Loading...
HomeMy WebLinkAboutDaily Report of Structural Steel Bend Office (541) 330 -9155 Geotechnical Office (503) 601 -8250 Carlson Test• Eugene Office (541) 345 -0289 ing, Inc• Salem Office (503) 589 -1252 Tigard Office (503) 684 -3460 Daily Report of Structural Steel Client: NORTHWESTERN TERRITORIES INC SHAWN WEST Project: NIPPON BIOMASS COGENERATION PROJECT CTI Job T1205903. Address: @INSTA -FAB VANCOUVER WA Jurisdiction: PORT ANGELES CTI representative R BATY OBOA 411 was on site this date May. 16, 2012 to perform Special Inspection for: Permit 11 -1239 DFS #(s) PO Number: SCOPE OF INSPECTION Location of steel inspection [to include grid lines, elevations (floors) and drawing details]: 1. Checked in with superintendent, client or shop rep. Name: BRIAN MADE FINAL WELD INSPECTION OF BEAMS PC /MKS B501 Company: INSTA -FAB AND B502. ei 2. Inspection was "IBC" Continuous I I Periodic 3. Work performed: In the field x At fab shop INS TA- FAB 0 4. If shop inspection do they have fabrication and QC procedures? I x I Yes No N/A INSPECTION Yes NoN /A 1. Reviewed previous inspection reports? x 2. Verified steel materials are in compliance by reviewing random samples of the mill test reports, steel ID X markings or other documentation. 3. Verified weld filler materials conform. x 4. Checked steel members to see they were fabricated and erected in accordance with the workmanship and X tolerances required. 5. Checked welded studs and structural connections were REPORT SUMMARY installed as required. X 6. Verified high strength bolts and fasteners conform. x 1. Work inspected was: x Completed In progress 7. Verified the quality of welds produced by welders, 2. Completed work inspected was in compliance with welding operators, and tackers conform. x P P P 8. Verified steel frame joint details for bracing, stiffening, x Approved plans and specifications Shop drawings member locations, and application of joint details at each X RFI Design change I I Submittal N /A connection are in compliance by random sampling. Document #(s) Dated: WELDER INFORMATION 3. Noncompliance item(s) were noted this date, details on Welders Name: ON FILE AT SHOP following page(s). Yes No x N/A Certification 4. Noncompliance item(s) were reinspected this date, details Yes No N/A on following page(s). I I Yes No x N/A 1. Verified the contractor's Welding Procedure Specifications are in conformance with X I I Conform Remain in progress AWS requirements. 2. Verified the essential variables outlined in the Report(s) findings were discussed and left with Welding Procedure Specifications were x BRIAN employed during execution of the work. of INSTA FAB 3. Verified the weldability ofreinforcing steel Based on the Code, approval is required from the Building Official before the other than ASTM A706. X SPECIAL INSPECTED items noted above can be covered. Carlson Testing has no authority to direct work of contractors or subcontractors. See additional report page(s). Distribute attachments. Page 1 of 1 Daily Report of Structural Steel For: 05/16/2012 CTI Job T1205903. Project: NIPPON BIOMASS COGENERATION PROJECT Notes: In some cases more than one box may be checked for a given item on the front page. Our reports pertain to the material tested/inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. Under all circumstances, the information contained in this report is provided subj ect to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. Reviewed By: Keith Gauvin Review Date: 05/25/2012 RB /CK CC: NORTHWESTERN TERRITORIES INC SHAWN WEST SHAWN @NTI4U.COM 8430 SW HUNZIKER ST, TIGARD OR PO BOX 23814, TIGARD OR 97281 Bend Office (541) 330 -9155 Geotechnical Office (503) 601 -8250 Eugene Office (541) 345 -0289 Carlson Testing, Inc. Salem Office (503) 589 -1252 Tigard Office (503) 684 -3460 Daily Report of Structural Steel Client: NORTHWESTERN TERRITORIES INC SHAWN WEST Project: NIPPON BIOMASS COGENERATION PROJECT CTI Job T1205903. Address: @INSTA -FAB VANCOUVER WA Jurisdiction: PORT ANGELES CTI representative R BATY OBOA 411 was on site this date May 15 2012 to perform Special Inspection for: Permit 11 1239 DFS #(s) PO Number: SCOPE OF INSPECTION Location of steel inspection [to include grid lines, elevations (floors) and drawing details]: 1. Checked in with superintendent, client or shop rep. Name: BRIAN MADE PRE INSPECTION OF BEAMS B501 AND B502. THIS Company: INSTA FAB WAS OF THE 1/4" FILLET WELDS AT STIFFENERS, WHICH WILL BE COVERED WHEN P310 IS FITTED AND 2. Inspection was "IBC" n Continuous x Periodic WELDED 3. Work performed: In the field x At fab shop INSTA FAB FINAL WELD INSPECTION TO BE DONE LATER. 4. If shop inspection do they have fabrication and QC procedures? x Yes No N/A INSPECTION Yes NoN /A 1. Reviewed previous inspection reports? 2. Verified steel materials are in compliance by reviewing random samples of the mill test reports, steel ID X markings or other documentation. 3. Verified weld filler materials conform. 4. Checked steel members to see they were fabricated and erected in accordance with the workmanship and X tolerances required. 5. Checked welded studs and structural connections were REPORT SUMMARY installed as required. X 6. Verified high strength bolts and fasteners conform. x 1. Work inspected was: Completed x In progress 7. Verified the quality of welds produced by welders, 2. Completed work inspected was in comp liance with welding operators, and tackers conform. x p p p 8. Verified steel frame joint details for bracing, stiffening, x Approved plans and specifications Shop drawings member locations, and application of joint details at each X RFI Design change r 1 Submittal N/A connection are in compliance by random sampling. Document #(s) Dated: WELDER INFORMATION 3. Noncompliance item(s) were noted this date, details on Welders Name: ON FILE following page(s). Yes r I No x N/A Certification AT SHOP 4. Noncompliance item(s) were reinspected this date, details Yes No N/A on following page(s). Yes No x N/A 1. Verified the contractor's Welding Procedure Conform Remain in progress Specifications are in conformance with X AWS requirements. 2. Verified the essential variables outlined in the Report(s) findings were discussed and left with Welding Procedure Specifications were BRIAN employed during execution of the work. of I NS TA- FAB 3. Verified the weldability ofreinforcing steel Based on the Code, approval is required from the Building Official before the other than ASTM A706. X SPECIAL INSPECTED items noted above can be covered. Carlson Testing has no authority to direct work of contractors or subcontractors. See additional report page(s). Distribute attachments. Page 1 of Daily Report of Structural Steel For: os /15/2012 CTI Job T1205903. Project: NIPPON BIOMASS COGENERATION PROJECT Notes: In some cases more than one box may be checked for a given item on the front page. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. Under all circumstances, the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. Reviewed By: Keith Gauvin Review Date: 05/25/2012 RB /CK CC: NORTHWESTERN TERRITORIES INC SHAWN WEST SHAWN @NT14U.COM 8430 SW HUNZIKER ST, TIGARD OR PO BOX 23814, TIGARD OR 97281 Bend Office (541) 330 -9155 Geotechnical Office (503) 601 -8250 Eugene Office (541) 345 -0289 Carlson Testing, Inc. Salem Office (503) 589 -1252 Tigard Office (503) 684 -3460 Daily Report of Structural Steel Client: NORTHWESTERN TERRITORIES INC SHAWN WEST Project: NIPPON BIOMASS COGENERATION PROJECT CTI Job T1205903. Address: @INSTA -FAB VANCOUVER WA Jurisdiction: PORT ANGELES CTI representative R. BATY OBOA 411 was on site this date May. 14 2012 to perform Special Inspection for: Permit 11 1239 DFS #(s) PO Number: SCOPE OF INSPECTION Location of steel inspection [to include grid lines, elevations (floors) and drawing details]: 1. Checked in with superintendent, client or shop rep. Name: BRIAN MONITORED FIT -UP AND WELDING OF FLARE BEVEL Company: INSTA -FAB WELDS 2. Inspection was "IBC" x Continuous Periodic MADE FINAL WELD INSPECTION OF PC /MKS B500, B504, 3. Work performed: I I In the field x At fab shop B505, B506, B509, C500, C501, B507, B508, B503, INSTA-FAB M314, M311, M313, AND M312. 4. If shop inspection do they have fabrication and QC (2 EA) M301 AND M310. procedures? I X I Yes No I I N/A (4 -EA) M214, M315, AND M300. INSPECTION Yes NoN /A 1. Reviewed previous inspection reports? 2. Verified steel materials are in compliance by reviewing random samples of the mill test reports, steel ID X markings or other documentation. 3. Verified weld filler materials conform. 4. Checked steel members to see they were fabricated and erected in accordance with the workmanship and X tolerances required. 5. Checked welded studs and structural connections were REPORT SUMMARY installed as required. X 6. Verified high strength bolts and fasteners conform. x I, Work inspected was: X Completed In progress 7. Verified the quality of welds produced by welders, 2. Completed work inspected was in compliance with welding operators, and tackers conform. X p p p 8. Verified steel frame joint details for bracing, stiffening, x Approved plans and specifications I X I Shop drawings member locations, and application of joint details at each X RFI Design change Submittal I I N/A connection are in compliance by random sampling. Document #(s) Dated: WELDER INFORMATION 3. Noncompliance item(s) were noted this date, details on Welders Name: ON FILE following page(s). I Yes No I X I N/A Certification AT SHOP 4. Noncompliance item(s) were reinspected this date, details Yes No N/A on following page(s). Yes No X N/A 1. Verified the contractor's Welding Procedure Conform I I Remain in progress Specifications are in conformance with X AWS requirements. 2. Verified the essential variables outlined in the Report(s) findings were discussed and left with Welding Procedure Specifications were X BRIAN employed during execution of the work. of INS TA FAB 3. Verified the weldabilityofreinforcing steel Based on the Code, approval is required from the Building Official before the other than ASTM A706. X SPECIAL INSPECTED items noted above can be covered. Carlson Testing has no authority to direct work of contractors or subcontractors. See additional report page(s). 7 Distribute attachments. Page 1 of Daily Report of Structural Steel For: 05 14 2 012 CTI Job T1205903. Project: NIPPON BIOMASS COGENERATION PROJECT Notes: In some cases more than one box may be checked for a given item on the front page. Our reports pertain to the material tested/inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. Under all circumstances, the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. Reviewed By: Keith Gauvin Review Date: 05/25/2012 RB /CK CC: NORTHWESTERN TERRITORIES INC SHAWN WEST SHAWN @NTI4U.COM •iii 8430 SW HUNZIKER ST, TIGARD OR PO BOX 23814, TIGARD OR 97281 Bend Office (541) 330 -9155 Geotechnical Office (503) 601-8250 Eugene Office (541) 345 -0289 Carlson Testing, Inc. Salem Office (503) 589 -1252 Tigard Office (503) 684 -3460 Daily Report of Structural Steel Client: NORTHWESTERN TERRITORIES INC SHAWN WEST Project: NIPPON BIOMASS COGENERATION PROJECT CTI Job T1205903. Address: @INSTA -FAB VANCOUVER WA Jurisdiction: PORT ANGELES CTI representative K EDWARDS OBOA 78 3 was on site this date Apr. 20, 2 012 to perform Special Inspection for: Permit 11 1239 DFS #(s) PO Number: SCOPE OF INSPECTION Location of steel inspection [to include grid lines, elevations (floors) and drawing details]: 1. Checked in with superintendent, client or shop rep. Name: BRIAN WILL PERFORMED CONTINUOUS AND PERIODIC VISUAL WELD Company: FAB CO INC INSPECTION FOR CONFORMANCE TO THE PROVIDED SHOP DRAWINGS DETAILS AND AWS D1.1 VISUAL ACCEPTANCE 2. Inspection was "IBC" Continuous x Periodic CRITERIA. 3. Work performed: In the field I X I At fab shop INSTA -FAB CO INC 1 -PC EA COLUMNS: MARK #'S C405, C406, C407, C423 C400. 1 -PC EA BEAMS: MARK #'S B412, B428, 4. If shop inspection do they have fabrication and QC 13460, B433, B415, 3436, B431, B427, B432, AND procedures? x Yes No N/A 4 -PCS #B409. 1 -PC COLUMN #C401, 2 -PCS B408, 8 -PCS EA MARK #'S HB401 -R, HB401 -L, 1 -PC EA INSPECTION HB406 -R H13406 -L, PLATE ASSEMBLY. Yes NoN /A 1. Reviewed previous inspection reports? X 2. Verifiedsteelmaterialsareincompliancebyreviewing CONTINUOUS VISUAL INSPECTION ON 3 PCS, COMPLETE random samples of the mill test reports, steel ID X JOINT PENETRATION WELDS AT COLUMN PLATES MARK markings or other documentation. S C402 C403, 1 COLUMN EACH 3. Verified weld filler materials conform. 4. Checked steel members to see they were fabricated and (CONT' D) erected in accordance with the workmanship and X tolerances required. 5. Checked welded studs and structural connections were REPORT SUMMARY installed as required. X 6. Verified high strength bolts and fasteners conform. x 1. Work inspected was: x Completed I I In progress 7. Verified the quality of welds produced by welders, 2. Completed work inspected was in compliance with welding operators, and tackers conform. X p p p 8. Verified steel frame joint details for bracing, stiffening, Approved plans and specifications x Shop drawings member locations, and application of joint details at each X RFI Design change Submittal N/A connection are in compliance by random sampling. Document #(s) SEE ABOVE Dated: WELDER INFORMATION 3. Noncompliance item(s) were noted this date, details on Welders Name: PREVIOUSLY VERIFIED CURRENT AND following page(s). Yes No I x i N/A Certification ON FILE IN SHOP OFFICE 4. Noncompliance item(s) were reinspected this date, details Yes No N/A on following page(s). I I Yes No x N/A 1. Verified the contractor's Welding Procedure I I Conform Remain in progress Specifications are in conformance with X AWS requirements. 2. Verified the essential variables outlined in the Report(s) findings were discussed and left with Welding Procedure Specifications were X BRIAN WILL employed during execution of the work. of INS TA FAB 3. Verified the weldability of reinforcing steel Based on the Code, approval is required from the Building Official before the other than ASTM A706. X SPECIAL INSPECTED items noted above can be covered. Carlson Testing has no authority to direct work of contractors or subcontractors. See additional report page(s). Distribute attachments. Page 1 of 1 Daily Report of Structural Steel For: 04/20/2012 CTI Job T1205903. Project: NIPPON BIOMASS COGENERATION PROJECT Notes: FOUND TO BE COMPLETE AND CONFORMING. SHOP DRAWINGS DATED 03/29/12 AND 04/09/12, REV -0. ADD 2 -PC #B408 AND 1 -PC #B461. In some cases more than one box may be checked for a given item on the front page. Our reports pertain to the material tested/inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. Under all circumstances, the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. Reviewed By: Keith Gauvin Review Date: 04/27/2012 KDE /CK CC: NORTHWESTERN TERRITORIES INC SHAWN WEST SHAWN @NTI4U.COM 8430 SW HUNZIKER ST, TIGARD OR PO BOX 23814, OR 97281 1 Bend Office (541) 330 -9155 Geotechnical Office (503) 601 -8250 Eugene Office (541) 345 -0289 Carlson Testing, Inc. Salem Office (503) 589 -1252 Tigard Office (503) 684 -3460 Daily Report of Structural Steel Client: NORTHWESTERN TERRITORIES INC SHAWN WEST Project: NIPPON BIOMASS COGENERATION PROJECT CTI Job 205903. Address: @INSTA FAB VANCOUVER WA Jurisdiction: PORT ANGEL representativeD. LOFTESNESS OBOA 809 /WABO SI 01507 le was on site this date Apr. 19, 2012 to perform Special Inspection for: Permit 11 1239 DFS #(s) PO Number: SCOPE OF INSPECTION Location of steel inspection [to include grid lines, elevations (floors) and drawing details]: 1. Checked in with superintendent, client or shop rep. Name: BRIAN 1) CTI REP MET WITH RYAN TO DETERMINE THE SCOPE Company: INSTA FAB OF TODAY'S INSPECTION. EXAMINED COMPLETED WELDING OF BEAMS AS LISTED BELOW. 