Loading...
HomeMy WebLinkAboutPermit H: Inspection Reports May 17, 2012 On Wed. May 1:6, 2012, I performed a weld inspection on a "pipe bridge walkway", Instafab drawing/ job 12006, sheetE402, Rev 0, JI-1 Kelley-contractor, Dallas Stalheim- welder (welder certifications on file at NTI) at the Nippon Paper facility, Port Angeles, WA. Numerous fillet, and several CJP groove welds were inspected. All welds were found to be consistent with the contract specifications, design drawings (mentioned above) and AWS D1.1. All welds inspected were of structural steel; no pipe welds were inspected. 5 Tom Gentilo, CWI 06 5/