Loading...
HomeMy WebLinkAbout1815 Marine Dr 1 - Building tv, CITY OF PORT ANGELES DEPARTMENT OF COMMUNITY ECONOMIC DEVELOPMENT BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 Application Number 11- 00001090 Date 12/13/11 Application pin number 965790 Property Address 1815 MARINE DR 2 REPORT SALES TAY ASSESSOR PARCEL NUMBER: 06-30-00-0-1- 4600 -0000- Tenant nbr, name DAISHOWA AMERICA CO LTD On your state excise tax form Application type description IND NEW CONST to the City of Port Angeles Subdivision Name Property Use (Location Code 0502) Property Zoning INDUSTRIAL HEAVY Application valuation 340875 Application desc 3,119 SF OFFICE ADDITION Owner Contractor C0 6° 11- DAISHOWA AMERICA CO LTD OWNER PO BOX 271 PORT ANGELES WA 983620044 (360) 457 -4474 Structure Information 000 000 3,119 SF OFFICE ADDITION Other struct info HARD SURFACE AREA Permit BUILDING PERMIT COMMERCIAL Additional desc 3,119 SF OFFICE ADDITION Permit Fee 2369.85 Plan Check Fee 1540.40 Issue Date 12/13/11 Valuation 340875 Expiration Date 6/10/12 Qty Unit Charge Per Extension BASE FEE 1020.25 241.00 5.6000 THOU BL- 100,001 -500K (5.60 PER K) 1349.60 f� s Permit MECHANICAL PERMIT v 1 Additional desc Permit Fee 94.10 Plan Check Fee .00 Issue Date 12/13/11 Valuation 0 Expiration Date 6/10/12 Qty Unit Charge Per Extension BASE FEE 50.00 2.00 14.8000 EA ME- FURN /HP /FAU OR 5 TON 29.60 2.00 7.2500 EA ME -VENT FAN (SINGLE DUCT) 14.50 Permit PLUMBING PERMIT Additional desc Permit Fee 128.00 Plan Check Fee .00 Issue Date 12/13/11 Valuation 0 Expiration Date 6/10/12 Qty Unit Charge. Per .Extension BASE.,FE.E... _..50.00. 8.00 7.0000 EA PL- PLUMBING TRAP 56.00 1.00 7.0000 EA PL -WATER LINE 7.00 Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 clays, if construction or work is suspended or abandoned for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. n 4: i�i3 1 Co IZ OUP L.s r Q, Date Print Name Signature of Contractor or Authorized Agen Signature of Owner (if owner is builder) T:Forms /Bullding Division /Building Permit BUILDING PERMIT INSPECTION RECORD PLEASE PROVIDE A MINIMUM 24 -HOUR NOTICE FOR INSPECTIONS Building Inspections 417 4815 Electrical Inspections 417 4735 Public Works Utilities 417 4831 Backflow Prevention Inspections 417 4886 IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT IN CONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS A T JOB SITE. Inspection Type C Date Accepted By Comments FOUNDATION: Footings Stemwall Foundation Drainage Downspouts Piers Post Holes (Pole Bldgs.) PLUMBING: Under Floor Slab Rough -In Water Line (Meter to Bldg) Gas Line Back Flow Water FINAL Date Accepted by AIR SEAL: Walls Ceiling FRAMING: Joists Girders Under Floor Shear Wall Hold Downs Walls Roof Ceiling Drywall (Interior Braced Panel Only) T -Bar INSULATION: Slab Wall Floor Ceiling MECHANICAL: Heat Pump Fumace FAU Ducts Rough -In Gas Line Wood Stove Pellet Chimney Commercial Hood Ducts FINAL Date Accepted by MANUFACTURED HOMES: Footing Slab Blockino Hold Downs Skirting PLANNING DEPT. Separate Permit #s SEPA: Parking Lighting ESA: Landscaping SHORELINE: FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY USE Inspection Type Date Accepted By Electrical 417 -4735 Construction R.W. PW Engineering 417 -4831 Fire 417 -4653 Planning 417 -4750 Building 417 -4815 CITY OF PORT ANGELES DEPARTMENT OF COMMUNITY ECONOMIC DEVELOPMENT BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 Page 2 Application Number 11- 00001090 Date 12/13/11 Application pin number 965790 REPORT SALES TAX Qty Unit Charge Per Extension on your state excise tax form 1.00 15.0000 EA PL -SEWER LINE 15.00 to the City of Port Angeles Special Notes and Comments (Location Code 0502) October 4, 2011 9:56:40 AM rbecker. Are you installing a mop sink. If so does it have an atomspheric vacuum breaker on the phauset? Does the heat pump have a water supplied going to it? If it does, then it needs a backflow assembly. If you have any questions contact Ron Becker at 417 -4886, E mail: rbecker @cityofpa.us Fax:360- 452 -4972 The General Archaeological Permit Conditions are as follows: 1. The applicant must hire an approved archaeologist to be present on site during all ground disturbances. The project proponent will be required to provide the City with the name and credentials for their archaeological representative(s) as well as a brief work plan and schedule ahead of the permitted ground disturbance. The Archaeologist must meet the Washington State guidelines for a Professional Archaeologist and must be in contact with the City Archaeologist prior to and during the permitted project. A professional monitoring report must be issued to the City Archaeologist upon completion of the ground disturbing actions. 2. Regardless of the presence of an archaeological monitor, if during ground disturbances,' any phenomena of possible archaeological interest are uncovered the contractor shall immediately stop such work and provide for a site inspection and evaluation by the City Archaeologist to ensure that all possible archaeological resources are handled in accordance with applicable law. In the event archaeological artifacts, features or human remains are discovered, the City will notify the Lower Elwha Klallam Tribe and the State Department of Archaeology and Historic Preservation, as required in RCW 27.44 and 27.53. Archaeological Preservation requirements will then be enacted as applicable to State law. If you have questions or comments, the City Archaeologist, Derek Beery, can be reached at (360) 417 -4704 or by 'email .at. dbeery @cityofpa.us. We are here to help and will do our best to guide you through archaeological compliance requirements for your project. Derek S. Beery Archaeologist City of. Port Angeles, WA 321 E. 5th.. Street..__...... ......:....:i...._ Port Angeles, WA 98362 dbeery @cityofpa.us Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 clays, if construction or work is suspended or abandoned for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. Date Print Name Signature of Contractor or Authorized Agent Signature of Owner (if owner is builder) T:Forms /Building Division /Building Permit BUILDING PERMIT INSPECTION RECORD PLEASE PROVIDE A MINIMUM 24 -HOUR NOTICE FOR INSPECTIONS Building Inspections 417 4815 Electrical Inspections 417 4735 Public Works Utilities 417 4831 Backflow Prevention Inspections 417 4886 IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT IN CONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE. Inspection Type Date Accepted By Comments FOUNDATION: Footings Stemwall Foundation Drainage Downspouts Piers Post Holes (Pole Bldgs.) PLUMBING: Under Floor Slab Rough -In Water Line (Meter to Bldg) Gas Line Back Flow Water FINAL Date Accepted by AIR SEAL: Walls Ceiling FRAMING: Joists Girders Under Floor Shear Wall Hold Downs Walls Roof Ceiling Drywall (Interior Braced Panel Only) T -Bar INSULATION: Slab Wall Floor Ceiling MECHANICAL: Heat Pump Fumace FAU Ducts Rough -In Gas Line Wood Stove Pellet Chimney Commercial Hood Ducts FINAL Date Accepted by MANUFACTURED HOMES: Footing Slab Blocking Hold Downs Skirting PLANNING DEPT. Separate Permit #s SEPA: Parking Lighting ESA: Landscaping SHORELINE: FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY USE Inspection Type Date Accepted By Electrical 417 -4735 Construction R.W. PW Engineering 417 -4831 Fire 417 -4653 Planning 417 -4750 Building 417 -4815 CITY OF PORT ANGELES 11 DEPARTMENT OF COMMUNITY ECONOMIC DEVELOPMENT BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES, WA 98362 Page 3 Application Number 11- 00001090 Date 12/13/11 Application pin number 965790 REPORT SALES TAX Special Notes and Comments on your state excise tax form (360) 417 -4704 office (360) 461 -9131 cell to the City of Port Angeles Address numbers shall be plainly visible from the street. (Location Code 0502) Address numbers shall be a minimum of six inches high and be of contrasting color from the background. October 14, 2011 9:48:24 AM sroberds. The proposal will result in a 3119 sq.ft. addition to an existing office in the IH zone outside of the shoreline environment for a total of 7% lot coverage and 9% site coverage. No additional parking will be added as a result of the addition so no SEPA review is required. October 4, 2011 10:30:54 AM GANDERS. If connection to City electrical is desired, load calculations will need submitted and City facility upgrades will need to take place. Public Works Utility Engineering has no requirements for this plan review. Other Fees STATE SURCHARGE 4.50 Fee summary Charged Paid Credited Due Permit Fee Total 2591.95 2591.95 .00 .00 Plan Check Total 1540.40 1540.40 .00 .00 Other Fee Total 4.50 4.50 .00 .00 Grand Total 4136.85 4136.85 .00 .00 Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. Date Print Name Signature of Contractor or Authorized Agent Signature of Owner (if owner is builder) T:Forms /Building Division /Building Permit G. BUILDING PERMIT INSPECTION RECORD PLEASE PROVIDE A MINIMUM 24 -HOUR NOTICE FOR INSPECTIONS Building Inspections 417 4815 Electrical Inspections 417 4735 Public Works Utilities 417 4831 Backflow Prevention Inspections 417 4886 IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK. BEFORE INSPECTED AND ACCEPTED. E POST PERMIT IN CONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE. Inspection Type Date Accepted By Comments FOUNDATION: Iebter6t19m Keg 4 p.0 I Iv Tu. Footings I Rebar in -fir ramps, S 'vs Stemwall Foundation Drainage Downspouts '3 tdewGt,b{<.S 5.2.k+. 