.6.4 Steps, stairways, and landings Wind Zones II or III, seek the advice of an engineer. Have engineered drawings showing Steps, stairways, and landings must be foundation, connection, and anchorage details constructed and inspected according to approved by local authorities. Design guidelines applicable building codes. may be found in HUD's permanent foundations guidebook referenced in Annex F. Homes destined for severe wind areas in Zone I shall be 6 Installation of optional features designed—and installed for Zone II conditions (see figure 3 1). NOTE Where applicable, and specific to manufacturer's product. 5.5.3:3 Areas prone to flooding 6.1 Hinged roofs and eaves Foundation considerations are discussed in the home has a hinged roof or eave(s), 4.4.1 and .the FEMA document referenced in If If the must be tak Annex F. Unconventional anchorage and tie -downs often are needed in designing and 6 1 1 Moving the home constructing the special elevated foundations g required in areas prone to flooding. Consult an engineer and the local building official for Plan to move the home without dismantling it, if guidance. possible. 5.6 Installation of on site structures 6.1.2 Hinged roofs or eaves Design all buildings and structures to support all If a hinged roof or eave must be dismantled, of their own live and dead loads. Provide fire obtain professional assistance to ensure that no separation, as state or local ordinances require, damage is done in the process. for occupancy. 6.1.3 Reinstalling dismantled roofs or eaves 5.6.1 Expanding rooms When reinstalling dismantled roofs or eaves, Install expanding rooms in accordance with the particular care should be taken to ensure that all manufacturer's instructions. When the vent stacks, furnaces, water heaters, ventilation manufacturer's instructions are not available, systems, fireplaces, and wood stoves are perimeter blocking shall be installed in properly installed in accordance with listed accordance with table 4 -1; ground anchors shall appliance manufacturers' instructions. be installed in accordance with figure 5 -2. 11 NCSBCS/ANSI A225.1 6.2 Garden and bay windows 6.5 Ventilation options If the home is supplied with a garden or bay Follow the component manufacturer's window that was dismantled or removed for instructions (see, for example, figure 6 -3.) transportation, it must be reinstalled to resist the elements and be supported as required. 6.6 Optional panels, siding, and moulding 6.3 Awnings and ramadas If the home is equipped with optional panels, siding, or moulding, refer to figure 6 -4 for the Choose only freestanding products with support proper installation procedures. columns. 6.7 Exterior coverings 6.4 Miscellaneous lights and fixtures Install exterior coverings (stucco, plywood, vinyl, Some exterior lights, ceiling fans and or hardboard exterior siding; shingled or tiled chain -hung fixtures may not yet be installed roofs; etc.) according to the product when the home is delivered. All of these fixtures manufacturer's instructions. Do not cover the must be grounded by a fixture grounding screw home's label (the "HUD" label) when applying or by a fixture grounding wire. For chain -hung any exterior coverings. fixtures, use both of these methods. When fixtures are mounted on combustible surfaces 6.8 Skirting such as hardboard, install a noncombustible ring to completely cover the combustible surface .;Skirting if used, shall be of ,durable materials exposed between the fixture canopy and the suitable for exterior exposures. Skirting must wiring outlet box.. If siding has not been ..not.be attached -in..a manner that .can cause installed at a fixture location, remove the outlet water to be trapped between the siding or trim box and install the siding with a hole. .for the to which it is attached. The .skirting should be outlet box. Then reinstall the outlet box and recessed under the siding or trim. Most local proceed as for other fixtures, which shall be codes do not permit= wood, including lumber and installed according to their listings. all wood siding used for skirting, to be used within •6 inches of tithe ground unless it is 6.4.1 Exterior lights pressure treated to prevent decay and termite infestations. Remove the junction box covers and make wire -to -wire connections, using wire nuts. Ventilation shall be provided for the crawl space General practice is to connect wires black -to- at a minimum of one square foot of free area for black, white -to- white, and ground -to- ground. every 150 square feet of the home's floor area. Push the wires into the box and secure the light Ventilation openings shall be placed at or near fixture to the junction box. Caulk around the each corner of the home and as high as base of the light fixture to ensure a water -tight practicable. Openings shall be located to seal to the side wall. Install the light bulb and provide cross- ventilation on at least two opposite attach the globe, as in figure 6 -1. sides. 6.4.2 Ceiling fans Except in arid regions with dry soil conditions, a uniform 6 -mil polyethylene sheet material or To reduce the risk of injury, install ceiling fans other acceptable vapor barrier material should with the trailing edges of the blades at least 6 be installed on the ground surface beneath the feet 4 inches above the floor. Connect the home to further reduce moisture. Where an wiring, as shown in figure 6 -2, and follow the acceptable ground vapor barrier is installed and manufacturer's instructions, as in shown in figure one such ventilation opening is within 3 feet of 6 -2. each corner of the home, the total area of ventilation openings may be reduced to one square foot for every 1,500 square feet of the 12 NCSBCS /ANSI A225.1 home floor area. Where local codes have t he installation of central air conditioning. Only minimum ventilation requirements for crawl qualified personnel may install a comfort cooling spaces, these requirements shall apply to system not provided with the home. Follow the homes with skirting and continuous foundations. product manufacturer's installation instructions and conform to all local codes. Access opening(s) not less than 18 inches in any dimension and not less than three square 7.2.1 Air conditioners feet in area shall be provided and shall be located so that any water supply and sewer An installed central air conditioning system must drain connections located under the home are not exceed the rating shown on the home's accessible for inspections. compliance certificate. Dryer vents, air conditioning condensation The home's electrical distribution panel may drains, and combustion air inlets must pass contain optional factory installed circuits for air through the skirting to the outside. conditioning. The maximum full -load ampere draw for the desired air conditioning unit must 6.9 Telephone and cable TV not exceed the circuit rating shown. IMPORTANT: Electrical circuits within the home CAUTION: Careless installation of telephone may not have been sized for the additional load and cable television lines may be hazardous. of non factory installed air conditioning, and a Failure to follow these instructions may result in separate, outside electrical supply may have to serious personal injury or death. The walls and be provided. floors of the home contain electrical circuits, plumbing; and duct work. Avoid contact with "A" -coil air conditioning units must be these systems when drilling through and placing compatible and listed for use with the furnace in cables within these cavities. Only trained the home. Follow the air conditioner 0 professionals should handle such work. manufacturer's instructions. Direct all condensation beyond the perimeter of the 6.10 Joints and seams home by means specified by the equipment manufacturer. Where appropriate, weatherproof all joints and seams that were disturbed during relocation of 7.2.2 Heat pumps the home. Install heat pumps according to the heat pump manufacturer's instructions. 