Loading...
HomeMy WebLinkAbout5.564 Original Contract 5. 5104 .7 AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN q�182001 THE CITY OF PORT ANGELES AND METROPOLITAN COMMUNICATIONS CONSULTANTS RELATING TO: PORT ANGELES TELECOMMUNICATIONS NETWORK DEVELOPMENT THIS AGREEMENT is made and entered into this /3Lday of February 2001, by and between THE CITY OF PORT ANGELES, a non charter code city of the State of Washington, (hereinafter called the "CITY and METROPOLITAN COMMUNICATIONS CONSULTANTS, a Washington Limited Liability Corporation (hereinafter called the "CONSULTANT WHEREAS, the CITY desires to develop the Port Angeles Telecommunications Network, the first step of which is the preparation of design and construction documents for the City's fiber optic backbone, and WHEREAS, the CITY desires to engage the professional services and assistance of a qualified consulting firm to perform the scope of work as detailed in Exhibits A, B and C, and WHEREAS, the CONSULTANT represents that it is in full compliance with the statutes of the State of Washington for professional registration and /or other applicable requirements, and WHEREAS, the CONSULTANT represents that it has the background, experience, and ability to perform the required work in accordance with the standards of the profession, and WHEREAS, the CONSULTANT represents that it will provide qualified personnel and appropriate facilities necessary to accomplish the work; NOW, THEREFORE, in consideration of the above representations and the terms, conditions, covenants and agreements set forth below, the parties hereto agree as follows: I SCOPE OF WORK The scope of professional services to be performed and the results to be achieved by the CONSULTANT shall be as detailed in the attached Exhibit A and shall include all services and material necessary to accomplish the work. The scope of work includes professional services for preparation of the fiber optic backbone and core customer drops design, critical materials identification for advance purchase, assistance during the construction bidding process, construction phase services, a request for proposal for equipment needed to activate the fiber optic backbone, assistance during the request for proposal process, and equipment installation construction phase services. The CITY may review applicable segments of the CONSULTANT'S work product at the designated milestones set up in the CONSULTANT'S Work Process Control Flow Chart, attached hereto as Exhibit D. Upon completion of review, the City shall approve the work segment or request revisions if the work segment is incomplete or unsatisfactory If the work segment is not satisfactory, the CONSULTANT shall make such changes as may be required by the CITY Such changes shall not constitute "Extra Work" as related in Section XI of this Agreement. The CONSULTANT agrees that all services performed under this Agreement shall be in accordance with the standards of the profession and in compliance with applicable federal, state and local laws. The Scope of Work may be amended upon written approval of both parties. II OWNERSHIP OF DOCUMENTS Upon completion of the work, all documents, exhibits, photographic negatives, or other presentations of the work shall become the property of the CITY for use without restriction and without representation as to suitability for reuse by any other party unless specifically verified or adapted by the CONSULTANT However, any alteration or reuse of the documents, by the City or by others acting through or on behalf of the City, will be City of Port Angeles page 1 2/6/2001 treatment of all persons, without respect to race, creed or national origin, or other legally protected classification and, in particular: A. The CONSULTANT shall maintain open hiring and employment practices and will welcome applications for employment in all positions, from qualified individuals who are members of minorities protected by federal equal opportunity /affirmative action requirements; and, B. The CONSULTANT shall comply with all requirements of applicable federal, state or local laws or regulations issued pursuant thereto, relating to the establishment of non discriminatory requirements in hiring and employment practices and assuring the service of all persons without discrimination as to any person's race, color, religion, sex, Vietnam era veteran status, disabled veteran condition, physical or mental handicap, or national origin. IX SUBCONTRACTS A. The CONSULTANT shall not sublet or assign any of the work covered by this Agreement without the written consent of the CITY. B. The CONSULTANT will be using the firms submitted with its proposal as subcontractors. Subcontractors other than those listed shall not be permitted without the written consent of the CITY. C. In all solicitation either by