1 2 3 Piers Post Holes (Pole Bldgs.) PLUMBING: Under Floor Slab Rough -In r, -1". I V 1L Water Line (Meter to Bldg) Gas Line Back Flow Water I FINAL Date 6 1 I IS Accepted byj i L AIR SEAL: Walls Viet. 1‘3.- a 1-1• Ceiling FRAMING: p XM j ',VvI I✓ O: P V) t Joists Girders Under Floor t Oc)m t-j .17-. 2- JL/, ear Hold Downs 13• a I a- 51-1. Walls Roof Ceiling C' T/ Drywall (Interior Braced Panel Only) T -Bar INSULATION: 1 nsu l Aki a in- mlech voorn S• DI. /J7 Slab Wall Floor Ceiling (P Le a' �ri/ MECHANICAL: Heat Pump Fumace FAU Ducts Rough -In w� Gas Line Wood Stove Pellet Chimney Commercial Hood Ducts FINAL Date 33�" i? y Accepted by G MANUFACTURED HOMES: Footing Slab Blocking Hold Downs Skirting PLANNING DEPT. Separate Permit #.s SEPA: Parking Lighting ESA: Landscaping SHORELINE: FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/ USE Inspection Type Date Accepted By N.. Electrical 417-4735 13 Construction R.W. PW Engineering 417 -4831 Fire 417 -4653 Planning 417 -4750 Building 417 -4815 5.4. 1 -(.A.- b7 H ›roon n'ro 0LiU H7,1 ro 000 v y z 7i Kro En LTJ o ip zr l Oi N 0 "i Ln ,r 0 w o z ro ro 0 W .moo L LLJ H m 0 0 m z o t+] !n 1 1 H H H 0 H H O W (I) co N L9 N M L*] o o 'x X t717 o o U) o b 7 o w O z N H O z H tt 0 U) H 0 0 0 N rro Z H Y.1 H d 0 0 0- z o L7 1 n n o 0 0 to T to 0 m 0 0 0 H G C G o 0 0 nor C 000 cnw O0H C G 41 G 0 n z O 0 N m o C 0 0 R 0 R H H H 0 H V 'c7 n tr) wzw �H O 00000 n H H O 0- C- C OO 00 3 ■G r 00 cn cn 0 N N 0 ro 0 z o o 0 t=) [n O O N N H n C n 0 H O r 00 0 0 0 H N O 0 o H z H H 3 o o w 0, '1, cn n H 0 m o 0 0 0. 0 0 (1)) 3 0 0 z Cr) 3 L0 10 H r G,' H L7 0 h7 10 Hn tr r W W w K N R ry 10 W G R o o 0 0 v O 0 H 10 J 10 10 .P o 0 0 03 0 01 10 01 w N W id03 3111 rIKIDI33O ONIOIIIIH A: QENOIS SSErIMfl QIOA )7 p a Ao.z ddb Z /SITegs uo .zpq gp.z5 q.zan sips uo TTEap -q puooas suBTs cords bupj t d VQr -T 4.zoda.t uoTgoa zoo uo suzagT LgsTUT; Adn000 01 NO T1aTTC Wd 65:90:11 ZTOZ '6 gsnbnV suOTgTpuoo TuToadS auoZ poOT3 adiq foupdn000 adAq uoTgon2t suoO ISNOO MEN QNI Niom Jo uoTgdzaosaQ 000 000 060T0000 TT .zaquznu uoTTeoTTddd aolopiquop Q,LrI Oa KOIUEW f KMOHSIVQ 1auMO AAVEH rIVI2iISIlGNI EuTUOZ Agaadoad Z6d ETA df1S G Id 9i L68E #SFZE DXE 0S6L #XVL uoTgdT1osaQ TEbarl aureN uoTsTATpgnS E 9 E 8 6 VM SErIEONV ,LHOd 1 EC ENIEVN ST8T ssalppy &gaado1d 0000 0091-- 1 0 00 0E 90 1aquinN Tao ZT /OT /6 aTec uoTTeaTdxE ZT /OT /8 area anssI A d `d d O d N E I A O N V d fl O O O 30 3 L FI O I 3 I Z 2I 3 D Z9E86 VM SErIEDNV JdOd OSTT XOg •O'd IEHEIS HIS E T Z E SE`IEONV I Od 30 XIIO o r K M K rog0 00 00 0 0 g 0 0 00 zzzO -30 0 0 r n M H ,i ;o 'C 0 0 0 p H 0 0 00�T H ((1) 0 0 r r 0 n` V) 0 m H 0 O 0 0 0 ro M z 0 o 0 0 01 0 C 1 0 C 0 '3 H I oo 3io 0 o 0 0 1 0 0 0 roC 00 0H yl0 10 0 0 r M 0 \.y0 r M r Cl 0 z\ M 1,1 M H Hr 0 H H H HH'U H 3 00(n (n (n Mti N n>. n1 M M r 0 m (*3 000 0 r b 0 i 0 0 0, 0 0 0 M G 0 o rb T W 0 H 0 1 H 0J 7 .rj�. x1 CD O z 0 O ro C z n r 0 M o 3 m w z m 0 !n fn H x1 U 0 r 7 h7 z PI H H ,21 H H 0 0 n 0 0 r) I H H z 0 y m n 0 0 0 0 0CIWCa0 00 3 0t) 0 C C H C r 0 M 0 0 0 o r r 0 X 0 n 0 c 0 01 0 o O 0 r 0 r 0 (n H iP iP rP H H z` 01' z (1 0 4 U1 'd O Ll r 0 H 0 H O N I N n H n H H H 3 '1 0 0 0 0 0 0 r 0 0 z 0 ('1 000 0 z 0 0 I n3 X z ro ro H X 0 11 0 0 z 0 z 0 0 (n H H H H U1 W H (n r 0) 0 0 wz 00 O i n w z r w 4 H z bH 0 0 ro 0 (n 3 n '-3 3. 3 00 0 m 0 m 00 CO (n m (n z z 0 H m m H r n C H 1-. (1 m (o n ID n C r N w XC `G 0 0 0 0 L71 0 0 0 0 0 0 0 H 1 M M 0 0 0 0 N N H ro C1 01 of 01 ro ro 01 M 0 bd H ro qro On•> n ro K ad r r r r r r .r r r K ad 0 1 >£0Ml7 Hai ro D 1-1 W H al l0 H w H H ro N ro a 1 Z Z Z t7 H M Pi H rn MH ro al 10 H o 0 0 0 0 0 0 0 0 0 0 H zr� >H(n 0(0 r N N r r H r r N H n- V) 01 M 3 H C7 ro 0 CD 1x70 01 ro aim o M m 0l 01 01 01 01 0, 01 In co N 01 (0 (n 01 w 43 N N 0 M H 310 310 0 0 0 0 O 0 0 0 0 O O N N N N N N H H N N N N 0 1 0 0 H O CI 0 H l0 C t 0 l0 01 01 .A IA A 01 A .A H H H H J 0 0 N N C M 0 H 01 20 m t11 (f) M (n 1 1 H H H O H H H 3 H H H 0 1 H r 1- F+ r 0' 1-' H I' I' I� r- r H H H (0 0 0 (n (n 01 M N M 0 td N N N N N N N N N N N N N N N N N N N M M Q 0 0 x x C" 1700 O0 H 1 0 4 0 03 01 C fl y 01 M m al H >4)4 T 4 >4 y4 >4 >4 C73 z, Z loo z .A MH rorror roC ror ror bC ror 'Ur T r MH[7 0 1 M 0 z r r r r r r r r r (1'Z HM M rro r r'roal Z 0 0 H M H d 0 H H z o H M I n n H aiciH n>ro4114014t14 ro3,'Ua/3b73U13W303(G3'A ro3(13of3W0 0 i w *01'1101 010 I 0 0O 0 M M 9'G rG HG r G rG rW trialw rW H W rW T W rW o1YN rW r -W r0 (D 0i N r-(D r MM no C r (n 001 G C7 G 0 01 0 01 01 C7 K r K C7 K x 1 01 t7 K H ai 0 0 1 H N 0 31 0 0. b O' U (awn 0 0 H H 0n G G)W r(D 0(D n(D G) 0? 0 r 0 3 G) 3 OO H0 00) G n *Hry O CnO Z 0 0 n C Da N 0101(001 N N N H N H N H H O' H (D 01 G G r ai 1 (0 0 H. H rt 0 01 0 0, I -1 4 0 ,4 2'4 01(OH010101>+-01-(0>0101 0 01 (0 0 31 0 0 W H H H Z 01 0 H M` z` aa7 H- H 0` M` x` r` Z` or` 01...)(D NOrtrt0 n 0 0 010 H \H t0z M 0 y 0E1 01 0 01 M M (1 l0 y0(D 00(0 001 K 0 H H 0 H 01 0) 01 1- 01 0 01 01 01 010(001>01(101>010101001 0101(0 H' A r K 0 01 1 H H 0 0 0 M (10010(10010 WO. O aJ 0 M o (0 O z OHO O H K 0 N+01N)01 OOH 01 'Z 0 3 z t N H K H y H 'Z H M H U) H H K H 01 H V1 H 9' H H Z N N 'y 01- 13 N N* H H> 3 z (n (1 M 3 R. N 01+301001 N ro H N H N 01>01 0 01 1-001 N G) O I 0 H H .7 1 y 3 V ro CJ M H .A H r 0> Z .P r C 1-1 H H .A H H H U) lq O N H M 01 0 Z to N A 01 l0 0 0 w A 0 H m (1) w 00 m C w T m 0 .A Z m N 00 N 0 'O N w N 0 Z 0 n 0 H H H z x101 ro F y z G H z 0 0 0 1- 0 0 (0 H '-3 H 0i (n C m N 1 0 N 01 4.11 H 0) w M N 1 01 w H 01 N .A 01 1 m n :1 H* l0 H (0 0,1 (0 0 H C•. H A -4 01 Z\ .A n 0) N w 0 w N H 00 N 0 1'• N N N '0 0 H w Z z 0000 W 0 cc, 0 z 0 -.1 0 0 0 .A 0 0 N H N 0 0 w•• N N (1 H N 0 01 0 H (D 0* l0 0 Z M J to N H N .A H 'A 0 CO l0 0/ N 3 In ro 00 (0 H n. H 4 H M M N 0 hi z 3 M O O N Y- r N N H 2, H X C 0 ro 0) 0 ro "1 0 1 0 0 M ro n N m (0 (1 O 01 01 z ro ro (n X 0 H M 3 01 3 3 3 3?\ 3 3 3 3 0 0 3 H 3 0 in n 3 n x x 0 M x K K cn x H ro T 'd to u1 O o W to M 3 u. C 1 u. b 0 3 3 (D O N to z z t7 H t7 (1 u- z G' u' 0 G' n G 0 01 H C n 'A H n 1-' H. U. H M n 1-' (1 1-' H n H 0 r* ro M o1( 0 10 11/ r' P. W 1.. W 0. 031 H 10 10/ H- r H'm 3 0- 0 M .0 (0(00 (D (D (D 0 (D rT (D rt (D 0 r* 1-' 0 0 1-'' V 1 W n 01 G 13 (1 '1 Dr G 1 G 0 C G 1 3 ro G r W ,7 r( 0 r N H Xy f* 0 N 1- H H N H N H N H N (D rt (D u. 0 w K o N K C' 0 K 'G "1 (n 0 "G 0 K 01 0 "C 3 0 n G H r 0' o1 M H N (D 8 0- W 0 l0 0 H 0 n K 0 rt W N 01 H C1 3 x rr r,' 11 rt 0 H 0 0 01 0 r H C K 0 0 0 11 Z r H /0 H J 0 M 01 TO n 0 .a M r 0 G 'A M 01 W -3 r x 0. M 0 w LCD K 0 0 (D 3 0. m (1 rt 01 N r r r 1 i W O H T 0 CJ 0 w C K O 0 0 0 n M M to O x g T M 'G '1E) '714 M O Y r m 3 M m K 0 H N H 16 9s...z, l n. V i t i r k y` W W W W 01 W Cn W W H 'U 000 H> n ro H W H 10 H W r r Z 01 0 11. 01 �37 0 <'0 o o O o 0 0 0 0 0 p ZC L 3 m 0 N N r r r r r N H 0 Cr, (0 M H 0 m W O Z ro (0 M• 0101. O n '.b n 'rb 01 .T1 m D1 01 at 01 N N N N N N N N W W N N O 1,10(1'.° H N N 3 0 0 OD, O O 0 0 N N N N r H N N N N W G' O r 0 0 (7 r 'A 'A 'A rP .P .P r r r r -1 J 0 0 N N M O r at q Y' W 1- M m H H r r r r r r r r r r r r r r r H H r r H H 01 0 W m U1 N MIN N N N N N N N N N N N N N N N MN M M 0 0 0 X x C 0C7 o 0 O3 M C o 0y b( m io ,,,0 7›,, D'4 >l4 0(4 T 4 >4 4 (74 W 7, CI. 0( 0 W C ro C V C W C W C 0 01 M r >0' MHO 0' 3 01 M 'n r C C r r r C r m Z ,m M I .1 0 n o H d o b b r H Z 0 .3 t11() n 010010010 01 3 0 .'0 3 W 3 W 3 W 3 ro 3 W 3 'A ro 3 W 3 W 3 W n '1 w( W '*1 W x1 0' 0 0 0 01 0010( 1 -0 C P1 M M N C N H (0 C N 01 r N o1 91 C N r• N r 0 (D 'i (0 00• (0 C t7 M 0 0 0 C C 0 0 0 0'< O W K l7 K r K 0 x1 't K- 0 't 0 0 H 'i 0 (1 ,0 0, H 0' 0 (1)0(0 00-3 H (1(00(00(0 G) War 10 C G) H n H 01n rn a'O G 0i 01-11 (1 Cn0 010 0 N M '.a N N N 011-101 .NH. 0' 0 0 q 0 0 0 0 r 00 U1 01 H 0 1 1-P >A. U1 A (0 H (0 H m H 1-y 1- H -1 w> a M n1 n1 (D N N 01 0 N "1 H H H M Z H H T 1 M M x C z 0 1- ;;;;VO0a M r*00N 0 +i0 m'i1 GG' n M m W M0 W M M m 1* yo(0 001 (0 K 'C 0 \H( 0 (1 01 (1 01 01 01 1 N w (0 N N C N N H N W N 00 3 •H' F10'C 'P Z n H n H H 3 WoroHo mo. o(oMO(ozo(O 1 o1 K 0\O N .*100(7 00 0101 3 KHr0H Mr m1- HKH£rmr'yr 0'7.00 N>'.ri (0 N .rry Z mm M N H N 0 N N ro H N H N N N C i N H N 3 N p 0 0 H 1 0 0 1 H 5 '0 'd z 'A r C 0y 'G 'A C C H H H A rH1 'NW 0M H M MM H m io z w w 01 (1 H (0 01 01 (0 1 01 (0 0 01 Zoo N r IV z (0 r o* 0 0 p r. Z H H 10 N N 01 H 01 01) ('1. 01 (01 N H N N .A N i W 0 0' 1 0 10 r m 0 H 0 N 'A J -0 01 0 .A 0 ,-0 N W -0 O w N H *1 N "1 r- U1 N mm w0 z w.. '(1(0-.3'-01 -Z- z.. oww0 0(0 0 -Z o O O A W o N H N O O W N N mm N O N 0 How* (0 0 Z 10 N r N 4 1-A 0 00 10 N N -0 N '001 -m -H 4 0 '[7 3 M N N 0 0 H r r* H Z 'Z 0 y '0 0 ''0 '0 0M). .0M). 