7 Preparation of appliances 7.2.3 Evaporative coolers 7.1 Clothes dryer vent Install a roof mounted cooler by following the The clothes dryer must exhaust to the exterior of appliance manufacturer's instructions. Before the home, or beyond any perimeter skirting installing a roof mounted cooler, be sure that installed around it, as shown in figure 7 -1. the roof will support the weight of the cooler. A IMPORTANT: Do NOT let the exhaust system rigid base must be provided to evenly distribute end under the home, where excess moisture or the cooler's weight over several rafters. flammable material can accumulate. (Follow the 7 3 Fireplace and wood stove chimneys and dryer manufacturer's instructions for installing p the exhaust system.) air inlets 7.2 Comfort cooling systems Fireplaces and wood stoves require on -site installation of additional section(s) of approved, IMPORTANT: Before installing a comfort listed assembly chimney pipe spark arrestor, ld e rain- a d cooling system, check the home's data plate to cap (see figure 9 1 p assure that the home has been designed for wood stove chimneys and air inlets shall be 13 NCSBCS /ANSI A225.1 inst I a led in accordance with their listings. All 8 Utility system connection and testing fireplaces and wood stoves installed shall be listed for use in manufactured housing. For field 8.1 Proper procedures installation, approval from the manufacturer and the authority having jurisdiction shall be required Consult local, county, or state authorities before to ensure compliance with the required connecting any utilities. Only qualified service standards. personnel, familiar with local codes and licensed where required, should make utility connections 7.3.1 Minimum extensions above roof and conduct tests. To ensure sufficient draft for proper operation, 8.2 Water supply extend the finished chimney at least 3 feet above the highest point at which it penetrates 8.2.1 Maximum supply pressure and the roof and at least 2 feet higher than any reduction building or other obstruction located within a horizontal distance of 10 feet. If there are The water systems of the home were designed obstructions on the site that extend higher than for a maximum inlet pressure of 80 pounds per the home's roof peak and are within 10 feet of square inch. IMPORTANT: If the home is the chimney, the installer may have to provide located in a water district where the local water an additional section of chimney pipe, if required supply pressure exceeds 80 pounds per square to do so by local codes. inch, install a pressure reducing valve. 7.3.2 Required components 8.2.2 Connection procedures The required components of a correctly- installed 8.2.2.2 Mandatory shut off valve chimney are as shown in figure 7 -2. Install an accessible shut -off valve between the 7.3.3 Combustion air duct inlets water supply and the inlet, as shown in figure 8 -1. It must be a full-flow gate or ball valve. Combustion air intake ducts end just below the bottom covering of the floor. The ducts must be 8.2.2.3 Cross -overs extended to the outside when the home has a basement or crawlspace. If the added ducts are Multisection homes with plumbing in both not supplied, they may be purchased at a sections require water -line cross connections, as hardware store. The fireplace manufacturer's shown in figure 8 -2. Remove the shipping caps instructions for installing combustion air ducts from the water lines and install the cross -over can tie found in the fireplace /stove or with the connectors provided with the home. If freezing chimney parts. Do not allow the combustion air could occur, wrap water connectors with inlet to drop material from the hearth to the area insulation. beneath the home. Locate the inlet damper above the expected snow level, as shown in 8.2.3 Freezing protection figure 7 -2. 8.2.3.1 Necessity 7.4 Range, cook -top, and oven venting In areas subjected to subfreezing temperatures, IMPORTANT: If the home is equipped with a protect exposed sections of water supply piping, combination range (cook- top) /grill or oven that shut -off valves, pressure reducers, and pipes in contains its own exhaust system, the vent must water- heater compartments with uninsulated exhaust to the exterior of the home. if doors, from freezing. perimeter skirting is installed, the vent must exhaust through the skirting. 8.2.3.2 Use of heat tapes Heat tapes (either automatic or nonautomatic) 14 NCSBCS /ANSI A225.1 can protect exposed plumbing from freezing. 8.4 Gas supply CAUTION: In order to reduce the risk of fire, use only heat tapes listed by a nationally recognized 8.4.1 Type of gas system furnished with testing laboratory for use with manufactured home homes, and install them only in accordance with the manufacturer's instructions. Plug the 3 -wire, All gas- burning appliances, including the heating grounded cord set of the heat tape into the system, are equipped for either natural gas (NG) outlet located under the home near the water or liquified petroleum gas (LPG). A qualified supply inlet (figure 8.1). service person must convert the appliances from one type of gas to the other, following the 8.2.4 Testing procedures instructions provided by the manufacturer of each appliance. Even though the water system was tested at the factory, it shall be rechecked for leaks at the 8.4.2 Orifices and regulators installation site. The test shall be made by subjecting the system to air or water at 100 IMPORTANT: Special orifices and regulators are pounds per square inch for 15 minutes without required for specific gases. See the instructions loss of pressure. accompanying each gas- burning appliance for modification instructions. Before making any 8.3 Drainage system connections to the site supply, check the inlet orifices of all gas- burning appliances to ensure 8.3.1 Assembly and support they are correctly set up for the type of gas to be supplied. Special attention should be given If portions of the drainage system were shipped to homes sited at altitudes above 3,000 feet. loose when the home was relocated, reinstall them in accordance with the MHCSS, Part 8.4.3 Proper supply pressure. 3280.608 (see figure 8 -3). IMPORTANT: The gas piping system in the 8.3.2 Proper slopes and connector sizes home has been designed for a pressure that is Drain lines must slope at least 1/4 inch fall per not to exceed 14 inches of water column (8 foot of ..run unless otherwise noted on the ounces or 1/2 pound per square inch). If gas schematic diagram (see figure 8 -4). from any supply source exceeds, or may EXCEPTION: 1/8 -inch fall per foot is allowed exceed, this pressure, a regulator must be when a clean -out is installed at the upper end of installed. To operate gas- burning appliances the run. Connect the main drain line to the safely and efficiently, do not exceed the design site's sewer hook -up, using an approved pressure limitations. For NG systems, the elastomer coupler (figure 8 -5). incoming gas pressure should remain between 6 inches and 8 inches of water column. For 8.3.3 Cross -overs LPG systems, the pressure should register between 12 inches and 14 inches of water Connect multisection -home, drainage -line cross- column. overs as shown in figure 8 -6. 8.4.4 Cross -overs 8.3.4 Testing procedures A gas cross -over may need to be installed in Even though the drainage system was tested at multisection homes. All cross -overs and fittings the factory, it shall be rechecked for leaks after must be listed for exterior use and be of the installation at the site. This shall be same size as the main unit pipe. Do not use accomplished by capping the water line, filling it tools to connect or remove the flexible with water, and holding it 15 minutes. connector quick- disconnect. 15 NCSBCS /ANSI A225.1 8.4.5 Testing procedures the tank and supply piping. Fill the tank to capacity with fuel and examine all joints in the Even though the gas system was tested at the system for leakage. factory, it shall be retested for leaks at the installation site by qualified personnel (see 8.6 Electricity 8.4.3)1 A large- enough power supply must be available 8.4.6 Connection procedures at the site. An inadequate power supply may result in improper operation of, and possible Inspect gas- burning appliance vents to ensure damage to, motors and appliances. The current that they have been connected to the rating in amperes of the home can be found on appliance, and ensure that roof jacks are the tag located outside, next to the feeder or installed and have not come loose during service entrance, and also on the electrical transit) IMPORTANT: Have the gas system distribution panel. connected to the gas supply only by an authorized representative of the gas company. 