competitive bidding or negotiation made by the CONSULTANT for work to be performed pursuant to a subcontract, including procurement of materials and equipment, each potential subconsultant or supplier shall be notified by the CONSULTANT of Consultant's obligations under this Agreement, including the nondiscrimination requirements. X CHANGES IN WORK Other than changes directed by the CITY as set forth in Section I above, either party may request changes in the scope of work. Such changes shall not become part of this Agreement unless and until mutually agreed upon and incorporated herein by written amendments to this Agreement executed by both parties. XI EXTRA WORK The CITY may desire to have the CONSULTANT perform work or render services in connection with this project, in addition to the Scope of Work set forth in Exhibit A and minor revisions to satisfactorily completed work. Such work shall be considered as "Extra Work" and shall be addressed in a written supplement to this Agreement. The CITY shall not be responsible for paying for such extra work unless and until the written supplement is executed by both parties. XII TERMINATION OF AGREEMENT A. The CITY may terminate this Agreement at any time upon not less than thirty (30) days written notice to the CONSULTANT. Written notice will be by certified mail sent to the consultant's designated representative at the address provided by the CONSULTANT. B. In the event this Agreement is terminated prior to the completion of the work, a final payment shall be made to the CONSULTANT, which, when added to any payments previously made, shall compensate the CONSULTANT for the percentage of work completed. C In the event this Agreement is terminated prior to completion of the work, documents that are the property of the CITY pursuant to Section I I above, shall be delivered to and received by the CITY prior to transmittal of final payment to the CONSULTANT. XIII INDEMNIFICATION /HOLD HARMLESS The CONSULTANT agrees to indemnify the CITY from any claims, damages, losses, and costs, including, but not limited to, attorney's fees and litigation costs, arising out of claims by third parties for property damage and bodily injury, including death, caused solely by the negligence or willful misconduct of the CONSULTANT, City of Port Angeles page 3 2/6/2001 CONSULTANT employees, affiliated corporations, officers, and subcontractors in connection with the work performed under this Agreement. The CITY agrees to indemnify the CONSULTANT from any claims, damages, losses, and costs, including, but not limited to, attorney's fees and litigation costs, arising out of claims by third parties for property damage and bodily injury, including death, caused solely by the negligence or willful misconduct of the CITY, CITY's employees, or agents in connection with the work performed under this Agreement. If the negligence or willful misconduct of both CONSULTANT and CITY (or a person identified above for whom each is liable) is a cause of such damage or injury, the loss, cost, or expense shall be shared between the CONSULTANT and the CITY in proportion to their relative degrees of negligence or willful misconduct and the right of indemnity shall apply for such proportion. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the CONSULTANT and the CITY, its officers, officials, employees, and volunteers, the CONSULTANT'S liability hereunder shall be only to the extent of the CONSULTANT'S negligence. It is further specifically and expressly understood that the indemnification provided herein constitutes the CONSULTANT'S waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. The parties have mutually negotiated this waiver. The provisions of this section shall survive the expiration or termination of this Agreement However, the CONSULTANT expressly reserves its rights as a third person set forth in RCW 51.24.035. XIV INSURANCE The CONSULTANT shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the CONSULTANT, its agents, representatives, employees or subcontractors. The CONSULTANT shall provide a Certificate of Insurance evidencing: 1. Automobile Liability insurance with limits no less than $1,000,000 combined single limit per accident for bodily injury and property damage; and, 2. Commercial General Liability insurance written on an occurrence basis with limits no less than $1,000,000 combined single limit per occurrence and $2,000,000 aggregate for personal injury, bodily injury and property damage. Coverage shall include but not be limited to. blanket contractual; products /completed operations; broad form property damage; explosion, collapse and underground (XCU) if applicable; and employer's liability; and, 3. Professional Liability insurance with limits no less than $1,000,000 limit per occurrence. Any payment of deductible