'O n0 N mZ G O 01 mz M m n (0 H H .3 3 3 3> 3 3 303 3 .33 0) m '1 3 O W W W L A M M 0 K H y x H ro Y' '[1 N N 0 0 W m M CO' WO' O u. 01 7 Z O' 3 3 n 01 0 0 n1 0 W M M C 0 H 0 H F H. 01 1 0 1--' 0 H H n r 0 rt m y C H H W r- r H. 01 H N H 0 01 r M N u. 0- r- (n 3 3 M 7 r* (0 (D (D y r* (D r* (0 1 N 0 1-r H 0 0 r 0 M G 'i 'i 'i C G 1i G 0010 '1 01 (0 r- N G 1- O N H 1-' r 7"1- N r N r N r N (0 (T NU. C O K K K m0 K 0 K :aO K 30 1 1 0 1-' 1- 0 0 K 0' 0 T p ('1- H' N (D a P. (0 0 H CO 3 x r* x -1 1* 0 H Z r Z n0 o 01 C H W 0 r -0 n 0, 0 v hi n 'P M C 0 7 01 M (1 0, 0 -0 C W G 4, M 0 w (0 0 'C 0 1-i (0 01 3 A. 0 as '0 C r W W O H 'i O W N C 01 w r 't 0 .30 0 'i M M '0 ^1 o M G M 0 r (D 3 M as K 0 as N r ro H d W W W W W W W CO H 0 1 009# 1 n ro E r r r r r r r nv0om0 Hal N hJ W H CI 10 H W H H 0 i ro x1 Z Z Z 0 H o 33 'CI H 9 nm yy;v Kro o p y o 0 0 0 y Z C� b H W al 0 W H N H H H H N 0 0 0 0 H 0 n• U1 m P1 3 H 0 ro C T1 01. oId• 0 0 I 01 01 Ul LO 01 Ul 01 Ul lP 01 W W N N 0 4 f7 H a1 'o 0 '0 0 O h1 C 0 0 O N N N N N N H 1- N N N N hi C O H O 0 H P r m O 4 .P H H H H -1 J O O N N r 1 O H O1 U1 1 i 0 P 0' 01 OD [n m V H H H 01 H Hyh1 H H HH H 1 H HH Hl 01 010 ow fn W u1 al NJ N CO m r N N N N N N N N N N N N N N m 01 0 0 X C` O m 9 0 q 001-1 O, O O 4 10 C7 H O .b .b Uzi l0 9 10 Z 4 Y'4 Co t' T 4 b 4 04 0 Z toot'' �i Z N C 0H0 W ror Ed Ed ror br MHO 0'4 3m 0 W Z r r r r r r r Utz H tEl m C n 9 NNW C U 1 9 H x 010 rro i W. rroRI Z01H Hal 0 +P 1 H F -.4 H time) o yn' H H H ai o n o 0 01 4 9 a1 0 b1 0 01 01 01 01 01 01 9 01 01 9 01 01 01 01 8 4 0 1 1 4- 01 8- 1 01 WW 4 o H G r m m r 9 P+ 01 01 3( r P1 H P1 r 0E y W r P1 o1 y( r P1 H- P+ r O (D Ii ID 0• fD r 0101 0 o r r r 0 In U1 0 08<008<08<98<08<P18<08<#-'P18<084 Hn 0 [nInn 0oH y r(( 3 C n (1 0 C? Ll r 0 y (1 y 0 0 H 0 0 'd G n* H II 0 000 z 0 0 W r a1 14 01 01 8 3 N N N H N H (VHF 7 G (-'1(99 G r a1 i U1 1• H H H m 'fl ,P In 01 a1 H m H (0 F' ,)y H H J W ,l7 J h 1 "1 (((1(1 P1 3( H H H 01` Z (n o H• H "1• I'1• al x' r Z O r• N N N O0 rr ly ,1 rt 0 019 O H 0 y a1 m 0 W m m (n 0 o ID o ID rr H ,'d O N n 1-i N o a1 N 01 N r N a= N H N 0 N h1 N 3 H- 4• M'< P 0 4 0019 1-1 1 Z N 0 a1 0 0 H (n O• 0(00010(0001090 O H 0\ O 018-01140 0 O Z 'Z X W H 0 3 Z Z m H U1 H H K H F 1- (n H y H H Z N N 'y u- 1 D N H H P P1 01 (n 1n m 0 N C 3 0 10019 01 01 0 01O]01 01010010-3(-' 7• 3 h1 ro Z 10 41 m r 0 9 Z .01 r r H H H .s H H H D1 lq N H m m m H 0O W Z .P C H 0 0 U1 w 01 W r W q 0D O .P z 01 N al N,0 R 1 01 (4 14 0 Z n n (n 4 y a1 01 ro H y z Gl H z 1( 0- 0 0 0 0 01 y H H W H N H U1 CO m Co 1 LO N H 01 N .01 N' CO 0 7 H* lD H (n O H ,b W Z 01 Z\ 0 J N w .1 0 Co.. N H 01 N h1 10 N* N m a1 0 Z 0 01 03 o Z.. 4.. 0 W W 0 31'0 0 Z CJ w o N H LO 0 0 W N N (n H N 0 Ul 0 H (D w l0 0 13 4 y 'A 0 01 01 0 N 1 N 0 O1 10 H O H 4 y Z O ro Z 3 m 0 O H P. 1 N N H H O 9001 P •0 y him 1 n ar N W Z (100)01 01Z ro c, U1 4 0 H P1 401 3 4 4 01 001 3 H3 Gl (n H z 01 mw C 010 m K' U1 x H ro 0 h1 LO Ul 0 0 CO U1 m (n H r.. 01 0 3 3 (D 0 N (0 z 'Z 0 H 7' H. 0 U Z G' Z G (1 G m m H r O H 01 0 H (1 H 0 1-' (1 rr ro ,b C H (1 r- E N r• P1 n P1 H- .,1 01 -1. 7' r- m 3 3 r1 IY (D y 0 (D CT (D (10 rr (D 0 0 H n 0 P. a1 G Ft r H G 'i r 'i a1G r• N G r' r N H 'k N H N H N H N ID r1 ID 1_( h} 41 O (n 0 0 4 0 3 0 1 1 G H H (1' 01 O al H N (D (3 r- CO 0 0 0 O 0 N N W 3 x 0 rt H y 0 1 H 7' .P r z 0 s 7< 0 U H LA H J n M "1 b 'i n (T1 r 0 7• ,P m n N k 01 x 4 m 0 0 (0 0 i (D 3 in 0 m GI rt r W P1 0 H 11 0 W N r 9 w r 0 H 0 0 'i m (7 10 .1 1 0 Y. m 0' m n r (D m m 0 N 01 W to co td 01 W H ro ›roon0> nro X r r r 0 r K 1:0 ro0+ 01001 0 .1 Xi H1 l0 H W H H b L C f0 M y ZZZ q z O K b o 0 0 0 0 o 0 033 Z0 �y to 0 b H r H H N H 0 (1) 'T7 M 3 H 0 m W 0 Z ro ro M• 0 W• 0 n a1 0 x1 01 ro to 01 0* U1 01 V7 01 01 W W N N 0 M H 3 0 N N N N N N H r N N NN '000 H O U 0, T iP 4 r r H r 01 J 0 O N N C 101 0 r 01 co z\ M 0) i 1 H N H 0 H H H H H r H H 'Ht0 ow(n (n In 01N 1 N N N N N N N N N N N M /01 0 0 x x r- C 0 H o 0 0 3 M 0 0 0 Z Z? (1 01 0 X >ti q 1 >01 001 x1 Z oo?i Z 0P /C ro ro br b C Cr MH�'1 o 3 M /3 c .01.1f .11111111b r C' C r Z r M M H ro .V 0 001 n n m 3 0 H H Z 0 03 M n n o0 0 x1;v 3tr13CO3W3ro3W3 Pro3W3W3Wn n whl 0WMW 0,10 I o M M a r a H a C a> a r a 01 a r a a C 0 fD n to F'- (D r M M 0 0 r r )0 W K 0 't r 't 0 01 0101 0 'G x 01 0 0 r n 0 3 .1 0. tf 0 r tY O 01010) 0003 0 G? L) r G) 03 G) H 01001001010 n 01 1 10 0 0 0 Z 0 M 01 N N N N H N H N H r '.Y .7 r (D '0 G G r .X i U1 (n 0 1 7 1 1 >3.cr)1Hg0H 0 w J 1 1 "1 (0 a a 0 a M H H H M M ('1- x C Z o r E N N0rt1Tnn 0 n0 0101 O 010 U1 11 M 1.0 01 0 (D o0(D r*'< Z 03 0 O 0 01 N 9 N 01 N› N H N C. N '1 N H ''0 0001 gP '0 n H H H 3 0 01 0 01 0 0 f 0 Z 0 0 o ff '1 0� 0 N *0' 01 0 00 ZZ �••I 3 U) r H K r Z r (n H H r Z N 1 01 0 0 1 D 01 r H> 4Z y' (n N M 'OHNH N 01>010010301 010100/ OHr G- H 3 01 '001 Z 0 y Z 4 r r H H r .P r H r N)O N H M M M H 010101010101010101>01001 Z 01 N 01 N 0 0 N W N 0 Z n n v1 x1 h1 ro H H Z 01 r Z tD N 0 0 0 0 Z H H 0 0301010101 (J1 0101(31 N P. In i Co n .'7 H 0 l0 r 01 0 03 ‚0 03 010010101 -3 0 W N H 01 N h1 H- N N 0 N '>1 01 0 0 0 H w Z Z o w w 0 0, +01 0 Z O N H 01 O O co N N (n r N O 01 0 r D W (.0 0 H 4 0m01 v1 N _1 u1 rom 0•• H o H 403 `01 O ro Z q 3 p• M O O H N- 11 N N H y H O 3 3 3 3 n 3' 3 03 3 N m 0 N o X 0 x x C (>1 x M 'C (n x H 0 y '011 to 01 0 0 W (n M In H y b 0 3 3 (D O N (0 'Z Z 0 H 0 Y u. 'Z G' u. Z n O M M H r M n r n r0 r 0 rt 'p H E a N a n a N X a x 01 3* 0 M r* co rt fD rt (D 0 r* r 0 O F' X 0 n G 1- 10 1 G n AC r- a G 01 r Z' N r N r N r N (D rt (D u b W K cn 0 01 0 01 x1 0 K 3 0 n 0 r r 0 tS m O. M- r N to 3 01 0 a 0 0 n 't n 0 0 0 0 n W 3 x 01 01 0 3 r* H q (D V- r 0 .P Z n G•G 0 0 01 H W- 0 r 01 n M '*1 0' n n rP M r O G a M 3 a a C 21 G .P M 0 w )0 K 0 n (D 3 A. m P 01 X (Y H W a O H n 0 ro N r rt E S w 0 `G O H 0 0 n M M (0 ^1 0 x M G to n r (0 M In N A N H to to to to to H ro ›roon -3 nro C r 0 C r h 10,b £010 rx1 10 H w r r 3 Cnz x Kro 0 0 0 0 0 0 y ZC TO y N Cri O XI H r r N r n• En 1 to H 0 to to oz ro ro m. x70.1• 0 O 0 VI 01 W W NN otn y- 30 N N N r r N N N N I71 O r 0 0 O N r H r -3 J O O N N' r w O r Ol D3 VI (n I I H H r 4l r r r rr rr 4-'r Hy t0. ow(n (n01 N N N N N N N N [I D11 0 O O S x C t7O H I O I O 0 b7 C o? XI N 1n H O I H ti.._ ti Y4 >�1 100 x7 Z loo Ti "Z o t-' 3 10 0 ro r X 33 0JHO 0 1 3 R1 r may, r r r n z r X H g d on c) r dillir H Z O y ca 1 n n o 0 0 H P 3tDro3t03 01 ro3tv3 H 3b1n r{ wn1 rt 4--ID N x7(11 0 H rY' w C N 01? w 0. P3 H. P3 r o (D 11 0 0 r.fD r t+1 nor C Ct U `X 'G 0.'G r x1'G l H 01 H 3 0, 0' 4- r 0' in (n W n O O y H C 0H 0 I H 0 GJ0 r0 0 T1 C 0 H rtrH 0 G] CnO Z w (11 N H N 0 N H r (D '0 C 0 C 1-1 1 (n 1 =J r UJ )Y' r H J CO 91 J 'T] N co 11 331 rt N '*7 y H H X 1 Z O C N D NO.f* rr13 1 1 rt r1 O UJro O Cr) b In l0 O (D O 0 (D r 'C rt I••< 5 y O CN'yH NC, N nJN r• Z. 10 0.P Z n H n H H K 1 O x7 z O r O Z1 O H (11 O O N 0 07 N O O ��--11 2. 3 r£ UJ r r r N N 0 u. 13 r 0 CD 10 (D N 0 r q 3 Z 91 X N 'y 0 N H N 3 N 0 G] O 1 O H r O• 01- H r11 r11 rd 4, 1p r W 0 1A r H r r H (1 N W N 11 tp Cn M O N H trJ z N H N R O 0 0 Z n n r y Z L r Z n r O 0 0 0 Z 3 3 H H 1 0.1 H to N 4, C l- N 1 CO n 0 r ID r 0 0 H ;yv N W O W N H o '*J r+- D N 0 N 0 0 1 x7 O W Z Z 4• w w O W T1 O Z O 0 0 N N (n r N O N 0 r N W 10 0 1O in ,l III 111 01 10 H n H 4 H Z 3 ',v M 0 0 H P. 0 N yy N H H xn O CI H 3 n 3 3 H 3 N CO n o 3 O X X (11 X M X H ro 1) 1 0 In (n 0 0 (0 (n 111 (n q O 3 3 (D O N 10 Z Z U H C' Z 7 r. Z0 n C J H 0 n H n n r( 1 0 C H W n P1 r W 1 -I- O' r- CO 3 O y ft (D O rf r n 0 r rt X 1 C C 0 13 xl 0 r• N C r* C N N r .N (D fT (D u '0 W 1t O x70 1 t 30 1 1 0 r r rt 0 m o. tn• r N m H rt w 0 o n °G o o 0 rt 11 3 X 0 X 13 0 y fD r 5' 1P L 13 O t 0 01 H tp r J O rD rt y 13 0 n 0 0' 1 a a a rt z p ID O w 1p 0 1 1 N 3 O' (0 o rt H 1 O H 1 1 rt (11 'CI I o rt 0 C O y O H 0 t 1 O 1.7 0 b1 n r m X to K N r N N U) W 07 H 0 Y' '000 n 0 r r k (0 0000U H x w 0 n A r 0 p H Z( K I 0 0 0 0 y zr So. HCn 07J r N r 0 n" (n 031 H 0 m m o z 0 ro (0m 0 n(.1 x (0 x(0 In W W N N 0 H r N N N N '0 0 0 0 0 0 0i r J J 0 0 N CO r by O r Cr) 'y r 0 (0 0 if' 33 H H r 0 r r r r r r H H (0 0 0 GO (1] lP 3) N N N N N N [7 h7 G O O S r- 00 H 0 1 0 0,3 M O o 31 N 0 A 4 04 (0 z °o z o 'd r a' r H o 31 30 b7 0 r r UI z r 33 33 H 3 O 0> T r H Z 0 y 33 1 0 0 4 ro3W3CjZWn r{ w'0 WOW 33( i £00 O 0 (3 (3 t 0 (3 (1 (3 +r'(D r 3 CI nor r r x)< Cyn rri (0 8,0 ats +r t00 (fa (n n 00 H H H on rn G0'tr G rt .1-• Cn0 'Z ty ty NHH a 0 rm'CI G G rz i 10 w>•ro '1O m N N* PN o1 HH .-3 0 r• Co (D N 0 0 0 rj ri ri 0 4J ro n (O O (D O C (D rt C H (0 0 '07 N I- z M'< A '0 n H n H H 3 OH d\O N o.MU 00 zz 3 r Z 3I i 1 00> 3 0 U] V1 try 33300 1 01-30 0 H 3 roro A H r A r 0 N H r (l l H ('3 Cr] CT) H 00 0000 Tl N W N O Z nn (n n•• 0 Z (0 r•0 800z H -3 .-3 A (n 1 (0 0 p r* io 0 (n or H 0 N (0 r• 10 N N 1 0 0 x1 0 z•• 0000 wro 0 z W el r 0 0 0 0 1-.