8.6.1 Description and rating of house wiring 8.4.7 Gas appliance start procedures The home is designed for connection to an electrical wiring system rated at 120/240 volts One at a time, open each equipment shut -off AC. IMPORTANT: Proper and safe connection valve, Tight pilot lights, and adjust burners depends on the type of supply system with according to each appliance manufacturer's which the home is equipped. instructions. IMPORTANT: Ensure that the water heater is filled with water before lighting 8.6.2 Electrical equipment/ installations the pilot light. Check the operation of the furnace and water heater thermostats and set All electrical equipment and installations shall be them to the desired temperatures. designed, constructed, and maintained in accordance with the applicable provisions of the 8.5 Heating oil systems MHCSS, the National Fire Protection Association (NFPA) 70, the National Electrical Code (NEC), Homes equipped with oil- burning furnaces must` or they local jurisdiction having authority, or all of have their oil supply tankage and piping the above. installed on site. These items are not supplied by the manufacturer. Consult the oil- burning furnace manufacturer's instructions for proper pipe size and installation- procedures. IMPORTANT: All oil storage tanks and pipe installations must meet all applicable local regulations and should be made only by experienced, qualified personnel. 8.5.1 Tank installation requirements Unless the home is installed in a community with a centralized oil distribution system, an oil storage tank must be installed outside the home. Locate the tank where it is accessible to service and supply and safe from fire and other hazards. 8.5.2. Leak test procedure Before operating the system, check for leaks in 16 NCSBCS /ANSI A225.1 Annex A (informative) Final Inspection Checklist This Annex is not part of the requirements of 3 Gas /fuel oil systems this document, but is included for informational purposes only. Check to ensure that: Final inspection shall be made when the home correct materials and fittings are used; installation (set -up) is complete. A checklist the pressure test has been conducted on such as the one given below should be the gas system; developed to ensure that no items have been overlooked and that work has been properly the connection between multisections are completed. in accordance with the MHCSS, with access as required. 1 Water and drain systems 4 Appliance function, operation, and Check to ensure that: venting correct materials for water and drain lines Check to ensure that: have been used; vent or chimney extensions shipped loose connections and splices are properly made; on the home have been mounted and serviced in accordance with the supports are of correct material and are manufacturer's instructions; properly .spaced; appliances and valves have been tested necessary inspections and tests have been and are properly working; made; venting of appliances under unit are in water lines are protected from freezing accordance with the MHCSS; when applicable; dryer is properly vented; proper slope has been maintained on drain lines. solid -fuel- burning fresh air intake is properly installed 2 Electrical systems temporary shipping blocks have been Check to ensure that: removed; panel amperage matches connection to exhaust fan operation and air flow are home; correct. electrical inspections have been performed; 5 Windows and doors connections between multisections are in accordance with the MHCSS and access Check to ensure that: covers are in place. windows meet egress requirements and have operation instructions on them; 17 NCSBCS /ANSI A225.1 doors function properly; 8 Skirting temporary shipping hardware has been Check to ensure that: removed from windows and doors. skirting used is in accordance with owner's 6 Exterior of home specifications; Check: venting is in accordance with the for damage to under carriage or bottom manufacturer's specifications; board; skirting is constructed to prevent frost chassis, floor joists, or both for movement in areas of where it occurs; installation /transportation damage; polyethylene ground cover is correctly bottom board for rips or tears; installed. for damage to siding (cracks, breaks, holes, 9 Blocking /footings n pops, etc.); Check to ensure that: for damage to metal or composition roofs: footings are of proper size and construction for holes or rips in metal roof; for soil conditions; shingles for damage and sealing; spacing of piers is in accordance with the manufacturer's guidelines; drip edge or fascia damage. footing depth is below frost line; roof openings for sealing (vents, stacks, etc.); foundation walls, if required, meet local codes, ordinances, or covenants; to ensure that when gutters and downspouts are installed, the water is pier construction meets manufacturer's diverted away from the home. specifications. 7 Interior of home 10 Anchoring Check: Check to ensure that: for damage to floor coverings (vinyl, approved anchors are used; carpet); correct number of anchors, straps, or both for damage to wall finish (holes, cracks, nail are used according to the manufacturer's pops, etc.); instructions; for damage to ceiling finish (holes, cracks, anchors are installed at correct angles and nail pops, etc.); in accordance with the anchor manufacturer's listing for approval. for damage to interior trim (splits, cracks, nail pops, etc.); 11 Miscellaneous multisection common areas for correct Check to ensure that: finishing. the smoke detector(s) is operating 18 NCSBCS /ANSI A225.1 correctly; construction seals (the "HUD Label have not been damaged, removed, or covered by skirting; installation /anchoring certificates, seals, or both have been issued and installed if required; data plate is intact and legible; low- hanging tree branches and bushes have been trimmed. All transit and installation damage is required to be reported to the manufacturer if the home is a new unit. Check with local authorities having jurisdiction prior to installation for code requirements and permits /inspections required. 19 NCSBCS /ANSI A225.1 Annex B (informative) Barrier -free Design Aspects for the Physically'Handicapped (Exterior Only) This Annex is not part of the requirements of 3 Ramps this document, but is included for informational purposes only. Ramps should not have a slope greater than 1 foot within 12 feet (or 8.33 percent) and should 1 General be no less than 4 feet in clear width. Ramps should be structurally designed to carry a The following are offered as guidelines to minimum live load of 100 pounds per square providing basic barrier -free design features in foot when freestanding. manufactured home communities to the extent considered desirable or needed by the If the ramp slope is greater than 5 percent and operators to facilitate use by the physically there is no drop -off, one handrail should be handicapped. The Annex material represents provided. Where a ramp drops off on one or informational material only and does not both sides, handrails should be required on both constitute a part of the mandatory provisions of sides of the ramp. Handrails should be 32 this standard. inches in height, measured from the surface of the ramp and extended 1 foot beyond the top NOTE 1 Dimensions herein are in U.S. units and.bottom.of the ramp ,or: turn :at:;right angles. only, as they are advisory. The ramp should have a nonslip surface. Each NOTE 2 This is a developing technology, and ramp should have a level platform at the top data herein should be checked with the latest that is at least 5 feet x 5 feet and this platform guide from recognized authorities. should extend at least 1 foot on the side from 2 Walks least a door opens. Each ramp should have at least 5 feet of straight, level clearance at the bottom. Straight-run ramps should have, at a Walks should be 42 inches wide. If the slope of minimum, 3- feet -long intermediate -level Plat- a walk is greater than 5 percent (1 -inch rise in a forms at intervals of 30 feet for purposes of rest 20 -inch run), a handrail should be provided. and safety, and wherever they turn should have The slope of a walk should not exceed 8.33 level platforms that should be at least as wide percent (1 inch rise in a 12 inch run). as the ramp and 5 feet long (deep). Walks should have a continuous common 4 Doors and doorways surface, not interrupted by steps or abrupt changes in level greater than 1/2 inch. Where Each exterior and interior door should have a walks' cross driveways or parking lots, they clear opening of no less than 32 inches when should blend to a common level by means of the door is open. Such a door should be curb cuts, ramps, or other means. Curb cuts operable by a single effort with one hand. The should have a textured, nonslip surface (such as distance between two doors (e.g., outer and broom finished concrete). inner) should be a minimum of 6 1/2 feet. The Walks should be provided with a level area no floor on the inside and outside of each such less than 5 feet x 5 feet where they terminate at double doorway should be level and clear for a doors. In no case should such walks extend distance of 5 feet from the door and should less than 1 foot beyond the side from which the extend 1 foot beyond the side from which the door opens. oor opens. The bottom rail of narrow, stile- framed glass doors should have a minimum height of 7 1/2 20 NCSBCS /ANSI A225.1 inches. Exter thresholds should be level, with 7 Available texts for further guidance a maximum edge height of 3/4 inch. Interior are: thresholds should be flush with the floor or leveled at not more than 5 percent slope, with a "Barrier -free Site Design," available from the maximum edge height of 1/2 inch. Where door Superintendent of Documents, U.S. closures are used, the pressure to open a door Government Printing Office, Washington, DC should not exceed a maximum of 15 pounds. 