or self insured retention shall be the sole responsibility of the CONSULTANT. The CITY shall be named as an additional insured on the Commercial General Liability insurance policy, as respects work performed by or on behalf of the Consultant and a copy of the endorsement naming the CITY as additional insured shall be attached to the Certificate of Insurance. The CITY reserves the right to review a certified copy of all required insurance policies in the CONSULTANT'S office. The CONSULTANT'S insurance shall contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. The CONSULTANT'S insurance shall be primary insurance as respects the CITY, and the CITY shall be given thirty (30) days prior written notice of any cancellation, suspension or material change in coverage. XV APPLICABLE LAW This Agreement shall be construed and interpreted in accordance with the laws of the State of Washington, and in the event of dispute the venue of any litigation brought hereunder shall be Clallam County. City of Port Angeles page 4 2/6/2001 XVI EXHIBITS AND SIGNATURES This Agreement, including its exhibits, constitutes the entire Agreement, supersedes all prior written or oral understandings, and may only be changed by a written amendment executed by both parties. The following exhibits are hereby made a part of this Agreement: Exhibit A Scope of Work, Project Schedule, Lump Sum Costs Exhibit B Scope of Work, Detailed Task Descriptions Exhibit C Assumptions and Conditions Exhibit D Consultant's Work Process Control Flow Chart In WITNESS THEREOF, the parties hereto have executed this Agreement as of the day and year first written above. CITY OF PORT ANG S MIP YOR -0" ME POLITAN COMMUNICATIONS CONSULTANTS 4,4 c..,,T, PRESIDENT APPROVED AS TO FORM: CRAIG KNUTS Y ATTORNEY ATTEST: BECKY UPT CI CLERK City of Port Angeles page 5 2/6/2001 Exhibit A Scope of Work, Project Schedule, Lump Sum Costs Stage 1 Backbone 100 Core Drops Design Completion By Lump Sum Total Project 1a Backbone and Core Drops, Design begin 03/21/01 Task 1.a.1 Project management 07/13/01 10,000 Task 1.a.2 Design materials, analyses, fieldwork 05/18/01 49,360 Task 1.a.3 Critical materials, material list, quantities specs 04/16/01 23,190 Task 1.a.4 25% design review with City 04/17/01 1,000 Task 1.a.5 50% design review with City 05/11/01 1,000 Task 1.a.6 90% design review with City 06/18/01 37,420 Task 1.a.7 Construction plans tech specs 06/29/01 13,050 Task 1.a.8 Design approval 06/29/01 1,000 Task 1.a.9 Contract documents, ready for bidding 07/13/01 5,000 Subtotal, Project 1 a 141,020 Project 1 a Expenses Expense 1.a.1 Travel /lodging 1 07/13/01 11,362 Subtotal, Project la Expenses 11,362. Total, Project 1 a Labor and Expenses II 152,382 I Project 1b Critical Materials, Advance Purchase Assistance 04/16/01 Task 1.b.1 Project management 05/15/01 1,500 Task 1.b.2 Critical materials, purchasing assistance 05/15/01 4,000 Subtotal, Project 1 b 5,500 Project 1 b Expenses Expense 1.b.1 Travel /lod•in• 05/15/01 500 Subtotal, Project 1 b Expenses 500 Total, Project 1 b Labor and Expenses II 6,000 Project 1c Backbone Core Drops, Bidding Process 07/13/01 Task 1.c.1 Project management 09/18/01 1,000 Task 1.c.2 Installation bid call 07/27/01 3,000 Task 1.c.3 Installation bid evaluations, recommendations 09/03/01 3,752 Task 1.c.4 Installation contract awards 09/18/01 incl in 1.c.2, 1.c.3 Subtotal, Project lc 7,752 Project 1 c Expenses Expense 1.c.1 Travel /lodging 1 09/18/01, 748 Subtotal, Project 1c Expenses 748 Total, Project lc Labor and Expenses I I 8,500 Total, Project la, lb, lc Labor and Expenses II 166,882 I City of Port Angeles page 6 2/6/2001 Exhibit B Scope of Work, Detail Task Descriptions Task Name Description Task 1.a.1 Project management 1. Client liason communications Task 1.b.1 2 Client representation Task 1 c 1 3. Client requested in- person meetings (up to 2 /month) 4. Client reports and project documentation 5 Work planning, team management and administration 6. Work oversight, performance monitoring and quality assurance 7. Work budgets and schedules 8. Prepare and maintain project critical path schedules Task 1.a.2 Design materials, analyses, fieldwork 1. Review of prior studies, including backbone business plan 2. Applicable city base maps r/w and utility maps 3. Obtain City criteria and design requirements 4 Determination of user services and applications required 5. Fiber type and count analyses 6. Special design situations, e g substation connections. 