(D0* 0 0 ro m 0•• H n H 4 Z by 0 O H r fr N N H ',L H 0 nT N oz G o m oz In 3 n H H 4 3 0 (n n 33 roro 0 X X X 01 (.1 H ro 4:1 0 0 0 m 1-4 C 4:1 n z 0 3 0 o N* CI CI 0 r H O r* 31 X- W CJ' 4- 10 33 0 r+ r 0 0 P. w 70 G r- N 0 rt r N (D ft (D u 10 W K' 3 0 rS G r-• r. 0 0 by 0 N (D 8 r- 8 01 0 n `C 0 (3 03 (0 8 'i O n K n r* (D r- r 0' `r. 0 (3 O 31 H 00 r �1 n 1< T ri 0 •a r 0 0 a a x] 0 0 ww O rt (D 3 0• m 0 1+ O N 0 0 T 'C O H 0 ri DI Cn <1 0 X O 0 C7 n r m LI w k 0 N w w H ro yroon nro 0 K' (7 TJ y£ o in o H n1 H r t0 A 0 n c z z n Kv o o 0 H Zr D. -3 O 70 N H 0' (n '1 0 3•• H 0 PP 0z ro 1i in z 0 0 n x1 n x7 ,hl xi w w N N 0 [T] H N 00 ro I C O '00 CJ H y O o N N r t ii O H O, y y CO z\ b7 (l H H H 0 H H H H H W o (n In M N N N N [*1 tri C o o x .x r 00H 010 03 in t oo £y in C H o y y x m 1-r 0 H oP 4 04 x1 z .o y in yr i1 'HZ 0 J 0 in C (n h1 H i 0 70 0 r P 4 0 0 z H ,Tl 0D H O 0 O N H 0 0 y D n n 0 0 0 03ro0 ry w III U1 00 I 0 H N r 0 (D ry (D r- (D r 0 0 0 0 0 r ri 0 aco O.b' rb'0 (n inn 0o H H 00 G H* HIt 0 0n0 z 0 0 '+7 4 1 a N PN W N'tl H0 H (D N 0 rt rt r{ Fi 11 0 U1 ro O H O C N M`G i'�'. 00 n H 3 o'--co O000 00 z z M 1 0 07 N 0 y 0 r L^ r, N O Z rP r H 1-' N to N H 0 07 0 H O0 N 0 d N w N 0 Z n 0 O H z (D r-o *o0z H *3 *3 i 0 0 O H 00 H cn 0H Z 0 w 0 p, h) N N 0 �'7 O o O 01 0 H' (D w '0 0 H O H U q H 0 00 (b* o 0 0 0 x C M 0 (ro O N (0 O Z 0 in y 'o y in H 0' r m 3 3 t7 O O r- .h1 N O rt 0 rt (D u 'O w 0 r 0 0' m N (D 0' F'- Dl 0 O rt N N 11 r1 7s" '4 r (D r H a 1 0 0 N 10 1-' J M nn ,P o 0 Pi 0 a w 10 11 (D am hJ rt a o 11 0 ro r*£ y 'to Hc1 11 M 01 o x (1 n m w N \-\1 O 0 N Q, 1 Tr_ J f 11 In d c c=c7.) A .......r j P r m .-3 ro g ro o n y q H ro 0 n t t *J y y z z y pi 0 0 0 H 01 0 -3 m n 0 7 H n (n 0 (T7 0 m O z 'd d ro (.7• zm• 0 npin x z yc1N N Ohl y� 3 o N N 01 Holz OH N N HMO Hmq qw MW 1 1 H H H 0 H H yy py 0w(n ON [.7N N (1(10 002 x33 r- t7C7 00£ £q (n, ty H0q >;u 0 H 0 1 y1 H 4 L 0 1 1(1 ow CO z H to m 001 ro H 1 z (101 a r ro z zo H HP w H lJ onq nN H H M n n 00 0 Tk E .01001 01(0 1 o *#.m r �7m nor r *Ht7 t7 tn ton O oy 1-3 H n G] C n z 1 0 d G 0 01 to V HH H 1 m ro O A� 4 n H (1 H 01 N CJ 0 0 H z 'L 3 *HHq 3zb tn h7 H 3 t'' 'O h7 z N H d7 b7 h7 ,c k s y *141.10 z nn UJ *00z y yH H O O N 0 «7 O 0 z I`�` d 1 00 P A H 3 x x CD t+7 x Mb] b ry C H R7 0 0 't7 w K t a 0 n rt AP 0 In H .P P ..l il A pi c:5 H O H (1 mm N N N 1? H NH C R S et 1 Owen Structural Engineering Inc. .olo 220 E. First Street Phone: (360) 452 -8574 00 Port Angeles, WA 98362 Fax: (360) 457 -8020 SPECIAL INSPECTION REPORT r PROJECT: Nippon Corporate Office Addition 3 ADDRESS: 1815 Marine Drive, Port Angeles, WA 98363 CONTRACTOR: Feeley Construction Inc. l c PERMIT 11- 00001090 5 46- REPORT 4 �c-- DATES: March 6, 2012 WEATHER: Cloudy CO WORK REQUIRING SPECIAL INSPECTION: Reinforced slab with monolithic IIS footings prior to concrete placement EST. OF COMPLETION OF THIS PORTION OF WORK: 99% DISCUSSIONS WITH PERSONNEL ON SITE: Bill Feeley, Bill Dawson, Derek Adamire OBSERVATIONS: Reinforcement in slab and foundation with bars tapping those extended from previous foundation placement. Some anchor bolts in place. REQUIRED MODIFICATIONS: Move the #4 "dipper" bars closer to the edge under corbel ledge for 2 x 8 joists (1 1 /2 to 2" clear) to prevent diagonal shear failure through non reinforced concrete. REQUIRED MODIFICATIONS TO PLANS: Provide longitudinal #4 under top outside corner of "dipper" bars. Add anchor bolts at unspecified walls. P S G O M IMO SIGNED BY AL_ cro Q x "a p 17175 v \G 0 /z_ -ZONAL wAs .7. 3/2 {c 1 fib i 4 ,f 0 1 `J 1 7175 it MAR 20.: 2012 h Ins 2 CITY OF PORT ANGELE I I370B Sp P BUILDING DIVISION Owen Structural Engineering Inc. 220 E. First Street Phone: (360) 452 -8574 Port Angeles, WA 98362 Fax (360) 457 -8020 March 5, 2012 Jim Lierly Building Inspector Community and Economic Development Department tY p P City of Port Angeles P. O. Box 1150 Port Angeles, WA 98362 DEAR Jim: SUBJECT: NIPPON CORPORATE OFFICE ADDITION PERMIT 11- 00001090 The following are changes for the project: 1. The 2 -10 door on the second floor level at the firewall between the new and existing is being changed to 3 -0 due to availability. We are still considering it not to be a required egress door. 2. We have elected not to install dead bolts on the exterior doors, thus not installing the signs regarding open during business hours. 3. We are showing changes to the framing (2 x 8 studs) at the south bathroom wall for the plumbing. 4. As an alternate for the vertical bars under the vents hooked at the top to act as stirrups for shear reinforcement to transfer hold down forces per detail 2/14, some X bars with hooks as per calculation sheet 19 and special inspection report #2 are installed. 5. The 2 x 12 floor joists are being replaced by Roseboro Forest Products Timber I joists 11 7/8" RFPI 40s. The 2 x 8s may be replaced with 9'/4" RFPI 40s. Respectfully s ..mitte zi_P o wAsy4. 4116 °A t 4 1� z Crai• R. en, P.E., S.E. 7 7 5 ��4L EP1 CRO /cs `/07,1/4r,„L- c RECEIVED MAR -.5 2012 113708 tat I k i a 6 �I liminnummissinal i ue i. 7i ?.3C j f---- p t 1. .3 Y v d 7 Z f2O:Q7:� ,Aat g 1 -S l E ���`4L. Ca "���D l r G it c PSi i 175 t t I t E L am 3 i OWEN STRUCTURAL ENGINEERING INC. Corporate Office Addition j )1$ 22a E. 1�` St., Port Angeles, WA 98362 Nippon Paper Industries USA I _..c,.: 360 452 8574 F AX (360) 457-8020 el.. Port Angeles, WA $70 IS 2.-- g t 0 V i Al 0 0,61") 7,7 -7 3, 5 r\-1 c 4 4 0 1, 1 5 zo )19 .2. 2,3 0 --4 I 7 c9k ,go7z EP 1 Z�4 BC)0(8,95) Q D 2 k 3,3„ 3)f-r --7 i RQ.z) 7, 1,1-. O 7 3$ 7.// C.. C'7 ic 3 .,-,G c.c.. G R :41," 2. v ovvi',---'' r- 0 Ar 'VT 3 v•- Q° A, .0 'LI! 4 t.3 i o 0 •F' A liACk`' z '1 rr '4 OWEN STRUCTURAL ENGINEERING INC. Corporate Office Addition 220 E. 1 at St., Port Angeles, WA 98362 Nippon Paper Industries USA (360) 452-8574 FAX (360) 457-8020 Port Angeles, WA I 37 a O c•- 6 2 )-.-vi) :1 i-- 6 11 ,4 )3 c ?■.k, 1 I 0 7, it (4" V R 6 v v 1 1 4- iz,-- A j. t■ tA c'&4, €2, 6), (.1 j(2 0 7 f o i 0.- i t i ..e./..,g (c 70 7 (1 2) I) ....s, ‘s 1 1 jr- i V EN A e .1„,._ /1 0 .cs "ft 4 '''''''''"rr'e e 11 0.4 lc or r-4- i,'7..:,=.14, i 1 /12- .-r c?4,- acirefi-ra,t4,1,244e OWEN STRUCTURAL ENGINEERING INC. Corporate Office Addition 220 E. 1 St., Port Angeles, WA 98362 Nippon Paper Industries USA (360) 452-8574 FAX (360) 457-8020 Port Angeles, WA Owen Structural Engineering Inc. 220 E. First Street Phone: (360) 452 -8574 Port Angeles; WA 98362 Fax: (360) 457 -8020 SPECIAL INSPECTION REPORT PROJECT: Nippon Corporate Office Addition ADDRESS: 1815 Marine Drive, Port Angeles, WA 98363 CONTRACTOR: Feeley Construction Inc. PERMIT 11- 00001090 REPORT 1 DATE: February 22, 2012 WEATHER: Cloudy and windy with intermittent showers WORK REQUIRING SPECIAL INSPECTION: Continuous footing (under stemwalls) and prior to concrete placement EST. OF COMPLETION OF THIS PORTION OF WORK: 99% DISCUSSIONS WITH PERSONNEL ON SITE: Bill Feeley, Bill Dawson, Derek Adamire; Jim Lierly, Building Official, City of Port Angeles OBSERVATIONS: Bottom longitudinal and transverse reinforcement with vertical dowels extended from footing. REQUIRED MODIFICATIONS: Cut corner bar at interior edge of SE corner. Provide dowel extensions to lap with rebar at adjacent "monolithic" footings that will be placed later. Add vertical dowels with hooks at edge of openings (vents) and hold downs. Remove loose soil and rocks within 3" of rebar. ALLOWED MODIFICATIONS TO PLANS: On plans, change top rebar on vent reinforcement detail to (2) #4 from (2) #5. On type 2 and 4 hold downs, #3 dowels within 2' /i" of hold down bolts hooked into footing may be replaced with #4 dowels within 4 REQUIRED MODIFICATIONS TO PLANS: Place a half -width vent under S bot h sides (near each edge) of both windows at the east elevation, four total. ADDITIONAL COMMENTS: \G� R- SIGNED BY:[ if AL 41- i pf AS V A/41',!1-- i,1 TONAL t 11370B Sp Insp 1 1 7175 l•�L EN �4 Owen Structural Engineering Inc. 220 E. First Street Phone: (360) 452 -8574 Port Angeles, WA 98362 Fax: (360) 457 -8020 SPECIAL INSPECTION REPORT PROJECT: Nippon Corporate Office Addition 3, f Z ADDRESS: 1815 Marine Drive, Port Angeles, WA 98363 CONTRACTOR: Feeley Construction Inc. PSG R. 0 y U 40°` ,a 9 PRMIT 11- 00001090 d y� `--'t, ti .r 1":. REPORT 2 DATES: February 27 and 28, 2012 7 175 r WEATHER: Cloudy °kr WORK REQUIRING SPECIAL INSPECTION: Continuous stemwalls prior to concrete placement EST. OF COMPLETION OF THIS PORTION OF WORK: 99% DISCUSSIONS WITH PERSONNEL ON SITE: Bill Feeley, Bill Dawson, Derek Adamire OBSERVATIONS: Longitudinal and vertical reinforcement as vertical dowels extended from footing or as lapping vertical dowels extended from footing. Hold down bolts and anchor bolts in place. Hooks at top of vertical bars acting as stirrups under vents were missing at short stemwalls where there is insufficient distance for lap splicing. REQUIRED MODIFICATIONS: Provide 45 °diagonal bars with 4" horizontal hooks each end per detail under vents at vertical bars missing top hooks under vents. Provide dowel extensions from the stemwalls to lap with rebar at adjacent "monolithic" footings that will be placed later. ALLOWED MODIFICATIONS TO PLANS: Move the 7/8" o anchorage bolt for the 8Q holddown for the corner at the north end of the east wall to the east end of the north wall where it can lap with 2 #4 vertical rebar that are hooked into the footing. The