20402. This publication is based on research (The lightest possible door pressure for use by and studies conducted by the American Society the disabled is preferred.) of Landscape Architects foundation under contract with the U.S. Department of Housing 5 Outside stairs and Urban Development and Office of Policy Development and Research and was issued in Outside stairs should not have abrupt (square) April, 1975 (HUD- PDR -84). This publication also nosing; a 1- inch diameter, rounded nosing is contains a helpful bibliography with additional desirable. Stairs should have at least one data; continuous handrail, 21 inches in height, measured from the tread at the face of the riser. "An Illustrated Handbook of the Handicapped The handrail should extend at least 18 inches Section of the North Carolina State Building beyond the top step and beyond the bottom Code," originally issued in 1974, with step or turn at right angles. Care should be subsequent updates, is available from the North taken that the extension of the handrails is not Carolina Department of Insurance, P. O. Box in itself a. hazard, and the extensions should be 26387, Raleigh, NC 27611; made on,: the side of a continuing wall where available. "American National Standard for Accessible and Usable Buildings and Facilities and Usability for 6 Other facilities for assistance to the Physically Handicapped People," American physically challenged National Standard A117.1, 1992. This standard applies to buildings, outdoor facilities, public Special designs are available for such other walks, and residential structures and is available facilities as listed herein for the convenience of from the Council of American Building Officials physically challenged persons. These include: (CABO), 5203 Leesburg Pike, #708, Falls Church, VA 22031; Campsites; "Design for the Physically Handicapped," U.S. Control devices for light, power, heat, Department of the Army, Office of the Corps of ventilation, windows, draperies, doors, and Engineers, Washington, DC 20314; similar devices; Public Law, P.L.- 101 -396, July, 1990; Elevators; Americans with Disabilities Act (ADA) Kitchen arrangements; Accessibility Guidelines for Buildings and Facilities; Final Guidelines; Swimming pool facilities; "Interim Guidelines for Building Occupant Telephone; Protection from Tornadoes and Extreme Winds," TR -83A, January ,1980, Sections 1 and Toilet compartments and toilet fixtures 2, Published by the Federal Emergency (including showers); Management Agency (FEMA), Washington, DC. Water fountains. 21 Annex C (informative) SAMPLE Sample Checklist for Enforcement Officials This Annex is not part of the requirements of this document, but is included for informational purposes only. Owner: Address: Manufacturer: Model: Serial Date of Mfr: "HUD" Label /State Label Number: Dealer: Dealer Installer: Installer Local Building Official Inspection: Local Permits: INSTALLATION: Seals: Installation Anchor Instructions Used: Manufacturer: State: 411 Support Footings: Type: Size: Piers: Materials: Spacing: Shims: Lot/Soil Conditions: Anchors: Spacing: Equipment Used: Equipment Approved: Frame Removed: Permitted by Manufacturer: (prior to 11/89) Foundation to Local Building Code: Support Locations According to Manufacturer: Skirting: Type: Attachment to Home: Poly on Grade: Access Panel: UTILITIES: Water: Correct Materials /Fittings: Protected From Freezing: Support Spacing: Waste: Correct Materials /Fittings: Slope to Drain: Support Spacing: Main Sewer Connection (Gasketed): Gas: Correct Materials /Fittings: Pressure Test: Electric: Connection Between Halves "HUD Code "Pre- HUD Code" homes only) Aluminum Wiring: Method Used to Eliminate or Reduce Danger: Supply Amps (matches panel in home): DATA PLATE: Roof -zone Load: Heating Zone: Furnace: Original (yes /no): Gypsum Board Lined: Water Heater: Original (yes /no): Gypsum Board Lined: Dryer: Original (yes /no) Range: Original (yes /no): MISCELLANEOUS: Fi replace: Yes /No /Model: Approved: Chimney: Fresh Air Intake: Venting: Skirting /Foundation: Roof and /or O.H.s Smoke Detectors: Alterations: Approved: Inspected: Comrnents: Date: Inspector: Time: Present During Inspection: NCSBCS /ANSI A225.1 Annex D (informative) Suggested Acceptance Guidelines for "Pre- HUD Code" (pre MHCSS) Manufactured (mobile) Homes This Annex is not part of the requirements of regardless of the length of the path of travel this document, but is included for informational between the doors. purposes only. One of the required exit doors must be "Pre -HUD- Code" homes are homes built prior to accessible from the doorway of each bedroom the MHCSS, 24 CFR 3280, which became and no more than 35 feet away from any effective on June 15, 1976, or homes built prior bedroom doorway. An exterior swing door shall to the implementation of individual states' have a 28- inch -wide x 74- inch -high clear inspection and certification programs in opening and sliding glass doors shall have a 28- accordance with ANSI Standard A119.1. inch -wide by 72- inch -high clear opening. Each exterior door other than screen /storm doors shall Building officials or other regulatory agencies have a key- operated lock that has a passage having jurisdiction over pre-code manufactured latch; locks shall not require the use of a key or (mobile) homes may enforce, by ordinance or special tool for operation from the inside of the legislation, compliance with the following items home. prior to issuance of permits or certificates of occupancy. 2 Flame spread 1 Exits and egress windows 2.1 Walls, ceilings, and doors 1.1 Egress windows Walls and ceilings adjacent to or enclosing a furnace or water heater shall have an interior The home has at least one egress window in finish with a flame spread rating not exceeding each bedroom, or a window that meets the 25. Sealants and other trim materials 2 inches minimum specifications of MHCSS 3280.106 or less in width used to finish adjacent surfaces and 3280.404 for manufactured homes. These within these spaces are exempt from this standards require the window to be at least 22 provision, provided all joints are supported by inches in the horizontal or vertical position in its framing members or materials with a flame least dimension and at least five square feet in spread rating of 25 or less. Combustible doors area. The bottom of the window opening shall providing interior or exterior access to furnace be no more than 36 inches above the floor, and and water heater spaces shall be covered with the locks and latches and any window screen or materials of limited combustibility (i.e., 5/16 -inch storm window devices that need to be operated gypsum board, etc.), with the surface allowed to to permit exiting shall not be located more than be interrupted for louvers ventilating the space. 