2. Inspection was "IBC" I I Continuous x Periodic 3. Work performed: I I In the field x At fab shop 2) REVIEWED REVISED APPROVED SHOP DRAWINGS. SHOP INSTA FAB DRAWINGS WERE USED FOR INFORMATION. 4. If shop inspection do they have fabrication and QC 3) EXAMINED THE FOLLOWING ITEMS FOR CONFORMANCE procedures? I Yes No I I N/A TO THE SHOP DRAWINGS, AND AWS D1.1. INSPECTION A) MARK B412 (3) BEAM Yes NoN /A 1. Reviewed previous inspection reports? 5) MARK B418 (1) BEAM X C) MARK B416 (1) BEAM 2. Verified steel materials are incompliance by reviewing random samples of the mill test reports, steel ID X D) MARK B434 (1) BEAM markings or other documentation. E) MARK 5408 (2) BEAM 3. Verified weld fillermaterials conform. X F) MARK C415 (1) COLUMN 4. Checked steel members to see they were fabricated and G) MARK B417 (1) BEAM erected in accordance with the workmanship and X tolerances required. (CONT' D) 5. Checked welded studs and structural connections were REPORT SUMMARY installed as required. X 6. Verified high strength bolts and fasteners conform. X 1. Work inspected was: x Completed In progress 7. Verified the quality of welds produced by welders, 2. Completed work inspected was in comp liance with welding operators, and tackers conform. X P p p 8. Verified steel frame joint details forbracing, stiffening, Approved plans and specifications x Shop drawings member locations, and application of joint details at each X RFI I I Design change Submittal N A connection are in compliance by random sampling. Document #(s) SEE NARRATIVE Dated: WELDER INFORMATION 3. Noncompliance item(s) were noted this date, details on Welders Name: MULTIPLE CERTS ON FILE IN SHOP following page(s). Yes x No N/A Certification OFFICE 4. Noncompliance item(s) were reinspected this date, details Yes No N/A on following page(s). Yes I I No x N/A 1. Verified the contractor's Welding Procedure Conform 1 I Remain in progress Specifications are in conformance with X AWS requirements. 2. Verified the essential variables outlined in the Report(s) findings were discussed and left with Welding Procedure Specifications were X BRIAN employed during execution of the work. of INSTA FAB 3. Verified the weldability of reinforcing steel Based on the Code, approval is required from the Building Official before the other than ASTM A706. X SPECIAL INSPECTED items noted above can be covered. Carlson Testing has no authority to direct work of contractors or subcontractors. See additional report page(s). Distribute attachments. Page 1 of 1 Daily Report of Structural Steel For: 04/19/2012 CTI Job T1205903. Project: NIPPON BIOMASS COGENERATION PROJECT Notes: H) MARK B416 (1) BEAM S) MARK HB403 -L (1) BRACE END PIECE I) MARK C416 (1) COLUMN T) MARK HB402 -R (1) BRACE END PIECE J) MARK C413 (1) COLUMN U) MARK HB402 -L (1) BRACE END PIECE K) MARK C412 (1) COLUMN V) MARK HB405 -R (1) BRACE END PIECE L) MARK C419 (1) COLUMN W) MARK HB405 -L (1) BRACE END PIECE M) MARK C420 (1) COLUMN X) MARK HB400 -R (1) BRACE END PIECE N) MARK HB404 -L (1) BRACE END PIECE Y) MARK HB400 -L (1) BRACE END PIECE 0) MARK HB404 -R (1) BRACE END PIECE P) MARK H0407 -L (6) BRACE END PIECE Q) MARK HB407 -R (6) BRACE END PIECE R) MARK HB403 -R (1) BRACE END PIECE In some cases more than one box may be checked for a given item on the front page. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. Under all circumstances, the information contained in this report is provided subj ect to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. Reviewed By: Keith Gauvin Review Date: 04/27/2012 DEL /CK CC: NORTHWESTERN TERRITORIES INC SHAWN WEST SHAWN @NTI4U.COM 8430 SW HUNZIKER ST, TIGARD OR PO BOX 23814, TIGARD OR 97281 Bend Office (541) 330 -9155 Geotechnical Office (503) 601 -8250 C Eugene Office (541) 345- 0289 `1 Carlson Testing, Inc. Salem Office (503) 589 -1252 Tigard Office (503) 684 -3460 3 Daily Report of Structural Steel Client: NORTHWESTERN TERRITORIES INC SHAWN WEST Project: NIPPON BIOMASS COGENERATION PROJECT CTI Job T1205903 Address: INSTA -FAB VANCOUVER WA Jurisdiction: PORT ANGELES CTI representativeJ• PILAND OBOA 282 was on site this date Apr. 13, 2012 to perform Special Inspection for: Permit 11 1239 DFS #(s) PO Number: SCOPE OF INSPECTION Location of steel inspection [to include grid lines, elevations (floors) and drawing details]: 1. Checked in with superintendent, client or shop rep. Name: BRIAN THE FOLLOWING PC /MKS WERE COMPLETED PER AWS D1.1 Company: INSTA -FAB REQUIREMENTS: 2. Inspection was "IBC" Continuous x Periodic BEAMS: B455 (1) B458 B454 B445 B451 3. Work performed: In the field I x At fab shop B450 B452 5457 B447 B449 INS FAB B448(2) B446(3) B453 5411(4) B405 5430 B429 B443 B437 B440 4. If shop inspection do they have fabrication and QC 5422 B438 procedures? x Yes No N/A COLUMNS: C417 C421 C425 C404 INSPECTION Yes NoN /A 1. Reviewed previous inspection reports? WORKMANSHIP COMPLIES WITH AWS D1.1 REQUIREMENTS. X 2. Verified steel materials are in compliance by reviewing random samples of the mill test reports, steel ID X 1) SHOP DRAWINGS 03/04/12 AND 03/12/12 markings or other documentation. 2) REF. DWG D166592 -31 -S -061 (02/01/12) 3. Verified weld filler materials conform. X 3) AMEC TRANSMITTAL 23 (03/16/12) DRAWINGS 4. Checked steel members to see they were fabricated and erected in accordance with the workmanship and X tolerances required. 5. Checked welded studs and structural connections were REPORT SUMMARY installed as required. X 6. Verified high strength bolts and fasteners conform. x 1. Work inspected was: x Completed I I In progress 7. Verified the quality of welds produced by welders, welding operators, and tackers conform. X 2. Completed work inspected was in compliance with 8. Verified steel frame joint details for bracing, stiffening, Approved plans and specifications I XI Shop drawings member locations, and application of joint details at each x I RFI n Design change I I Submittal N/A connection are in compliance by random sampling. Document #(s) REF DWG 061 Dated: WELDER INFORMATION 3. Noncompliance item(s) were noted this date, details on Welders Name: DARYL 5 KEVIN E PAUL B following page(s). I I Yes No x N/A Certification C3114 W08089 C3116 4. Noncompliance item(s) were reinspected this date, details Yes NoN /A on following page(s). Yes No x N/A 1. Verified the contractor's Welding Procedure Conform Remain in progress Specifications are in conformance with X AWS requirements. 