rner studs attached by the holddown will need to have the plywood fro both walls edge nailed to them and the multiple studs attached to each other p r the holddown notes. W o anchor bolts may be threaded rods (to allow the 4" hreaded extension above the plate) with a slight bend in the 6" embedme into the stemwall. ADDITIO AL COMMENTS: lt„ ®G 4 SIGNED BY: ..r. r r e',,`"" t" 171; 1137013 SpInsp2 t.. Owen Structural Engineering Inc. 220 E. First Street Phone: (360) 452 -8574 Port Angeles, WA 98362 Fax: (360) 457 -8020 SPECIAL INSPECTION REPORT PROJECT: Nippon Corporate Office Addition ADDRESS: 1815 Marine Drive, Port Angeles, WA 98363 CONTRACTOR: Feeley Construction Inc. PERMIT 11- 00001090 REPORT 3 DATES: March 2and 5 until 9:30 am, 2012 WEATHER: Cloudy both days WORK REQUIRING SPECIAL INSPECTION: Eposy dowels into the north concrete foundation wall of the existing building per detail. EST. OF COMPLETION OF THIS PORTION OF WORK: 100% DISCUSSIONS WITH PERSONNEL ON SITE: Bill Feeley, Bill Dawson, Derek Adamire OBSERVATIONS: Some holes were drilled, wire brushed, and cleaned by oilless air pressure. Cleanliness and depth were checked on these as well as the new holes observed to go through the same process. About half the holes required additional wire brushing and blowing out. Simpson Epoxy Set XP expiring September 31, 2012 was properly inserted in the holes and the rebar inserted, twisted and brought out prior to adding more epoxy reinserting the epoxy covered bar, more twisting and air bubbles popping at the surface. ALLOWED MODIFICATIONS TO PLANS: On plans, change rebar to go through embedment to 5" from 6 ADDITIONAL COMMENTS: Full time special inspection by Craig Owen and /or Bill Dawson under my direction. G R. 0 SIGNED BY: .F !�+s o Z .x... ate. 117/ 1 7 1 7: /2". ‘voikiALiater o 3 9 4 P' a.-.-- lI37OBSpInsp2 NOTES Permit 1 O la L su6rya-r,u (-i q 3 it) G E --w+ ilk icy- t t -11 rol oto- lvl u0,2. as r nfflAA -e- Ut z U u B� 4, 1 .D, .4 r! LL 1 1��_. 1 1 1 1 -1 C 0W 4 m at 4 2 596. `f. 4 itek ,Q(WW,40 J c T k EA\QA Cam. S a.11_ Gu-e (.6 M j a car-, k JAAN -e T;Forms /Building Division/Notes i o i I o 0 op T en W O ti Ea J a. z f o `1!O a 3 a oo c O Z 3 e! r. i i l i qa y C g v c a, F h a fir.31 n a lk W i R i �q y w 5 i O itl l i o c 1 1 U O i p'13 1 i f I II 1 o 14 4 '*20 .1 2 2t S 9 �i s i i B A_ i G -1,_, a. p 3 L s p a o I .0 a: +-ii �p� d� o O Z i 114 I o j z 1 .r. E- r a 0 ga allii s$IT 9y e o 8 0 1 t b �..g i ,1 1 V^ i W (7 2 B UILDING PLUMBING MECHANICAL PERMIT APPLICATION LONG FORM (To be used for projects that require plan review.) IO 3— 00 ri G�' `i� r✓rA�:a Co Lip Date Receive QP.r o V a,\ Sh° Permit# .11)W City of Port Angeles Please print in ink. Date Appro IllEffi Attn: Building Permit Technician Approved 11 321 E. 5 St., Port Angeles, WA 98362 360- 417 -4815 fax: 360- 417 -4711 Credit card payments are accepted Mon -Fri 8 -5 pm (no Am. ri :n Express) Hours: Mon through Fri 8 5 pm Cash checks are accepted Mon -Thurs 8:30 -4 pm Fri 8:0 -12:30 pm Contact person: G�0 c (2 OLVE.'E1 E Phon Z Z Q Property owner: 1 ��y,n, X N i,1 P/ 2 I t llUl fU -''5 Phone: 1 47' Pro y ow is mailin_g address Contractor's business name: Phone: (or property owner's name if he /she is doing /overseeing the work) Contractor's mailing address: rs O Contractor's L &I license: number: Expiration date: .lreis Project Address: 1 15 To-s by-, fm c,vr`('e V0Q eA.. VQ)ss /oit7 i.14 4 5 Av 1I-- P ib -I Project Type: D Residential Commercial /Industrial o Multi- family Project Business Name: Zonin (for commercial, industrial, or multi family projects) 1C• lest' /7/O /'J !14057/v/9'L Parcel 1 L142 t 0 Lot #f Complete only the portions of this permit that are relevant to your project. 7 Pay the plan check fee (based on the valuation of the project) at the time of submittal Residential Projects submit: Two sets of plans* (including engineering calcs, geotech reports, etc. if applicable) Prescriptive Approach Simple Form (confirming conformance to the Energy Code) :Commercial Projects su Three sets of plans* (including engineering talcs, geotech reports, etc. if applicable) Paper confirming conformance to the Energy Code For large projects, a pre- construction meeting with various City department personnel is highly recommended. To schedule a pre- construction meeting, contact the Planning Manager at (360) 417 -4750. Additional information may need to be submitted including: landscape plan, parking plan (including ADA spaces, ramps, etc.), utilities (existing proposed), curbs, sidewalks, storm water plan, etc. For Additions New Structures also submit: d/ Site plan (8 1/2" x 11 showing all structures (existing proposed), setbacks, new driveways If an architect or engineer drew the plans or calculations, include at least one "wet- stamped" set of plans and /or calculations. T:Forms /Building Division /Building /Plumbing /Mechanical Permit Application Long Form (Revised 2011) Page 1 of 4 Repair Solar Panels Miscellaneous: (explain the project) Project Valuation Remodel: °(explain the project, including how the building space is currently being used and what the new, 'remodeled use will be) Project.Valuation If the space will `change from commercial to residential, submit: "Checklist Converting Commercial Space into Residential •Space c Addition: (explain the project and complete submit page 3) P419 VI 1c.r164 c.k i C- SPACG1— Maximum height of the new addition Ze feet Project Valuation i .3L1 0 '7! V 9O New Structure: (explain the project and complete submit page 3) Maximum height of the new structure feet Project Valuation PLUMBING 'PERMIT: Will there be ANY plumbing changes (items moved, added,,:replaced or altered) Check one: No Yes If yes, complete submit page 4 "Plumbing.Changes" MECHANICAL PERMIT: Will there be ANY mechanical changes (items moved, added, replaced, or altered) Check one: No Yes If yes, complete submit:page 4. "Mechanical Changes t® Occupancy group 3 of bedrooms k.)-11 Willa lawn sprinkler system be installed? N Occupant load of full baths Will a fire sprinkler system be installed? D Construction type of half baths Z *Homeowner: If you will b "e doing 6C/erseeing the'work <then the project valuation Mill.be determined by doubling the cost of materials, to reflect the value the irepair:adds :your :property. Cost of materials x`2 Project Valuation`$ 1 have read and completed this application and know it to be true and correct. l.am authorized to apply for this permit and understand that it is my responsibility to determine what permits are required, and to obtain permits prior to working on projects. Date 1 2 9 Ai Signature_ Print Name 'e, V 01 j O P NJ Page2of4 Floor Areas Existing square New square Price per new footage footage square foot Basement A/ x st i 2 321 1 Floor ?Ric, 1 3z_6 2" Floor 1 '1'71— 3rd Floor 474 Garage Il/ Carport 'j Covered Porch p0 38' (.eS �'L Deck 30" high) Deck 30" high)* Shed Other Other u Remodel project valuation C 3 10,5 ,30 TOTAL VALUATION 3 )g75. Walking surface of the deck above ground For residential building projects the minimum square foot valuation we accept is: Dwelling $85.00 per sq. ft. garage /utility /misc.structure $30.00 per sq. ft. porch /deck /carport $12.00 per sq. ft. LOT COVERAGE SITE COVERAGE Lot coverage is the amount or percent of ground area on which buildings are located. It includes: houses, garages, carports, covered patios, cantilevered portions of buildings, roof overhangs that are longer than 30- inches, uncovered decks or porches having walking surfaces higher than 30- inches off the ground, etc. Total footprint of structures 7_ l ,_700 sq. ft. lot size I b (PS 5 sq.ft. Lot coverage .7 Site Coverage is the amount of impervious surface on a parcel, including structures, paved driveways, sidewalks, patios, and other impervious surfaces. (see Port Angeles Municipal Code 17.94.135 for exemptions) Does the project include a new driveway? a yes no If yes, what will the driveway be made of? o cement c asphalt o gravel D.1 other (NOTE: 18 feet is the recommended minimum driveway length for residential projects) Does this project include a new parking pad? o yes L7' no If yes, what will the parking pad be made of? o cement o asphalt o gravel o other a) Total footprint of structures 7k 7CX.) sq. ft. (existing new) b) Total concrete, asphalt, other impervious surfaces '20 3 sq. ft. (existing& new) c) Add lines "a" °b" above to get the total impervious Z E,� sq. ft. (existing new) Total impervious j 7 1)) q. ft: .lot size /_C?? CPC sq. ft. Site coverage l Page 3 of 4 1 PLUMBING CHANGES Check "No" or "Yes" (and enter quantities) for each Tine item. Type Plumbing Changes (Moved, Added, Replaced, or Altered Sink (hand; mop, floor etc.) No Yes Quantity Toilet No Yes 1 Quantity Bathtub o Yes x Quantity Shower No Yes" Quantity Washing Machine No Yes Quantity Hot Water Heater )do Yes Quantity Water Line (meter to structure) .V o Yes Quantity Re- plumb'the structure Yes Quantity Sewer Line No ,Yes' Quantity Backf!ow Prevention Device Types: Beverage Machine "No Yes Quantity Landscape Watering System o Yes Quantity Fire Sprinkler System 2 inch line No Yes Quantity Fire Sprinkler System 2 inch line No Yes Quantity Please liist all other planned plumbing changes or additions that aren't listed above. Litt* MECHANICAL CHANGES Check "No" or "Yes" (and enter quantities) for each line item. Type Mechanical Changes (Moved, Added, Replaced, Furnace, heat pump, or or Altered) forced air unit 5 tons No Yes Quantity Furnace, heat pump, or forced air unit 5 tons No. Yes Quantity Ductless heat pump __No Yes Quantity Wall (recessed) heater Yes Quantity Baseboard heater /2. Yes Quantity Steffes room. heater No Yes Quantity Wood- burning.stove -No Yes.. Quantity Pellet stove No Yes Quantity Radiant floor heat No` Yes Quantity Gas fireplace or freestanding stove No Yes Quantity Gas cooking stove No Yes Quantity Propane tank set No Yes .Quantity Gas line No Yes Quantity Boiler No Yes Quantity Clothes Dryer No yes Quantity Ventilation fan (single duct) No Yes 2- Quantity Hood duct mechanical exhaust No Yes Quantity. Ventilation system (not part of a heating or air conditioning system) No Yes Quantity Air handler /No Yes Quantity Evaporative cooler (non- portable) No Yes Quantity Please list all other planned mechanical changes -or additions that aren't listed above. Page 4 of 4 .T., ',1,-..