54 inches above the finished floor. However, the louvers shall not be of materials of greater combustibility than the door itself (i.e., 1.2 Exits plastic louvers on a wooden door). Reference MHCSS 3280.203. The home is required to have two exterior exit doors, located remotely from each other, as 2.2 Exposed interior finishes required in MHCSS 3280.105. This standard requires that single- section homes have the Exposed interior finishes adjacent to the cooking doors no less than 12 feet, center -to- center, range (surfaces include vertical surfaces from each other, and multisection home doors between the range top and overhead cabinets, no Tess than 20 feet center -to- center from each the ceiling, or both) shall have a flame- spread other when measured in a straight line, rating not exceeding 50, as required by MHCSS 24 NCSBCS /ANSI A225.1 0 280.203. Backsplashes not exceeding 6 minimum requirements of MHCSS 3280.709(g). inches in height are exempted. Ranges shall have a vertical clearance above the cooking top 4.2 Equipment of not less than 24 inches to the bottom of combustible cabinets, as required by MHCSS A solid fuel burning fireplace or fireplace stove 3280.204(e). shall be equipped with an integral door or shutters designed to close the fire chamber opening and shall include complete means for 3 Smoke detectors venting through the roof, a combustion air inlet, a hearth extension, and means to securely 3.1 Location attach the unit to the manufactured home structure. A smoke detector shall be installed on any wall in the hallway or space communicating with 4.2.1 Chimney each bedroom area between the living area and the first bedroom door, unless a door(s) A listed, factory -built chimney designed to be separates the living area from that bedroom attached directly to the fireplace /fireplace stove area, in which case the detector(s) shall be and equipped with, in accordance with the installed on the living -area side, as close to the listing, a termination device and spark arrester, door(s) as practicable, as required by MHCSS shall be required. The chimney shall extend at 3280.208. Homes with bedroom areas least 3 feet above the part of the roof through separated by any one or combination of which it passes and at least 2 feet above the common -use areas such as a kitchen, dining highest elevation of any part of the room, living room, or family room (but not a manufactured home that is within 10 feet of the bathroom or utility room) shall be required to chimney. have one detector for each bedroom area. hen located in hallways, the detector shall be 4.2.2 Air intake assembly and combustion -air tween the return air intake and the living area. inlet 3.2 Switches and electrical connections An air intake assembly shall be installed in accordance with the terms of listings and the Smoke detectors shall have no switches in the manufacturer's instructions. A combustion air circuit to the detector between the over current inlet shall conduct the air directly into the fire protection device protecting the branch circuit chamber and shall be designed to prevent and the detector.' The detector(s) shall be material from the hearth from dropping onto the attached to an electrical outlet box and area beneath the manufactured home. connected by a permanent wiring method to a general electrical circuit. The detector(s) shall 4.2.3 Hearth not be placed on the same branch circuit or any circuit protected by a ground -fault circuit The hearth extension shall be of interrupter. noncombustible material that is a minimum of 3/8 -inch thick and shall extend a minimum of 16 inches in front and 8 inches beyond each side 4 Solid fuel burning stoves /fireplaces of the fireplace /fireplace stove opening. The hearth shall also extend over the entire surface 4.1 Solid -fuel- burning fireplaces and fireplace beneath a fireplace stove and beneath an stoves elevated or overhanging fireplace. Solid -fuel- burning, factory -built fireplaces and fireplace stoves may be used in manufactured homes, provided that they are listed for use in manufactured homes and installed according to their listing /manufacturer's instructions and the III 25 NCSBCS /ANSI A225.1 5 Electrical wiring systems 3280.709(d). 5.1 Testing 6.3.1 Separation All electrical systems shall be tested for The required separation may be achieved by continuity in accordance with MHCSS the installation of a direct -vent system (sealed 3280.810, to ensure that metallic parts are combustion system) furnace and water heater or properly bonded; tested for operation, to the installation of .a furnace and water heater demonstrate that all equipment is connected with enclosures that separate the furnace and and in working order; and given a polarity check, water heater venting and combustion systems to determine that connections are proper. from the interior atmosphere of the home. There shall be no doors, grills, removable 5.2 Protection access panels, or other openings into the enclosure from the inside of the manufactured The electrical system shall be properly protected home. All openings for ducts, piping, wiring, for the required amperage load. If the unit etc., shall be sealed. wiring employs aluminum conductors, all receptacles and switches rated at 20 amperes 6.3.1.1 Water heater or less that are directly connected to the aluminum conductors shall be marked CO /ALR. The floor area in the area of the water heater Exterior receptacles, other than heat tape shall be free from damage from moisture to receptacles, shall be of the ground -fault circuit ensure that the floor will support the weight of interrupter (GFI) type. Conductors of dissimilar the water heater. metals .(copper /aluminum or copper -clad aluminum) must be connected in accordance with NEC Section 110 -14. 6 Replacement furnaces and water heaters 6.1 Listing Replacement furnaces or water heaters shall be listed for use in a manufactured home. Vents, roof jacks, and chimneys necessary for the installation shall be listed for use with the furnace or water heater. 6.2 Securement and accessibility The furnace and water heater shall be secured in place to avoid displacement. Every furnace and water heater shall be accessible for servicing, for replacement, or both as required by MHCSS 3280.709(a). 6.3 Installation Furnaces and water heaters shall be installed to provide complete separation of the combustion system from the interior atmosphere of the manufactured home, as required by MHCSS 26 NCSBCS /ANSI A225.1 Annex E (informative) Sample Schedule for Manufactured Home Installation Permits This Annex is not part of the requirements of electrical inspection (state electrical board this document, but is included for informational or municipality) purposes only. Separate permit or hourly inspection fees in For installation of new or relocated homes in a excess of the original basic permit flat fees may municipality, a basic permit flat fee may be be established by the municipality for the established by the municipality to cover the following: following inspections: required corrections reinspection foundation inspection: accessory structures or buildings frost depth foundation (requires extra inspection) inspection (i.e., wood decks, carports, entry ways, out- buildings, etc.) piers and footings on grade (common to most park installations) alterations to original home inspection (i.e., structural, mechanical, plumbing, electrical). skirting installation /ventilation Contact state building codes division prior to issuance, as submittal to state may be anchoring of unit (when required by required for approval. local ordinance or by manufacturer's instructions) plan review of accessory structures or alterations plumbing inspection: sewer connection water connection on -site work performed on home water /drain Tines gas -line inspection: materials and connections testing structural inspection: data plate information (June 15, 1976 and newer) structural damage precode upgrading rules by municipal ordinance (see Annex D) 27 NCSBCS /ANSI A225.1 Annex F (informative) Bibliography of Foundation Plans Available From Manufacturer This Annex is not part of the requirements of this document, but is included for informational purposes only. ASCE 7 -1988, "Minimum Design Loads for Buildings and Other Structures," American Society of Civil Engineering, 1430 Broadway, New York, NY 10018 FEMA 85, "Manufactured Home Installation in Flood Hazard Areas," Federal Emergency Management Agency, Washington, DC 20472, Septernber, 1985 HUD Handbook 4930.3 (1989), "Permanent Foundations Guide for Manufactured Housing," U.S. Department of Housing and Urban Development, 451 7th Street, SW, Washington, DC 20410 "Permanent Wood Foundation System Design, Fabrication, and Installation Manual 1987, National Forest Products Association (NFPA), 1250 Connecticut Avenue, NW, Washington, DC 20036 "Frost -Free Shallow Foundation Design Guidelines," Energy Design Update, March, 1988 "Building Foundation Design Guidebook," Doc. No. DE88013350, National Technical Information Service, 5285 Port Royal Road, Springfield, VA 22161 28 Annex G (informative) Tables This Annex is not part of the requirements of this document, but is included for informational purposes only. 11111 29 ERRATA: Annex G and Annex H, Illustrations should be described as "prescriptive not "informative The statements on page 29 and 35 should read: "This Annex is part of the requirements of this document. Each table or illustration should be consider part of the prescriptive text of the specific section of NCSBCS.ANSI A225.1 wherein it is referenced." Table 3 -1 General Description of Soils Allowable Pressure Soil Type (pounds per square foot) Based on the unified classification No allowances made for overburden system pressure, embedment depth, water table height or settlement problems Rock or hard pan 4,000 and up Sandy gravel and gravel 2,000 Sand, silty sand, clayey sand, silty 1,500 gravel, or clayey gravel Clay, sandy clay, silty clay, or clayey 1,000 silt Uncompacted fill Special analysis is required Peat or organic clays Special analysis is required NOTE 1. To be used only when none of the following is available: soils investigation and analysis of the site; compliance with the local building code; and evaluation by a registered professional engineer, architect, or building official. 