2. Verified the essential variables outlined in the Report(s) findings were discussed and left with .r Welding Procedure Specifications were BRIAN employed during execution of the work. X of INS TA FAB W` 3. Verified the weldability ofreinforcing steel Based on the Code, approval is required from the Building Official before the other than ASTM A706. X SPECIAL INSPECTED items noted above can be covered. Carlson Testing has no authority to direct work of contractors or subcontractors. See additional report page(s). I I Distribute attachments. Page 1 of 1 Daily Report of Structural Steel For: 04/13/2012 CTI Job T1205903. Project: NIPPON BIOMASS COGENERATION PROJECT Notes: In some cases more than one box may be checked for a given item on the front page. Our reports pertain to the material tested/inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. Under all circumstances, the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. Reviewed By: Keith Gauvin Review Date: 04/20/2012 JP /CK CC: NORTHWESTERN TERRITORIES INC SHAWN WEST SHAWN @NTI4U.COM 8430 SW HUNZIKER ST, TIGARD OR PO BOX 23814, TIGARD OR 97281 4 Bend Office (541) 330 -9155 i Geotechnical Office (503) 601 -8250 Carlson Testing, Inc. Sal Eugene Office 5 89 -1252 Tigard Office (503) 684 -3460 Daily Report of Structural Steel H Client: NORTHWESTERN TERRITORIES INC SHAWN WEST Project: NIPPON BIOMASS COGENERATION PROJECT CTI Job #7 T1205 Address: ®INSTA -FAB VANCOUVER WA Jurisdiction: PORT ANGELES CTI representative R. CANALES OBOA 637 /WABO SI 01419 was on site this date Mar. 19, 2012 to perform Special Inspection for: Permit 11 -1239 DFS #(s) PO Number: SCOPE OF INSPECTION Location of steel inspection [to include grid lines, elevations (floors) and drawing details]: 1. Checked in with superintendent, client or shop rep. Name: BRIAN VISUAL INSPECTION OF SINGLE -PASS FILLET AND AUTO Company: INSTA FAB CO INC STUD WELDING ON PCMK #'S (2) M103 -1, (2) M103 -2, (2) M103 -3, (2) M103 -4, (2) M105 -1, (2) M105 -2, 2. Inspection was "IBC" Continuous x Periodic (2 M105 3, (2) M105 COMPLETED PER ATLAS 3. Work performed: In the field x At fab shop SYSTEMS DRAWINGS DETAIL B/4000069 AND ATLAS MEMO INSTA -FAB CO INC DATED 02/23/2012. 4. If shop inspection do they have fabrication and QC procedures? x Yes I I No N/A i1 INSPECTION "'a Yes NoN /A 1. Reviewed previous inspection reports? x lik 2. Verified steel materials are in compliance by reviewing 111 2M random samples of the mill test reports, steel ID X I' markings or other documentation. ANGEL 3. Verified weld filler materials conform. x BUILDING 4. Checked steel members to see they were fabricated and erected in accordance with the workmanship and X tolerances required. 5. Checked welded studs and structural connections were REPORT SUMMARY installed as required. X 6. Verified high strength bolts and fasteners conform. x 1. Work inspected was: x Completed In progress 7. Verified the quality of welds produced by welders, 2. Completed work inspected was in compliance with welding operators, and tackers conform. x p p p 8. Verified steel frame joint details for bracing, stiffening, x Approved plans and specifications I Shop drawings member locations, and application of joint details at each X RFI Design change I I Submittal N A connection are in compliance by random sampling. Document #(s) SEE NOTES Dated: SEE NOTES WELDER INFORMATION 3. Noncompliance item(s) were noted this date, details on Welders Name: CURRENT CERTIFICATIONS ON FILE following page(s). I I Yes No x N/A Certification AT SHOP OFFICE 4. Noncompliance item(s) were reinspected this date, details Yes No N/A on following page(s). I I Yes I I No I XI N/A 1. Verified the contractor's Welding Procedure Specifications are in conformance with x I I Conform Remain in progress AWS requirements. 2. Verified the essential variables outlined in the Report(s) findings were discussed and left with Welding Procedure Specifications were BRIAN employed during execution of the work. x of INSTA FAB CO INC 3. Verified the weldability ofreinforcing steel Based on the Code, approval is required from the Building Official before the other than ASTM A706. X SPECIAL INSPECTED items noted above can be covered. Carlson Testing has no authority to direct work of contractors or subcontractors. See additional report page(s). Distribute attachments. Page 1 of 1 Daily Report of Structural Steel For: 03 /19 2 012 CTI Job T1205903. Project: NIPPON BIOMASS COGENERATION PROJECT Notes: DOCUMENT #(S): STRUCTURAL DRAWINGS DATED: 11/26/2011 ATLAS DRAWINGS 02/23/2012 In some cases more than one box may be checked for a given item on the front page. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. Under all circumstances, the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. Reviewed By: Keith Gauvin Review Date: 03/23/2012 RC /CBK CC: NORTHWESTERN TERRITORIES INC SHAWN WEST SHAWN @NTI4U.COM 8430 SW HUNZIKER ST, TIGARD OR PO BOX 23814, TIGARD OR 97281 i s 23 3 Bend Office (541) 330 -9155 FILE C P Eugen e Of e Office (503) 601 -8250 F Eugen Offic (541) 345 -0289 �arlson Testing, Inc• Salem Office (503) 589 -1252 Tigard Office (503) 684 -3460 Daily Report of Structural Steel Client: NORTHWESTERN TERRITORIES INC SHAWN WEST Project: NIPPON BIOMASS COGENERATION PROJECT CTI Job T1205903. Address: @INSTA -FAB VANCOUVER WA Jurisdiction: PORT ANGELES CTI representative CANALES OBOA 637 /WABO SI 01419 was on site this date Mar. 12, 2012 to perform Special Inspection for: Permit 11 -1239 DFS #(s) PO Number: SCOPE OF INSPECTION Location of steel inspection [to include grid lines, elevations (floors) and drawing details]: 1. Checked in with superintendent, client or shop rep. Name: BRIAN VISUAL INSPECTION OF SINGLE PASS FILLETS AND Company: INSTA FAB AUTO -STUD WELDING ON PC /MKS (2) M102 -1, (2) M102 -2, (2) M102 -3, (2) M102 -4, (2) M104 -1, (2) 2. Inspection was "IBC" Continuous x Periodic M104 -2, (2) M104 -3, (2) M104 -4 COMPLETED PER 3. Work performed: In the field X At fab shop ATLAS SYSTEMS DRAWINGS, DETAIL B/4000069; REFER INSTA FAB TO ATLAS MEMO DATED 02/23/12. 4. If shop inspection do they have fabrication and QC THE WORK DONE CONFORMS TO ENGINEER DETAILS AND procedures? x Yes No N/A THE VISUAL ACCEPTANCE CRITERIA OF AWS D1.1, TABLE 6.1. INSPECTION Yes NoN /A 1. Reviewed previous inspection reports? X 2. Verified steel materials are in compliance by reviewing random samples of the mill test reports, steel ID X markings or other documentation. DOC'S: STRUC. DRAWINGS (11/26/11) 3. Verified weld filler materials conform. X ATLAS DRAWINGS (02/28/12) 4. Checked steel members to see they were fabricated and erected in accordance with the workmanship and X tolerances required. 5. Checked welded studs and structural connections were REPORT SUMMARY installed as required. X 6. Verified high strength bolts and fasteners conform. x 1. Work inspected was: x Completed In progress 7. Verified the quality of welds produced by welders, 2. Completed work inspected was in comp ltance with welding operators, and tackers conform. X p p p 8. Verified steel frame joint details for bracing, stiffening, X Approved plans and specifications Shop drawings member locations, and application of joint details at each X RFI Design change I I Submittal I I N/A connection are in compliance by random sampling. Document #(s) SEE ABOVE Dated: WELDER INFORMATION 3. Noncompliance item(s) were noted this date, details on Welders Name: CURRENT CERTS ON FILE AT SHOP OFFICE following page(s). Yes No X N/A Certification 4. Noncompliance item(s) were reinspected this date, details Yes No N/A on following page(s). Yes No X N/A 1. Verified the contractor's Welding Procedure I I Conform Remain in progress Specifications are in conformance with X AWS requirements. 