7. Provision for other network interconnections (e.g. Qwest, NoaNet, Clallam Co PUD, etc.) 8 Wireless network interconnections 9. "Meet -me" facility provisions 10. Field surveys and digital photo log of routes, obstructions, existing other utilities 11. Advise City re make ready pole and new conduit requirements 12 Node site conditions and requirements Task 1.a.4 25% design review with City 1. For each review, following materials will be submitted: Task 1.a.5 50% design review with City a. Four copies of 11x17" drawing sets for City review Task 1.a.6 90% design review with City b. Electronic pdf format copy of other documents for City review Task 1.a.8 Design approval c. Updated project cost estimate 2. In- person meeting with City as required 3. Modify design documents per review comments Task 1.a.3 Critical materials 1. Fiber system and route design sufficient for quantity take -off material list, quantities specs 2. Materials purchase document in pdf format ready for City printing 3. Materials cost estimate 4 In- person meeting with City as required Task 1.a.7 Construction plans technical specs 1. Industry standard, City format, BICSI certified, design documents Task 1.a.9 Installation, contract documents, ready for bidding 2 Final submittal, incorporating all City comments will consist of: a. Camera ready plans for City printing b Technical specifications, contract documents in electronic pdf format c. Typical drop standard detail drawings (2 ea aerial and underground) d Updated project cost estimate 3. In- person meeting with City as required Task 1.b.2 Critical materials, purchasing assistance 1. Provide contacts and assist City in locating and purchasing project optical fiber cable Task 1.c.2 Installation, bid call 2 For bidding process, provide consultation and answer questions in bid period Task 1.c.3 Installation bid evaluations, recommendations 1 Evaluate bids, provide evaluation report, recommend award Task 1.c.4 Installation contract awards 2 Prepare total project construction (TPCC) and total project cost (TPC) report City of Port Angeles page 7 2/6/2001 Exhibit C Assumptions and Conditions PROJECT TASKS BY CITY The City of Port Angeles will provide the following: 1. Base map information including horizontal and vertical control. 2. Utility maps and available as built documents. 3. Provide City criteria and design requirements 4. Identify all network termination and demarcation locations at City sites and other user site locations. 5. Provide sample contract document from a recent project as a model for this project 6. Prompt review of materials submitted for City comment 7. Print the bidding documents including the camera ready plans provided by the Consultant. BACKBONE CONSTRUCTION PLANS Consultant's drawings will be produced using AutoCAD 2000 format 1. Standard drawing frame size shall be 11 inches by 17 inches. 2. Plans shall be at a scale of 1 inch equals 200 feet. 3. A preliminary drawing list shall include at a minimum the following sheets: a. Cover Sheet b. Location Map, Drawing Index, General Notes c. Overall Route Map and Drop Site Index d. System Logic Diagram e. Plan Sheets, number as required f. Drop Site Plans and Details, 100 sites g. Typical drop standard detail drawings (2 ea aerial and underground) h. Standard Details i. Miscellaneous Details 4. All review and final drawings will be certifed by BICSI /RCDD Designer City of Port Angeles page 8 2/6/2001 Exhibit D Consultant's Work Process Control Flow Chart This confidential and proprietary document is the property of the Consultant and is furnished for the use of this contract agreement only. TELECOMMUNICATIONS ENGINEERING WORKFLOW PROCESS MODEL BLOCK DIAGRAM No ruM10 AMLME<> CVMMERCIAL WORE V ■00.1.11. CTS .n.y.. p•wg, .4•7,0,., ...o. .0,.1 IMOICOVNIL num, STI. e, Illi .V 7.,,,,,,,V.r P- r0j, 010x.mic LETA,CE/TPZ 71•17< 101.0 Pa MIEN rOre XII;INS Cd. TEM CMI, COMAOL OUTSIDE 40 IMNM4./0•5) ROSA. CONTRACTORS 1111 I 0...,14, 0. MOWS TIM /40.6124 F•••••■=• te.11p• 11.1 COST UMW{ e 4'4* 0 -1 60/E Raw .6,07t• s C: A... elt 7 z...1 PROJECTS 4 m4, i00,......0•• C•py0:1.0.7 0:0.01 m., 170.11..47 sr••• el Raw tnnunt rucs c 0./Ma PROMS. MRCM. RE0.011:45 JjI /10 US roe 1140( etraursr 10F•Die wow SONE MO Var• CARCOPILS M. 0[11,100.11. 0:06MCIION 412.0IM (1,0:4 MY. woo) BECIfEEL Essi PNNL 11/111 C i) SECURITY I -1 1 1 liallirllaArl/CAMITON INCINUADIC MOVE T commzumna mem I COMMITTEE ,,,,,,ri mcc...o• •••••o•• =Mt ROWE 40 Tra *5-MILIS t0.0.11 /3-0.1.1, CO.P03 MUM WYO. 40 IPPROIE AS P.M(.5 N VALLATON WO ....4 r 'ENTERPRISE (4519.■ 0.,-.7 I 0 -,4-- ,,V,,' WORK LIST 0 7 I purr Novo. inrc. 1. L:fr• CCIMi 00030i MILY t r 0 1 0 141CCESS 042% PONT co mOCI, 00403.< CCRMENTAIM1 MCM7 0 011:11 MO I. IS CIO= 500:INL•10 .11 000, ntio. MVECIla• 00d-OFF 4 ,p, p,,,,,,0,40, PRI-420 orrriws L Min WPM. Mr[0011 01.441 Okl• ,M- 21' C2fg' •.0 Ay_p4,7, 1 LOCKHEED MAIiI7N SERVICES, INC 01 n ol ..r. N/A KCMG 14103t p4p, DOME WORKGLOw_DPGRAJA RAC MA WORKRAW PROCESS mooa BLOCK OMR. TELECOMMUNICATIONS ENGINEERING E. N/A KNN //40010/GB0SE/ 5r.,,fl I. 3 R11105 M. .p.. Rum 11 464 N.A..... N/A 1 1 2 3 1 4 t 5 1 6 1 7 1 8 City of Port Angeles page 9 1/26/2001