2. Hereafter, the words engineer" or "architect" shall refer to a registered professional engineer or architect. 1111 Table 4 -1 Minimum Pier Capacity 0 Frame Plus Perimeter Blocking (Both Frame and Perimeter Blocking Required) Roof Minimum Pier Capacity (pounds) Section Live Pier Width Load Location (feet) (pounds per square foot) Maximum Pier Spacing (feet) 4 6 8 10 8 20 Frame 900 1300 1800 2200 Perimeter 600 800 1100 1400 30 Frame 900 1300 1800 2200 Perimeter 700 1100 1400 1800 40 Frame 900 1300 1800 2200 Perimeter 900 1300 1800 2200 10 20 Frame 1100 1700 2200 2800 Perimeter 700 1100 1400 1800 30 Frame 1100 1700 2200 2800 Perimeter 900 1400 1800 2300 40 Frame 1100 1700 2200 2800 ill' Perimeter 1100 1700 2200 2800 12 20 Frame 1300 1900 2600 3200 Perimeter 800 1200 1600 2000 30 Frame 1300. 1900 2600 .3200 Perimeter 1100 1600 2100 2600 40 Frame 1300 1900 2600 3200 Perimeter 1300 1900 2600 3200 14 20 Frame 1500 2200 3000 3700 Perimeter 900 1400 1900 2400 30 Frame 1500 2200 3000 3700 Perimeter 1200 1800 2400 3000 40 Frame 1500 2200 3000 3700 Perimeter 1500 2200 3000 3700 16 20 Frame 1700 2600 340.0 4300 Perimeter 1100 1600 2200 2700 30 Frame 1700 2600 3400 4300 Perimeter 1400 2100 2800 3500 40 Frame 1700 2600 3400 4300 Perimeter 1700 2600 3400 4300 18 20 Frame 1900 2900 3900 4800 Perimeter 1200 1800 2500 3100 30 Frame 1900 2900 3900 4800 Perimeter 1600 2400 3200 3900 40 Frame 1900 2900 3900 4800 Perimeter 1900 2900 3900 4800 III III Table 4 -2 Minimum Pier Capacity Multisection Center -Beam Blocking Roof Live Section Load Width (pounds Pier Load and Minimum Pier Capacity (pounds) (feet) per square foot) Mating Wall Opening (feet) 5 10 15 20 25. 30 35 8 20 600 1200 1800 2400 3000 3600 4200 30 800 1600 2400 3200 4000 4800 5600 40 1000 2000 3000 4000 5000 5000 7000 10 20 800 1500 2300 3000 3800 4500 5300 30 1000 2000 3000 4000 5000 6000 7000 40 1300 2500 3800 5000 6300 7500 8800 12 20 900 1800 2600 3500 4400 5300 6100 30 1200 2300 3500 4700 5800 7000 8200 40 1500 2900 4400 5800 7300 8800 10200 14 20 1000 2000 3000 4100 5100 6100 7100 30 1400 2700 4100 5400 6800 8100 9500 40 1700 3400 5100 6800 8400 10100 11800 16 20 1200 2300 3500 4700 5800 7000 8100 30 1600 3100 4700 6200 7800 9300 10900 40 1900 3800 5800 7500 9700 11600 13600 EXAMPLE: 14 -foot section width 30 pounds -per- square -foot roof live load 18- foot -wide mating -wall opening Follow down the "Section Width" column to "14 feet." Follow across to "30 pounds per square foot" (psf) in the "Roof Live Load" column. Since the mating wall opening is 18 feet wide, follow across to the column headed "20." (For any opening width that is not shown, use the next highest number on the chart.) The required pier capacity is 5,400 pounds. III Table 4 -3 Footing Size Pier Minimum Footing Size or Equal Area (inches) ID {capacity Soil Capacity (pounds.) 1000 Sf 1500 •sf 2000 sf 4000 sf 600 9x9 8x8 7x7 5x5 800 11 x 11 9x9 8x8 5x5 1000 12x12 10x10 8x8 6x6 1500 15x15 12x12 10x10 7x7 2000 17x17 14x14 12x12 8x8 2500 19x19 15x15 13x1 10x10 3000 21 x 21 17 x 17 15 x 15 11 x 11 3500 22x22' 18x18 16x16 12x12 4000 24x24 20x20 17x17 13x13 4500 25x25 21x21 18x18 13x13 5000 27x27 22x22 19x19 14x14 5500 28 x 28 23 x 23 20 x 20 15 x 15 6000 29 x 29 24 x 24 21 x 21 15 x 15 6500 31 x 31 25 x 25 22 x 22 16 x 16 7000 32x32 26x26 22x22 16x16 7500 33 x 33 27 x 27 23 x 23 17 x 17 8000 34 x 34 28 x 28 24 x 24 17 x 17 8500 35x35 29x29 25x25 18x18 9000 36 x 36 29 x 29 25 x 25 19 x 19 10000 38x38 31 x31 27x27 20x20 11000 40 x 40 32 x 32 28 x 28 21 x 21 12000 42x42 34x34 29x29 22x22 13000 43 x 43 35 x 35 31 x 31 22 x 22 14000 45 x 45 37 x 37 32 x 32 23 x 23 15000 46 x 46 38 x 38 33 x 33 24 x 24 16000 48x48 39x39 34x34 25x25 17000 49 x 49 40 x 40 35 x 35 25 x 25 18000 51 x51 42x42 36x36 26x26 19000 52 x 52 43 x 43 37 x 37 NOTE 1. The footing sizes shown are for square pads and are based on the area (square inches) required for the Toad. Other footing configurations, such as a rectangular configuration, may be used, provided the area (square inches) is equal to or greater than the area of the square footing shown in the table. For example, a 12 -inch x 22 -inch (264- square -inch) footing may be used in place of a 16 -inch x 16 -inch (256- square -inch) footing. Also, two 12 -inch x 24 -inch pads may be used in place of one 24 -inch x 24 -inch pad. 2. Local regulations may require design verification by an engineer. 3. psf pounds per square foot III Annex H (informative) Illustrations This Annex is not part of the requirements of this document, but is included for informational purposes only. 35 Middle North 3 A Middle k 446 x r 3 tgaitURAMMitimo I j ,fir xS rr 3i A 04VaAtV10 1111111111 ;SI% SIJ S 1y 0 AK North South s HI South Design Roof -load Zones: South 20 psf (pounds per square foot) minimum Middle 30 psf (snow) North 40 psf (snow) Reference Manufactured Home Construction and Safety Standards (MHCSS) 24 CFR 3280.506, latest edition Figure 3 -1 (a) Roof -load zone map (informational only) IIP it 6 w. a F! Yf r---1% s'�.. is v� a ...,....„..,...,,...,...,..,,,,,,,.......„„......,m5,m70,54:‘,.„,05415.52,:. ,,,A 2 i F fifiowjatrp.-. 04,0 05,00 v A. 4, 1 '''W AK t HI `cp Zone 1 2 3 U -value 0.116 0.096 0.079 Reference Manufactured Home Construction and Safety Standards (MHCSS) 24 CFR 3280.506, latest edition III Figure 3 -1(b) Heating- and cooling- design zone map (informational only) it Zone 4111,11 I 11111141106 iit Ak II —Th Zone l 110 01, Zone Zone III 4111111111110, Zone II I 1 ly Zone A O i Zone II Zone III Zone III ..--,\3 Zone I Zone 11 AK Zone I Zone III HI Zone III Design Wind -load Zones: Standard Wind Zone I 15 psf Horizontal 9 psf uplift* Hurricane Zone II ±39 psf Horizontal 27 psf uplift Hurricane Zone III ±47 psf Horizontal 32 psf uplift net uplift Note psf: pounds per square foot Reference Manufactured Home Construction and Safety Standards (MHCSS) 24 CFR 3280.305(c)(2), latest edition ill Figure 3 -1(c) Wind -load zone map (informational only) Single- section Multisection J�'O`4rv°$�``` 0c J'�°U,,' i 2 .a O �g v wr6`SY '��'P >e r :o-t� RaBoo •odd.� 7o �i m om DO: Crown and grade the site to slope away from the home and cover it with 6- mil -thick polyethylene sheeting or the equivalent. DON'T: Grade the site so that water collects beneath the home. Figure 3 -2 Elimination of water beneath the home Pier 1 Pier 2 Pier 3 G am. 1 I A 1 1 I 1 Single blocks, Double- interlocked blocks, Steel or concrete maximum height of 36 inches maximum height of 80 inches manufactured pier Concrete grouting III Steel reinforcing bars .............,..........w.... 4 4111 For piers exceeding 80 inches in height, the concrete blocks should be filled with concrete grouting and steel reinforcing bars should be utilized. III Figure 4 -1 Typical footing and pier installation Required perimeter support (see note 4 below); existing patio door or addition of patio door 11 Frame support Main beam Front (hitch) 1 1 r Is m---- 1 ‘00 Exterior door of home i Required perimeter Exterior wall support (see note 4) line of home Figure 4 Typical blocking diagram for single- section home when manufacturer's instructions are not available Note (applies to both figures 4 -2 and 4 -3) 1. See table 4.1 for required pier capacity and spacing. 2. See table 4.3 and section 4.2 for footing requirements. 3. Piers shall be located at a maximum of 2 feet from both ends. 4. Place piers on both sides of entry doors and at any other openings greater than 4 feet in width, such as patio or atrium doors; under porch posts, fireplaces, and wood stoves; and under those places where heavy pieces of furniture such as pianos, organs, waterbeds, etc., may be placed. 