--..T.,-:-.T.,:.:1T-----' I w ,t •E ---i/j„ 1 1*7 s' i 6 1 .1 g 6 1 11 j E I il 2 i g2 rli L,3 1 li 0 „--0 0 a ,g L //1,,,.•:--,7::--------::, iR 3 Y E B Ii •1 —1 10.. i 7 1 I 0 ui=1 LIP n /6 .7 i ..4.• L__ 11: --L N Ll N •1- N./ Ati.m. N 1 711i s..: 1 0 1 1 0 0 0=3 n g N 00 L.. g 0 0 0 0 ti 7 7 7 IN MI u MI M 1?, E g gg 0 \..9 t: .-z- c,:i cr d' V n: z ,Z- 6 A N •k-.'' .1 <0 't-----11 I N\ \,,,,x u cc, ,n w Z 0 cc ta- )7) 7( ta.J cc 0 i v) u- N U-1 LU f2C H (1) D -.-7 Z ,..3 LU 4c:e N -,94 v CL LU l 's (331-IS 1 ..o S tl‘ N./ 0 Z I -1.- 0 o_ CC 0 1 1 I LL 1 Z 1 I I cc) co 1-- 0 t Lu in CD in 1 F 1 z ----77' IT UJ (;IJCC-‹ 4 7.1 Lu cc 0 2 un o 0 I 2 o 4 N I 'Lc E LL rN 1 I 1 L '75 1 LL 1 c: 0 r...1 ,Li- V 6 4, 1' 1 (D i z cc I LD T;• in >7 0 Lu 2:- s 1 Clallam County Assessor Treasurer Property Details 57013 DAISHOWA AMERIC... Page 1 of 1 Clallam County Assessor Treasurer Property Search Results 57013 DAISHOWA AMERICA CO LTD for Year 2011 2012 Property Account Property ID: 57013 Legal Description: TAX #7950 EXC EAS #3897 BL146 PT SUR V13 P92 Geographic ID: 0630000146000000 Agent Code: Type: Real Tax Area: 0010 PA 121 PORT ST CNTY H2 L WMP Land Use Code 51 Open Space: N DFL N Historic Property: N Remodel Property: N Multi Family Redevelopment: N Township: Section: I Range: Location Address: 1902 MARINE DR Mapsco: PORT ANGELES, WA 98363 Neighborhood: PA Industrial Map ID: 3 Neighborhood CD: 5106000 Owner Name: DAISHOWA AMERICA CO LTD Owner ID. 20352 Mailing Address: PO BOX 271 Ownership: 100.0000000000% PORT ANGELES, WA 98362 -0044 Exemptions: Taxes and Assessment Details Property Tax Information as of 10/03/2011 Amount Due if Paid on: NOTE: If you plan to submit payment on a future date, make sure you enter the date and click RECALCULATE to obtain the correct total amount due. Click on "Statement Details" to expand or collapse a tax statement. First Half Second Half Year Statement ID Base Amt. Base Amt. Penalty Interest Base Paid Amount Due 0 Statement Details 2011. 151736 $41166.62 $41166.54 $0.00 $0.00 $82333.16 $0.00 lo" Statement Details 2010 40026 $46312.74 $46312.73 $0.00 $0.00 $92625.47 $0.00 Values Taxing Jurisdiction I Improvement Building Sketch Property Image Land Roll Value History Deed and Sales History Payout Agreement This year is not certified and ALL values will be represented with "N /A Website version: 9.0.32.2200 Database last updated on 10/3/2011 3:50 AM 2011 True Automation, Inc. All Rights Reserved. Privacy Notice http: /websrv8.clallam. net propertyaccess /Property.aspx ?cid =0 &year =2011 &prop_id =57013 10/3/2011 r-kg0024 Cow`"rA r Linda Pangrle From: Derek Beery <r NN Sent: Monday, October 17, 2011 9:52 AM To: Linda Pangrle Oonc\--or Subject: 1805 Marine Drive Nippon Office Addition Permit Conditions PJ GoV'' The General Archaeological Permit Conditions are as follows: 1. The applicant must hire an approved archaeologist to be present on site during all ground disturbances. The project proponent will be required to provide the City with the name and credentials for their archaeological representative(s) as well as a brief work plan and schedule ahead of the permitted ground disturbance. The Archaeologist must meet the Washington State guidelines for a Professional Archaeologist and must be in contact with the City Archaeologist prior to and during the permitted project. A professional monitoring report must be issued to the City Archaeologist upon completion of the ground disturbing actions. 2. Regardless of the presence of an archaeological monitor, if during ground disturbances, any phenomena of possible archaeological interest are uncovered the contractor shall immediately stop such work and provide for a site inspection and evaluation by the City Archaeologist to ensure that all possible archaeological resources are handled in accordance with applicable law. In the event archaeological artifacts, features or human remains are discovered, the City will notify the Lower Elwha Klallam Tribe and the State Department of Archaeology and Historic Preservation, as required in RCW 27.44 and 27.53. Archaeological Preservation requirements will then be enacted as applicable to State law. Washington State ch.-ological Report Gu'•el es can be foun ere: http: /www.dahp.wa.•.v /pages /Environmental: iew /documents /CONSU NTS -ARCHY 063.pdf A list of approv-: archaeological contr. tors 's available on e sa website here: htt.: www.da,•.wa.:ov doc. ents Exte a1FINAL. L.f 2Se,∎ 41h If you have questions or comments, the City Archaeologist, Derek Beery, can be reached at (360) 417 -4704 or by email at dbeerOcityofpa.us We are here to help and will do our best to guide you through archaeological compliance requirements for your project. Derek S. Beery Archaeologist City of Port Angeles, WA 321 E. 5th Street Port Angeles, WA 98362 dbeery @cityofpa.us (360) 417 -4704 office (360) 461 -9131 cell 1 0,m,/,,,,, CITY OF PORT ANGELES ntSYS DEPARTMENT OF COMMUNITY ECONOMIC DEVELOPMENT BUILDING DIVISION ._d 321 EAST 5TH STREET, PORT ANGELES, WA 98362 Application Number 12- 00000587 Date 5/14/12 Application pin number 935974 Property Address 1902 MARINE DR OFFIC ASSESSOR PARCEL NUMBER: 06- 30- 00 -0 -1- 4600 -0000- R EPORT SALES TAX Application type description MECHANICAL APPL. PERMIT on your state excise tax form Subdivision Name Property Use to the City of Port Angeles Property Zoning INDUSTRIAL HEAVY (Location Code 0502) Application valuation 20790 Application desc HEAT PUMP SYSTEM DUCTING Owner Contractor DAISHOWA AMERICA CO LTD PENINSULA HEAT INC r.) PO BOX 271 782 KITCHEN -DICK RD PORT ANGELES WA 983620044 SEQUIM WA 98382 (360) 457 -4474 (360) 681 -3333 Permit MECHANICAL PERMIT Additional desc HEAT PUMP DUCTING Permit Fee 75.45 Plan Check Fee .00 Issue Date 5/14/12 Valuation 0 Expiration Date 11/10/12 Qty Unit Charge Per Extension BASE FEE 50.00 1.00 14.8000 EA ME- FURN /HP /FAU OR 5 TON 14.80 1.00 10.6500 EA ME -VENT SYSTEM (NON -HVAC) 10.65 Fee summary Charged Paid Credited Due Permit Fee Total 75.45 75.45 .00 .00 Plan Check Total .00 .00 .00 .00 Grand Total 75.45 75.45 .00 .00 Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether spe ed rein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions y state or lo ..w gulating construction or the performance of construction. S/4C Ch4/ i 1 Date Print Name Signature of Contractor or Authorized Agent Signature of Owner (if owner is builder) T:Forms /Building Division /Building Permit BUILDING PERMIT INSPECTION RECORD tp, PLEASE PROVIDE A MINIMUM 24 -HOUR NOTICE FOR INSPECTIONS Building Inspections 417 4815 Electrical Inspections 417 4735 Public Works Utilities 417 4831 Backflow Prevention Inspections 417 4886 IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT IN CONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE. Inspection Type Date Accepted By Comments FOUNDATION: Footings Stemwall Foundation Drainage Downspouts Piers Post Holes (Pole Bldgs.) PLUMBING: b Under Floor Slab Rough -In Water Line (Meter to Bldg) Gas Line Back Flow Water FINAL Date Accepted by AIR SEAL: VVails Ceiling FRAMING: Joists Girders Under Floor Shear Wall Hold Downs Walls Roof Ceiling Drywall (Interior Braced Panel Only) T -Bar INSULATION: Slab Wall Floor Ceiling MECHANICAL: Heat Pump Furnace FAU Ducts Rough -In Gas Line Wood Stove Pellet Chimney Commercial Hood Ducts FINAL Date Accepted by MANUFACTURED HOMES: Footing Slab Blocking Hold Downs Skirting PLANNING DEPT. Separate Permit #s SEPA: Parking Lighting ESA: Landscaping SHORELINE: FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/ USE Inspection Type Date Accepted By Electrical 417 -4735 Construction R.W. PW Engineering 417 -4831 Fire 417 -4653 Planning 417 -4750 C>n Building 417 -4815 10'-. T•Fnrmc /Ruilrlinn rlivisinn /Ruilrlinn Permit MAY -14 -2012 08:48A FROM: PENINSULA HEAT COMPA 360681 TO: CITY PA PERMITS P.1 4 BUILDING PLUMBING MECHANIC PERMIT APPLICATION SHORT FORM (To be used for protects that do not require plan review.) Date Received' P" Permit rd City of Port Angeles Please print In Ink. Date Approved 1 dr Attn: Building Permit Technician Approved by 321 E. 60" St., Port Angeles, WA 98362 360-417.4815 fax: 360. 