2. Verified the essential variables outlined in the Report(s) findings were discussed and left with Welding Procedure Specifications were X BRIAN employed during execution of the work. of INSTA FAB 3. Verified the weldability of reinforcing steel Based on the Code, approval is required from the Building Official before the other than ASTM A706. X SPECIAL INSPECTED items noted above can be covered. Carlson Testing has no authority to direct work of contractors or subcontractors. See additional report page(s). Distribute attachments. Page 1 of 1 Daily Report of Structural Steel For: 03/12/2012 CTI Job T1205903. Project: NIPPON BIOMASS COGENERATION PROJECT Notes: In some cases more than one box may be checked for a given item on the front page. Our reports pertain to the material tested/inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. Under all circumstances, the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. Reviewed By: Keith Gauvin Review Date: 03/21/2012 Rc /CK CC: NORTHWESTERN TERRITORIES INC SHAWN WEST SHAWN @NTI4U.COM 8430 SW HUNZIKER ST, TIGARD OR PO BOX 23814, TIGARD OR 97281 Bend Office (541) 330 -9155 Geotechnical Office (503) 601 -8250 Eugene Office (541) 345 -0289 Carlson Testing, Inc• Salem Office (503) 589 -1252 Tigard Office (503) 684-3460 Daily Report of Structural Steel Client: NORTHWESTERN TERRITORIES INC SHAWN WEST Project: NIPPON BIOMASS COGENERATION PROJECT CTI Job T1205903. Address: @INSTA -FAB VANCOUVER WA Jurisdiction: PORT ANGELES CTI representative R. CANALES OBOA 637 /WABO SI 01419 was on site this date Mar. 01, 2012 to perform Special Inspection for: Permit 11 -1239 DFS #(s) PO Number: SCOPE OF INSPECTION Location of steel inspection [to include grid lines, elevations (floors) and drawing details]: 1. Checked in with superintendent, client or shop rep. Name: BRIAN VISUAL INSPECTION OF COMPLETE JOINT PENETRATION Com ari INS TA FAB (CJP) WELDING ON #M108 (1) AND FILLET WELDS ON P y #M214 COMPLETED. 2. Inspection was "IBC" Continuous Periodic 3. Work performed: 0 In the field At fab shop CJP WELDING REPAIRS AND ULTRASONIC TESTING ON INSTA FAB THE OTHER #M108 COMPLETED. 4. If shop inspection do they have fabrication and QC THE WORK DONE CONFORMS TO ENGINEER DETAILS AND procedures? Yes I I No 0 N/A THE VISUAL ACCEPTANCE CRITERIA OF AWS D1.1, TABLE 6.1. INSPECTION Yes NoN /A 1 Reviewed previous inspection reports? X PERFORMED ULTRASONIC INSPECTION /TESTING ON COMPLETED JOINT PENETRATION SPLICES ON #M108. 2. Verified steel materials are in compliance by reviewing random samples of the mill test reports, steel ID X (SEE ATTACHED UT REPORT) markings or other documentation. 3. Verified weld filler materials conform. X 4. Checked steel members to see they were fabricated and DOC' S STRUCT DWGS (11/26/11) erected in accordance with the workmanship and X tolerances required. ENG. DETAIL (02/28/12) 5. Checked welded studs and structural connections were REPORT SUMMARY installed as required. X 6. Verified high strength bolts and fasteners conform. X 1. Work inspected was: in Completed In progress 7. Verified the quality of welds produced by welders, 2 Completed work inspected was in compliance with welding operators, and tackers conform. x P p p 8. Verified steel frame joint details for bracing, stiffening, Approved plans and specifications Shop drawings member locations, and application of joint details at each X RFI El Design change 0 Submittal 0 N/A connection are in compliance by random sampling. Document #(s) sEE ABOVE Dated: WELDER INFORMATION 3. Noncompliance item(s) were noted this date, details on Welders Name: CURRENT CERTS ON FILE AT SHOP OFFICE following page(s). 0 Yes 0 No N/A Certification 4. Noncompliance item(s) were reinspected this date, details Yes No N/A on following page(s). 0 Yes 0 No IN N/A 1. Verified the contractor's Welding Procedure progress ro Conform Remain in Specifications are in conformance with X p g AWS requirements. 2. Verified the essential variables outlined in the Report(s) findings were discussed and left with Welding Procedure Specifications were BRIAN employed during execution of the work. of INSTA FAB 3. Verified the weldability of reinforcing steel Based on the Code, approval is required from the Building Official before the other than ASTM A706. X SPECIAL INSPECTED items noted above can be covered. Carlson Testing has no authority to direct work of contractors or subcontractors. See additional report page(s). Distribute attachments. Page 1 of 2 Daily Report of Structural Steel For: 03/01/2012 CTI Job T1205903. Project: NIPPON BIOMASS COGENERATION PROJECT Notes: ULTRASONIC REPORT DATED 03/01/12 ATTACHED In some cases more than one box may be checked for a given item on the front page. Our reports pertain to the material tested/inspected only. Information contained herein is not to be reproduced, except in fi without prior authorization from this office. Under all circumstances, the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. Reviewed By: Keith Gauvin Review Date: 03/09/2012 RC /CK CC: NORTHWESTERN TERRITORIES INC SHAWN WEST SHAWN@NTI4U.COM 8430 SW HUNZIKER ST, TIGARD OR PO BOX 23814, TIGARD OR 97281 Bend Office (541) 330 -9155 Geotechnical Office (503) 601 -8250 Eugene Office (541) 345 -0289 C arlson Testing Inc. Salem Office (503) 589 -1252 Tigard Office (503) 684 -3460 Ultrasonic Test Report Client: NORTHWESTERN TERRITORIES INC SHAWN WEST Date: 03/01/2012 Project: NIPPON BIOMASS COGENERATION PROJECT CTI Job T1205903. Job Address: INSTA -FAB VANCOUVER WA PO Permit (s): 11 1239 Fab Shop Inspection At: INSTA FAB Drawing ENG. DETAIL DTD 02/28/12 Material: C/S Test Method Standard: CTI UT -1 Acceptance Standard: AWS D1.1 TABLE 6.2 Ultrasonic Unit SN: 0 09MM6 Ultrasonic Unit Model: KKB- USN -52C Transducer SN: 0255 ANGL/12954 STRGH Joint Description: BUTT JOINT, CJP, BACK GOUGING d a Decibels Defect Distance O a -�5 u Z W v M q pq q o Aa G L y c w ftS i O b v b b .y t- ]-i d L L H a c� ti 4 d p v C r a.� ti Weld Identification Ae 4 E, ,°'j 4 a d w a a q A -Y Elevation, Grid Orientation, From From Specific Weld a h c d "X" Y" 1 (1) M108 (2) BUTT X 68.5 A/B 1 -3 58.0 SPLICE WELDS Please see reverse side for additional information. IN Distribute attachments. Page 1 of 1 Job Number: T1205903. Date Of Test: 03/01/2012 c iu Decibels Defect Distance a O :r o Pa G q u Z p F M O 'v u b .Y u u w L cl Weld Identification t x F w g a 1 d w- g a ;441 FS 4 A A d Elevation, Grid Orientation, From From Specific Weld a b c d "X" "Y" Lamination scans were performed: Yes 0 No fl N/A Typist: CK Remarks: (2) INSPECTED /TESTED WELDS. NO REJECTABLE INDICATIONS NOTED. CC: NORTHWESTERN TERRITORIES INC SHAWN WEST SHAWNONTI4U.COM Test results were brought to the attention of: BRIAN with: INSTA -FAB Name Company Inspector: R. CANALES II Name Level Certification Number Reviewed By: Keith Gauvin On 03/09/2012 Our reports pertain to the material tested/inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. Under all circumstances, the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. 