0 -Piers /supports shall be sized Required perimeter according to table 4.2 or calcu- support (see note 4) lated by a design professional and located under the bearing points of Patio door clear -span openings in center 1 1 mating walls IF r r!T T"T1 1 I 1 1 1' e- -1 v i a 1 i 1- 1-- -b' 1 1 1 1 1 1 1 I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1- Slide out fireplace ir o Exterior door of home 1 II 1 Required perimeter \Exterior wall support (see note 4) line of home i Figure 4 -3 Typical blocking diagram for multisection home when manufacturer's installation instructions are not available s n 2 10 315 6 3E? 3 540 1 36 21 36 30 36 s 2 8 24 18 60 31 54 48 3 60 486. 48 13 6 7 9 48 66 36 48 54 53 5 54 60 36 13 48 48 42 60 51 12 15 24 7 48 6 31 48 2 1 6 21 6 30 18 48 26 15 \A. 41 35 36 42 9 3 0 3 64 24 54 48 4 24 X20 g 12 18 48 25 45 14 12 42 30 2 1 2 18 221 24 6 48 3 3 2 i 4 4 18 25 �fr 5 7 17 20 18 36 52 5 42 1 1 14 21 12 21 16 18 30 60 r 1 g 1 't 1 0 5 18 6 12 30 g 6 27 6 12 2 2 7 20 1 1 �1,1111 1 3 20 6 24 21 17 Nor �1 r Oli 13 15 6 6i 1 1 36 18 q g 12 104 6 l& .,:.,:......:.,.7.,:.,..r.,,..„:...,.....,:....:..;...i.:.,..::.,:..:„7„, 2 2 3 and 1,• vollp 1 Average Depth of Frost Penetration in Inches Source: U.S. Department of Commerce Weather Bureau Figure 4 -4 Frost penetration map (a) This system is utilized when a cross -over duct has not been built into the floor, and the II) furnace is outside the I -beam. With this type of installation, it is necessary for two flexible ducts to be installed. Furnace adpt J adapter X11 X m Strap 10 -inch diameter flexible support Duct insulated duct with 1.0 perm. Block maximum vapor barrier support Flexible duct shall not be in contact with the ground III (b) This system is used when a cross -over duct has not been built into the floor, and the furnace is situated directly over the main duct in one section of the home. A single flexible duct is then used to connect the two sections to each other. Furnace f j lir/ i I Strap support Duct 10 -inch diameter flexible Block insulated duct with 1.0 perm support maximum vapor barrier Flexible duct shall not be in contact with the ground III Figure 5 -1 Cross -over duct installation Anchor Mm Maulm im u A r ho Spacing Strap Method Ullt�ma load impolusgmagnso sing4Agogityggeg gigmaigottgoloolovailobiii*Ito:::•so Zone 111 a Single Strap 4725 lbs. 11' 0" 6' 0" 4' 6" 1; Double Strap 4725 lbs.' 11' 0 "2 6' 0, 2 4' 6 2 Note 1 Unless listed /labeled for a higher capacity by the anchor manufacturer 2 Unless a greater spacing is specified by the anchor manufacturer 3 All homes located in Wind Zones II and III shall have a vertical tie installed at each diagonal tie location. 2 -foot see chart 2 foot maximu .i. I maximum Frame I beam Anchor 0 0 0 0 0 Figure 5 -2 Number and location of straps and ground anchors Diagonal ties Home Main beam 40° to 50° Diagonal frame Anchor and strap tie-straping in straight line Install anchor to full depth Straps to be installed O (i.e., completely to head) within an angle of 40 to 50 Note 1. All anchoring parts must be certified to a 4,725 -pound capacity. 2. The ground anchors must be sized in accordance with the direction of the load and the type of soil. 3. The ground anchors' augers must be installed below the frost line. 4. Ground anchors may be installed vertically if either a 10 -inch x 18 -inch (at a minimum) concrete collar or an approved metal stabilizing device is installed. 4111 Figure 5 -3 Proper alignment of straps and anchors Diagonal and vertical ties 1 f f f Home i 7 Main beam 4 Vertical tie 40 50° strapping Anchor aligned with resultant of combined forces Note- 1. All anchoring parts must be certified to a 4,725 -pound capacity. 2. The ground anchors must be sized in accordance with the direction of the load and the type of soil. 3. The ground anchors' augers must be installed below the frost line. 4. Ground anchors may be installed vertically if either a 10 -inch x 18 -inch (at a minimum) concrete collar or an approved metal stabilizing device is installed. Figure 5 -4 Proper alignment of straps and anchors (a) Exterior Tight fixture Ground wire Junction box Wire nut Color -coded wires I dim Ak 0 Globe Noncombustible ring (if required) (b) Chain -hung fixture or ceiling fan Ceiling box Color -coded Ground wire wires d am,'` 'r Wire nut Ground strap I irAir Ceiling Fixture Noncombustible ring ground (if required) g Fixture wire mounting screw Figure 6 -1 Installation of exterior lights Figure 6 -2(a) Paddle fan installation CAUTION: Before following the step -by -step (b) Leave approximately 4 inches of wire procedure, be sure that the power to the fan free in the box. wire is off. 5. Secure the center beam in place over the 1. Remove the fan manufacturer's installation center line joint. Be sure that the fan's supply instructions from the package and determine wire is not pinched or penetrated with beam the meth of attaching the fan to the beam fasteners. that is to be used. 6. Secure the electrical box to the ridge beam 2. If the center beam (shipped loose) does not with #8 x 2 1/2 -inch wood screws through the contain a precut hole for the electrical box, cut a two holes in the top of the box. hole with a hole saw approximately 1/4 inch larger than the box diameter, at the proper 7. Strip about 3/4 inch of insulation from the location. The center line of the hole should line white and black conductor ends. up with the location of the supply wire through the ceiling. Center the hole in the width of the 8. Position the noncombustible flash ring, which beam. is provided, over the. electrical box so that the finished surface (adjacent to the electrical box) 3. Install the box in the hole and secure the that is to be covered by the fan canopy is not flange to the center beam with four #6 x 1 -inch exposed. wood screws. 9. Follow the manufacturer's installation 4. (a) Insert the ceiling wire through a knock- instructions for mounting the fan assembly on out hole in the side of the electrical box. the box and for electrical wiring of the fan. Use the electrical connectors that are provided for NOTE It may necessary to cut a notch from 'splicing the wire. Be certain that the fan is the to on the supply -wire side of the center grounded as specified in the manufacturer's beam hole to allow the supply wire to be inserted instructions and that the wires are connected into the electrical box without rubbing against the properly (white -to -white and black -to- black). center beam during. installation. 0 Double -wide ridge beam 1 I 4 1 Ceiling board 2 x 6 -inch center beam shipped loose Supply wire coiled and for field installation secured for shipment I Hole for box cut through 2 x 6 -inch beam Notch beam at hole if 1 (may be cut in plant or in field) necessary for wire Secure box to ridge beam with chase two 8 x 2 1/2 -inch wood screws (field installed) Secure box to 2 x 6 -inch center beam with four \Electrical box (see note) #6 x 1 -inch wood screws (field installed) Supply wire inserted in field through side knock -out of box Note Applicable to U.L. listed paddle fan with a swivel -type mounting bracket ill Figure 6 -2(a) Paddle fan installation Figure 6 -2(b) Protruding ridge beam For proper ceiling fan installation, a on the beam and secure the box to the beam prefabricated box has been provided that with the #6 x 2 -inch wood screws, which are includes the electrical box containing the provided, in the metal corner braces. spliced wires with their connectors. 4. Strip about 3/4 inch of the insulation from The prefabricated box is also designed to the ends of the white and black conductors. conceal the wire that runs through the ceiling where the fan is to be located. CAUTION: 5. Position the noncombustible flash ring, which Before following this step step procedure, be is provided, over the electrical box so that the sure that the power to the fan wire is off. finished surface (adjacent to the electrical box) that is to be covered by the fan canopy is not 1. Remove the fan manufacturer's installation exposed. instructions from the package and determine what method of attachment of the fan to the 6. Follow the manufacturer's installation beam will be used. instructions for mounting the fan assembly to the box and for electrical wiring of the fan. Use 2. Insert the ceiling wire through a side knock- the electrical connectors, which are provided, for out hole in the electrical box. Secure the wire in splicing wires. Be certain that the fan is the electrical box clamp at a point that is grounded as specified in the manufacturer's approximately 4 inches from its end. instructions and that wires are connected properly (white -to -white and black -to- black). 