4174711 Credit card payments are accepted Mon -Fri 8 -5 pm (no American Express) Hours: Mon through Fri 8 5 pm Cash checks are accepted Mon -Thurs 8:30.4 pm Fri 8:30 -12 :30 pm Contact pension a,,/ l 4eie tom Phone: 3 3 rq�e �7 f� f �0 P P� /1 D/ ��Lp�r 1-1111 r- ✓77'1 6 �S' �D "9 Prop own is errf ilinp addreas: /z4 oGva Pte' /�sPhon n U- c a 7/ e7 l�s bv∎-- X36 Contractor's buainess name: S 4-1,1 �7" Phone (or property owner's name if he /she Is doing /overseeing :f he work) e k) -33 i3 Contresn mailing ad ie/ ei ,e1 Sere n- bi/4 Contractor's ens 91/6 n_ mb 14 Expiration to PF.A/ IA/1 Project Address: 186 7242-4 Protect Type: o Residential rlrC al-industrial o Multi family Protect Business Name: 4/1 Pj �usyyics (for commercial, industrial, or multi- family proj t s) The following permits are usually issued over the counter immediately, without the need for plan review. Complete only the portions of thls permit that are relevant to your project. Re -roof; in house in 'garage o other tear off re -roof o lay over one layer Licensed contractor: Submit a copy of your re -roof bld. Project Valuation (labor materials, not Including sales tax) Re- side: house o garage o other Project Valuation (labor materials, not including sales tax) Repair (explain the protect) Project Valuation "J1omeowner; If you will be doing overseeing the work, then the project valuation will be determined by doubling the coat of materials, to reflect the value the repair adds to your property. Cost of materials x 2 Project Valuation T:Forms/Bullding Division /Building /Plumbfng/Mechanleal Permit Application Short Form (Revised 2011) 1 VE Page 1 of 2 R MAY 1 4 2012 C B ANGELES OF PORT I DING D M SION MAY -14 -2012 08:48A FROM:PENINSULA HEAT COMPA 3606812086 TO: CITY PA PERMITS P.2 4 Swlmmino Pool or Soa It 24" deep): For prefabricated swlmminnpgo/ or so. protects that 4o not mull" plan review: Obtain the City of PA handout entitled "Pools Spas" follow the requirements. Project Valuation pemolltion: A demolition permit Is needed when an entire building gets demolished. What will be demolished? o house o garage o other some demolition permit applications need to be reviewed by various City departments, and may take approximately two weeks to obtain. (1) Agree to ensure that all utilities are/will be properly turned off (and capped off If needed) prior to demolition. Obtain (from the City of PA) an aerial view map of the parcel and put an "x" over the structure(e) to be demolished. Submit the map with this application. (1) Obtain (from the City of PA) a copy of the Olympic Region Clean Air Agency (ORCAA) Demolition Permit Application. Contact ORCAA at 380 417 1466 to discuss whether or not an ORCAA Demolition Permit will also be needed. yes o no Will the debris be going to the Regional Transfer Station In Port Angeles? o yea v No if yes, will a licensed contractor be taking It there? It yea, obtain (from the City of PA) a copy of the Waste Disposal Application, Complete and submit the waste disposal application to the Building Permit Technician, now (or later if asbestos testing Is needed). Plumbing Permit: jexolaln the oroJectl Project Valuation Mechanical Permit; (explain the project) i ii ./.74==.4 7 2— hie? ,(�l� 5yi ..05, i J �l ea a Ar Project Valuation old() D 1 have read and completed fhls application and know It to be true end correct i am authorized to apply for this porm and understand that It is my responslblll o determine what m►its are required, and to obtain permits prior to working on protects. Date 5//9/2- Signature Print Name 1�1 et �v rs n,.LJ Page 2 of 2 CITY OF PORT ANGELES FIRE DEPARTMENT PERMIT 321 East 5' Street, Port Angeles, WA 98362 0 q' Application Number 12- 00000370 Date 4/06/12 n Application pin number 049730 Property Address Vgi'V MARINE DR REPORT SALES TAX ASSESSOR PARCEL NUMBER: 06-30-00-0-1-460070000- Qn our state excise tax form Application type description FIRE ALARM SYSTEM Y Subdivision Name to the City of Port Angeles 0,,. Property Use Cy; Property Zoning INDUSTRIAL. HEAVY (Location Code 0502) Application valuation 6000 ‘6 Application desc FA SYSTEM FOR OFFICE cr,.. fi nal g 1510_ Owner Contractor DAISHOWA AMERICA CO LTD PERFORMANCE SYSTEMS PO BOX 271 7324 SW DURHAM RD PORT ANGELES WA 983620044 PORTLAND OR 97224 (360) 457 -4474 (360) 681 -8971 t,; Permit FIRE ALARM SYSTEM yi'' Additional desc FA SYSTEM FOR OFFICE Permit Fee 160.00 Plan Check Fee .00 Issue Date 4/06/12 Valuation 0 Expiration Date 10/03/12 Qty Unit Charge Per Extension BASE FEE 100.00 1.00 10.0000 ECH FIRE ALARM EA ZONE 10.00 1.00 50.0000 ECH FIRE ALARM PLAN REVIEW 50.00 Special Notes and Comments A full acceptance test will be required for the fire alarm system. April 2, 2012 2:33:00 PM kdubuc. Replace the heat detector in Office "E" with a smoke detector. Fee summary Charged Paid Credited Due Permit Fee Total 160.00 160.00 .00 .00 Plan Check Total .00 .00 .00 .00 Grand Total 160.00 160.00 .00 .00 f= This permit becomes null and void if work authorized is not commenced within 180 days, if work is suspended or abandoned for a period of 180 days afer the work has commenced, or if required inspections have not been requested with eIs 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be c true and correct. All provisions of recognized standards, laws and ordinances governing this type of work will be compied 0 ..•,.o with whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating the work specified in the permit. /,L) `ii Z, ,;2,0 Signature of Contractor or Authorized Agent Date Signature of Owner (if Owner is builder) Date FIRE PERMIT INSPECTION RECORD Call 360 417 -4655 for fire inspections. Please provide a minimum 24 -hour notice. It is unlawful to cover, insulate or conceal any work before inspected and accepted. Post permit in a conspicuous location. KEEP PERMIT CARD AND APPROVED PLANS AT JOB SITE Inspection Type Date Passed Comments FIRE SPRINKLER Underground piping hydrostatically tested Underground piping flushed Interior piping hydrostatically tested Interior piping inspection ilir Dry system air tested at 40 psi (24 hours) Sprinkler final FIRE ALARM Rough -in inspection Alarm final LP -GAS Completed by Contractor: Underground piping inspection /pressure test Test #1 Above ground piping inspection/pressure test Piping pressure test psi Time initiated Tank (container) inspection Test #2 Appliance inspection Piping pressure test psi Time initiated LP -gas final UNDERGROUND STORAGE TANK (UST) ABANDONMENT Removal of flammable /combustible liquids Tank appropriately abandoned UST abandonment final PERMIT OTHER (specify) i permit final g t GENERAL COMMENTS: 1, 2/15/00 FIRE RELATED PERMIT APPLICATION CITY OF PORT ANGELES For City Use Only: Attn: Building Permit Technician Date Received t4. a l� 321 E. Fifth St., Port Angeles, WA 98362 Permit (360) 417 -4815 fax (360) 417 -4711 Applicant Performance Systems Integration Phone 36Q- 681 -8971 Property Owner Nippon Paper Company Phone 360- 565 -7016 Property Owner's Address Contractor Performance Systems Integration Phone 360 681 -8971 Contractor's Address PO BOX 194 Carlsborg WA 98324 License perfns *980m4 Expires 6/30/19 E -mail slimmer @psintegrated. PROJECT ADDRESS 2 Marine Drive, Port Angeles WA 98362 Project Business Name 1,6 Fire Alarm System o Residential Multi- family )1 Commercial Industrial Check all that apply Briefly describe the project: x One addressable loop Add new FA system to Office One zone Additional zones List quantity of additional zones PROJECT VALUATION (labor materials) 6,000.00 Fire Sprinkler System o Residential Multi- family Commercial o Industrial Check all that apply RECEIVED Briefly describe the project: Installing backflow protection device(s)? yes no APR 2 2012 <2 inch water line (list quantity of devices) >2 inch water line (list quantity of devices) CITY OF PORT ANGELES li q Y i E?&M DING DIVISION PROJECT VALUATION (labor materials) sT lrilG.7MTII `:7 Z Hood Duct Fire Suppression System o Com ntial Multi- family Commercial ❑Industrial Check all that apply Briefly describe the project: Will only the fire suppression system be installed or altered? yes no Will a hood and /or ductwork be installed or altered? yes* no If yes, a mechanical permit will also be needed. PROJECT VALUATION (labor materials) I have read and completed this application and know it to be true and correct. 