8430 SW HUNZIKER ST, TIGARD OR PO BOX 23814, TIGARD OR 97281 Bend Office (541) 330 -9155 Geotechnical Office (503) 601 -8250 Carlson Testing, Inc. Eugene Offi�ee (541) 589 -1252 Tigard Office (503) 684 -3460 Daily Report of Structural Steel Client: NORTHWESTERN TERRITORIES INC SHAWN WEST Project: NIPPON BIOMASS COGENERATION PROJECT CTI Job T1205903. Address: @INSTA -FAB VANCOUVER WA Jurisdiction: PORT ANGELES CTI representativeR. CANALES OBOA 637 /WABO SI 01419 was on site this date Feb 29, 2 012 to perform Special Inspection for: Permit 11 1239 DFS #(s) PO Number: SCOPE OF INSPECTION Location of steel inspection [to include grid lines, elevations (floors) and drawing details]: 1. Checked in with superintendent, client or shop rep. Name: BRIAN VT INSPECTION OF CJP WELDING ON (2) #M108 EMBED Company: INSTA FAB SECTIONS. (1) SECTION IS BEING REPAIRED WITH SPLICES OF ADDED ON PIECES TO GET CORRECT LENGTH. 2. Inspection was "IBC" x Continuous Periodic THAT REPAIR IS DONE. WILL UT TEST AFTER PIECE HAS 3. Work performed: In the field x At fab shop COOLED DOWN (NEXT AM) ALL OTHER WELDING NOT INSTA FAB COMPLETED AT THIS TIME. 4. If shop inspection do they have fabrication and QC THE WORK BEING DONE CONFORMS TO ENGINEER DETAILS procedures? x Yes I I No N/A AND THE VISUAL ACCEPTANCE CRITERIA OF AWS D1.1, TABLE 6.1. INSPECTION Yes NoN /A 1. Reviewed previous inspection reports? 2. Verified steel materials are in compliance by reviewing random samples of the mill test reports, steel ID X markings or other documentation. 3. Verified weld fillermaterials conform. 4. Checked steel members to see they were fabricated and erected in accordance with the workmanship and X tolerances required. 5. Checked welded studs and structural connections were REPORT SUMMARY installed as required. X 6. Verified high strength bolts and fasteners conform. x 1. Work inspected was: I x I Completed In progress 7. Verified the quality of welds produced by welders, 2. Comp leted work inspected was in compliance with welding operators, and tackers conform. x p p p 8. Verified steel framejointdetailsforbracing ,stiffening, x Approved plans and specifications I I Shop drawings member locations, and application of joint details at each X RFI Design change Submittal N /A connection are in compliance by random sampling. Document #(s) STRUCT. DRAWING Dated: 11/26/2011 WELDER INFORMATION 3. Noncompliance item(s) were noted this date, details on Welders Name: CURRENT CERTS ON FILE AT SHOP OFFICE following page(s). Yes No I x I N/A Certification 4. Noncompliance item(s) were reinspected this date, details Yes No N/A on following page(s). I I Yes No x N/A 1. Verified the contractor's Welding Procedure Specifications are in conformance with X Conform I I Remain in progress AWS requirements. 2. Verified the essential variables outlined in the Report(s) findings were discussed and left with Welding Procedure Specifications were x BRIAN employed during execution of the work. of INSTA FAB 3. Verified the weldability ofreinforcing steel Based on the Code, approval is required from the Building Official before the other than ASTM A706. X SPECIAL INSPECTED items noted above can be covered. Carlson Testing has no authority to direct work of contractors or subcontractors. See additional report page(s). Distribute attachments. Page 1 of Daily Report of Structural Steel For: 02/29/2012 CTI Job T1205903. Project: NIPPON BIOMASS COGENERATION PROJECT Notes: In some cases more than one box may be checked for a given item on the front page. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. Under all circumstances, the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. Reviewed By: Keith Gauvin Review Date: 03/12/2012 RC /PL CC: NORTHWESTERN TERRITORIES INC SHAWN WEST SHAWN @NTI4U.COM 8430 SW HUNZIKER ST, TIGARD OR PO BOX 23814, TIGARD OR 97281 i (;;F JJ ro: B end Office (541) 330 -9155 l%/�'yt Geotechnical Office (503) 601 -8250 Eugene Office (541) 345 -0289 O• Carlson Testing, Inc. Salem Office (503) 589 -1252 Tigard Office (503) 684 -3460 Daily Report of Structural Steel 3 Client: NORTHWESTERN TERRITORIES INC SHAWN WEST 9 Project: NIPPON BIOMASS COGENERATION PROJECT Cj'I Job T1205903 Address: @INSTA -FAB VANCOUVER WA Jurisdiction: PORT ANGELES CTI representative R. CANALES OBOA 637/WABO SI 01419 was on site this date Feb. 28, 2012 to perform Special Inspection for: Permit 11 -123 DFS #(s) PO Number: '0 SCOPE OF INSPECTION Location of steel inspection [to include grid lines, elevations (floors) and drawing details]: 1. Checked in with superintendent, client or shop rep. Name: BRIAN VT INSPECTION OF CJP WELDING ON EMBED PIECEMARK Company: INSTA FAB #'S: (1) M106, (2) M107 COMPLETED. 2. Inspection was "IBC" I x I Continuous Periodic THE WORK DONE CONFORMS TO ENGINEER DETAILS AND 3. Work performed: In the field x At fab shop THE VISUAL ACCEPTANCE CRITERIA OF AWS D1.4. INSTA FAB 4. If shop inspection do they have fabrication and QC procedures? x Yes I No N/A INSPECTION Yes NoN /A 1. Reviewed previous inspection reports? 2. Verified steel materials are in compliance by reviewing random samples of the mill test reports, steel ID X markings or other documentation. 3. Verified weld filler materials conform. 4. Checked steel members to see they were fabricated and erected in accordance with the workmanship and X tolerances required. 5. Checked welded studs and structural connections were REPORT SUMMARY installed as required. X 6. Verified high strength bolts and fasteners conform. x 1. Work inspected was: x Completed I On progress 7. Verified the quality of welds produced by welders, 2. Completed work inspected was in compliance with welding operators, and tackers conform. x p p p 8. Verified steel frame joint details for bracing, stiffening, x Approved plans and specifications I x Shop drawings member locations, and application of joint details at each X RFI Design change 1 I Submittal I I N/A connection are in compliance by random sampling. Document #(s) STRUCT. DRAWING Dated: 11/26/2011 WELDER INFORMATION 3. Noncompliance item(s) were noted date, details on Welders Name: CURRENT CERTS ON FILE AT SHOP OFFICE following page(s). Yes n No x N/A Certification 4. Noncompliance item(s) were reinspected this date, details Yes No N/A on following page(s). Yes I I No x N/A 1. Verified the contractor's Welding Procedure Specifications are in conformance with X Conform Remain in progress AWS requirements. 2. Verified the essential variables outlined in the Report(s) findings were discussed and left with Welding Procedure Specifications were BRIAN employed during execution of the work. x of INSTA FAB 3. Verified the weldability ofreinforcing steel Based on the Code, approval is required from the Building Official before the other than ASTM A706. X SPECIAL INSPECTED items noted above can be covered. Carlson Testing has no authority to direct work of contractors or subcontractors. See additional report page(s). Distribute attachments. Page 1 of 1 Daily Report of Structural Steel For: 02/28/2012 CTI Job T1205903. Project: NIPPON BIOMASS COGENERATION PROJECT Notes: In some cases more than one box may be checked for a given item on the front page. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. Under all circumstances, the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARL SON TESTING, INC. Reviewed By: Keith Gauvin Review Date: 03/09/2012 RC /PL CC: NORTHWESTERN TERRITORIES INC SHAWN WEST SHAWN @NTI4U.COM 8430 SW HUNZIKER ST, TIGARD OR PO BOX 23814, TIGARD OR 97281 Bend Office (541) 330 -9155 Geotechnical Office (503) 601 -8250 Eugene Office (541) 345 -0289 Carlson Testing, Inc• Salem Office (503) 589 -1252 f` Tigard Office (503) 684 -3460 Daily Report of Structural Steel Client: NORTHWESTERN TERRITORIES INC SHAWN WEST Project: NIPPON BIOMASS COGENERATION PROJECT CTI Job T1205903. Address: @INSTA -FAB VANCOUVER WA Jurisdiction: PORT ANGELES CTI representative R. CANALES OBOA 637 /WABO SI 01419 was on site this date Feb. 27, 2 012 to perform Special Inspection for: Permit 11 -1239 DFS #(s) PO Number: SCOPE OF INSPECTION Location of steel inspection [to include grid lines, elevations (floors) and drawing details]: 1. Checked in with superintendent, client or shop rep. Name: BRIAN VT INSPECTION OF CJP WELDING ON EMBED #'S M106, Company: INSTA FAB M107. WELDING NOT COMPLETED AT THIS TIME. 2. Inspection was "IBC" x Continuous Periodic THE WORK BEING DONE CONFORMS TO ENGINEER DETAILS 3. Work performed: In the field x At fab shop AND THE VISUAL ACCEPTANCE CRITERIA OF AWS D1.1, INSTA FAB TABLE 6.1. 4. If shop inspection do they have fabrication and QC procedures? x Yes No N/A INSPECTION Yes NoN /A 1. Reviewed previous inspection reports? x 2. Verified steel materials are in compliance by reviewing random samples of the mill test reports, steel ID X markings or other documentation. 3. Verified weld fillermaterials conform. x 4. Checked steel members to see they were fabricated and erected in accordance with the workmanship and X tolerances required. 5. Checked welded studs and structural connections were REPORT SUMMARY installed as required. X 6. Verified high strength bolts and fasteners conform. x 1. Work inspected was: Completed I xl In progress 7. Verified the quality of welds produced by welders, 2. Completed work inspected was in compliance with welding operators, and tackers conform. X p p p 8. Verified steel frame joint details for bracing, stiffening, x Approved plans and specifications I Shop drawings member locations, and application of joint details at each X RFI n Design change Submittal N/A connection are in compliance by random sampling. Document #(s) STRUCT. DRAWINGS Dated: 11/26/2011 WELDER INFORMATION 3. Noncompliance item(s) were noted this date, details on Welders Name: CURRENT CERTS ON FILE AT SHOP OFFICE following page(s). Yes I I No I N/A Certification 4. Noncompliance item(s) were reinspected this date, details Yes No N/A on following page(s). Yes No I N/A 1. Verified the contractor's Welding Procedure Specifications are in conformance with X I I Conform Remain in progress AWS requirements. 2. Verified the essential variables outlined in the Report(s) findings were discussed and left with Welding Procedure Specifications were x BRIAN employed during execution of the work. of INSTA FAB 3. Verified the weldability of reinforcing steel Based on the Code, approval is required from the Building Official before the other than ASTM A706. X SPECIAL INSPECTED items noted above can be covered. Carlson Testing has no authority to direct work of contractors or subcontractors. See additional report page(s). Distribute attachments. Page 1 of Dail Report of Structural Steel For: 02/27/2012 CTI Job T1205903. Project: NIPPON BIOMASS COGENERATION PROJECT Notes: In some cases more than one box may be checked for a given item on the front page. Our reports pertain to the material tested/inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. Under all circumstances, the information contained in this report is provided subject to all terms and conditions ofCTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. Reviewed By: Keith Gauvin Review Date: 03/07/2012 RC /PL CC: NORTHWESTERN TERRITORIES INC SHAWN WEST SHAWN @NTI4U.COM 8430 SW HUNZIKER ST, TIGARD OR PO BOX 23814, TIGARD OR 97281 Bend Office (541) 330 -9155 Geotechnical Office (503) 601 -8250 Carlson Testing, Inc. Eugene o fee (541) 589 -1252 Tigard Office (503) 684 -3460 Daily Report of Structural Steel Client: NORTHWESTERN TERRITORIES INC SHAWN WEST Project: NIPPON BIOMASS COGENERATION PROJECT CTI Job T1205903. Address: ®INSTA -FAB VANCOUVER WA Jurisdiction: PORT ANGELES CTI representativeR. CANALES OBOA 637 /WABO SI 01419 was on site this date Feb. 24, 2012 to perform Special Inspection for: Permit 11 -1239 DFS #(s) PO Number: SCOPE OF INSPECTION Location of steel inspection [to include grid lines, elevations (floors) and drawing details]: 1. Checked in with superintendent, client or shop rep. Name: BRIAN VISUAL INSPECTION OF COMPLETE JOINT PENETRATION Company: INSTA FAB WELDING ON (2) M106 (1) IS COMPLETED FLARE BEVEL GROOVE WELDING ON #'S M203, M204, M205, 2. Inspection was "IBC" x Continuous Periodic M206, M207, M208, M209, M210, M211, M212, M213, 3. Work performed: In the field X At fab shop M214 COMPLETED INSTA -FAB S' REFERENCE STR if VI AV• WINGS AND SHOP DRAWINGS. 4. If shop inspection do they have fabrication and QC THE WORK DONE CON i TO ENGINEER DETAILS AND procedures? x Yes No N/A THE VISUAL ACCEPTANCE CRITERIA OF AWS D1.1, TABLE 6.1. INSPECTION Yes NoN /A 1. Reviewed previous inspection reports? X 2. Verified steel materials are in compliance by reviewing random samples of the mill test reports, steel ID X markings or other documentation. 3. Verified weld filler materials conform. X 4. Checked steel members to see they were fabricated and erected in accordance with the workmanship and X tolerances required. 5. Checked welded studs and structural connections were REPORT SUMMARY installed as required. X 6. Verified high strength bolts and fasteners conform. x 1. Work inspected was: x Completed In progress 7. Verified the quality of welds produced by welders, welding operators, and tackers conform. X 2. Completed work inspected was in compliance with 8. Verified steel frame joint details for bracing, stiffening, x Approved plans and specifications Shop drawings member locations, and application of joint details at each X RFI Design change I 1 Submittal N /A connection are in compliance by random sampling. Document #(s) STRUCTURAL DRAWING Dated: 11/26/2011 WELDER INFORMATION 3. Noncompliance item(s) were noted this date, details on Welders Name: CURRENT CERTIFICATION ON FILE following page(s). 1 1 Yes No x N/A Certification AT SHOP OFFICE 4. Noncompliance item(s) were reinspected this date, details CW Yes No N/A on following page(s). I Yes No I x1 N/A 1. Verified the contractor's Welding Procedure Conform 1 1 Remain in progress Specifications are in conformance with X AWS requirements. 2. Verified the essential variables outlined in the Report(s) findings were discussed and left with Welding Procedure Specifications were x BRIAN employed during execution of the work. of INS TA FAB 3. Verified the weldability ofreinforcing steel Based on the Code, approval is required from the Building Official before the other than ASTM A706. X SPECIAL INSPECTED items noted above can be covered. Carlson Testing has no authority to direct work of contractors or subcontractors. O See additional report page(s). Distribute attachments. Page 1 of 1 Daily Report of Structural Steel For: 02/24/2012 CTI Job T1205903. Project: NIPPON BIOMASS COGENERATION PROJECT Notes: In some cases more than one box may be checked for a given item on the front page. Our reports pertain to the material tested/inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. Under all circumstances, the information contained in this report is provided subj ect to all terms and conditions ofCTl's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSONTESTING, INC. Reviewed By: Keith Gauvin Review Date: 03/02/2012 RC /CBK CC: NORTHWESTERN TERRITORIES INC SHAWN WEST SHAWN @NT14U. COM 8430 SW HUNZIKER ST, TIGARD OR PO BOX 23814, TIGARD OR 97281 Bend Office (541) 330 -9155 Geotechnical Office (503) 601 -8250 Carlson Testing, Inc. Eugene cs�e (503) 589 -1252 Tigard Office (503) 684 -3460 Daily Report of Structural Steel Client: NORTHWESTERN TERRITORIES INC SHAWN WEST Project: NIPPON BIOMASS COGENERATION PROJECT CTI Job T1205903. Address: @INSTA -FAB VANCOUVER WA Jurisdiction: PORT ANGELES CTI representative CANALES OBOA 637 /WABO SI 01419 was on site this date Feb. 23 2012 to perform Special Inspection for: Permit 11 -1239 DFS #(s) PO Number: SCOPE OF INSPECTION Location of steel inspection [to include grid lines, elevations (floors) and drawing details]: 1. Checked in with superintendent, client or shop rep. Name: BRIAN VISUAL INSPECTION OF COMPLETE JOINT PENETRATION Company: INSTA FAB WELDING ON (2) M106 IN PROGRESS. 