3.Place the prefabricated box in its final position Beam C' C)/ /i9� Fan wire from ceiling I/ 40 i th... 1 t y Electrical box: mr, Prefabricated box fastened to beam clamp wire at box inlet; with two 6 x 2 -inch wood screws on clamp provided with box. each side (4 -inch minimum free cable in box) III Figure 6- 2(b) Protruding ridge beam Figure 6 -3 Ventilation improvement installation NOTE 4 The following installation instructions are (b) Find the free end of the switch leg wire and provided to assist a person who is qualified and insert into the junction box. experienced with construction and electrical wiring. They are not intended to enable someone (c) Reinstall the junction box in the wall. unfamiliar with electrical wiring and construction to perform the installation. 9. Connect the hot wire and the switch leg wire 1. The ceiling backer for the fan is mounted as follows: directly ini line with the junction box mounted in the wall of the hallway. Measure approximately (a) Connect the white wires to each other 18 inches out from the wall into the hallway for using a wire nut. backer center. (b) Connect the black wires from the hot wire 2. Cut e 8 -inch diameter hole, using the and switches to the terminals on the switch. location Of step 1 as the center, through the ceiling board and backer. (c) Connect the ground wires (bare) using a permanent connector. Run a jumper from 3. Using! a plumb bob, find the center of the the ground connection to the ground screw hole and rnark it on the roof backer. Drill a small on the switch. hole through the roof backer and roof to mark the center, of the opening from the exterior (the 10. Install the switch in the junction box and install the switch cover plate. roof backer is omitted with a shingle roof). 4. Switch off the main circuit breaker in the 11 From the exterior of the home, cut an 8 panel boxi Remove the junction -box cover from inch diameter hole through the roof using the the fan. Install a 1/2 -inch cable clamp through hole made in step 3 as the center. the hole in the side of the fan. 12. Slide the fan up through the hole in the 5. Find the free end of the switch leg wire, ceiling and secure it with four #8 x 1 1/4 inch (at located in ithe roof cavity, to be connected to the the minimum) wood screws through the ceiling fan. Insert: the switch leg wire through the cable board and into the ceiling backer. clamp. 13. Apply butyl rubber tape to the underside of 6. All connections are to be properly made with the predrilled holes or the area where the screws wire nuts Connect the black wire from the are to be installed. Slip the roof cap down switch legj to the black wires from the fan; the around the fan from the exterior of the home. white wire !from the switch leg to the white wires (Due to changes in roof height, an extension from the fan; and the ground wire (bare) from tube may be required.) the fan switchlleg to the green ground screw in the 14. Screw the roof cap down to the roof and roof backer with #8 x 1 -inch sheet -metal screws. 7. Close the fan's junction box with a Cover the screws and flange ends with roof bracket and secure it with the nut supplied for coating. that purpolse. 15. Install the ceiling -fan cover on the fan. Turn 8. Remove the blank cover from the junction the circuit breaker back on and check the fan for box in the wall. The wire with wire nuts on it is proper operation. the hot wire. 16. The vent is activated by simply flipping the `Nall switch to the "on" position. (a) Rernove the junction box from the wall. (a) Before Roof cap• q Switch wire Ceiling backer 18 inches Switch leg wire Hot wire /Junction box (b) After Roof backer Flange Roof backer Ceiling backer Vent fan Switch leg wire Hot wire Switch Figure 6 -3 Ventilation improvement installation (a) Alternativea, field applied, interior end -wall panel (b) Alternative, field applied, wood siding at end wall Center of double- section home i III Center of double- section home i IIIIIIIIIIIIIIIIIIIIIIIIIIII Fasten panel with 18- gauge, 1/4 x 3/4- inch staples or 6dinails, Exterio 6 inches on center Full -s rface s.din around perimet r coverage of g and 12 inches all stud and xterior in field top and bottom sidi g plate with PVA Plant applied Field parjiel applied Plant I' p e Plant applied Field- applied panel applied V panel panel Plant--___ One full -sized panel applied no less than 16 inches panel nor larger than One full -sized panel no less 32 inches than 16 inches nor larger than 32 inches •ummiu g ,11 L1 11 71 11 11 11 11 I1 11 11 11 11 11 Fasten exterior panel to the studs Note i in accordance with the siding manufacturer's 1. Specific designs shown must be approved by a DAPIA installation instructions (Design Approval Primary Inspection Agency) 2.: PVA polyvinyl acetate III (c) Alternative,ifield- applied, horizontal -lap siding Siding to be installed in accordance with manufacturer's installation instructions Window Porch light O installed Door installed Home installer to with J rail with J-rail installed around it remove all plastic Corner sheeting used for Corner trim installed transit protection 0 trim installed Note 1. Double section homes with horizontal -lap siding may be shipped with no siding on the front and rear end walls. 2. The manufacturer will install doors /windows trimmed with J -rail and corner trim and will cover with plastic sheeting for transiti. All siding, starter trim, fasteners, and vents will be shipped loose in the home for installation on set -up. 3. Home installer to complete installation after home is set -up, including the installation of roof vents if required. Figure 6 -4 Installation of optional panels, siding, and moulding ,4111411‘. 0 Dryer duct (typical location) N 00 0.1.° Duct drop -out tube Flexible duct Manufacturer's exhaust installed at site I hood or equivalent CAUTION: Installation of the exhaust system must be in CAUTION: This exhaust system must not terminate accordance with the dryer manufacturer's instructions. under the home. Exterior wall Manufacturer's exhaust hood or equivalent (typical location) X 1 11P. Dryer duct Figure 7 -1 Dryer exhaust system 1 1 1/2 -inch Trim with Push down (-4 sheet -metal shears if it is difficult to make flashing lay 1 Storm collar flat on roof r !Round top assembly 0 Caulking ::::restor t Chimney cap adapter 3 -foot minimum Triple wall pipe Flashing Storm collar Flashing M Firestop thimble Ill Damper handle Closed Il�llulllIl lulnl O C L Open III C ---)1 lAllk Air inlet damper handle 11111 II Illerm 111111 Above 1 ,tillip�►_. l VI Over basement or crawl space installation III Figure 7 -2 Fireplace or wood stove chimney and air intake installation :1‘,..( 4 ,,,,,,,t) Master,, shut -off V j valve I li1 d INN i il Wrap with heat tape if necessary for local freezing conditions. Install heat tape 7' Al in accordance with manufacturer's installation instructions. Heat tape is to be listed or approved 'N Id for manufactured home use. 'po To heat tape receptacle under home Figure 8 -1 Typical water connection Holes in side rails Floor O ME 1' im ?ittiiitiil j 1 itttit!tttttttttttt 1 nsulation Inspection covers allow connection to be made and insulated after the two halves are set up and blocked CAUTION: If freezing conditions exist, wrap water connector with insulation. Use water connectors supplied by manufacturer, where applicable. III Figure 8 -2 Typical water -line cross -over Two 16d nails into Two 16d nails Minimum of 2 x 3 -inch lumber floor joist I 11111.411 1 I Drain pipe 10 Two 16d nails into floor joist Minimum of 2 x 3-inch Two staples or screws lumber on each side Galvanized or aluminum strap 16d nails Galvanized or aluminum strap Two 16- gauge, I1 M inimum of 7/16 x 2 -inch 1 x 3 inch staples each end lumber (1 -inch lumber) or two 16d nails Minimum of 2 x 3-inch Drain pipe lumber Two staples each side Galvanized or aluminum strap Figure 8 -3 Drain -pipe support methods c 0 o Second stool drop Main stool drop 0 o Strap support 4 feet on center Shipping cap 0 I I Shippin� l cap o o Field- installed, slope 1/4 inch per foot To sewer Figure 8 -4 Drain -pipe slope and connections Typical connecting pipe and fittings ►om (not supplied by the manufacturer) I Support strap at maximum of 4 -foot intervals Approved elastomer coupler wiaammas Site sewer hook -up Note Fittings in the drainage system that are subject to freezing, such as P -traps in the floor, have been protected with insulation by the manufacturer. Insulation must be replaced if it is removed to gain access to the P -trap. Figure 8 -5 Connection to site sewer LLVjj I Cap and 1 c. chain Horne sid II II Slope 1/4 inch per foot Support strap at maximum of 4 -foot intervals Figure 8 -6 Drain -line cross -over connection