1 am authorized to apply for this permit and understand that it is my responsibility to determine what permits are required, and to obtain permits prior to working on projects. Date 3 °3v 2'tz. Print Name"fA-- Signatur- T:Forms /Building Division/Fire- related permit application ELECTRICAL PERMIT 2'' 3 N CITY OF PORT ANGELES t 360-417-4735 b Application Number 12- 00000601 Date 5/15/12 Application pin number 748657 Property Address 1815 MARINE DR 1 REPORT SALES TAX ASSESSOR PARCEL NUMBER: 06- 30- 00 -0 -1- 4600 -0000- on your excise tax form Application type description ELECTRICAL ONLY Subdivision Name to the City of Port Angeles Property Use (Location Code 0502) Property Zoning INDUSTRIAL HEAVY Application valuation 0 Application desc New office space Owner Contractor DAISHOWA AMERI'CA CO LTD ANGELES ELECTRIC PO BOX 271 524 E. 1ST ST. Vim:/ PORT ANGELES WA 983620044 PORT ANGELES WA 98362 �J� (360) 457 -4474 (360) 452 -9264 Permit ELECTRICAL NEW COMMERICAL C 1 Additional desc v 1 Permit Fee 757.00 Plan Check Fee .00 Issue Date 5/15/12 Valuation 0 Expiration Date 11/11/12 q Qty Unit Charge Per Extension 3 20.00 5.0000 ECH EL- BRANCH CIRCUIT W /FEEDER 100.00 1.00 96.0000 ECH EL- LIMITED 1ST 1500 SQ FT 96.00 1.00 5.0000 ECH. EL -ADDNT LIMITED 1500 SQ FT 5.00 f 3.00 132.0000 ECH EL -COM 0 -200 SRV FEEDER 396.00 1.00 160.0000 ECH EL -COM 201 -400 SRV FEEDER 160.00 1 Fee summary Charged Paid Credited Due Permit Fee Total 757.00 757.00 .00 .00 Plan Check Total .00 .00 .00 .00 Grand Total 757.00 757.00 .00 .00 INSPECTION TYPE DATE: RESULTS: INSPECTOR: DITCH SERVICE CZ 44?' _.14:, ROUGH -IN 14 g FINAL g j l1j2 A7 COMMENTS: PERMIT WILL EXPIRE SIX (6) MONTHS FROM LAST INSPECTION Signature of owner or Electrical Contractor X 1 Date: G: \EXCHANGE \BUILDING ~i o *pUR7,�!F C% ELECTRICAL INSPECTION v, g BRING REPORT co G 4 �ww 417 -44735 *OAKS 6 DATE: PERMIT INSPECTOR 81 I2 -c5 f7 OWN R CONTRACTOR AA NI Gas -.1 1z ,i C- ADDRESS /S 1C M u-v K- nf2-. APPROVED NOT APPROVED DITCH ROUGH IN /COVER SERVICE FINAL CORRECTIONS NEEDED: l- R C 6F P E&oIRIr.,P T-ovz_, .1 .,cr 1(--)rz rzi. c2sQ TAcLrm_s ►\>t `CO 0 i 2) 42,av>+4.i>it.2c aF thsc... 12-1EQvtF.-. '__et? C KIPLKT 'u01LP3 14,e. ZS Iyn, 144, _rz DC S1g,TZUl Ms L$T'1TrLC4\T dt ti.L+c_L 23c) Z 3 E_, L.arg*...-. sue¢ v(CC I- 1 F1KL1SK 1�1...�c_7•141G1°e,L. 1 "Th1.L14":1 LOKd 614/544(_ 1.,1 Ll ?S -r GCV0-IZ. Q1,p+TE,S f•-licc. 10 NOTIFY INSPECTOR WHEN CORRECTIONS ARE COMPLETED WITHIN 15 DAYS DO NOT I; .OVE 0ppOR744,01 ELECTRICAL ICAL LI lSP CMIO[ 4° W IRRONO REPORT 417-4735 DATE: PERMIT INSPECTOR ,z o 601 OWNER ACTOR f4•Let r e--0 ADDRESS ,1815 m L am 17r2 APPROVED NOT APPROVED DITCH ROUGH IN /COVER SERVICE FINAL CORRECTIONS NEEDED: 12,) t. b t) gEOV1R:gi) D '33z,D► us z �L "6S,14 Al&c l 42--41— NOTOFV O IRII SPIECTOR CORRIECTOONS '‘RE COMPLETED WOTC-0111d 15 DAYS DO (SOT IR EMOV °FP RT"4° F ELECTRICAL INSPECTION N G WIRING REPORT w °R P "F 417 -4735 DATE: 65 1 Z- PERMIT INSPECTOR OWNER 113520 0 CONTRACTOR 4446. te-V ADDRESS APPROVED NOT APPROVED DITCH 5ati=tel.p ROUGH IN /COVER SERVICE FINAL CbRRECTIONS NEEDED: oQ i�� t d1 1 �-uDI�. r NOTIFY INSPECTOR WHEN CORRECTIONS ARE COMPLETED WITHIN 15 DAYS DO NOT REMOVE 05/15/2012 08:54 FAX 360 452 9265 Angeles Electric 100001 /0001 `col r O CITY OF PORT ANGELES PERMIT APPLICATION Building Division/Electrical Inspections 321 East Fifth Street P:O, Box 1150 Port Angeles Washington, 98362 1 Ph: (360) 4 7 -47 5 Fax: (360) 417 -4711 -.r Date: S /.i Multi- Family or Commercial* Commercial Addition Alteration Remodel Repair* Plan Review May Be Required, Please Complete Electrical Plan Review Information Sheet 81,z ,W.# 2�T rl ,p Job Address: Building Square Footage: n 1 Description of above �f bA; Y"�• Owner Info a on Contractor Information Name: L i! Name: t fir____ C. /IJG Meiling 4 I �_�Ai %,ul AID. MalllrrgAdd Jd r es; 5 City: State: Zip: 'jar City: yorrAvv3LL.8 State: WA Zip: Phone: Fax: Phone: 02 4749 Fax. 9 2 License Exp. License Exp. Item Unit Charge gty Total (Qtv Multiplied by Unit home) Service/Feeder 200 Amp. $132.00 1 3 39L Service/Feeder 201-400 Amp. 160.00 —11E— f n9 de 1 b b b b Service/Feeder 401 -600 Amp 225.00 Service/Feeder 601 -1000 Amp. 288.00 Service /Feeder over 1000 Amp. 410.00 ob Branch Circuits 1-4 86.00 O° Branch Circuit W/ Service Feeder 5.00 Branch Circuit W/O Service Feeder 74.00 Each Additional Branch Circuit 5.00 Temp. Service/ Feeder 200 Amp. 102.00 Temp. Service/Feeder 201 -400 Amp. 121.00 Temp. Service/Feeder 401-600 Amp. 164.00 Temp. Service/Feeder 601 -1000 Amp 186.00 Portal to Portal Hourly 96.00 Sign /Outline Lighting 88.00 Ob Signal Circuit/ Limited Energy Multi- Family 64.00 ��,,,r� `j 6 Od Signal Circuit/ Limited Energy First 1500 sf Commercial 96.00 72L") 1 Note: $5.00 for each additional 1500 sf Renewable Electrical Energy 5KVA System or Less 113.00 Thermostat 56.00 ob Tot 15 Owner as defined by RCW.19.28.261: (1) Owner will occupy the structure for two years after this electrical permit Is finalized. (2) Owner is required to hire an electrical contractor if above said property is for sale, rent or lease. Permit expires after six months of last inspection. After reading the above statement, I hereby certify that I am the owner of the above named property or a licensed electrical contractor. I am making the electrical installation or alteration in compliance with the electrical laws, N.E.C., RCW. Chapter 19.28, WAC. Chapter 296 46B, The City of Port Angeles Municipal Code, and Utility Specifications and PAMC 14.05.050 regarding Electrical Permit Applications. Signature of owner, electrical contractor or electrical administrator: Cash Cheek a'Endlt Cud II Q^J f /L X Dated: �l y/;L 01101/2012 ELECTRICAL PERMIT a CITY OF PORT ANGELES (A 360- 417 4735 Application Number 12- 00000595 Date 5/15/12 Application pin number 106540 Property Address 1815 MARINE DR 1 REPORT SALES TAX ASSESSOR PARCEL NUMBER: 06- 30- 00 -0 -1- 4600 -0000- on your excise tax form Application type description ELECTRICAL ONLY Subdivision Name to the City of Port Angeles Property Use (Location Code 0502) Property Zoning INDUSTRIAL HEAVY Application valuation 0 Application desc T -stat Owner Contractor DAISHOWA AMERICA CO LTD PENINSULA HEAT INC PO BOX 271 782 KITCHEN -DICK RD PORT ANGELES WA 983620044 SEQUIM WA 98382 n (360) 457 -4474 (360) 681 -3333 &I 2O$/ o �J Permit ELECTRICAL NEW COMMERICAL o J p Additional desc (1 Permit Fee 56.00 Plan Check Fee .00 Issue Date 5/15/12 Valuation 0 Expiration Date 11/11/12 Q'ty Unit Charge Per Extension 1.00 56.0000 ECH EL- LVT- THERMOSTAT 56.00 Fee summary Charged Paid Credited Due Permit Fee Total 56.00 56.00 .00 .00 !1 Plan Check Total .00 .00 .00 .00 �v Grand Total 56.00 56.00 .00 .00 INSPECTION TYPE DATE: RESULTS: INSPECTOR: DITCH SERVICE ROUGH -IN Jq 1 Z FINAL COMMENTS: PERMIT WILL EXPIRE SIX (6) MONTHS FROM LAST INSPECTION Signature of owner or Electrical Contractor X Date: G: \EXCI IANGE \BUILDING MAY -14 -2012 08:49A FROM:PENINSULA HEAT COMPA 3606812086 TO:CITY PA PERMITS P.3/4 -77�M 1!(p:, r� i'm L \V) 1 ..J U L-1;,001,-.44, th CITY OF PORT ANGELES PERMIT APPLICATION Building Division/Electrical Inspections E F, U 9 `t 321 East Fifth Street P.O. Box 1150 Port Angeles Washington, 98362 t; 1;t o n r` e✓id01 Ph; (360) 417 -4735 Fax: (360) 417 -4711 Date: 5 /Z Multi Family or Commercial' lir 18c Plan Review Mly Be.R w uired, Please Co lete Electrical PI Re ie Information Sheet Job Address: YU o2 /4 it r/ rig ri re Building Squa re ftio lege: Desaiption of above aa e n !_arr i l_ Fm ed. Owner 1pfpJaJk i v CContract. Information Name: A/ /f�/�(J Name: ri Mailinp{kddress 1 Mailing Address: Z /MS� City: r Male: 7 i4 Zip: 7 City: s^FQ r Zip State Phone lei r i Fax: Phone: G .1-313 3 Fax S-/ License Exp, License Exp. teini Unit Chem. gt Total IQty Multiplied by Unit Charnel Service /Feeder 200 Amp. 132.00 Service /Feeder 201 -400 Amp. 160.00 Service/Feeder 401-600 Amp 225.00 Service/Feeder 601 -1000 Amp. 288.00 Service/Feeder over 1000 Amp. 410.00 Branch Circuit WI Service Feeder 5.00 Branch Circuit W10 Service Feeder 74.00 Each Additional Branch Circuit 5.00 Branch Circuits 1-4 86.00 Temp. Service/ Feeder 200 Amp. 102.00 Temp. Service /Feeder 201 -400 Amp. 121.00 Temp. Service /Feeder 401.600 Amp. 164.00 Temp. Service /Feeder 601 -1000 Amp 185.00 Portal to Portal Hourly 96.00 Sign /Outline Lighting 88.00 Signal Circuit/ Limited Energy Multi- Family 64.00 Signal Circuit/ Limited Energy First 1500 of Commercial 96.00 1 Note: $5.00 for each additional 1500 sf Renewable Electrical Energy 510/A System or Less 113.00 Thermostat 56.00 1s6 Note: $5.00 for each additional T-Stat 5- 6 Total Owner as defined by RCW.19.28.261: (1) Owner will occupy the structure for Iwo years after this electrical permit is finalized. (2) Owner is required to hire an electrical contractor if above acid property is for sale, rent or lease. Permit expires after six months of last inspection. After reading the above statement, I hereby certify that I am the owner of the above named property or a licensed electrical contractor. I am making the electrical installation or alteration in compliance with the electrical laws, N.E.C., RCW. Chapter 19.28, WAC. Chapter 296.468, The City of Port Angeles Municipal Code, and Utility Specifications and PAMC 14.05.050 regarding Electrical Permit Applications. Signature of owner, electrical contractor or electrical administrator: cash Check /1/44it&I cab it A/ L6 Dated: s A' 01m1/20I2