2. Inspection was "IBC" X Continuous I l Periodic SINGLE PASS FILET WELDS ON PC MK #'S (2) M200, 3. Work .performed: In the field I x 1 At fab shop M202, M201, B200 COMPLETED. REFERENCE INSTA STRUCTURAL DRAWING AND SHOP DRAWING. 4. If shop inspection do they have fabrication and QC THE WORK DONE CONFORMS TO ENGINEER DETAILS AND procedures? x Yes No N/A THE VISUAL ACCEPTANCE CRITERIA OF AWS D1.1, TABLE 6.1 AND AWS D1.4. INSPECTION Yes NoN /A 1. Reviewed previous inspection reports? X 2. Verified steel materials are in compliance by reviewing random samples of the mill test reports, steel ID X markings or other documentation. 3. Verified weld filler materials conform. x 4. Checked steel members to see they were fabricated and erected in accordance with the workmanship and X tolerances required. 5. Checked welded studs and 'structural connections were REPORT SUMMARY installed as required. X 6. Verified high strength bolts and fasteners conform. X 1. Work inspected was: x Completed In progress 7. Verified the quality of welds produced by welders, 2. Completed work inspected was in compliance with 1 welding operators, and tackers conform. X p p p 8. Verified steel frame joint details for bracing, stiffening, x Approved plans and specifications I Shop drawings member locations, and application of joint details at each X RFI 1 Design change I I Submittal N/A connection are in compliance by random sampling. Document #(s) STRUCTURAL DRAWING Dated: 11/26/2011 WELDER INFORMATION 3. Noncompliance item(s) were noted this date, details on Welders Name: CURRENT CERTIFICATION ON FILE following page(s). I I Yes 1 I No X N/A Certification AT SHOP OFFICE 4. Noncompliance item(s) were reinspected this date, details Yes No N/A on following page(s). Yes No I X I N/A 1. Verified the contractor's Welding Procedure progress ro i i Reman n Specifications are in conformance with X Conform p g AWS requirements. 2. Verified the essential variables outlined in the Report(s) findings were discussed and left with Welding Procedure Specifications were X BRIAN employed during execution of the work. of INSTA -FAB 3. Verified the weldability ofreinforcing steel Based on the Code, approval is required from the Building Official before the other than ASTM A706. X SPECIAL INSPECTED items noted above can be covered. Carlson Testing has no authority to direct work of contractors or subcontractors. See additional report page(s). 1 1 Distribute attachments. Page 1 of Daily Report of Structural Steel For: 02/23/2012 '11 CTI Job T1205903. Project: NIPPON BIOMASS COGENERATION PROJECT Notes: In some cases more than one box may be checked for a given item on the front page. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except m full, without prior authorization from this office. Under all circumstances, the information contained in this report is provided subj ect to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. Reviewed By: Keith Gauvin Review Date: 03/02/2012 RC /CBK CC: NORTHWESTERN TERRITORIES INC SHAWN WEST SHAWN @NT14U.COM 8430 SW HUNZIKER ST, TIGARD OR PO BOX 23814, TIGARD OR 97281 Bend Office (541) 330 -9155 Geotechnical Office (503) 601 -8250 Carlson Testing, Eugene Office (541) 345 -0289 ing Inc. I Salem Office (503) 589 -1252 Tigard Office (503) 684 -3460 Daily Report of Structural Steel Client: NORTHWESTERN TERRITORIES INC SHAWN WEST Project: NIPPON BIOMASS COGENERATION PROJECT CTI Job T1205903. Address: INSTA -FAB VANCOUVER WA Jurisdiction: PORT ANGELES CTI representative R. CANALES OBOA 637 /WABO SI 01419 was on site this date Feb 21, 2012 to perform Special Inspection for: Permit 11 1239 DFS #(s) PO Number: SCOPE OF INSPECTION Location of steel inspection [to include grid lines, elevations (floors) and drawing details]: 1. Checked in with superintendent, client or shop rep. Name: BRIAN VISUAL INSPECTION OF COMPLETE JOINT PENETRATION Company: INSTA-FAB (CJP) WELDING ON (14) M100 EMBEDS PER SO40 AND 2/041 COMPLETED. 2. Inspection was "IBC" I X I Continuous Periodic 3. Work performed: In the field x At fab shop THE WORK DONE CONFORMS TO ENGINEER DETAILS AND INSTA FAB THE VISUAL ACCEPTANCE CRITERIA OF AWS D1.1, TABLE 6.1. 4. If shop inspection do they have fabrication and QC procedures? I x I Yes I I No, N/A INSPECTION Yes NoN /A 1. Reviewed previous inspection reports? x 2. Verified steel materials are in compliance by reviewing random samples of the mill test reports, steel ID X markings or other documentation. 3. Verified weld filler materials conform. x 4. Checked steel members to see they were fabricated and erected in accordance with the workmanship and X tolerances required. 5. Checked welded studs and structural connections were REPORT SUMMARY installed as required. X 6. Verified high strength bolts and fasteners conform. x 1. Work inspected was: x Completed In progress 7. Verified the quality of welds produced by welders, welding operators, and tackers conform. 2. Completed work inspected was in compliance with X 8. Verified steel frame joint details for bracing, stiffening, x Approved plans and specifications I I Shop drawings member locations, and application of joint details at each X RFI I-I Design change n Submittal N/A connection are in compliance by random sampling. Document #(s) STRUCTURAL DWGS Dated: 11/26/11 WELDER INFORMATION 3. Noncompliance item(s) were noted this date, details on Welders Name: CURRENT CERTS ON FILE AT SHOP OFFICE following page(s). Yes No x N/A Certification 4. Noncompliance item(s) were reinspected this date, details Yes No N/A on following page(s). Yes No x N/A 1. Verified the contractor's Welding Procedure Conform I I Remain in progress Specifications are in conformance with X AWS requirements. 2. Verified the essential variables outlined in the Report(s) findings were discussed and left with Welding Procedure Specifications were BRIAN employed during execution of the work. of INSTA FAB 3. Verified the weldability ofreinforcing steel Based on the Code, approval is required from the Building Official before the other than ASTM A706. X SPECIAL INSPECTED items noted above can be covered. Carlson Testing has no authority to direct work of contractors or subcontractors. See additional report page(s). I I Distribute attachments. Page 1 of 1 Daily Report of Structural Steel For: 02/21/2012 CTI Job T1205903. Project: NIPPON BIOMASS COGENERATION PROJECT Notes: In some cases more than one box may be checked for a given item on the front page. Our reports pertain to the material tested/inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. Under all circumstances, the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. Reviewed By: Keith Gauvin Review Date: 03/06/2012 RC /CK CC: NORTHWESTERN TERRITORIES INC SHAWN WEST SHAWN @NT14U.COM 8430 SW HUNZIKER ST, TIGARD OR PO BOX 23814, TIGARD OR 97281